ORDINANCE NO. o�--
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF ALLEN AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
NAVARRO CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with Navarrn Cnngtruetinn for the making and construction of
certain street improvements on the-hereinafter described portions of streets, avenues and
public places in said City, to- it.
UNIT 1: ALLEN AVENUE From St. Louis Avenueto the east property line of Lot 3,
Block 3, St. Helena Addition, and from the west property
line of Lot 1, Block 19, Lawn Terrace Addition to
Louisiana Avenue, known and designated as Project No.
104-22000-143, Unit 1.
UNIT 2: ALLEN AVENUE OVERPASS From the east property line of Lot 3, Block 3, St. Helena
Addition to the west property line of Lot 1, Block 19,
Lawn Terrace Addition, known and designated as Project
No. 104-22000-143, Unit 2.
UNIT 3A: ARIZONA AVENUE From Maddox Avenue to approximately 250' south, known
and designated as Project No. 104-2200-143, Unit 3A.
(DELETED)
UNIT 3B: ARIZONA AVENUE From Elmwood Avenue to approximately 210' north, known
and designated as Project No. 104-22000-143, Unit 3A.
UNIT 4: SOUTH MAIN STREET From Jefferson Avenue to 150' north of E. Allen Avenue,
known and designated as Project No. 104-22000-143, Unit 4.
UNIT 5 & 5A: JEFFERSON-BRYAN From South Main Street east and north approximately 4501 ,
known and designated as Project No. 104-22000-143, Unit
5 & 5A.
WHEREAS,-by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 7149 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Vorth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 7149 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed andshall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective Credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS l day of �hl�t��v1, , 19 7
APPROVED AS TO FORM AND LEGALITY:
City Attorney
UNIT 6: ELMWOOD AVENUE From Epps Street to Louisiana Avenue, known and de-
signated as Project No. 104-22000-143, Unit 6.
UNIT 7: MADDOX AVENUE From Epps Street to Louisiana Avenue, known and de-
signated as Project No. 104-22000-143, Unit 7.
UNIT 8: EAST ALLEN AVENUE From Bryan Street to 150' east, known and designated
as Project No. 104-22000-143, Unit 8.
UNIT 9: EPPS STREET From Elmwood Avenue to Maddox Avenue, known and de-
signated as Project No. 104-22000-143, Unit 9.
PROJECT NO, 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, FROM ST, LOUIS AVENUE TO T_
BEST END OF OVERPASS AND FROM THE EAST END OF OVERPASS TO LOUISIANA AVENUE., to be improved
by constructing a seven-inch reinforced concrete pavement on a six-inch thick lime stabil-
ized subgrade with seven-inch high superimposed concrete curb on a forty-four to sixty foot
roadway, Six-inch thick concrete driveways and four-foot wide concrete sidewalk will be
constructed where specified,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH. SIDE PATILLO'S ADDITION
Beginning at the northeast corner of St, Louis Avenue and Allen Avenue.
Tarrant County Hospital 1 & 5 200' Existing facilities No assessment
District 17
1500 S. Main 76104
Tarrant County Hospital 18 & 31 5 193' Existing facilities No assessment
District
1500 S. Main 76104
South Main Street intersects ST. HELENA ADDITION
Fort Worth Drug & Notion 3 1 85,14' Grade differential No assessment
Company
1601 S, Main Street
76104
Fort Worth Drug & 6 1 100' Grade differential No assessment
Notion Company
1601 S, Main St,
76104
Bryan Street intersects
1.
PROJECT NO, 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE S T, HELENA ADDITION
Manuel Coronado 2 3 100' Grade differential No Assessment
1605 Bryan Ind,
76110
Overpass begins LAWN TERRACE ADDITION
City of Fort Worth 5 14 110' No Assessment
Ind.
