Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 52806
09/20/2019 10:17 AM Developer and Project Information Cover Sheet: Developer Company Name: NTP35,LP Address, State,Zip Code: 2525 Ridgmar Blvd Ste 440,Fort Worth TX,76116 Phone&Email: 814-236-6100,steve(&mckeever.us Authorized Signatory,Title: Steve McKeever,President Project Name and Brief North City Phase 1 Description: Water, Sewer, Paving, Storm Drain, Signals Project Location: SWC of N. Tarrant Pkwy&IH-35W Plat Case Number: FP-19-003 Plat Name: North City Addition Mapsco: 2 CD 2 City Project 102049 CFA Number: CFA190035 City of Fort Worth,Texas Standard Community Facilities Agreement OFF10AL EC O' CFA Official Release Date: 10.07.2015 Page 1 of 10 CITY SECRETARY FT WORTHo ,F , STANDARD COMMUNITY FACILITIE AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 52806 WHEREAS, NTP35, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as North City Phase 1 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate i i i the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA'i• subject to the availability of City funds and approval by the Fort Worth City Council and shall bi- memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the (collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth,as unended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that once the Project has been completed and the City has officially accepted the Improvements City must release the collateral or Developer's financial City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 OFFICIAL RECORD Page 2 of 10 CITY SECRETARY FT. WORTH,TX guarantee. Developer further acknowledges that said acceptance process requires the Developer's contractor(s)to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) x, Sewer(A-1) x,Paving(B) x, Storm Drain(B-1) x, Street Signals (C) x. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 10 City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the City. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the Project or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 10 K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers,agents or employees.Further,Developer will indemnify and hold harmless the City for any losses,damages,costs or expenses suffered by the City or caused as a result of said Developer's or his contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. M. Developer will further require its contractors to fully indemnify, defend and hold harmless the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages-sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design,performance or completion of any work, or on account of any act, intentional or otherwise, neglect or misconduct of said contractors, or their sub-contractors, officers, agents or employees. Further, Developer will require its contractors to fully indemnify, and hold harmless the City for any losses, damages,costs or expenses suffered by the City or caused as a result of said contractor's, or their sub-contractors', officers' agents', or employees', failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 10 by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4%of the-Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the City is not installing the streetlights, inspection fees equal to four percent(4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 1 YEAR i. Developer shall complete the Improvements within one (1) year, provided, however, if construction of the Improvements has started within the one year period,the Developer may request that the CFA be extended for one additional year ("Extension Period"). ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one(1)year from the date of this Agreement(and any Extension Period) the Improvements have not been completed. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 10 construction of same if before the expiration of one (1) year, and any Extension Period, the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction. Q. PROHIBITION ON BOYCOTTING ISRAEL Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this Agreement,Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel, and(2) will not boycott Israel during the term of the Agreement. R. IMMIGRATION AND NATIONALITY ACT Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,DEVELOPER'S EMPLOYEES, SUBCONTRACTORS,AGENTS,OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 10 Cost Summary Sheet Project Name: North City Phase 1 CFA No.: CFA19-0035 City Project Number: 102049 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 453,867.00 2.Sewer Construction $ 300,847.00 Water and Sewer Construction Total $ 754,714.00 B. TPW Construction 1.Street $ 324,711.00 2.Storm Drain $ 13,858.00 3.Street Lights Installed 6y Developer $ - 4. Signals $ 342,500.00 TPW Construction Cost Total $ 681,069.00 Total Construction Cost(excluding the fees): $ 1,435,783� Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 15,094.28 D. Water/Sewer Material Testing Fee(2%) $ 15,094.28 Sub-Total for Water Construction Fees $ 30,188.56 E. TPW Inspection Fee(4%) $ 13,542.76 F. TPW Material Testing(2%) $ 6,771.38 G. Street Light Inspsection Cost $ H. Signals Inspection Cost $ 13,700.00 H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 34,014.14 Total Construction Fees: $ 64,202E70� Choice Financial Guarantee Options,choose one Amount MarX one Bond=100% $ 1,435,783.00 Completion Agreement=100%/Holds Plat $ 1,435,783.00 Cash Escrow Water/Sanitary Sewer-125% $ 943,392,50 Cash Escrow Pavin /Storm Drain=125% $ 851,336.25 Letter of Credit=125%w/2 r expiration period $ 1,794,728.75 x City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 10 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER NTP35, LP a Texas limited partnership Dana 6urehdoff(Sep 18,20& By: NTP Investments LLC Dana Burghdoff a Texas limited liablilty company its sole partner Sterne-McKeeve� Interim Assistant City Manager Steve McKeever(Sep 17,2019) Date: Sep 1$ 2019 Name: Steve McKeever Title: President Recommended by: Date: Sep 17,2019 Evelyn Robe 5(Sep 18,2019) Evelyn Roberts/Jennifer Ezernack Contract Compliance Manager: Project Assistant By signing, I acknowledge that I am the Planning and Development person responsible for the monitoring and Administration of this contract, including ensuring all performance and reporting requirements. Approved