Project Namel Bridge Re�at Five Locations 2019-1 City Sec# r 51832
clientPro*#04 101576
Cont.dorl Gibson 3 Associates,Inc. PM Traiqul Islam Inspeclorr Christopher ed
Change Order Submittal# L.� Date 8/9/2019
Dept. TPW Totals Contract Time
CD
Original Contract Amount $469,315.00 $469.315.00 150
Extras to Date
Credits to Dale
Pending Change Orders(m M&C Prods)
Contract Cost to Date $469,315.00 $469,315.00 150
Amount of Proposed Change Order $0.00 65
Revised Contract Amount $469,315.00 $469,315.00 215
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(d necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $586,643.75
S Q
This change order is to remove rock riprap work at LTJG Barnett Rd bridge from the contract and add handrail paint work of E.Northside Rd bridge over Trinity River instead
per M&C C-19-0056.This change order is also to add 249.33 SF of overhead structure repair at S.University Or bridge with no addlional cost to contract.To complete this
addtional work 65 calendar days are requested to add to this contract
6-lqoo I Assoca.Iw By: Alan C. r-�
Company (Please Print)
I I Z I Q I i iwri A-b 06►-& Signature:
4��n;�d-
Aftin
�d �r_�_s,. TX 751110 Title: 11,:rd"t
(Please
Date: 01/201toi9
RECEIVED
SEP 2 3 2019
eny OE FORT WORTH —
cR`tsECRE'ARY EOFFICIALRECORDETARYTH, TX
FORT WORTH® City of Fort Worth
Change Order Request Breakdown
ProjectNamel Bridge Rehabilitation at Five Locations(2019-1) City Sec# 1 51832
Client Project#(s)1 101676
Contractorl Gibson&Assoaates,Inc. PM I Traiqul Islam Inspectorl Christopher Bell
Change Order Submittal# 0 Date 819/2019
Dept. TPW Contract Time
Totals CD
Original Contract Amount $469,315.00 $469,315.00 150
Extras to Date
Credits to Date
Pending Change Orders(n M&C Process)
Contract Cost to Date $469,315.00 $469,315.00 150
Amount of Proposed Change Order $0.00 65
Revised Contract Amount $469,315.00 $469,315.00 215
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+255/6) $586,643,7571
This change order is to remove rock riprap work at LTJG Barnett Rd bridge from the contract and add handrail paint work of E.Northside Rd bridge over Trinity River instead
per M&C G19-0056.This change order is also to add 249.33 SF of overhead structure repair at S.University Dr bridge with no addtional cost to contract.To complete this
addtonal work 65 calendar days are requested to add to this contract.
Ic
City of Fort Worth
Change Order Additions
Project Name Bridge Rehabilitation at Five Locations(2019-1) City Sec# 51832
Client Project# 101676
Contractor Gibson&Associates,Inc. PMJ Traiqul Islam Inspector Christopher Bell
Change Order Submittal# 0 Date 8/9/2019
ADDITIONS
ty Unit U nit Cost Total
Northside Or bridge
& ---�225.06
TPW $161,100.00
u ota diticis $161,100.Oj
Change Order Additions Page 2 of 4
FOR-r.,.rWW�ORIH City of Fort Worth
Change Order Deletions
Project Name Bridge Rehabilitation at Five Locations(2019-1) City Sec# 61632
Client Project# 101676
Contractor Gibson&Associates,Inc. PMJ Traiqul Islam Inspector Ch stopher Bell
Change 0rderSubmittal# Date 892019
DELETIONS
Unit Unit Cost I ota
TPW $161,100.00
�iuo I otal uelebons 4� 1 ,100.00
Change Order Deletions Page 3 of 4
MISBE Breakdown for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
9/18/2019 BIM 360 Document Management
B IUTODESIC BIM 360 fortworthgm,101676-Bridge Rehab 3019-1- A TI
Document Management POLDERS REVIEWS TRANSMITTALS ISSUES
RevievrS ) Review detail
CLOSED #7 Change order Approval workflow
Export Report This MYMVI IS CLONW.
