Loading...
HomeMy WebLinkAboutContract 52816 r 44 CITY ox'ME-ARY — N ISO. , oE�o�cvvo���t �► C1TY� S Cp fAV INTERLOCAL AGREEMENT BETWEEN THE TRINITY RIVER AUTHORITY OF TEXAS , - AND THE CITY OF FORT WORTH, TEXAS STATE OF TEXAS § COUNTY OF TARRANT § THIS AGREEMENT is by and between the TRINITY RIVER AUTHORITY OF TEXAS, with its principal office at 5300 South Collins Street, Arlington, Tarrant County, Texas 76018, a conservation and reclamation district operating pursuant to special and general law (AUTHORITY), and the CITY OF FORT WORTH, TEXAS, a home-rule municipal corporation, with its principal office at 200 Texas Street, City Hall, Fort Worth, Tarrant County, Texas 76102 (CITY). WITNESSETH: WHEREAS, the Texas Legislature has authorized the execution of Interlocal Cooperation Agreements between and among governmental entities pursuant to the Interlocal Cooperation Act, Chapter 791 of the Texas Government Code, as amended; and WHEREAS, the AUTHORITY owns and operates the Henrietta Creek Interceptor System that transports wastewater from the cities of Fort Worth, Haslet, Northlake, and Roanoke to the Denton Creek Regional Wastewater System (DCRWS) treatment plant in Roanoke; and WHEREAS, the DCRWS Phase II Interceptor Flow Assessment prepared for the AUTHORITY identified that segments of the Henrietta Creek Interceptor System are in need of improvement in order to convey current and future wastewater flows; and WHEREAS, in 2012, the AUTHORITY initiated design efforts to evaluate options for the replacement/rehabilitation of the Henrietta Creek Relief Interceptor, 25HC-1; and WHEREAS, design has identified a preferred pipeline alignment that includes placing a portion of a new pipeline inside the CITY'S street right-of-way; and WHEREAS, the AUTHORITY plans to install a 60-inch pipeline (SEWER LINE) within Litsey Road right-of-way, located within the CITY; and WHEREAS, the AUTHORITY and CITY desire to enter into this AGREEMENT, under which the AUTHORITY will construct or cause construction of that portion of the new SEWER LINE by other than open cut, which requires temporary installation of tunneling shafts within the right-of-way and adjustments to several CITY sewer line connections or laterals; and WHEREAS, the CITY desires that AUTHORITY pay certain fees for construction inspection services for the construction of the SEWER LINE within Litsey Road right-of-way; and OFF11COAL RECOR Ch `RA-CFVV STREET RECONSTRUCTION iLA--25HC-1 Page 1 of 6 FT. WORTH,TX WHEREAS, the AUTHORITY has agreed to pay for inspection and materials testing costs for the reconstruction of Litsey Road right-of-way, if required, after the SEWER LINE is installed, which fees are estimated at $16,200 as shown on Attachment A attached hereto and incorporated herein; and WHEREAS, this AGREEMENT is necessary for the benefit of the public and each party has the legal authority to provide the governmental functions which are the subject of this AGREEMENT; NOW THEREFORE, in consideration of the above recitals, the premises and agreements, covenants and promises herein set forth, it is agreed as follows: Section 1. DEFINITION OF TERMS. Terms and expressions as used in this AGREEMENT, unless the context shows otherwise, shall have the following meanings: A. "CONSTRUCTION" means any one or more of the following: (1) Construction administration, engineering, environmental, geotechnical, architectural, legal, title, surveys, construction schedules, plans, work drawings, specifications, submittals, or other necessary actions, including administrative overhead; (2) Erecting, installing, building, or acquiring the SEWER LINE improvements, other appurtenances, or other affected improvements such as other utilities; and (3) The construction management and inspection or supervision of any items listed above. B. "SEWER LINE" more specifically means the construction of approximately 100 linear feet of 60-Inch gravity sewer pipeline that will be bored under Litsey Road as depicted on Exhibit B; C. "Inspection and Materials Testing Fees" means those certain fees paid to the CITY as per the fee schedule, Attachment A. Section 2. SCOPE. The CITY will, or will cause the inspection and materials testing of the reconstruction of Litsey Road after construction of the SEWER LINE has been completed (if required). Section 3. OBLIGATIONS OF THE AUTHORITY AND CITY A. The AUTHORITY is responsible for the