Loading...
HomeMy WebLinkAboutOrdinance 6593 ORDINANCE NO. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF AMANDA STREET AND PORTIONS OF SUNDRY OTHER STR7MTS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, T�CAS; 1ECLARING THT COMRACT WITH TEXAS BITULITHIC COMPANY FOR THE' CONSTRUCTION OF SAID IMPROV 10ENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATE'S IN VIDE OE OF SPECIAL ASSESS- MENTS LEVIED AFTER GIVING EFFECT TO SU►IEY CREDITS HEPE'IN AUTHORIZED AND ALLOWED AGAINST SOMV OF SAID ASSESSMTNTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND E-11ROLL THIS OPDI??.ANCE BY COPYING THE. CAP- TION OF SAM✓' IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AFI) EFF?+'CTIVE DATE. ITMEAS, the City of Fort Worth, Texas, has heretofore entered into a contract with ,TEXAS BITULITHIC COMPANY for the making and construction of certain street improvements on the hereinafter described portions of streets. avenues and public places In said City, to-wit: UNIT 1: AMANDA STREET From Ramey Avenue to East Rosedale Street, known and designated as Unit 1, Project No. 104-24000-189. WHEREAS, by sundry proceedings heretofore passed by the City Council of the ri.ty of Fort Worth, Texas, including Ordinance No. 6416 a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the city of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6416 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT.- I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; .and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on'the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows.- III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the. appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS j;ga day of , 19 APPROVED AS TO FORM AND LEGALITY: �rE 00 / City Attorney ?ROJZCT NO. 104-24000-189, AI�NDA 4TREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, to be improved by constructing six-inch thick reinforced concrete pavement on a four-inch thick ___anent stabilized sunbgrade9 seven-inch high concrete curb and eighteen-inch wide concrete x•y:tter so that the finished street will consist of one thirty-six foot roadway and by con- 8rI- .°urting four-foot wide concrete sidewalk and six-inch thick concrete driveways where spacified. BLOCK "�1 � 1k ]GOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT 3EGI e'N1�ICO' AT NORTHWEST CORNER OF RAMEy AVENUE AND AMANDA STREET WEST 'SIDE OF STREET W. R. HUWARD ADDITION Dewey Alexander 10 3 37 ° Pavement $7.73 $286.01 2134 Amanda Comm. 34' Curb .& Gutter 2.31 78.54 22` Sidewalk 2.80 61.60 85 Sq. Ft. Drive .83 70.55 $496.70 cliver :Miller 9 3 50' Pavement $7,73 $386.50 "32 Amanda Comm. 50' Curb & Gutter 2.31 115.50 36' sidewalk 2.80 100.80 85 Sq. Ft. Drive .83 70.55 $673.35 MLggie & General 8 3 50' Pavement $3.92 $196.00 Rr u Res. 50' Curb & Gutter 2,31 115.50 Waller Street 50' Sidewalk 2.80 140.00 San Francisco, Calif. $451.50 N,iw Light SDS 7 & 3 100' Pavement $3.92 $392.00 F.3uae �3f 'gayer 6 Res. $392.00 2126 Amanda; y: e ie bell Barnes 5 3 50' Pavement $3.92 $196.00 c,7ya 3z,,llo Hertzfield Res. 50' Curb & Gutter 2.31 