Loading...
HomeMy WebLinkAboutOrdinance 6493 ORDINANCE NO. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF LMWTELD DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS- DECLARING THE CONTRACT WITH AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS,~ ME:NTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP- TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with Ausm_COMPANY -for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit. UNIT 1: CYPRESS STREET DELETED UNIT 2: PANOLA AVENUE DELETED UNIT 3: LYNNFTELD DRIVE From Hampshire Boulevard to Jamaica Lane, known and designated as Unit 3, Project No. 104-24000- 208. UNIT 4: VIEW STREET From Tandy Avenue to Ayers Avenue, known and designated as Unit 4, Project No. 104-24000-208. UNIT 4-A: VIEW STREET From the southeast corner of Tract 1, E. Johnson Survey to Tandy Avenue, known and designated as Unit 4-A, Project No. 104-24000-208. UNIT 5: PROVINE STREET From the south property line of Lot 9, Block 2, Akers Paxton Addition to the southeast corner of Lot 5, Block 9, Painted Oaks Addition, known and designated as Unit 5, Project No. 104-24000-208. WHEREAS, by sundry proceedings heretofore!M, by the City Council of the City of Fort Worth, Texas, including Ordinance Noo a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6363 & 6371 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; .and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II, The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: i III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the. appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of , 19 / APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-24000-208, UNIT 3: LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET NORMANDY PLACE ADDITION The Church of God 3 380' Pavement, Curb and of Prophecy Comm. Gutter $2.70 $1,026.00 c/o Van M. Dickens $1,026.00 3428 Hampshire Blvd. JAMAICA LANE INTERSECTS Henry C. Crow V 2 30' No Benefit 3501 Lynnfield Res. No Assessment SOUTH SIDE OF STREET Veva Corey 19 1 30' No Benefit 3500 Lynnfield Dr. Res. No Assessment L. C. Dumas 20 1 60' Pavement $2.80 $168.00 3440 Lynnfield Dr. Res. 60' Curb & Gutter 2.60 156.00 16 Sq. Ft. Drive .85 13.60 $ 337.60 Eugene E. Tong 21 1 60' Pavement $2.80 $168.00 3436 Lynnfield Dr. Res. 60' Curb & Gutter 2.60 156.00 78 Sq. Ft. Drive .85 66.30 $ 390.30 Roma Dee Taylor 22 1 60' Pavement $2.80 $168.00 3432 Lynnfield Dr. Res. 60' Curb & Gutter 2.60 156.00 70 Sq. Ft. Drive .85 59.50 $ 383.50 5 PROJECT NO. 104-24000-208,_ UNIT 3e LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET NORMANDY PLACE ADDITION Johan W.. White A 1 50' Pavement $2.80 $140.00 3428 Lynnfield Dr. Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Driveway .85 13.60 $ 283.60 D. H. Brown B 1 50° Pavement $2.80 $140.00- 2826 E. Rosedale Roes. 50, Curb & Gutter 2.60 130.00 16 Sq. Fey. Driveway .85 13.60 $ 283.60 Danny Joe Lee C 1 50' Pavement $2.80 $140.00 3420 Lynnfield Res. 50' Curb & Gutter 2.60 130.00 116 Sq. Ft. Driveway .85 13.60 $ 283.60 Eva Lee Trott D 1 50' Pavemen t $2.80 $140.00 3542 Avenue I Res. 50° C: rb, Gutter 2.f1C) 130.00 166 S�. 