Loading...
HomeMy WebLinkAboutContract 50942-A4 AMENDMENT NO. 4 TO AGREEMENT pG� FOe��PQy STANDARD AGREEMENT FOR PROFESSIONAL SERVICES PIONEER TOWER REHABILITATION STATE OF TEXAS CITY SECRETARY CONTRACT NO. Qq 4a-A4 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Elements of Architecture, Inc. (Consultant) made and entered into City Secretary Contract No. 50942 (The Contract) which was authorized by the City Council by M&C C-28724, the 6th day of June 6, 2018, for Pioneer Tower Rehabilitation; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional structural review and evaluation. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the analysis of the scaffolding to install a fabric wrap. The cost of this additional service is $5,650.00 plus $400.00 in reimbursable expenses. The scope of services is described more fully in Elements of Architecture Letter dated August 13, 2019, subject: "Proposal for Architectural/Engineering Services, Pioneer Tower Rehabilitation, Additional Services —Add Services 07-Tower Stone Replacement". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However the total fee paid by the City shall not exceed a total of $208,311.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." EFT. L, RECJ CRET City of Fort Worth,Texas Standard Agreement for Professional Services AMENDMENT RTH Revision Date:8/16/2016 Page 1 of 2 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this the day ofdl—�, 2019, in Fort Worth, Tarrant County, Texas. Elements hitect e, In PROVED: By: By: _ Debbi ulwi r, AIA Kevin Gunn Presiders Interim Assistant City Manager APPR ECOr DED: RECORD By: By: irector J. er 4#@f+w Property Management Department City Secretary ST15W o/ U APPROVED AS TO FORM AND LEGALITY: M&C Not Required Contract Authorization XAS . By: J n . Strong Assistant City orney CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: &Yim� R. GAO- Brian R. Glass, AIA Architectural Services Manager EFT. WORTH, ' pE City of Fort Worth,Texas Ti�;,y. Standard Agreement for Professional Services AMENDMENT ; ;' Revision Date:8/16/2016 , TyPage 2 of 2 ELEMENTS 1201 6'h Ave,Suite 100 Fort Worth,Texas 76104 of Architecture, Inc. Phone 817.333.2880 Fax 817.333.2883 August 13, 2019 Ronnie Clements City of Fort Worth 401 West 13th Street Fort Worth, TX 76102 Re: Proposal for Architectural/Engineering Services for Pioneer Tower Rehabilitation Additional Services 07-Tower Stone Replacement Dear Ronnie; Elements is pleased to provide to you this proposal for A/E services associated with providing recommendations and documents for corrections required to the existing stone watertable of the tower due to the deterioration of the structure and the replacement of the precast to natural stone. Our tasks anticipated for this work includes the following: 1. Site visit/investigation of the existing structures for issues. 2. Provide documents as required to address issues to be presented to Muckleroy and Falls for pricing and construction. 3. Respond to any questions that may arise during the construction of the work. Exclusions and Qualifications to This Proposal: 1. Services requested in addition to those specifically outlined in this proposal will be identified and a fee proposal provided with approval required before continuing with those services. 2. We have only included Architectural and Structural Engineering, as we do no believe any other disciplines are needed. 3. Proposals for consultant when provided are attached with the information included as if provided within this proposal. 4. We have not included submittal to the city for permitting as we have assumed this project as a modification to the original permit. PROPOSED FEE Labor We propose to provide our services as identified in this proposal for the fees as defined below: Architectural- Elements $ 2,900.00 Structural Engineering-RLW(2500 x 1.1) $ 2,750.00 Total Project $5,650.00 Fees listed above are for labor only. Expenses Reimbursable expenses as outlined in the Master Contract are not included in our labor fee and are estimated at$400. PROJECT TEAM RL Woods will be providing structural engineering. All firms are SBE certified firms. If you have any questions regarding this proposal or need to discuss, please call me. Sincerely, Laou J� Debbie Fulwiler, AIA President Attachments: RL Woods Proposal Debbie Fulwiler From: Renate Woods <rwoods-rlwa@att.net> Sent: Tuesday,July 23,2019 11:03 AM To: Debbie Fulwiler Cc: jduran-rlwa@att.net Subject: RE: Pioneer Tower- Stone at Tower Debbie, The only additional work we are anticipating at this time is to address recommendation#4 from the report: 4. Once supports(and perhaps bonding)have been verified,we will provide recommendations on additional removal of stone and temporary support of remaining stone, to determine condition, existing size, and sufficiency of existing relief angle. If angle is damaged from oxidation or it has insufficient capacity for applied load, the angle will have to be replaced or beefed up. Our fee to make the temporary stone removal recommendation, visit the site to view angle condition and size, and design the new lintel angle(s)and attachment (if required), and observe the angle's installation would be $2500. However,we could not do the site observation of existing lintel until some existing stone is removed and the remaining stone stabilized. And, any new angles would need to be fabricated and galvanized. I do not see all those pieces coming together within the next few weeks...so it is likely that the shoring(at least up to the second landing)will need to be maintained a while longer. k7) // Renate'Woods I Principal I Owner L �V 1151 W. Pioneer Pkwy I Arlington,TX 176013 Structural&Forensic Engineering 817.277.6686 ext 1021 rwoods-rlwa,@att.net I www.riwaengineers.com From: Debbie Fulwiler [mailto:dfulwiler@elementsofarc.com] Sent: Monday,July 22, 2019 1:42 PM To: Renate Woods Subject: Pioneer Tower-Stone at Tower Renate, Is it possible to pull a fee together on this even before we have the additional testing by Giles or do you need to wait for some results? Maybe give me a fee for the extreme? They will be starting to remove scaffolding in about another week and we want to get this moving and at least our fees approved as soon as possible. Debbie Fulwiler,AIA President Elements of Architecture, Inc. 120161h Ave.,Suite 100 Fort Worth,TX 76104 P 817.333.2880 F 817.333.2883 C 817.475.6465 1