Arizona Avenue intersects
Ho D. Edmondson 6 15 100' Existing facilities No Assessment
5400 Ramey Ind, Widening for traffic channelization
76105
Delaware Western Proper- 5 15 100' Existing facilities No Assessment
ties, Inc, Ind, Widening for traffic channelization
Tax Department 11971
1702 Continental Life Bldg.
76102
SOUTH SIDE
Phillips Petro Company 1 18 100' Existing facilities No Assessment
Lesee of Reproco, Inc, Comm, Widening for traffic channelization
P.O. Box 1967
Houston, Texas
2.
PROJECT NO. 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE LAWN TERRACE ADDITION
City of Fort Worth 10 18 100' No Assessment
Arizona Avenue intersects
City of Fort Worth 8 19 No Assessment
Overpass begins
ST. HELENA ADDITION
City of Fort Worth 1 4 No Assessment
Ind.
T. W. Wiese 10 2 100' Grade differential No Assessment
1701 Bryan Ind.
76110
Floyd J. Morris, Jr. 1 2 100' Grade differential No Assessment
1801 Ems Road East Ind.
76116
South Main Street intersects
PATILLO ADDITION
City of Fort Worth 64 10 100' No Assessment
Comm.
3.
PROJECT NO. 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE PATILLO ADDITION
City of Fort Worth 33 10 100' No Assessment
Galveston intersects EMORY COLLEGE SUBDIVISION
S.L. Daly 32 10 100' Existing facilities No Assessment
2729 Colonial Pkwy. Rea. Widening for traffic channelization
76104
St. Louis Gardens, Inc. 1 10 100' Existing facilities No Assessment
1020 Currie Apt. Widening for traffic channelization
UNIT 1:
TOTAL COST TO PROPERTY OWNERS.................- 0 -
TOTAL COST TO CITY OF FORT WORTH..............$229,010.74
TOTAL CONSTRUCTION COST.................... . ..$229,010.74
4.
PROJECT NO. 104-22000-143, UNIT 3B: ARIZONA AVENUE FROM ELMWOOD AVENUE TO APPROXIMATELY
210' NORTH, to be improved by constructing a six-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb
and eighteen-inch wide concrete gutter on a thirty foot roadway ending in an eighty foot
cul-de-sac. Six-inch thick concrete driveways and four foot wide concrete sidewalk will
be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE LAWN TERRACE ADDITION (HARRIS REVISION)
Beginning at the northwest corner of Arizona Avenue and Elmwood.
W.B. Johnson 1 19 95' Pavement $10.52 $ 999.40
1118 E. Allen Ind. 95' Curb & gutter 3.43 325.85
76104 $1,325.25
Adjusted by Council Action to. . . .. . . . .. ... .... .. . .$350.00
LAWN TERRACE ADDITION
Good Hope Missionary 3 19 50' Pavement $10.52 $ 526.00
Baptist Church Ind. 50' Curb & gutter 3.43 171.50 $697.50
1118 E. Allen
76104
Good Hope Missionary 2 19 101 Sq. ft. drive $ 1.38 $ 139.38 $139.38
Baptist Church Ind.
1118 E . Allen
76104
City of Fort Worth 1 19 50' No Assessment
Ind.
EAST SIDE
C.L. Anderson 9 18 Owner occupied
1705 Arizona Ind. 50' Pavement $ 6.79 $ 339.50
76104 50' Curb & gutter 3.43 171.50
74 Sq. ft. driveway 1.38 102.12 $613.12
7 .
PROJECT NO. 104-22000-143, UNIT 3B: ARIZONA AVENUE, continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE
Hamilton Hughes 8 18 50' Pavement $10.52 $526.00
112 E. Rosedale Ind. 50' Curb & gutter 3.43 171.50 $697.50
76104
Mrs. Douglas Smith 7 18 50' Pavement $10.52 $526.00
2212 Magnolia Ind. 50' Curb & gutter 3.43 171.50 $697 .50
76110
Louise A. Rogers 6 18 Owner occupied
1717 Arizona Ind. 40' Pavement $ 6.79 $271.60
76104 40' Gutter only 1.72 68.80
74 Sq. ft. driveway 1.38 102.12 $442.52
UNIT 3B:
TOTAL COST TO PROPERTY OWNERS. .. . . . . . . . . . .. . . . . . .$3,637 .52
TOTAL COST TO CITY OF FORT WORTH. . . . . . . .... .. . ...$6,161.49
TOTAL CONSTRUCTION COST.... . . . . .. . .. . . . . . .. . . . . . .$9,799.01
8.
