HomeMy WebLinkAboutOrdinance 5690 y ,
ORDINANCE NO.
ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR PART OF THE COST
OF IMPROVING A PORTION OF CAiw,PUS DRIVE (South Industrial Thoroughfare_. _
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS: FIXING CHARGES AND LIENS AGAINST ABUTTING
PROPERTY THEREON, AND AGAINST THE OWNERS THEREOF: PROVIDING FOR THE
COLLECTION OF SUCH ASSESSMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFI-
CATES IN EVIDENCE THEREOF: RESERVING UNTO THE CITY COUNCIL THE RIGHT
TO ALLOW CREDITS REDUCING THE AMOUNT OF THE RESPECTIVE ASSESSMENT TO
THE. EXTENT OF ANY CREDIT GRANTED: DIRECTING THE CITY SECRETARY TO EN-
GROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE
MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE
IN THE ORDINANCE RECORDS OF SAID CITY: AND PROVIDING AN EFFECTIVE DATE.
WHEREAS,the City of Fort Worth,Texas,has heretofore ordered that each of the hereinafter described
portions of streets, avenues and public places in the City of Fort Worth,Texas,be improved by raising,grading,
or filling same and by constructing thereon to-wit:
Campus Drives From I.H. 820 to Seminary Drive, known
(South Industrial Thoroughfare) and designated as Unit No. 2, Project
No. 104-23000-114, a 7-inch reinforced
concrete pavement on a 64 foot roadway.
The above,together with combined concrete curbs and gutter on proper grade and line where same are not already
so constructed,together with storm drains and other necessary incidentals and appurtenances;all of said improve- .
ments are to be so constructed as and where shown on the plans and in strict accordance with the Plans and
Specifications therefor: and contract has been made and entered into with _
Worth Construction Company
for the making and construction of such improvements on the above said portion of streets,avenues and public
places.
WHEREAS,estimates of the cost of the improvements of each such portion of streets,avenues and public
places were prepared and filed and approved and adopted by the City Council of the City, and a time and place
was fixed for a hearing and the proper notice of the time,place and purpose.of said hearing was given and said
hearing was had and held at the time and place fixed therefor,to-wit, on the 19 day of nQnpmhPr
1966 , 9s30 A.M. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and at
such hearing the following protests and objections were made,to-wit:
protested that
protested that
protested that
-protested that
__protested that
that
__--_protested that
protested that
.—protested that
protested that
protested that
protested that
and said hearing was continued to the present time in order to more fully accomplish the purposes thereof, and
all desiring to be heard were given full and fair opportunity to be heard,and the City Council of the City having,
fully considered all proper matter, is of the opinion that the said hearing should be closed and assessments
should be made and levied as herein ordered:
NOW ThIEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
Said hearing be, and the same is hereby,closed and the said protest and objections,and any and all other
protests and objections, whether herein enumerated or or not, be and the same are hereby, overruled.
IL
The City Council, from the evidence,finds that the assessments herein levied should be made and levied
against the respective parcels of property abutting upon the said portions of streets, avenues and public places
and against the owners of such property,and that such assessments and charges are right and proper and are
substantially in proportion to the benefits to the respective parcels of property by means of the improvements
in the unit for which such assessments are levied,and establish substantial justice and equality and uniformity
between the respective owners of the respective properties, and between all parties concerned, considering the
benefits received and burdens imposed, and further finds that in each case the abutting property assessed is
specially benefited in enhanced value to the said property by means of the said improvements in the unit upon
which the particular property abuts and for which assessment is levied and charge made,in a sum in excess of
the said assessment and charge made against the same by this ordinance,and further finds that the apportion-
ment of the cost of the improvements is in accordance with the law in force in this City, and the proceedings of
the City heretofore had with reference to said improvements, and is in all respects valid and regular.
III.
There shall be, and is hereby, levied and assessed against the parcels of property herein below mentioned,
and against the real and true owners thereof(whether such owners be correctly named herein or not) the sums of
money itemized below opposite the description of the respective parcels of property and the several amounts
assessed against the same, and the owners thereof. as fill- as such owners are known, being as follows:
IV.
Where more than one person, firm or corporation owns an interest in any property above described,each
said person, firm or corporation shall be personally liable only for its,her or his pro rata of the total assessment
against such property in proportion as its, his or her respective interest bears to the total ownership of such
property, and its, his or respective interest in such property may be released from the assessment lien upon pay-
ment of such proportionate sum.
V.
The several sums above mentioned and assessed against the said parcels of property, and the owners
thereof, and interest thereon at the rate of six per cent (6�r) per annum, together with reasonable attorney's
fees and costs of collection, if incurred, are hereby declared to be and are made a lien upon the respective parcels
of property against which the same are assessed, and a personal liability and charge against the real and true
owners of such property, whether such owners be correctly named herein or not, and the said liens shall be and
constitute the first enforceable lien and claim against the property on which such assessments are levied, and
shall be a first and paramount lien thereon, superior to all other liens and claims,except State, County,School
District and City ad valorem taxes.
