Loading...
HomeMy WebLinkAboutOrdinance 7491 LI ORDINANCE NO.-= I AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF CL1�ilRI� RAAT) _ _ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: CLEBURNE ROAD From Sycamore Road to McCart Street, known and designated as Project No. 104-36000-411, Unit 1, a seven-inch thick hot-mix asphaltic concrete pavd- ment'on asix-inch thcik lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a forty-foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 2: McCART STREET From the southeast corner of Lot 20, Block 1, South- Ridge Addition to 1130' northerly, known and desig- nated as Project No. 104-36000-411, Unit 2, an eight- inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade with seven- inch high concrete curb and eighteen-inch wide con- crete gutter. The roadway will consist of two thirty- six foot traffic lanes with a twenty-eight foot median. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Austin Road Company ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: CLEBURNE ROAD From Sycamore School Road to McCart Street,known and designated as Project No. 104-36000-411, Unit 1. The estimated cost of improvements is $ 208,359.51 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 15.53 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ 1.39 per square foot; the total estimated amount per front foot to be as against abutting property and the owners thereof is $ 18,54 plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 7th day of March , 1977 , at 9*30 A.M., in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice ,of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session.of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be.by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to ,such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be ,improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the.- properties to be assessed,, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those perms sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy ,of the notice of hearing and shall further certify the date or dates , on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this _7 day of v� A 19 '7- . APPROVED AS TO FORM AND LEGALITY: r City Attorney UNIT 2; McCART STREET From the southeast coener of Lot 20, Block 1, South Ridge Addition to 1130' northerly, known and desig- nated as Project No. 104-36000-411, Unit 2. The estimated cost of improvements is $ 459,600.33 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.51 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 22.61 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ -0- per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $26.12 , plus the cost incurred for concrete drivewav con- struction where specified. The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for _ wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ — per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof. for 6-inch thick concrete driveway is $ ` per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified . N Z � Q ' � < 0. rEmm ---�Z r-s `� 0 J •soft Q c v0l y � 0 J o I cr J 4 O O O O 7 r � w cr z > wo N i W a O co ¢ 6J J � y O M 7 I Icr F-ft �. 