115.50 'y.3. Box 2206 35° Sidewalk 2.80 98.00 52 Sq. Ft. Drive .83 43.16 $452.66 1 PROJECT NO. 104-24000-189 AMANDA STREET FROM RANEY AVENUE TO EAST ROSEDALE STREET CON- TINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT, WEST SIDE OF STREET W. R. HOWARD ADDITION Willie White 4 3 50' Pavement $3.92 $196.00 2122 Amanda Res. 50' Curb & Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Drive .83 70.55 $491.25 Berkowitz Properties, 3 3 50' Pavement $3.92 $196.00 Inc. Res. 50' Curb & Gutter 2.31 115.50 729 lCd. 28th 50' Sidewalk 2.80 140.00 $451.50 Rev. C. C. Carson 2 3 50' Pavement $3.92 $196.00 1406 E. Allen Res. 50' Curb & Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Drive .83 70.55 $491.25 Andy Conner 1 3 65' Pavement $3.92 $254.80 2300 Amanda Res. 65' Curb & Gutter 2.31 150.15 54' Sidewalk 2.80 151.20 85 Sq. Ft. Drive .83 70.55 $626.70 BURNS STREET IWERSECTS Solomon Brooks 10 2 65' Pavement $3.92 $254.80 8037 S. Maryland Ave. Res. 65' Curb & Gutter 2.31 150.15 Chicago, 111. 60619 43' Sidewalk 2.80 120.40. 171 Sq. Ft. Drive .83 141.93 $667.28 2 PROJECT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CON- TINUED P BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET W. R. HOWARD ADDITION Myrtle Agers 9 2 50' Paverir.nt $3.92 $196.00 2110 Amanda Res. 50' Curf, & Gutter 2.31 115.50 36° S iee,ia lk 2.80 100.80 85 Sq. Ft. Drive .83 70.55 $482.85 Pearline Washington 8 2 50' Pavement $3.92 $196.00 2108 Amanda . Res. 50' Curb & Gutter 2.31 115.50 35' Sidewalk 2.80 98.00 85 Sq. Ft. Drive .83 70.55 $480.05 Estella Johnson 7 2 50' Pavement $3.92 $196.00 1369 Justin Avenue Res. 50' Curb & Gutter 2.31 115.50 Glendale, California 39' Sidewalk 2.80 109.20 85 Sq. Ft. Drive .83 70.55 $491.25 Ellis Collins, Jr. 6 2 50' Pavement $3.92 $196.00 5623 Goodman Res. 50' Curb & Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Drive .83 70.55 $491.25 Elizabeth Temple 5 2 50' Pavement $3.92 $196.00 2100 Amanda Res. 50' Curb & Gutter 2.31 115.50 35' Sidewalk 2.80 98.00 41 Sq. Ft. Drive .83 34.03 $443.53 3 PROJECT NO. 104-24000-189, AMANDA STREET FROM RANEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF THE STREET W. R. HOWARD ADDITION Lois F. Ellison 4 2 50' Pavement $ 3.92 #196.00 2920 Elinor Res. 50' Curb & Gutter 2.31 115.50 30' Sidewalk 2.80 84.00 155 Sq. Ft. Driveway .83 128.65 $ 524.15 A. L. Jackson 3 2 _ 50' Pavement $11.54 $577.00 2008 Amanda Comm. 50' Curb & Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Driveway .83 70.55 $ 872.25 Wade Loyd 2 2_ 50' Pavement $11.54 $577.00 2004 Amanda Res. 50' Curb & Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Driveway .83 70.55 $ 872.25 Mrs. Ed Pointer 1 2 45' Pavement $11.54 $619.30 2809 N. Main Comm. 45' Curb & Gutter 2.31 103.95 20' Sidewalk 2.80 56.00 194 Sq. Ft. Driveway .83 1,61.02 $ 840.27 CHAPMAN STREET INTERSECTS J. A. Moreland 3 50' Pavement $11.54 $577.00 1930 Amanda Comm. 50' Curb & Gutter 2.31 115.50 50' Sidewalk 2.80 140.00 $ 832.50 4 PROJECT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET W.R. HOWARD ADDITION Elsie Narene Priddy 2 & 1 100' Pavement $11.54 $1,154.00 4208 Trail Lake 1 