The sums so assessed against the abutting property and the owners thereof shall be and become due and
payable as follows, to-wit; in five (5) equal installments,due respectively on or before thirty (30) days,one (1),
two (2), three (3), and four (4) years from the date of completion and acceptance of the improvements in the
respective unit, and the assessments against the property abutting upon the remaining units shall be and become
due and payable in such installments after the date of the completion and acceptance of such respective units,and
shall bear interest from said date at the rate of six per cent (61(') per annum,payable annually with each install-
ment,except as to the first installment, which shall be due and payable at the maturity thereof,so that upon the
completion and acceptance of the improvements in a particular unit, assessments against the property abutting
upon such completed and accepted unit shall be and become due and payable in such installments, and with
interest from the date of such completion and acceptance. Provided, however, that any owner shall have the
right to pay the entire assessment, or any installment thereof, before maturity by payment of principal and
accrued interest, and provided further that if default shall be made in the payment of principal or interest
promptly as the same matures, then the entire amount of the assessment upon which such default is made shall,
at the option of said City of Fort Worth,or its assigns,be and become immediately due and payable, and shall be
collectable, together with reasonable attorney's fees and cost of collection, if incurred, PROVIDED, however,
that acting through its duly authorized Director of Public Works the City of Fort Worth retains the right to
authorize payment of the sums assesed against abutting property upon such completed and accepted unit in not
more than forty-eight (18) equal regular monthly installments of not less than $9.00 each, the first of such
installments to become due and payable not more than thirty (30) days after the completion and acceptance by
the City of the particular unit, PROVIDED FURTHER,that the City Attorney is hereby empowered to authorize
payments of said sums of lesser installments and/or over a longer period of time in cases in which the Director
of Public Works has previously determined that an extreme financial hardship upon the property owner will
otherwise result;and PROVIDED FURTHER,that such method of payments shall be authorized only in instances
where the owner or owners of property abutting; upon such completed and accepted unit shall have executed and
delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract
upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in
trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against
such property.
If default shall be made in the payment of any assessment, collection thereof shall be enforced either by
the sale of the property b,v the Assessor and Collector of Taxes of said City as near as possible in the same man-
ner provided for the sale of property for the non-pay-mer.t of ad valorem taxes, or at the option of the City of
Fort Worth, or its assigns, payment of said sums shall be enforced by suit in any court of competent jurisdic-
tion, or as provided in any mechanic's or materialman's contract as aforesaid, and said City shall exercise all of
its lawful powers to aid in the enforcement and collection of said assessments.
�fJ �
o
Nt
a a o `n
a m n It
40 w V)
.a
4 O N
LO
F+ �
�+$ CY) M O
!A !A
Q
s a
aEn
co LO
a co LO
rn co
rn
0
a
o rn N
qMq
N �* W � O
a
0 0"
V co Cl) m
o !A fA H9 M FA !R fR
2
7+ L
a t,j q
O W O+ rn LO to r�
a a U) C: o+ co co to
w cn vwi � .o
Ox. w Q N N � 00
CCC777 �q eA �H eA �H rA fAV
7 �
0
�y Fes+ � �
►r 1D a W N N N
w w _' '4
w pp
N In
0. w �L F-. N
,moo, a 10
aaF,u°3 08
aww (:F� w
0
0
>cc
H Q ^
cli
y co pQ
cu ® o w a+ a Q
Z N N N
It
s
p 8 2 a a v v
In w � o v m
o> > N s s o
a •� ¢ ON 1.0
o H
N p O r '+
.0 T ch N •--� •--�
N CV C O O
pp� � •.i >_ O O ONq
?.z NCA N `7
a o r
N H � +)
'¢ qH0 II II
a
<D c OD 5!�
a CA x ~ U U U
G)
v H N Cy M +-) +-)
N O C Q C LO
CQ
O -
� .�Oo coi m
H
H
N O V Cl)
o � r .o 0
t
a AVM V N -i
ppppN ON
00
W U A a M t- ILD LO CID
U) co
N
O Tu
vw w 10
H
W N C7 t--• N tt �O CD