as to Form &Legality: Jennifer Ezernack on behalf of(Sep 18,2019) Name: Janie Morales Title : Development Manager Richard A.McCracken(Sep 18,2019) Richard A. McCracken Assistant City Attorney ATTEST: a � u U: M&C No. N/A Date: Mary J. Kayser/Ronald Gonzales (AS Form 1295: N/A City Secretary/Assistant City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement OFFICIAL RECORD CFA Official Release Date: 10.07.2015 Page 9 of 10 CITY SECRETARY FT WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment x Location Map X Exhibit A:Water Improvments X Water Cost Estimate X Exhibit A-1: Sewer Improvements X Sewer Cost Estimate X Exhibit B: Paving Improvements X Paving Cost Estimate X Exhibit B-1: Storm Drain Improvements x Storm Drain Cost Estimate X Exhibit C: Street Signals Improvements X Street Signals Cost Estimate (Remainder of Page Intentionally Left Blar k) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:05.01.2015 Page 10 of 10 00 42 43 DAP-BID PROPOSAL Page I of6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3312.0001 Fire Hydrant Assembly 33 12 40 EA 9 $4 800.00 $43 200.00 2 3312.4114 16"x 12"Tapping Sleeve&Valve 33 12 25 EA 2 $12,000.00 $24,000.00 3 3312.4109 12"x 12"Tapping Sleeve&Valve 33 12 25 EA 5 $8,000.00 $40,000.00 4 3312,4107 12"x 8"Tapping Sleeve&Valve 33 12 25 EA 8 $6,000.00 $48,000.00 5 3312,4106 12"x 6"Tapping Sleeve&Valve 33 12 25 EA 9 $5,500.00 $49,500.00 6 3312.3005 12"Gate Valve 33 12 20 EA 14 $2,400.00 $33,600.00 7 0241.1118 4"-12"Pressure Plug 02 41 14 EA 12 $260.00 $3 120.00 8 3311.0441 12"Water Pipe 33 11 10,33 11 LF 4892 $38.00 $185 896.00 9 3311.0241 8"Water Pipe 3311 10,3311 LF 246 $49.00 $12,054.00 10 3311.0141 6"Water Pipe 3311 10,3311 LF 191 $48.00 19,168.00 11 3305.0109 Trench Safety 33 05 10 LF 5329 $1.00 $5,329.00 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT I:WATER IMPROVEMENTS $453,867.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposat_DAP 00 42 43 DAP-BID PROPOSAL Page 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT 11:SANITARY SEWER IMPROVEMI---NIrS 1 3331.4208 12"Sewer Pipe 33 11 10,33 31 ILF _ 2549 $49.00 $124,901.00 2 3331.4108 6"Sewer Pipe 33 11 10,33 31 LF 335 $59.00 $19,765.00 3 3305.0109 Trench Safety 33 05 10 LF 2884 _ $2.00 $5,768.00 4 3339.1101 5'Manhole 33 39 10,33 39 EA 13 $6,700.00 $87,100.00 5 3339.0001 Epoxy Manhole Liner 33 39 60 _VHF - 193 $275.00 $53,075.00 6 3305.0106 Manhole Adjustment,Major 33 05 14 EA� 1 $2,500.00 $2,500,00 7 3301.0101 Manhole Vacuum Testing 3301 30 EA 1 $370.00 $370.00 8 0241.1118 4"-12"Pressure Plug 0241 14 EA 8 $200.00 $1,600.00 9 3301.0002 Post-CCTV Inspection 3301 31 LF 2884 $2.00 $5,768.00 10 11 12 P14 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 _ 34 35 36 37 38 39 40 41 42 43 44 _ 45 TOTAL UNIT II:SANITARY SEWER PROVEMENTS $300,847.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposd_DAP 00 42 43 DAP-BID PROPOSAL Page 3 of S SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 3341.0205 24"RCP,Class III 3341 10 LF 63 $66.00 $4 158.00 2 3349.5003 20'Curb Inlet 3341 10 EA 1 $9,700.00 $9,700.00 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $13,858.