Menton Description Version Markup Cnmmems Approval status Action upon complat PROGRESS
Change OrderLpdf -- V1 0 No comments Yet Approved Copied to❑Project ^
Irdtlafer Initial Review
it Change Order Breakdown CO1CPN101676.ai_ -- V] 0 Noc ..M yeL Approved Copied to G l Pro'j." TI Tariqul Islam Aug 28,9:32AM
«rtquLLslam®fOrtwortAlesasgOv>
M6C COLpdf •- VI 0 No comments yet. i Approved Copied to^.]Project
Submitted t0 ReAmear 1
Map COLpdf — V] 0 NO wunments yet- ,,. Approved Copied to rJ Project
Revlewar1 Irdbal Review1 n
3P 3affmy Perrigo Aug 30,837 AM
<Ner,ey.pemgo®fOrtwortntesasgav>
Submitted to Revlewer2
Revlevar2 Inttlal Review2 n
SC steVe makes Aug 30,850 AM
<stephen20ake@fortworthtlAas.gov.
< Submitted to Revle ver 3
OGpr
<1 O���ja Rerlawer3 lmttal Rmlew3 n
.,��: 1 <<•<a��y rl,< DR Douglas Black Aug 30,1P2 AM
<!•<� <dcug.bMdr®fortoorthtexasgov>
U; Submitted to Approver
1 approved.
A}}���vji���/ bye Approver nnai Review n
• DB Dam Burghdoff Sep 13,5:06 PM
`i « ••• <dana.burghdof 9fortworthtdos.gw>
J. K r i Secretary * � •"v`- Reviewended
'Y
Review[lased
https://doce.b360.autDdesk.00m/projects/ee0c80f5-7f9d-432d-987e-e34549fd8f6a/reviews/a70al652-24d1-4725•ald5•be34cBaefa90 1/1
M&C:
1295: ao I9-sa44&3
1
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Tariqul Islam
Graduate Engineer
Title
This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
M&C Review Page 1 of 1
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FoR�rH
DATE: 8/20/2019 REFERENCE **M&C 19- LOG NAME: 20BRIDGE REHABILITATION
NO.: 0056 2019-1 CHANGE ORDER 1
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 51832 with
Gibson &Associates, Inc., to Remove LTJG Barnett Road Bridge and to Add East
Northside Drive Bridge at No Additional Contract Cost(COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 1 to City Secretary
Contract No.451832 with Gibson &Associates, Inc.,to remove LTJG Barnett Road bridge and to add
East Northside Drive bridge at no increase in contract cost.
DISCUSSION:
On January 15, 2019, Mayor and Council Communication (M&C C-28986) awarded City Secretary
Contract No.451832 in the amount of$469,315.00 to Gibson &Associates, Inc.,for Bridge
Rehabilitation 2019-1 at five locations. (City Project No. 101676)
The original contract has rock riprap work at LTGJ Burnett Road bridge over West Fork Trinity River.
Due to specific requirement on type of riverbank erosion control by Tarrant Regional Water District
(TRWD)rock riprap work at this location was not allowed.As such, staff has proposed to remove this
bridge from the contract and add East Northside Drive bridge over West Fork Trinity River
instead. Change Order No. 1 will remove LTGJ Burnett Road bridge from the contract and add East
Northside Drive bridge with no additional contract cost. This Change Order does not require an
increase in the contract amount.The project is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendation, funds are
available as appropriated in the current capital budget of the General Capital Projects Fund. Prior to
an expenditure being incurred, the participating department has the responsibility to validate the
availability of funds.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
Submitted for City Manager's Office by: Dana Burghdoff(8018)
Originatinq Department Head: Steve Cooke (5134)
Additional Information Contact: Jeffery Perrigo(8117)
ATTACHMENTS
Map C01.pdf