Loading...
HomeMy WebLinkAboutContract 36513-A8 AP-0 - CI. , 6ECRETARY CONTRACT NO. � AMENDMENT NUMBER 8 TO CITY SECRETARY CONTRACT NO. WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, L. P. , (ENGINEER) made and entered into City Secretary Contract No. 36513, (the CONTRACT) which was authorized by the City Council by M&C C-22600 on the 8th day of January, 2008 in the amount of $726, 110 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $7, 757 . 00 which was administratively authorized by the City on the 19th day of March 2009, Amendment Number 2 in the amount of $110, 428 . 00 which was authorized by M&C C-24123 on the 9th day of March 2010, Amendment Number 3 in the amount of $25, 524 . 00 which was administratively authorized by the City on the 30th day of September 2011, Amendment Number 4 in the amount of $155, 902 . 00 which was authorized by M&C C-25627 on the 5th day of June 2012, Amendment Number 5 in the amount of $17, 705 . 00 which was authorized by M&C C-26125 on the 5th day of March 2013, Amendment Number 6 in the amount of $42, 750. 00 which was authorized by M&C C-26555 on the 12th day of November 2013, and Amendment Number 7 in the amount of $61, 375 . 00 which was authorized by M&C C-26753 on the 8th day of April 2014 ; and WHEREAS, the Contract involves engineering services for the following project: East First Street from Beach Street to Oakland Boulevard; and WHEREAS, it has become necessary to execute Amendment No. 8 to said Contract to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in the proposal dated August 19, 2014, M copies of which is attached hereto and incorporated herein. The cost to m City for the additional design services to be performed by Engineer m totals $13, 420 . 00 . (See Attached Funding Breakdown Sheet, Page -3-) 2 . cr, m z c Article II of the Contract is amended to provide for an increase in °C the fee to be paid to Engineer for all work and med under the Contract, as amended, so that the total fee 0f1;1tML�f y for all work and services shall be an amount of $1, 160, 9 tiff SECRETARY FT. WORTH, TX .Page -1- A 3. All other provisions of. the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Dunaway Associates, L. P. le.--q-A4 Fernando Costa To K. Fo d, P.E. Assistant City Manager `v'ice President DATE: 9 S DATE: APPROVAL RECOMMENDED: L J . LJ Douglas W. ! ersig, P.E. Director, Transportation/Public Works Department APPROVED AS TO FORM AND LEGALITY: Doug s W. Black Assistant City Attorney ATTEST: CIF°�® o V° ° ° � o0 Mary J. Kt e r , °�o .,a�`��a ' City Secretary OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -2- FUNDING BREAKDOWN SHEET City Secretary No. 36513 Amendment No. 8 Department Fund-Account-Center Amount 20 C200 531200 204230014530 $13, 420 . 00 Total : $13, 420 . 00 Page -3- DUNAWAy DA No. 2006328 August 19, 2014 Mr. Michael Weiss, P.E. City of Fort Worth Transportation& Public Works Department Fort Worth, Texas 76102 Reference: Amendment No. 8 East First Street from Beach Street to Oakland Boulevard City Project No. 00145 Mr. Weiss: This letter constitutes our request for supplemental authorization for tasks outside and in excess of the scope of services for the current contract and amendments. This request is based upon the following items: SCOPE OF SERVICES 1.0 Subsurface Utility Engineering After the East First Street project was surveyed and under design, two Access Midstream gas pipelines were constructed that cross the proposed roadway and potentially impact design of roadway, drainage, and related facilities. It has become necessary to determine the horizontal and vertical location of the two pipelines as they may impact the proposed roadway and associated improvements. Level "A" Subsurface Utility Engineering will be performed, requiring up to four (4) test holes to be excavated to determine the location and alignment of the two pipelines. Excavation, location of facilities, and backfilling of the test holes will be performed by The Rios Group (formerly Gorrondona &Associates). 2.0 Plan Sheet Update Once the Subsurface Utility Engineering Level "A" data is processed, the locations of the two pipelines will be included on the affected roadway plan sheets. Reasonable adjustments in ditch flow lines of less than 0.5 feet, concrete caps over pipelines, or concrete lining of affected ditches will be made to the project plans to provide the proposed level of service required, and maintain adequate protection for the pipelines. 550 Briley Avenue,Suite 400 --- Fort Worth,Texas 76107 ---Tel:817.335,1121 ---Fax:817.335,7437=dunawayassoclates,com Amendment No. 8 August 19, 2014 Page 2 3.0 Address TxDOT Comments after 100% Plans Some time has passed since the final plans, estimates, and specifications were prepared and delivered to TxDOT. Recently, TxDOT has requested a number of changes that require adjustment to item bid codes, quantities, and special specifications. These adjustments require reissuing summary sheets, special specifications, opinions of cost, as well as adjusting title block information for various plan sheets throughout the project set. 4.0 Basic Fee A summary of the total project is as follows: M=BE Provided Original Contract $ 726,110 Amendment #1 $ 7,757 Amendment #2 $ 110,428 Amendment #3 $ 25,524 Amendment #4 $ 155,902 Amendment #5 $ 17,705 Amendment #6 $ 42,750 Amendment #7 $ 61,375 Amendment #8 13,42 54.0% TOTAL BUDGET $1,160,971 21.1% Summary for Amendment#8 by Task: Description: FEE Request Task 1.0 Subsurface Utility Engineering $ 7,675.00 Task 2.0 Plan Sheet Updates $ 3,035.00 Task 3.0 Address TxDOT Comments after 100% Plans $ 1,985.00 10% Sub Markup $ 725.00 Total $ 13,420.00 550 Bailey Avenue,Suite 400 - Fort Worth,Texas 76107 �Tel: 81 7.335.1121 � Fax: 81 7.335.7437 - dunawayassociates.com Amendment No. 8 August 19, 2014 Page 3 Summary for Amendment#8 by firm: Percentage of Amendment Dunaway Associates L.P. $ 6,170 46.0% The Rios Group 7,250 54.0% Total $ 13,420 100.0% Please review the enclosed information. Do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. Z Grady Be chum, P.E. Sr. Project Manager Public Sector Services 550 Bailey Avenue,Suite 400= Fort Worth,Texas 76107 ;Tel: 81 7,335.1121 = Fax:817.335,7437 - dunowayossociates.com