1 ZiAi 4 cn Oy 1 c� 4 1� wco Od Q LLJ Q i W V cr.s LJ ui 44 �b LL O 9 O C FORT WORTH, TEXAS February 7 19 77 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen and Mrs, Rimmer, In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below-, Estimates of the total cost of improvements on a portion of Cleburne Road and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit-, PROJECT NO, 104-36000-411, UNIT 1° CLEBURNE ROAD FROM SYCAMORE SCHOOL ROAD TO MCCART STREET, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty-foot roadway, Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established- Seven-inch hot-mix asphaltic concrete Unzoned or Commercial and CF zoning a o „ a , o , . , . „ _ _$15o53/LoFa Residential Zoning . , oa „ „ oo . o . . . o > o . . . . . _ . „$ 5.49/L,Fo Residential Zoning less rear lot credit. . . . _ . . . . . . . . .. . . . . . . _$ 1,24/L,F, Seven-inch curb and eighteen-inch gutter.. . . . . . . . . . . „ . . ... . . _$ 3.01/L,F, Six-inch thick concrete driveway, , . . . . . . . . . o . 00 . 000. . 00 . „ o . a . a$ 1,39/S,Fo The assessments result in the following division of cost; UNIT 1-, TOTAL COST TO PROPERTY OWNER. . , . , , _ , _ . . . . . . . . .. .$45,207a29 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN)-, . . . . e <oo . . . _$ 6,815.43 TOTAL COST TO CITY OF FORT WORTH (STREETS), . e . . a .. o . . . o . . . . . . .$106,336a79 TOTAL ESTIMATED CONSTRUCTION COST. . . . 000 . o . 00 . . .. . . o . . .. . oaa$208,359051 PROJECT NO 104-36000-411 UNIT 2- MCCART STREET FROM THE SOUTHEAST CORNER OF LOT 20 BLOCK 1, SOUTH RIDGE ADDITION TO 1130 NORTHERLY, to be improved by constructing an eight-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter. The finished roadway will consist of two-thirty-six foot traffic lanes with a twenty-eight foot median. The following assessment rates have been established- Eight-Inch Hot-Mix Asphaltic Concrete Unzoned or commercial and CF Zoning.. . . .. . .. ... . . . . . ... . . . . . . . .$22,61/L,F, Residential Zoning. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .$ 4.99/L,F, Residential Zoning less rear lot credit.. . . . . . . . . . .. . . . . . . .74/L,F, Seven-inch curb and eighteen-inch gutter.. . . . .. . .. . . . . . . . .. . .. .$ 3.51/L,F, The assessments result in the following division of cost.- TOTAL COST TO PROPERTY OWNERS.. . . . 39,644.54 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN).. . . . . . . . . . . . . ..$316,435.66 TOTAL COST TO CITY OF FORT WORTH (STREETS)_ .. . . .. . . . . . ... . . . .$103,520.13 TOTAL ESTIMATED CONSTRUCTION COST— . . . . ­ . .. .. . . . o .. . . .. . . . .$459,600.33 Both Units- TOTAL COST TO PROPERTY OWNERS. . .. . . ... . .... . ... . . ... ... . ... . . .$134,851.83 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN). .. . .. .. . ... . . . .$323,251.09 TOTAL COST TO CITY OF FORT WORTH (STREETS) .. ... . . . .. . . ... . . . ..$209,856.92 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . .... . . . . .. . .. .. . . .. . .. .$667,959.84 ACK M. GRAHAM, P.E. ITY ENGINEER PROJECT NO, 104-36000-411, UNIT Io CLE'BURNE ROAD FROM SYCAMORE SCHOOL ROAD TO MCCART STREET, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty-moot roadway. Six-inch thick concrete drive- ways will be constructed where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE E. LITTL'EPArGE SURVEY Candleridge Development _Tract 2 1835' Pavement $15,53 $28,497,55 Corp. LEn�oned 1825' Curb & gutter 3,01 5,493,25 7008 Candlestick Court $33,990.80 Fort Worth, Texas 76133 Trinity Cumberland Tract 2-A- 470' Pavement $ 5,49 $ 2,580.30 Presbyterian Church I-A C.F. 470' Curb & gutter 3.01 1,414.70 P.O. Box 16073 Rea, Cr. 155 S.F. Driveway 1e39 215.45 Fort Worth, Texas 76133 $ 4,210.45 CANDLERIDCE ADDITION Candleridge Dev, Corp. 17 41 Rear lot 7008 Candlestick Court Res, 82,34' Pavement $ 1,24 $ 102.10 Fort Worth, Texas 76133 82,34' Curb & gutter 3,01 247.84 $ 349.94 Candleridge Dev, Corp. 18 41 Rear lot 7008 Candlestick Court Res, 73,89' Pavement $ 1,24 $ 91.62 Fort Worth, Texas 76133 73,89' Curb & gutter 3,01 222.41 $ 