installation of the SEWER LINE; B. The AUTHORITY is responsible for boring under Litsey Road including appropriate boring procedures, backfill materials, filling of annular space and compaction around and above the SEWER LINE as per CITY specifications listed in Attachment B, in order to support the public right-of-way; TRA-CF'NJ STREET RECONSTRUCTION LA—25HC.1 Page 2 of 6 C. The CITY will provide the inspection and materials testing services working in conjunction with the AUTHORITY or its contractor; D. The AUTHORITY shall pay the CITY the amount of$16,200.00 for the inspection and materials testing services in advance of the SEWER LINE's construction; E. The AUTHORITY shall provide to CITY the contractor's proof of insurance prior to construction of the SEWER LINE. CITY shall be provided a copy of the contractor's payment and performance bond naming AUTHORITY as obligee, as well as a two-year maintenance bond for the work associated with the installation of the sewer line under Litsey Road naming the CITY as the obligee; F. The AUTHORITY shall invite the CITY to all pre-construction conferences and construction progress meetings to review construction progress and schedules when needed; G. The AUTHORITY shall inform the CITY of any changes to the construction plans and specifications furnished by the AUTHORITY for the SEWER LINE; H. The CITY shall provide for inspection during final construction of the SEWER LINE to determine whether the base for Litsey Road is undermined during construction of the SEWER LINE. The AUTHORITY may perform its own inspections during construction of the SEWER LINE and provide input to the CITY as necessary. The AUTHORITY shall inform the CITY of the name of the individual responsible for inspection on behalf of the AUTHORITY. Should CITY'S inspection reveal construction not in accordance with approved plans and specifications, as may be amended by addendum or change order, the CITY will immediately notify the AUTHORITY in writing, and the AUTHORITY will take proper action to remedy the discrepancy, all subject to the CITY'S approval, said approval not to be unreasonably withheld. Inspection of the SEWER LINE by the AUTHORITY shall in no way relieve the CITY of its responsibility to inspect Litsey Road. The AUTHORITY shall advise the CITY'S representative identified herein at least 72 hours in advance of AUTHORITY'S intention to commence construction of the SEWER LINE; I. The CITY, the AUTHORITY and the AUTHORITY'S design engineer will conduct a final review of Litsey Road, if reconstructed, for conformance with the design and compliance with the construction contract documents. The CITY'S engineer or inspector will prepare a list of deficiencies to be corrected by the contractor before recommendation of final payment; J. The AUTHORITY shall provide the CITY one set of as-built drawings in full size (22- x 34-inch) drawings and electronic copy, within 30 days of completion of the SEWER LINE; TRA-CF-IJ STREE' RECONSTRUCTION III - 25HC. Page 3 o1 6 K. Upon completion and acceptance of the SEWER LINE by the AUTHORITY, the AUTHORITY shall be responsible for maintenance and operation of the SEWER LINE; L. Upon completion and acceptance of the Boring under Litsey Road, the CITY shall be responsible for operation of Litsey Road and CITY will assume maintenance obligations after the expiration of the Maintenance Bond; and M. Total compensation paid by AUTHORITY to CITY pursuant to this AGREEMENT may not exceed $75,000, absent subsequent approval of the AUTHORITY'S Board of Directors. Section 4. TERM OF AGREEMENT, NOTICES. A. TERM OF AGREEMENT. This AGREEMENT shall be effective upon full execution hereof, as indicated by the dates subscribed by the signatories, and shall continue in force and effect until the Boring under Litsey Road are finally accepted by the CITY; B. NOTICES. All notices or communications provided for herein shall be delivered to AUTHORITY and CITY or, if mailed, shall be sent to AUTHORITY and CITY at their respective addresses. Electronic transmissions are acceptable with confirmation of receipt. For the purposes of notice, the addresses of the parties, until changed by written notice, shall be as follows: AUTHORITY: Trinity River Authority of Texas P.O. Box 240 Arlington, Texas 76004-0240 Attention: Ms. Patricia M. Cleveland Acting Northern Region Manager CITY: City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Attention: Mr. Patrick Buckley, P.E. Senior Professional Engineer, Transportation and Public Works Department Section 5. ASSIGNMENT. Any assignment of rights or delegation of duties under this AGREEMENT is void without the prior written consent of the parties, said approval not to be unreasonably withheld. 