Loading...
HomeMy WebLinkAboutContract 36478CITY SECRETARY QJ,Z_Jr-Q CONTRACT NO. ~,JO ---~oiiiiia CONT Between CITY OF FORT WORTH ENVIRONMENTAL MANAGEMENT DEPARTMENT and INTERCON ENVIRONMENTAL, INC. for Asbestos Abatement and Demolition at Villa Del Rio Apartments 5817 Boca Raton Blvd. & Oak Hollow Apartments 5901 Boca Raton Blvd. Fort Worth, Texas January 2008 -L City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/4/2007 -Ordinance No.# 17903-12-2007, 17904-12-2007, & 17905-12-2007 DATE: Tuesday , December 04 , 2007 LOG NAME: 521NTERCONWDHVN SUBJECT: REFERENCE NO.: **C-22560 Authorize Execution of Contract with lntercon Environmental , Inc ., for Asbestos Abatement and Demolition at the Villa Del Rio and Oak Hollow Apartment Complexes , Approve Transfer of Funds , and Adopt Appropriation Ordinances RECOMMENDATION: It is recommended that the City Council : 1. Authorize the City Manager to execute a contract with lntercon Environmental , Inc ., for asbestos abatement and demolition at the Villa De l Rio and Oak Hollow apartment complexes in the amount of $1 ,492 ,159 .79 ; 2. Adopt the attached supplemental appropriation ordinance increasing appropriations in t he Environmental Management Fund (R103) by $507 ,159 .79 and decreasing the unreserved retained earnings by the same amount; 3 . Approve the transfe r of $507 ,159 .79 in undesignated funds in the Environmental Management Operating Fund (R103) to the Environmental Management Project Fund (R101 ); 4 . Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Envi ronmental Management Project Fund (R10 1) by $507 ,159.79 ; and 5. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Specially Funded Capital Projects Fund (C291) by $250 ,000 . DISCUSSION: On June 5 , 2007 , the City Council authorized the Execut ion of Agreements for the Purchase of the Villa Del Rio and Oak Hollow Apartment Complexes located at 5817 Boca Raton and 5901 Boca Raton Fort Worth , Texas , and $750 ,000 for the fencing and demolition (M&C Reference No . L-14332 ; Ordinance No . 17588- 06-2007 ). The apartment buildings contain asbestos-containing materials that are requ ired to be removed prior to building demolition . The Environmental Management Department is contracting for removal of the asbestos- containing materials including : sheetrock with wall texture and j o int compound , popcorn ceiling texture , linoleum floor covering , and floor tile w ith mastic . Following the asbestos removal activities , all buildings will be demolished and all improvements including parking areas , sidewalks , building slabs , and pools will be removed . An Invitation to Bid was advertised on October 4 and October 12 . The following firms subm itted bids on Logname : 52 INTER CONWDHVN Page 1 of 2 November 1: AAR Incorporated ; Andrew Joseph Co ., Inc .; Basic Industries, Inc.; CST Environmental , Inc .; Eagle Construction and Environmental Services, L.P.; lntercon Environmental , Inc .; LVI Facility Services , Inc.; Midwest Wrecking Co . of Texas , Inc .; and Project Development Group, Inc . Based on the low bid of $1,492 ,159.79, City staff recommends award of the contract to lntercon Environmental , Inc . lntercon Environmental , Inc ., is in compliance with the City 's M/WBE Ordinance by committing to 7 percent MWBE participation. The City's goal on this project is 26 percent. Work on the project is expected to begin in December 2007 . The apartment complexes are located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance , funds will be available in the Environmental Management Project Fund (R101) and the Specially Funded Capital Projects Fund (C291 ). TO Fund/Account/Centers R103 538070 05211000 R101 472103 052200804000 R101 539120 052200804000 C291 539110 174770080674 Submitted for City Manager's Office by: Originating Degartment Head: Additional Information Contact: Logname: 52INTERCONWDHVN $507 ,159 .79 507159.79 $507 ,159 .79 $250 ,000 .00 FROM Fund/Account/Centers R103 538070 0521100 R101 539120 052200804000 C291 539110 174770080674 C291 446100 174770080640 Libby Watson (6183) Brian Boerner (6647) Michael Gange (6569) $507 ,159 .79 $507 ,159 .7 9 $985 ,000 .00 $250 ,000 .00 Page 2 of2 STATE OF TEXAS COUNTY OF TARRANT CITY OF FORT WORTH CONTRACT FOR ASBESTOS ABATEMENT AND DEMOLITION AT THE VILLA DEL RIO AND OAK HOLLOW APARTMENT COMPLEXES This Contract is entered into by and between the City of Fort Worth , Texas , a home-ru le mun icipality located within Tarrant County, Texas , ("City"), acting through Libby Watson , its duly authorized assistant city manager, and lntercon Environmental , Inc., a Texas corporation, acting through Karen Andrews , its duly authorized president ("Contractor"). WHEREAS , the City desires to conduct a project for the demolition of and abatement , removal and transportation , and disposal of asbestos containing material of the Villa Del Rio apartment complex located at 5817 Boca Raton Boulevard , and the Oak Hollow apartment complex located at 5901 Boca Raton Blvd both in Fort Worth, Texas ; and WHEREAS, the City desires to hire a professional firm knowledgeable and experienced in conducting such demolition and asbestos removal , transportation and disposal ; and WHEREAS, the Contractor has represented that it is knowledgeable and experienced in conducting such a demolition and asbestos removal, transportation and disposal project. WITNESSETH: NOW, THEREFORE , in consideration of the mutual promises and benefits of this Contract, the City and the Contractor agree as follows : 1. DEFINITIONS In this contract, the following words and phrases shall be defined as follows ; Asbestos shall mean the asbestiform va rieties of chrysotile , amosite, crocidolite, tremolite, anthophyllite , and actinolite and all materials containing one percent or more of any of those substances . Asbestos-Containing Material (ACM) shall mean materials or products that contain more than one percent (1.0%) of any kind or combination of asbestos, as determined by Environmental Protection Agency (EPA) recommended methods as listed in Section 40 of the Code of Federal Regulations, (CFR) Part 763 , Subpart F and 40 CFR 763 Subpart E, Appendix A. This means any one material component of a structure . Abatement shall mean any action that dislodges, strips, or otherwise takes away asbestos containing material (ACM). City 's Representative means the Director of Environmental Management, or the Director's designee. Contract shall mean this document, all attached exhibits and the Contractor's Response to the 1TB attached as exhibit A , which shall be incorporated and made a part of this Contract. Contractor shall mean lntercon Environmental, Inc. Director shall mean the Director of the City of Fort Worth 's Environmental Management Department. Invitation to Bid (1TB) shall mean the City's Invitation to Bid for Project DEM 07-12 : APT . NESHAP shall mean the United States Environmental Protection Agency National Emissions Standards for Hazardous Air Pollutants , as described in Title 40 CFR Part 61. Notice to Proceed means the letter issued by the City that authorizes Contractor to begin work . It also authorizes future invoices to be paid . Regulated Asbestos-Containing Material (RACM) shall mean (a) friable asbestos material , (b) Category I non-friable ACM that has become friable , (c) Category I non- friable ACM that will be or has been subjected to sanding , grinding , cutting , or abrading , or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized , or reduced to powder by forces expected to act on the material in the course of demolition or renovation operations . Subcontract means a contract between the Contractor for this project and another person or company for any task defined in the scope of work. A purchase order is also considered a subcontract. Substantial Completion means the date when the removal is sufficiently completed in accordance with the Contract Documents, as modified by any change orders agreed to by the parties , so that the City can occupy the project or specified area of the project for the use for which it was intended. 2. SCOPE OF CONTRACTOR'S SERVICES The scope of work shall include the demolition, abatement, removal and disposal of the following asbestos containing or asbestos contaminated material ("ACM ") of the Villa Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 2 Del Rio apartment complex located at 5817 Boca Raton Boulevard , and the Oak Hollow apartment complex located at 5901 Boca Raton Blvd both in Fort Worth , Texas . A. Oak Hollow Apartment Complex The Oak Hollow apartment complex is located at 5901 Boca Raton Blvd., Fort Worth, Texas . The 10-acre property consists of 24 , two-story apartment buildings and a two-story leasing office/clubhouse that was constructed in 197 4. The apartment complex contains 176 units with a total of 173 ,104 square feet of leaseable space. The complex is constructed with concrete slab-on-grade foundations , wood framing, pitched roofs covered with asphalt shingles , and brick and wood siding walls. B. Villa Del Rio Complex The Villa Del Rio apartment complex is located at 5817 Boca Raton Blvd ., Fort Worth , Texas . The 4.65-acre property consists of 11 , two-story buildings, and three single story buildings that were constructed in 1975. The apartment complex contains 108 units with a total of 84 ,000 square feet of leasable space . The complex is constructed with concrete slab-on-grade foundations , wood framing , Spanish tile roofing , stucco and pa inted wood panel exte rior walls . C. Project Coordination 1. Contractor will be responsible for coordinating with the Environmental Management Department, within twelve (12) days after receipt of notice to proceed , the start date of demolition to allow for notification to the Texas Department of State Health Services (TDSHS). The City will prepare and submit the TDSHS notification and pay all TDSHS notification fees. 2. Upon award , contractor shall provide to the City an updated schedule detailing the phased approach to perform ing the abatement and demolition of the two complexes. 3 . Upon rece ipt of a notice to proceed and prior to demolition , Contractor must obtain a wrecking permit to demolish the subject structure from the Department of Development, telephone (817) 392-2222. In obtain ing the wrecking permit, the Contractor will be required to abide by City of Fort Worth Ordinance No. 17228, also known as the "Tree preservation ordinance " included as Attachment B to this Contract. No tree 6" Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 3 diameter or greater shall be removed and all trees within 50 feet of a structure will be protected per Attachment B. Removing trees that interferes with construction is permissible if Contractor ensures that 25% of canopy remains . A copy of the ordinance has been. Contractor shall leave all trees in place and remove only those trees that are dead or will jeopardize the health and safety of the workers performing demolition activities. 4. Prior to site mobilization , the Contractor must prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the requirements detailed in the TPDES General Permit No. TXR150000 and received approval from the City. In addition, the Contractor must also submit a Notice of Intent (NOi) to the Texas Commission on Environmental Quality (TCEQ) for storm water discharges associated with construction activities. The Contractor must maintain this plan until sufficient vegetation has been established. D . Site Preparation 1. Prior to any Abatement or demolition activities, the Contractor shall remove all universal waste items including light bulbs, mercury containing devices, paints, pesticides, etc. These items will be properly packaged and disposed by the Contractor. The Contractor shall provide documentation (waste manifest, bill of lading, etc.) that the waste was properly disposed. 2. Contractor shall disconnect all associated air conditioning units and properly evacuate any remaining refrigerant contained within the units prior to being disconnected. 3. Contractor is aware that utilities are currently not available to the site. Prior to demolition, the Contractor shall verify that all utilities (i.e. natural gas , telephone, water, etc ... ) have been disconnected. Contractor shall cut and cap all site utilities at point of connection to the site. E. Site Work 1. All structures, with one exception, on both complexes shall be Abated of all ACM and will be demolished removing all building slabs/foundations, utility infrastructure and grading of the parcel to properly manage storm water. 2. Prior to the start of Abatement and demolition of any structure, each structure shall be inspected to ensure the safety of the crew. 3. Abatement activities shall include the removal of approximately 334,688 square feet of sheetrock wall texture and joint compound, approximately 511 Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 4 square feet of popcorn ceiling texture , and approximately 7 ,399 square feet of yellow linoleum from the Villa Del Rio Apartment complex. In addition , approximately 808,720 square feet of sheetrock wall texture and joint compound and approximately 36, 176 square feet of floor tile and mastic will be removed from the former Oak Hollow Apartment complex. Asbestos Abatement specifications are incorporated into this Contract as Attachment C . All debris generated from the removal of ACM is to be disposed of as asbestos-containing waste. 4. Except for apartment 300, all other units in building 5939 of the Oak Hollow Apartment Complex, shall be Abated of all ACM. Building 5939 will be demolished using wet methods with the ACM left in place in apartment 300 only, and debris from this building will be disposed as ACM from this building only . A certified National Emission Standards for Hazardous Air Pollutants (NESHAPS) supervisor shall be present to over see the wet demolition of this structure. 5. Prior to any site disturbance, the Contractor shall have implemented the Best Management Practices (BMPs) detailed in the approved SWPPP . This shall include, but not be limited to, the use of silt fencing , rock check dams , mulching, erosion control blankets , curb and inlet protection devices , sediment traps , sediment basins, and/or stabilized construction entrances and exits . 6 . Demolition activities shall include the demolition of all site structures , concrete/asphalt parking and drives, pools , side walks , slabs/foundations and asphalt/concrete streets and sidewalks . All demolition debris will be removed from the site and recycled or disposed in a landfill accepting such waste. All foundations will be removed down to a minimum of 2 feet below grade. If foundations/piers extend beyond 2 feet below grade , they may be severed at that point and left in place . 7. Contractor shall clean and remove all furniture, household furnishings , building materials , tires , abandoned or junked vehicles or vehicle parts, debris, trash , rubbish and any other solid waste from the premises . These materials shall be recycled , reclaimed or disposed at a facility or landfill that is approved to accept such waste . 8. Contractor shall insure that each vehicle contracted for waste hauling possess a valid City of Fort Worth Waste Hauler Permit as issued by the Environmental Management Department -Solid Waste Division, telephone: (817) 392-5150 . Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 5 9. Demolition activities will be performed in accordance with Federal, State and local visible emission requirements (i.e . no visible emissions will leave the demolition area). Water will be made available in the vicinity of the construction area . 10. The work area shall be maintained in a manner that will control all demolition debris from becoming windblown and/or migrating from the work area during and after working hours. 11. Upon completion of the demolition work, the Contractor shall obtain a final inspection on the wrecking permit from the Building Inspection Division in the Development Department. 12 . After all demolition and other debris have been removed from the site , the Contractor shall remove all concrete/asphalt slabs, walks, pools, steps and roadways from the property. This demolition shall be completed last to minimize sediment tracking from the site. 13 . The Contractor shall use site material, if available, or clean fill from an approved source to fill any holes in the terrain resulting from any of the above work and grade the entire lot, ensuring that low areas are filled to prevent the pooling of water. 14. Upon completion of the entire project as detailed in the Contract and approved by the City, Contractor shall sweep dirt and debris from the haul routes used to ensure any sediment tracked from the site is collected. 15. A specific grass type indigenous to the area shall be selected by the City and planted by Contractor. The soil will be analyzed by the Contractor in order to determine current nitrogen, phosphoric acid, and potash contents in order to determine the concentration and fertilization rate that should be applied to maximize growth. The seeded area shall be watered by the Contractor, as needed, to allow proper establishment of vegetation. The Contractor shall maintain the vegetative area for six months , or until a uniform vegetative cover with a minimum of 70 percent coverage has been established and has been accepted by the City for maintenance by others, whichever is earlier. 16. Once sufficient vegetation has been established upon the concurrence and approval of the City , all BMPs will be removed by the Contractor and the project will be closed out. Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 6 3. SCOPE OF CITY SERVICES A. City shall coordinate with facilities , City departments, and any tenants for access to the site. B. City shall prepare and revise all notifications necessary to the Texas Department of State Health Services Health (TDSHS) for the work provided herein . C. City shall make payment of all applicable TDSHS fees. D. City shall give timely direction to the Contractor. E. City shall render decisions regarding modifications to the Contract and any other issue. 4. TIME TO START AND TO COMPLETE THE PROJECT Contractor shall begin work upon receipt of the Notice to Proceed issued to Contractor by City and Contractor complete all phases of the work pursuant to the Project Schedule attached as Attachment D. 5. COMPENSATION A. In consideration for the work performed by Contractor under this Contract, City shall pay Contractor a sum not to exceed one million four hundred ninety-two thousand one hundred fifty-nine dollars and seventy-nine cents ($1,492,159.79). The cost for the performance of such work shall be in accordance the Contractor's Response to Section 2.4 of the 1TB as shown in Attachment A. The City shall not be liable for any of Contractor's costs in excess of the Not-to-Exceed Amount unless the City has signed and issued a formal Modification to the Contract. B. Contractor understands and agrees that claims for additional compensation due to variations between conditions actually encountered in the project and as indicated in the Contract Documents will not be allowed unless the Contractor can clearly show to City, as determined in the sole discretion of City , why the variation was not identifiable prior to executing this Contract. C. The City agrees to pay Contractor within thirty (30) days after receipt of correct invoices, except as provided in Section 7 "Indemnification," subsection H. Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 7 D. Contractor acknowledges that payment will not be rendered by City unless Contractor completes the removal of asbestos as described within the Scope of Work and the work is accepted by the Director. E. Periodically during the performance of this Contract, the Contractor's Project Manager shall inform the City 's representatives of his/her best estimate of the expenses incurred to that time. In the event that the estimate approximates the Not-to-exceed amount, Contractor shall prepare to cease its operations unless and until the Contract is amended and an authorized representative of the City directs Contractor to perform additional work. F. Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to Contractor was caused by City 's failure to provide information , if any , which it is required to do. When extra compensation is claimed , a written statement thereof shall be presented to the City . G . In the event that actual expenditures may result in a total cost in excess of the Not-to-Exceed Amount, Contractor must submit a Modification to the Contract in accordance with Section 24 . 6. INSURANCE The Contractor certifies it has , at a minimum , current insurance coverage as detailed below and will maintain it throughout the term of this Contract. Prior to commencing work, the Contractor shall deliver to City, certificates documenting this coverage . The City may elect to have the Contractor submit its entire pol icy for inspection. A. Commercial General Liability Insurance -$1 ,000 ,000 each occurrence ; $2 ,000,000 aggregate. 8. Automobile Liability Insurance - Coverage on vehicles involved in the work performed under this Contract: a) $1 ,000 ,000 per accident on a combined single limit basis or: $500,000 Bodily injury/person $500,000 Bodily injury/accident $250,000 Property damage b) Uninsured/Underinsured Motorist: $20,000 Bodily Injury each person, $40 ,000 Bodily Injury each accident; $15 ,000 Property Damage each accident. The named insured and employees of Provider shall be covered under this Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 8 policy. The City of Fort Worth shall be named an Additional insured on Endorsement TE 9901 or equivalent, as its interests may appear. Liability for damage occurring while loading , unloading and transport ing materials collected under the Contract shall be included unde r this policy . C. Worker's Compensation - Statutory limits for Worker's Compensation plus Employer's liability at a minimum: $100,000 each accident; $500,000 disease -policy limit; and $100 ,000 disease -each employee. D. Environmental Impairment Liability (Ell) and/or Pollution Liability -$2 ,000 ,000 per occurrence. Ell coverage(s) must be included in policies listed in items A and B above; or, such insurance shall be provided under separate policy(s). Liability for damage occurring while loading , unloading and transporting materials collected under the contract shall be included under the Automobile Liability insurance or other policy(s). E. Asbestos Abatement Insurance -$2 ,000 ,000 each occurrence with no Sunset Clause . F. The following shall pertain to all applicable policies of insurance (A. through E.) listed above : 1. Additional Insured Clause: "The City of Fort Worth , its officers , agents , employees , and representatives are added as additional insureds as respects operations and activities of, or on behalf of the named insured , performed under Contract with the City of Fort Worth." The additional insured requirement does not apply to Workers ' Compensation policies. 2. Subcontractors shall be covered under the Provider's insurance polic ies or they shall provide their own insurance coverage; and , in the latter case , documentation of coverage shall be subm itted to the Provider prior to the commencement of work and the Provider shall deliver such to the City. 3. Prior to commencing work under this Contract , the Provider shall deliver to the City of Fort Worth insurance certificate(s) documenting the insurance required and terms and clauses required . 4. Each insurance policy required by this Contract shall contain the following clauses: "This insurance shall not be canceled, limited in scope or coverage, or non-renewed until after forty-five (45) Days prior written notice has been given to the Director of Environmental Management, City of Fort Worth, 1000 Contract for Demolition and Abatement CRL 12.23 .07 Via Del Rio & Oak Hollow Page 9 Throckmorton, Fort Worth, Texas 76102." Note : Written notice can be by Provider or insurance company. 5. The insurers for all policies must be licensed/approved to do business in the State of Texas. Except for workers' compensation , all insurers must have a minimum rating of A: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required , written approval of Risk Management is required . 6. The deductible or self-insured retention (SIR) affecting the coverage required shall be acceptable to and approved in writing by the Risk Manager of the City of Fort Worth in regards to asset value and stockholders equity. In lieu of traditional insurance , alternative coverage maintained through insurance pools or risk retention groups must be also approved by the City's Risk Manager. 7 . Waiver of rights of recovery (subrogation) in favor of the City of Fort Worth . 8. Such insurance policies shall be primary, without right of contribution and not subject to any offset by any other insurance carried by the City or the Provider. 9. If insurance policies are not written for specified coverage limits , an Umbrellas or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage . 10 . Unless otherwise stated , all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a cla ims-made basis, the retroactive date shall be coincident with or prior to the date of the contractual agreement and the certificate of insurance shall state that the coverage is claims- made and the retroactive date. The insurance coverage shall be maintained for the duration of the contractual agreement and for five (5) years following completion of the service provided under the contractual agreement or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 11 . The City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City of Fort Worth. In the event the City requires the insurance limits to be increased or changes in policy categories or types of coverage, the City shall provide written notice to the contracting party . The contracting party will have ninety days from the date of notice to comply with the additional requirements. Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 10 7. INDEMNIFICATION A. For purposes of this Contract , the following words and phrases shall be defined as follows: 1. Environmental Damages shall mean all claims , judgments , damages , losses , penalties , fines, liabilities (including strict liability), encumbrances , liens , costs , and expenses of investigation and defense of any claim , whether or not such claim is ultimately defeated , and of any good faith settlement or judgment, of whatever kind or nature , contingent or otherwise , matured or unmatured , foreseeable or unforeseeable, including without limitation reasonable attorney's fees and disbursements and consultant's fees , any of which are incurred as a result of handling, collection , transportation , storage , disposal, treatment , recovery , and/or reuse of asbestos containing materials pursuant to this contract , or the existence of a violat ion of environmental requ irements pertaining to , and including without limitation : a. Damages for personal injury and death , or injury to property or natural resources; b . Fees incurred for the services of attorneys , consultants , contractors , experts, laboratories and all other costs in connection with the investigation or remediation of such wastes or violation of environmental requirements including , but not limited to , the p reparation of any feasibility studies or reports of the performance of any cleanup, remediation , removal , response , abatement, containment , closure, restoration or monitoring work required by any federal , state or local governmental agency or political subdivision , or otherwise expended in connection with the existence of such wastes or violations of environmental requirements , and including without limitation any attorney's fees, costs and expenses incurred in enforcing this contract or collecting any sums due hereunder; and c. Liability to any third person or governmental agency to indemnify such person or agency for costs expended in connection with this Agreement. 2 . Environmental requirements shall mean all applicable present and future statutes , regulat ions , rules, ordinances, codes , licenses , permits , orders , approvals , plans , authorizations, concessions, franchises , and similar Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 11 items, of all governmental agencies, departments , commissions , boards , bureaus , or instrumentalities of the United States , states , and political subdivisions thereof and all applicab le judicial , administrative , and regulatory decrees , judgments, and orders relating to the protection of human health or the environment, including without limitation: a. All requirements , including, but not limited to, those pertaining to reporting , licensing , permitting , investigation, and remediation of emissions , discharges , releases , or threatened releases of hazardous materials, pollutants , contaminants or hazardous or toxic substances , materials , or wastes whether solid , liquid, or gaseous in nature , into the air, surface water, groundwater, stormwater, or land , or relating to the manufacture , processing , distribution , use, treatment , storage , disposal , transport, or handling of pollutants , contaminants, or hazardous or toxic substances , materials , or wastes , whether solid , liquid , or gaseous in nature ; and b. All requirements pertaining to the protection of the health and safety of employees or the public. B. GENERAL INDEMNIFICATION: CONTRACTOR DOES HEREBY RELEASE, INDEMNIFY, REIMBURSE, DEFEND, AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS, EMPLOYEES AND VOLUNTEERS FROM AND AGAINST ANY AND ALL LIABILITY, CLAIMS, SUITS, DEMANDS, OR CAUSES OF ACTIONS WHICH MAY ARISE DUE TO ANY LOSS OR DAMAGE TO PERSONAL PROPERTY, OR PERSONAL INJURY, AND/OR DEATH OCCURRING AS A CONSEQUENCE OF THE PERFORMANCE OF THIS CONTRACT, WHEN SUCH INJURIES, DEATH, OR DAMAGES ARE CAUSED BY THE NEGLIGENCE OF CONTRACTOR, ITS OFFICERS, AGENTS, OR EMPLOYEES, OR THE JOINT NEGLIGENCE OF CONTRACTOR, ITS OFFICERS, AGENTS, OR EMPLOYEES, AND ANY OTHER PERSON OR ENTITY. C. ENVIRONMENTAL INDEMNIFICATION: CONTRACTOR DOES HEREBY RELEASE, INDEMNIFY, DEFEND, REIMBURSE, AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS, EMPLOYEES AND VOLUNTEERS AGAINST ANY AND ALL ENVIRONMENTAL DAMAGES AND THE VIOLATION OF ANY AND ALL ENVIRONMENTAL REQUIREMENTS RESULTING FROM THE HANDLING, COLLECTION, TRANSPORTATION, TESTING, STORAGE, DISPOSAL, TREATMENT, RECOVERY, AND/OR REUSE, BY ANY PERSON, OF ASBESTOS CONTAINING MATERIALS PURSUANT TO THIS CONTRACT WHICH IS REMOVED UNDER THIS CONTRACT, WHEN SAID ENVIRONMENTAL DAMAGES OR THE VIOLATION OF SAID ENVIRONMENTAL REQUIREMENTS WERE THE Contract for Demolition and Abatement CRL 12.23 .07 Via Del Rio & Oak Hollow Page 12 RESULT OF ANY ACT OR OMISSION OF CONTRACTOR, ITS OFFICERS, AGENTS, EMPLOYEES, OR SUBCONTRACTORS, OR THE JOINT ACT OR OMISSION OF CONTRACTOR, ITS OFFICERS, AGENTS, EMPLOYEES, OR SUBCONTRACTORS AND ANY OTHER PERSON OR ENTITY. D. The obligations of the Contractor under this section shall include, but not be limited to, the burden and expense of defending all claims, suits and administrative proceedings (with counsel reasonably approved by City), even if such claims , suits or proceedings are groundless, false, or fraudulent, and conducting all negotiations of any description , and paying and discharging, when and as the same become due, any and all judgments, penalties or other sums due against such indemnified persons. E. Upon learning of a claim, lawsuit, or other liability that Contractor is required hereunder to indemnify City, City shall provide Contractor with reasonably timely notice of same. F. The obligations of the Contractor under this section shall survive the expiration of this Contract and the discharge of all other obligations owed by the parties to each other hereunder. G. In all of its contracts with subcontractors for the performance of any work under this Contract, Contractor shall require the subcontractors to indemnify the City in a manner consistent with this section . H. In the event that a written claim for damages against Contractor or any of its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the City Manager, as evidenced by a final inspection, final payment to Contractor shall not be recommended by the City Manager for a period of thirty (30) days after the date of such final inspection, unless the Contractor submits written evidence satisfactory to the City Manager that the claim has been settled and a release has been obtained from the claimant involved . 1. If the claim concerned remains unsettled at the expiration of the said thirty- day (30) period , out of the performance of such work. 2 . The City Manager shall not recommend final payment to Contractor if a claim for damages is outstanding for a period of six (6) months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing, satisfactory to the City Manager, that: a . The claim has been settled and a release has been obtained from the claimant involved; or Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 13 b. Good faith efforts have been made to settle such outstanding claims , and such good faith efforts have failed. 3 . If condition (a) above is met at any time within the six (6) month period , the City Manager shall recommend that the final payment to Contractor be made. If condit ion (b) above is met at any time within the six (6) month period , the City Manager may recommend that final payment to Contractor be made . At the expiration of the six (6) month period , the City Manager may recommend that final payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the City Manager. The Contractor may be deemed by the City Manager to be entitled to a semi-final payment for work completed , such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising . 8. WARRANTY Contractor warrants that it understands the currently known hazards and suspected hazards that are present to persons , property and the environment by removing , transporting and disposing of asbestos conta ining materia ls. Contractor further warrants that it will perform all services under this Contract in a safe , efficient and lawful manner using industry accepted practices , and in ful l compl iance with all applicable state , local and federal laws governing its activities. Contractor also warrants that it is under no restraint or order that would prohibit performance of services under th is Contract. 9. LICENSES AND PERMITS A. Contractor certifies that on the day work is to commence under this Contract, and during the duration of the Contract , it shall have and maintain current valid and appropriate federal , state and local licenses and permits necessary for the provision of services under th is Contract. B. Contractor agrees to require all of its subcontractors used in performance of this Contract to have and maintain current valid and appropriate federal , state and local licenses and permits necessary for the provision of services under this Contract. Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 14 10. TERMINATION A. City may terminate this Contract, with or without cause, by giving ten (10) days written notice to Contractor, provided that such termination shall be without prejudice to any other remedy the City may have . In the event of termination , any work in progress will continue to completion unless specified otherwise in the notice of termination. B. If the City terminates this Contract under subsection A. of this section, City shall pay Contractor for all services performed prior to the termination notice. C. All completed or partially completed original documents prepared under this Contract shall become the property of the City when the Contract is terminated, and may be used by the City in any manner it desires; provided, however, that the Contractor shall not be liable for the use of such documents for any purpose other than as described when requested. 11. DEFAULT A. Contractor shall not be deemed to be in default because of any failure to perform under this Contract , if the failure arises from causes beyond the control and without the fault or negligence of Contractor. Such causes shall include acts of God, acts of the public enemy, acts of Government, in either its sovereign or contractual capacity , fires , flood , epidemics , quarantine restrictions , strikes , freight embargoes, and unusually severe weather. B. If the failure to perform is caused by the failure of a subcontractor of Contractor's to perform , and if such failure was beyond the control of both the Contractor and the subcontractor, without their fault or negligence, Contractor shall not be deemed to be in default unless the subcontracted supplies or services were reasonably obtainable from other sources . C. Alternatively , if at any time during the term of this Contract the work of Contractor fails to meet the specifications of the Contract Documents, City may notify Contractor of the deficiency in writing. Failure of Contractor to correct such deficiency and complete the work required under this Contract to the satisfaction of City within ten (10) days after written notification shall result in termination of this Contract. All costs and attorneys fees incurred by City in the enforcement of any provision of this Contract shall be paid by Contractor. D. In the event either party defaults in the performance of any of its obligations under this Contract, misrepresents to the other a material fact, or fails to notify Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 15 the other party of any material fact which would affect the party's performance of its obligations hereunder, the non-defaulting party shall have a right to terminate th is Contract upon giving the defaulting party written notice describing the breach or omission in reasonable detail. The defaulting party shall have a fifteen (15) day period commencing upon the date of notice of default in which to affect a cure. If the defaulting party fails to affect a cure within the aforesaid fifteen (15) day period , or if the default cannot be cured , the Contract shall terminate as of the date provided in the notice of default. E. The remedies provided for herein are in addition to any other remedies available to City elsewhere in this Contract. 12. RIGHT TO AUDIT A City shall, until the expiration of five (5) years after final payment is paid under this Contract, have access to and the right to examine any directly pertinent books, documents , papers and records of Contractor involving transactions related to this Contract. Contractor shall give City access during normal working hours to all necessary Contractor facilities in order to conduct aud its in compliance with the provisions of this paragraph. C ity shall give Contractor reasonable advance notice of intended audits . B. Contractor shall include in all its subcontracts hereunder a provision to the effect that the subcontractor shall give City , until the expiration of five (5) years after final payment is paid under the subcontract , access to and the right to examine any directly pertinent books , documents, papers and records of such subcontractor involving transactions to the subcontract, and further, that City shall have access during normal working hours to all appropriate work space, in order to conduct audits in compliance with the provisions of this paragraph . City shall give subcontractor reasonable advance notice of intended audits . C . The obligations of the Contractor under this section shall survive the expiration of this Contract and the discharge of all other obligations owed by the parties to each other hereunder. 13. MINORITY AND WOMEN BUSINESS ENTERPRISES In keeping with the City 's Minority/Women Business Enterprise (MWBE) ordinance, Contractor agrees to a minimum of seven percent (7%) of the total dollar value of this Contract will be paid as compensation to certified MWBE firms , pursuant to the City 's Ordinance . Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 16 14. INDEPENDENT CONTRACTOR Contractor shall perform work under this Contract as an independent contractor and not as an agent or employee of City. City shall not be considered the employer, co- employer or joint employer of the officers, employees or agents of Contractor. Contractor shall have the sole control , supervision , direction and responsibility over its officers, employees and agents and shall have the sole responsibility for determining the manner and means of providing the work described in this Contract, except as outlined in this Contract or as otherwise required by federal , state , county or city law, regulation or rule . 15. NON-DISCRIMINATION A. During the performance of this Contract, Contractor agrees not to discriminate against any employee or applicant for employment because of race , religion , color, sex or national origin, except where religion , sex or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of the non-discrimination clause . B. Contractor also agrees that in all solicitations or advertisements for employees placed by or on behalf of this Contract, that Contractor is an equal opportunity employer. C. Notices, advertisements, and solicitations placed in accordance with federal law , rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section. 16. GOVERNING LAW The City and Contractor agree that the validity and construction of this contract shall be governed by the laws of the State of Texas, except where preempted by federal law. 17. LIQUIDATED DAMAGES If Contractor fails to commence and complete work under this Contract within the stipulated time, there shall be deducted from any moneys due or owing Contractor, or which may become due, the sum of$ 1,000.00 per day for each day after the date the project was to be completed, until the project is substantially completed . Such sum Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 17 shall be treated as liquidated damages and not as a penalty, and City may withhold from Contractor's compensation such sums as liquidated damages. The amount of damage to City for delay in completion of the work is difficult to ascertain and the amount of the liquidated damages per day as stated above is reasonably anticipated pecuniary damages for such delay, and is not a penalty. 18. RIGHTS AND REMEDIES NOT WAIVED In no event shall the making by the City of any payment to Contractor constitute or be construed as a waiver by the City of any breach of covenant, or any default which may then exist, on the part of Contractor, and the making of any such payment by the City while any such breach or default exists shall in no way impair or prejudice any right or remedy available to the City with respect to such breach or default. Any waiver by either party of any provision or condition of the contract shall not be construed or decreed to be a waiver of any other provision or condition of this Contract, nor a waiver of a subsequent breach of the same provision or condition, unless such waiver be expressed in writing by the party to be bound. 19. ASSIGNMENT The City and Contractor bind themselves and any successors and assigns to this contract. Contractor shall not assign, sublet, or transfer its interest in this contract without written consent of the City. Nothing herein shall be construed as creating any personal liability on the part of any officer or agent of the City, nor shall it be construed as giving any rights or benefits hereunder to anyone other than the City and Contractor. 20. NOTICE Notices required to be made under this Contract shall be sent to the following persons at the following addresses; provided, however, that each party reserves the right to change its designated person for notice, upon written notice to the other party of such change: If to City: Written notice shall be sent to: Brian Boerner, Director Department of Environmental Management 1000 Throckmorton Fort Worth, Texas 76102 Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 18 If to Contractor: Name : Address : Karen Andrews lntercon Environmental , Inc. 2214 FM 1187, Building #6 Mansfield , TX 76063 Telephone : (817) 477-9995 FAX : (817) 477-9996 21. VENUE Should any action, real or asserted , at law or in equity, arise out of the terms and conditions of this Contract , venue for said action shall be in Tarrant County , Texas . 22. SEVERABILITY The provisions of this Contract are severable; and if for any reason any one or more of the provisions contained herein are held to be invalid , illegal or unenforceable in any respect, the invalidity, illegality or unenforceability shall not affect any other provision of this Contract, and this Contract shall remain in effect and be construed as if the invalid, illegal or unenforceable provision had never been contained in the Contract. 23. ENTIRETY This Contract, the Contract documents and any other documents incorporated by reference herein contain all the terms and conditions agreed to by the City and Contractor, and no other Contracts, oral or otherwise , regarding the subject matter of this Contract or any part thereof shall have any valid ity or bind any of the parties hereto. 24. MODIFICATION No modification of the Contract shall be binding on Contractor or City unless set out in writing and signed by both parties. Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 19 SIGNATURE PAGE FOR VILLA DEL RIO AND OAK HOLLOW APARTMENT OMPLEXES DEMOLITION AND ASBESTOS ABATEMENT CONTRACT This Contrac by,the parties in trip ii9tte in Tarrant County , Texas on this date , .....::.,,,~..__,_=~~,.,.._-'-+-----' 200_0 . APPROVED AS TO FORM ATIEST : _,.,..----., Marty Hendrix, City Secretary Contract for Demolition and Abatement CRL 12 .23.07 Via Del Rio & Oak Hollow BY: Karen Andrews , President WITNESS : QM ~j~ GL«~L; Name : ngelica P etruzz~ Title : Executive Vi ce President CORPORA TE SEAL : Page 20 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Environmental Management Project DEM 07-12: APT for the removal of asbestos containing materials and demolition of structures at the Villa Del Rio and Oak Hollow Apartment Complexes , Fort Worth, Texas . STATE OF TEXAS COUNTY OF TARRANT CONTRACTOR Karen Andrews Title President Date 12 / 31 / o 7 § § § Before me, the undersigned authority , on this day personally appeared Karen Andrews , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of Intercon Environmental, Inc. for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this 31st day of December , 20_0_7 __ !~ ,,"'~,·~z·,,, Angelica Petruzzelli ~,~•·. #', fT [•~··· ·.··?~ Notary Public, State o exas \ :. ...., :,J My Commission Expires: .. ~. "·" .. ~-·1/ii,;",\~··' February 28, 2008 ''''""'' THE AMERICAN INSTITUTE OF ARCHITECTS A/A Document A311 Performance Bond SU 103 1697B KNOW ALL MEN BY THESE PRESENTS: that INTERCON ENVIRONMENT AL INC !Here insert full name and address or legal title of Contractor) 2214 FM 1187, BLDG 6 -MANSFIELD , TX 76063 as Principal, hereinafter called Contractor, and, ARCH INSURANCE COMPANY (Here insert full name and address or legal t itle of Surety) 3 PARKWAY, STE 1500 PHILADELPHIA, PA 19102 as Surety, hereinafter called Surety, are held and firmly bound unto CITY OF FORT WORTH (Here insert full name and address or legal title of Owner) 1000 THROCKMORTON STREET FORT WORTH, TX 76102 as Obligee, hereinafter called Owner, in the amount of ONE MILLION , FOUR HUNDRED AND NINETY TWO THOUSAND, ONE HUNDRED AND FIFTY NINE 79/100 Dollars ($ 1,492 ,159.79 ) / for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Contractor has by written agreement dated 19 , entered into a contract with Owner for REMOVAL OF ASBESTOS CONT AlNlNG MA TERlALS & DEMOLITION OF STRUCTURES AT THE VILLA DEL RIO & OAK HOLLOW APARTMENT COMPLEXES AT 5817 & 5901 BOCA RATON BLVD IN FORT WORTH. in accordance with Drawings and Specifications prepared by (Here insert full name and address or legal title of Architect) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. AJA DOCUMENT A311 • PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND • AIA ® FEBRUARY 1970 ED .• THE AMERICAN INSTITUTE OF ARCHITECTS , 17.1 5 N .Y. AVE ., N .W ., WASHINGTON, D . C. 20006 1 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully perform said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the Owner. Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default, or shall promptly 1) Complete the Contract in accordance with its terms and conditions, or · 2) Obtain a bid or bids for completing the Contract in accordance with ,ts terms and conditions, and upon de- termination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest responsible bidder, arrange for a contract between such bidder and Owner, and make available as Work progresses (even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this para g raph ) sufficient funds to pay the cost of completion less the balance of the contract price ; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the contract price ," as used in this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by Owner to Contractor. Any suit under this bond must be instituted before the expiration of two (2) years from the date on which final payment under the Contract falls due. No right of action shall accrue on th is bond to or for the use of any person or corporation other than the Owner named herein · or the heirs , executors, adminis- trators or successors of the Owner. Signed and sealed this 31st day of DECEMBER 192007 INTERCON ENVIRONMENTAL INC ~~~~~~~-1~().,.JU.M....~(Pri ncip <l/J · _QA;L!',{V!,e~ Pe&~:( ~ /W1lncs.<) 0 0 Karen Andrews !T it l f') President /, 1 7/ 1 ARCH INSURANCE COMP ANY ~ i)crl~ 1 ""'"'' ~~~~:::::.....:.==:!...--,ff'-:==-/W=-:il::::n(-''S.'""',J'-'c::o-''-=-~,-------Mi~d,-D f ~•J A ITORNEY-IN-FACT AIA DOCUMENT A311 • PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND • AIA ® FEBRUARY 1'l70 ED .• THE AMERICAN INSTITUTE OF A RCHITECTS , 1735 N .Y. AVE., N.W., WASHINGTON, D . C. 20006 (5~al } iSe,,I) 2 THE AMERICAN INSTITUTE OF ARCHITECTS A/A Document A311 Labor and Material Payment Bond SU 10 3 1697B THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND IN FAVOR OF THE OWNER CONDITIONED ON THE FULL AND FAITHFUL PERFORMANCE OF THE CONTRACT KNOW ALL MEN BY THESE PRESENTS: that INTERCON ENVIRONMENTAL INC (Here insert full name and address or legal title of C o ntractor) 2214 FM 1187 , BLDG 6 -MANSFIELD, TX 76063 as Principal, hereinafter called Principal, and, ARCH INSURANCE COMPANY (He re insert full name and address or legal t i tle of Surety) 3 PARKWAY, STE 1500 PHILADELPHIA , PA 19102 as Surety, hereinafter called Surety, are held and firmly bound unto CITY OF FORT WORTH (Here insert full name and address or legal title of Owner) 1000 THROCKMORTON STREET FORT WORTH, TX 76102 as Obligee, here inafter called Owner, for the use and benefit of claimants as hereinbelow defined, in the amount of One Million, Four Hundred and Ninety Two Thousand, One Hundred and Fifty Nine 79/100 (Here i nsert a sum equal to at least one-half of the contract price) Doi la rs ($ 1,492,159.79 ) , for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has by written agreement dated 19 , entered into a contract with Owner for REMOVAL OF ASBESTOS CONTAINING MATERIALS AND DEMOLITION OF STRUCTURES AT THE VILLA DELRIO & OAK HOLLOW APARTMENT COMPLEXES AT 5817 & 5901 BOCA RATON BLVD IN FT. WORTH. in accordance with Drawings and Specifications prepared by (Here insert full name and address or legal t i tle of Architect) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. AIA DOCUMENT A311 • PERFORMANCE . BOND AND LABOR AND MATERIAL PA YM ENT BOND • A!A ® FEBRUARY 1970 ED.• THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE ., N .W., WASHINGTON, D . C. 20006 3 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Principal shall promptly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance of the Contract, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the fol- lowing conditions : 1. A claimant is defined as one having a direct con- tract with the Principal or with a Subcontractor of the Principal for labor, material, or both, used or reasonably required for use in the performance of the Contract, labor and material being construed to include that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental of equipment directly applicable to the Contract. 2. The above named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon . The Owner shall not be liable for the payment of any costs or expenses of any such suit. 3. No suit or action shall be commenced hereunder by any claimant : a) Unless claimant, other than one having a direct contract with the Principal, shall have given written notice to any two of the following: the Principal, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made , stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail; postage prepaid, in an envelope ad- dressed to the Principal , Owner or Surety, at any place where an office is regularly maintained for the trans- action of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer. b) After the expiration of one (1) year following the date on which Principal ceased Work on said Contract, it being understood, however, that if any limitation em- bodied in this bond is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the Project, or any part thereof, is situated , or in the United States District Court for the district in which the Project, or any part thereof, is sit- uated, and not elsewhere . 4 . The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by Surety of mechanics' liens which may be filed of record against said improvement, whether or not claim for the amount of such lien be presented under and against this bond. Signed and sealed this 31st day of DECEMBER 19 2007 INTERCON ENVIRONMENTAL INC '.£E£.1<~1.A-• ~~~"""1---l J(\J\wnM,D_~(Principal) _ciu IN.. l,1 .(' I& P-1Z!7u ,142f_ l M 0 (Witne.1.1) D ~ Karen Andrews (TitlcJ President /! /} / !ARCH INSURANCE COMPANY -6wL.lL.-1·, I_L,J::e.....,,<~' Dof::=.:::.._IL.l,..X ~d fl::::i,,,,..-=.i -=-,V\~-/'v,, ~ n ".( ' :, "t'''Yi I (Witnc•\\) r I lM:.U ~-y;,., ...... JJ-.... Michael J. Friedrich !Title·! ATTORNEY-IN-FACT AIA DOCUMENT A311 • l'[fffO RMAN CE BOND AND LABOR AND MAHRIAL PAYM[NT BOND • AIA ® FEBRUARY 1'170 ED .• THE AM[RICAN INSTITUTE OF ARCHITECTS, 1715 N .Y. AVE., NW., WA SHIN C TON, D. C. 20()0(, (Seal > (Scal i 4 POWER OF ATTORNEY Bond# SU 103 1697B Know All Men By These Presents That the Arch Insurance Company, a corporation organized and existing under the laws of the State of Missouri . having its principal office in Kansas City. Missouri {hereinafter referred to as the "Company") does hereby appo int Wilham A Baile:,. Mariel A GonLdleL A n 11t: M Barb er and Michael J Friedrich uf Bndgev,ew IL (EAC H ; its true and lawful Attorney(s)-in-Fact, to make. execute . seal . and del iver from the date of issuance of this power for and on its behalf as surety , and as its act and deed Any and all bonds and undertakings EXCEPTION NO AUTHORITY is granted to make . e>:ecute . seal and deliver bonds or undertakings that guarantee the payment or collection of any promissory note. check . draft or letter of cred it This authority does not permit the same obligation to be split into two or more bonds in order to bring each such bond within the dollar limit of authority as set forth herein . The Company may revoke this appointment at any time. The execution of such bonds and undertakings in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes . as if the same had been duly executed and acknowledged by its regularly elected officers at its principal office in Kansas City, Missouri . This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on March 3, 2003, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect: "VOTED, That the Chairman of the Board, the President, or any Vice President. or their appointees designated in writing and filed with the Secretary. or the Secretary shall have the power and authority to appoint agents and attorneys-in -fact , and to authorize them to execute on behalf of the Company. and attach the seal of the Company thereto, bonds and undertakings , recognizances. contracts of indemnity and other writings . obligatory in the nature thereof. and any such officers of the Company may appoint agents for acceptance of process " This Power of Attorney is signed. sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of Directors of the Company on March 3, 2003 VOTED, That the signature of the Chairman of the Board, the President. or any Vice President, or their appointees designated in writing and filed with the Secretary , and the signature of the Secretary, the seal of the Company, and certifications by the Secretary, may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on March 3, 2003, and any such power so executed , sealed and certified with respect to any bond or undertaking to which it is attached, shall continue to be valid and binding upon the Company OOML0013 00 03 03 Page 1 of 2 Printed in U.S.A. 1:, I estimony Whereof the Company has caused this instrument to be signed a nd ,ts co rporate seal to be affixed by their autho rized offi c ers . this J]!!:!_ __ day of . February ___ , 2006 --- .A.ttested and Certified Martin J Nilsen , Secretary S TATE OF NEW YORK SS COUNTY OF NEW YORK SS ~' {t~>~c, .... ">\ k I ··c,•,ou•, 1S 's \ , C,I I ,lu ) •\ :a.,''"',,:, \ '"-------/ i '·-~ llmuri _./ ------- Arc h Insurance Company .-~-----~ ,,-· Edward M Titus . Vl'ce President I Peter J Calleo . a Notary Public . do hereby certify that Edward M Titus and Martin J Nilsen personally known to me to be the same persons whose names are respectively as Vice President and Secretary of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free an voluntary act of said corporation and as the,r own free and voluntary acts for the uses and purposes the<ein set forth . , n . ~. PETER J. CALLEO, ESQ. • ' Notary Public. State of New Y.:,r1( Peter J . Cal . Notary Pu lie . ~o. ?2CA6109336 My commiss1 n expires 5-03-2008 Ct :lrf,ed rr. New York County CERTIFICATION Commission Expiras May 3, 200a I Martin J. Nilsen . Secret ary of the Arch Insurance Company, do hereby certify that the attached Power of Attorney dated on behalf of the person(s) as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate ; and I do further certify that the said Edward M. Titus: who executed the Power of Attorney as Vice President, was on the date of execution of the attached Power of Attorney the duly elected Vice President of the Arch Insurance Company . IN TESTIMONY WHEREOF. I have hereunto subscribed my name and affixed the corporat~ seal of the Arch Insurance Company on this 31st day of December , 20_Q]__. ·){> .. !.. ,j{ :.:_ .. ,, •.#;--> ... ;. ,/'.... c.,,C- / ____ .,_/ ____________ _ Martin J ,}.iilsen, Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated . PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Surety 3 Parkway, Suite 1500 Philadelphia, PA 19102 OOML0013 00 03 03 Page 2 of 2 Printed in U.S.A. ATTACHMENT A CONTRACTOR RESPONSE TO 1TB Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 21 INVITATION TO BID FORT WORTH CITY OF FORT WORTH ENVIRONMENTAL MANAGEMENT DEPARTMENT 1000 THROCKMORTON FORT WORTH, TEXAS 76102 PROJECT: DEM 07-12: APT REMOVAL OF ASBESTOS CONTAINING MATERIALS AND DEMOLITION OF STRUCTURES AT THE VILLA DEL RIO AND OAK HOLLOW APARTMENT COMPLEXES 5817 & 5901 BOCA RATON BOULEVARD FORT WORTH, TEXAS 76112 September , 28, 2007 Intercon Environmental, Inc . Company Name 2214 FM 1187, Bldg 6 Address Mansfield, Texas 76063 City, State, Zip 11 1 07 Date Table of Contents 2.0 Proposal Documents ~" ifflktercon ENVIRONMENTAL, INC. 1. Proposal Document Checklist. .................................................. 2.1 Acknowledgement of Receipt of Addenda .................................... 2.2 Addendum #1 Addendum #2 -to include new Pricing Sheet Scope of Work .................................................................... 2.3 2. Cost -VOIDED ..................................................................... 2.4 3. Contractor Information 8: Qualifications ...................................... 2. 5 Company .Information .......................................................... 2.5.1 Statement of Qualifications ................................................... 2.5.2 Project References ............................................................. 2.5.3 Staff Matrix ...................................................................... 2.5.4 4. Contractor Submittals ........................................................... 2.6 Project Schedule ............................................................... 2.6.1 Schedule of Values ............................................................. 2.6.2 Sample Invoice 8: Sample Closeout Documentation ....................... 2.6.3 Organization Communication Chart ......................................... 2.6.4 License 8: Certificates ......................................................... 2. 6. 5 Department of State Health Services (DSHS) Asbestos Abatement Contractor's 8: Transporters License Mold Remediation Company 8: Lead Firm Staff Licensing Subcontractors License 8: Certificates Department of State Health Services (DSHS) Asbestos Transporters License 5. Subcontractors Information 8: Qualifications ................................ 2. 7 Subcontractors Company Information ....................................... 2. 7.1 Subcontractors Statement of Qualifications ............................... 2. 7 .2 Subcontractors Staff Matrix ................................................... 2. 7. 3 6. Bonds ............................................................................... 2.8 7. M/WBE Utilization Requirements .............................................. 2.9 Subcontractors/Suppliers Utilization Form M/WBE Certificates Good Faith Effort Form Supporting Documentation 8. Statement of Residency ........................................................ 2.10 Nondiscrimination ............................................................... 2. 11 Prevailing Wage Rates .......................................................... 2.12 9. Insurance Certificates .......................................................... 2.13 10. Contractor's Responsibilities .................................................. 2. 14 Contractor's Legal 8: Compliance History ................................... 2. 15 2.0 BID DOCUMENTS Note: ALL BID DOCUMENTS MUST BE SUBMITTED IN THE SAME ORDER AS RECEIVED FROM THE CITY AND WITHIN A BOUND PACKAGE. FAILURE TO SUBMIT ALL OF THE ITEMS LISTED ON THE FOLLOWING PAGES, IN A SEALED ENVELOPE, MAY RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE. 2-1 2.1.Bid Document Checklist All Bid Documents , including this checklist, must be completed in full and subm itted in a sealed envelope , in the requested order, to be considered a responsive submittal. Bid Documents Initi al if Included 1 . Bid Document Checklist KA 2 . Acknowledgement of Receip t of Addenda Ilk 3. Scope of Work ~ 4 . Cost 18 5 . Contractor Information and Qualifications k'A 6 . Contracto r Submittals ~~ 7 . Subcontracto r Information and Qualifications ~ 8 . Bonds ~:A- 9 . M/\NBE Utilization Requi rements ~ 10 . Statement of Residency ~A- 11 . Nondiscrimination llA 12 . Prevailing Wage Rates ~ 13 . Insurance Certificates ~ 14 . Contractor 's Responsibilities tl-A 15 . Contractor 's Legal and Compliance History Uk I understand that all of these items will be reviewed , and any items not included may result in my bid being considered non-responsive. Signature ~M..~ Name Karen Andrews Title President Company Intercon Environmental, Inc. Date 11 1 07 2-2 2.2.Acknowledgement of Receipt of Addenda 2.2.1 . Check if applicable ~ The undersigned acknowledges the receipt of the following addenda to the Invitation to Bid , and has attached all addenda following this page. (Add lines if necessary). Addendum Number 1 Addendum Number 2 Addendum Number 3 10/16/07 (Date received ) 10/25/07 (Date received) (Date received) 2.2.2. Check if applicable __ The undersigned acknowledges the receipt of no addenda to the Invitation to Bid . ~ 19 ature Karen Andrews Name President Title Intercon Environmental, Inc. Company 11/1/07 Date 2-3 TO: FROM: DATE: RE: Sign in Sheet fORTWORTH ENVIRONMENTAL MANAG EMENT Interested Parties Derek Senter ADDENDUM Environmenta l Management Department May 11 , 2007 Addendum #1 Project#: DEM 07-12:APT Removal of Asbestos-Containing Materials and Demolition of Structures at the Villa Del Rio and Oak Hollow Apartment Complexes 5817 and 5901 Boca Raton Boulevard Fort Worth , Texas 761112 A copy of the sign in sheet from the October 11 , 2007 Pre-Bid Meeting is included as a part of this addendum . Tree Ordinance Information about the City of Fort Worth 's Tree Preservation Ordinance can be found at http://www.fortworthqov.org/pacs/info/default.aspx?id=37810. If you have additional questions regarding the requirements , click on the Urban Forestry Compliance Section link at the top of the page for a list of contacts . Concerning site grading There were multiple questions concerning the final grading of the site. Key concerns for the final site appearance are for the entire site to properly drain, prevent pooling , and to protect sloping areas from eroding before and after vegetation is established . Storm Drains The two storm-drain inlets located in the northeast corner of the Oak Hollow Apartment Complex should be converted from curb inlets to drop inlets set flush with the final grade of the site . They shall be protected to prevent sediment from entering the storm drain and to prevent erosion surrounding the inlet area. The two storm drain in lets at the Oak Hollow Apartment Comp lex , located adjacent to the tennis court , shall be treated one of two ways ; they shall be converted to drop inlets as discussed above or the drain lines shall be tied in together and the inlets shall be capped. This will allow storm water to continue to flow through from other sources to the outfall. Electricity Electricity will not be available at the site . Contractors will have to prov id e/arrange for their own source of power for the project. Site Visit A second pre-bid meeting will be held Monday October 22 at 9 :3 0 am . As a reminder, follow the instructions located in the bid package and include a copy of the addenda in the bid package as stated in the instructions. Karen Andrews From : 3ent: To: Subject: Attachments: Bob McFadin Tuesday , Oct obe r 16 , 2007 4: 13 PM Jerry And rews ; Ke ith Flowers ; Fernando Av ila ; Angelica Pe t ruzze ll i; Karen Andrews FW : Addendu m #1 -REMOVAL OF ASBESTOS CON T A INI NG MATERIALS AND DEMOLITION OF STRCUTURES A T THE V I LLA DE L RIO AND OAK HOLLOW APARTMENT CO M PLEXES Addendum 1 -DE M0 7-12APT .doc From: Senter, Derek [mailto:Derek.Senter@fortworthgov.org] Sent: Tuesday, October 16, 2007 3:46 PM To: Tom Palet; bsgrayco@sbcglobal.net; Jenn Lutz ; Estimating; jgibbs@cste nv.com ; Jerry Andrews; ferna ndo@alamo1.com; AES@adva ncedenviro. net; Linda@a-e-i.net; nemat@airsafe .us; mike@h penvi rovision .com ; cares2clean@sbcglobal.net; npeltier@tx.rr.com ; echavez@poncecontractorsinc.com; g lopeznstarcorp@aol.com; olmos@hughes.net; jgarvine@pdge.com; jon.morgan@basic-ind .com; jsatterwh ite@lloydnabors.com; mwwreckbc@cs .com ; KM@southwestcontructors.com; quinton@tascotx.com; charley .mock@shawgrp.com; dhoffman@eiwaste.com ; Derek Farrell; Jud Stringer; bwbbrentbates@hotmail.com; AES @advancedenviro.net; joec@horsleyspecialties.com; echavez@ponceco ntractorsinc.com; quinton@tascotx.com ; dknight@tajc-inc.com ; mike.cactus@sbcglobal.net; Steve Chappell ; Jud Stringer; brian@midwestwrecking.net; Fernando Avila ; themarcongroup@yahoo.com; Bob Mcfadin; rickrickels@arcabatement.com; sagnor@pdge .com; cherryenvironmental@comcast.net; ajc@tajc-inc.net; samielb3030@yahoo .com; jgibbs@cstenv.com; mabdalk@poncecontractorsinc.com; brian.welch@basic-ind.com; joew@ecesi.com ; brad@newdfwlawn .com ; draybeam@hotmail.com; ralvarado@lviservices.com; janet@ae-si.com Subject: Addendum #1 -REMOVAL OF ASBESTOS CONTAINING MATERIALS AND DEMOLITION OF STRCUTURES AT THE VILLA DEL RIO AND OAK HOLLOW APARTMENT COMPLEXES All , Please see the attached addendum . As mentioned in the addendum , there wil l be a second opportunity to walk the site on Monday October 22 , at 9 :30 am . Thanks , Derek Senter , CHMM Environmental Management Department City of Fort Worth 817-392-6325 2.3. Scope of Work Bids are being accepted by the C ity of Fort Worth for the furnishing of all labo r, materials and equipment necessary to perform the removal of all Asbestos-Containing Materials (ACM) and th e demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartme nt complexes located in Fort Worth at 5901 and 58 17 Boca Raton Boulevard , respect ively . 2 .3 .1 . Sit e Info rmat ion Oak Hollow The Oak Hollow apartments are located at 5901 Boca Raton Blvd., Fort Worth , Texas . The 10-acre property consists of 24 , two-story apartment bui ld ings and a two-story leasing office /clubhouse that was constructed in 197 4. The apartment complex contains 176 un its with a total of 173 ,104 square feet of leaseable space. The buildings were constructed with concrete slab-on-grade foundat io ns , wood framing , pitched roofs covered with asp halt sh in gles , and brick and wood siding walls. Villa Del Rio The Villa Del Rio apartments are located at 5817 Boca Raton Blvd ., Fort Worth, Texas . The 4.65-acre property consists of 11, two-story buildings , and three single story buildings that were constructed in 1975. The apartment complex contains 108 un its with a total of 84 ,000 square feet of leasable space . The buildings were constructed with concrete slab-on-grade foundat ions , wood framing , spanish tile roofing, stucco and painted wood panel exterior walls . 2.3.2. Project Coordination Contractor will be responsible for coordinat ing with the Environmental Management Department, within twelve (12) days after receipt of notice to proceed , the start date of demolition to allow for notification to the Texas Department of State Health Services (TDSHS). The City of Fort Worth will prepare and submit the TDSHS notification and pay all TDSHS notification fees . Upon award , contracto r shall provide to the City of Fort Worth an updated schedule detailing the phased approach to performing the abatement and demolition of the two complexes . Upon receipt of a notice to proceed and prior to demolition , contractor must obtain a wrecking permit to demolish the subject structure from the Department of Development, telephone (817) 392-2222 . In obtaining the wrecking permit, the contractor will be required to abide by City of Fort Worth ordinance number 17228 , also known as the "Tree preservation ordinance ." Under the preservation ordinance , no tree 6" diameter or greater will be removed and all trees w ithin 50 feet. of a structure will be protected as per tree ordinance #17228. Removing trees that interferes w ith construction is permissible while still retaining 25% of existing canopy. A copy of the ordinance has been included as appendix B. It is the City 's intent to leave al l trees in place 2-4 and only remove trees that are dead or will jeopardize the health and safety of the workers perform in g demolition activities . Prior to sit e mobilization, the contractor must prepare and subm it a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the requirements detailed in the TPDES General Permit No. TXR150000 and received approva l from the City . In addition , the contractor must also submit a Notice of Int ent (NOi) to the Texas Commission on Environmental Quality (TCEQ) for storm water discharges associated wi th construction activities. The contracto r must maintain this plan until sufficient vegetation has been established . 2 .3.3 . Site Preparation Prior to any abatement or demolition activities , the contractor will remove all universal waste items including light bulbs , mercury containing devices , paints , pesticides , etc .. These items will be properly packaged and disposed by the contractor . The contractor will provide documentation (waste manifest , bill of lading, etc.) that the waste was properly disposed. Contracto r will disconnect all associated air conditioning units and properly evacuate any remaining refrigerant contained within the units prior to being disconnected . Utilities have been terminated to the sites. Prior to demolition , the contractor will be responsible for verifying that all utilities (i.e. natural gas , telephone , water , etc ... ) have been disconnected . Contractor will cut and cap all sit e utilities at point of connection to the site. 2.3.4. Site Work All structures , with one exception, on both complexes will be abated of all ACM and will be demolished removing all building slabs /foundations , utility infrastructure and grading of the parcel to properly manage storm water. The clubhouse/office at the Oak Hollow Apartments will be removed under a separate project. The abatement and demolition of this structure is not included in this solicitation . Prior to the start of abatement and demolition of any structure , each structure shall be inspected to ensure the safety of the crew. Abatement activities will include the removal of approximately 334 ,688 square feet of sheetrock wall texture and joint compound , approximately 511 square feet of popcorn ceiling texture, and approximately 7,399 square feet of yellow linoleum from the Villa Del Rio Apartment complex . In addition, approximately 808,720 square feet of sheetrock wall texture and joint compound and approximately 36 ,176 square feet of floor tile and mastic will be removed from the former Oak Hollow Apartment complex. Asbestos abatement specifications have been included in the bid as Appendix C. All debris generated from the removal of ACM is to be disposed of as asbestos-containing waste . 2-5 Building 5939 located in the Oak Hollow Apartment complex is a two-story building where there appears to have been a ch imney/attic fire in Apartment # 300 . Whereas only the ceiling appears to be affected for that apartment unit only . Whi le the fire did travel across the attic , the remainder of the ceiling joists appear to be only smoke damaged . The othe r units in building 5939 will be abated of all ACM . Building 5939 will be demolished using wet methods with the ACM left in place in apartment 300 only , and deb ri s from this build ing will be disposed as ACM from this building only . A certified Nationa l Emission Standards for Hazardous Air Pollutants (NESHAPS ) superv iso r shall be present to over see the wet demolition of this structure. Prior to any site disturbance , the contractor w ill have implemented the Best Management Practices (BMPs) detailed in the approved SWPPP . This shall include , but not be li mited to , the use of silt fencing , rock check dams , mulching, erosion control blankets , curb and inlet protection devices , sediment traps , sediment basins , and /or stabilized construction entrances and exits. Demolition activities will include the demolition of all site structures , concrete/asphalt park ing and drives , pools , side walks , slabs/foundations and asphalt/concrete streets and sidewalks. All demolition debris will be removed from the site and recycled or disposed in a landfi ll accepting such waste. All foundations will be removed down to a min imum of 2 feet below grade. If foundations/piers extend beyond 2 feet below grade , they may be severed at that point and left in place . Contractor shall clean and remove all furniture , household furnishings , building materials , tires , abandoned or junked vehicles or vehicle parts , debris , trash , rubbish and any other solid waste from the premises . These materials shall be recycled, reclaimed or disposed at a facility or landfi ll that is approved to accept such waste . Contractor will insure that each vehicle contracted for waste hauling possess a valid City of Fort Worth Waste Hauler Permit as issued by the Environmental Management Department -Solid Waste Division , telephone : (817) 392-5150. Demolition activities will be performed in accordance with Federal, State and local visible emission requirements (i.e. no visible emissions will leave the demolition area). Water will be made available in the vicinity of the construction area . The work area will be maintained in a manner that will control all demolition debris from becoming windblown and /or migrating from the work area during and after working hours. Upon completion of the demolition work, the Contractor will obtain a final inspection on the wrecking permit from the Building Inspection Division in the Development Department. After all demolition and other debris have been removed from the site , the contractor shall remove all concrete/asphalt slabs , walks , pools , steps and roadways from the property . This demolition task will be completed last to minimize sediment tracking from the site. 2-6 The contractor shall use site material , if available, or clean fill from an approved source to fill any holes in the terrain resulting from any of the above work and grade the entire lot , ensuring that low areas are filled to prevent the pooling of water. Upon completion of the entire project, contractor shall sweep dirt and debris from the haul routes used to ensure any sed i ment tracked from the site is collected . A specific grass type indigenous to the area will be selected and agreed to depending upon the time of year when the planting will occur. The soil will be analyzed by the contractor in order to determine current nitrogen, phosphoric acid, and potash contents in order to determine the concentration and fertilization rate that should be applied to maximize growth . The seeded area will be watered by the contractor, as needed, to allow proper establishment of vegetation. The Contractor will maintain the vegetative area for six months , or until a uniform vegetative cover