314.03 Candleridge Dev, Corp. 19 41 Rear lot 7008 Candlestick Court Res, 63' Pavement $ 1.24 $ 78, 12 Fort Worth, Texas 76133 63' Curb & gutter 3.01 189.63 $ 267.75 1, PROJECT NO, 104-36000-411, UNIT Io CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE CANDLERIDGE ADDITION Candleridge Dev. Corp, 20 41 Rear lot 7008 Candlestick Court Res. 67' Pavement $ 1,24 $ 83,08 Fort Worth, Texas 76133 67' Curb & gutter 3,01 201.67 $ 284,75 Candleridge Dev, Corp. 21 41 Rear lot 7008 Candlestick Court Res, 70' Pavement $ 1,,24 $ 86,80 Fort Worth, Texas 76133 70' Curb & gutter 3,01 210,70 $ 297.50 Woodway Road intersects Candleridge Dev, Corp, 13 42 11.0' aide tot adjusted to; 7009 Candlestick Court. Res, 100' Pavement $ 5 .49 549,00 Fort Worth, Texas 76133 10(0 �;r,rh gut Pv '.� 1 301,00 $ 850,00 Can('lerid ge Dev. Corp, 12 42 110' ride lot adjusted to: 7008 ^anc lestick Courr Res , 100' n��r� =ter= $ 5,49 $ 549.00 Worth, Texas 76133 100' Corh R getter. 3,01. 301.00 $ 850,00 Woodacre Road intersects Candleridge Dev. Corp, 19 43 110' Side lot adjusted to; 7008 Candlestick Court Res. 100' Pavement $ 5,49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00 $850.00 2. PROJECT NO, 104-36000-411, UNIT I< CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE CANDLERIDGE ADDITION Candleridge Dev. Corp. 18 43 120' Side lot adjusted to: 7008 Candlestick Court Res. 100' Pavement $ 5.49 $ 549,00 Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00 $850.00 Cleburne Court intersects Candleridge Dev. Corp. 12 43 120' Side lot adjusted to: 7008 Candlestick Court Res. 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3 Al 301,00 $850�00 Candleridge Dev. Corp, 11 43 110' Side lot adjusted to: 7008 Candlestick Court Res. 100' Pavement $ 5�49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3001 301..00 $850,00 Woodmoor Road intersects Candleridge Dev, Corp. 20 44 110' Side lot adjusted to: 7008 Candlestick Court Res, 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3.01 301,00 $850,00 Candleridge Dev., Corp, 19 44 110' Side lot adjusted to; 7008 Candlestick Court Res, 100' Pavement $ 5,49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00 $850.00 3. PROJECT N0, 104-36000-411, UNIT I: CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE CANDLERIDGE ADDITION Misty Meadow Drive intersects Candleridge Dev, Corp, 16 45 110' Side lot adjusted too 7008 Candlestick Court Res, 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00 $ 850,00 J.W. WILLIAMS SURVEY Candleridge Dev. Corp, Tract 3 360' Pavement $15.53 $ 5,590,80 7008 Candlestick Court CF 360' Curb & gutter 3.01 1,083.60 Fort Worth, Texas 76133 $ 6,674.40 Candleridge Dev. Corp. Tract 3-A 300' Pavement $15.53 $ 4,659.00 7008 Candlestick Court Comm, 280' Curb & gutter 3.01 842.80 Fort Worth, Texas 76133 $ 5,501.80 McCart Street intersects FAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp. 1 1 87.42' Pavement $ 5.49 $ 479.94 1101 Summit P.O. Box 171 Res. 87,42' Curb & gutter 3,01 263,13 Fort Worth, Texas $ 743.07 Attn. Ronald Norman Foster Financial Corp. 2 1 70' Pavement $ 5,49 $ 384,30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3.01 210.70 Fort Worth, Texas $ 595,00 Attn: Ronald Norman 4. PROJECT NO, 104-36000-411, UNIT Ia CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp, 3 1 70' Pavement $ 5.49 $ 384,30 1101 Summit P,O. Box 171 Res, 70' Curb & gutter 3.01 210,70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp, 4 1 70' Pavement $ 5.49 $ 384,30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3,01 210.70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp. 5 1 70' Pavement $ 5.49 $ 384.30 1101 Summit P.O. Box 171 Res, 