NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: CHADWICK FARMS PHASE 2 SECTION 5
City Project No.: 101448
Improvement Type(s): Water M Sewer
Original Contract Price: $162,991.00
Amount of Approved Change Order(s): $1,450.00
Revised Contract Amount: $164,441.00
Total Cost of Work Complete: $164,40.00
Cawm E,rt Se 27 2019
Carmen Estep(Sep 27,20h) Y
Contractor Date
Office Manager
Title
Jackson Construction, Ltd
Company Name
302019
Steve Cisneros(Sep 30,2019) Sep s
Project inspector Date
Fred Ehia(Oct 2,2019) Oct 2,2019
Project Manager Date
;7a�1%6tMorae�2t,2019) alit Oct 5,2019
Janie S<adett Morales;Oct 5,2019)
CFA Manager Date
Danaeurghdo0(0 t7,201) Oct 7,2019
Asst. City Manager Date
OFFICIAL REC%q 1 of 2
CITY SECRETARY
FT. WORTH,TX
Notice of Project Completion
Project Name: CHADWICK FARMS PHASE 2 SECTION 5
City Project No.: 101448
City's Attachments
Final Pay Estimate 0
Change Order(s): 0 Yes ❑ N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 120 CD Days Charged: 215
Work Start Date: 2/4/2019 Work Complete Date: 9/6/2019
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CHADWICK FARMS PHASE 2 SECTION 5
Contract Limits
Project Type WATER&SEWER
City Project Numbers 101448
DOE Number 1448
Estimate Number 1 Payment Number 1 For Period Ending 9/23/2019
CD
City Secretary Contract Number Contract Time 12aD
Contract Date Days Charged to Date 215
Project Manager NA Contract is 100.00 Complete
Contractor JACKSON CONSTRUCTION LTD
5112 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors DICKINSON / CISNEROS
Monday,September 23,2019 Page 1 of 4
City Project Numbers 101448 DOE Number 1448
Contract Name CHADWICK FARMS PHASE 2 SECTION 5 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 9/23/2019
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"PVC WATER PIPE 1013 LF $28.00 $28,364.00 1013 $28,364.00
2 STD FIRE HYDRANT ASSEMBLY W/6"GATE 2 EA $4,100.00 $8,200.00 2 $8,200.00
VALVE&VALVE BOX
3 DUCTILE IRON WATER FITTINGS 0.5 TN $6,400.00 $3,200.00 0.5 $3,200.00
W/RESTRAINT
4 TRENCH SAFETY 1013 LF $1.00 $1,013.00 1013 $1,013.00
5 1"DOMESTIC WATER SERVICES 31 EA $1,000.00 $31,000.00 31 $31,000.00
6 CONNECT TO EXISTING 8"W.L.STUB-OUT 2 EA $850.00 $1,700.00 2 $1,700.00
7 8"GATE VALVE CO#1 1 EA $1,450.00 $1,450.00 1 $1,450.00
--------------------------------------
Sub-Total of Previous Unit $74,927.00 $74,927.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"SDR 26 PVC SEWER PIPE 959 LF $38.00 $36,442.00 959 $36,442.00
2 CONNECT TO EXISTING 8"S.S STUB OUT 1 EA $1,400.00 $1,400.00 1 $1,400.00
3 SDR-26 4"SEWER SERVICES 31 EA $870.00 $26,970.00 31 $26,970.00
4 4'STD DIA S.S.MANHOLE 4 EA $4,700.00 $18,800.00 4 $18,800.00
5 EXTRA DEPTH FOR 4'STD DIA MANHOLE 10 VF $285.00 $2,850.00 10 $2,850.00
6 TRENCH WATER STOPS 1 EA $175.00 $175.00 1 $175.00
7 TRENCH SAFETY 959 LF $1.00 $959.00 959 $959.00
8 POST CCTV INSPECTION 959 LF $2.00 $1,918.00 959 $1,918.00
Sub-Total of Previous Unit $89,514.00 $89,514.00
--------------------------------------
Monday,September 23,2019 Page 2 of 4
City Project Numbers 101448 DOE Number 1448
Contract Name CHADWICK FARMS PHASE 2 SECTION 5 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 9/23/2019
Project Funding
Contract Information Summary
Original Contract Amount $162,991.00
Change Orders
Change Order Number 1 $1,450.00
Total Contract Price $164,441.00
Total Cost of Work Completed $164,441.00
Less %Retained $0.00
Net Earned $164,441.00