PROJECT NO, 104-22000-143, UNIT 4: SOUTH MAIN STREET FROM JEFFERSON AVENUE TO 150' NORTH OF
EAST ALLEN AVENUE, to be improved by constructing a two-inch thick hot-mix asphaltic surface
course on existing concrete base and increasing the width of the street four feet on each
side with six-inch thick reinforced concrete base on a four-inch thick lime stabilized sub-
grade, with seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the
finished street will be forty to forty-eight feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE PATILLO ADDITION EMORY COLLEGE SUBDIVISION
Beginning at the intersection of South Main and Jefferson.
T. & G. Properties 58 10 35' Existing facilities No Assessment
1020 Currie Comm.
76107
E. V. Srygley 59 10 50' Existing facilities No Assessment
2931 Glenco Terrace Comm.
76110
E. V. Srygley 60 10 50' Existing facilities No Assessment
2931 Glenco Terrace Comm,
76107
E. V. Srygley 61 10 50' Existing facilities No Assessment
2931 Glenco Terrace Comm.
76110
E. V. Srygley 62 10 50' Existing facilities No Assessment
2931 Glenco Terrace Comm.
76110
E. R. McComb 63 10 50' Existing facilities No Assessment
1704 S. Main St. Comm.
76110
9.
PROJECT NO. 104-22000-143s UNIT 4; SOUTH MAIN STREET, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE PATILLO ADDITION EMORY COLLEGE SUBDIVISION
City of Fort Worth 64 10 34' No Assessment
Comm,
Allen Avenue intersects PATILLO ADDITION GOLDSMITH SUBDIVISION
Tarrant County Hospital 5 310' Existing facilities No Assessment
District
1500 S. Main Street
76104
FAST SIDE F. RICHARDS SURVEY
St. Joseph Hospital 15 Acre Tract 150' Existing facilities No Assessment
1401 South Main Street
76104
ST. HELENA ADDITION
I
Fort Worth Drug & 1, 2 & 3 1 135' Existing facilities No Assessment
Notion Company Ind®
1601 South Main Street
76104
Laurel Street intersects
10,
PROJECT NO. 104-22000-143, UNIT 4: SOUTH MAIN STREET, Continued:
BLOCK
O4NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMEN
EAST SIDE ST.HELENA ADDITION
Floyd J. Morris, Jr. N.37.5 of 1 2 37.5'Existing facilities No Assessment
1801 Ems.Road E. Comm.
76116
Mrs. Ruth Mathews S.12.5 of 1 & 2 37.5' Existing facilities No Assessment
1703 S. Main St. N. z of 2 Comm.
76110
Wilma Blewett Little SZ of 2 & 2 65 ' Existing facilities No Assessment
608 Fort Worth Club Bldg, lot 3 Comm.
306 ;,Test 7th Street
76102
Floyd J. Morris, Jr. 4 .2 50' Existing facilities No Assessment
1801 Ems Road East Comm.
76116
R. E. Snyder 5 2 50' Existing Facilities No Assessment
1716 Bryan Avenue Comm.
76110
UNIT 4:
TOTAL COST TO PROPERTY OMERS. . . . . .. . .. . . . .. . . . . -0-
TOTAL COST TO CITY OF FORT WORTH .. . . . . . . . . . . . . .$30,104.39
TOTAL CONSTRUCTION COST. . .. . . . . .. . . .. . . . . . .. . . . .$30,104.39
11.
PROJECT NO. 104-22000-143 UNITS 5 & 5A: JEFFERSON-BRYAN AVENUE FROM SOUTH MAIN STREET EAST
& NORTH APPROXIMATELY 450 . Jefferson Avenue will be improved by constructing a six-inch
thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with
seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot road-
way. Bryan Avenue will be improved by constructing a six-inch thick hot-mix asphaltic con-
crete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter on a thirty-foot roadway ending in an eighty foot
cul-de-sac. Six-inch thick concrete driveways will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE ST. HELENA ADDITION
Beginning at the NE corner of South Main and Jefferson.
