HomeMy WebLinkAboutIR 9212 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 9212
To the Mayor and Members of the City Council March 23' 2010
Page 1 of 3
, SUBJECT: STORM WATER MANAGEMENT PROGRAM UPDATE
rilys
This Informal Report is to update the City Council on the status of the City's Storm Water
Management Program {SWMP} in response to Staff Action Tracking item 561.
* .Revenue
Projected revenue for FY 10 is $25.7 million. Staff will conduct a series of meetings with the
SWMP Citizen's Advisory Committee beginning in March 2010 to gain community input on the
SWMP and its resource needs for FY 11.
Capital Program
The SWMP completed its 2"d revenue bond sale in November '09. The $45 million acquired
through this sale will be used to fund the 2010 and 2011 capital program. The below table
provides data on SWMP capital projects for FY 08 — FY 11.
FY 08 FY 09 FY 10 FY 11
Design $2M (15 projects) $3.1 M {24 $3M (10 projects) $4.6M (15
ro'ects projects)
Construction $9M (10 projects) $5.1M {10 $12.8M (18 $18.4 (15
ro'ects projects) ro"ects
Right-of-way $1.6 M
acquisition $2M $1 M $1.2M
Attached to this IR are a list of projects by Council District (attachment 1) and a map showing the
locations of all capital projects from 2008 —2011 (attachment 2).
Large capital proiects
One of the biggest challenges facing the SWMP is the identification of feasible solutions for
some of the larger flooding problems with which we're faced. The primary examples of
these are the problems in the Central Arlington Heights and Forest Para ern communities.
We've completed extensive studies in both areas and evaluated multiple alternatives for
l addressing the flooding. The estimated cost of each of the alternatives is cost prohibitive
$30 million to $60 million). We've engaged an independent drainage engineering urban
planning consultant to work with us to develop a strategic, best practices type of approach
to these issues. This process will involve heavy community interaction as we seek to hone
in on an affordable phased approach to mitigating the flood risk in these areas. This effort, i I
p r--- ect d to completer in "ail 201
I ISSUED 13Y THE Cl MANAGER T� I
R T
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 9212
To the Mayor and Members of the City Council March 23, 2010
M' Page 2 of 3
n
SUBJECT: STORM WATER MANAGEMENT PROGRAM UPDATE
xara
* .Planning
We plan to spend $5 million on drainage studies in both FY 10 and 11 to evaluate the factors
resulting in the most critical flooding problems throughout the City. These studies are the
necessary first step toward identifying, designing, and constructing solutions to drainage problems.
Attached are a list of the FY 10 and FY 11 studies (attachment 3) and maps showing the locations
of completed, current, and upcoming studies (attachments 4 and 5).
G/S Mapping
We recently started phase II of a 4 year, $10 million initiative to locate, evaluate, and map
the majority of the City's storm water system. This data is critical to effectively and
efficiently evaluate and develop solutions to flooding problems.
NF r * Field Operations
This part of the SWMP continues to be very visible and productive with small maintenance and
repair projects ongoing continuously throughout the City. More and more of this type of work has
been outsourced including: channel mowing, inlet installation, heavy channel maintenance and
restoration, and cave-in repairs. As a result of the increased use of private service providers, 2
levels of supervision and 12 positions were eliminated from the SWMP's Field Operations section
in 2010 (all 12 positions were vacant due to the recent hiring freezes).
* Nigh Water Warning System
This fall we will begin installing high water warning systems at 33 new sites. This expansion is
being partially funded (53%) through a $792,000 Federal Department of Transportation grant. This l
i includes two attachments which show existing high water warning system locations (attachment l
5) and the locations of the 38 new warning systems (attachment 71.