Earned This Period $164,441.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $164,441.00
Monday,September 23,2019 Page 3 of 4
City Project Numbers 101448 DOE Number 1448
Contract Name CHADWICK FARMS PHASE 2 SECTION 5 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 9/23/2019
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / CISNEROS Contract Date
Contractor JACKSON CONSTRUCTION LTD Contract Time 120 CD
5112 SUN VALLEY DRIVE Days Charged to Date 215 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $164,441.00
Less %Retained $0.00
Net Earned $164,441.00
Earned This Period $164,441.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0,00
Balance Due This Payment $1645441.00
Monday,September 23,2019 Page 4 of 4
C-) 0 a -vz ncn t7C') C) c� o
ro 9 0 � x m p `n O :V
N > o z o O m m D z 0
-' mz � m mm *
n m m c0i o -1 -1 p n (m7 � m � � � y n
r < c 0 m , 0 0 0 -1 'U D O n --1
N o oa
-� O O-{
m
Dm a y `o Q ;ana nmmm Dm O O 0 m
zz >0 -1 z 0 z m
z m
m n 0
A
-�I O O
C ,Zmj
z
Q Cl a N
m N N c�37 O 0 0 0-
m (Ji q O .A O
v 0) Go
O
N N ,"'i c y v !; G) rQ� oj Uri
J
m W cp
CD
j ? �
�n w mopp o m N m
o o
c=v 40 O0 0
a. o 0 0 m
c� q mN cn
1D 00 co
to (D ±O .' O N O O C a s a m
A co
co
O O O N N
O O C7
7 7 D
o o o
A O`
m
rD
a fD 0
rn m m C D
D D
o ~ 0 Z Mi
Z
m Q o Q N D O G)
O Z
m
c) N --— °° °o O
c> d 4F z (0 co
S o
r -N C
<
in A asp 9
4 N N N
N
O O O O T
VH
O 0
O O m n
z
0 0 Z t7
.n o m
0
0
c v
oN
to
o 0 o m
-i
� c o n �
0 0 0 N
0
0 o D
� n
�p 1
( � «
( � �
} § »
0 / k
- /
§ k E
0 2
z ] «
7 A \
§ § \ ;u Xz w � g
/ e = § §\ 2 a ) a
m k c 931,
4 q rk � }
IM } 17 @ }
� �§ a
\\<
« g
m� E $
jk \ §§\
)0 (
a � z a §§ /
# §
\ »
m
m
�� $
� )§ � E
� o B � �
§ § \ /(m
CID3 $ � M
) kEG
} saz
icu
) f \ t §
` k / k k
< m
O ^ � \
A
/ §
Tj§ � k
R 3 /}k
. CD
. �
m 3
\
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: CHADWICK FARMS PHASE V, SECTION 2
PROJECT NUMBER: 101448
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
PVC 8" C-900 1,013
FIRE HYDRANTS: 2 VALVES(16" OR LARGER) 0
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES
NEW SERVICES: 1" COPPER 540
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PVC 8" SDR-26 959
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES
NEW SERVICES: 4" SDR-26 840 LF
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
0 (817)392-7941 •Fax:(817)392-7845
eCONSTRUCTION LTD.
51 1 Z SUN VALLEY DRIVE
FORT WORTH, TX 761 19
TEL: 817-5 7 Z-3303
FAX: 817-478-0443
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Troy L. Jackson,
President Of Jackson Construction, Ltd, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Chadwick Farms Section 5 Phase 2
BY
Tro . Jackson, President
Subscribed and sworn before me on this date loth of September, 2019.
4'/-bW
Notary P blic
Tarrant, Texas
CARMEN L. ESTEP
Yo.• 4�_Notary Public, State of Texas
.: Comm. Expires 04-06-2020
Notary ID 2910611
.. CONSENT OF SURETY OWNIM O
TO FINAL PAYMENT ARCHITrCT o
ALA Document G707 CONTRACTOR
SU.ii1!'I'Y )0
Bond No. 1068067 OTHFR 0
TO OWNER: ARCHITECT'S PROJECT
fAWmeand )
City of Fort Worth, TX
CONTRACT FOR:Water, Sewer and Lighting
Fort Worth TX
PROJECT: CONTRACT DATED.,
(Ak —d
Chadwick Farms Section 5 Phase 2
In accordance with the provisions of t1m Contract between die Owner and the Con aaor as indicated aNn e,the
(j=M name and awmsv Nwwy)
The Hanover Insurance Company
440 Lincoln Street
Worcester MA 01653
SURETY,
on bond of
fjnwq name and addrtwgfContmaur)
Jackson Construction, Ltd.