Comm. 100' Curb & Gutter 2.31 231.00 50' Sidewalk 2.80 140.00 388 Sq. Ft. Drive .83 322.04 $1,847.04 BRACKEEN SUBDIVISION Charles F. Ball, Sr. 4 2 58' Pavement $11.54 $ 669.32 P.O. Box 773 Comm. 58' Curb & Gutter 2.31 133.98 Hurst, Texas 58' Sidewalk 2.80 162.40 $ 965.70 Johnnie Bell, 3 2 46.5' Pavement $11.54 $ 536.61 Corine Daggett, Comm. 46.5' Curb & Gutter 2.31 107.42 George Daggett 35.5' Sidewalk 2.80 99.40 and Lillie Mae Daggett 85 Sq. Ft. Drive .83 70.55 c/o Katie Davis Holloway $ 813.98 1916 Amanda Winnie Davis 2 2 52.25' Pavement $ 7.73 $ 403.89 1910 Amanda Comm. 52.25' Curb & Gutter 2.31 120.70 41.25' Sidewalk 2.80 115.50 85 Sq. Ft. Drive .83 70.55 $ 710.64 Maeola Clayton Twine 1 & 2 52.25' Pavement $ 7.73 $ 403.89 & Amanda Clayton Forte N. Comm. 52.25' Curb & Gtr. 2.31 120.70 1908 Amanda 1.25' 41.25' Sidewalk 2.80 115.50 of 2 109 Sq. Ft. Drive .83 90.47 $ 730.56 5 PR:OJFCT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET G�W. COONROD SURVEY Mollie Davis Nichols Tract 34 38' Pavement $ 7.73 $ 293.74 1908 Amanda Comm. 38' Curb & Gutter 2.31 87.78 38' Sidewalk 2.80 106.40 $ 487.92 WEST SIDE OF STREET BRACKEEN SUBDIVISION SECOND FILING Ottie Conner 4 76' Pavement $11.54 $ 877.04 1900 Amanda Comm. 76' Gutter Only 1.16 88.16 $ 965.20 Ernest Williams 1 76' Pavement $11.54 $ 877.04 2712 S. Jones Comm. 66' Curb & Gutter 2.31 152.46 10' Gutter Only 1.16 11.60 66' Sidewalk 2.80 184.80 $1,225.90 Moses Temple 11 98' Pavement $11.54 $1,130.92 2100 Amanda Comm. 78' Sidewalk 2.80 218.40 $1,349.32 WILLIE STREET INTERSECTS Ladell & Clara Smith 10 98' Pavement $11.54 $1,130.92 1408 Illinois Comm. 98' Curb & Gutter 2.31 226.38 78' Sidewalk 2.80 218.40 $1,575.70 6 PROJECT NO 104-24000-189 AMANDA STREET FROM RANZY AVENUE TO EAST ROSEDALE SIMET, CONTINUED BLOC[ OWNER LOT ZONING FRONTAGE RATE AMOUNT A3SLSSMENT WEST SIDE OF STREET G. W. COONROD SURVEY Cowan Methodist Tract 29 760 Pavement $3.92 $297.92 Church Comm. 760 Curb b Gutter 2.31 175.56 1700 Amanda 56' Sidewalk 2.80 156.80 155 Sq. Ft. Drive .83 128.65 $ 758.93 Mira. Richard H. Taylor 76' Pavement $7.73 $587.48 1622 Amanda Tract 28 Comm. 76' Curb 6 Gutter 2.31 175.56 65' Sidewalk 2.80 182.00 85 Sq. Ft. Drive .83 70.55 $1,015.59 Mark Williams Tract 26-A 76' Pavement $7.73 $587.48 1620 Amanda Comm. 76' Curb 6 Gutter 2.31 175.56 58' Sidewalk 2.80 162.40 140 Sq. Ft. Drive .83 116.20 $1,041.64 Ester P. Nance Tract 24 76' Pavement $11.54 $877.04 11936 Oberlin Dr. Comm. 76' Curb & Gutter 2.31 175.56 Dallas, Texas 56' Sidewalk 2.80 156.80 155 Sq. Ft. Drive .83 128.65 $1,338.05 Miss Johnnie Bell Tract 23 76' Pavement $11.54 $877.04 2012 Dillard Comm. 76' Curb 6 Gutter 2.31 175.56 76' Sidewalk 2.80 212.80 $1,265.40 7 PROJECT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET - CONTINUBD_ BLOCK OWNER LOT ZONING_ FRONTAGE RATE AMOUNT_ ASSESSMENT WEST SIDE OF THE STREET G. W. COONROD SURVEY Ada Bell Jones Tract 16-A 52.5' Pavement $ 7.73 $405.83 1608 Amanda Comm. 52.5' Curb & Gutter 2.31 121.28 41.5' Sidewalk 2.80 116.20 85 Sq. Ft. Driveway .83 70.55 $ 713.86 Mattie Jones Tract 16 52.5' Pavement $ 7.73 $405.83 1606 Amanda