1F' Jsa ,ay .85 13.60 $ 283.60 Milton H. Mathews E 1 50, P 4. ,. $2.80 $1.40.00 313 Clairmont Rc,j. 50, C�"Lxb & Gutter 2.60 130.00 ,116 3q. Ft. Driveway .85 13.60 $ 283.60 Joseph L. Smith F 1 50' Pavement $2.80 $140.00 3408 Lynnfield Drive Res. q0° Curb & G%t tear 2.60 1:30.00 101 Sq. Ft. Driveway .85 85.85 $ 355.85 Charles W. Torti G 1 50' Pavement $2.80 $140.00 3404 Lynnfield Drive Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Dri,,�eway .85 13.60 $ 283.60 S. W. Witt H 1 50' Pavement $2.80 $140.00 3400 Lynnfield Drive Res. 16 Sq. Ft. Driveway .85 13.60 $ 1153.60 6 PROJECT NO. 104-24000-208, UNIT 3; LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET NORMANDY PLACE ADDITION Flavia Black J 1 50' Pavement $2.80 $140.00 3328 Lynnfield Dr. Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Drive .85 13.60 $ 283.60 Iva Lee Terrell K 1 50' Pavement $2.80 $140.00 2301 Lillian Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Drive .85 13.60 $ 283.60 Robert M. Cagle L 1 50' Pavement $2.80 $140.00 3320 Hampshire Blvd. Res. 50' Gutter Only 1.30 65.00 16 Sq. Ft. Drive .85 13.60 $ 218.60 Burl L. Majors M 1 50' Adjusted to 3316 Hampshire Blvd. Res. 50' Gutter Only $1.30 $ 65.00 16 Sq. Ft. Drive .85 13.60 $ 78.60 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . $5,212.85 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . 12,579.98 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . $17,792.83 7 PROJECT NO. 104-24000-208, UNIT 49 VIEW STREET FROM TANIIDY AVENUE TO AYERS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement of a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-mach wide concrete gutter so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF TANDY AVENUt AND VIEW STREET NORTH SIDE OF STREET E. JMNSON SURVL` Park Department Tract 1 1470' Pavement $2,80 $4,116.00 3220 Botanic Garden 1470' Curb & Gutter 2,60 3,822,00 Drive $7,938.00 ASTERS STREET INTERSECTS SOUTH SIDE OF STREET —L'jt AJ1 1i.SIN A. Jantz, Jr. 1 16 105' Pavement $2080 $ 294�00 2400 N. Ayers Res, 105' Curb & Gutter 2.60 273.00 76105 $ 567 .00 A, Jantz, Jr. 2 16 80° Pavement $2080 $ 224000 2400 N. Ayers Res, 80' Curb & Gutter 2.60 208.00 76105 $ 432.00 R. H. W. IDrechsel, Sr. 3 16 105' Pavement $2,80 $ 294.00 1414 Texas Street Res. 105' Curb & Gutter 2.60 273000 761.02 $ 567.00 Edward P. Patterson 4 16 105' Pavement $L 80 $ 294.00 3608 View Street Res, 105' Curb & Gutter 2060 273000 76103 85 Sq. Ft, Drive ,85 72.25 $ 639.23 E. S. Estill 5-A 16 105' Pavement $2080 $ 294a00 3600 View Street Res, 105' Curb & Gutter 2,60 273 00 76103 $ 567.00 8 PROJECT NO. 104-24000-208, UNIT 43 VIEW STREET FROM TANDY AVENUE TO AVERS AVE°N E CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT LEWIS AVENUE INTERSECTS SOUTH SIDE OF STREET TANDY ADDITION B. N. Clark 1-A 15 105" Pavement $2,80 $294,00 3536 Views Street Res, 105' Curb & Otter 2.60 273.00 76103 $567.00 Arthur L. Manning 2 15 105' Pavement $2a80 $294.00 3528 Views Street Res. 105' Curb 6, Gutter 2.60 273.00 76103 x $557.0 Elizabeth Johnson 3 15 105 la-ement $2.80 $294.00 3522 View Street Rea. 105' Gutter 2.60 273.00 7610 171 Sq, Ft. Drive .85 145.35 $712,35 W. D. Horne 4 15 105° ]Pavement $2<80 $294.00 c/o R. E. Horne Res. 105' Curb & Gutter 2,60 2d`3.00 P.O. Drawer 459 85 Sq. Et. Drive .85 72.25 Plainview, Texas $639.25 Gerald V. Thompson 5 15 105' Pavement $2,80 $294.00 3500 View Street Res. 105° Curb & Gutter 2.60 273.00 76103 $567.00 SANDERSON AVENUE INTERSECTS Clarence Epperly 1 7 105' Pavement $2.80 $294.00 2400 Sanderson Ave. Res, 105' Curb & Gutter 2.60 273.00 76103 $567.00 9 PROJECT NO; 104-24000-208, UNIT 