5112 Sur. Valley Drive
Fort North TX 76119
CONTRACTOR*
hereby approves of the final payment to the Conwxtor,and agrees that final payment to the Contractor shalt not relieve the Surety of
any of its obligations to
(lizevo nameandaddtmw ofOwmrj
City of Fort Worth, TX
Fort Worth TX
OWNER,
as set famb in said Surety's bond.
IN i'fiT MESS WHIMOF,the Surety has hereunto set its hand on this date: September 10, 2019
(marlinecf*h;gfie: antbfoltbmufbrdrnwxertdawand)canj
The Hanover Insurance Company
{SerraW,Y)
By:
_ gfarNbo trpna�ntatiar)
Jack M. Crowley Attorney-in-Fact
_ (Pt»umd rrmrrraxJt�ldr)
Surety Phone No. 508-853-7200 x-4476
G7071994
r THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWER OF ATTORNEY
THIS Power of Attorney limits the a of those named herein,and they have no authority to bind the Company except in the manner and to
the extent herein stated.
KNOW ALL PERSONS BY THESE PRESENTS:
That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being corporations organized and existing
under the laws of the State of New Hampshire,and CITIZENS INSURANCE COMPANY OF AMERICA,a corporation organized and existing under the laws
of the State of Michigan,(hereinafter individually and collectively the"Company")does hereby constitute and appoint,
Steven R.Foster,Jack M.Crowley,Sonia Lara and Teuta Luri
Of Willis of Texas,Inc.of Dallas,TX each individually,if there be more than one named,as its true and lawful attorney(s)-in-fact to sign,execute,seal,
acknowledge and deliver for,and on its behalf, and as its act and deed any place within the United States,any and all surety bonds, recognizances,
undertakings,or other surety obligations.The execution of such surety bonds,recognizances,undertakings or surety obligations,in pursuance of these
presents,shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company,in their own
proper persons.Provided however,that this power of attorney limits the acts of those named herein;and they have no authority to bind the Company except
in the manner stated and to the extent of any limitation stated below:
Any such obligations in the United States,not to exceed Thirty Five Million and No1100($35,000,000)in any single instance
That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company,and said
Resolutions remain in full force and effect:
RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and
empowered to appoint Attorneys-in-fact of the Company,in its name and as it acts,to execute and acknowledge for and on its behalf as surety,
any and all bonds,recognizances,contracts of indemnity,waivers of citation and all other writings obligatory in the nature thereof,with power to
attach thereto the seal of the Company.Any such writings so executed by such Attorneys-in-fact shall be binding upon the Company as if they
had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons.
RESOLVED:That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto,granted
and executed by the President or Vice President in conjunction with any Vice President of the Company,shall be binding on the Company to the
same extent as if all signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile.
(Adopted October 7, 1981—The Hanover Insurance Company;Adopted April 14, 1982—Massachusetts Bay Insurance Company;Adopted
September 7,2001—Citizens Insurance Company of America)
IN WITNESS WHEREOF,THE HANOVER INSURANCE COMPANY,MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vice Presidents,this 10th
day of April,2019.
The Hanover irura'nc�e�]C�ompany The Harm ar lre ranee Comg O"V
Massachusetts Bay s..s.q+esce company Massachusetts Bay I—ra nee Compa-y
CWiseos Insurance Company of America tOfm Citizens?nears—Company of America
rc G.r Nlrft Yea BFJH°'fit t
John C.Roche,ESP and President James H_KaNaaecl i;V e President
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER )ss.
On this Ir day of April,2019 before me came the above named Vice Presidents of The Hanover Insurance Company,Massachusetts Bay Insurance
Companpend Citizens Insurance Company of America,to me personally known to be the individuals and officers described herein,and acknowledged that
the sealsoffixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and
Citizens Insurance Company of America,respectively,and that the said corporate seals and their signatures as officers were duly affixed and subscribed to
said instrument by the authority and direction of said Comorations.
DUNE J. MMkNO
4 , !t/YP�i✓E MJvi�l/L �
orrarrw7u os wrarant
lyr r1awYMek o- I piano J- ..Ncwn R,h1w
a. Kiv Ce ,—n stm Ezpv',Man-:h
I,the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of
America,hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney issued by said Companies,and do
hereby further certify that the said Powers of Attorney are still in force and effect.
GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this 10thday of September 2019
CERTIFIED COPY
Ttwdory G.Ju WtkWz,Vice Aa cigiet i..