I
In conjunction with this effort we are also working to develop a stream gauge network that
eventually can function as a flood warning system, allowing us to predict during the course of a
rain event, roads that will overtop so we can take actions in advance to better protect the public at
those sites. l
E
iS Y T � �iTY A O T T� T AS l
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 9212
To the Mayor and Members of the City Council March 23, 2010
0 1,
Al Page 3 of 3
SUBJECT: STORM WATER MANAGEMENT PROGRAM UPDATE
FEMA floodplain map updates
We continue to work with Fort Worth property owners who have been required by their mortgage
companies to get flood insurance pursuant to the recent changes in the FEMA floodplain maps. In
some cases, the changes in the floodplain maps show properties that were always at risk of
flooding but were not shown to be in the floodplain on the old maps. However in other cases, there
are errors on the new maps that incorrectly show properties in the floodplain when they should be
out. When a property appears to be legitimately at risk of flooding, we work with the owner to
prepare the proper forms, and provide them with the best information we have to help them obtain
the best possible flood insurance premium from their insurance company. When we find that the
floodplain map is in error, we document the error and provide as much information to the citizen as
we can so that they can address the situation with their mortgage company while we send the error
report to FEMA. Although it can take several months to resolve, mortgage companies typically will
refund any flood insurance premiums that were paid as a result of an error in a new floodplain
map.
Work Order and Asset Management System (WOAMS)
By the end of April 2010 we expect to award a consultant agreement for a needs assessment of
the SWMP for a work order/asset management system. The effectiveness and efficiency of every
aspect of the SWMP will be significantly enhanced by the acquisition and use of a system that will
capture, compile, and report on critical data on our storm water system. Under this agreement the
needs of the SWMP will be assessed in view of the larger context (i.e. based on an understanding
of existing WOAMS and related needs in other City of Fort Worth Departments). This will ensure
that the recommendations for acquisition of a system for the SWMP will based on an
understanding of compatibility issues in the greater City organization. Actual acquisition of a
WOAMS will be a subsequent step requiring City Council approval.
Please contact Greg Simmons at 817.392,7862 with any questions about this report,
A. Fisseler, P.E.
City Manager
1 ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
Storm Water Capital Projects FY 2008 - FY 2009
mow._
Project Name Type Work CCD 2008 2009
F Misc. Culvert Improvements Construction 1 $ 305,938
E: Misc, Structural Improvements Construction 1 $ 259,844
D. Misc, Channel Improvements Construction 1 $ 84,660
Misc Capital Projects(Evergreen) Construction 1 $ 1,000,000
HWWS Construction 1 $ 350,000
Citywide seepage projects Construction 1 $ 111,000
Contract A: Misc. Drainage Extensions Desi n 1 $ 251,056
Contract B: Misc. Drainage Improvements Design 1 $ 241,901
Citywide seepage projects Design 1 $ 18,520
Lebow Channel Improvements 30% Design 2 $ 599,650
Terminal-been storm drain extension Design 2 $ 219,900
Loving Channel Improvements Design 2 $ 45,250
Lower Lebow Bridge Improvements(NE 28th) ROW ROW 2 $ 1,572,175
Lebow Channel ROW(everything else) ROW 1 2 $ 351,130
Robin-Denver Storm Drain Reconstruction Construction 1 2 1 $ 1,314,734
NE 27th, Decatur, Hardy and Selene-NH Streets Construction 2 $ 498,700
2400 Meacham Boulevard drainage improvements Design 2 $ 170,020
Lebow Channel ROW ROW 2 $ 1.025.000
Briarhaven-Fieldcrest Drainage Improvements Construction 3 1 $ 1,963,720
Merida/Kerm it-Bonn ie/Sarita/ Waverly Park drainage improvi Design 3 $ 87,066
Bellaire Park Court Storm Drain Improvements Design 3 $ 49,922
Westcreek-Kellis Park Drainage Improvements Design 3 $ 37,300
Lost Creek Drainage Improvements Phase 2 Design 3 $ 7,000
Briarhaven-Fieldcrest Drainage Improvements ROW ROW 3 $ 299,216
Westcreek Drive-NH Streets Construction 1 3 $ 510,782
Lost Creek Drainage Improvements Phase 2 Construction 1 3 $ 311,230
Briarhaven-Fieldcrest Drainage Improvements Construction 3 1 $ 195,000
Ruidosa-Bandera storm drain improvements(2010) Design 3 $ 129,724
Summercrest Court drainage Improvements Design 3 $ 113,805
Ruby Place Channel Improvements Design 3 $ 67,550
Arundel Storm Drain Improvements Design 3 $ 60,824
Ed ehill Road Storm Drain Extension(6452 Waverly Design 3 $ 34.771
Charron Court Storm Drain Extension Design 3 $ 30,038
Westlake Drive drainage improvements Design 3 $ 24,945
Spindletree-NH Streets Construction 4 $ 287,963
Fossil Drive Drainage Improvements Desi n Desi n 4 $ 202,207
8100 Trinity Blvd. culvert improvements(Walker Branch) Desi n 4 $ 75,965
Carten Outfall Erosion Protection Design 4 $ 73,495
,Longstraw Channel Improvements Desi n 4 $ 35,480
Harper(Fain; Fairview, Karnes, Primrose)-NH Streets Construction 4 $ 361,524,
1 Randol Mill Road Culvert Improvements Design 4 i 165,573
r edar c s� = ,aes on Design 4
d11 t r i n r Ue - -41651
"�
s:on �v
1461
esgn 5 _
..._,2 .