1 RA-CF" STREET RECONSTRUCTION LA --25HC-1 Page 4 of 6 Section 6. IMMUNITY. It is expressly understood and agreed that, in the execution of this AGREEMENT, no party waives, nor shall be deemed hereby to waive, any immunity or defense that would otherwise be available to it against claims arising in the exercise of governmental powers and functions. Section 7. SEVERABILITY. If any of the terms, sections, subsections, sentences, clauses, phrases, provisions, covenants or conditions of this AGREEMENT are for any reason held to be invalid, void or unenforceable, the remainder of the terms, sections, subsections, sentences, clauses, phrases, provisions, covenants, or conditions in this AGREEMENT shall remain in full force and effect and shall in no way be affected, impaired or invalidated. Section 8. GOVERNING LAW. The validity of the AGREEMENT and of any of its terms or provisions, as well as the rights and duties hereunder, shall be governed by the laws of the State of Texas. Section 9. PLACE OF PERFORMANCE, VENUE. All amounts due under this AGREEMENT, shall be paid in Tarrant County, Texas, said Tarrant County, Texas, being the place of performance as agreed to by the parties to this AGREEMENT. In the event that any legal proceeding is brought to enforce this AGREEMENT or any provision hereof, the same shall be brought in Tarrant County, Texas. Section 10. ENTIRE AGREEMENT. This AGREEMENT contains all the terms, commitments and covenants of the parties pursuant to this AGREEMENT. Any verbal or written commitment not contained in this AGREEMENT or expressly referred to in this AGREEMENT and incorporated by reference shall have no force or effect. Section 11. CURRENT REVENUES. The parties hereto shall make payments called for hereunder only from current revenues legally available to each party. TRA-CFW STREET RECONSTRUCTION ,_A—25HC-1 Wage 5 of 6 IN WITNESS WHEREOF, the parties acting under authority of their respective governing bodies have caused this AGREEMENT to be duly executed in several counterparts, each of which is deemed to be an original, to be effective as of the last date subscribed by a signatory, below. CITY OF FORT WORTH TRINITY RIVER AUTHORITY OF TEXAS By: By: DANA URGHD F VIN ARD Assistant City pager eneral Manager Date: t h Date: ATTEST: ATTWOWARD c57 By: By: MARY J. E SLO,�apl ������ City Secretary Secretary, B; WA (CITY'S SEAL) ,, (AUTHORITY�.' Qe A. '.� ti • \ d • 0 r • • r 1'� C • - r (� _ • y Zwj ��� ' '' ���i'•tip •f,��'c .: �;,;,� �.:',�;....• eft � ••* Q APPROVED AS TO FORM M&C Date: DOUGLAS W. BLACK , Senior Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT. WORTH IfX TF2A-CFU,r STF2FE F F2ECONSTFtJCTI'JN :LA—2�+NC-? ?age 5 0`6 a Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Wt� uollltt� Name of Employee Title This form is N/A as No City Funds arelassociated with this Contract k;fe4 v/rests Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT WORTH, TX Attachment A CFA No: 20 City Project Number: Date: COMMUNITY FACILITIES AGREEMENT APPLICATION Are you requesting City participation in this project? Specify City Participation amounts: ❑ Yes* ® No Water: $0.00 If yes, by which department(s)? Sewer: $0.00 ❑ TPW ❑ Water Paving: $0.00 ❑ Other: Storm Drain: $0.00 Street Lights: $0.00 *If yes, must provide vendor number: Other: $0.00 Note: A Developer-executed CFA, all fees You may also register online at: and financial guarantee must be received http://fortworthtexas.gov/purchasing/register/ and approved before a request for City participation will be presented to the Fort Worth City Council. Has there been a PDC on this project? (Y/N) If Yes, provide date: Has a facilitator been assigned to this project? (Y/N) If Yes, provide name: PROJECT TYPES — CHECK ALL THAT APPLY: ❑ WATER ❑ PAVING/STREET SIGNS ❑ STREET LIGHTS ® SEWER ❑ STORM DRAIN ❑ SIGNALS I. PROJECT INFORMATION (Provide information for each box) Project Name: Henrietta Creek Relief Interceptor IPRC Project Keith Ghanma (25HC-1) Project Manager: Project Address or North Fort Worth Location: Other plats associated with this CFA: N/A Subdivision Name: N/A Block Number(s): N/A Council District: 7 Lot Number(s): N/A CFA Application Revised 11/27/2017 JLE Page 1 of 5 II. APPLICANT/DEVELOPER INFORMATION Applicant/Developer Legal Name: Trinity River Authority of Texas Developer Type: ❑ Individual ® Entity Contact Name: Kelly Davis Title: Senior Engineer Street Address: 5300 South Collins St. City: Arlington State: TX Zip: 76018 PO Box: P.O. Box 60 City: Arlington State: TX Zip: 76004 Phone Number: 817-493-5100 E-mail: davisk@trinityra.org III. SIGNATORY INFORMATION (Person who sill sign the contracts) Applicant/Developer Legal Name: Trinity River Authority of Texas *Must match signatory documents Developer Type: ❑ Individual ® Entity Contact Name: Title: Street Address: 5300 South Collins St. City: Arlington State: TX Zip: 76018 PO Box: P.O. Box 60 City: Arlington State: TX Zip: 76004 Phone Number: 817-493-5100 E-mail: IV. AGENT/CONSULTANT INFORMATION Contact Name: Ben Stephens Title: Senior Project Manager Street Address: 12225 Greenville Ave., City: Dallas State: TX Zip: 75243 Suite 200 PO Box: City: State: Zip: Phone Number: 972-761-1631 E-mail: bttephens@halff.com Agent/Consultant: Consultant: Halff Associates, Inc. CFA Application Revised 11/27/2017 JLE Page 2 of 5 V. PROJECT EXHIBITS (Exhibits must be no bigger than 8 %11 x 11" and must clearly define all proposed construction) General — Required for all proiects: N Vicinity Map ❑ Signature Authority Documentation ❑ One (1) Bid Proposal for each Infrastructure N One (1) Exhibit for each infrastructure Select infrastructure pieces: N A—Water N B — Paving ❑ C —Street Lights N Al —Sewer N 131 —Storm Drain ❑ C1 —Street Name Signs ❑ C2—Traffic Signals VI. COST ESTIMATES: Estimated Project Cost(double-click spreadsheet for entry of Construction Cost in grey fields and automatic calculations of the inspection and material testing fees) $ 1,750.00 Administrative Fee (NON-REFUNDABLE) Construction Water Construction Item Inspection Fee Material Testing Fee Total Cost (Cost x 2%) Fee (Cost x 2%) $ - A-Water $ - $ - $ - $ 210,000.00 Al-Sewer $ 4,200.00 $ 4,200.00 $ 8,400.00 $ 210,000.00 WATER TOTALS $ 4,200.00 $ 4,200.00 $ 8,400.00 Construction TPW Construction Item Inspection Fee Material Testing Fee Total Cost (Cost x 4%) Fee (Cost x 2%) $ 110,000.00 B-Paving/Street Signs $ 4,400.00 $ 2,200.00 $ 6,600.00 $ 20,000.00 131-Storm Drain $ 800.00 $ 400.00 $ 1,200.00 $ - C-Street Lights $ - N/A $ - $ - C1-Traffic Signals $ - N/A $ - $ 130,000.00 TPW TOTALS $ 5,200.00 $ 2,600.00 $ 7,800.00 $ 340,000.00 PROJECT TOTALS $ 9,400.00 $ 6,800.00 $ 16,200.00 CFA Application Revised 11/27/2017 JLE Page 3 of 5 CFA Application Revised 11/27/2017 JLE Page 4 of 5 VII. FINANCIAL GUARANTEE INFORMATION (Select One) ❑ Cash Escrow—Acceptable formats include Business Check or Cashier's Check 1 @ 125% of total Water Construction Costs (Water and Sewer) 1 @ 125% of total TPW Construction Costs (Paving, Storm Drain, Street Lights, Signs and Traffic Signals) Vendor Number: NOTE: You must provide vendor number. Feel free to register online at: http://fortworthtexas.gov/purchasing/register/. ❑ Escrow Pledge Agreement—Acceptable formats include Business Check or Cashier's Check 4 originals @ 125% of total project costs: Water, Sewer, Paving, Storm Drain, Street Lights, Signs and Traffic Signals ❑ Development Bond 1 original @ 100% of total project costs: Water, Sewer, Paving, Storm Drain, Street Lights, Signs and Traffic Signals Provide payment receipt or confirmation that bond premium has been paid for a minimum of 2 years. ❑ Letter of Credit— Must have minimum 2-year expiration term Must be payable by fax or issued by a bank within the DFW region. 1 @ 125% of total project costs: Water, Sewer, Paving, Storm Drain, Street Lights, Signs and Traffic Signals ❑ Completion Agreement— Plat(s) held until project completion and can only be used for on-site improvements 4 originals @ 100% of total project costs: Water, Sewer, Paving, Storm Drain, Street Lights, Signs and Traffic Signals ® Statement of Appropriated Funding — FOR GOVERNMENTAL ENTITY CFAs ONLY Governmental entity to provide Board/'Council/Commission resolution or other action authorizing funding for the project 1 @ 100% of total project costs: Water, Sewer, Paving, Storm Drain, Street Lights, Signs and Traffic Signals CFA Application Revised 11/27/2017 JLE Page 5 of 5 VII. FEE PAYMENTS: The non-refundable