with a minimum of 70 percent coverage has been established and has been accepted by the City for maintenance by others , whichever is earlier . Once sufficient vegetation has been established , all BMPs will be removed by the contractor and the project will be closed out. 2-7 TO: FROM: DATE: RE: FORT WORTH ENVIRONMENTAL MANAG EMENT Interested Parties Derek Senter ADDENDUM Environmental Management Department October 25 , 2007 Addendum #2 Project#: DEM 07-12:APT Removal of Asbestos-Containing Materials and Demolition of Structures at the Villa Del Rio and Oak Hollow Apartment Complexes 5817 and 5901 Boca Raton Boulevard Fort Worth , Texas 761112 General Comments: Proposals are due on Thursday , November 1, 2007 no later than 1 :30 PM at the City of Fort Worth Purchasing Divis ion , 1000 Throckmorton , Fort Worth , Texas 76102. ONE (1) original copy of the Request for Proposal (RFP) and three (3 ) complete bound copies must be subm itted to be considered responsive . As stated in section 1.3 , the time for submitting requests for an interpretat ion of the bid has expired. Sign in Sheet A copy of the sign in sheet from the October 11 , 2007 and October 22 , 2007 Pre-Bid Meetings are included as a part of this addendum. Bid Form A revised bid form /section 2.4 is included in this addenda. Please line through the existing section 2.4 and comp lete the revised version provided in th is addenda . Tree Ordinance A further study of the site indicates it will be necessary to remove a number of the trees to fac ilitate demol ition of the site structures. In addition , many may become severely damaged during the demolition process . The City of Fort Worth will prepare Phase One documents as detailed in the "Tree Preservation Ord inance " for this project. Th is will include the performance of a tree survey identifying the current canopy cover on sit e. This will allow the removal of up to 50 percent of the existing tree canopy. The City of Fort Worth believes this will allow for the proper protection of the existing resource and will also facilitate the completion of the scope of work without impeding progress . In addition, this will alleviate the contractor from paying any fees associated with the "Tree Preservation Ordinance" and from being held liable for the preservation of trees designated to be removed. The contractor will still be responsible for protecting the trees that are not designated to be removed and for following the requirements of the ordinance during the performance of this project. Questions Received Q: Do you have specifications or design and construction standards for the drop inlet construction? A: Specific design and construction details are not available . The drop inlet shall be constructed in a manner that ties into existing utilities. It shall tie into the existing grade and have a grated surface that prevents the infiltration of large debris . As a guide, Texas Department of Transportation, Fort Worth District Standards for Grated Inlets (Attached) should be used. Q : Section 2 .6 .1 Project Schedule: This not a small project and most scheduling software will make the schedule extremely small to fit into your size requirements. We use Microsoft Projects ---if the overall schedule is larger that your listed limits - will it be accepted? A : As stated in section 2.6.1, the project schedule should be on paper with a maximum dimension of 11" high by 17" wide . Q: Section 2.6.2 Schedule of Values: Will AIA Documents G702 be acceptable? A: Yes Q: Section 2.6.3: a. Will AIA Document G703 be acceptable? And b. Will a table of contents from a close-out book be acceptable? (Our close-out documentation is not small) A: Yes, if AIA Document G703 reflects the invoice format and closeout documentation that would be provided as a part of the project it will be acceptable. Q: IHST prepared the Asbestos Specifications: They were not present at the pre-bid. Will they be the Consultant of Record for this project? A: Yes Q: Prevailing Wage Rates: Abatement Workers will fall into which of the classifications you have listed? A: Laborer Common and /or laborer Skilled pending the role that that worker will be serving. Q: Can 1 Cubic Yard Bag Systems be used for asbestos waste? A : As stated in section 2 .2.5 of appendix C , All asbestos materia l and associated debris should be removed and placed in double layer 6 mil asbestos disposal bags . The size of the bags shall be up to the contractor. Q: Can the office building that is to remain on site be used as a j o b s ite offi ce ? A : No . The Oak Hollow office building is scheduled t o be demo li shed prio r to the in itiation of this project. As a reminder, follow the instructions located in the bid package and include a copy of the addenda in the bid package as stated in the instructions . 2.4 Cost Oak Hollow A artments Removal of all asbestos containing mat erials including: • -808 ,720 square feet of sheetrock wall textu re and jo int compound; and A 1 . • -36 , 176 s uare feet of floor ti le and mastic 6 O Removal of all asbestos containing materials including : • -334 ,688 square feet of sheetrock wall texture and joint compound ; • -511 square feet of popcorn ce iling texture ; and A2 . • -7 ,399 s uare feet of ellow linoleum . 3 o Asbestos Removal Subtotal $ B1. 36 B2.* B3 .* Villa Del Rio A artments Demolition and proper disposal of 11 , two-story build ings and three , single-story buildings removing all B4 . buildin slabs Removal of all concrete parking, side walks , utilities , 5 1 18 B5*. rad in of the ro ert to ro erl mana e storm water 4 Removal of top 2 feet of poo l perimeter, breakup / allow B6.* water to infiltrate bottom and backfill ool 1 Storm Water Mana ement at BOTH Com /exes Preparing and implementing a Storm Water Pollution Prevention Plan, Installing and maintaining all BMPs , establishing vegetation , B7. and removal of BMPs u on com letion Demolition Subtotal $ Total of Items A 1, A2, and B 1 thru B 7 GRAND TOTAL $ 639,036 .22 $ 302 2 5 7.97 9 41,294 .1 9 $ 261 8 49 .00 $ 97 888.80 $ 1 000 .00 $ 1 12 4 5 6 .20 $ 3 1,981.60 $ 1 000 .00 $ 44 690 .00 5 5 0 ,86 5.6 0 1 ,492,159.79 t The City reserves the right to select separate vendors for the Asbestos Removal and the Demolition. Company Nam e Inte rc o n Environme nt a l, Inc. In it ials: -~-:k"~--- The undersigned hereby proposes to furnish the equ ipment, labor materials, superintendence, transportation and disposal , and any other items or services necessary to complete the scope of services detailed in this Solicitation . Bids shall be firm priced offers unless otherwise specified. In the event of a discrepancy between unit price and extended price , the unit price shall govern. City reserves the right to select any combination of items 1 thru 9 and may select multiple vendors to complete the work. ***Contractor shall complete all phases of work to achieve substantial completion within 155 calendar days of receipt of notice to proceed*** ignature Karen Andrews Name President Title Intercon Environmental, Inc. Company 11/1/07 Date 8 1 e C ~-o· _,. 1n~l CONTROL POINI PLAN SECTION A-A TA BL E OF QUANTITIES TYPE 3 INLE T · o· • 4 · -o" BARS A BAR S A BAA S C STEPS il\2".!. @12"! i'112"!ttl2"(rt6) NO. LCHI. NO. LCTH, NO. LGHI . NO. LCTH. 10 B'-6 ~ 6 6 '-6" 12 3·-11 · 3 2 '·10" TOTAL STEEL 1 27, 00 LBS. TOT AL CONCRETE 1, 90 C. V. AOOlflONAL S1E£.l ZJ. 63 LBS. IIOOJT I ON,',,L CONCR£T£ 0. 362 C. Y. .____.:,---': ' IJ ·15[ J '-6" I] ~: BARS B-1 & B-2 3· -o· JT. SECTION B-B TYPE 3 STRUCTURE BARS C F" I ELO CUT ANO BE NO B ARS AS REOU I REO TO CLEAR PIPE ' L ,,:i-~_J-~--.~/,~-~.~,,~,w. "'1·,--L-~-~ f ;,... ro J~L~T~- 1fL I ,'.-:: .. ,l(,' ~:;I~ ~ .Lwo11111101om--,1,· ,•1,· ~ GRATE DETAIL CONTROL POINT PLAN TOP ELEVATION ,-- 1 r=\::....-_'_,_ -----I~ i I I \_ LOWER STRUCTURE~: l I 1 1' I SECTION A-A "")(] .. )(th• ANGLES FRAME DETAIL . J 0 ,_______.,_,· _-'-------',-I J[ BARS A BARS C 1r TA BLE OF QU ANTITIES TYPE 3 ·C INLET 'C' • I ' -6 " BARS A BARS C STEPS et 12 ·· ! @ 12" ! ttl 2" (rt61 NO. UiTH. NO. LGHl. NO. LCTH. NO. LCHI. 8 ' -6" I 2 I ' -5 " I 2' ·10" TOT AL STEEL -49. 68 LBS. TOT AL CONC. 0. 53 C. V. A00lll0NAL STEEL P.L.t. 23. 63 LBS. AOOIT IONAL CON(, P.L.r. 0 . 362 C. Y. LJ]~-· ri~ s· >~\i '!; ~: ·, '.: NO. 6 m :rORM(O 01\R :·.~;: :·::. 12· 0. C. -STAGGERED STEPS --r ',,-STEPS '2 " 0 C • / IS1IICC£RE01 ,. 8.tiRSA/ • ·-~·~c;_ __ .. cul ANO BOID UP STEEL OF LOWER STRUCTURE /.S SHOWN LOCAT I ON or: INLET AS SHOWN IN Tll( PL,!,NS REFERS 10 CONTROL SECTION B -B TYPE 3 -C STRUCTURE GENER AL NQTE,S; I. ALL CONCREIE SIIALL BE CLASS "A". 2. ALL RUNl="ORCING STHL SIIALL BE NO, " B.._RS. Oll.l(NSJONS RELATING 10 SIEH AR[ lO CENTERS Of BARS. fl[LO CUI ANO BENO BARS ,.5 REOV I REO 10 ACC~OAT( TI ES TO LOWE:R STRUCTURE ANO TO CL[,t,R PIPES . .,_ REDUCE CONCRETE QUAN TI TIES IN TABLES roo AR[A or (ACII PIPE IN SIRUCHJn[. ~-CRAI( ANO nu.ME SHALL CONFOOM TO ITEM HI. 5. LOCAT ION OF INLET AS SHOWN IN THE PLANS R(HRS TO COOTrlOL PO I Nl SHOffi ON fll l S SHH.I . JNL[l Sl!All BE o\LJCNEO so THAT Cfl,\l[ VMl[S ARE PARAL LEL ro OJR[CI ION Of lRAH IC. FOR lV 3 -C 'iilRUCfUR[S NOi ON CU...VERTS , LOWER STRUCTURE MAY BE POS ITIOU£0 AS REOUIR£0 TO ALIGN WI TH TOP STRUC ilJRE, STORM OOA IN PIPES OR OTM[R AOJAC(NT S1F1UC1Uf1E:S. 6. NOT TO BE US(D JN OR ADJACENT TO •REAS FOR Pf.O[STR[AN ACCESS. 7. INL EJ lOP MAY BE CAST MONOLITHICALLY WITH CON CR ETE PAVEMENT . IF NOT PLACEO MONOLllll!CALLY, A SEALEO 'h " £.)CPANSION JO INT SH ALL BE PLACED AROUND Ill[ loP Of lHE INLET SlRVCl~E. 10 TH[ OEPIH ~ CONC RETE PAV[~NT. CLASS ], <I , S 00 7 JO I N! SEALANT SHAL L BE US[O TO SEAL JO IN !. CONCRETE REOI.NCT ION ON[ P[P[ .-f-r ••os O•portmtrnt of Tt'°onsoortot ion I FORT WORTH DI STR I CT P I PE D I A. Zl" 27" JO " 33 - 36 ' C. Y. CONC . "' o. 10 0 ' 0 I n . 18 o. zz o. 2 ..... (ll(t llOt 0 P90li,,.lo•1"llol_.,_.,,,.,,, .... ,,....G1lr, •n •1"''•*-•-••G GRATED INLET DETAIL S T YPE S 3 8, 3 -C G I -3-0 2 (F Wl OI Slfl lC COi.NU toN lflOl Sltll JOe Sfflll I t f October 22, 2007 Bid Walk, Abatement and Demolitiori of Oak Hollow and Villa Del Rio Apartment Complexes I 1 I ; t s ,' s "--Ii . } . eJ I S '7 ~ J..,_ ' i October 11, 2007 Bid Walk, Abatement and Demolition of Oak Hollow and Villa ue, Rio Apartment Complexes I ! ! Name Company Phone Fax Email Cs, It ' , ! 9?2-5°7'5-~3'] 97z-S~7 -;roo '7' _J6;bb.s.e_ c..s.+e-nv . ~ I t/72.,-.2-1-~~n .. b·t,. -'121.· 1--l1 ...--£"2.'S"b esl-.· ... e.-h: .. , (9lloylt1~b,,.-s. l!.4'-y"t. I l '1.,\t\,;&=H1-\J-3) 214; 3~l fi S"f:}O Company ' ' Phone F~oc Email Name I SV-tA-'\ c~~~ ti\: dwe-;,~ Wlj.ec\.l~c:, C, : ,g ll · 5"~9 -70Cfi Z. . g,,7 6<\0, C\:53C, } ,t_; C"\ Q_ W\ t: .. t ·V { $ \.-1- 'vJ vt.-e.c... c.. l"" C, • "' e. if") l /)L ~ \ ! I r r~ lk~'("s \.'1 >oor.ia\.L<; ~f'-'2,\A -'8oi-.L-S:.. q Jt { Jl,w, ~\-~£\., ,ta\ t~ .(?____ -I ' . ! .-51'l/-4S 9 e { "' ..... &r-c/,.,;·/ ..tJA/,,,-/ v:;.,Ja Lvr -~<-'-/i /Ire , ~ 74 CHQ'-':J~J<;,. ;)!fi: ~-~'-I I ---KA ), , ,.,, ,,,-,., A-~ rLJ }_ r 1 :r-_ _,:; Q,/tl -7 ~3' ?U uJ.Jt., --f1ikt :i4k~ t< f_t_ '(!_ r r c., 1Je 144<! h1---/'M 113 1110000 Dcu,1ls ,l} / ' t!>..,,. ..... l3o v,'J~ '}..}(,f,)?5) ~~ /11) it::_.·•lc...t Vt fr;:) U"onvt·e.rl ~':'1--<trz-,u· ~ t 8r,l-tt l7·-l.Jt;'>1J~ I ' I ' l ! I i i I i ! i l l ; I ' ! i ~ I I i I l i i ! 2.4. Cost The undersigned hereby proposes to furn ish t he equipmen t, labor superintendence , transportation and disposal , and any othe r it ems or serv ices to complete the scope of services detailed in th is So lici t ation . Bids shall be firm priced offe rs un less othe rwi se sp eci fi ed . In the even t between unit price and ext ended pr ice , the un it pr ice shal l govern . Oak Hollow Apartments -Removal of all asbestos containing materials including -808 ,720 square feet sheetrock wall texture and joint compound and -3 , 176 1 . s uare feet of floor tile and mastic Villa Del Rio Apartments -Removal of all as estos containing materials includ ing -334,688 sq re feet of sheetrock wall texture and joint compoun , -511 square feet of popcorn ceiling texture , d -7 ,399 2. s uare feet of ellow linoleum Villa Del Rio Apartments -Demo!' 10n and proper disposal of 11 , two-story building and three , single - story buildings removing all bui 1ng slabs , concrete /asphalt parking and rives , pools , sidewalks , utilities , grading of the pare to properly manage storm 3 . water , and establishin v etation Oak Hollow Apartmen -Demolition and proper disposal of 24, two-st y apartment buildings remov ing all building slabs , co c.rete parking , pools, side walks , utilities , grad i ng of e parcel to properly manage storm 4. water , and estab shin ve etation TOTAL $ $ $ or shall complete all phases of work to achieve substantial completion ___ calendar days of receipt of notice to proceed.*** co Karen An dr ew s Name Pres ide nt Title I nt ercon Environme ntal , Inc . Company 11 /1/07 Date 2-8 2.5. Contractor Information and Qualifications Bidder shall submit the following items proving they are duly qualified and capable to fulfill and abide by the requirements listed herein. The documents listed below shall be included in this bid submittal, in the same order as listed , following this page , bound within the response . 2 .5.1 . Bidder shall provide company information including its company name , address , telephone number(s), email address and FAX number(s) for the local office as well as the headquarters. 2.5 .2 . Bidder shall attach an up-to-date and concise copy of its current Statement of Qualifications. 2.5.3. Bidder shall provide at least three project references similar in scope and size to that of this Solicitation. Each project references shall include the following information: • Company's Name • Name and Title of ContacVProject • Email , Phone, and Address of Contact • ContracVProject Value • Brief Description of Service Provided 2.5.4 . Bidder shall complete a staff matrix including the following information detailing the providers personnel, their qualifications, and years of experience for staff that will be providing services associated with this Solicitation. • Position title and job function as associated with this contract , (President, Vice President, Project Managers, Technical Managers, Field Supervisors, etc . .) • Name • Tasks to be performed in association with this contract • Certifications/Licenses • Total Years Experience • Length of employment with your company 2-9 ENVIRONMENTAL, INC. 2214 F M 118 7. Building 6 . Mansfiel d , Texas 76063. Te l e phone (81 7 ) 47 7 -9995. Facs i mile {817 ) 477-9996 www . i ntercon -environmental .com 2. 5. 1 Contractors Company Information Intercon Environmental , Inc. 2214 FM 1187, Building #6 Mansfield, Texas 76063 (817) 477 -9995 Telephone (817) 477 -9996 Facsimile Person of Contact: Ms. Karen Andrews karen@intercon-environmental.com 4i Texas DSHS Asbestos Contractor License No. 80-0805 4 Texas DSHS Asbestos Transporter License No. 40-0336 Texas DSHS Lead Firm License No . 2110368 Texas DSHS Mold Remediation Contractor License No. RC00136 NCTRCA Certificate No. WFDB34659Y0808 . ~ SCTRCA Certificate No. 20702202 HUB Certificate No. 1522437774500 tercon ENVIRONME NTAL, INC. 2214 F M 1187, Building 6, Mansfield Texas 76063, Te l ephone (8 17 ) 4 77-9995. Facsimile (817 ) 477 -999 6 www . i n t erc on-envi ron men tal .co m 2. 5. 2 Statement of Qualificati ons lntercon Environmental , Inc. possesses contractor licenses for asbestos abatement , lead and l ead-based paint abatement, mold remediation and demolition projects. We also have the qualifications to demolish , r ebuild or construct buildings , respond to emergencies and perform genera l construction improvements . lntercon Env i ronmental, Inc. has completed numerous projects such as floor t il e installation, demolition , l ead and mold decontamination , wall and ceiling instal lation and painting projects . Ou r ab i li ti es are only l imited by your needs, as we require no minimum contract amoun t. lntercon's team members, fleet and equipment provi de us w ith excellent capabilities . Our fleet of late-model vehicles, state-of-the-art abatement, demol ition, and transportation equipment allows us to get i n and out of project sites quickly. Our demolition team is capable of performing multiple "full scale " demolition projects simultaneously. We have the ability to staff and perform six large abatement projects concurrently. During peak abatement season, we have the resources to obta in add itional supervisors and laborers from a group that is licensed by the Texas Department of State Health Services to perform up to ten abatement proj ects simultaneously. Our Project Managers are availab l e at al l times during every project. Our team members have been in the Dallas /Fort Worth market for over 1 7 years, specializing in all aspects of the asbestos and lead abatement, mold remediation and demolition industries. lntercon maintains 2 1 full time employees to handle the needs of our clients and ensure that we can meet or exceed any project's demand. Our telephones are answered 24 hours a day by knowledgeable company representatives with the ability to mobilize personnel and equipment to a project site at a moments notice. lntercon Environmental, Inc. has in-house resources for work normally sub-contracted to other firms. We have found this to be more reliable, efficient, and effective in meeting the needs of our clients . By utilizing in- house resources, we have a much greater control on meeting deadlines and maintaining a consistency of high quality work and customer satisfaction. We cover every aspect of the abatement and demolition process . lntercon Environmental, Inc. will never disregard a request for service, even in an emergency. lntercon's team members are averaging less than two hours response time for emergency clean-ups. All projects are· completed on time or ahead of schedule. Each project was completed to the owners ' total satisfaction. We have never requested a change order for work we contracted to complete. We take pride in every project we are awarded. Bid Documents /Specific /SOQ Statement of Qualifications Page 2 of 8 Firm: Corporate / Main Office : Telephone : Officer: Email address : Karen Andrews, President COMPANY / PERSONNEL INFORMATION lntercon Environmental , Inc. 2214 FM 1187, Building #6 , Mansfie l d , Texas 76063 (8 17) 477 -9995 , Facsim i le : (8 17) 477 -9996 Ka re n Andrews , Pres iden t karen @i ntercon-envi ron mental .com EN V IRONMENT AL, INC. Ms. Andrews possesses a Bachelor of Science i n Biology with a m i nor in Chemistry and w ith her degree began in the environmental field i n 1992 encompassing both operational and admin i strat ive duties in various disciplines of the environmental industry. Presently she conducts all of lntercon's financial , operational, and regulatory responsibilities. She is currently licensed by Texas Department of State Health Services as a Lead Abatement Supervisor and ma i nta i ns an expertise in all facets of t he Asbestos , Lead , and Mold Industries utilizing her many years of experience i n field operations , lab analysis , and a ll regulatory documentation required in the environmental industry. Jerrold Andrews, Vice President Mr. Andrews began his Business Management experience in 1 984. He transitioned to the Demolition and Environmental Industries in 1991 . He has extensive experience and knowledge in all phases of Commercial and Residential Demolition and Construction , General Contracting and Project Management , Asbestos , Lead nd Mold Abatement, Hazardous Chemical and PCB Disposal. He is interactive with clients and suppliers on a daily basis and maintains a constant oversight of all of lntercon's financial and operational activities. He is licensed by the Texas Department of State Health Services as an Asbestos Abatement Supervisor and a Mold Remediation Supervisor ; and by the State of Louisiana as an Asbestos Abatement Supervisor. Fernando Avila, Sales Manager Mr. Avila established his Business Management career in 1984 and went on to successfully pursue a profession in the Environmental Industry in 1986. He is licensed by Texas Department of State Health Services as an Asbestos Abatement Supervisor, handling a multitude of projects including Asbestos Abatement, Mold Remediation, Lead Removal, and Demolition . With his vast knowledge of the abatement and demolition industries, he is able to competitively bid projects and secure opportunities with clients . Bob McFadin, Demolition Sales Manager Mr. McFadin started in the transportation industry in 1972 and progressed to the Environmental and Demolition Industries in 2000. He is licensed by the Texas Department of State Health Services as an Asbestos Abatement Supervisor and is educated in all transportation regulations and procedures and the Demolition and Abatement Industries . With this knowledge , he is able to procure both demolition and asbestos projects. Bid Documents /Specific /SOQ-Asb&Demo Statement of Qualifications Page 3 of 8 •ose Contreras, Project Manager ~" A tercon ENV I RONMENTAL, INC. 1 r. Contreras began his career as an asbestos abatement worker in 1987 and within two years was promoted to a Texas Department of State Health Services Licensed Asbestos Abatement Supervisor. His ability to manage large crews effectively , expediently and profitably, has enabled him to further his pos iti on to Project Manage r over lntercon's Supervisors for Asbestos Abatement, Mold Remediation , Lead Removal, and Demolition projects. David Dunham, Demolition Project Manager Mr . Dunham began in 1970 in the transportation in dustry and in 1998 moved over to the Construction and Demolition industries. His experience as a heavy equipment operator along with his Class A CDL License enables him to manage all facets of lntercon's Demolition Team. Keith Flowers , Demolition Sales In 1978, Mr. Flowers began in construct ion sales and progressed to various management positions . In 2001 he was certified by the US Army Co rp of Eng i neers in Construction Qual ity Management. Additionally he was Superintendent of military construction projects for the US Navy and the US Ai r Force with a majo r l ocal construct i on firm. In 2002 , Mr. Flowers entered the Environmental Industry as an Operations Manager and Estimator and obtained his Asbestos Abatement Supervisor's license through the Texas Department of State Health Services . Lfector Medina, Senior Supervisor Mr. Medina began his environmental career in 1987 as an asbestos abatement worker, licensed by the Texas Department of State Health Services , and in 1995 became li censed as an Asbestos Abatement Supervisor directing crews over Asbestos Abatement, Mold Remediation and Lead Removal and Demolition projects. Based on his experience and his proven compliance record, he was promoted to Senior Superv i sor to oversee lntercon 's Supervisors. Eulogio Torres, Supervisor Mr. Torres has been in the environmental industry since 1984, working as an asbestos abatement worker licensed by the Texas Department of State Health Services and in 2002 advanced to a successful licensed Asbestos Abatement Supervi sor over crews performing Asbestos Abatement , Mold Remediation , Lead Removal and Demolition projects . Jose Ramos, Supervisor Mr. Ramos began his career in 1997 as an asbestos abatement worker, licensed by the Texas Department of State Health Services. In 2003, he was promoted to a licensed Asbestos Abatement Supervisor heading over crews performing Asbestos Abatement, Mold Remediation, Lead Removal, and Demolition projects. Ricardo Zavala, Supervisor Mr. Zavala started working in the environmental field in 1998 as an asbestos abatement worker, licensed by ~he Texas Department of State Health Services. In 2005, he obtained his license to perform mold remediation and advanced to the position of Asbestos Abatement Supervisor overseeing crews perform Asbestos Abatement and Mold Remediation projects. Bid Documents /Specific /SOQ -Asb&Demo Statement of Qualifications Page 4 of 8 Bid Documents /Specific /SOQ-Asb&Demo ORGANIZATION CHART ENVIRONMENTAL, INC. Hugo V aJ.derranra :W arehonse Supervisor Statement of Qualifications Page 5 of 8 ENVIRONMENTAL , IN C. Copy of Supervisor Licenses held: Karen Andrews; President • Jerrold Andrews; Vice President ~~~0 ? .... ~"'91 .>I• H.-tu "'"' .., .. C ontrol N o : H9H.f2 . Control ,11 : J<,fio Dc p :1r1mc n1 of St.Uc Hettllh Sen ice, cc rtifil')il lh ~I: ERROLD L A~DREWS Ot.·1>.e11mc nt of S tate Health Se-n 'icc.1 ccnific!i that: JERRO:CD LAN DREWS l1Ucenotduan: Mold Remc-diatio n Con1r1trtor Al'ihC'ltO\ Almtcmcnt Su1)cn i~(Jr Expi res : 9/14 009 David L. Lakey. ~tD. Comm issioner of Hcat th Fernando Avila, Sales Manager ~!\TE ~~· i , 1 i«•n '4!d ~ .tn ; .\ ~ \t1a1 m en• upen t"'-O r Li en e i"umbcr: From: To: 803502 02 0 00 0211 /2009 Cnn ~rol "-o : rJ51 7j . ~,i<·e n se Nu mbrr: Fro m : :ro: r Bobbie McFadin, Demo Sales Manager and Asbestos Supervisor ~ ~··TEXAS• " ~n t d Cont rol Nn : 9!-1 7~ Stat~ Health Services • De purtm c nl of S tate He.-llh Sen ices c e rtifies that : BOBBIE P i\1 C F A D .IN JR is Licensed MS un : Licen s e N um be.-: F r o m : T o: 804525 02118/200 7 02/17/2009 Eulogio Torres, Asbestos Supervisor . ....... .. . . •* ' TEXAS • Co nirol No: Departmento • • ')~~JI!' State Health Services t; • DL·p:111,m.•nt or Stale Health Scn·kl'S certifies th :11 : EU.LOG.IQ TORRES h LiccnSetl us an: \1-l,t•\l{t, \h,lfrtlh!II '•ll jll'I' l "lr Lice n se Numbe r : 8044 19 Ex11ira li on Date: 10/6/2009 Ricardo Zavala, Asbestos Supervisor ~ ~·'TEXA S• • Oepar'JTIC!nl d · ~State HealthServicES • Co rllrol No: 9jJ81 . De1rnrtmc111 of S1:11c H ealth Cl" ice.., cc,1ifi c~ 1h :11 : RI CARDO ZAVALA is Licensed a an: \'-hC'itoS Aha~emcnt S 1111 e n i.;;or Lirense From: To : umber: 804689 06/29/2006 06 /28/2008 Bid Documents /Specific /SOQ -Asb&Demo 8033 17 11 /15 /2005 J 2/14/2007 ,License N umber: MRCOJ2~ From : ' ' 0 1/06 h oo6 r T o : , 0 1/06 /2008 Jose Contreras, Project Manager ~ *~·"TEXAS" • Dcp.v,men~ ~ Sf;nf! fiie;a,lth Scr"...ce, ('on1n1I o; 9 .. J-l~<f O 1·,arlnu:n t or S r :1te l·l <"-f•l&h ·e n in·, r-L"rt ifi c, 1h ,u : .10 · A CONTR E RAS i..!l> Lic<:n q_d ,, .. a n : ,.