Comm. 52.5' Curb 6 Gutter 2.31 121.28 41.5' Sidewalk 2.80 116.20 85 Sq. Ft. Driveway .83 70.55 $ 713.86 R. P. Estes Tract 15-A 52' Pavement $11.54 $600.08 1107 Burk Burnett Comm. 52' Curb 6 Gutter 2.31 120.12 30' Sidewalk 2.80 84.00 171 Sq. Ft. Driveway .83 141.93 $ 9".13 Jerome Mitchell Tract 15 54' Pavement $11.54 $623.16 5141 Fitzhugh Comm. 54' Curb 6 Gutter 2.31 124.74 36' Sidewalk 2.80 100.80 140 Sq. Ft. Driveway .83 116.20 $ 964.90 Harold Bergstrom Tract 14 50' Pavement $11.54 $577.00 634 College Comm. 50' Curb & Gutter 2.31 115.50 Grand Prairie, Texas 50' Sidewalk 2.80 140.00 75050 $ 832.50 8 PROJECT NO. 104=24000-189, AMANDA STREET FROM RANEY AVENUE TO EAST ROSEDALE STREET, CON- TINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET G. W. COONROD SURVEY G. W. Harris Tract 13 50' Pavement $11.54 $577.00 5135 Meadowbrook Drive Comm. 50' Curb f< Gtr. 2.31 115.50 39' S idewE lk 2.80 109.20 85 Sq. Tt. Drive .83 70.55 $872.25 Dan Dornbuckle Tract 12 50' Pavement $ 7.73 $386.50 1512 Amanda Comm. 50' Curb & Gtr. 2.31 115.50 39' Sidewalk 2.80 109.20 85 Sq. Ft. Drive .83 70.55 $681.75 Laurabeth Hicks Tract 11-A 50' ]Pavement $11.54 $577.00 P.O. Box 9273 Comm. 501 Curb & Gtr. 2.31 115.50 Southern University 50' Sidewalk 2.80 140.00 Baton Rouge, La. $832.50 Louella Sanders Tract 11 52' Pavement $11.54 $600.08 1200 Missouri Comm. 52' Curb & Gtr. 2.31 120.12 32' Sidewalk 2.80 89.60 155 Sq. Ft. Drive .83 128.65 $938.45 S. D. Fry Tract 10 52' Pavement $11.54 $600.08 5209 Cottey Comm. 52' Curb & Gtr. 2.31 120.12 52' Sidewalk 2.80 145.60 $865.80 9 PROJECT NO, 104-24000-189, AM4NDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET G. W, COONROD SURVEY John Pullium Tract 9 57.56' Pavement $11.54 $664.24 2511 Marlin Comm. 57.56' Curb & Gtr. 2.31 132.96 57.56' Sidewalk 2.80 161.17 Ir $ 958.37 COWAN STREET INTERSECTS George Alexander Tract 7 66.26' Adjusted to 913 East Stella Comm. 60' Pavement $11.54 $692.40 60' Curb & Gutter 2.31 138.60 49' Sidewalk 2.80 137.20 85 Sq. Ft. Drive .83 70.55 $1,038.75 Mrs. Woodrow James Tract 7-C 75' Pavement $7.73 $579.75 1414 Amanda Comm. 75' Curb & Gutter 2.31 173.25 57' Sidewalk 2.80 159.60 140 Sq. Ft. Drive .83 116.20 $1,028.80 J. W. WASHINGTON SUBDIVISION Theodora Ross, Nadine 2 45' Pavement $11.54 $519.30 Crenshaw Rasberry and Comm. 45' Curb & Gutter 2.31 103.95 Betty J. Wiley 45' Sidewalk 2.80 126.00 1816 Ellington Drive $ 749.25 Theodora Ross, Nadine 1 45' Pavement $11.54 $519.30 Crenshaw Rasberry and Comm. 45' Curb & Gutter 2.31 103.95 Betty J. Wiley 45' Sidewalk 2.80 126.00 1816 Ellington Drive $ 749.25 Adolphus Hill A & 110.76' Pavement $3.92 $434.18 1408 Amanda B Res. 110.76' Curb & Gtr. 2.31 255.86 88.76' Sidewalk 2*.80 248.53 171 Sq. Ft. Drive .83 141.93 $1,080.50 10 PROJECT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CON- TINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET G. W. COONROD SURVEY Frank Tamayo Tract 6-B 110.75' Pavement $ 3.92 $ 434.14 1402 Amanda Rea. 110,75' '.:pjrb & Gtr. 2.31' 255.83 99.75' Sidewalk 2.80 279.30 85 Sq. Ft. Drive .83 70.55 $1,039.82 P. S. Kolius S. 110, 110' Pavement $ 3.92 $ 