Administrative Fee of$1750.00 shall be paid at the time of application. Material Testing and Inspection Fees must be paid before the CFA will be executed by the City. Please include the City Project Number and fee type (administrative, inspection, testing, or cash escrow) in the check's memo line. Preliminary Use of Material Testing and Inspection Fees: Upon payment of the material testing and inspection fees, receipt of an executed CFA by the City and submittal of the distribution package to the City, the City may use these fees for any project-related costs, which may include charges by City contractors related to scheduling or attending pre- construction meetings. If this project is formally withdrawn, the City will retain an amount equal to any actual or outstanding costs incurred through the date of project withdrawal; the remaining material testing and inspection fees will be refunded to the Developer. IX. DEVELOPER CONSENT TO PRELIMINARY USE OF FEES 1, <Name>, an authorized signatory of the Developer Entity, hereby make application for a CFA for the above-referenced and titled project pursuant to the information contained in this application and specifically acknowledge the Preliminary Use of Fees statement in Section VII above. Developer: Trinity River Authority of Texas City of Fort Worth <Name> Jesus J. Chapa <Title> Assistant City Manager Date Date CFA Application Revised 11/27/2017 KE Page 6 of 5 FORT WORTH,") NEW CFA PROCESS: (Effective 07/17/2017) 1. Completed CFA application and submittal documents are provided to the CFA office and payment(s) are made of the administration, material testing and inspection fees. 2. CFA Application is routed by CFA Office to City Manager's Office for review and approval. 3. CFA Exhibit(s) and Bid Proposal(s) are uploaded to Buzzsaw by applicant and received, reviewed and approved by Project Manager. 4. Notification is sent to CFA Staff once final exhibit(s) and bid proposal(s) are uploaded into project folder via Buzzsaw. 5. Confirmation of bid proposal(s) will be sent to applicant from the CFA office. If there is a balance due, this will be collected prior to agreement draft. 6. CFA office routes a-CFA Agreement for approval and/or signatures as follows: a. Consultant approval b. Signatory as signer c. CFA office as signer d. CFA office manager as signer e. Legal as signer f. City Manager Office as signer g. City Secretary as signer 7. CFA office executes agreement once returned electronically from officials listed above 8. IPRC is notified of execution. Please be advised that plats will be held for Completion Agreement guarantees. 9. Letter of Acceptance/Green Sheet—upon final inspection, materials testing and inspection fee amounts will be reconciled using the actual construction cost(contract cost plus change orders). Should the fee amounts increase, the additional monies must be received prior to the issuance of the City's Letter of Acceptance. 10. Submittal of final lien waiver attesting that they have been paid in full by the developer and releasing the developer and City for all future claims. Refunds — are issued to the entity paying the fees; to receive a refund or reimbursement requires registering as a Vendor. Instructions for registering can be found at: http://fortworthtexas.gov/purchasing/register/. 11. Financial Guarantee— is released upon receipt of any fees due, contractor's lien release and signed final pay sheets from the City's construction office. CFA Office releases hold on plat(s). Questions? Contact us! Evelyn Roberts Jennifer Ezernack 817-392-2025 817-392-2737 http://fortworthtexas.gov/planninganddevelopment/cfa/ INTERLOCAL AGREEMENT BETWEEN THE TRINITY RIVER AUTHORITY OF TEXAS AND THE CITY OF FORT WORTH, TEXAS ATTACHMENT B LIST OF APPLICABLE SECTIONS FROM THE CITY OF FORT WORTH CONSTRUCTION SPECIFICATION DOCUMENTS Section Title 0241 14 Utility Removal Abandonment 03 30 00 Cast in Place Concrete 3301 30 Sewer and Manhole Testing 3301 31 Closed Circuit Television (CCTV) Inspection 33 03 10 Bypass Pumping of Existing Sewer Systems 33 04 50 Cleaning of Sewer Mains 33 05 10 Utility Trench Excavation, Embedment and Backfill 33 05 13 Frame Cover and Grade Rings — Cast Iron 33 05 26 Utility Markers — Locators 3331 15 HDPE Pipe for Sanitary Sewer 3331 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 3331 22 Sanitary Sewer Slip Lining 33 39 30 Fiberglass Manholes