70' Curb & gutter 3.01 210,70 Fort Worth, Texas $ 595,00 Attn,, Ronald Norman Foster Financial Corp, 6 1 70' Pavement $ 5.49 $ 384.30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3,01 210,70 Fort Worth, Texas $ 595.00 Attn. Ronald Norman Foster Financial Corp. 7 1 70' Pavement $ 5.49 $ 384.30 1101 Summit P.O. Box 171 Res, 70' Curb & gutter 3.01 210.70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp. 8 1 70' Pavement $ 5.49 $ 384.30 1101 Summit P,O: Box 171 Res, 70' Curb & gutter 3.01 210,70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman 5. PROJECT NO. 104-36000-411, UNIT Io CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp. 9 1 70' Pavement $ 5.49 $ 384.30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3.01 210.70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp. 10 1 75' Pavement $ 5.49 $ 411.75 1101 Summit P.O. Box 171 Res. 75' Curb & gutter 3.01 225.75 Fort Worth, Texas $ 637.50 Attn: Ronald Norman Misty Meadow Drive So. intersects Foster Financial Corp. 1 2 110' Side lot adjusted to: 1101 Summit P.O, Box 171 Res. 100' Pavement $ 5,49 $ 549,00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850,00 Foster Financial Corp, 12 2 110' Side lot adjusted to: 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549,00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850,00 Woodmoor Road intersects Foster Financial Corp, 1 3 115' Side lot adjusted to: 1101 Summit P.O. Box 171 Res , 100' Pavement $ 5.49 $ 549,00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 6. PROJECT NO, 104-36000-411, UNIT Ia CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp. 18 3 115' Side lot adjusted toy 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5,49 $ 549,00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 Santa Rita Drive intersects Foster Financial Corp, 5 4 80' Pavement $ 5,49 $ 439.20 1101 Summit P.O. Box 171 Res, 80' Curb & gutter 3.01 240,80 Fort Worth, Texas $680.00 Attn- Ronald Norman Foster Financial Corp, 4 4 70' Pavement $ 5,49 $ 384�30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3,01 210.70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp. 3 4 70' Pavement $ 5,49 $ 384.30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3,01 210,70 Fort Worth, Texas $ 595 AO Attn: Ronald Norman Foster Financial Corp, 2 4 70' Pavement $ 5,49 $ 384,30 1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3,01 210.70 Fort Worth, Texas $ 595,00 Attn! Ronald Norman Foster Financial Corp, 1 4 80' Pavement $ 5,49 $ 439,20 1101 Summit P,O., Box 171 Res, 80' Curb & gutter 3,01 240.80 Fort Worth, Texas $ 680.00 Attn- Ronald Norman 7. PROJECT NO. 104-36000-411, UNIT I° CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Holly Springs Lane intersects Foster Financial Corp. 1 5 115' Side lot adjusted to: 1101 Summit P.O. Box 171 Res, 100' Pavement $ 5.49 $ 549,00 Fort Worth, Texas 100' Curb & gutter 3,01 301.00 Attnt Ronald Norman $ 850.00 Foster Financial Corp. 33 5 115' Side lot adjusted tot 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5,49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 Del Rio Drive intersects Foster Financial Corp, 1 6 136.89' Side lot adjusted to: 1101 Summit P.O. Box 171 Res, 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attnt, Ronald Norman $ 850.00 Foster Financial Corp. 43 6 130' Side lot adjusted to: 1101 Summit P,:O, Box 171 Res , 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 Memphis Lane intersects Foster Financial Corp. 1 7 110.01' Side lot adjusted to: 1101 Summit P.O, Box 171 Res. 