431.20 5112 Cliffview of Res. 110' Curb & Gtr. 2.31 254.10 Tract 6-A 110° Sidewalk 2.80 308.00 $ 993.30 P. S. Kolius N. 180' 180' Pavement $11.54 $2,077.20 5112 Cliffview of Comm. 180' Curb & Gtr. 2.31 415.80 Tract 6-A 130' Sidewalk 2.80 364.00 388 Sq. Ft. Drive .83 322.04 $3,179.04 EAST ROSEDALE INTERSECTS DAN DULANEY SURVEY EAST SIDE OF STREET Robert L. Sanders N. 180' 180' Pavement $11.54 $2,077.20 1900 May of Comm. 180' Curb & Gtr. 2.31 415.80 Tract 1 140' Sidewalk 2.80 392.00 465 Sq. Ft. Drive .83 385.95 $3,270095 Robert L. Sanders S. 120' 120' Pavement $ 3.92 $ 470.40 1900 May of Res. 120' Curb & Gtr. 2.31 277.20 Tract 1 50' Sidewalk 2.80 140.00 388 Sq. Ft. Drive .83 322.04 $1,209.64 11 PROJECT NO. 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WAST SIDE OF THE STREET J. A. CAVILE PLACE AVENUE "G" INTERSECTS Housing Authority N. 175.45' of 175.45' Pavement $ 3.92 $687 76 of Fort Worth Block A $ 687 . 76 P.O. Box 430 Res. Housing Authority S 350' of 350' Pavement $ 3.92$1,372.00 of Fort Worth Block A $1,372 00 P.O. Box 430 Comm. CALUMET STREET INTERSECTS JOHNNIE PULLIUM SUBDIVISION Dixie Acceptance Inc 1 51' Pavement $11.54 $588.54 4077 Woodcock Drive Comm. 51' Curb & Gutter 2.31 117.81 Jacksonville, Florida 35' Sidewalk 2.80 98.00 124 Sq. Ft. Driveway .83 102.92 $ 907.27 Oteria Greer Lee 2 50' Pavement $11.54 $577.00 1531 Amanda Comm. 50' Curb 6 Gutter 2.31 115.50 39' Sidewalk 2.80 109.20 116 Sq. Ft. Driveway .83 96.28 $ 897.98 DAN DULANEY SURVEY B. B. Young Tract 11 50' Pavement $11.54 $577.00 455 S. Calhoun Comm. 50' Curb 6 Gutter 2.31 115.50 35' Sidewalk 2.80 98.00 85 Sq. Ft. Driveway .83 70.55 $ 861.05 12 PROJECT N0. 104-24000-189, AMANDA STREET FROG! RAMEY AVENUE TO EAST ROSEDALE STREET - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET DAN DULANEY SURVEY Seporah Ann Jones Tract 12 50' Pavement $ 7.73 $386.50 1539 Amanda Comm 50' Curb 6 Gutter 2.31 115.50 36' Sidewalk 2.80 100.80 65 Sq. Ft. Driveway .83 70.55 $ 673.35 KATY STREET INTERSECTS Willie Matthews Tract 14-D 82' Pavement $ 7.73 $633.86 1603 Amanda Coaam. 82' Curb 6 Gutter 2.31 189.42 60' Sidewalk 2.80 168.00 85 Sq. Ft. Driveway .83 70.55 $1,061.83 Covell Anderson N. 61' of 61' Pavement $ 7.73 $471.53 1607 Amanda Tract 15 Comm. 61' Curb 6 Gutter 2.31 140.91 50' Sidewalk 2.80 140.00 85 Sq. Ft. Driveway .83 70.55 $ 822.99 Berkowitz Properties, S. 50' __. 50' Pavement $11.54 $577.00 Inc. of Tract 15 Comm. 50' Curb 6 Gutter 2.31 115.50 729 NW. 28th Street 41 Sq. Ft. Driveway .83 34.03 $ 726.53 CHARLO►ITE GOINS SUBDIVISION B. A. Barnes C 111' Pavement $11.54 $1,280.94 1504 W. Abrams Comm. 111' Curb 6 Gutter 2.31 256.41 Arlington, Texas 71' Sidewalk 2.80 198.80 310 Sq. Ft. Driveway .83 257.30 $1,993.45 13 PROJECT N0. 