Loading...
HomeMy WebLinkAboutContract 49838-AR1 CITY SECRETARY $ FORT WORTH. City of Fort Worth COI+ITRACTNO. Construction Allowance Request Breakdown Construction CA# u Date 1 7/6/2018 City Sec# 49838 Client Project#(s)l 100742 FAC#(s)l 30106 0200431 5740010100742 002380 Project Name Trail Drive Extension Description Contractorl McClendon Construction Co., Inc. City Inspector Don Watson Funding TPW Water Contract Time Allocation Account Totals CD Original Contract Amount $5,353,620.84 $150,000.00 $5,503,620.84 516 Extras to Date $78,500.00 $78,500.00 Credits to Date Current Contract Amount $5,353,620.84 $228,500.00 $5,582,120.84 516 Amount of Proposed Allocation $44,300.00 $0.00 $44,300.00 Original Allowance Available for Allocation $100,000.00 $100,000.00 Allowance Funds Previously Allocated $0.00 Remaining Funds Available for this Allocation $1001000.00 $100,000.00 JUSTIFICATION SUMMDft , This construction allowance no. 1 includes items that have been submitted and reviewed as necessary for the project by the attached RFI's. A summary of changes and overruns has also been attached.This construction allowance does NOT include items requested by the Bass Foundation to be added to the project. The items requested by the Bass Foundation will be added at a later date by M&C approval for change order to the contract. F OR Mary J. Kayser, City Secratoy FOFFICIAL RECORD CRETARY ORTH,TX It is understood and agreed that the acceptance of this Construction Allowance Request by the con rac or ons i ord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis- ,of the time shown on this Construction Allowance Request by a later Change Order,if necessary. e FORT WORTH. City of Fort Worth Construction Allowance Request Breakdown Construction FOA# 1 Date 7/6/2018 City Sec# 49838 Client Project#(s) 100742 FAC#(s) 30106 0200431 5740010 100742 002380 Project Name Trail Drive Extension Description Contractorl McClendon Construction Co., Inc. City Inspector Don Watson ADDITION-5 ITEM DESCRIPTION DepYFAC Qty Unit UnitCost o a ew F&I ATC Controllera ancas er&University a $3,950.00 New Reinstall existing Controller at Trail&University TPW 1.00 Ea 500.00 New Ground Box Type D with Apron TPW 3.00 Ea T7750.00 New Signal Cabinet Foundation TPW 1.00 Ea $3,350.00 New F&I 352i Controller Cabinet Assembly TPW 1.00 Ea 18,850.00 New 6"Gate Valve TPW 1.00 Ea 1,100.00 New Ground Box Traffic Rated TPW 2.00 Ea 2,600.00 ✓ New Install Electrical Servcie Pedestal TPW 1.00 Ea 5,700.00 / New Additional Tree Removal TPW 1.00 Ea 400.00 New Remove&Replace Curb&Gutter TPW 75.00 LF $40.00 Change Order Additions Page 2 of 8 TPW $44,300.00 Water $0.00 / Sub Total Additions 44,300.00 Change Order Additions Page 3 of 8 FORT WORTH® City of Fort Worth Construction Allowance Request Breakdown Construction FOA# 1 Date 7/6/2018 City Sec# 49838 Client Project#(s) 100742 FAC#(s)l 30106 0200431 5740010100742 002380 Project Name Trail Drive Extension Description Contractorl McClendon Construction Co., Inc. City Inspector Don Watson GONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ITEM DESCRIPTION ep y Unit UnitCost o a Construction Allowance Change Order Deletions Page 4 of 8 TPW $44,300.00 Water $0.00 Sub Total Deletions $44,300.00 Change Order Deletions Page 5 of 8 MWWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Raul E. Lopez Name of Employee Senior Professional Engineer—Project Manager Title ®FFIUAKr RECORD CITY SECRETARY FT. WORTH,TX