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attnt Ronald Norman $ 850.00 8. PROJECT NO. 104-36000-411, UNIT I: CLEBURNE ROAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp. 27 7 70' Pavement $ 5.49 $ 384.30 1101 Summit P.O. Box 1.71 Res. 70' Curb & gutter Ml 210.70 Fort Worth, Texas $ 595.00 Attn: Ronald Norman Foster Financial Corp. 26 7 110' Side lot adjusted to: 1101 Summit P.O. Box 171 Res, 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 Blue Grass Lane intersects Poster Financial Corp. 7 8 120' Side lot adjusted to: 1101 Summit P.O. Box 171 Res, 100' Pavement $ 5,49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn! Ronald Norman $ 850.00 Foster Financial Corp. 6 8 65' Pavement $ 5.49 $ 356.85 1101 Summit P,O. Box 171 Res, 65' Curb & gutter 3.01 195.65 Fort Worth, Texas $ 552,50 Attn! Ronald Norman Foster Financial Corp, 5 8 60' Pavement $ 5.49 $ 329.40 1101 Summit P.O. Box 171 Res, 60' Curb & gutter 3.01 180.60 Fort Worth, Texas $ 510.00 Attn.- Ronald Norman Foster Financial Corp. 4 8 60' Pavement $ 5.49 $ 329,40 1101 Summit P.O. Box 171 Res . 60' Curb & gutter 3.01 180.60 Fort Worth, Texas $ 510.00 Attn: Ronald Norman 9, PROJECT NO, 104-36000-411, UNIT I: CLEBURNE RgAD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp. 3 8 60' Pavement $ 5.49 $ 329.40 1101 Summit P.O. Box 171 Res, 60' Curb & gutter 3.01 180.60 Fort Worth, Texas $ 510,00 Attn: Ronald Norman Foster Financial Corp. 2 8 60' Pavement $ 5.49 $ 329.40 1101 Summit P.O, Box 171 Res. 60' Curb & gutter 3.01 180.60 Fort Worth, Texas $ 510.00 Attn. Ronald Norman Foster Financial Corp. 1 8 97 ,21' Pavement $ 5.49 $ 533,68 1101 Summit P.O. Box 171 Res. 97.21' Curb & gutter 3.01 292,60 Fort Worth, Texas $ 826.28 Attn: Ronald Norman Foster Financial Corp. 20 8 130' Side lot adiusted to: 1101 Summit P.O, Box 171 Res , 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3,01 301.00 Attn: Ronald Norman $ 850,00 Greenville Drive intersects Foster Financial Corp. 1 9 120' Side lot adjusted to: 1101 Summit P,O. Box 171 Res, 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attna Ronald Norman $ 850,00 Foster Financial Corp, 26 9 120' Side lot adjusted to: 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850.00 10. PRGJECT NO. 104-36000-411, UNIT It CLEBURNE ROAD, Continued , BLACK OWNER LOT ZONING FRONTAGE RATE AMOUNZ ASSESSMENT EAST SIDE SOUTH RIDGE ADDITION Misty Meadow Drive So, intersects Foster Financial Corp. 1 10 120' Side lot adjusted to: 1101 Summit P.O. Box 171 Res . 100' Pavement $ 5„49 $ 549.00 Fort Worth, Texac 100' Curb & gutter 3,01 301,00 Attn: Ronald Norman $ 850.00 Foster Financial Corp. 62 10 120' Side lot adjusted to: 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 50 00 Fort Worth, Texas 100' Curb & gutter 3,01 301.00 Attn: Ronald Norman $ 850.00 South Ridge Drive intersects Foster Financial Corp. 1 11 115' Side lot adjusted to: 1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00 Fort Worth, Texas 100' Curb & gutter 3.01 301.00 Attn: Ronald Norman $ 850,00 E. LITTLEPAGE SURVEY McCart North Joint Venture Tract 1 427' Pavement $15.53 $ 6,631,31 3128 Lemmon Ave. East Unzoned 427' Curb & gutter 3.01 1,285.21 Dallas, Texas 75204 $ 7,916.52 % Mr. Rod Routen, Trustee UNIT Io TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . . . .. . . . . . . . .. . . . . .$ 95,207.29 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . . . . . . . . .$ 6,815.43 TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . .. .. . .. ... . . .$106,336�79 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . .$208,359.51 11. PROJECT NO. 104-36000-411, UNIT 2; MCCART STREET FROM THE SOUTHEAST CORNER OF LOT 20, BLOCK 1, SOUTH RIDGE ADDITION TO 1130' NORTHERLY, to be improved by constructing an eight-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter. The finished roadway will consist of two thirty-six foot traffic lanes with a twenty-eight foot median. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE S.A.&M.G.RR SURVEY Beginning at a point 620' south of intersection Cleburne Road and McCart Street. Southwest Regional Tract 3 993' less 40' credit (drainage easement) Financial & Management Unzoned 953' Pavement $22.61 $21,547.33 Corp. , Trustee 933' Curb & gutter 3.51 3,274.83 611 Ryan Plaza, Suite 103 $24,822.16 Arlington, Texas 76011 EAST SIDE SOUTH RIDGE ADDITION Foster Financial Corp 20 1 Rear lot 1101 Summit P.O. Box 171 Res, 130' Pavement $ .74 $ 96.20 Fort Worth, Texas 130' Curb & gutter 3.51 456.30 Attn.- Ronald Norman $ 552.50 Foster Financial Corp. 19 1 Rear lot 1101 Summit P.O. Box 171 Res. 171.27' Pavement $ .74 $ 126.74 Fort worth, Texas 171.27' Curb & gutter 3.51 601.16 Attno Ronald Norman $ 727.90 Foster Financial Corp. 18 1 Rear lot 1101 Summit P.O. Box 171 Res. 20' Pavement $ .74 $ 14.80 Fort Worth, Texas 20' Curb & gutter 3.51 70.20 Attn° Ronald Norman $ 85.00 Foster Financial Corp. 1 1 130' Side lot adjusted to: 1101 Summit P.O. Box 171 Res. 100' Pavement $ 4.99 $ 499.00 Fort Worth, Texas 100' Curb & gutter 3.51 351.00 Attna Ronald Norman $ 850.00 12. PROJECT NO. 104-36000-411, UNIT 2: MCCART STREET, Continued , BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE I.W. WILLIAMS SURVEY Cleburne Road intersects Candleridge Dev. Corp. Tract 3-A 167' Pavement $22.61 $ 3,775.87 7008 Candlestick Court Comm. 167' Curb & gutter 3.51 586.17 Fort Worth, Texas 76133 $ 4,362.04 Candleridge Dev, Corp. Tract 3 317' Pavement $22.61 $ 7,167,37 . 7008 Candlestick Court CF 307' Curb & gutter 3.51 1,077.57 Fort Worth, Texas 76133 $ 8,244.94 UNIT 2: TOTAL COST TO PROPERTY OWNERS. . . .. ... . . . . . . . . . . . . . . . . . .$ 39,644.54 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . .. . .$316,435,66 TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . . . . .$103,520.13 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . . .. . . . . . . . .... .$459,600.33 BOTH UNITS: TOTAL COST TO PROPERTY OWNERS. . . . . . . .. . . . . . . . . . . . . . . . . .$134,851.83 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . . . . .$323,251.09 TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . . .. .$209,856.92 TOTAL ESTIMATED CONSTRUCTION COST. . . ..... ... ... .. .. .. . .$667,959.84 13. ry r City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT:Award of Contract-Assessment PAGE NUMBER Paving in Southridge Addition, Phase I, 2/7/77 C-3671 1976 78 C.I.P. rage G 3 & 4 i °r 3 City Council action is required on Project No. 104-36000=411, as described below: Unit Street Limits Street R.O.W. Width-Ft. Width-Ft. �. W. Cleburne Road Sycamore School Rd. to McCart Street 40 60 II. McCart Street S. E. corner of Lot 20, Blk. 1, South- 2-36' 120 ridge Addition to 1130' northerly. Lanes W/28' Median. Origin of Project This project was initated in conjunction with Community Facilities Contract No. 8981 as approved by M&C C-3550 on October 11, 1976, with Foster Financial Corporation. Both streets border the Southridge Addition which is being developed by Foster Financial. Improvements West Cleburne Road will be improved with collector grade hot-mix asphaltic concrete pavement with concrete curb, gutter and driveway approaches, and required drainage pipe and appurtenances. McCart Street will be improved with arterial grade hot-mix asphaltic con- crete pavement with concrete curb and gutter on two 36-foot traffic lanes with a ?8-foot median. Also included are 12-foot wide left-turn lanes at West Cleburne Road. Drainage