104-24000-189, AMANDA STREET FROM RANEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET DAN DULANEY SURVEY Willie E. Murray Tract 18-C 56' Pavement $11.54 $646.24 4750 Ramey Comm. 56' Curb & Gutter 2.31 129.36 45' Sidewalk 2.80 126.00 85 Sq. Ft. Drive .83 70.55 $ 972.15 John Hornbuckle Tract 18 55' Pavement $11.54 $634.70 1629 Amanda Comm. 55' Curb 6 Gutter 2.31 127.05 35' Sidewalk 2.80 98.00 155 Sq. Ft. Drive .83 128.65 $ 988.40 John Hornbuckle Tract 19 55.5' Pavement $7.73 $429.02 1629 Amanda Comm. 55.5' Curb 6 Gtr. 2.31 128.21 35.5' Sidewalk 2.80 99.40 155 Sq. Ft. Drive .83 128.65 $785.28 Clifford McCoy Tract 21 55.5' Pavement $11.54 $640.47 2001 Danner Comm. 555' Curb 6 Gtr. 2.31 128.21 35.5' Sidewalk 2.80 99.40 155 Sq. Ft. Drive .83 128.65 $ 996.73 STALCUP'S ADDITION FIRST FILING Hettie Burns Motley 1 14 65' Pavement $7.73 $502.45 1703 Amanda Comm. 5' Curb & Gutter 2.31 11.55 50' Sidewalk 2.80 140.00 23 Sq. Ft. Drive .83 19.09 $ 673.09 Walter D. Burns 2 14 65' Pavement $7.73 $502.45 1705 Amanda Comm. 61' Sidewalk 2.80 170.80 $ 673.25 14 PROJECT NO. 104-24000-189, AMANDA STREET FROM RANEY AVENUE TO EAST ROSEDALE STREET, CON- TINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET STALCUP°S ADDITION, FIRST FILING WILLIE STREET INTERSECTS W. 1Killingsworth 6 & 9 66.67' ?Evement $11.54 $ 769.37 Rt. 1 Box 62-A N. 20' Comm. 56.67' Curb & Gtr. 2.31 130.91 Mansfield, Texas of 7 46.67' Sidewalk 2.80 130.68 155 Sq. Ft. Drive .83 128.65 $1,159.61 Homer L. Baughman, Jr. S. 9 73.34' Pavement $11.54 $ 846.34 2913 Princeton 26.67' Comm. 73.34' Curb & Gtr. 2.31 169.42 of 7 58.34' Sidewalk 2.80 163.35 & Lot 8 85 Sq. Ft. Drive .83 70.55 $1,249.66 DUNBAR STREET INTERSECTS Ebenezer Missionary 6 & 10 133' Pavement $ 3.92 $ 521.36 Baptist Church 7 Comm. 127' Sidewalk 2.80 355.60 1901 Amanda $ 876.96 J. C. SCOTT SIUBDIVISION Essie_ Mae Ford 1 1 59.4° Pavement $ 7.73 $ 459.16 1909 Amanda Comm. 35' Curb & Gtr.' 2.31 80.85 44.4' Sidewalk 2.80 124.32 $ 664.33 Mary Corzine ` 2 1 60' Pavement $ 7.73 $ 463.80 1911 Amanda Comm. 600 Curb & Gtr. 2.31 138.60 49' Sidewalk 2.80 137.20 $ 739.60 15 PROJECT NO, 104-24000-189, AMANDA STREET FROM RAMEY AVENUE TO EAST ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET J. C. SCOTT SUBDIVISION William Scott 3 1 60' Pavement $11.54 $692.40 1421 Stewart Comm. 60' Curb & Gutter 2.31 138.60 60' Sidewalk 2.80 168.00 $ 999.00 Murrel Samuel 4 1 60' Pavement $11.54 $692.40 1309 York Drive Comm. $ 692.40 ELGIN STREET INTERSECTS J. B. GRAY ADDITION J. C. Welch N. ' 2 105' Pavement $ 7.73 $811.65 2001 Amanda of 1 Comm. 105' Curb & Gutter 2.31 242.55 91' Sidewalk 2.80 254.80 85 Sq. Ft. Drive .83 70.55 $1;379.55 Fannie Walker N. 2 58.5' Pavement $ 7.73 $452.21 2009 Amanda 58.5' Comm. 58.5' Curb & Gutter 2.31 135.14 of S. 47.5' Sidewalk 2.80 133.00 of 1 85 Sq. Ft. Drive .63 70.55 $ 790.90 Mrs. Catherine Truitt S. 47' 2 47' Pavement $ 7.73 $363.31 2011 Amanda of 1 Comm. 40' Curb & Gutter 2.31 92.40 36' Sidewalk 2.80 100.80 85 Sq. Ft. Drive .83 70.55 $ 627.06 16 PROJECT NOB, 104-24000-189, AMANDA STREET FROM RANEY AVENUE TO FAST ROSEDALE STREET, CON- TINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET JAMES MAYFIELD ADDITT CHAPMAN STREET INTERSECTS Mayfield Baptist 14 2 180' PF.mvrment $' 3.92 $ 705.60 Church thru Res. 175' cutter Only 1.16 203.00 4904 Chapman 17 $ 908.60 MAXWELL SUBDIVISION Irma Wright 1 1 116' Adjusted to 605 Morningside Res. 100' Pavement $ 1.92 $ 392.00 100' Curb & Ctr. 2.31 231.00 100' Sidewalk 2.80 