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Vnit of Bid No. Description Section No. Leasure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 3213.0301 4"Cone Sidewalk 32 13 20 SF 10041 $6.00 $60,246.00 2 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 6 $2,600.00 $15,600.00 3 3216.0101 6"Cone Curb and Gutter 32 16 13 LF 1984 $2.00 $3,968.00 4 3213.0103 8"Cone Pvmt 32 13 13 SY 2822 $57.00 $160,854.00 5 3211.0501 6"Lime Treatment 32 11 29 SY 2822 $14.50 $40,919.00 6 10241.1300 Remove Cone Curb&Gutter 0241 15 LF 1843 $7.00 $12,901.00 7 10241.4003 Remove 20'Curb Inlet 0241 14 EA 1 $5,000.00 $5 000.00 8 13292.0400 Seeding,Hydromulch 32 92 13 SY 2910 $1.00 $2 910.00 9 13291.0100 Topsoil 3291 19 CY 485 $15.00 $7,275.00 10 3292.01 Block Sod Placement 32 92 13 _ SY 900 $7.00 $6 300.00 11 3217.0001 4"SLD Pvmt Marking HAS(W) 32 17 23 LF 1104 $1.50 $1,656.00 12 3217.0301 12"SLD Pvmt Marking HAE(W) 32 17 23 LF 710 $6.00 $4,260.00 13 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 211 $8.00 $1,688.00 14 3217.4304 Remove 12"Pvmt Marking 32 17 23 LF 449 $2.00 $898.00 16 3217.4306 Remove 24"Pvmt Marking 32 17 23 LF 118 $2.00 $236.00 _17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 _ 36 37 38 39 40 _ 41 42 43 44 45 TOTAL UNIT IV:PAVING IMPROV MENTS1 $324,711.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Venion September 1,2015 00 42 43-Bid Proposal_DAP 00 42 43 DAP-BID PROPOSAL Page S of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS 1 2605.3127 Furnish/Install Conduit-Schedule 80 PVC 3 26 05 33 LF 115 $25.81 $2,968.32 2 2605.3128 Furnish/Install Conduit-Schedule 80 PVC 3 26 05 33 LF 485 $51.62 $25,037.11 3 3441.1001 3-Sect Signal Head Assmbly 3441 10 EA 15 $1,792.46 $26,886.93 4 3441.1003 5-Sect Signal Head Assmbly 3441 10 EA 3 $2,724.54 $8,173.63 5 3441.1011 Ped Signal Head Assmbly 34 41 10 EA 8 $932.08 $7,456.64 6 3441.1031 Audible Pedestrian Pushbutton Station 34 41 10 EA 8_$1,433.97 $11,471.75 7 3441.1215 Furnish/Install Hybrid Detection System 3441 10 APR 4 $10 324.58 $41,298.32 8 3441.1217 Furnish/Install Hybrid Detection Cable 3441 10 LF 1059 $8.60 $9 111.44 9 3441.1220 Furnish/Install Model711 Preemption Detector 3441 10 EA 4 $1,720.76 $6,883.05 10 3441.1224 Furnish/Install Preemption Cable 3441 10 LF 1042 $7.17 $7,470.98 11 3441.1310 4/C 14 AWG Multi-Conductor Cable 3441 10 LF 80 _$2.51 $200.76 12 3441.1311 5/C 14 AWG Multi-Conductor Cable 3441 10 LF 1026 $3.58 $3,678.13 13 3441.1312 7/C 14 AWG Multi-Conductor Cable 34 41 10 LF 42 $4.30 $180.68 14 3441.1315 20/C 14 AWG Multi-Conductor Cable 3441 10 __LF 820 $9.32 $7,643.06 15 3441.1322 3/C 14 AWG Multi-Conductor Cable 3441 10 LF 1640 $3.58 $5,879.27 16 3441.1409 NO 8 Insulated Elec Condr 3441 10 LF 850 _$2.87 $2,437.75 17 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 690 $2.51 $1,731.52 18 3441.1503 Ground Box Type D,w/Apron 3441 10 EA 2 $1,720.76_$3,441.53 19 3441.1606 Install 10'-14'Ped Pole Assmbly 34 41 10 EA_ 5 $2,867.94 $14,339.69 20 3441.1613 Furnish/Install Type 43 Signal Pole 3441 10 EA 1 $12,188.74 $12,188.74 21 3441.1615 Furnish/Install Type 45 Signal Pole 3441 10 EA 3 $21,509.54 $64,528.62 22 3441.1624 Furnish/Install Mast Arm 40'-48' 3441 10 EA 1 $5 735.88 $5 735.88 23 3441.1625 Furnish/Install Mast Arm 52'-60' 34 41 10 EA 3 $17,207.63 $51,622.90 24 3441.1701 TY 1 Signal Foundation 34 41 10 EA 5 $358.49 $1,792.46 25 3441.1704 TY 4 Signal Foundation 3441 10 EA _ 1 $573.59 $573.59 26 3441.1705 TY 5 Signal Foundation _ 3441 10 mm EA 3 $716.98 $2,150.95 27 3441.2003 Dispose of Pole and Mast Arm Assembly 3441 13 EA 4 $2,150.95 $8,603.82 28 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 3441 30 EA 4 $860.38 $3,441.53 29 3441.4005 Install Alum Sign Mast Arm Mount 3441 30 EA 1 $179.25 $179.25 30 9999.0001 CAT- Ethernet Cable 00 00 00 �LF 210 $8.60 $1 806.80 31 9999.0002 PTZ Camera 00 00 00 EA 1 $3,584.92 $3,584.92 32 33 34 35 36 37 38 39 40 41 _ 42 43 44 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS $342.500.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43-Bid Proposal-DAP 00 42 43 DAP-BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT 1:WATER IMPROVEMENTS $4533,867.00 UNIT 11:SANITARY SEWER IMPROVEMENTS $300,847.00 UNIT III:DRAINAGE IMPROVEMENTS v $13,858.00 UNIT IV:PAVING IMPROVEMENTS $324,711.00 UNIT V:TRAFFIC SIGNAL IMPROVEMENTS $342,500.00 Total Construction Bid $1,435,783.00 This Bid is submitted by the entity named below: Troy L. Jackson BIDDER: BY: Jackson Construction,LTD. 5112 Sun Valley Drive TITLE: IJAGWenr Fort Worth,Texas 76119 DATE: /► Contractor agrees to complete WORK for FINAL ACCEPTANCE within ��_ working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS.DEVELOPER AWARDED PROJECTS Forth Version September 1,2015 00 42 43_Bid Prop cal_DAP �l I' W L3 ED 4 Z Q S 1-- LJ Z F- W 35 �' Q J NORTH TARRAN PKWY �yo ROJECT OCATION 3 77 9 81 287 I LOCATION MAP NOT TO SCALE MAPSCO NO. 13B COUNCIL DISTRICT #2 " Winkelmann VICINITY MAP & Associates, Inc. OWNER/DEVELOPER: NORTH CITY ADDITION CONSULTING CIVIL ENGINEERS Is SURVEYORS I LOTS 1-8. BLOCK 1 6750 HILUCREST PLAZA DRIVE,SURE 215 (972)490-709D STEVE McKEEVER DALlAS.TEXAS 7523D (972)490-7099 FAX NTP35 LP CPN 102049 Texas Engineers Registration 00 89 2525 RIDGMAR BLVD, SUITE 440 FORT WORTH SHEET Texas Engineers Re 10ation N . 1 GI�AS COPYRIGHT o 2019. Winkelmann &Associates, Inc. FORT WORTH, TX 76116 Scale :N.T.S Date : 09-17-19 WILLIAM N SURVEY 1 ABSTRACT N0. 999 of Dwg. File : 77701 CFA EXHIBITS.dwg TARRANT COUNTY, TEXAS 1 Proiect No. : 77701.00 I I LOT 3R2.BLOCK D LOT!t}R/,Wiw D I I THE PRES L,ADdTKw LOT,1RI,BLOCK D 7NE PRESTgO ADdBD/V 1: CO/OZIJ2/0290 TFE aREE79DV0 ADUTIOV Or{D214DMM 0 OP.R.T.GT. CC,per. B2pp OPit T..G T. LOT.W.3-Ry BLOCK D LDS RESMA I �y I OPR.T.GT. TIE PRESUO AWIFIGN Ow D214MIM CW DM4a PA 1GW0' I I. d I O.PRT.GT. EX. 480 WTR. CONNECT TO EX. 16" 16"x16" ANCHOR TEE N TARRANT PKWY UE 6 = ,• �, "" - - _ - - - I i — — - 12"x8" TAPPING LOT 2 111 SLEEVE & VALVE I LOT 3 I I I 8" PLUG I I I I I 12"x12" TAPPING �I I HEj4 SLEEVE & VALVE LOT � � — � — A — — LOT 4 "g��� 12 VALVE & PLUG =_— — — _ ��• NOTE: ALL PROPOSED WATER LINES ARE 12" UNLESS OTHERWISE z 12" " NOTED TAPPING II w I LOT 5 SLEEVE & VALVE I I I II N o aN I I -LOT 6 -- , LOT 7 M� =a 12"x8" TAPPING IIIIL jII II III III,I II QU-)wo SLEEVE & VALVE N ro 8" PLUG of II I� z= SCALE: II II I I i 1"=250' 1 II II LOT 8 I I ++ If LEGEND it