R. E. Snyder 5 2 100' Existing facilities No Assessment
1716 Bryan Avenue Ind.
76110
R. E. Snyder 6 2 100' Existing facilities No Assessment
1716 Bryan Ind.
76110
Bryan Avenue intersects
SOUTH SIDE J. BURSEY SURVEY
Fort Worth Drug & Tract 1, 179.58' Pavement $10.52 $1,889.18
Notion Co. .936 Acres Ind. 179.58' Curb & Gutter 3.43 615.96
1601 S. Main St. $2,505.14
12.
UNIT 5A: BRYAN AVENUE, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE ST. HELENA ADDITION
R.E. Snyder 6 2 35' Pavement $10.52 $368.20
1717 Bryan Ind. 35' Curb & gutter 3.43 120.05
76110 85 Sq. Ft. Driveway 1.38 117.30 $605.55
Sam Ramirez 7 2 Owner occupied
1712 Bryan Ind. 50' Pavement $ 6.79 $339.50
76110 50' Curb & gutter 3.43 171.50
85 Sq. Ft. Driveway 1.38 117.30 $628.30
Joe Ellis 8 2 40' Pavement $10.52 $420.80
996 Lingville Road Ind. 40' Curb & gutter 3.43 137.20
Stephenville, Texas 85 Sq. Ft. Driveway 1.38 117.30 $675.30
R.J. Moss 9 2 Owner occupied
1704 Bryan Ind. 50' Pavement $ 6.79 $339.50
76110 50' Curb & gutter 3.43 171.50
85 Sq. Ft. Driveway 1.38 117.30 $628.30
T.W. Wiese 10 2 30' Pavement $10.52 $315.60
1701 Bryan Ind. 30' Curb & gutter 3.43 102.90 $418.50
76110
EAST SIDE
City of Fort Worth 1 4 30' No Assessment
Ind.
i3.
UNIT 5A: BRYAN AVENUE, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE ST. HELENA ADDITION
City of Fort Worth 2 4 50' Pavement No Assessment
Ind. 50' Curb & gutter
Fort Worth Drug & 3 4 107.47' Shallow lot (32%)
Notion Company Ind. 107.47' Pavement $10.52 $1,130.58
1601 S. Main St. 107.47' Curb & gutter 3.43 368.62
76104 $1~ 499.20
Less 68% - 1,019.46
$ 479.74
UNIT 5 & 5A:
TOTAL COST TO PROPERTY OWNERS. . . .. .. .. . . . .. .. .. . . . .$ 5,940.83
TOTAL COST TO CITY OF FORT 14ORTH . . . . .. . . .. .. . . . . . .$11,373.01
TOTAL CONSTRUCTION COST. . . ... . . . .. . . . . . . .. . .. . . . . . .$172313.84
14.
PROJECT NO. 104-22000-143, UNIT 6: E114400D AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE LA14N TERRACE ADDITION (HARRIS REVISION)
Beginning at the NE corner of Elmwood Avenue and Epps Street.
Jimmie L. Hibbler 4 19 33' Pavement $12.83 $423.39
2309 Lena Ind. 33 ' Curb & gutter 3.43 113.19
76105 107 Sq. Ft. Driveway 1.38 147.66
$ 684.24
J. I. Black 3 19 42 ' Pavement $12.83 $538.86
5063 Gaines Court Ind. 42 ' Curb & gutter 3.43 144.06
76117 107 Sq. Ft. Driveway 1.38 147.66
$ 830.58
W. B. Johnson 2 19 42' Pavement $12.83 $538.86
1118 E. Allen Ind. 42 ' Curb & gutter 3.43 144.06
76104 234 Sq. Ft. Driveway 1.38 322. 92
$1,005.84
W. J. Johnson 1 19 42' Pavement $12.83 $538.86
1118. E. Allen Ind. 42 ' Curb & gutter 3.43 144.06
$ 682.92
Arizona Avenue intersects.
