HomeMy WebLinkAboutContract 52792-A1 Id AMENDMENT NO. 1 TO AGREEMENT
STANDARD AGREEMENT FOR TECHNICAL SERVICES
1"11c�cs�2ZO Existing Drop-Off Station — Building Addition and Site Modifications:
Brennan
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. 5a'1 9 a-A l
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Basecom, Inc. (Contractor) made and entered into
City Secretary Contract No. (The Contract) which was authorized by the City
Council by M&C C-29078, on the 26th day of March, 2019, for the addition of a new office
building, the repurposed of an existing covered Swap Shop and site improvements; and
WHEREAS, further amendment is necessary to clarify timing of bonding and insurance until
with the Notice to Proceed.
NOW THEREFORE, City and Contractor, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
ADDITIONAL INSURANCE REQUIREMENTS: item shall be added to read as follows:
n. The Contractor shall provide the City of Fort Worth, required bonds and insurance prior
to the Issuance of Notice to Proceed, and prior to starting any work on the site. Notice
to Proceed shall be in writing, in the form of Attachment "A"
2.
ATTACHMENTS: The Notice to Proceed form shall be included as Attachment "A".
3.
All other provisions of this Contract which are not expressly amended herein shall remain in
full force and effect.
OFFICIAL. RECORD
CITY SECRETARY
CFW Standard Agreement for Professional Services AMENDMENT(16Aug2016) FT. WORT° ,tgT*,,f
Basecom Inc.—Brennan DOS—Amendment No.1 JuIv 201
EXECUTED this the 3A41 day of_ Sgkmbtl 2019,
in Fort Worth, Tarrant County, Texas.
Ba om In APPROV D:
,."
1
By: L J By:
Os r Oaxac Kevin Gunn
President Interim Assistant City Manager
F �FORT�
APPRO L RECOMMENDED: C RDED: �®
By. By.
ist'eve ook4Director M ry J. Kayser
y Prope y Management Department Ci y Secretary
�XAS
APPROVED AS TO FORM AND LEGALITY: M&C Not Required
Contract Authorization
By:
�Joh B. Strong
sistant City Att/neyy
CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all performance and reporting requirements.
A, �'� 0,
By: I'C4./
Brian R. Glass, AIA
Architectural Services Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
CFW Standard Agreement for Professional Services AMENDMENT(16Aug2016) Page 2 of 2
Basecom Inc.—Brennan DOS—Amendment No.1 July 2019
FORTWORTH
Attachment"A"
Date:
NOTICE TO PROCEED
Contractor
Address
Phone:(xxx)xxx-xxxx
Project Name:
Gentlemen:
Pursuant to the provisions of City Secretary Contract Number xxxxx this is your authority to proceed on the
referee ton date!Visor to commel ing work,it wOl be nece r you to contact James DicAel,
Constr<ic t `Supermtertdelf who will iaharge of subt jro�ectmak6,arrangetents with him tninspect
pmict construction He;tn ;be contacted at. $17)392-8 72
Sincerely, y
James Diestel
Construction Superintendent
Cc: M/WBE Office
File
PROPERTY MANAGEMENT DEPARTMENT
FACILITIES DIVISION
THE CITY OF FORT WORTH*401 WEST 13'11 STREET*FORT WORTH,TEXAS 76102
(817)392-2586*FAx(817)392-8488
General Conditions of the Contract for Construction Lump Sum Contract Page 27 of 27
CFW PMD—Project Name May 2019