PROPOSED \\ I I WATER LINE EXISTING 12"x12" TAPPING ® WATER LINE SLEEVE & ALVE I I III I I PROPOSED FIRE HYDRANT I 12"x6" TAPPING SLEEVE & II VALVE PROPOSED LIVING SPACES WAY „ z GATE VALVE (PUBLIC ACCESS EASEMENT) „ 12" VALVE & PLY;G Winkelmann EXHIBIT A " & Associates, Inc. OWNER/DEVELOPER: WATER NORTH CITY ADDITION CONSULTING CIVIL ENGINEERS Is SURVEYORS LOTS 1—$E BLOCK 1 6750 MILLCREST PLAZA ORWE.SUITE 215 (972)4e0-7000 STEVE McKEEVER DALLAS.TEXAS 73=0 (972)490-7099 FAX NTP35, LP CPN 102049 Texas Eng,neers No.1 0866 N0. 89 2525 RIDGMAR BLVD, SUITE 440 FORT WORTH, TEXAS SHEET Texas EnS. seemyors R. 10ation N0 COPYRIGHT a 2019, VAnkelmann h Assoclates,Inc. FORT WORTH. TX 76116 WI�LLIAM MCCOWEN SURVEY 1 Scale :N.T.S Date : 09-17-19 — ABSTRACT NO. 999 of Dwg. File : 77701 CFA EXHIBITS.dwg TARRANT COUNTY, TEXAS 1 Pro'ect No. : 77701.00 is I l i I I I LOT.]R$LDac D LOT.lt.S-Rl.OCOOf D THE PRESDIo 1421IO JN LOT m OCo(YC D AiE%DX4 Wft8 9MM CO/D21.72f028O 7FE PRE9Ol0 AOYH7KW OLY DY11016/E6 cl QP.R.T.c T. Cqf D2152ldM QPAT.c T. LOT Yti-n LOCK D LDS A I � I I QP.R.T.cT, 71E PM3W AM71ON CC/D21404sim �LtP.2LcL I pLTd I QPJt T.cT. u R CONNECT TO EX. SSMH - - - - - - - - - - - (X-12760 SH.23) - - N TARRANT PKWY 16w 111 INSTALL 6" SERVICE �. LOT 2 — LINE & PLUG LOT 3 -- (LOTS 1-4) I I I LOT 4 LOT I I 111 It NOTE: ALL PROPOSED SANITARY SEWER I INSTALL 6" SERVICE LINES ARE 12" z LOT 5 LINE & PLUG I 11 UNLESS OTHERWISE NOTED (LOTS 5 & 6) I 11 II wV) V) LOT 7 I I I I I I I I I LOT 6 ! I I 111 N II -- -- -- L- �� I11 " V)M U_ I - IIIF illll " z= SCALE: II II11 „ I 1"=250' 1 111 11 \ LOT 8 III I 111 1 Ii LEGEND 1 1 I I PROPOSED SEWER LINE CONST. 4' SEWER I " MANHOLE " _ II EXISTING SEWER LINE " LIVING SPACES WAY I " (PUBLIC ACCESS EASEMENT) Al Winkelmann SAN�SEWER & Associates, Inc. OWNER/DEVELOPER: NORTH CITY ADDITION CONSULTING CIVIL ENGINEERS(972)S URVEYOR eo-7090S STEVE McKEEVER LOTS 1-8. BLOCK 1 ��U HIUCREST PLAZA DRIVE,SURE 213 OALIAS,TOW 7s230 (972)490-7099 FAX NTP35, LP CPN 102049 Texos Engfneen Registmtion No. 89 FORT WORTH. TEXAS Texas Sur-y m No.100866-00 2525 RIDGMAR BLVD, SUITE 440 FORT WORTH, SHEET COPYRIGHT a 2019, Winkelmann h Associates,Inc. FORT WORTH, TX 76116 1 Scale : .T.-S Date : 09-5 7-;g WILLJAM ABSTRACT RACMCCOT N SURVEY Frw : 77701 CFA EXHr81TS.dw N0. 999 of TARRANT COUNTY, TEXAS 1 §� I I I I I t fA7 3Rz eLoa D r,D7.��-R,,sEocrr o I X 7 E FRIES Yo AOd7KW LOT 3Rr,ALOOK D DE PRESM AW71W F 1 9u I CavR.7�cei°0 7M PRESM ADLV7ra4 Oq 02rMIDree I LOT E R EBLOCKSIDIO A ♦- i CC/D2r32re290 OPR T.G7 LOT Yt3-n BLOCK D AE PRE51010 I J I 0.PRT.GT. DE PRESM AaWMW Q °GyOPR71G7 + I o ° 4 DECEL LANE PCCI A I I w- N TARRANT PKWY �E - � _ r LOT 2 LOT 3 I I I I 5' REINF. CONCRETE I I I LOT 4 SIDEWALK LOT 1 1 I 1. 