15.
PROJECT NO. 104-22000-143, UNIT 6: ELWOOD AVENUE, continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE LAI-IN TERRACE ADDITION (HARRIS REVISION)
Louise A. Rodgers 6 18 Owner occupies
1717 Arizona Ind. 100' Pavement $7.95 $795.00
76104 100' Gutter only 1.72 172.00
$967.00
Adjusted by Council Action to. . . . . . . . . . . . . . . . $ 900.00
Reproco Corp. 5 18 100' Pavement $12.83 $1,283.00
c/o Phillips Petroleum Co. Ind. 1.72 172.00
P. 0. Box 1967 $1,455.00
Houston, Texas 77001 Adjusted by Council Action to. . . . . . . . . . . . . . . . $1,000.00
Louisiana Avenue intersects.
SOUTH SIDE
Joe Day, Jr. & W77.4-2 & 20 127' Pavement $12.83 $1,629.41
Peter J. Pealer E50-3 Ind. 127' Curb & gutter 3.43 435.61
1135 Pebble Creek Road $2,065.02
76107
Catarino Alvarado 1'1z-3 20 50' Pavement $12.83 $ 641.50
2223 Prospect Avenue Ind. 50' Curb & gutter 3.43 171.50
76106 107 Sq. Ft. Driveway 1.38 147.66
$ 960.66
W. E. Robinson E50-4 20 50' Pavement $12.83 $ 641.50
1335 E. Myrtle Ind. 50' Curb & gutter 3.43 171.50
$ 813.00
16.
PROJECT NO. 104-22000-143, UNIT 6: EL11W00D AVENUE: Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE
Confederated Life Ins.Co. W24-4 20 64' Pavement $12.83 $821.12
P. 0. Box 2090 & E40-5 Ind. 64' Curb & gutter 3.43 219.52
Dallas, Texas $1,040.64
Exell Darden W 60-5 20 60' Pavement $12.83 $769.80
1334 E. Myrtle Ind. 60' Curb & gutter 3.43 205.80
76104 107 Sq. Ft. Driveway 1.38 147.66
$1,123.26
Lindbergh McMillian E-50-6 20 40' Pavement $12.83 $513.20
5244 Mansel Lane Ind. 40' Curb & gutter 3.43 137.20
76134 $650.40
UNIT 6:
TOTAL COST TO PROPERTY OWNERS. .. . . . . . . .. . . . . . . .$11,756.56
TOTAL COST TO CITY OF FORT WORTH . . .. . .. .. . . ...$ 7,394.11
TOTAL CONSTRUCTION COST... .. . .. . . . . . .... . . .. . . .$19,150.67
17.
PROJECT NO. 104-22000-143, UNIT 7 : MADDOX AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a thirty-six foot roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE LAWN TERRACE ADDITION
Beginning at the NE corner of Maddox Avenue and Epps Street.
James E. Williams EZ-W2-14 32' Pavement $12.83 $ 410.56
2413 Annglenn 32' Gutter only 1.72 55.04
76119 $ 465.60
Adjusted by Council Action to. . . . . . . . . . . .. .. . ... .$320.00
Louis Houston WZ,EZ of 14 32'Pavement $12.83 $ 410.56
519 E. Maddox 32' Gutter only 1.72 55.04
$ 465.60
Adjusted by Council Action to. . .$320.00
85 Sq. Ft. Driveway $ 1.38 $ 117 .30 $437 .30
Louis Houston E'k of 14 13 32' Pavement $12.83 $ 410.56
519 E. Maddox Ind. 32' Gutter only 1.72 55.04
$ 465.60
Adjusted by Council Action to.... . .. . .. . . . .. ... . .$320.00
Arizona Avenue Intersects
James E. Williams 15 12 100' Pavement $12.83 $1,283.00
2413 Annglenn Ind. 100' Gutter only 1.72 172.00
76119 $1,455.00
Adjusted by Council Action to. .. ... .... .. . . . . . . . .$750.00
Gilbert Cook W38 of 14 12 38' Pavement $12.83 $ 487.34
1601 Arizona Ind. 38' Gutter only 1.72 65.36
76104 $ 552.90
Adjusted by Council Action to. . . . . . .. . . .. . . . .. . . .$400.00
James Harvey E62 of 14 12 Owner occupied
1514 Louisiana Ind. 62' Pavement $ 7.95 $ 492.90
76104 62' Gutter only 1.72 106.64 $599.54
18.