" is Des!
$
TF�c l,ai 2 xeser I e K`1 d,ajE+�msr s i�r€E a°a x'e-e Ir r inr3plt p r ar=v,Ter d serri 7 e?;r ..._.__�.,._ .... -
_ .
p ovements Construction 8 $ 49 96
is Construction ; 7 117,746.
rts Design _7522
#
sa ent Des--n
aw ... _mow � �s 4-40 1
w,
Storm Water Capital Projects FY 2008 - FY 2009
Project Name Type Work CCD 2008 2009
East Rosedale SC-2 Culvert Improvements Construction 8 $ 2,660,756
Mornin side Neighborhood Drainage Improvements Construction 8 $ 1,169,948
East Harvey Ave. Storm Drain Reconstruction Design 8 $ 197,077
Harvey Street Park Storm Drain Rehabilitation Design 8 1 $ 24,670
East Rosedale SC-2 Culvert Improvements-ROW ROW 8 $ 116,000
Morningside Neighborhood Drainage Improvements ROW 8 $ 32,550
Linda Lane storm drain improvements Design 8 $ 63,565
Upper Sierra Vista detention improvements Design 8 $ 13,020
Southland Terrace Drainage Improvements Construction 9 $ 1,773,770
Kellis-May Drainage Improvements Construction 9 $ 349,748
Butler-McClure culvert improvements Design 9 $ 235,583
Forest Park-Parkview Storm Drain Rehabilitation Design 9 $ 634.007
East Downtown Storm Drain Structural Rehabilitation Design 9 $ 287,746
West Downtown Storm Drain Structural Rehabilitation Design 9 $ 241.287
Total Costs by Year incl project management and administration costs)l $15.3 million $11.0 million
fta ,..;.._n, .
o n Storm Water Project Plan FY 2010 • FY 2011
Project Name Type Work CCD 2010 Planned Cost 2011 Planned Cost
Contract B: Misc, Drainage Improvements Construction 1 $ 1„140,000
Misc Capital Projects(Evergreen) Construction 1 $ 500.000
Contract B: Misc. Drainage Improvements ROW ROW 1 $ 50,000
Contract A:Misc. Drainage Extensions Construction 1 $ 2,200,000
Misc Capital Projects(Evergreen) Construction 1 $ 500,000
New Projects(Anticipate 13 new projects) Design 1 $ 1,000,000
Terminal-Deen storm drain extension Construction 2 $ 3,200,000
Lincoln Ave Construction 2 $ 2,500,000
Refugio Construction 2 $ 280,000
Parsons Lane Construction 2 1 $ 110,000
Kearney Construction 2 $ 30,000
Mercado Channel Improvements Design 2 $ 250,000
Meacham Airport Detention Pond Design 2 $ 174,000
Upper Lebow Detention Improvements Design 2 $ 120.000
Lincoln Ave Design 2 $ 80,335
Tony's Creek detention pond rehabilitation Design 2 $ 45,000
Kearney Design 2 $ 22,765
Refugio Design 2 $ 21,729
Parsons Lane Design 2 $ 7,000
Lebow Channel ROW(everything else) ROW 2 $ 750,000
Lebow Channel ROW(FEMA grant) ROW 2 $ 330,000
Dry Branch Creek Phase 2 Detention Improvements ROW ROW 2 $ 150,000
Dry Branch Creek Phase 2 Detention Improvements ROW ROW 2 $ 800,000
Loving Channel Improvements ROW ROW 2
r $ 50,000
Ruidosa-Bandera storm drain improvements Construction 3 $ 850,000
Summercrest Court drainage Improvements Construction 3 $ 640,000