1 I1 1 �h 4" 3,000 PSI. PER I I 1 II I N A ~ ate$ CITY OF FORT WORTH DETAILS 5' REINF. CONCRETE SIDEWALK 4' 3.000 PSI, PER FORT W l LOT 5 WOTMTH DE TAILS� 1 I I N �Q N I LOT 7 I I I I a W I LOT 6 I SCALE: =a I I I 1 1 I I l a I) L— l l I I i 1"=250v V v If-— I 11 I M m -- -- -- -- -- I lI I �r3 a. 1 i� 11 I = LEGEND (` 1 z ® B- PSI. 1\ I I �13 BARS BARS 18' O.C.E.W. \ LOT 8 1 II 1 II s \ \ II � II LOT 141Z SACK AME \ 1 I 5 " OLy PRESM T. 40.7/ E \ I I 11 Q \ 1 II DECEL LANE Q Z II J II U `II Q U\ANG SPACES WAY 1 (PUBLIC ACCES'S EASEMENT) Winkelmann EPAVING & Associates, Inc. OWNER/DEVELOPER: NOR CITY CITY ADDITION CONSULTING CIVIL ENGINEERS Yo-VEYOR 709DS 6750 XI STEVE McKEEVER LO rJ 1-8, BLOCK HI...PIMA DRIVE,SUfrE 715 CALLS,TDCA5 75230 (972)490-7099 FAx NTP35, LP CP�N 1102049 Texas Engineers Registration No. 89 FORT t�Vlt 1 fly TEI�AS Texas Su""are N.100866-00 2525 RIDGMAR BLVD, SUITE 440 SHEET COPYRIGHT n 2019, Wlnkelmann h Associates, Inc. FORT WORTH. TX 76116 Scale :N.T.S Date : 09-17-19 WILLIAM MCCOWEN SURVEY 1 — ABSTRACT NO. 999 OF Dw9. File : 77701 CFA EXHIBITS.dwq TARRANT COUNTY, TEXAS 1 Pro'ect No. : 77701.00 LOT.WZ B.00(D LOT JRJ--RI.BLOC(D iF I I I LOT,M BLOCK D 1NE PROM AMMIN ZS U I GP.R.T.GT. PLO' C D214046IB7 LOT 15R,B.00C A m w� I �1 CC/D21521AM GPR T.C.T. LOT M3-4 BLOC(O 11E FtLE�'O I I GPR.T.GT. AE PRE RM A IKW �ORRT.GT.N I U ' I �RT.GT. N TARRANT PKWY 1— 16w r 11 I 20 CURB INLET I 63 LF 24" RCP 1 LOT 2 I LOT 3 1 I I LOT 4 LOT 1 1 I I I I I ° I I i I nK 11 Z `` LOT 5 I I I I I I a (n LOT 7 aW I i I I I 11 I3 � I LOT s I I I I 11 a N � Q—� � I II � NM :3of I. � I r SCALE: II I I I " Z= 1"=250r 1 \ I II LOT 8 I LEGEND i i II PROPOSED STORM LINE II © PROPOSED �\\ CURB INLET EXISTING ® STORM LINE I II LOT LINE AW 11 BOUNDARY LINE „ LIVING SPACES WAY (PUBLIC ACCESS EASEMENT) FHILLWinkelmann STORM SEWER CREST & Associates, Inc. OWNER/DEVELOPER: NORTH CITY ADDITION CONSULTING CIVIL ENGINEERS(073)S4R0V000S STEVE McKEEVER LOTS 1-8, BLM 1 AZA DRIVE,SUITE 31S7-30 (973)490-7099 FAX NTP35, LP /�CPN 102049 ngineers Registration No. 69 FORT t2VRTf7R �y�5 urveyors No.100666-00 2525 RIDGMAR BLVD, SUITE 440 TM SHEETGHT o 2019, Winkelmann k Associates, Inc. FORT WORTH, TX 76116 , Date : 09=17—I$ WILLIAM MCCOWEN SURVEY: J77CT CFA E}(Ff181T$_ Lw M ABSTRACT N0. 999 of TARRANT COUNTY, TEXAS 1 ore No. 01.00 I rI I I I LOT 3RZ Roar D LOT.,RJ-R,.e.Dor D 1Hr PResdo ADDr7xav Lor art,Rorx D nr PRESiYe A097XW � av R.3zr5290 PE PR'ESM A097XW Ott 0YMOMM I LOT i3R ROOKA �W$u I CCI DZI3P/M aPRT.a T. LOT.W3-RZ ROOKD i)E PRESdO LiPR.T.GT. i)E NEE�VO ADt�7Kw CCI�RT1G358M I � Ctl I I I 0.PR T.C.T. — - -T. - - - - - - - - - - - - - - -�. - --�- --- UE N TARRANT PKM' ----`____-- 1 I I TRAFFIC SIGNAL LOT 2 I LOT 3 TO BE MODIFIED I I 1 I LOT 4 LOT 1 I I I ny pQ�I — v z LOT 5 � I II II I �a w u I LOT 7UJI I as II LOT6 I I I I I 11 I Q13 N �C) NM C �- I� III SCALE: 11 I Z 1"=250' I I I I LOT s I I11 II 11 II LEGEND LOT LINE I " 11 BOUNDARY �I LINE LIVING SPACES WAY I " (PUBLIC ACCESS EASEMENT) Winkelmann EXHIBIT C & Associates, Inc. OWNER/DEVELOPER: TRAFFIC SIGNAL NORTH CITY ADDITION CONSULTING CIVIL ENGINEERS ■ SURVEYORS 6750 HILLCREST PL12A DRIVE,BUTTE 215 (972)490-7090 STEVE McKEEVER LOTS 1-8. BLOCK 1 DALAS.TEXAS 75230 (872)490-7009 FAX NTP35, LP CPN 10L2�049 Texas Engineers Registration No. 89 FORT WORTH, TEXAS Texas Surwy",No.100865-00 2525 RIDGMAR BLVD, SUITE 440 VIA VIA A SHEET COPYRIGHT o 2019.Nlnksimann &Associates, Inc. FORT WORTH, TX 76116 Scale :N.T.S Date : 09-17-19 WILUAM N SURVEY 1 ABSTRACT N0. 999 of Dwg. File : 77701 CFA EXHIBITS.dwg TARRANT COUNTY, TEXAS Pro'ect No. : 77701.00 1