Facilities will consist of 431-feet of concrete pipe with headwall and 1308-feet of concrete box culvert with wing walls as required. Submission of Bids The following bids were received on January 18, 1977. Bidders were authorized to bid either or both streets, with hot-mix asphaltic concrete and reinforced concrete pavement alternates required on McCart Street: t DATE REFERENCE SUBJECT: Award of Contract-Assessment PAGE NUMBER Paving in Southridge Addition, Phase I, 2 3 217177 C-3671 1976/78 C.I.P. Page G 3 & 4 of Bidder W. Cleburne Road McCart Street Total Bid Austin Road Company $184,388.95 *$406,725.96 *$591,114.91 ** 439,884.35 ** 624,273.30 Texas Bitulithic Company 210,208.34 * 430,128.65 * 640,336.99 ** 464,395.00 ** 674,603.34 Charles Cohen, Inc. 221,73M 8 * 431,897.45 * 653,627.73 ** No Bid ** No Bid S.R. 0. Asphalt, Inc. 212,264.47 * No Bid Cleburne Rd. ** No Bid Only Southwestern Construction 213,704.42 * No Bid Cleburne Rd. ** No Bid Only Brown & Blakney, Inc. No Bid * 430,003.76 McCart Street ** 456,259.66 Only * 8-inch hot-mix asphaltic concrete pavement ** 7-inch reinforced concrete pavement Working Days Allotted: 140 Analysis of the two types of pavement bid on McCart Street, indicates that the 8-inch hot-mix asphaltic concrete pavement should be used. Project Cost and Financing Based on the low bid and standard policy, approximately $134,852 is pro- posed to be assessed against abutting properties, which will be provided for by a bond fund transfer from the Revolving Fund Unspecified. Cost to the City for street construction, including engineering is estimated to be approximately $209,857, and approximately $323,251 for storm drainage facilities. Upon completion of the project, the developers of Southridge Addition and CandleRidge Phase II, will reimburse the City approximately $64,297 for their portion of street costs over and above their assessments. Bond fund transfers are required from the Streets in New Additions Un- specified and Engineering Unspecified Accounts to supplement the Project Account. DATE REFERENCE SUBJECT: Award of Contract-Assessment PAGE � V NUMBER Paving in Southridge Addition, Phase I, C-ER 3 _ 2/7/77age °r Recommendations It is recommended that: 1) The following bond fund transfers be approved: Amount From To Reason $134,851.83 Unspecified Revolving Southridge Addn.Assmt. To provide funds Fund for the property 042-09000-901 Pay. 042-15000--411 owner's share of construction Costs. $162,900.00 Streets in New Addi- Southridge Addn.Assmt. To provide additional tion funds for the City's (Unspecified) Pay. 104-36000-411 share of constructio 104-36000-901 Costs. $ 16,345.00 Engineering Unspeci- Southridge Addn.Assmt. To provide additional fied funds for engineering 104-95000-901 Pay. 104-36000-411 fees. 2) An ordinance be adopted: a. Declaring the necessity for and ordering of the improvements; b. Making provisions for levying assessments; c. Directing the Public Works Department to prepare estimates of costs and amount to be assessed; d. Awarding the contract to Austin Road Company in the amount of $591,114.91 based on their combined low bid on TJnit I and II; and e. Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 3) An ordinance be adopted: a. Approving the estimates of costs and amounts proposed to be assessed; and b. Setting March 7, 1977, as the date for the Benefit Hearing. GG:vm Attachment SUBMITTED BY: DISPOSITIO Y COUNCIL: PROCESSED BY APPROVED ❑ OTHER (DESCRIBE) J � L,Adopted Ordinance Flo. netermi ATD ning SECR•EtTARY DATE t�^� m r� lky and Ordering Tnr yelaste CITY MANAGER Adopted Ordinance No. Setting date o4-7/-7 - Benefit Hearing as March 7, 1977