\ ... IK.'"''lO"' \.h ,Ucm(nl ""'op,l'n i •r Li'-.·c u se l'-u n1 ber: F rom : To: 804 20 1 07/23 , ~006 07/22 0 Hector Medina, Senior Asbestos Supervisor • Control No : . ... 9356=' . Ocf)art mcnt of S late t-l ca llh S('n ic~ certifies that: HECTOR i\H:Dl , A i ~ Li censed a.s ..1 n : J\"bc1r;·f o;, ,\ t>a tl'mcnt ~upen i~,r Lice 11 se N um be r : Fro m : To: 80~027 07/211/2006 07/2 7/2 008 Jose Ramos, Asbestos Supervisor ~ ~-;TEXAS •.• Depl,rtment ... St ate Health SeMces ... . Con t ro : 'It 9•200"" . . Dep:u1mc111 of Ute Hcullh Sen iceS ce rtifies 1h.e1 : JO ER llAMO S h I iccnsed iU 11n : \,hl•,to, \hatcm rnl "iu 1,e ni "or Lirense N umber: F,·0111 : T o: 8044::~ 03/31 /2006 03/30/2008 • License l\' umber: 804432 !l rom : 04;07/2006 To: 04/06/2008 . Control Ni -: 9~2~11'· • Statement of Qualifications Page 6 of 8 "'" 31ktercon ENVIRONMENTAL, I NC. lntercon Environmental, Inc. has successfully completed projects for the following governmental and educational institutions : Federal Government Ab i lene National Guard State Government Texas Department of Transportation Countv Government Dallas County Tarrant County Citv Government City of Arlington City of Carrollton City of Dallas City of Duncanville City of Fort Worth City of Dallas Love Field Aviation Dept. Colleges and Universities Austin College Grayson County Community College Texas State Technical College University of North Texas Denton School Districts Birdville ISD Eagle Mountain-Saginaw ISD Fort Worth ISD Hudson ISD Graford ISD Kilgore ISD Housing Authorities Balmorhea Housing Authority Grapevine Housing Authority Groesbeck Housing Authority Linden Housing Authority Mabank Housing Authority Teague Housing Authority Temple Housing Authority Bid Documents /Specific /SOQ-Asb&Demo City of Garland City of Jacksboro City of Lancaster City of Mansfield City of River Oaks EDC City of University Park Mansfield ISD Prairiland ISO Richardson ISD Tidehaven ISD Trenton ISD Valley Mills ISD Statement of Qualifications Page 7 of 8 Current License and Certifications Program Name Certification Number NCTRCA -DBE WFDB23227N0808 SCTRCA -SBE , WBE 20702202 State of Texas -HUB 1522437774500 WBE National Council -WBE 234367 City of Austin -DBE INT8315158 City of Austin -WBE INT8315158 City of Beaumont -MBE Texas Department of State Health Services License Number Contractor Asbestos Abatement License 80-0805 Asbestos Transporter License 40-0336 Contractor Lead Abatement License 2110368 Mold Remediation License RCOOl 36 Texas Residential Construct i on Commission Builder Number Registered Builder 16680 Louisiana Dept of Environmental Quality License Number Asbestos Removal & Abatement 42608 Asbestos Contractor / Supervisor 8S01993 Bid Documents /Specific /SOQ -Asb&Demo ENVIRONMENTAL, INC. Expires 08 /31 /08 02 /28 /09 03 /1 1 /08 01 /31 /08 12 /05 /09 12 /05 /09 10/12 /08 Expires 02 /05 /09 02 /05 /09 09 /02 /09 01 /25 /08 Expires 02 /28 /08 Expires 12 /31 /07 04 /26 /08 Statement of Quali f icat ions Page 8 of 8 ENVI RONMENTAL, INC. Insu rance Genera l Liability Arch Special t y Insurance Company $5 ,000 ,000.00 Includes Pollutio n Liability Worker's Compensation Texas Mutual Insurance Company $5 ,000,000.00 Automobile Liability Hired Autos & Non-Owned Autos The Hart ford I nsurance Company $5 ,000 ,000 .00 Policy Nu mber 1 2 EMP 43 5 l 3 00 Pol i cy Number 1142280 Policy Number 10UENTS3006 Exp ires 02 /03 /08 Expires 02 /25 /08 Expires 02 /06 /08 Excess Genera l Liability , Additional Insured and Wa ive r of Subrogation i nsurance is available upon request . Bank References : Wells Fargo 1640 West Henderson Cleburne , Texas 7603 1 Mr . Bart Cannon - (817) 556-5 108 Credit Rating Information : Dun & Bradstreet Rating : CB2 Paydex : 79 Duns# 143048119 Client References: Mr. Roger Grantham, City of Fort Worth Mr. John Flippen, University of North Texas Mr. Sam Peacock, City of Dallas Love Field Aviation Ms. Melanie Rhea, Ri chardson ISO Mr. Mark Smith , Lockheed Martin Fire & Missile Mr. George Re i d, Fort Worth ISD Bi d Documen t s /Speci fi c /SOQ -Asb&Demo (817) 392-8592 (940) 565-4837 (214) 670-6654 (469) 593-0044 (972) 603-7288 (817) 871 -3293 tercon ENVIRONMENTAL, INC. 2214 FM 1187 . B u i l d i ng 6. Mansfield Texas 76063. Te l ephone (817 ) 4 77 -9995 . F acsimi l e (8 1 7 ) 4 77 -9 996 l. Project Information : Client / Owner: Contact Information: Consultant Information : Contract Information : Scope of work: Performance Period: Project Information : Contract Information : Scope of wo r k : Performance Period : 2 . Project Information : Cl ient / Owner : Contact Information : Length of Contract: Scope of wor k: Performance Period : 3. Proj ect Infor mation : Client / Owner: Contact Informati on : Length of Co ntract: Scope of work : Perfo r mance Per i od : 2. 5. 3 Project References Various Facil ities , Fort Worth, Texas City of Fort Worth www . i nterc o n-envi ronmen ta I .co m Roger Grantham , Env i ronmental Program Manager / (817) 392 -859 2 roger.grantham@fortworthgov.org l 000 Throckmorton Street Fort Wort h, T exas 761 02 IHST Environmental, Inc. / (972 ) 478 -74 15 6-yr Annual Asbestos Price Agreement, Cowtown Inn / Bi lled to Date : $8 57 ,534 . l O Removal of asbestos-containing sheetrock , fireproofing , floor tile & mastic , the r mal pipe i nsulation and thermal pipe fittings . April 2004 to Present Asbestos & Demoliti on of Vickery Corridor Ri ght-of-Way (SH 12 1 ), Fort Wo rt h , Texas Contract Amount: $1,579,126.05 / Bi lled to Date : $627 ,878.61 SHl 21 : Removal of asbestos-contai n i ng mater i als and demolition of 39 parcels . December 2006 to Present Various Facilities , Tarrant County , Texas Tarrant Coun ty Clarence Pressley , Operations Manage r / (817 ) 884 -3708 cpressley@tarrantcounty.com l 00 West Weatherford, Suite 4608 Fo r t Worth, Texas 76196 Asbestos & Demolition Annual Price Agreements / Billed to Date : $265 , l 05 . 75 Removal of asbestos -contain i ng sheetrock , floo r tile & masti c , thermal p i pe i nsulati on and thermal pipe fittings . Commercial and Residential Structural Demolition . December 2004 to Present Various Facilit i es , Dallas County, Texas Texas Department of Transportation Larry Gilbert, Ri ght-of -Way Section Manag er / (214) 32 0-62 5 5 lgilbe l @dot.state .tx.us P.O. Box 133067 Dallas , Texas 7 53 1 3-3067 Asbestos & Demol ition Annual Price Ag r ee m en t / Bi ll ed to Date : $3 34 ,297.6 0 Removal of 1 35 ,3 71 square f ee t of asbestos -co nt ain i ng sheetroc k and 12, l 0 9 square feet of asbestos -conta i n i ng floor t i le & masti c Building Demol i tions . June 2007 to Present data/bi d docs /City of Fort Worth /2 .5 .3 Pro ject Refe ren ces tercon ENVIRONMENTAL, INC. 22 1 4 F M 1 18 7 . Bu i l d i ng 6. Mans fi e ld T e x as 7 60 6 3 . T e l e p h o ne (817) 477 -9 995 . Fa c s imi l e (8 17) 4 77 -9996 w ww . i nte rc o n -e nv i ron me nt al .com 2. 5.4 Contractors Staff Matrix Position Title Name Tasks Certifications / Licenses Total Years Length of &Job Experience Em ployment Function President Karen Andrews Operations Bachelor of Sci ence in Biology 15 ye ar s 3 .75 years with a minor in Chemistry ; DSHS Lead Ab at emen t Supervisor Vice President Jerrold Andrews Operations & DSHS Asbestos Abatement 16 years 3.75 years Safety Supervisor and Mold Remediation Supervisor Sales Manager Fernand o Avila Operations , Safety , DSHS Asbestos Abatement 20 years 3 .7 5 ye ars & Project Supervisor Management Sales Manager Bob Mcfadin Operations, Safety DSHS Asbestos Abatemen t 33 years 3 .75 ye ars & Project Supervisor, Class A CDL Management License Project Manager Jose Contreras Project DSHS Asbestos Aba tement 20 years 3 .7 5 years Management Supervisor Project Manager David Dunham Project Class A CDL License 20 years 1.5 years Management Supervisor Hector Medina Project Supervision DSHS Asbesto s Abatement 20 years 3.75 years Supervisor Supervisor Eulogio Torres Project Supervision DSHS Asbestos Abatemen t 23 years 1.5 years Supervisor 2.6. Contractor Submittals Bidder shall submit the following items included in this bid submittal , in the same order as listed , following this page , bound within the response . 2.6.1. Project Schedule : Contractors shall provide a project schedule that includes all major tasks pursuant to the Scope of Work and Specifications . The project schedule shall show all tasks in the left most column and their duration shall be plotted horizontally versus time . A time scale shall be selected so that the complete duration of the project can be shown on paper with a maximum dimension of 11" high by 17" w ide . The project schedule must be submitted with the bid. During the term of the contract the Contractor shall submit monthly project schedules showing planned work and actual work accomplished . 2.6.2. Schedule of Values: Progress Payments will only be made after completion of those tasks and/or subtasks identified on the Project Schedule and Schedule of Payments. Progress Payments will be made during the project no more frequently than once per month. A payment schedule must be submitted with the Bid showing the name of each task and /or subtask , the name of the deliverable document for each task and /or subtask , total task and /or subtask cost, planned payment dates for each task and /or subtask , and the amount that would be remaining in the contract account. Upon receipt of final project completion documentation, final project payments will be approved . Final payment will not be approved until project complet ion documentation has been submitted to and approved by the City of Fort Worth. Ten percent (10%) of total project cost will be held back until receipt of final project completion documentation. 2.6.3 . Provide a sample invoice and sample project closeout documentation . 2.6.4 . Provide an organization chart that details the communication channels between the Contractor and City of Fort Worth personnel for this contract. 2.6.5 . Provide copies of contractors (or subcontractors) licenses to perform necessary tasks related to this solicitation including the , NESHAP abatement of ACM and transportation of ACM. 2-10 Date: Project: A B Item Description Number Item 1 Bonds Oak Hollow Abatement 2 2 story buildings Villa Del Rio Abatement 3 2 story buildings 4 1 story buildings Oak Hollow Demo 5 2 story buildings 6 Parking 7 Sidewalks 8 Utilities 9 Grading 10 Pool Villa Del Rio Demo 11 2 story buildings 12 1 story buildings 13 Parking 14 Sidewalks 15 Utilities 16 Grading 17 Pool Storm Water 18 Prepare SWPPP 19 Implement SWPPP 20 Maintain BMP 21 Install Vegetation 22 Maintain Vegetation 23 Remove BMP -Sub Total Schedule of Values 11/01/07 Invoice No. 07-xxx Removal of Asbestos Containing Materials & Demolition of Structures at the Villa Del Rio & Oak Hollow Apartment Complexes 5817 & 5901 Boca Raton Bvld., Fort Worth, Texas 76112 C 0 E F G H Quantity Type Rate SchdValue Previous This Application Total Application Work in place 1 ea $37,303.99 $37,303.99 $0 .00 $0.00 24 ea $25,960.85 $623,060.33 $0.00 $0.00 11 ea $24,558.46 $270,143.02 $0.00 $0.00 3 ea $8,186.15 $24,558.45 $0.00 $0.00 24 ea $10,637.62 $255,302.89 $0.00 $0.00 1 ea $76,353.26 $76,353.26 $0.00 $0 .00 1 ea $9,544.16 $9,544.16 $0.00 $0.00 1 ea $4,772.08 $4,772.08 $0.00 $0.00 1 ea $4,772.08 $4,772.08 $0.00 $0.00 1 ea $975.00 $975.00 $0.00 $0.00 11 ea $9,137.07 $100,507.73 $0.00 $0.00 3 ea $3,045.69 $9,137.06 $0.00 $0.00 1 ea $24,945.65 $24,945.65 $0.00 $0.00 1 ea $3,118.21 $3,118.21 $0.00 $0.00 1 ea $1,559.10 $1,559.10 $0.00 $0.00 1 ea $1,559.10 $1,559.10 $0.00 $0 .00 1 ea $975.00 $975.00 $0.00 $0 .00 1 ea $2,925.00 $2,925.00 $0.00 $0.00 1 ea $7,010.19 $7,010.19 $0.00 $0.00 1 ea $2,437.50 $2,437.50 $0.00 $0.00 1 ea $25,350.00 $25,350.00 $0.00 $0.00 1 ea $3,900.00 $3,900.00 $0.00 $0.00 1 ea $1 ,950.00 $1,950.00 $0.00 $0.00 --$253,672.15 $1,492,159.79 $0.00 $0.00 Application Number: Period to: I J This Application Total Completed Stored Materials and stored to date $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0 .00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 page 1 of 1 One 11/1/07 to 11/30/07 K L Balance to % Finish 0.00% $37,303.99 0.00% $623,060.33 0 .00% $270,143.02 0.00% $24,558.45 0.00% $255,302.89 0.00% $76,353.26 0.00% $9,544.16 0 .00% $4,772.08 0.00% $4,772.08 0.00% $975.00 0.00% $100,507.73 0.00% $9,137.06 0 .00% $24,945.65 0.00% $3,118.21 0.00% $1,559.10 0.00% $1,559.10 0.00% $975.00 0.00% $2 ,925.00 0.00% $7,010.19 0.00% $2,437.50 0.00% $25,350.00 0.00% $3,900.00 0.00% $1 ,950.00 0.00% $1,492,159.79 M Retainage $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ENVIRONMENTAL, INC. 2214 FM 1187, Building 6, Mansfield, Texas 76063 Telephon e (817) 4 77-9995 -Facsimile (817) 4 77-9996 Bill To P .O. No . Description Total Invoice Date Invoice# 10/19 /2007 07-178.3 Project Amount. $0.00 2214 FM 118 7 • Building 6 • Mansfield, Texas 76063 • Phone : (817 ) 477 -9995 • Fax : (8 17) 477-9996 Viii PROJECT CLOSE -OU · Consultant: ntercon Environme ntal , Inc. Project No. 07-XXX Prepared for: Mr. Roger Grantham City of Fort Worth 1 000 Throckmorton Street Fort Worth, Texas 76102 November l, 2007 ENV I RONMENTAL , INC. www.intercon-environmen tal .com ENVIRONMENTAL , INC. Table of Contents 1 . Notification 2. 3. DS'l?JS Asbestos Abatement License Asbestos Training Certificate Medical Surveillance of Asbestos Exposure 5. Texas DSHS Contractors License 6. Texas DSHS Transporter License 7. Waste Manifest (if applicable) Department of State Health Services ASBESTOS/DEMOLITION NOTIFICATION FORM TYPE OF NOTIFICATION: (Select one and fill in the requested information) ~ ORIGINAL O AMENDMENT No. 0 CANCELLATION ----- 0 EMERGENCY •Was emergency request made to the Regional Office or Environmental Health Notifications roup (EHN G) by ph one? 0Yes 0No ,/, .· •If yes, the DSHS reference#: and nam e of the Regional or EHNG representative with w hom you spoke? ----------------Date:_/_/_ Time: ~' Da.m. G]p.m. r •Describe the reason for emergency: ,;. ',, D (x ) Below if Amended TYPE OF WORK D Asbestos Abatement Is this a phas ed project ? 1. Facility Location ~ Abatement/Demolition O ....... Description or Facility Name:...,,.-~-,------,------------------------- 0 ....... Physical Address: ---~---'-,-----;a-,--~----------------------- 0 ....... County : _ __,,_.-------~ ~----------Zip: ______________ _ O ....... Facility C:;.,io,c:n ... ·, ....... t::.::c-------'t::-=------E----Phone #: ( ) ______________ _ (Select one) QJndu strial{Manufacturing D NESHAP-Only D Public School K-12 '· .:, 3. Facility'l)eau s O ...... Description of Area/Room umber:----------------------------- 0 ...... Age of Building: ___ Size: Number of Floors: ___ _ O ...... Is this building occ upied? D Yes D No 0 ...... Prior Use:----~--------------------------------- 0 ...... Future Use:------------------------------------- 0 ...... Date of Asbestos Survey/NESHAP Inspection:_/_/_ D ...... DSHS Inspector License No.:~--~~- D...... Analytical Method : 0 PLM D TEM D Assumed Asbestos O No Suspect Material O ...... DSHS Laboratory License #: ------ WORK SCHEDULE/ASBESTOS AMOUNTS (Note: if the start date (s) entered below cannot be met, the DSHS Regional or Local Program office must be notified prior to the scheduled start date . Failure to do so is a violation ofTAHPA Section 295 .61 .) 1. Asbestos Abatement Work Schedule: O ...... Start date: / / and End date : / / 0 ...... Work days: 0Mon~0Tues. Owed. 0Thurs~0Fri. 0Sat. 0Sun . 0 ...... Working hours: D a.m. D p.m. to _________ Da.m. Op.m. 2. Demolition Work Schedule: D ...... Start date: / / and End date: / / 0 ...... Work days : 0Mon~0Tues. Owed . 0Thurs~0Fri. Osat. 0Sun. O ...... Working hours : D a.m. D p.m. to ---------Oa.m. Op.m. FORM A PB #5, REV 5/07 (x) Below if Amended C. ASBESTOS AMOUNTS 0 ...... Is Asbestos Present? 1;81 Yes D No (Complete the table below if asbestos is present) Asbestos-Containing Building Material Type Approximate amount of Asbestos Ln Ln S Q Ft M Ft Pipes Surface Area demolition demo lition o ..... . o ..... . -------Zip : _________________ _ ---------~-------State: Texas Zip:_7_6_0_6_3 _____________ _ Job -S ite Phone#: ( 817) _2_87_-_88_9_9 _____________ _ 0 ...... C. ASBESTOS ABATEMENT CONTRACTOR#2 (Only if there is more than one Contractor) DSHS Asbestos Contractor License #: ------- Contractor Name :----------------------------------- Address: -------------------------------------- City: ______________ State : Zip : ---------------- Office Ph one #: ( Job-Site Ph one #: ( ) D. ASBESTOS SUPERVISOR D ...... DSHS Supervisor License#: 80 -4419 D ...... DSHS Supervisor License #: _8_0_-4_2_0_1 __ _ Site Supe rvisor: Eulogio Torres Site Supervisor: -,J-o-se-C,...o-n"""'t-re-r-as ______________ _ FORM APB #5 , REV 5/07 (x) Below if Amended E. NESHAP TRAINED INDIVIDUAL D ...... NESHAP Trained In di vidual: ------------------------------Ce rt i fi cation Date : _/_/_ 0 ...... F. DEMOLITION CONTRACTOR Demolition Contractor: lntercon Envi ronmental Inc. Address : 2214 FM 1187, Building #6 City : Mansfield State: .JX_ Zip : -'-7--'-60=6:c..;:3 __ _ 0 ...... G. PROJECT CONSULTANT OR OPERAT OR DSHS License No .: _1_0_-0_1_4_5_.,.,...,,,=----- Project Consultant or Operator : _IH_S_T _______________ ~......,_ ___ ...,.....,. ______ _ Address : 22 35 Keller Way City: Ca rrollton State: TX Zip : _7-'-5-'-00.;;...6;;__ __ O ...... H. Waste Transporter DSHS Waste Transporter License#: 40-0312 Waste Transporter: CBA Services Inc. Address : 5877 Barn_e_tt-=R=-o-a-=d-=s,-u.,...it_e...,..A ____________ ......,....,.....,_.--_____ __,.. ______ _ Ci ty : Krum State : TX Zip :--=-::.=...c:..:;,,::.,,=.._..::,+-....:.....--:e.,._,...,_ __ .,...::.-________ _ Contact Person : Jana Osborn ------------- D ...... I. Waste Disposal Site TCEQ Permit#: -'l--'-0=25"--'B'----~~---- Waste D isposal Site : DFW Landfill Address : 1600 Railro_a_d.,_S,,...t-re_e_t ______ ..,......_~---.----,.---------------- City: Lewisville Ph one #: ( 972 ) 315-5421 CERTIFICATION STATEMENT I hereb y declare that I have examined this o,tificatioJI an ·, t the best of my knowledge and b elief, all information provided is complete , tru e, and co rrect. I affirm that I am · e owner, OJil~ator , or delegated age nt and that I am responsible for the fee associated with this notification . I also understano that the owner, operator , or delegated agent is responsible fo r notifi cation to the department. Date: __ / __ / __ Phone#: 817-477-9995 IMPORTANT INFORMATION NOTIFICATION TIMELINESS REQUIREMENT: Your Asbestos/Demolition Notification form must be postmarked no le ss than ten working days (not calendar days) prior to the start of any asbestos abatement or demol iti on. FILING FEE: An invoice will be mailed to the facility owner up on completion of the project. CALL FOR ASSISTANCE: (5 12) 834-6747 or (888) 778-9440 (to ll free in Texas) MAIL FORM TO: ENVIRONMENTAL HEALTH NOTIFICATIONS GROUP TEXAS DEPARTMENT OF STATE HEALTH SERVICES PO BOX 143538 AUSTIN, TX 78714-3538 FORM A PB #5 , REV 5/07 ACORDTM CERTIFICATE OF LIABILITY INSURANCE DA TE (MM/DD /YY) 02/01/2007 PRODUCER INSURED ' COVERAGES THE WY A TI AGENCY 1300 11TH STREET SUITE 305-E HUNTSVILLE, TX 77340 INTERCON ENVIRONMENTAL , INC . 2214 FM 1187 , BLDG . #6 MANSFIELD , TX 76063 Serial# 100147 THIS CERTIFICATE IS ISSUED AS A MATIER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXT END OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC# INSURER A: ARCH SPECIAL TY INSURANCE COMPANY INSURER s: MASSACHUSETIS BAY INS. CO . INSURER c: TEXAS MUTUAL INSURANCE COMPANY INSURER D: INSURER E: THE POLICIES OF INSURANCE LISTED 'BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE 80l:1CY PERIOD JNDICATED . NOTWITHSTANDING ANY REQUIREMENT , TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO HIGH THIS CERiflFICATE MAY BE ISSUED OR MAY PERTAIN , THE INSURANCE AFFORDED BY THE POLICES DESCRIBED HEREIN IS SUBJECT TO ALL THE"l"ERMS , EXCLUSIONS AND CONDITIONS OF SUCH POLICIES , AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS . INSR ADD'L LTR NSR TYPE OF INSURANCE GENERAL LIABILITY POLICY NUMBER A X CO MMERCIAL GENERAL LIA BI LITY 12 EMP 43513 02 B ,_...._~ CLAIMS MADE 0 OCCUR X ASBESTOS/LEAD ABATE X POLLUTION LIABILITY GEN'l AG GREGATE LIMIT APPLIES PER: X POLIC Y j'f c?r LOC AUTOMOBILE LIABILITY ANY AUTO All OWNED AUTOS X SCHEDULED AU TOS X HIRED AUTOS X NON-OWNED AUTOS GARAGE LIABILITY ANY AUT O EXCESS/UMBRELLA LIABILITY OCCUR D CLAIMS MADE ANY PROPRIETOR/PAR OFFICER/ME~:BER D (C l If yes . desctibe under SPECI AL PROVISIONS below OTHER ADY-8744779-01 POLICY EFFECTIVE POLICY EXPIRATION DATE MM/DD/YY DATE IMM/DD/YYI 2/3/08 2/3/07 2/3/08 2/25/07 2/25/08 GENERAL AGGREGATE $ PRODUCTS -COM P/OP AGG $ COMBINED SINGLE LIMIT $ (Ea accident) BODI LY INJURY $ (Per person) BODIL Y INJ URY $ (Per accident) PROPERTY DAMAGE $ (Per accident) AUTO ONLY -EA ACC IDE NT $ OTH E R THAN AUTO ON LY : EACH OCCURRENCE AGGREGATE El EACH ACCIDENT EAACC $ AGG $ OTH- ER $ El DISEASE -EA EMPLOY EE $ El D ISEASE -POLI CY LIMIT $ 1,000 ,000 50 ,000 5,000 1,000 ,000 1,000 ,000 1,000,000 1,000 ,000 4 ,000 ,000 4 ,000 ,000 1,000 ,000 1,000,000 1,000 ,000 1DESCRIPTION OF OPERA TIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS FOR INFORMATION AND BIDDING PURPOSES ONLY CERTIFICATE HOLDER FOR INFORMATION AND BIDDING PURPOSES ONLY ACORD 25 (2001/08) CANCELLATION SHOULD ANY OF TH E ABOVE DESCRIBED POLI CI ES BE CANCELLED BEF OR E THE EXPIRATION DATE THER EOF , THE ISSUING INSURER W ILL ENDEA VOR TO MAIL _1Q_DA YS WRITIEN NOTICE TO THE CERTIFIC ATE HOLDER NAMED TO THE LEFT , BUT FA IL URE TO DO SO SHALL IMPOSE ND OBLIGATIO N OR LIABILITY OF ANY KIN D UPON THE INSU,Rffi, ITS AG ENTS OR REPRESENTATIVES . ~// AUTHORIZED REP~~-~~ {V/'i /'\ 0 ,-.. f\ _/ r--,·~ \~ \ __ ,x.j <./ :< l r 1 , ©·-ACORD CORPORATION 1988 ~-----1~ Project Name .... I ______ '--__________ _. Date .... I ______ ~----~ Project Number ~---------------~ Shift ENVIRONMENTAL, INC. ShiftSupervisor '---------------------' Day .___ __________ ___. DAILY PROJECT LOG Time Activity Today's Work Areas Consulting Firm On Site Representatives Site Inspections Yes No D D D D D D Received Removed Dumpsters Today I Dumpsters To-Date================ Daily Project Log Shift Supervisor Signature ======================== ,. tercon .------l Project Namej .... ________________ ...... Project Number L-----------------~ ENVIRONMENTAL, INC. DAILY TIME SHEET Employee Time In Time Out Total 2 I------"--'---~-'-~~'--=--'-~"---------""'-""...,_+--.,... 3 r---,------------,---,--,--,--,---t---~~~-- 4 5 6 7 8 9 1 o 11 12 13 14 15 16 17 18 19 20 t---------,----,---:::--:::-:::--c-:--=,---:::-t-:7,-..,..,--+--,-- l-----''-'--"-----'-'---"-----'--"''-=---'-=--"~-=-'-f-'..'----'-...:......+..:"""""'----'"'-'"'--..:. 1---------------------------1----- 1--~~"'-----'--~~;.;.._;;:..._......,----"'......._ ....... .....;.. ....... ~ ........ +---....... ~+-==c......""4"~ 1------------------+------+-----1---,----+----+----~ ___________ ........,......__..._.~---------_._-----'---~-------+----"--"----I 1------'-'------~~----'----'--"------'---+---'---"cc.;...+-----'-----"'-'----+'~-~--+--~-+------l 1---------------------------1---------+--------l Daily Time Sheet Shift Supervisor Signature Date!~----( Shift Day .__ ___________ __. Safety Meeting Topic Accidents or Incidents Today New Hires Today Total Hours To-Date Project Budget Hours ~-------~ l Project Name .... I __________ .. ________ _. ENVIRONMENTAL, INC. Project Number '------------------~ CONTAINMENT LOG Employee Time Out Time In Time Out 1 1---------------------,------------------+---------1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1---~-------------+---'---""""'.,.....~-'--,....."""----+----,--...a::;a'-+---'-'--'-+--....... -"""'I f------------,---,----+----,-----"'--=~,,..,.._-----:---,,:,-+',,,,--'-,.....":i--:+----+------:-----:-"""'I l=---'~--------'--'~~--'--''-"'--"---"-F--'-'-"'-----'-'--'""""-"--'"""'--'--+"'--,,;--~+--....;;.:.;;i;i.f.i!..--'--4-=...--"'-----'--'+--"""---'--''-"' t--------,-----,-----r,-,---,---,-----,----,---f,,:t-,-----t',:,:;:,..-,:-,----::+--C"±::-'T-T'"""-----:---c1 ~-.:..... ....... _..;;__;..:.;....:...,._;;........:....-'--~-'+------'--'-'----':..;...;c--'--'--4---'--''""'--'~ t-------,--------:-----:-----:-:---t-----:--,---,------:-:--:-::::-----:-----:--::+-----:------:-T'"""---,-~----:-"".:'.'t 1=--~~---'-'--~~~-'--'~--'--4-"'-'-............. ~==--='="-'--4-"-"~~---4==....~--'--4-~~~..,. l----"'"--"'"----'-------"--=-------'----t--------""'""-'--"~-~ ....... --"'""'-~ ........ +"-=--=-........ --+----='-----'---'+-~~~--l 1-----------------'+--'-'"--'-'""-'-""'-........ --+--~-=-+------:+--""'.:......-+-_...;;;.....~~ 1--------------,---------------+------+-----+------l f---'------'-.....c_..;;;.;......;.___;c.._ ______ -+----"--'-'--'--"-'-'---~---+-----~ ........ +---""-"'-'---:+-~~~+--~......c.'""" 20 Containment Log Shift Supervisor Signature .