cli
LILICps, O
M7� GgwM ) N
U
W LLJV r �.., �t •1] 00
0.4 z a.w w
w
xO o m 4-)-0 Lf)
H
H s ~? N [r) —4 A N C"7
Q Ul N . ro -4 N m m
O H 1 - of-- 0 m � O'-•
bG N H �+ H 7 �a r;V H 7
§ + � r�i w +� .A � N T.-+IT) w +1 rarer
fla O T al •.a .-� O +� •H .-I N w O O +)•4 .+
i-� � N U of 4'.^i U a .7 L}i' 4i U 0
H N CA to 0) N -1 O 0) N a C '..:1 H 'A of Cs
a roaoa, m ro o m ro Hto•ri m 0ai m
U Cri C N+' +) O� rnq
m 0 m C C
0 CD N +) .x C•,4 co m m 01
H a H Cl) IP CA m H H U H H?G
H O N Cn r+ W +) C -Y -P m
.ZO 4 (3 4j H +) ] y" (1) ro N en .i
�—� O O Q (n H +)-4.4 {•�
U p + m x [U d fn H a ca
o UN 7\
�u
U
N
U H •
� t r
LO
9 7 U O 10 M
0 1 O4
O N �
.0
F
N C] .--� C N N
M
Q z W U) O
IF•1 H C .0� N Cc')
011�fa OwN
a ++)
(0 x w 4
L)
M
F a)
H
CL' U
Itl O
3 Uf yy r .LC)
-� OD
LO
O O Lr))
•1 O U W a .�i cl i c
N ITa
�d
to cNi
y a ''Td- 5 a V :-I ti N
a 1: N
naw
5w
i=i F O�UF N GO
pa, F M LU w N N N
N
w U z w r�i �Oo O
p¢ w
H O
F a1) V V
M
roFA 42)
r,
Y f~ U) F TS
N Oa (D
w � 4. -0 r
Ln w w I- a H k
+' > •U +> > N U N
a ar.. (n>A i (nm �a
O
U �
a o z
NN mc+
X
7 •rri 0 .tea 1- C O 0
IY O a N N 0 +�
aH °' °' � N +� +)$4 A w
O (n H H O3 7 0 0 O.�
W
a
�Hy
O H
U'Z t r
y31
a3a � O
aaa
co
n:
U U
ri 1r �t
o c �s
00 7 0 C- .J
a U C-
o , G�
U
Yco
7 � _o
o C- w
�s co
cyoo
ATTACHMENT "B" SOUTH INDUSTRIAL THOROUGHFARE
Page 1 of 1 I.H.820 TO SEMINARY DRIVE
PROJECT NO. 104-23000-114 CONTRACT I UNIT 2
PER
CENT
CONTRACT PRICE............................................................................................................$ 316,345.16
ENGINEERING .............................................................................................................. 31,634.52
ESTIMATED CONSTRUCTION COST................................................................................................................$ 347,979.68 100.0
RESIDENTIAL FOOTAGE..,............................. 12,909.2 100.0
COMMERCIAL FOOTAGE.............................. —0— —0—
TOTAL FOOTAGE........ .................................. 12)909.2 100.0
RESIDENTIAL ASSESSMENT......................................................5 148,455.80 42.7
COMMERCIAL ASSESSMENT.................................................... —0— —0—
GROSS AMOUNT ASSESSED..........................................................................................5 148,455.80 42.7
LESS CREDITS GRANTED................................................................................................ 35,023.25 10. 1
TOTALNET ASSESSMENT................................................................................................................................ 113,432.55 32.6
NET AMOUNT PAID BY CITY AT LARGE.................................................. ....................................................E 234,547.13 67.4
SIGNED RESULT OF POSTCARD SURVEY
ORIGINAL FOR AGAINST NO OBJECTION
TOTAL PETITION PAVING PAVING SUBMITTED
NO. OF FRONT FEET 13,100.5
PER CENT 100.0 POST CARD SURVEY
PARCELS OF PROPERTY 6 NOT TAKEN
PER CENT 100.0 Lcl
W
NO. OF PROPERTY OWNERS 5 O
PER CENT 100.0 �..,pPG
H f;7
O
OWNERS LIVING ON STREET 3 Q 134
134
PER CENT 100.0 Hr1
04
OWNERS LIVING ELSEWHERE 2
PER CENT 100.0
OFFICIAL RfCUSD
CITY SLCRUARY
FT. WORTH, TEX.
City of Fort Worth, `texas
McMAMAN
Mayor and Council Communication MORPHIg
GRAHAM
DATE REFERENCE SUBJECT: Benefit Hearing - Campus Drive PAGE
NUMBER Seminary Drive to Loop 820 1 REM
12/19/66 G-1030 CIP-4 i of
On November 28, 1966, the City Council awarded a contract for the paving of
Campus Drive, and set December 19, 1966, as the date for the benefit hearing
(MSC Cm844). The project includes the following units:
ROADWAY
N T STREET LIMITS WIDTH R.O.W.
2 Campus Drive I.H. 820 to Seminary Dr. 64 feet 120 feet
i
It is the opinion of the Public Works Department that each parcel of property
is benefitted in an amount equal to or in excess of the amount recommended for
asseAtment.
Recommendation
It is recommended that an ordinance be adopted closing the hearing and levying
the assessments as proposed.
JLB:lp
The following summaries are attached:
Resume
Distribution of cost and assessments
Assessment rolls in alphabetical order
p�F�I RECORD
CITY SECRETARY
SUBMITTED BY: DISPOSIT BY COUNCIL: CES Y
APPROVED 44TNER (DE RIBE)
CITY SECR Y
DATE
CITY MANAGER rn
19 1J"