4: VIEW STREET -FROM TANDY AVENUE TO AYERS AVENUE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET TANDY ADDITION Barton Davis 2 7 105' Pavement $2.80 $294.00 3424 View Street Res. 105' Curb & Gutter 2.60 273.00 76103 85 Sq. Ft. Drive .85 72.25 $639.25 Clarence E. Tyree 3 7 105' Pavement $2.80 $294.00 3416 View Street Res. 105' Curb & Gutter 2.60 273.00 76103 $567.00 Albert J. Hart 4 7 105' Pavement $2.80 $294.00 3408 View Street Res. 105' Curb & Gutter 2.60 273.00 76103 248 Sq. Ft. Drive .85 210.80 $777 .80 Giles Tandy 5-A 7 105' Pavement $2.80 $294.00 2401 Tandy Avenue Res. 105' Curb & Gutter 2.60 273.00 $567 .00 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . $16,880.90 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . 18,809.93 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 4 . . . . $35,690.83 10 PROJECT NO; 104-24000-208, UNIT 4-A: VIEW, STREET FROM THE SOUTHWEST CORNER OF TRACT 1, E. JOHNSON SURVEY TO TANDY AVENUE, to be improved by constructing a six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF TRACT 1. E. JOHNSON SURVEY NORTH SIDE OF STREET E. JOHNSON SURVEY Park Department W. 226' of 226' Pavement $2.80 $632.80 3220 Botanic Tract 1 226' Curb & Gutter 2.60 587.60 Garden Drive Res. 85 Sq. Ft. Drive .85 72.25 $1,292.65 SOUTH SIDE OF STREET W. T. McFADDEN SURVEY C. A. Keenan, Jr. Tract 1-E 156' Pavement $2.80 $436.80 P.O. Box 245 Res. 156' Curb & Gutter 2.60 405.60 76101 $ 842.40 MEADOWVIEW ADDITION Mary Belle Fowler 11 70' Pavement $2.80 $196.00 3316 View Res. 70' Curb & Gutter 2.60 182.00 76103 31 Sq. Ft. Drive .85 26.35 $ 404.35 Joe William 10 70' Curb & Gutter $2.60 $182.00 3321 View Res. $ 182.00 76103 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . $2,721.40 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 2,547.15 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . 5 268.55 t PROJECT NO. 104-24000-208, UNIT 5: PROVINE STREET FROM SOUTH PROPERTY LINE OF LOT 9, BLOCK 2, AKERS PAXTON ADDITION TO SOUTHEAST CORNER OF LOT 5, BLOCK 9, PAINTED OAKS ADDITION, to be improved by reshaping the existing gravel base and constructing a surface course of two inches of hot-mix asphaltic concrete, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTH PROPERTY LINE OF LOT 9, BLOCK 4, AKERS PAXTON ADDITION WEST SIDE OF STREET AKERS PAXTON ADDITION J. B. Kynard 9 4 97 ' Pavement, Curb 1801 Ederville Rd. Res. & Gutter $2.57 $249.29 52 Sq. Ft. Drive .85 44.20 $293.49 PAINTED OAKS ADDITION Thomas F. Hill 4 2 50' Adjusted to 1725 Ederville Road Res. 31' Pavement, Curb & Gutter $2.70 $ 83.70 171 Sq. Ft. Drive .85 145.35 $229.05 Lois M. Gunn 3 2 No Benefit No Assessment 1721 Ederville Rd. Res. Roman H. Aday 5 2 115.5' Adjusted to 1728 Provine Res. 85' Pavement $1.15 $ 97.75 30' Curb & Gutter 2.69 80.70 $178.45 PROVINE STREET INTERSECTS EAST SIDE OF STREET James T. McAlister 9 1 No Benefit No Assessment 1733 Provine 11 PROJECT NO: 104-24000-208, UNIT 5: PROVINE STREET FROM SOUTH PROPERTY LINE OF LOT 9, BLOCK 2, AKERS PAXTON ADDITION TO SOUTHEAST CORNER OF LOT 5, BLOCK 9, PAINTED OAKS ADDITION, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET AKERS PAXTON ADDITION Joe Cochran North Side of 1800 Carl 1 4 85' Pavement $1.15 $ 97.75 Res. 85' Curb & Gutter 2.69 228.65 $326.40 Joe Cochran West Side of 1800 Carl 1 4 97 ' No Access Agreement Res. TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . $1,027.39 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . 3,147.46 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 5 4,174.85 12 City of Fort Worth, Texas Uo" Mayor and Councit Communication DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE • MUMMER Paving at Five Vocations on the 2 6/1/71 FP-804 East Side tut Final Council action on the project described below is requested. Project Description Nate: Assessment Paving at Five Locations on the East Side, Project No. 104-24000-208 Contractor: Austin Road Company Contract Awarded: August .17,. 1970..(M&C_.C-1814) Work .Order Issued: December 22, .1970 Work Order Effective: January 4, 1971 Date of Final Inspection and -Approval: April .12, 1971 Working Time Bid: . .80 Working .Days ,+ 2 .(C.O. _#l) 82 - 26 .(Delete Units 1 .&...2)= 56 working days Working. Time .Used: 36 .Working -Days Protect.-Cost .and..FiUnging Original Bid Price: $87,964.85 Change Order No. 1: +5,751.035 (NK, C-1821, .8/31170) Change Order No.. 2: 31,032..31. _(M¢C..G-1625,. 9/14/70 and 9128J7.0) Revised .Contract Price:. $62,,683-89 Final Contract Cost: $57.,206,42 Partial Payments Previously made: 3 Amount; $50,,925.53 Final Payment Due: $. 6,280-89 Sufficient funds are available for final .payment to be .made .from .Proj.ect Account Number 104-24000-208. . Deviation from .Bid Price: Final. project ..cost is..$5:,477.47 less than .the revised contract price. The under"run was .caused ,primarily:. by. the .following: .1). Fewer. utility adjustments than .anticipated..resulted in .a .savings of..$2,.570..83. 2).. The absence-of .need-for metal pipe. sub-drain_,resulted_ in .a ..savings ,of .$2,000. The remainder -of the cost difference., .$906-64 (1..45% o£ .the .revised _bid .price), consisted of -minor variations .between .quantities estimated in. the..contract documents .and..quantities 'actually measured- and used: at .the_.job .site. .Compl.iance..with .Specifications Results. of testing• 27 corings are listed. as follows: Units 3, 4,_ and 4A. .(26 .corings) Exceeds Even with Below .Specs. but Below Specs .Specs,... —within-Tolerance —.Tolerance Paving 23 0 3" 0 Sub--!grade . 8 18 0 0 DATE REFERENCE SUBJECT: Final. Payment -. Assessment PAGE NUMBER Paving_ at..Five .Locations. on...the 6/1/-71 FP-804 East._Side 2 °t 2 On Units,.3., 4 .and 4A,.the average, thickness of. the. .HKAC .paving. is.__6.58 inches as compared to 6.00 inches .specified,. and the .average .thickness.,.o£ the cement stabilized sub-grade is .6._05 inches as compared to..6-00 niches .specified. Unit 5 (1 core) Exceeds Even with Below Specs- but Below Specs Specs - Within.-Tolerance Tolerance Paving 1 0 0 0 Base 1 0 0 0 On Unit 5 the thickness: of the HMAC surface is .3...52-inches as compared to 2.00 inches specified, and the thickness..of .the .cement .stabilized.-base is 6..25, inches as compared to .6..00 .inches..specified.. In .addition:,_ tests made .duri,ng .cons.truction. show that materials used were in compliance with contract.-specifications. .Recommendations It is recommended that-the project described -above be._accepted .by the adoption of an ordinance and that .final .payment of .$6,280...89. be. authorized to Austin Road ..Companyo RNL:mm SUBMITTED BY: DISPOSITION COUNCIL: PROCESSED BY r AT-APPROVED ElOTHER (DESCRI �r �� v B� � �._o r`-Fr-1 �fh CI SEC ARY DATE CITY MANAGER `