PROJECT NO. 104-22000-143, UNIT 7: MADDOX AVENUE FROM EPPS STREET, Continued:
BLOCK
MNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMEN
NORTH SIDE LAWN TERRACE ADDITION
Louisiana Avenue intersects
SOUTH SIDE
J. C. Henderson 1 15 100' Pavement $12.83 $1,283.00
1020 East Cannon Ind. 100' Gutter only 1.72 172.00
76104 $1,455.00
Adjusted by Council Action to. . . . . . . .. . . . .. . ... . . .. . . . . . .$1,300.00
Owner occupied
Gilbert Cook 10 15 100' Pavement $ 7.95 $ 795.00
1601 Arizona Ind. 100' Gutter only 1.72 172.00
76104 $ 967.00
Arizona Avenue intersects
Owner occupied
waymond Price 1 14 85' Pavement $ 7.95 $ 675.75
1600 Arizona Ind. 85 ' Gutter only 1.72 146.20
76104 .$ 821.95
UNIT 7:
TOTAL COST TO PROPERTY (VNERS. .. . . . . . . . .. . . . . . .. . . . . . . . .$ 5,915.79
TOTAL COST TO CITY OF FORT WORTH. . . . . . .. . . . . . . .. ... . .. . .$11,576.98
TOTAL CONSTRUCTION COST. . . . . . .. .. . . . . . .. . . . . . . . . . . .. . . . .$17,492.77
19.
PROJECT NO, 104-22000-143: UNIT 8 EAST ALLEN AVENUE FROM BRYAN STREET TO 150' EAST, to be
improved constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thicl
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter on a thirty foot roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE F. RICHARDS SURVEY
Beginning at the NE corner of Bryan Avenue and Allen Avenue.
St, Joseph's Hospital 155' Existing facilities No Assessment
1401 South Main Street
76104
SOUTH SIDE ST. HELENA ADDITION
Fort Worth Drug & 6 3 15' Existing facilities No Assessment
Notion Company Ind.
1601 S. Main Street
76104
William Rohleder 1 3 100' Existing facilities No Assessment
1601 Bryan Ind,
76110
ALLEY PAVING
WEST SIDE
Fort Worth Drug & 6 3 75' No Assessment
Notion Co. Ind,
1601 South Main St,
76104
20.
PROJECT NO. 104-22000-143: UNIT 8, EAST ALLEN AVENUE, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
ALLEY PAVING ST.HELENA ADDITION
WEST SIDE
Manuel Coronado 2 3 25 ' No Assessment
1605 Bryan Ind.
76110
William G. Rholeder 1 3 50' No Assessment
1601 Bryan Ind.
76110
UNIT 8:
TOTAL COST TO PROPERTY OWNERS. . .. . . . . . . . . .. . . . - 0 -
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . .. .$ 7,185.38
TOTAL CONSTRUCTION COST .. . . . . . .. .. . .. . .. . .. ..$ 7,185.38
21.
NO 104-22000-143 UNIT 9: EPPS STREET FROM ELMWOOD AVENUE TO MADDOX AVENUE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE M.K.T. RAILROAD R.O.W.
M.K.T. Railway Company 700' Traffic channelization No Assessment
2101 Epps Street
76104
EASE T SIDE LAWN TERRACE ADDITION
Waymond Price 1 14 65' Traffic channelization No Assessment
1600 Arizona Ind.
76104
Waymond Price 2 14 50' Traffic channelization No Assessment
1600 Arizona Ind.
76104
Helen Peterson 3 & N'k of 4 & 14 75' Traffic channelization No Assessment
3601 Monticello N45 of 6 Ind.
76107
Lonnie F. Redmond S45 of 6 14 45' Traffic channelization No Assessment
1614 Arizona
76104
22.
