Loading...
HomeMy WebLinkAboutResolution 5134-10-2019 A Resolution NO. 5134-10-2019 A RESOLUTION AUTHORIZING THE EXECUTION OF A LOCAL PROJECT ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN THE AMOUNT OF $81,731.00 FOR MAINTENANCE OF INTERSTATE HIGHWAY 30 BRIDGES AT THE HEMPHILL STREET CONNECTOR PROJECT WHEREAS, On June 20, 2017, the City executed a Local Project Advance Funding Agreement with Texas Department of Transportation (TxDOT) increasing the estimated receipts and appropriations of the Intergovernmental Contribution Fund amount of $3,408,803.00 from Regional Toll Revenue Funds for the construction of the Hemphill Street Connector Project;and WHEREAS, the City of Fort Worth desires to enter into a Local Project Advance Funding Agreement with the Texas Department of Transportation for maintenance of the Interstate Highway 30 Bridges at the Hemphill Street Connector Project which provides for State participation in the amount of $81,731.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: The City Manager is hereby authorized to execute a Local Transportation Project Advance Funding Agreement with the Texas Department of Transportation in the amount of $81,731.00 for the maintenance of Interstate Highway 30 Bridges at the Hemphill Street Connector Project from Lancaster Avenue to West Vickery Boulevard. Adopted this 15th day of October 2019. ATTEST: OF FORT Mary J. Kayser, Ci yVecretary 't �S ORT WORT MAYOR AND COUNCIL COMMUNICATION MAP 20HEMPHILL CMAR CONSTRUCTION ELLA V �a p ?81 O gTEXAS q q 3�t�� Q yl-f1 19TH li � c T 13THF-WY J 15TH g ®� qq LA' NCASTER IF V`�' L-ANCASTE�q F. -= UPRR UPRR 01p'ES1 J. T WEg, =FWY - y a " WEST-FWY v E )ASO VIC ER RVIS O z a� Z A GETT DAGG DA ETT q z BkOAD qq Q q BROA AY RY w O N (7 LU w STEL O J BR DWAY u "' n a w CL L D EL w BE S)E ~ z m ° O 0 O PE IRSTH Z rn C1 T CK N TUCKER q Z _ ANNI q P-El NNSYLVANIA ��n� q I EHATTIEF [q �O NO NN CAN FLEI�D a El a F- LANCASTER AVE qqq , R E qq C F-21 z �L� 48"STORM DRAIN" D SHWC F- PUL SKI z to ROSEDALE ooD T -r lY f z 0 0 = - F uj o MAGNOLIA Eli EM RP H ,,..n *r- _ w -I 0 500 1000 UKSE�J - ' ,r� ••�••� d . t M 1 r IFt OZ t ,�- �- _ s f, :•-•� 0 c250 500 °• s. - -.l IFl MAD Ox '' PROJECT LOCATION DETAIL Copyright 2014 City of Fort Worth. Unauthorized reproduction is a violation of applicable laws. This product is for informational purposes and may not have been prepared for or be suitable for legal,engineering,or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. CITY PROJECT#00141 The City of Fort Worth assumes no responsibility for the accuracy of said data. City of Fort Worth,Texas Mayor and Council Communication DATE: 10/15/19 M&C FILE NUMBER: M&C 19-0244 LOG NAME: 20HEMPHILL TXDOT AFA SUBJECT Accept the Specified Federal Highway Planning and Construction Grant and Adopt Resolution Authorizing Execution of a Local Project Advance Funding Agreement with Texas Department of Transporation in the Total Amount of$81,731.00 for the Maintenance of Interstate Highway 30 Bridges at the Hemphill Street Connector Project from Lancaster Avenue to West Vickery Boulevard(COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council accept the specified federal highway planning and construction grant and adopt the attached Resolution authorizing execution of a Local Project Advance Funding Agreement with Texas Department of Transportation in the Total Amount of$81,731.00, with no City cost participation,for the maintenance of interstate Highway 30 Bridges at the Hemphill Street Connector Project from Lancaster Avenue to West Vickery Boulevard. ------------- DISCUSSION: The Hemphill Street Connector Project extends from Lancaster Avenue to West Vickery Boulevard under Union Pacific Railroad and Interstate Highway 30.This project includes constructing a new 4-lane arterial street with turn lanes, railroad bridge and tracks,excavation, retaining walls, paving, storm drainage improvements,shared use path,sidewalks,streetlights,traffic signals,landscaping and irrigation. On June 20,2017 (M&C C-28289, CSC No.49771)the City adopted an appropriation ordinance and executed a Local Project Advance Funding Agreement with Texas Department of Transportation(TxDOT)increasing the estimated receipts and appropriations of the Intergovernmental Contribution Fund amount of$3,408,803.00 from Regional Toll Revenue Funds for the construction of the Hemphill Connector Project from Lancaster Avenue to West Vickery Boulevard. Under this Agreement,TxDOT will reimburse the City for the maintenance of Interstate Highway 30 Bridges at the Hemphill Connector Project from Lancaster Avenue to West Vickery Boulevard in the amount of$71,271.00.The total amount of this Agreement is$81,731.00 and includes $10,460.00 for TxDOT's Direct and Indirect State Costs with no City contribution.The City will replace the existing expansion joints on the Interstate Highway 30 Bridges to prevent stormwater from leaking through and staining the new retaining walls along Hemphill Street.On June 25,2019(CSC No.45717-A3AR10),the City administratively authorized a Contingency/Allowance Request under the Construction Manager-at- Risk Agreement with McCarthy Building Companies, Inc.to perform this additional work. The Hemphill Street Connector Project is located in COUNCIL DISTRICT 9. A Form 1295 is not required because:This contract will be with a governmental entity,state agency or public institution of higher education:Texas Department of Transportation FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations,execution of the agreement and adoption of the attached appropriation ordinance,funds will be available in the current operating budget,as appropriated, into the Grants Capital Projects Federal Fund. This is a reimbursement grant. The Transportation/Public Works Department is responsible for requesting all reimbursements. The Transportation/Public Works Department is responsible for the collection and deposit of funds due to the City.Upon receipt,these funds will be deposited into the Grants Capital Projects Federal Fund. Submitted for City Manager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: William Johnson 7801 Additional Information Contact: Jennifer Roberts 8447