HomeMy WebLinkAboutOrdinance 3394 ORDINANCE NO.
AN ORDINANCE APPROVING THE REPORT OF THE PUBLIC WORKS DEPARTMENT,
AWARDING THE CONTRACT FOR THE DMVEMENT OF A PORTION OF BEACH
STREET EXTENSION IN THE CITY OF FORT MORTH, TEXAS, AND AUTHORIZING
ITS EXECUTION: HARING APPROPRIATION FOR THE INDEBTEDNESS INCtRRED
THEREBY: Aim DIRECTING THE CITY ENGINEER TO PREPARE ESTIMATES.
WMMS, on the 28th day of September, 1955, by Ordinance passed and
approved by the City Council of the City of Fort Worth, being Ordinance No.
3388, the City determined the necessity for and ordered the improvement of a
portion of Beach Street Extension, to-wit:
BEACH STREET EXTENSION: From the southeasterly line of Belknap Street to
the southerly line of Galves Avenue, known and designated as Unit No. 1.
WHEREAS, subsequent to the passage and approval of said ordins e, plans
and specifications for said improvements were submitted by the Public Works
Director and said plans and specifications were approved and adopted by the
City Council; and,
WH RFAS, notice to bidders was given as required by the City Charter;
and,
WHEREAS, the bid of Texas Bitulithic Company, was found to be the lowest
and best bid for the making and construction of said improvements, to-gait:
Excavation of present street and placing lop compacted flexible base course
with combined curb and gutter and necessary appurtenances, and placing lip
Hot Mix Asphaltic Concrete Surface on 31m Hot Mix Asphaltic Concrete Binder, all
as provided by said plans and specifications:
Now, ARE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That the work of making and constructing such improvements and contract
therefor is hereby awarded to Texas Bitul.ithie Company, at and for the prices
stated in the proposal of the said company and as reported and recommended by
the Public Works Department. The Mayor and City Secretary are hereby directed
to execute the said contract in the name of the City of Fort Worth, Texas,
and to impress the corporate seal of the City thereon, the said Contract
embracing tberein, among other things, the prices for the work.
SECTION 2.
That to provide for the payment of the indebtedness incurred by the
City of Fort Worth by said Contract, there is hereby appropriated out of
available funds which have been set aside for said purpose, an amount
sufficient to pay said indebtedness so incurred.
SECTION 3.
That the Public Works Director of the City of Fort Worth be and he is
hereby ordered and directed to file with the City Council estimates of the
cost of such improvements in accordance with the terms of the powers and
provisions of Chapter 106 of the acts of the First called session of the
Fortieth Legislature of the State of Texas, now shown as Article 1105b of
Vernon's Civil Statutes of the State of Texas, Annotated, which law has
been adopted as an amendment to and made a part of the Charter of the City
of Fort Worth.
APP OVM AS TO FORM:
ITT ATTORNEr
Adopted by City Council on October 19, 1955•
REPORT OF THE PUBLIC WORKS DEPARrAENT
TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF FORT WORTH:
Your Public Works Department to which was referred the Bids for the
improvements of Beach Street Extension from the southeasterly line of Belknap
Street to the southerly line of Galvez Avenue, known and designated as Unit
No. 1, in the City of Fort worth, Texas, hereby respectfully reports to your
Honorable Body that it recommends the acceptance of the Bid of Texas Bitulithic
Company, for the performance of said work at and for the fallowing prices, to-
wit:
ITEM UNIT
NO, DESCRIPTION QUANTITY PRICE AMOUNT
1. Removing Existing Trees 108 Ea. 10.00 $ 1,080.00
2. Unclass. Street Excavation 37,500 C.Y. 0.40 15,000.00
3. Unclass. Channel Excavation 9,030 C.Y. 0,40 3,612.00
4. Comb. 8" Curb and 2' Gutter 15,533 L.F. 1.68 26,095.44
5. Std. 10' Cone. Storm Sewer Inlet 18 Ea. 225.00 4,050.00
6. Std. 5' Cone. Storm Sewer Inlet 21 Ea. 175.00 3,675.00
7. Std. 18" Cone. Culvert Pipe in place 76 L.F. 3.27 248.52
8. Std. 15" Cone. Culvert Pipe in place 84 L.F. 2.87 241.08
9. Std. 24" Cone. Culvert Pipe in place 300 L.F. 4.15 1,245.00
10. Plank Railroad Crossing at C.R.I.&G.
Railroad 400 L.F. 22.70 9,080.00
11. Std. Concrete Driveway Approaches 2,688 S.F. 0.50 1,344.00
12. Std. 4' Concrete Sidewalks 912 S.F. 0.36 328.32
13, 2-1/2" Galvanized Conduit 501 L.F. 1.00 501.00
14. 1-1/4" Galvanized Conduit 490 L.F. 1,00 490.00
15. Traffic Markers 1,500 Ea. 1.00 1,500.00
16. Comb. 6" Curb and 1' Gutter 1,985 L.F. 1.28 2,540.80
17. 1-1/2" Hot Mix Asphaltic Conc.Surf. 47,245 S.Y. 0.64 30,236.80
18, 100 Flexible Base (Crusher-run) 47,245 S.Y. 1,44 68,032.80
19. 3-1/2° Hot Mix Asphaltic Conc.Binder 47,245 S.Y. 1.20 56,694.00
TOTAL COST $225,994,76
Respectfully submitted,
PUBLIC WORKS DEPARTMENT
BY
PU IC WORKS-DIRECTOR