P
PROJECT NO. 104-22000-143, UNIT 9: EPPS STREET, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE LAWN TERRACE ADDITION
C.L. Hunter, Jr. S65 of 8 40' Traffic channelization No Assessment
1704 Arizona 19
76104 Ind.
Henry Gentry 5 19 135' Traffic channelization No Assessment
1805 W. Rosedale Ind.
76104
UNIT 9:
TOTAL COST TO PROPERTY OWNERS... .. . . .... .... .- 0 -
TOTAL COST TO CITY OF FORT WORTH. .. . .. . ... . . .$ 46,438.43
TOTAL CONSTRUCTION COST. . . . . .. . . .. . . . . .. . ... .$ 46,438.43
ALL UNITS:
TOTAL COST TO PROPERTY OWNERS.. . . . .. . ... .. .. . . . . . .. . . . .$ 27,250.70
TOTAL COST TO CITY OF FORT WORTH. . . . . .... . . .. .. . .. .. . . .$1,431,237.32
TOTALCONSTRUCTION COST... . . . ... . . .. . . . . . . .. . . . . . . . . . ..$1,458,488.02
23.
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE SUBJECT. Final Payment-Allen Ave.Overpass PAGE
NUMBER Construction and Related Street Improve- ,
2/7/77 FP-1208 ments (Contract No. 8171)Project No. Iof -
104-22143
Final Council action on the project described below is requested.
Project Description
Name: Allen Ave. Overpass Construction & Related Street Improvements
(Contract No. 8171) Project No. 104-22143
Contractor: Navarro Contracting Co.
Contract Awarded: February 24, 1975 (M&C C-3022)
Work Order Issued: July 8, 1975
Work Order Effective: July 14, 1975
Work Began: July 21, 1975
Project Complete and Final Inspection: Nov. 23, 1976
Final Construction Approval: Jan. 20, 1977
Working Time Bid: 300 Working Days
Working Time Used: 238 Working Days
Project Cost and Financing
Original Bid Price: $1,389,751.09
Change Order No. 1: -$13,182.15 (M&C C-3654)
Revised Bid Price: $1,376,568.94
Final Contract Cost: $1,325,898.20
Partial Payments Previously Made: 19 Amount: $1,189,775.83
Final Payment Due: $136,122.37
Sufficient funds are available for the final payment to be made from Project
No. 104-22143-0002.
Deviation from Bid Price: The final contract cost of this project is
$50,670.74 under the revised bid price. The major portion of the savings
is the result of the following: (1) The estimated cost for railroad flagmen
underan $35,026.63; (2) fewer utility adjustments were required than estimated
( - $2,861.41) ; (3) the work required less class "B" reinf. conc. rip rap than
estimated in the contract specifications, effecting a savings of $3,010.80;
(4) It was not necessary to relocate the anticipated amount of existing fences
( - $2,151.75); (5) The required C.Y. of unclass. borrow was considerably
less than was estimated resulting in a savings of $5,868.15. The remaining
cost difference ( - $1,752.00) is attributed to minor variations between
quantities estimated in the contract specifications and quantities measured
and used at the job site.
DATE REFERENCE SUBJECT: Final Payment-Allen Ave. Overpass PAGE
NUMBER Construction and Related Street Improve-
2/7 77 FP-1208 Iments (Contract No. 8171) Project No. 2 °r ?
104-22143
Compliance with Specifications
Tests made during construction show that materials used and required thick-
nesses were in compliance with the contract specifications.
Recommendations
It is recommended that the project described be accepted by the adoption
of an ordinance and final payment of $136,122.37 be made to Navarro
Contracting Co.
GG:vcm
SUBMITTED BY: DISPOSITIO Y COUNCIL: PROCESSED BY
APPROVED p OTHER (DESCRIBE)
) `7 �[ /4
T J� CITY SECRETARY
/? DATE