---_(_ Date .... I _______________ ~ Shift ._ _______________ _. Day '-----------------~ Containment Area Personal Protection Equipment Used D D D Steel Toe Rubber Boots Single Tyvek Type Suit Double Tyvek Type Suit Cotton Gloves Rubber Gloves 1/2 Face Respirator I HEPA FIiters Safety Glasses Hard Hats ·:;1tc . , ..... • -. Control Nu: fa,o<f • • rtilie~ ·mat: GEBCO ASSOCIATES in cooperation with THE fJN/Vl ERSITY OF NORTH TEXAS certifies that · xam given on the final day for the En:vironmental . Pro&Eatif: · ,a..titled Asbestos Contra "·· e . · isor Refresher • President Date of issue: 01/15/07 Certificate Number: 07024 4839 GEBCO's Training Programs are provided in cooperation with federal and state regulatory agencies. and fulfill all applicable requirements for ac<;rcditation . OEBCO is licensed for Asbestos Training under the Texas Asbestos Health Protection Rules . GEBCO Associates , LLC • 669 Airport Freeway, Suite 210 • Hurst, TX 76053 • (817) 268-400 6 Physician's Written Statement Medical Surveillance for Asbestos Exposure Envirorunentol &. Sanitation Lkiettsill& Group I00/572•S548 or 511.1134-6610 1'~: 512-&34-6614 )l'J)'.Jl',TmsQnlfetn• iAilclrcss,'•' ' . INDICAl'E WHICH.ITEMS WE.RE PERFORMED WITH , (Any that are not applicable, must still be lnltl · .. Completion and. review of the slandardiiocl medical . qutstionnaire 111d wolk history~'\Y.llli,-~.!iViiiil · ·bi di~~ the pulmoilaly, ctu'dlovascWar, and gastrointminal systems ~er part I and2of Appendb:Dhi. 926.110 I. If cmployod, the employer provided, and review was made of. the emplo)'ef's deseription of this employee's , Rlete 10 the employee's cxposu~ the cmpl<iyce'$ repmonlative or ant ici pated exposure leve~ the pwonal· iespiralOry equipment to be utilized by the employee, and infbrmation from previous medical cxaminati employ•• that is not olherwise available to the physielw . A phYJical ex81tlination with emphasis upon the pulmonary, wdiovascullf, Qd gastrointestinal systems. The pulmonary function tc!u of forced vi1ll capacity (PVC) and forced expiratory vo lume at one stcond acoordance with NlOSH and ATS sl8ndard4 . / icate whether or not the physician d<lcided that an x-ray was required and was perfonned : VES _V_ o orr ~NO __ chest roentgeriogn,m, poslol'ior-anteoor, 14" x 17" or ~rrent film on file with interpretation in accordance with 29 CPR 1926.1101, AppendiK E. •fil!ll: Accordlov; to 29 CFR 1926.IIOl(M)(l)(lll(C), the requlremtnt for a dlest NIY ls /;- •t the physician's dim,-tion . The employee was infonncd by the pbysielan of tho results of the exam and of any mc.dical cond.itions that m.a.y lll,Sult livm asbestos exposure including the increased risk of lung cancer attributable to the combined effect of.smoking and asbestos expoSllte. Unless otherwise noted ~low, this evaluation iodi.cates that no medical conditions were de.tected that would place the employee~· art incroasod risk of material health impainn.e11t from exposure to asbestos, and no limilJl_ti~ns are rcoommended on the e,np,v/--e concerning the use of personal protective cquipmcnl or respirator . By ,tgniog thi5 form. I acknowledge that this examination has b"n perfonned in accordan ce with either 29 CFR J 926 . ll O I or 40 CFR 763.122( a), as required. Comments or limitations, if any ---'?ti_;..._.fn.c.wf'------------------------- Dallas Texas City S111o 75247 Zip Roviial April 2005 Publ.icatlonHll-11669 I PRlVACYNOTlF'ICATION . I Wid, few 1.!Utptk,ns. you hilvt lhc cl~1\ lu ~ucst tnd ba in(om k.'4 ebou1 inftifl'll:~Kln ,h;u lho: SW'c of '1'1:m collotlJ l~lt y('tu . Yov :ue (ntidtd lo ft"CCive ;u!d rC°Vl\'W tilt' inlbt'msnion uwn r«,ut·st. 1iou nlso ha,·t O.: right' t<' iuk the stole ;,.i<ll<'f 10 t'l"frt.;t ;,nf informa11t1n tha1 li !Jrt1:rml!X'd h' be iow,rt ,a, S\'oJ bPr'llwww tdh s\;11~ [Of rto\"" mforon,11<M 1 on l~iva,;y Notitka1ion. /Rrfcocowc, \k»t1mnrn1 Cod<, St,.'tlon 5S2.Q~I. 552 .02.1 , 5!9,iJ!).l u,><I is9.\1fl) f '. ,~ llrwlt:tst:>M th :\t di$clllwre or a soti~I ~. oril).· nomb(r t, ~ applicruu JS mandntory un1Jcr the Fnmtl y Cudc-S«H,..,1 ::i I lOlfflS.x:· r.i ~o,l.t)' oumt'ltr11 art 0()11(id<fl111>1 onJ \\i ll t,e 11~,1 (o< 1dcntifi<:1tion Mid oe,..-.11ni ~ tcs 1uo-ed t>)• 1,iw. onJcr ti>: Pr;-,.,, At11Nidt4iifUi.~f41M' . IWm b<~" ~m; gi.cn ,olw1wily •ow m,r ~. \Ued "'' lhc En••1011111t11t:JI I< S:miuuon Li<tll!lh& (i1011p tu vc11fy my idefll i\Y. 11,11rv1ng Blvd. Suite 2 0 Della&, TX 75247 111 I I 111 ~ f ;;rJ ~ ~· .... 0 ., "11 ;:; Ii ik If i il ;; s . . ~ ! ~ . .. . f ~f..~~~h: .. ··.: ·: . :~:.::·~--~ ·.:·~·:·:: :~:::r.·::: .. . License Number-! ······. ·· )1 ·.. · l · '::~ ir" r ·.· ·~: ,Expirdtion Dat.e: · .. ·-·.::: .. , ..... ·.·. ..\r_.-: ......... ·.·:·::, .. ,\t·. ········.,.. )t:... . . .... tr ~::: _Jw --~ ' . . .. Cc>nt1·ol Ntl: 9~ = t 5 .. -,J._ --. -··· .. ,,-... _ .. . --,-, :1.ts;.te11:ifies th11t: ,~,~i1ft~·.•·• 10~6/2009 GEBCO ASSOCIATES· in cooperation with TH . U~LVERSITY OF NORTH TEXAS certifies that Torres has successfully complete • President Date of issue : 04/23/07 Certificate Number: 07106 1077 GEBCO's Training Programs are provided in cooperation with federal and state regulatory agencies , and fulfill all applicable requirements for accreditation . GEBCO is licensed for Asbestos Training under the Texas Asbestos Health Protection Rules. GEBCO AssQciates, LLC • 669 Airport Freeway, Suite 2 i O • Hurst, TX 76053 * (817) 268-4006 Certificate of Worker's Acknowledgement and Worker Rclease ENVIRONMENTAL, fNC. 2>1-'" fl:t.l t1-&T • lhl'l<e'hg ~ • lril*"·•Hi,,ht, l•·o...•• Tt,~t), 1•tt1H1••• (l,,fj 4'1",l.ffl~, J·•,r.•l.,.ill• l .. 17'J 4'1'J-t<t•&. Intercon En1°ironmental, Inc. Respirator Flt Test E,/cgrn 7fua s ·.-)rlteteg!!J.:.~'!?!"u,,!ic.etn. l'roje<1Name O.te ________ _ Employee f'·U~me: Proje«Add=, ______________________ _ DSHS License Number: Respirator TYi>": Respirator Brand: iO"fl/Jq ~ WORKL~G WlTI! ASBESTOS CAN BE DANGEROUS. ll'\HA.UNG A.Sil EST OS FIBERS HAS BEl!N LINKF.:D Witt! V AlUOUS 'l1'PllS or CANCER. IF '!'OU SMOKE AND lNHALE ASBESTOS FIBERS 'THE CHANCE THAT YOU WILL DEVELOP LUNG C:ANO;R IS GR&AT&Jl THAN THAT OF nlE NON·SMOJ{IN(; POIIUC. Respirator Size: Mcd;um ~ {dfde onel ~ l. Was resplra,tor reasonat>ly comf<>rtable? 2. Was positive .a<>d rrega11ve pressure best administered.? 3. Does the lndwidu.al understand fully the protection factor of thl s type resplratnr? ~ _!:,!L Your emplo),.r', c:onlri<:t·w;lh the Owner. f~:lic, •b. O"< p:ojm requoo Iha, you bt su;,pliell wilh the p,opc:r ~spimtcr md be trained in its ~uJ,c.J.r-n.ir.at in w~ work p:-aa.ica: ttnd in t.~e us~ o! the equlpmonffolllld on the job, md you "*11\C a media:1-tnltlilwlon. Th:o< lhini;, Me to h,.,. been done at DO cost to you.. Jlr signing dris.ccni5cati.on )'Otl .are awuin:t the.Owner that yout e:nploye: hai met ihose ol,liptians to }'OU ·oru1 am ~ i<> hold th~ ~""'· his Corml!tallt, T .. tioi l.obotlllOl')', and rqnµca~tlvc hao:nlc;s m any.~~f!1i.m.1. arising from~,~.a.ied to tbb p('oject. 4. Was the. 1ndlv.idual instructed on the proper use and care of' this type respirator? 5. Was a smoke t:ype·test administered? 6. During the actual test was the Individual requ1red to converse and move hls or her head around to insure corr.ect fit? 7. Did recipien.t pass lit test? _£_ _L_ ~ .~ 1"h ... ltams .,.. my p,e,rsona.l ~llty. n I lose any of-thls eQUip~nt or~ dam~ any, t wn:1 .-.ln,burM" J.nterciori.~v1toru·~rtt~ ,t.nc. th• full~ price: tor .-cti, .tide lostor~od. r agree that this lnformatlon above Is true and CX><Ted. Employee Sign2tture: & .. o·G 1 a: ::z:;;,e~ Test administered by..:];,_~<. A-~ntf'Y4 I am c·x.pe.rie.nc.ed ·tn the edmin.lstrat:ion of proper flt tests. Date C>f fit test Of-JO-DJ OSltA Regul-(-nck-· 211.~) 1110 -111:C'OP\ The employer .shall ~Ufl! that arr em~tovee USlnQ. • ~L.fittin9 fa~eoir lested prior to initial use d llte nesp:irator, whe~r b dtfferent nsplratOI'" fa~pie<:e-(stte1 styl make) is used, .and at,least annually cher.eafter. . • · , ,'?> ~· ~.G=<-:' O:C+',e r.,t:fT?l'C::~ Socia1S~tyNo. 4SJ99·to'f'1 11:19 1 MCOOl The employer shall COftdua.. an .-dditionill fh test whencv.rr the-. cmpio.yte "'por.tS. or the ~er... PL.HCP, -.su~. or progr,11_m .ctmit'Mb"etor _i'Nlccs v'lsu:al obx,v.t;ons .-of, d\aQ9C'S In. the emptio,ee',~r condttion tnat coukl affea respirator t1:.. s:uct1 conditkms indude. but ere not,..:~lted t:.o., f~ sam~i,: 1'et"1t1if c:han9ft. an.metic surporv, or an obvl~ c~ in body weight. --> WiL.'1en·.,Zc .. , A · Coq brea 1 61toG1e /01r:e ~1 ~,¥ ~-~, 0. --f -a 11 I jj !< t: ~· 'C""' ~I ~~ • ·u .a-~ -"" ~ f! ~ .f~ 1~~ "" !~"' ..... ~~~ .s ·.i!,!:! " .J.•,n v.,:, ,.; ii I), ·s :if::"-J'\Jl Ji --·~! ii .§ ti') 'll j :-~ ~.lz -rft i ~I !. i. ;];' ,rlr-!l +:· . "" .. eli IJ :t' l1i ')% i 8:: < t/1• ~ '11. • VI ~· ~ ,(> '~ --. ~ i.J \.I N I ~"-= ... :!! ._g i:::i= ~~ 11 "Ii-i! '!:: lliQ. ·t: '; ,s 62 1~ I= < r~ I CC) C ;._-.,"Cl~• C ·~·•,L e •"'.x ~ :ii .I! • .. ·-, ·;'1.=rl l'l ... >, -5uij --___ C .c -.g..:-:i. = ~ ~ -> 15 1! ..,, I ~ 111 j :.s ~ ''. . , ~ .:. ; -a a : ! ~ .gt!! ~""' o .... f k a e'6 i. {"~o "D'=S z,5 ~ ~a.5 .~ ·Ill'-"' 11: . Ii ~:i ? e .i ~ 0 l1i :II . Al~ . ! 8 ,. .; ;., · .., ·~ ,~.~I i,··'t;jf ! ~'= ii it~ -~·-4> ., ij ,. ~ o I 2 ~ ...,, s -s i:a1~ ~-=" .. ,~ <I) s =---;;ais . '~ '5 -.! ":I .. w f 1l g O 8 ,s -~ 'o ! .I .i= § ~ ·"' -8 'e ;s ~ f. t~-!,i1 1 ~ . If"' 11 ~ sJ i°JiS.'111 ! f i ~~ !1 1-1.1 ·. :s .... e "S! i-:a_jj!: .. I> ""·e-l i! 'b~ ... lil .. J~~ 'o'= t=E·2, ii·~ ~J J li i 1 ·! S 1 ! : i ~ ! 1"" ~1 .. !le i~~ 61 _g9i3~ li .i> .2 ~ -,. .;:, o -la -f:! .,bti o "5! ·~o-·· ····· r!: -o .~.!!---ea .. ~ ·-lil z:: ... :i; 8~s~ ,i i -st t l ~ i ! i ; : 1 i ta li i(1j "~ t]f ~I 1!~~ .a fet.2 l"i ;~~ !~ 2eiu iE-!ri~t~t --~s -~~ w;l·z_~ 6! .. ~ ... " .i:!.-..... o i38.ll~ '2 °i! -s: :a § .ti -~ ] I i}':' ,;.~ !l -~ -~-c, :: ~ J!! e J>. ~ s 2 > -o ... "e ·a .. :! El --o ·-_5 "lZ i ':i .. !:I" l -8-: si ·~ 1t ,.. o ;i ~ § 1:! l la »:;s .. "O ... i:; !:. I e ce. f= ~ .a ..;-s..,~ ii a·< -a. --.. .!:!,~ j .g e 1 -! ,a .... fll ·2 ii 1.. ~ I -~. ~ .'!!' .. , -~ ii"" • e o""' .'" .,. --a·~-~ 0 I ~ ~ -t&.·i .. 1 ':i i~ .-§'..~ •.... s.! .. 1·tl~ 11 'o,i ~ tfJ t :l Ii .§ i. j 1J: .'!l # ti :9 JI ii~~·· 6 .J5; ,g,lw.:; 11 .J~~ tt :a !~ti.tis: c~ ~i"!S:;JI .sj iSJ!]:5 ~ 11 -s rt-~ ., i~ · ;.ali-i le · ll{f ! j~ ,f@i"-s ! gf)~~.11 II J ..... a ., ,.,,~ltl.. ~ -~ § gee ,f -1s ~ i li .. ,~~ is11 ;j'o~l ·t , Ji ~l·e} -a. l ~ .,i 1~-! · .::-11 ·t.-~ ~.-; <if -f <.i-o-• t::.,li-5"" .~~ ;t ~~~ ~ jfil ~1'f-~ ~ --8~ >. ~ ~ l ,.;! ] ... O· i ~ 8 i g 11 '5 ! ~i ~~ < ... 1-.i ... ;;.'fj "'"'-~ ... ! R £ .. .~ u ~ t ~ 5 .t :.r.; ~ ;,; ~ 1 I; • E a .B i! l! -" ~-if~ J! -I) !i soi,:{~ 'B -.... "3 ::.-rn 1 ~ ::n·-! .. ---~ !J &-lS~ -~ r n-: ;"i { g ~ e; :i~Eli. 1 ~ V;;,:. ~: n•g;-;1~ iJ~ub; Sii1·~ i ~.]J! ~ ~ s-x.2 ~·. Z;;~""}:if.,,. 0 !ii :;.,\'lol:j i==1. i~~~ i.!S-szi? -i .... ~_! ?;. lo, .,. l! E ·t -: ·-g i ~',' ~ g} z. ·.:. i ~-:i! ticvtJ}§ .<; =; ~ ~ t c:;J;.flill£ ·f ]i.],d.3 ~~l~ ~.§ i'" i;Ls~ "II Jl ~ :;_ "~ •:a .':·; !!~ t!Etl3 rfiP .:~l;!'d -1~J·!~ S:· ]~~'cl! ;~~,~i-~ r~i i'g ~ i ... !!, -~ -.8,t p,.;!fi. ~£ 1,i,! i:-;~ l/.1; ~ :~ ... t-=> i--g_Pfi ,. ~ ~!~! :e: := ..::.· -'$; License :Num6er. 800805 P.ffective (!)ate: 2/6/2007 VOID IF ALTERED ~~D 'EauanfoJ. lancliez~ :M.(J)., .'.M.<P.% Commissfoner of Jleaftli Control Number: 95110 . · according to the NON-TRANSFERABLE "DliPARTMENT OF STATE HEALTH SERVICES in the Slate of Texas within the purvie :f . $0 long as this license is not suspended o Licen.se :Num6er. 400336 (£jfective <Date: 2/6/2007 VOID IF ALTERED tflt~M <E,tfuarao J. landiez, :M.©., :M.<P. Commissioner of J(eaCtli Control Number: 95113 accordingto the NON-TRANSFERABLE 1 1 i 1 1 1 lease print or type. (Form designed fo r use on elite (12 -p itch) typewriter.) 07-XXX Form Approved . 0M B No. 2050-0039 UNIFORM HAZARDOUS 1. Generator ID Number 2. Page 1 of 3. Emergency Respo nse Phone 4. Manifest Tracking Number WASTE MANIFEST N/A ' "enerator's Name and Mailing Address City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 817-392-8592 Generator's Phone: 6. Transporter 1 Company Name lntercon Environmental, Inc. 7. Trans porte r 2 Company Name 8. Designated Facility Name and Site Ad dress DFW Landfill 1600 Railroad Street Lewisville, Texas 75067 972-315-5421 Facility's Phone: 9a. 9b . U.S. DOT Descliptio n (including Proper Shipping Name , Hazard Class , ID Numbe r, HM and Packing Group (if any)) 1. 2. 3. 4. Hazardous substance, solid, N.O.S. (asbestos) ORM-E , NA 9188 , RQ=1 Pound Waste which contains non-friable asbestos or waste containing non-friable asbestos 1 817477-9995 004095538 JJK Gene ra1or's Site Address (if different than mailing address) Villa Del Rio & Oak Hollow Apartment Complex) 5817 & 5901 Boca Raton Boulevard Fort Worth, TX 76112 U.S. EPA ID Number ,( na lntercon Environmental Inc 2214 FM 1187, Bldg 6 Mansfield, Texas 76063 817 4 77-9995 15 . nsignment are fully and accurately desclibed above by the proper shipping name , and are classified, packaged, ti' tlclf1Sllort1ttl'C01rding to applicable international and national governmental regulations. If export shipment and I am the Primary ched EPAAcknowledgment of Consent. ma large quantity gene rator) or (b) (ill am a small quantity generator) is true. Signature Month Day Yea r ~ 16 . International Shipments D Export from U.S. Portofentry/exit: ------------------ Date leaving U.S.: ~ 1 ffi 17 . Transporter Acknowledgment of Receipt of Materials ~ Tran sporter 1 Printed/Typed Name 0 a.. Signatu re Month Day Year Ull-,:----,-~,,..,....,....,.,,,--...,..,.,.-------"..,.-------------........ .,,_-------------------.....,.,......,--'.....,,.-.......,.,......~ ~ Transporter 2 Printed/Typed Name Signature Month Day Year et: I- 1 18. Discrepancy 18a. Discrepancy Indication Space D Quantity D Type D Residue I Manifest Reference Number: ~ l-1-8b-.-Al-te-m-ate_F_a_ci_lity-(-or_G_e-ne-ra-to-r)--------------------...:.:.;;:=;;.;.;.;==;..;..;.;;=;;.;__--U-,-.S,-.""E.,..PA-ID---Nu-m-be-r----------~ D Partial Rejection D Fu ll Rejection I ~ t,.,F.,,.ac_il.,,;,ity'_s_P,.,ho_ne_:,.,.,,.-,....,,......,,,,.....,.......,,..--,-,---------------'-------------....._---------,,..,..,.--,,---=----:-:--i w 18c. Signature of Alternate Facility (or Gene rator) Month Day Year ,~ci'LL~~----------------------------------------------~---'--~-~ '-laza rdous Waste Report Manage ment Method Codes (i.e., codes for hazardous waste treatment. disposal , and recycling systems) 2. 3. 4. ~ 120. Designated Facility Owner or Operato r: Certificatio n of rece ipt of hazardous materials covered by the manifest except as nded in Item 18a I ""'P-rin-te_d_/T'-yp-ed_N_a_m_e--------------------""'--S-ign-a-tu-re---'-------------------M.,...o-nth,.......__,,.Da-y-""y,"'"e-ar--i =PA Form 8700-22 (Rev. 3-05 ) Previ ous editions are obsolete . DESIGNATED FACILITY TO DESTINATION STATE (IF REQUIRED) ENVIRONMENTAL , I NC. 22 1 4 FM 1187. Bu i lding 6 . Mansfie ld Texas 76063. Telephone (817) 477-9995. Facsimile (81 7) 4 77 -9996 www. i ntercon-envi ronmen ta l. com 2.6.4 Organization Communication Chart TEXAS DEPARTMENT OF STATE HEALTH SERVICES <Be it lnown tliat INTERCON ENVIRONMENTAL INC is certifiea to perfonn as a Asbestos Abatement Contractor in the, State :ofTexas within the purvie}'V of Texas Occupations Code, chapter 1954, so long as this license is not suspended or revoked and is renewed according to the rules adopted by the Texas Board of Health. ~kD P,auarao J. lancne ./ :M. ([), I 9r{, (P,'}( Commissioner ojJfeaCtn License :Num6er. 800805 <Effective <Date: 2/6/2007 <EJ(piration <Date: 2/5/2009 ('Vouf Jljter 'Ex:pifation (])ate) VOID IF ALTERED Control Number: 95110 NON-TRANSFERABLE TEXAS DEPARTMENT OF STATE HEALTH SERVICES <Be it R._,nown tliat INTERCON ENVIRONMENTAL INC is certifiea to peif orm as a Asbestos Transporter in the State of Texas within the purview of Texas Occupations Code, chapter 1954, so long as this license is not suspended or revoked and is renewed according to the rules adopted by the Texas Board of Health. z:4~A<D <.Eauarao J. lancliez, 'M.©,, '.M.<P.J{ Commissioner of Jfea{tft License Jlum6er. 400336 (£fjective <Date: 2/6/2007 c&piration <Date: 2/5/2009 ('Voul Jlfter <Ex:piration <Date) VOID IF AL TE RED Control Number: 95113 NON-TRANSFERABLE DEPARTMENT OF STATE HEALTH SERVICES BE IT KNOWN THAT INTERCON ENVIRONMENTAL, INC is hereby licensed and authorized to perform as a MOLD REMEDIATION COMPANY in the State of Texas and is hereby governed by the rights , privileges, and r esponsibil ities set forth in Title 25, Texas Administrative Code, Chapter 295, relating to T exas Mold Assessment and Re1nediation Rules , as long as this license is not suspended or revoked, and is renewed according to the law. RC00136 L icens e Number 1/25/2006 Iss ued D at e 1/25/2008 E xpirati o n D ate V o id aft er ex pi rati on date VOID IF ALTERED Department of State Health Services Q uade R. Sta hl , Ph.D . Division o f Regul ato ry Ser v ice s Eduardo J. Sanchez , M .D ., M.P .H Commissioner NON-TRANSFERABLE CONTR OL NUM BER: 37 0 5 <Be it fi.Jiown tliat INTERCON ENVIRONMENTAL INC is certified to peifonn as a Lead Firm in the State oj<Te:{fl,s and is li.ere6y govemea 6y tfie rigfzts, p1111i{eges and responsi6ifities set forth in <I'e:{fl,s Occupations Code, Cfiapter 1955 andrritfe 25, <Te:{fl,s }ldministrative Code, Cnapter 295 reCating to <Te~as <.Environmenta( Lead <Rgduction, as Cong as this (iceuse is not suspended or revoR!,a. License 1{um6er: 2110368 Contro{ 1f um6er 5965 (!)avid L. Lak§y, <M.. <D. Commissioner of J{ea{tn VOID IF AL TE RED NON-TRANSFERABLE f£.y;piration (!)ate: 9/2/2009 (Void Jlfter f£.y;piration (])ate) TEXAS DEPART.MENT OF STATE HEALTH SERVICES <Be it fi.Jiown tfiat CBA SERVICES INC is certified to peifomt as a Asbestos Transporter in the State of Texas within the purview of Texas Occupations Code, chapter 1954, so long as this license is not suspended or revoked and is renewed according to the rules adopted by the Texas Board of Health. itl~~D P.auarao J. lancliez, 'JrUD., 'A1.P.J-{ Commissioner of J-fea[tfi Lice1tse 1{u11i6er. 400312 <E,ffective (])ate: 5/8/2006 <E>.pt'ration (])ate: 5/7/2008 (o/ouf Jtfter<.f.zyiratiott (l)ate) VOID IF ALTERED Control Number: 92573 NON -TRANSFEAABLE \ / ~ C<i nt1·ol No: 8911.fl ... certifies that Jerrold L. Andrews has suf!c~ssfully co,inpleted and passed the exaro given on the final day for the Environmental Training Program entitled • Asb,estos C.ontractor/Supervisor Refresher Conducted at Hurst, Texas on April 23 , 2007 This fa '.an'EPA fully approved course for purpose of accreditation undet Section 206 of TSCA, Title II. It covets topics listed in the NESHAP training requirement of 40 CFR, Part 61, subpart M . President ~~­ ~r Date of issue : 04/23/07 Certificate expires: 04/23/2008 Certificate Number: 07107 8129 GEBCO's Training Programs are provided in cooperation with federal and state regulatory agencies, and fulfill all applicable requirements for accreditation. GEBCO is licensed for Asbestos Training under the Texas Asbestos Health Protection Rules . GEBCO Associates, LLC * 669 Airport Freeway, Suite 210 * Hurst , TX 76053 "' (817) 268-4006 .. Cot1trot 'No: 9~l, , : . •f 't~ ,, . ;,, lj·~,s;~~~~~~;f~lly 1cofupJ~f¢J' ,~p;~;p.~~~~d· the .~~i» , ·f·y~~'· 9.~t~~·(uia1ta-, .·f<>r ,th~ ltnvirontnent.a~ ' ' Y• : , " • , ' . '\:. f·. 1 . ';')}f.ahtin ·J,i a : ':lentitled'. ... i:\~,k:ns:~~.~~,;~A:n''<~,.;:~;t:,~ ·"'.iit,l .. ···s'i,J\'e D :t.if···r;'.e···s··h'· 'n,r · ~~:'1:~·· ;~~,:.:,\ '·~~~f. ~~..;~·:Jl'J i ~}'~, t. •· ' : i~:.. ' ~~·;; .:~{Ii:~':·~!!'' '. , '. :_: ..... ;~ • . , ,. . '. . Condµcte~ ~!;:~\fl's~·T~x,~s, orf ~pf ))2~q1 ,_. . . ; . ;frhJs :)$ '~ tPkJuUy(appro\fed:~g ?tse~Jor, Ptitp.9~~:~f'c!c~r~i;atfo,it~der,1f¢ctjpti '2Q.6''0f J$<i1A r Title ll. ; l~·c~vers ·t6P,1cs listed in the. NES!lt\iP 'tt:amfug r~qAirement •of 40 1.0F<R!. ' J?-~\;f i{~l,;suoparf ~f ' '•' ', : ' ·.' ' . '\-i . ' ,; . ,;:=:'j ,.·. ; ,,. 'f : ' . ,·_t ~', ,;, ' ';,.. ;<,; /t'=- '" • ... , ,., .• ~,..·~' !f!tt ''],.,. .,.. ·,T' ', ~,/ ' ·:~L .:.:. .,,,,.-'), ,• "") . /1 ' .--·~~_.,,. ' :"l', i ··<}.f'lii<'''··t2··'4t :.:~:.~ '··q ::':_, ,. ... ~.-~...,,.,,-:-"' President Instructor. Date of issue :-04/09/o;r f, ··. , , . , .r;· ·/' ·:: ,,. · Certificate ~xpit¢s : 04/09/2008 Certificate Number,; 07.b9.8, 904$ GEBCO's trainjng Programs lfre proVi~ed in cooperat~on with Jeder,al an.d state regulatory agencies; and fulfill .all applicable r~quirements for accreditation. GEBCO is Jicensed for A.sbe$ios Training under the texas. Asb.estbsf{ealth Protectfoh Rules , (;EBCO. Associates, LLC * 6§9 Aitp,ort Freeway, Suite. 21,Q •· Htitst ,,T:K 76053' ·• (817) 268'4006 t· '<II .. Control No:. 9517! • ,GEBCO AS-SOCIATES in cooperation with rHE UNl'VERSITY OF NORTH TEXAS certifies that Bobbie P. McFadin, Jr. has successfully completed and passed the exam given on the final day for the Env,ironmental Training Program. entitled • Asb.estos -Contractor/Su.p·ervis .or Refresher Conducted at fforst , Texas on January 02, 2007 This is an EPA.fuUy ,approved. course -for purpose of accreditation under Section 206 of TSCA, Title Il . lt covers topics listed in the NESHAP traitling requirement of40 CFR , Part 6 l, subpart M . President Date of issue : 01102/07 Instructor Certificate expires: 0110212008 Certificate Number : ()1008 5685 GEBCO's Trainjng Progrt1.ms arc prcrvided in cooperation with federal and state regulatory agencies , and fol fill all applicabl e re quirch1 ents fo r accr editation . GEBCO is licensed for Asbestos Training under the Texas Asbestos Health Protection Rules . GEBCO As sociates , LLC * 669 Airport Freeway, Suite 210 * Hurst, TX 76053 • (817 ) 268-4006 C! CERTIFICATE OF TRAINING EPA/AHERA Training Program This is to certify that JOE E. MILLS JR. TX.DL. 19322901 Has completed 40 hours of training and PASSED the test required by Section 206 of TSCA Title II and in accordance with LOUISIANA STATE ASBESTOS REGULATIONS entitled, ASBESTOS CONTRACTOR/SUPERVISQ ,R INITIAL Presented by Mendez Environmental Training Services, Inc 1101 Veterans Memorial Blvd, Suite 7 -Kenner , LA 70062 Phone: (504) 46 -8858 -Fax : (504) 468-7708 Course Date: 12 -04 to 12-08-2006 Certificate Number: AS 1206KLAHM8210 Test Date: 12 -08-2006 Grade: ~1 % Expiration Date: 12-08-2007 CERTIFICATE OF TRAINING EPA/AHERA Training Program This is to certify that HORACE R. MILLS TX.DL. 08237 473 Has completed 40 hours of training and PASSED the test required by Section 206 of TSCA Title II ana in accordance with LOUISIANA STATE ASBESTOS REGULATIONS entitled, ASBESTOS CONTRACTOR/SUPERVISOR INITIAL Course Date : 12 -04 to 12 -08 -2006 Certificate Number : AS1206KLAHM8209 Test Date : 12 -08 -2006 Grade : '10 % Expiration Date : 12 -08-2007 2.7.Subcontractors Information and Qualifications Complete the following table listing each subcontractor a nd t he ir proposed tas k associated with this contract. I I , I CBA Services , Inc. Asbestos Waste Hauling Tomas Reyes Tr ucking Inc. De molition Debris Hauling Aloha Env i ronmental, Portable Toilet s Inc. Reed Hydromulching, Inc. Hydromulching Kohl e r Rental Power, Inc. Generator Rental 1Reeder Distrubutors, Inc. Fuel Supply If subcontractors are to be utilized , the following information should be submitted for EACH subcontractor. (This section must be completed in addit ion to the requ ired M/W BE documentation in Section 2.9 .) 2.7.1. 2.7.2 . 2 .7 .3 . Subcontractor's company name , address , email add ress , telephone number (s), and FAX number (s) for the local office as well as the headquarte rs . Subcontractors current Statements of Qualifications . Matrix including the following information detailing the subcont ractor's personnel , their qualifications , and years of experience for staff that w ill be providing serv ices associated with th is Solicitation. • Position title and job function as associated with th is contract , (Pres ident, Vice President, Project Managers, Technical Managers, Field Supervisors, etc . .) • Name • Tasks to be performed in association with th is contract • Certifications/Licenses • Total Years Experience 2-11 I i I tercon ENV I RONMENTAL, INC. 2214 FM 1187 . Bu il d in g 6. Mansfield , Texas 76063 . Telephone (8 17) 477-9995 . Facs i m il e (81 7) 477-9996 www . i ntercon-envi ron mental. com 2. 7. 1 Subcontractors Company Information ASBESTOS WASTE HA UL/NG CBA Services, Inc. 5877 Barnett Road, Suite A Krum, Texas 76249 Person of Contact: Ms. Jana Osborn janaosborn@hotmail.com (940) 482-9900 Telephone (940) 482-3457 Facsimile 4 Texas DSHS Asbestos Transporter License No. 40-0312 4 NCTRCA Certificate No. WFDB33008Y1207 HUB Certificate No . 1020623415400 DEMOLITION DEBRIS HA ULING Tomas Reyes Trucking, Inc. 3529 Peoria Street Dallas, Texas 75212 Person of Contact: Mr. Jesse Velasquez maricela@reyestrucking.com (214) 631-2711 Telephone (214) 905-7565 Facsimile 4 NCTRCA Certificate No. HMMB34752Y0808 4, HUB Certificate No. 1752080792000 PORTABLE TOILETS Aloha Environmental, LP P.O. Box 820584 Fort Worth, Texas 76182 Person of Contact: Mr. Drew Pope alohaenviro@yahoo.com (817) 348-9901 Telephone (817) 348-9901 Facsimile 4 HUB Certificate No. 1141897255700 Data/Bid Docs/Fort Worth, City of-2.7.1 Subcontractors Company Information Page 1 ofZ 2. 