HomeMy WebLinkAboutContract 36513-A1 (2) AMENDMENT NUMBER 1
STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. U 5 ,-
COUNTY OF TARRANT 8
WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, L.P. ,
(ENGINEER) made and entered into City Secretary Contract No. 36513, (the
CONTRACT) which was authorized by the City Council by M&C C-22600 on the
8th day of January, 2008;
WHEREAS, the Contract involves engineering services for the following
project:
East First Street from Beach Street to Oakland Boulevard;
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated March 5,
20091 copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by
Engineer total $7,757.00.
2.
Article II of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$733,867 .00.
OFFICIAL RECORD'
3 CITYSECRETARY
FT.WORTH,TX
Page -1-
03-18-09 A11 :46 IN
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED on this the _ ,q .µme day of _ Mo rGV�,, 2009 in
Fort Worth, Tarrant County, Texas .
ATTEST: APPROVED:
rv\ t
(4 6VT-v
Marty HendrixIN Fernando Costa
City Secretary Assistant City Manager
LNO M&C REQUIRED
APPROVAL RECOMMENDED:
William A. Verke.A, P.E.
Director, Transportation/Public Works Department
Dunaway Associates, L.P.
ENGINEER
3 ww'14
STE'r46t� K. SAMES, r'E.
MIN C1 PAL
APPROVED AS TO ORM AND ITY:
2V
Amy Ramsey
Assistant City Attorney OFFICIAL RECORD r
CITYSECRETARY
FT.WORTH,TX
Page -2-
NAWAAY
DA No. 2006328
March 5, 2009
Mr. Michael Weiss, P.E.
City of Fort Worth
Department of Engineering
Fort Worth, Texas 76102
Reference: Amendment No. 1
East First Street from Beach Street to Oakland Boulevard
City Project No. 00145
Mr. Weiss:
This letter constitutes our request for supplemental authorization for tasks outside the scope
of services of our current contract. The additional work includes the following task:
1. Investigation of the Albright Bridge (Site 41TR225) — During the archaeological
investigation of the East First Street widening adjacent to the West Fork of the
Trinity River, AR Consultants discovered a portion of the Albright Bridge, which
has been identified as a historically significant structure. Pilings and a portion of
the bridge footings are present and will be impacted by the widening of East First
Street. Further investigation involving archival research, excavation at the site,
clearing by hand, documentation, preparing report for the Texas Historical
Commission and the Corp of Engineers, and curation of items found, is required
by the Texas Historical Commission.
A summary of the total project is as follows:
Basic Fee
1. Original Contract $ 726,110.00
2. Amendment #1 7,757.00
TOTAL BUDGET $ 733,867.00
Please review the enclosed information. Do not hesitate to call me if you have any questions
or require additional information regarding this proposal.
1501 Merrimac Circle,Suite)00 g Fort Worth,Texas 76107 g Tel:81 7,335.1121_-- metro:81 7,429.2135--- Fox:817.335.7437- www.dunaWavossocinta.c cnm
Amendment No. 1
March 5, 2009
Page 2
Sincerely,
DUNAWAY ASSOCIATES, L.P.
alwlll-��
Stephen R. James, P.E.
Principal
Director, Public Sector Services
Cover Lettter Amendment#1.doc