Charron Court Storm Drain Extension Construction 3 $ 120,000
Westlake Drive drainage improvements Design 3 $ 100,000
Ed ehill Road Storm Drain Extension(6452 Waverly)ROW ROW 3 $ 50,000
Westcreek-Kellis Park Drainage Improvements Construction 3 $ 1,500,000
Arundel Storm Drain Improvements ROW ROW 3 $ 280,000
Eastern Hills Drainage Improvements Phase 1 Design 4 1 $ 360,000
Cedar Breaks storm drain extension Design 4 1 $ 100.000
Oakwood Trail Storm Drain Extension Design 4 $ 50,000
Fossil Drive Drainage Improvements Construction 4 $ 1.500,000
Kings Oak Addition Drainage Improvements(NLT 2010) Construction 4 $ 1,000,000
Eastern Hills Drainage Improvements Phase 1 Construction 4 $ 800,000
Oakwood Trail Storm Drain Extension Construction 4 $ 450,000
Far East Fort Worth Drainage Improvements Construction 5 $ 710.000
Wilbar er-Hu hes storm drain extension Construction 5 $ 250,000
rr�Burhiif Channel?snprov�r°�ets �}esi n $ 18th>000 , s
7 '.B i at3s € 1 ,dt a t t r rr
00.00 ?
r t rt( ru t(@r to € € -19 05 10 ,0
I rco S neat stcrm drain irnproaemets Desir $ 121.823
(t ochvrso Curt drains e improver er is Desi n 7 $ 100,000
s. ,,.
Storm Water Project Plan FY 2010 - FY 2011
34rf:
Project Name Type Work CCD 2010 Planned Cost 2011 Planned Cost
Quail Run drainage improvements Construction 7 $ 255,000
Central Arlington Heights Drainage Improvements Phase 1 Design 7 $ 1,600,000
East Como Channel Improvements ROW ROW 7 $ 140,000
Harvey Street Park Storm Drain Rehabilitation Construction 8 $ 1,000:000
Linda Lane storm drain improvements Construction 8 $ 620,000
Oakridge Terrace Drainage Improvements Construction 8 $ 350,000
East Harvey Ave.Storm Drain Reconstruction Construction 8 $ 270,000
Mornin side Neighborhood Drainage Improvements Construction 8 $ 173,254
Upper Sierra Vista detention improvements Design 8 $ 210,000
Glen Garden West Drainage Improvements Design 8 $ 190,444
Rolling Hills Addition Drainage Improvements Design 8 1 $ 155,888
Provine Street Drainage Improvements Design 8 $ 99,770
East Harvey Ave,/Burchill Storm Drain Reconstruction ROW ROW 8 $ 18,400
Oakridge Terrace Drainage Improvements ROW ROW 8 $ 8,440
Upper Sierra Vista detention improvements Construction 8 $ 1,000,000
Provine Street Drainage Improvements Construction 8 $ 275,000
Hammond St/Hopkins Ct drainage improvements Design 9 1 $ 76,155
Butler-McClure culvert improvements ROW ROW 9 $ 200,000
Butler-McClure culvert improvements Construction 9 $ 1,800,000
Hammond St/Hopkins Ct drainage improvements Construction 9 $ 1,500,000
Forest Park-Berry Drainage Improvements Phase 1 Design 9 $ 2,004,400
Total Projected Costs by Year inci project management and administration costs) $20.5 million $28.5 million
Storm Water Management Division Capital Projects
emu,.