280.00 85 Sq. Ft. Drive .83 70.55 $ 973.55 CALLAHAN STREET INTERSECTS Willie Clark, Jr. W. 92.7° 2 116' Adjusted to 2201 Amanda of 1 Res. 100' Pavement $ 3.92 $ 392.00 $ 392.00 Susie Roberta 12 2 116' Adjusted to Masaingill Res. 100' Pavement $ 3.92 $ 392.00 2123 Amanda 100' Curb & Otr. 2.31 231.00 100' Sidewalk 2.80 280.00 $ 903.00 17 PROJECT NO, 104-24000-189, AMANDA STREET FROM RANEY AVENUE TO ROSEDALE STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET MAXWELL SUBDIVISION HARLEM STREET INTERSECTS Minnie Florence 1 3 116' Adjusted to Stein Rea. 100' Pavement $3.92 $392.00 1305 Hattie 100' Curb & Gutter 2.31 231.00 100' Sidewalk 2.80 280.00 $ 903.00 E. J. Maxwell 12 3 116' Pavement $11.54 $1,338.64 2525 Ridgmar Blvd. Comm. 113' Curb & Gutter 2.31 261.03 104' Sidewalk 2.80 291.20 93 Sq. Ft. Drive .83 77.19 $1,968.06 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . $ 81,596.17 TOTAL COST TO CITY OF FORT WORTH , . . . . . . . 68,331.84 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . $149,928.01 18 City of Fort Worth, Texas Mayor and Council Communication OOBBg DATE REFERENCE SUBJECT: Final Payment m Assessment Paving PAGE NUMBER of Amanda Street from Ramey to East 11/22/71 FP-837 Rosedale Project No. 104-24000-189 lor � Final Countil action on the project described below is requested. Proiect Description Name: Assessment Paving of Amanda Street from Ramey Avenue to East Rosedale, Project Number 104-24000-189 Contractor: Texas Bitulithic Company Contract Awarded: December 12, 1970 (M&C C-1882) Work Order Issued: March 18, 1971 Work Order Effective: March 29, 1971 Work Began: April 6, 1971 Date of Final Inspection and Approval: September 21, 1971 Working Time Bid: 80 Working Days Working Time Used: 71 Working Days Project Cost and Financing Original Bid Price: $135,126.80 Change Order No. l: + 620.40 (A.R. 1-15, 2.1, 8-13-71) Revised Bid Price: 135,747.20 Final Contract Cost: 136,298.19 PartialPayments Previously Made: 5, Amount: $122,568455 Final Payment Due: $13,729.64 Final payment to be made from Project Number 104-24000-189. A bond fund transfer is needed in the amount of $542.80 from Revolving Fund Unspecified, 042-09724-901, to Revolving Fund 042-10424-189. Deviation from Bid Price: The final cost of this project is $550.99 over the re- vised. bid price. This over-run can be attributed to minor variations between quantities estimated in the contract documents and quantities actually measured and used at the job site. Compliance with Specifications Tests made during construction show that materials used and required thicknesses were in compliance with contract specifications. Recommendations It is recommended that: 1) A bond fund transfer of $542.80 from Revolving Fund Unspecified No. 042m 09724-901 to Revolving Fund No. 042-10424 189 to provide additional funds needed. 2) The project described above be accepted by the adoption of an ordinance and final payment of $13,729.64 be authorized to Texas Bitulithic Company. SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY ROVE ❑�OOTT'HER (DESCRIBE) CITY SECRETARY DATE CITY MANAGER f� Z Z -21