7.1 Subcontractors Company Information Page 2 of2 HYDRO M UL CH Reed Hydromulching, Inc. P.O. Bo x 477 Blooming Grove, Texas 76626 Person of Contact: Mr. Marcus Reed mtreed@airmail.net (817) 548-9120 Telephone (903) 695-2275 Facsimile 4 Licens e : Tex as Licensed Irrigator No. LI5083 4 Texas Class CDL 4 40 Hour Hazmat Technician G ENERATOR REN TAL Kohler Rental Power, Inc. 1100 Avenue S Grand Prairie, Texas 75050 Person of Contact: Mr. Todd Kinler Todd.Kinler@kohler.com (972) 206-7070 Telephone (972) 206-7071 Facsimile F UEL S UPPLIERS Reeder Distributors, Inc. P.O. Box 8237 Fort Worth, Texas 76124 Person of Contact: Ms. Sheila Griffin sheilagriffin@reederdistributors.com (817) 429-5957 x 324 Telephone (817) 477-9611 Facsimile ENV I RONMENTA L, I N C. Statement of Qualifications CBA Services, Inc. October 17, 2007 Introd uct io n CBA Services. Inc. was founded in 2001 , entered the environmental arena with a driving force providing an array of services in various areas of the State of Texas . CBA Services, being 100% woman O\,vned small business. CBA Services' primary focus is roll-off and end dump transportation and disposal of waste materials, such as , asbestos waste, industrial wast~ contaminated soils, construction and demolition debris , CBA has been successful at offering cost effective environmentally friendly solutions for transportation and disposal, 24 hour emergency response dispatch and pre-printed disposal documents. The company's pe.nnanent staff includes highly motivated professionals with experience in various fields bringing multiple areas of expertise to the company. Location CBA Services · primary base of operation is located in Krum, Texas, a suburb surrounding tbe Da\1as / Fort Worth. Texas Metroplex which proYides eas y access to the thriving metropolis , as well as. the entire state. Representativ e Projects The following are a list of representative projects demonstrating experiences on similar p rojects. Arlington, Texas (Unh'e rs ity of Texas) CBA provides 40 cubic yard a.o;bestos vaults for transportation and disposal of approximately 50 loads of asbestos. Proper documentation is provided back to the clie,nt through fully executed EPA Uniform Hazardous Waste Manifests. These projects have been on-going for 4 years. Dallas., Texa s (ACE -PSC) CBA provides 20 cubic yard open-top roll-off containers for transportation of waste materials from a facility for PSC. We provide transportation of two to three loads per day. P roper documentation is provided back to the client through pre-printed, fully executed copies of Waste Management, Inc . Waste Manifests for tracking of the shipment of tbeir waste. This is an on-going contract for 3 years . Dallas , T e xas (Merc han til c Proj ect) C BA provides 40 cubic yard asbestos vaults for transportation and disposal of approximately 150 loads of asbestos . Proper documentation was provided back to the client through pre-printed, fully executed Texas Commission of Envi ronmental Quality Uniform Hazardous Waste Manifests . This project lasted for a period of 8 months. Fort Wo rth, Texas (A ction Em,ironmenta l) CBA provided 40 cubic yard asbestos vault for the transportation and dis p osal of approximately 210 loads of asbestos from their job site in Fon Worth, Texas. Proper documentation ,vas provide.cl back to the client through pre-printed, full executed, Emironrnental Protection A.geocy Uruform Hazardous Waste .Manifests. This project lasted for a period of 7 months. Fort Worth, Texas (American Commodities) CBA provides 25 cubic yard open-top roll-off containers with tarps and gaskets for transponation of industrial waste mate.rials from a facility for American Commodities. We provided the client \vitl, fully executed Waste Management, Inc. Waste Manifests for tracking of the shipment of their \1-aste. This is an on-going contract for 4 years. Fort Worth, Texas (Protect} CBA received a response call at 2:00 a.m. requesting servjce for an emer gency response. A truck had opened a valve on 1-30 and dwnped materials into a nearby creek . CBA responded with containers on-site within one hour. CBA placed one 3 0 cubic yard open - top roll-off container for the contaminated soil and placed two 30 cubic yard watertight vacuum containers to hold the water being removed from the creek. Within four hours of the original response call CBA had removed the c.ontainers from the site and properly disposed of the waste materials. CBA provided fully executed Texas Corruni.ssion of £m-i.ronmental Quality Uniform Hazardous Waste Manifests to the client for full and complete closure of the incident. Project completed in a t imely manner during a 3 week period. Farmers Branch, Texas (City of Farmers Branch) CBA was called in response to an emergency response. CBA in1.111ediately pulled into action and responded within I hour to provide twenty 30 cubic yard open-top roll-off containers for the transportation and disposal of djesel contaminated soil. The highway was closed due to an accident and within one hour CBA was on-site with roll-off containers . CBA was loaded and off-site, which allowed the highway to re-open, within t\vo and one-half hours from the original response calL CBA provided pre-printed, full y executed Texas Commission of Environmental Quality Uniform Hazardous Waste Manifests to the client. The material was disposed of as Class 1 Non-hazardous contaminated soil in a Class r permitted landfill. Project completed in a timely manner during a 4 month period. Haslet, Texas (Devon Energy) CB.A. provided 25 cubic yard vacuum boxes for the transportation and disposal of approximately 125 loads of sludge from their job site in Haslet, Texas. Proper documentation was provided back to the client though pre-printed. fully executed Environmental Protection Agency Unifonn Hazardous Waste manifests. This project lasted for a period of 2 months. Haslet, Texas (Fountain Quail) CBA provided 25 cubic yard vacuum boxes for transportation and disposal of approximately 40 loads of sludge from their facility in Haslet Texas. Proper documentation was provided back to the clje,nt through pre-printed, fully executed Environmental Protection Agency U niform Hazardous Waste manifests. This project lasted for a period of J month. Rockwall, Texas (Texas Commission of Emrironmental Quali.tJ) CBA provided three 30 cubic yard open-top roil-off containers for the transportation and disposal of contaminated materials from a Texas Commission of Environmental Quality funded dean-up. CBA provided pre-printed disposal forms and managed the t:ransponation and disposal of all waste materials being removed from the site . CBA provided fully executed Tex.as Commission of Environmental Quality U niform Hazardous Waste Manifests to the client for complete closure of the clean-up . This project was completed in a timely manner during a l year period. San Antonio, Texa.s (Department of Defense) CBA provides a permanent 40 cubic y ard asbestos vault for the transportation and disposal of asbestos waste materials from a facility for the Department of Defense. We provide the client with fully executed Texas Commission of Env ironmental Quality and Environmental Protection Agency Uniform Hazardous Waste Manifests, in addition to certified payroll and special reports require.d by the Departmen t of Defense. This hac; be.en an on-going contract for 5 years. Texas Department of Criminal Justice (Statewide) CBA provides 40 cubic yard asbestos vault for the transportation and disposal of asbestos waste materials form the various facilities across the State of Texas. We provide the Texas Department of Criminal Justice with fully executed copies of the Environmental Protec.tion Agency Uniform Hazardous Waste Manif ests. This is an on-going contract for 4 years. Wic hita Falls, Texas (innovative) CBA provided ten 2.5 cubic yard open-top roll-off containers with tarps and gasket-; for transportation of waste materials from a facility for Texas Department of Transportation. We provided the client v-.'itb fully executed Texas Commission of Environmental Quality Uniform Hazardous Waste Manifests. The project ""'as completed in a timely manner over 2 months. Personne l CBA maintains nine full-time employees to manage environmental transportation and disposal of waste materials, as well as . Their combined professional staff includes 40 Hour Ha?...ardous Materials Trained and Certified personnel and Asbestos A v.--areness personnel. All employees have been fit tested and certified with their 1/i face respirator with HEPA filtration cartridge systems. E quipmen t P ro fi le CBA has proven to be an association of some of the most highly skilJed and experienced personnel from the management level to the field operations personnel. CBA currently owns and/or operates roll-off trucks and provides oversight management of end dump trucks. CBA currently provides 20 cubic yard open -top containers. 25 cubic yard open- top containers, 30 cubic yard open-top containers, 40 cubic yard open-top containers, 40 cubic yard asbestos vaults, and vacuum containers. C ert ifications • State of Texas Historically Under Utilized Business • North Texas Council of Governments Minority Certification • South Central Texas Council of Governments Minority Certification Permits and Licenses CBA currently holds permits and licenses from the following agencies • Texas Department of Health Asbestos Transporter License • US Department of Transportati o n Hazardous Materials Certificate of Registration • T ex as Department of Transportation License • Texas Commission of Environmental Quality Permit Insurance CBA currently holds insurance limits on the follov,ing types • General Liabi lity • Automobi1e Liability • Workers Compensation and Employers' Liability • Professional / Poll ution Liability Programs $5,000,000 $1,000.000 $500,000 $1.000 ,000 CBA's safety policy is to establish, activel y promote, and continuously improve the safety, health, and accident prevention program; to provide a safe and healthful work environment for all employees ; to prevent human and material loss; and to meet or exceed Occupational Safety and Health Administration (OSHA) regulations, and Federal , State and Local laws for safety and health . We believe that injuries can be prevented, management is responsible for preventing injuries, safety requires involving all employees, training employees to work safely is essential. and that accident prevention is good business . Our practice is that all of the employees ac.tively participate in the Safety and Health program. Our health and safety program establishes the policies and procedures, whkh protect workers and the public from potential hazards posed by work. We consider safety the highest pri ority during work at a site containing p otentially hazardous conditions. ln all instances, all project activities will be conducted in a manner that minimizes the probability of injury, accident or inciden t occurrence. Medical Monitoring All personnel partjcipate in a company supported, medical surveillance program under the direction of a physicfa.'l. Our medicaJ surveillance program requires 40 hour trained personnel to be medically screened upon employment and subsequent examinati ons annuall y whil e under the employment of C BA. We have in-place a substance abuse program, which requires initial pre-employment and random sc.reening. Policy Statement on Drugs and Alcohol The company has a vital interest in maintaining safe., health.ful and efficient working conditions for its employees. Being under the influence of a drug or alcohol on the j ob poses serious safety and health risks, not only to the user , but to those who work ,vith or come i.n contact v.ith the user . The use o r sale of an illegal drug or alcohol in t he work place or on the work time also poses unacceptable risks fo r safety , healthful and efficient operations . Accordingly, it is the ri .ght and intent of the company to maintain a working environment that is free of substance abuse . Alcohol • lt i s prohibited for any employee to be under the influence o f alcohol while performing company business, while in a company facility , or while operating v ehicles or equipment O\Vned by o r l eased by the company. • Possession o f alcohol wbjJe in or on a company truck or equipment i s prorubired. • Use of alcohol or possession of any open container of alcoho l while in a company facility or project site is prohibited. Legal Drugs Prescribed and/or over-the-counter drugs may affect behavior and performance. Employees are encouraged to advise their supervisor that they are taking such drugs for medical reasons, and medical evaluation may be required. During any period that such use of drugs adversely affect job perfonnance, the employee v.rill be relieved of his/her job duties or reassigned by the company. Illegal Drugs The use, sale, transfer or possession of any illegal drug by any employee v..rhile in a company facility or v,.fo]e performing company business is strictly prohibited. Violation ofthis policy ·will result in disciplinary action. up to and including. tem1ination of employment, even for the first offense . Experience CBA is a licensed transporter of asbestos in the State of Texas. In al1 instances when asbestos or asbestos containing material are being transported and/or disposed of. drivers are required to be donned in Level C PPE. Being an in demand transporter for multiple a,;.bestos contractors throughout the state requires Level C PPE to be required constantly. References ACE Environmental (Remediation Contractor) P .O . Box 541436 Grand Prairie, Texas 75054 Contact: Ms. LaDonna Leshuk Phone# (214) 734-4000 Fax# (972) 641-1208 Action Environmental Services (Asbestos Contractor) P.O. Box 292756 Lewisville, Texas 75029-2756 Contact: Mr. Ken Capps Phone# (214) 676-5660 Fax# (469) 467-3917 Cactus Systems, Inc. (Asbestos Contractor) 221 W . Exchange. Suite 207 Fort Worth, Texas 76106 Contact Name: Mr. Mike Horton Phone # (8 1 7) 626-4 791 Fax # (8 17) 626-4 72 5 CST En vironmental (Asbestos Contractor) 140 I O 1nterdri ve West Houston. Texas 77 032 Contact Name : Mr . PJ Parish Phone # (972 ) 579-8939 Fax # (972 ) 579-9009 Devon Energy Corporation (Oil and Gas Company) 1209 CR 1304 Bridgeport, Texas 76426 Contact Name: Mr. Darrell Mosby Phone# (940) 394-2000 Fax# (940 ) 394-2105 Eagle Construct.ion & Environmental Services (Emergency Response Contractor) P.O . Box 872 Eastland., Texas 7 6448 Contact: Mr. Marc Walraven Phone # (254) 629-171 8 Fax # (254 ) 629-&625 ECO Systems (Asbestos Consultant) P.O . Box 110849 Carrollton., Texas 75011-0849 Contact Name: Mr . Garey Hackney Phone # (972 ) 416-0520 Fax# (972 ) 4 l 6-4512 Fountain Quail Water Management (Oil and Gas Company) Suite 105 4000 Acton Highway Granbury, Texas 76049 Contact: Dv.-ayne Martin Phone# (817) 326-6325 Fax# (817) 326-6328 GEO Exploration Services (Emergency Response Contractor) 12775 Business 287 North Fort Worth , Texas 76179 Contact: Mr. Steve Cohn Phone # (817) 439-4610 Fax # (817) 439-4612 HP Envirovision (Asbestos Contractor) 460 S. Beltline, Suite 430 l rving, Tex.as 75060 Contact: Mr. Tom PaJet Phone # (972) 399-0068 Fax # (972) 986-6013 Innovative In dustrial Solutions (Emergency Response Contractor) P.O. Box 271173 Flower Mound, Texas 75028 Contact: Mr. Brent George Phone # ( 469) 877-6998 Fax# (972) 874-9373 lntercon Environmental, Inc. (Asbestos Contractor) 2214 FM 1187 , Bldg . 6 Mansfield, Texa5 76063 Contact: Mr. Jerry Andrews Phone# (817) 477-9995 Fax# (817) 477-9996 Liberty Services (Remediation Contractor) 103 N. Oak.lawn Eastland, Texas 7 6448 Contact: Mr. Brian Rogers Phone # (254) 629-8801 Fax# (254) 629-8803 Mercury Services (Asbestos Contractor) 1731 Wall Street Garland, Texas 75041 Contact Name: Mr. Devin Droemer Phone# (972) 926-5900 Fax# (972) 926-5903 Protect Environmental (Emergency Response Company) 6504 Midway Road, Suite 200 Haltom City, TX 76117-5363 Contact Name: Mr. Richard Cameron Phone# (817) 589-9005 Fax# (817) 838-9898 Additional Documentation Included • Resume of President • Copy of Certificate oflnsurance • Copy of Texas Department of Health Asbestos Transporter License • Copy of Texas Commission of Envirorunental Quality Transporter Permit • Copy of US Department of Transportation Hazardous Materials Certificate of Registration • Copy of Texas Deparunent of Transportation License • Copy of State of Texas HUB Certification • Copy of North Central Texas Council of Governments Minority Certification • Copy of South Central Texas Council of Governments Minority Certification • Copy of Lener of Goodst:anding with the State of Texas Comptroller Objective: 5877 Barnett Road Krum , Texas 76249 (940) 482-9900 (940 ) 465-2314 Ce ll My objective is to build and grow a financially strong company through a comm itment to ou r customers' satisfaction and employee's well being. Overview: • Excellence in customer satisfaction • Reviewing Financial Statements and overview of company • Commitment to honesty and integrity in all business dealings Professional Experience: 21 years business experience I CBA Services, t,nc. President / Corporate Treasurer April 2002 to Present • Responsible for daily management of operations: Serve on Board of Directors • Review Financial Statements and make decisions for imp roved profitability • Manage Operations Manager • Review and approve legal contracts • Review and approve bid documents • Review and approve billing • Review and approve expenses and invoices • Review and sign payroll • Maintain all licenses , perm its and certifications • Tracking and payme nt of sa les taxes , and federal taxes • Negotiate contracts with customers and vendors • Development of accounting systems and legal structure • Ensuring that company complies with all applicable federal, state and local regu lations . • Ensuring that company complres will all app licable safety guidelines • Overseeing the maintenance and repair of equipment • Review and make decisions regarding project profitability. I Eagle Construction & Environmental Services, L.P. Statewide Division Manager .... Industrial Services January 1998 -April 2002 • Responsible .for managing daily operations : • Initial development of division • Review of Financial Statements to m~l<e decisions for im proved profitability • Daily operations of transportation division throughout the State of Texas. • Revenue generated of $5 ,000 ,000.00 annually • Approval of time sheets , sa les reports , utilization of equ ipment reports , weekly service reports , daily work schedules , expense reports , job profitability reports , customer inv oices and vendor invoices. • Approval of all Estimates. • Deve loping database system • Management of Sales Representatives, Dispatchers and Drivers statewide • Ensuring that equipment is maintained and repaired • Negotiating contracts with customers and vendors • Managing and overseeing work. on various job sites • Ensuring that all transportation and disposal regulations are followed . • Ensuring that all employees complied with safety guidelines. I Waste Management, Inc. lnd ustrial Services Manager May 1992 -January 1998 • Responsi ble for managing dai ly operations and program i mplementation : • Initially involved in the development of a pi·lot program "Industrial Services " and assi sted with implementation throughout a 7 state area. • Developed $8,000 ,000 .00 in rev enue • Developed database tracking syst em • Developed new p rograms for mass marketing of services • Managed Customer Service Representatives and Sales Represen tatives • Negotiated pricing and contracts with Customers and Vendors • Managing and overseeing work on various j ob sites • Consu lted w ith customers reg ard ing regulations for disposal of waste • Review Financial Statements and determine opportu nities for improved profitability • Trained new employees on disposal regulations , database and practices and procedures . National Accounts Specialist • Responsible for Southwestern prog ram : • Initially involved in development of pi lot program "National Accounts " and assisted with nationwide im plernentation • Obtained and mai ntai ned nationwide accounts • Estimated work and coordinated nationwide for esti mates • Assisted in developing nationwide p ri c ing database syste m • Developed target account lists for 5 state reg ion • Responsible for marketing and determining most effective program for clients I Spring Clean Owner March 1988-May 1992 • Responsible for managi ng daily operations: • Developed $200 ,000 .00 in annual revenue • Managed crews on job sites • Pr epare and review payroll, taxes and bookkeeping • Reviewed Financial Reports I Hulcher Services, tnc. Office Manager June 1986-March 1988 • Responsible for managing da ily admini strative work load and equipment: • Managed Admi nistrative Assistants • Managed properties and utilities nationwide • Purchased equipment, vehicles a nd trucks • Developed database for track ing equipment repairs and life expectancy of major components • Ensured that equipment was maintained and repaired • Assisted with development of the mai ntenance program TEXAS DEPARTMENT OF STATE I-IEALTfl SERVICES <Be it fuiow,i tfia.t CBA SERVICES INC is cenific,f to pmfom1 as a Asbestos Transporter in the State o/Texas within the purview o[Texas Occupations Code, chapter 1954, so long as this license is not suspended or revoked and is ren e wed according to the rules adopted by tire Texas Board of Health. t4~1 MD 1£auartfo J. landiez, ':M.<D., '){.(P.J{ Commissiouer of J{ea(tfi ££cerise '.Num6er. 400312 T.ffictivc <Dttlc : 5/8/2006 1:..xpiratiott rvau: 5/7/2008 {Vofrf JI ft tr 'E..tJ.nm t io ri ([)a tt) VOID IF ALTERED Control Number : 92573 NON-TRANS FERABLE IHY/020 ••• TEXAS COMMISSION ON ENVIRONMENTAL QUAUTY NOtlce of Reglstr3tlon Industrial and Hazardous Waste Page , Date : I 03/29/04 Th1S registration ooes not const1tute autMrlzatt:,n of any waste management act i vities or facllltes llsted Delow . The registration reflects hazardous and/or lnclustrlal waste generation and 11anagement actlvltles for Which the registrant has orovtded not1f1catlon . Reautrements for sol Id waste management are orovlded by Texas Aon1n1stratlw1 cocle section 335 or the rules or the TQ)QS Coom1sslon on Environmental Quality (TCEQ). Ct1anges or aeldlttons lo waste manag~ent methods referred to In tnts notice re oui re wr·1lten notifi c ation lo the TCEQ. Solid Waste Registration Number : 67418 EPA IO : ri<R000057409 ihe Solid Wa s te Heglstratlon Number provides access to comnuterlz.ed and fl led Information oertatnlng to your ooeratlon. Please ref e r to that number in any correspondence . Company Name : SI te Name, SIie Locat ton : Contacl : CSA Services Inc CSA Services 5877 Oarnett Rd . Ste A. Krum. TX Osoor n. Jana Ma I Ii ng Address : 5077 Barnett rtd Ste A K.,·um , TX 76249 rteg1s1rat1on Status , Registration Tyo~: Transporter Type : Tran s port Wst Clais , Active Transoorter For hire 1 2 3 H Region, County : ., 61 Oen\on I lit lal Registration Dale : 02/00/2003 Last Amendment Date : T1t le : President Last :late NOR C01T1outer uodate , 03/12/2004 Phone : 940-482 -9900 S ite Street AOdress : :;677 Barnett fid :;te A r:rum , Tl\ 76249 Business Descr iption . NAICS Code : Tax Identifi c ation#: Tr·ansoonatton of wast e material -Industrial 8. naiardous 48411 General Freight Tru:ktng. Local 0 20 623415 Handler Status : Ooera tor IJam@ : Phone : Address : Information CBA Services In c 940 -482 -9900 5877 Barnett Rd Ste A Krum, TX. 767'19 Owner Information Name : CUA Services I11 c Phone : 940 -462 "9900 Addre ss: 5 877 Barnett Rd Ste A Krum. TX. 76249 As of 03 /1'.1/200/I -111e next unas s igned sequence 1umller for WASTE S Is O<X)1 imd tl1e m~xt unassigned sequence 1umber for UNITS Is 001. 5gct1on 335 . Chaoter 31 or the Texas Aonlnstratlvi! Code specifies lhi! notlrlcatlon. record keeping, m~nlf!!stlng and reporting reaulrements for hazardou s and Industrial so11c1 wa stes. DEPARTMENT OF TRA..i~SPORTA TION PIPELINE AJ'\'.D HAZARDOUS l\L\ TERlALS SAFETY AD\1I~ISTR-\. TIO~ HAL.\RDOUS lV1ATER1ALS CERTIFICATE OF REGISTR-\ TIO N FOR REGISTR-\ TIO N Y E A R (S) 2006-2009 Registrant: CBA SERVI CES. I~C. Attn: JANA OS B OR.i"-' 5877 B UIL~EIT RD. STE A KR UH, TX 76 249 T his certifies that the r egistrant is regi stered v.·ith the U.S. Depanment of Tr ansportation as required by 49 CFR Part 107, S ubpart G. This certificate is is sued under the authority of 49 U .S.C. 5 108. It is unlawful to alter or falsify this d ocument. Reg. :\'o : 060706 001 0270Q Issued: 6 /8 /2006 Expires: 6/30/2009 Record Keeping Requirements for the Registration Program T he following must b e maintained at the principal place of business for a period of three years from the d«te of issuance of this Certificate of Registration: ( 1) A co py of Lhe ;egic:tr aiion statement fikd with PH\1SA: and (2 ) Tnis Certifica te of Registrati on Each person subject to the registration requiremen t mus1 furnish Lhat person's Certificate of Registration (o r a copy) and all other records and information pen~in ing !o the infom1ation con1a ined in me rcgistraLion s.la temem 10 an authorize-cl representative or special agent of tbe L . S Dcpanment of T ranspona Lion upon request. Each motor carri er (pri\·ate or for -bire) and t·ach w:ssel operator subject 10 the registration requirement r.1us1 keep a copy of the c urrent C eniiic~He o f R egisu-ati0n or anoLher documem bearing. the reg.i:,;t.ation number identified as the .. l.J.S. DOT lhzma! Reg. No."' in each truck and truck tra ctm or Yesscl {trJikrs and semi-traile rs not i.ncludd) used to Lransport hazardou.. matcriab subje-c! to the re-g.istration requirement. The. C('ri ificate of Registration or document bearing the registration number rnust be made axai.labk, upon request. to enforcement personnel. For information , contact the Hazardous f\fateriab Registration Manager, PHH -6 0 . Pipe line and Haz:a.rdous Materials Safety Administration, U.S. Department ofTransponaiion. 4 00 Se,·cnth Str eet S\.',", Washington.. DC 20590, telephone (2 0 ~) 366-4 i 09. ~ --~~ MOiOR CARRIER CE'RTIFJCAT'! OF R:EG tSi"RATIO N C•rtif.cate of Registration No: 005i2025iC CS,., S~v1 CES. lNC . STEA SB77 EA,C':NETT RD KRU M, TX 7S24S Kevin~ fulfili ao !he ~pf~cr. requiramen-..s cf, ::he -De;>att.men: of Transporta:i0;n (ixDOT} t ~lirur,g to th:: ragistratiG/i of comm&rciai motor carriers, 1h is Ce~tE· of Registr~fion is he~by :grarne.d :o : CSA SERVJCES . INC . Sl=A 5!77 5AAHETT RD KJ!WM. TX 71249 This C$rtlfi cete of Regist"Stion g1.,~"f.zed TxDOT's issuance of a n ir.suraxe ec,-b earn ioer.tff-1ing e_,cr. Co.