1
I
Legend
I Year Of Construction
-2008
412009
i X2010
02011
Attachm.-nt 2,
c ' i
r
r�
F
1
AN Storm Water Master Plan: Stud Status as of 3/812014
Q y
The following 2004 CIP watershed planni n g studies are in progress:
k CD Watershed Planning Study Name Consultant Status
4 Eastern Hills Jacobs Awaiting final report
7 Central Arlington Heights Freese & Nichols Part of Peer Review Study
9 Forest Park-Berry AECOM Part of Peer Review Study
8,9 Henderson Street ; Halff Associates Awaiting final report
8,9 East Central Business LAN Amendment pending for model conversion
The following Storm Water studies are in progress or starting within the next ear:
CD Study Name Consultant Status
1 Citywide Dam Safety Study Freese & Nichols In Progress
1 Miscellaneous Stream Crossing Analysis Teague Nall and Perkins Starting Soon
1 Flood Warning Study AECOM Starting Soon
2 Menefee Creek Master Plan R.W. Beck In Progress
2 Big Bear Creek Master Plan Halff Associates FY 2411
2 Tony's Creek Master Plan HDR Engineering FY 2011
3 Broadmoor Drainage Master Plan LAN In Progress
3 Lower Mary's Creek Master Plan Freese & Nichols In Progress
_ Upper Willow Lake Channel Master Plan S & B Infrastructure, LTD In Progress
3 Royal Creek Master Plan CP & Y Inc. Starting Soon
3 Ridglea Creek and Luther Creek Master Plan Dunaway Associates Contract Signed
3 Overton Park Creeks Master Plan AECOM FY 2011
3 Mary's Creek Tribs 1 and 2 Master Plan Brown & Gay FY 2011
3 South Mary's Creek Master Plan (Lost Creek) Dunaway Associates FY 2411
3 Plantation Creeks Master Plan CP & Y Inc. FY 2011
4 Bonnie Brae and Carter-Riverside Neighborhoods ANA Starting Soon
4 Woodhaven Creek Master Plan Wade Trim In Progress
1 4 Summerfields Creek Master Plan Jacobs FY 2411
1 4 Stream WF-1 Master Plan (Randol Mill culverts) Dunaway Associates In Progress
I Lake Arlington West Shore Drainage Master Plan Brown & Gay : In Progress
F Dunbar Creep Faster Plan lirnley-Horn &
Progress
riidcat ranch Master Plan Halff Associates din Pr
Eastland Creek faster Plan _ ; HDR Engineering In Progress
r d ecliff Tributaries Master Plan Teague Nall and Perkins In Progress
8 1 Summer Creep Master Plan AECOM i FY 2411
= Upper Sycamore/Lower Edgecliff Master Plan Freese & Nichols FY 2011
Lake Crest ranag aster Dian t� itatech Progress
Study Name Consultant ; Status
7 Como Creek Master Plan AECOM In Progress
7 t Lake Country Estates Drainage Master Plan Kimley-Horn & j Starting Soon
I Associates
7 ` Burton Hill Trinity Trails Neighborhood Master Plan BHB Starting Soon
8 Garden Acres Drainage Master Plan TranSystems ; In Progress
8 Hallmark Drainage Master Plan Steve Slater ' Contract Signed
8 Glenwood Creek Master Plan URS Corporation FY 2011
8 Ludelle Channel Master Plan Halff Associates FY 2011
8 South Fork Chambers Creek Master Plan LAN FY 2011
i 9 1 Warner Channel Floodplain Re-Mapping Study Jerry Parche In Progress
9 Leslie Creek Watershed Master Plan URS Corporation Starting Soon
9 Greenbriar Creek Master Plan URS Corporation FY 2011
3,8 Three Channels Floodplain Re-Mapping Study Stream Water Group Starting Soon
4,5 Cottonwood Creek Master Plan Kimley-Horn & In Progress
Associates
[:3:,9 Howard's Branch/HB-1 Floodplain Re-Mapping Study DeOtte FY 2011
5 Prairie Dog Creek Master Plan HDR Engineering In Progress
Key: Green = 19 Studies are already in progress.
Blue = 2 Contracts have recently been signed and studies will be starting very soon.
Yellow = 8 M&Cs should be coming to council this spring or summer.
Orange = 14 studies planned to start in FY 2011 based on funds availability.
machment
r i
rr+
T
w
/
I
W
a
y�m r P
or-
LL
/
a
a F �i
i
co
LU
I
4 � /
M UL�....
cs
_. _.
k
c 00
CAD
41
r
8 r
tale, 1
UJ
� x LoL LE
r
cn
0
o CL 0
Z cn ZA(i
i
m E ' z .. .
co
_7"L tq
t
a
" G
p+
77
4W WW 1.�
�J
MG J%U�� ti 1w1# swt'�z �
w 9 J I al(43 P a,Mlv a va � CY
R
�j c-1.1
�
s
.. ^r
-_ �„ �. ..400 N F. Ath lull
M 5%0�Dq* Rd 1182D
..'«r— •»+w '+"_..m,..... _�SCTw19G _ ,GAS �.
°--�Ts�r�t B'kvrd _
#u 1 ficu 923 m runts #3hre6 P
93J
d
13,1.13 1600 R ryNr Ad �.�..�. 104
4M swe 77T
i $r
�v
760 G
# - 00
y .
1
w
1 '9�
x r r°� d• ,� 9 ,°+rY"
w'
W II 0
,a
} ...
w
w �ww
a
"I ,�,• ,13 00 �
Jk
°
o
r
u WATER W SYSTEM
o,. MIA
DORESS colAI
y
tl�„ , fi p.l” k Y•Y n7 '� vt
mrc WM U w«
t Y qm .Y
d rc v+
E b I „� � � � a s rcrh r. �
m ' �4aukh wLE, ,ASLE. �„ w ,�, _, x w. w i9ro a
" .",..M ";tlb
���_�� �� »• -,�� �� �� �mr �v ���pr��. Ahn dR U�,a� x9 Mi a
err .,�,.m,�v� .� 4xw.l a' IMY IOW kJ Sr ' M'Y/`1
A
4 l y,. tiu 7 "
" �... � d Gry �4Y Vd1 atl�, rt 'd/ ISD "
�.. . � Nv'K tl �yf a pur Ym �,"Y kr� rr nitidu�
� F '^
d ry `
^�, J �. '� A MlrM td
f WN
n y err r awn+ r».�. w,. V $ �..... Y 1✓WiNY"rod Mw9 M"� d !tl^ ,,e
v0 4 M 6
ldM ec Uv� Gq n M 9
N
lid
RRAN
rc
�yy I 4 0
4a*aN
�«1ry ✓. fw � _ �,,, f -0 PO"o a YL C Q NS "dMYI4 0 W d
_ 1 y J m 1N l;uy ro '%% a
a � ,.... 'd t,4N.9f�f tlnai wrod'n Iwp �`a�b m wnti a r�lr rw ddb
Y k RdN .'..� ',.. P YzC"7K tw al Wi c tl,a,rcl imr 0sr*�i
4 w ZERO'
.. " .. ,...,y "^ . ....� � .... ... ,.w....�tl� K 6Md a��u� r *YUra Yrtiu.� "W„�"u Lv�q d�aE�Y���
� t%r c�rcY Ga uMm.
A kN
n f
U m I, M�rL O
�, °r ... rd�u'�. wed ig;o
-
N P•.es^+re.�wr ^�r�wuw AI5"a�e 7r411AA.rw1I
e � a» �+¢�rcF m rra� r��rcr.^�r�r�n~at�mtl�~I
�� a BAKER � `
L .,
' " �
1 2, 0
"j
_ y0
� aN kY
F q t !W
xl ��� m" _,�N , 4YA 'BRt?iJ{{
x 00" ED 'LE
d
"M
6up 3�C y«
rAM ROM r w w
o^
kRm
m-* p
s 14 �� ,, ' Iry �f
E
r
.� rs ' 6 � ,
„�. . r,
t
s RIVNIGER
r
x,
93K P—PuCF
SON m
41,
rza 0
R
�a
ON 3
IN
a
„Am. ..n.
iii f � ,r...,.
^ii i" z� OS �,, NEW .mom � �E WARNING Y EM LOCATIONS