-nmercial motor veh"tde ·:-eg\st~d wi:h TxDOT . Th is C.rtifie#ta cf R~istretion i s not transfwab•=· VOID IF ALT ER:E.D iJ~.1: ~f ctf r nf mrxas Historically Underutilized Business Certif.ication and Compliance Prog ram The Texas Bu ir d ing & Procu reme nt Commiss ion (TBPC). hereby certifies that CBA SERVICES , INC. has s uccessfu lly met the estab lished requ irements of 1he State o f Texas Historically Underu tili zed Bu siness (HUB ) Ce rtification and Compliance Program to be re cognized as a HUB . This certificate . printed i S<AUG -2C;J;. supersedes any r eg,slrai1on and cer11hca1e previou siy :ssued by the TSPCs HUB Certif1c ai1on and Com;:wance P rogram . If tne1e are an y change s re ga rd ing th e iniormauor. (1.e . business s t ructure . own ers hip , day-t,:i·d ay management . opNahonal conrro!. a.dC're::.ses . phone anc iax numbe rs o r a uthorized s ignatures } provided in tie submission oi the busin ess · apphca.hon !or r eg,stra hen/cert1t,cation as a HU S, you mus.t 1mrnedia.te ty (wifhin 30 days oi such changes ) notify lhe TBP C 's HUB program i. writing The Commissi o n reserves the rig ht to co nduct a comp!1 ance rev,ew ai any tfrhe to GOnfmn H UB e 11g;t)ihlv . HUB cert ification may be s u spended or revoked upo n findings of ineligibihty. CertificateN I D Num b er: 1020623415400 File/Ve ndor Number: 20396 A pprova l Da te : 18-.A.U G-2006 Exp iration Date: 18-.A.UG-2 010 Paul A . Gibson HUB Ce.rti!icatlo n & C ompliance Manager Texas Buildin g & Procurernen l Commission (512 ) 305-907 1 Note: In o rde r !or State agencies and ,ns1 rtu tions c! i1igher education (universities ) to be credited for· utt hz1ng th is 1:,us ,nes.s as a H U B . they m ust award payment under 1t1e Certiflcate/ViO Number ioenlif ted above . A g enc ies and u nivers:ttes a re encouraged lo vahda le H UB cert1hcation p rior lo issuing a nonce of award by accessm9 the Inte rne t{http :J/www .tbpc.state Ix .us ) or by contachng the TBPC 's HUB Cert1fi cat10n and C ompliance P rogram at {888) 863·5B61 or (5 12) 463·5872 NCTRCA Disadvantaged Business Enterprise Certification CBA Services, Inc. Disadvantaged Business Enterprise hns filed with thl' Agency an Affidavit as defined by 49 CFR part 26 and is hereby certifi ed to pro,•ide s ervicc(s) in the following arcns: 484220 ; 562211 ; 562219 : Specialized Freig ht (ex ce pt Used Goods) Trucking , Local ; Hazardous Waste Treatment ancl Disposal ; Other Nonl1azardous Waste Treatment and Disposal ; December 2006 This Certific ation is valid b egi nning and s upe rseded any registration or listing previou s ly Issued. This certlnrniion mu st b e updated annually by submissio n of an Annual Update Affidavit At any time there Is a charge in ownership or control of lhe firm, notification must be made Immediately to the North Ce nt ml Texas Regional Certification Agency or :m TlJCP certifying entity. Decemb e r 07 Cc rtiflcnte ex11iration 20 ------------' --afl~~fn¥ Cert!Ocation Administrator Dece mber 06 Issued date ----------------• 20 _ CERTIFICATION NO. WFDB33008Y 1207 ':::J~i\t\~~;~~i~€~i~~i~f.}~~S~tif~iifiw{::jifir~1*Ji~~ti-rti~ll~~~~~~~rr_--... h,, ,-... ..,;;,.;, ~ ..• ,.-.. ,--.::-,/;.:ix,.-...,,~~~--~.>,:.Y.'-"··-,__•,,·.-,·,'-··'i1;:::S,--.~>;;:;,I, •.. , •... ---.0, . .,v<....,-.-.·,",-,;.-tff..~,,., •-·~.;.;;(':"~ ·"""""-".5''% :-;:~.~--::--. ,,,.X, ... I,, -·~~.::;; ... :,-,; .. ,_'...:! • X"\~x-.:v: ··r-~~t~(i;.. .... ~ ....... " :;y)--t:": ,; .. ,t;.•'il ">'j.."...-;...,'.:::, .... ~·~ .,-~:.: ... _ ... y .. ,y-4-~~.:-~~ \'.J{;, "~-:---;,;_,1,.t .v ... ,ro::.,:-... "\):;.;.'/ ,,•.-:._-.:-~·-, ... \.;;--':::=-,~,,.,.}· r~ ,----:.~~.·~-lt;'"•~~ ..• •f,/,' ,; ~=--; 't ii I. I • ;~,,·iY;;.#,i,r ~'#lfi.l{tlr~~-~~,~ ~"7~t!:r~ff rt;,.'i·h~,?t1.~1~~,i"-f:u1,.J?r$x?~~!/i~':"}~~;~t;li.irli/?:J\}tr,{:_'i~)U:S?tYtrr:r:~~~ii,\~~:-~ liJ:.\1.~iw{{~tt:~'J,{',ir,..'}·t'ii-i~vrt1.+~ :ii~ . . . . . . . . ri}h/~ :,,:-.;-;~2. ~ · SCTRCA [·:·:-.-~··. · .. · ;::;~. ~tff· "_·,~:.,.. ::: ,'•, .. 1 •• ,;,··.;:-:?;::' . '< . "':a; 11. · .., . . . :;:~~c-·:;·. ! •,·;?.:',;-. t ,..anlft,J > .. ,. ~::.:_,~, •.. l··t.:t~!.i.l~ .i£.·l:.· ~. (· ,.,,.¥' .•. ·~ ,, -·. :··t Minority and Women Bu. stness Enterprise I.};:::.·-\> '. · .. ,.... ~..,.).,. 0· --. ·:\ ·~ "i-· (MWBE) Program ·"';-· ... ::,.::.. ., .. " :it 1'i: .., , r..::--: ·-. <•:-;>:., '°'f\ ' . !ti~ i:';.<"-; '. <:{:t~: -~-. ~ ., ~ . -r~ .-~ .-. Iii}:;::~>~ <~!§{:, ~&-X~P~ "v: CBA Services, Inc. w.·,:\> •'..'-· ~~ ii.t' --':., ... /?}I~ . ~~ itJ}-.. . -.'.'~'.~~ has .filed the appropriate affidavit with the South Central Texas Regional ~t{f.: . >{~t~~ Certification Agency (SCTRCA) and is hereby certified, in accordance with .tt.,'.'"Jl .. : -~.§1 SCTRCA Policies and Procedures, as a: E~,;.:< . :~i::~/-.·' SB E WBE I[.€.};{>~/ /l'fl .~,:.,.:,.,:;~ \'.;I I S.:;1,,;<,};,?) :.::;~I \\,:o.,.\}~:.::~ ~I . )ft; f!f;r·:· This Certification Certificate must be updated by submission of a pf}{::;-" Compliance Affidavit. You are required to notify the SCTRCA within 30 !1?;r;_:·, · days of any change in circumstances affecting your ability to me-et size, ft.~ .... disadvantage status, ownership, or control requirements and any material t::?r:: cha~ge~ in the in~~rm~tion provided in the submission of the business [{}., application for cert1f1cat1on. ff·'.-:·,,., CERTIFICATE EXPJRES: 06/30/09 CERTIFICATE NO. 207063049 Certified in the following work cate.gories: North American Industry Classlflcation System (NAICS) code(s): 562211 562219 484220 Hazardous Waste Treatment and Disposal Non-Hazardous Waste Treatment and Disposal Specialized Freight Trucking, Local r Sheena D Suber-EXECUTIVE DI-RECTOR ·'-..... -1;~:< Ii-::_/: ':,;. :·;,, ~:: ,., 1.(::·. 1· t" !Y ... (·· ~~'':· !:.c, 1~ ,~ lr~ -·· i..';' ~; fi; ~C . ·if?::: m-;_'.'~ .. ... !- ~., ;·;. ~1~~~ . .: ,. .. ,. .. ~ TEXAS COMPTROLLER OF PUBUC ACCOUNTS S CS AN COMBS • COM l'TKO L L[R • AU STIN . T[XAS 7 8774 THE STATE OF TEXAS COUNTY CF TRAVIS Oc to ber 1 7, 2 007 CERTIF.'l ~A_TE _OF ACC.J)lJNT STATUS I , Susan Combs , Comptrolle r of Public Account s of the State of Te:,<as, DO HEREBY CERTIFY that according t o the records of this office CBA SERVICES INC is , as of thi s date, in good standing with this office having no franch ise tax repo r ts or payments due at this time. This certificate is valid through the date that the next franchise tax repo r t will be due May 15, 2008. This certificate does not make a repn.=sentation as to th e stat u s of t he co r por ation's Certificate of P.uthority, if any, with the Texas Secretary o f State. This certifi.cate is v a lid f o r the purpose o f conversion when the converted entity is subject to fra.nchise tax as required by la1.;. This certificate is not valid for the pur pose of dissolution , me rg er , o r wi~hdr aw a l. GI VE N .UNDER MY HAND l LND S EAL OF OFFICE in the Cit y of Austin, this 17 Lh day of October 2 0 07 A .D. Sus a n Co:mbs Texas Comptroller Taxpayer number : 102 0 6234154 File number: 0800092997 Form 05-304 (Rev . 02-03/14) http J/ecpa.cpa.state .tx.us/coa/se rvl et/cpa.app.coa.C oaLetter 10/17/2007 ~rt Services, Inc. 5877 Barnett Road, Ste. A Krum, Texas 76249 Phone: (940) 482-9900 FAX: (940) 482-3457 October 17, 200 7 Ms. Karen Andrews Intercon Env ironmen tal , Inc. 2214 FM 1187 , Bldg. 6 Mansfield , Texas 76063 Dear Ms. Andrews: CBA Service #: Employee Matrix The following are the employees that will work on the project w e discussed earlier toda y . I ha v e outlined each employee that will be inv olved and their respectiv e responsibilities , licenses , certificates and experience. Name Job Tasks Certificates Years Title Performed / Licenses Exp. Jana Osborn President Operations & Safety 18 years TX Class A CD L Ops. Driving, Operations #15022647 w/ Haz End. 10 years Kelsey Mccaughan Mgr. & Safety Asbestos Awareness TX Class A CD L #09859793 w / Haz End. 23 years Ned Daniels Driver Driving Asbestos Awareness TX Class A CDL #00728358 w/ Haz End. 13 years Scott Stephens Driver Driving Asbestos Awareness If you have any questions or need any additional information , please call me at (940) 482-9900. Sincerely, Jana Osborn, President Certification of Contractor's Legal and Compliance History Complete ONE of the Following Certificati ons Certification of LegBI Ac6on Report I certify under penalty of law that the attached Legal Action Report detailing Contracto r's , Contractor's officers , Contractor's employees , and Contracto r's proposed subcontractors legal and compliance history relating to the protection of the environment was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel · property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the sys1em , or those persons direcily responsible fo r gathering the information , the information submitted is, to the best of my knowledge and belief. true . accurate , and complete . I am aware that there are significant penalties for submitting false information . including the possibility of fine and imprisonment for knowing violations . CONTRACTOR : Signature Company Name Date Certif,ca6on of NO Legal Action I certify under penalty of law that the legal and compliance history of Contractor , Contractor's officers , Contractor's employees, and Contractor's proposed subcontractors was researched under my direction or supervision in accordance with a system desig.ned to assure tha1 qualified personnel properly gather and evaluate the infonnation submitted . Based on my inquiry of the person or persons who manage the system . or those persons directly responsible for gathering the information, I hereby certify that no legal action relating to the protection of the environment was brought against Contractor, Contractor's officers , Contractor's empk>yees , o r Contractor's proposed subcontractors within the preceding five years . To the best of my knowledge and belief, this statement is true , accurate, and complete.. I am aware that there are significant penalties for submitting false information , including the possibility of fine and imprisonment fo r lcnowing violations. ~~ACT~: . ,. ' ·,-J::: V ~-[ . ~J Z'iA----- Name ', \) ,;/,' j ,,[ (. I X J.:: : ... _,;, , ..... ' -· 1 Title ,.,- -)I, {1.';C(C Company I !, 1---1, . ,-·c c Jc ,1 Date 2-26 STATEMENT OF QUALIFICATIONS Tomas Reyes Trucking, Inc. 3529 Peoria Street Dallas, Texas 75212 Tomas Reyes Trucking, Inc . is a local family owned and operated company based in Dallas, Texas. We have been in business for over 36 years and operate a fleet of 86 trucks and trailers. We specialize in providing transportation services geared toward the construction and demolition industries. We are a safety oriented carrier with a full time engineering safety consultant under contract and in the field on a daily basis. We pride ourselves on our safety rating along with our maintence facility and maintence program to keep our state of the art fleet in top notch operating condition. Our number one goal is to give our clients quality transportation service at an affordable price with minimal service failures. From : De Wilson, 972 581 4959 (CSID) To :Shannon-8174779996 1dditio~al Coverages and Factors I .i ne of ~usi ness Coverages for Business Auto :overage :ombined :s ingle limit :o 11 i s ion :ompreheris i ve Limits . 1,000,oob .ine of 8usiness Coverages for General Liability :overage : ~neral ~ggregate 'roducts ,/Comp 1 eted Ops .ggregat~ ~rsonal ~ Advertising njury ' .ach Occ~rrence ire Dam~ge ledi ca 1 ~xpense Limits 2,000,oob 2,000,000 1,000,000 1,000,000 100,000 ! 5,000 Ded/Ded Type 500 500 Ded/Ded Type B/1412007 9 :51 :15AM 08/06/2007 Rate Premium Factor Rate . Premium Factor ci.. 0) C ~ (.) 2 (/) Q) 6i' )'.'. (/) cc E 0 - ') t5 ) NCTRCA Minority Business Enterprise Certification Tomas Reyes Trucking, Inc has filed with the Agency the appropriate Affidavit and is hereby certified to provide servlce(s) in the following areas: Minority Business Enterprise 484220; Specialized Freight (except Used Goods) Trucking, Local; Th . c ·n ti I 1· ·1 b · · August 2007 d d d I t t· 1· · 1s erh 1ca on s Vil 1u egmnmg an superse e any regs ra 10n or 1stmg previously issued. This certification must be updated annually by submission of an Annual Update Affidavit. At any time the1 ·e is a charge in ownership or control of the firm, notification must be made immediately to the North Central Texas Regional Certification Agency. Certificate expiration ______ A_u_g_u_s_t ___ , 20_0_8_ Certlflcatlon Administrator Issued date August 20 07 --------------' -- CERTIFICATION NO. HMMB34 7 52Y0808 i . t--=- 1 i Tomas Reyes Trucking, Inc . 3529 Peoria Street Dallas , Texas 75212 Tel. (214) 631-2711 Fax (214) 905-7565 Ms . Karen Andrews Intercon Environmental , Inc . 2214 FM 1187 , Bldg. 6 Mansfield, Te x as 76063 Dear Ms. Andrews : Tomas Reyes Trucking, Inc. Employee Matrix The following are the employees that will work on the project we discussed . I have listed the employees that will be involv ed and their areas of responsibili ty as w ell as their y ears of experience in the industry . Name Tomas Rey es Antonio Reyes Jesse Valasquez Job Title Owner Co-Owner Fleet Mgr. Tasks Performed Project Management Project Management Dispatch Coordinator Experience 36 y ears 20 y ears 15 y ears If y ou hav e an y questions or need any additional information, please call me at (214 ) 631-2 711. Sincerely, Jesse Valasquez Certification of Contractor's Legal and Compliance History Complete ONE of the Fo llowing Certificat ions Certification of Legal Action Report I certify under penalty of law tha t the attached Legal Actio n Report de tairing Contracto r's , Contractor's officers, Contractor's employees , and Contractor's proposed subcontractors legal and compliance history relating to the protection of the environment was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information subm itted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for ga thering the information, the information submitted is , to the best of my knowledge and belief, true , accurate , and complete . I am aware that the re are significant penalties for submitting fa lse information, including the possibility of fine and imprisonment for know ing violations . CONTRACTOR : Signature Company Name Date Title Certification of NO Legal Action I certify under penalty of law t hat the legal and compliance history of Contractor , Contracto r's officers , Contractor's employees , and Contractor's proposed subcontractors was researched under my direction or supervision in acco rdance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information , I hereby certify that no legal action relating to the protection of the environment was brought against Contractor, Contractor's officers , Contractor's employees , or Contractor's proposed subcontractors within the preced ing five years . To the best of my knowledge and belief, th is statement is true , accurate, and complete . I am aware that there are significant penalties for submitting false information , includi ng the possibility of fine and imprisonment for know ing vio lations . Sig nature ) -J ' S, f.;,1..::...\ (, Name ~', C .J \....C; '.\ ·E-r Title ..~-· .. r--. " 1,· -(' / { ' /1, ,..( ..., Company Date 2-26 P. 0. Bo x 820584 Fort Worth , Texas 76182 Statement of Qualifications Aloha Env ironmental , LP special izes in provid ing quality service to our clients at an affordable price for the portable temporary sanitation facilities . Drew Pope , Owner of Aloha Environmental LP, and our staff have over 50 years combined experience in the industry . Aloha Environmental , LP services customers throughout the Dallas / Fort Worth Metroplex. Our vast inventory of equipment enables us to meet the needs of our customers no matter how large the event may be. Drew Po!=)e 8176053591 ~faft nf 1<lttxas Historically Underutilized Business Certification and Compliance Program The Texas Building & Procurement Commission (TBPC), hereby certifies that ALOHA ENVIRONMENTAL, LP has successfully met the established requirements of the State of Texas Historically Underutilized Business (HUB) Certification and Compliance Program to be recognized as a HUB. This certificat8, printed 20-MAA-2004, $Upcl'$odes any registration and certificate previously i:ssued by the TBPC's HUB Certification and Compliance Program. If there are any changes regarding the information (i.e .• business structure, ownership, day•to-day management, operational control, addresses, phone and tax numbers or authorized signatures.) provid&d in the submi!lGion of the business' application for registration/certification as a HUB, you must immediately (within 30 days of such changes} notify the TBPC's HUB program in writing. The Commission reserves the right to conduct a compliance review at any time to confirm HUB eligibility. HUB certification may hA suspended or revok~ upon findings of inaligibility. Certificate/VID Number: FileNendor Number: Approval Date: Expiration Date: 1141897255700 36664 1 &-MAR-2004 16-MAR-2008 ?uJ A. C;bv-- Paul A. Gibson HUB Certification & Compliance Supervisor Texas Building & Procurement Commission (512) 305-9071 Note: In order for Sta.ta agenci~ and instituti~ of higher education (universities) to be credited tor Utilizing this business as a HUB, they must award payment under the CertificateNtD Nurnber identified above. Agencies and universities are encouraged to validate HUB certification prior to issuing a notice of award by accessing the lntemet {http://www.tbpc.$tate.tx.ue) or by contncting the TBPC'$ HUB Certification and Compliance Program at (888) 863-5881 or (512) 463-5872. p. 1 Aloha Environmental, LP . P.O. Box 820584 Fort Worth, Texas 76182 Tel. (817) 348-9901 Fax (817) 348-9901 Mob . (817) 706-6610 Ms. Karen Andrews Intercon Environmental , Inc. 2214 FM 1187 , Bldg. 6 Mansfield, Texas 76063 Aloha Environmental, LP. Employee Matrix Dear Ms. Andrews: The following are the employees that will work on the project we discussed. I hav e listed the employees that will be involved and their areas of responsibility as well as their years of experience in the industry. Name Drew Pope Lamont Tucker Carlos Vargas Job Title Owner Supervisor Technician Tasks Performed Project Management On Site Tech. Service On Site Tech. Service Experience 20 years 20+ years 5 years If you have any questions or need any additional information, please call me at (817) 348-9901. Sincerely , Drew Pope Certification of Contractor's Legal and Compliance History I Complete ONE of t h e Following Certi fica ti ons 1 Certification of-Legal Action Report I certify under penalty of law tha t the attached Lega l Action Report detaili ng c J ntracto r's, Contractor's officers, Contractor's employees . and Contractor's proposed subcontractorJ lega l and compliance h istory re lating to the protection of the environment was prepared under my direction or supervision in accordance with a system designed to assure that qualified personn~I prope rly gather and evaluate the information submitted . Based on my inquiry of the person or p1sons who manage the system , or those persons directly responsible for gathering the infor .. 1ation, the information s ubmitted is , to the best of my knowledge and belief, true , accurate, and complete. I am aware that there are sign ificant penalties for submitting false information , induding the possibility of fine and imprisonment for knowing vio lations . -j CONTRACTOR: I l I Signalul:e.. Company Name Date Title 1 · d Certification of NO Legal Action I certify under penalty of law that the legal and compliance history of Contractor, dpntractor's officers, Contractor's employees, and Contractor's proposed subcontractors was researohed under my direction or supervision in accordance with a system designed to assure th1* qualified personnel properly ga ther and eva luate the information submitted . Based on my inqµiry of the person or persons who manage the system, or those persons directly responsible for gathering the information , I hereby certify that no legal action relating to the protection of the enviro~ment was broug ht aga inst Contracto r, Contractor's officers , Contractor's employees, or Cbntractor's proposed subcontractors within the preceding five years . To the best of my knowledge ~nd belief, this statement is true. accurate, and complete . I am aware that there are significant pJnalties for submitting false information , including the possibil ity of fine and imprisonment for knowing violations . ! i A} DY'\c:z -t fO J ~/veVI. f({ ( I ~o/u J \ Company . i t> Name Date Swf'i·R§ Tit le 2-26 10668-vE:lIB dsz: E:D L O DE: ~:JO Statement of Qualifications Reed Hydromulching, Inc. P.O. Box 477 Blooming Grove, Texas 76626 LI# 5083 In 1994, Marcus Reed established Reed Hydromulching, Inc. with the goal of b ecoming the premier vendor for this type of service; a goal he quickly obtained. Reed Hydromulching, Inc. provides se~ice throughout the State of Tex as to both pri v ate and municipal clients. Owner Marcus Reed is licensed by TCEQ for irrigation. Additionally , he has a 40-hour HAZMAT Technician Training Certification for soil remediation. Reed Hydromulching, Inc. specializes in seed drilling , brillien seeding, erosion control service , and temporary irrigation . Utilizing our state-of-the-art equipment and indu s try-approved processes w e are able to provide our clients with superior quality landscaping a t an affordable price. We have the capability to perform, manage , and maintain multiple projects simultaneously. Our ability to handle projects of any size and scope makes us not only the first choice, but in many cases the only choice for our clients. Our proven performance through the years has earned us many repeat customers with varying project needs. Let Reed Hydromulching, Inc. be the first choice for your next landscape management project. We look forward to the opportunity to help you grow in the future . Oct 29 07 07:13a Marcus Reed Reed-Inc. October 28, 2007 Ms. Karen Andrews Inter con Environmental, Inc. 2214 FM 1187, Building #6 Mansfield, Tx 76063 Re: Employee Matrix De.or Ms . Andrews , 903 695 2275 P. 0 . Box 477 Bloom i ng Grove , TX 76626 817-929-5771 Fax : 903-695-2275 E-mai l: mtreed@airmail.net The following ore the employees that will work on the Villa Del Rio and Oa~ Hollow apartment site located in the City of Ft Worth. The employees ore listed alorg with their titles, responsib i lities, licenses , certificates , and year's experience. Marcus Reed, President, Chief of Operations License: Texas Licensed Irrigator License: LI5083 Texas Class CDL 40 Holl" Hazmat Technician 18 Years Experience Tammy Reed , V ice President, Chief Financial Officer 10 Years Experience Please feel free to call me if you hove any questions at 817-929-5771. Sincerely , ,Y.arcus Reed President Reed Hydromulching, Inc. p .2 Certification of Contractor's Legal and Compliance Hi~tory Complete ONE of the Following Certifications Certifictttion of Legal Action Report I certify under penalty of law that the attached Legal Action Report detailing Contractor's , Contractor's officers, Contractor's employees, and Contractor's proposed subcontractors legal and compliance history relating to the protection of the environment was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information , the information submitted is, to the best of my knowledge and belief, true, accurate, andi complete. I am aware that there are significant penalties for submrrting false infonnation , ir,cluding the possibility of fine and imprisonment for knowing violations. I CONTRACTOR: Signature Company Name Date Tiffe Certification of NO Legal Action i I certify under penalty of law that the legal and compliance history of Contractor,/ Contractor's officers , Contractor's employees, and Contractor's proposed subC011tractors was researched under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the fnfonnation submitted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I hereby certify that no legal action relating to the protection of the environment was brough1 against Contractor, Contractor's officers, Contractor's employees, or I Contractor's proposed subcontractors within the preceding five years. To the best of my knowled~ and belief, 1his statement is true, accurate, and complete. I am aware that there are significant 1 1 penalties for submitting false infom,ation, including the possibility of fine and imprisonment ,for knowing violations. ! . I /-( <rP ¢J /<--zu~ ' C~CTOR: ; he'.:! t/1:::l ()? c7 mpany Name ' J0~3C>-O? Date {f);:pg ~/l~ rit:1e SU:G 969 806 ; I ! peet:J snoJBlflJ I 2-26 dg~:so LO 08 PO The following information is suppl ied for the purpose of obta ining merchandise on open account. I Company Name Fax Phone Kohler Co . (920) 459-1665 (920 ) 457-444 1 ddress City State I Zip Code 444 Hig hl and Drive Ko hler WI 53 044 Kind of Business Fed era l I .D . Numbe r Plumbing Product s , Kitche n and Bathroom Cabinets, Engin es , Gene rator Sets , Furni t ure, a nd . 39 -0 40 2810 Ho s pitality Services Yea r Bus in ess Establ ished At Present Address Since Payment Terms 1873 190 0 De fi ned on Pu rc hase Order Is Business Incorporated? I Under Laws of What State? D&B Number D&B Rating Yes Wisconsin 00 -607 -3225 5A2 Wholly-Owned Subsidiaries Ann Sac ks T ile & Ston e , Inc . Bak er, Knapp & Tubbs , Inc . Kohle r Renta l Power , Inc. Kohler Reynosa S . de R.L. de C.V. McGu ire Furn iture Com pany Ko hler Canada Co . Robern , Inc . Bank Name San imex, SA de C .V . Canac Kitchens U.S. Ltd . . ·. ';,, ,, ,Three Corporate Officers He rbert V. Koh ler, Jr., Chairman , CEO & Presid e nt Jeffrey P. Cheney , Sen io r V ice President -Finance & Chief Financial Officer John M. Surali k -Treasu rer Bank Name U.S . Bank Wachovi a Ban k -Ko hler Account #2079900134 872 : Telephone Address Telephone Fax Credit Inquiries TRAM #SL -MO -T1 OP Fax o nly -900-329-002 2 VA-7350 PO Box 500 15 (540 ) 563-7363 (540 ) 563-733 1 One US Ban k Plaza , PO Bo x 524 City State Zip Code St. Louis MO 63166-0524 Name John Deere -Credit Department Address 3801 West Ridgeway City Waterloo Name Telephone Fax (319) 292-4577 (319 ) 292-5206 State Zip Code IA 5070 1 J B Hunt -Credit De partment Add ress Telephone Fax 61 5 J B Hun t C o rp o ra t e (479 ) 419-3505 (479) 820-4995 Drive City Roano ke Name Internat ional Paper -Credit Department Address Telephone 98 1 South Hickory (920) 921-9601 PO Bo x 190 City State Fond du Lac W I Name Alliant Energy -Attention Ne il Krebsbach Address j Telephone 4902 No . Biltm ore Ln , (608) 4 58 -5784 PO Bo x 7700 7 Zip Code 24040 Fax (920 ) 419 -1236 Zip Code 54936-0190 Fax (608 ) 458-4824 I ---·---: ---------I State c·,ty Zip Code Crty I State Zip Code Lowell AR 72745 Ma d ison WI 5370 7-1007 separate sale s/use tax blanket exemption s are suppl ied by our compan y as each order or rele ase specifically carries within it any exemption that appl ies n a per order basis . Rev 4112/07 Roy M. Goldenbogen Manager -Cash Managem e nt Kohler Power: History: Global Power: About Us Page 1 of 2 KOHLER. Call us at 800.544 .2444 "Thoug h it may seem a long step between electric plants and plumbin g fixtures ... they are similar in that th ey both admin ister to the comfort , health a nd well-being of peo ple." Kohler of Kohler News, 1929 Kohler Power Systems : American Legend Born of a breakthrough in technology , Kohler® Power Systems has continued to follow that same path of i nnovatio n for more than eighty years. A nd it's that commitment which has made the company a global force in the manutacture and marketing a vast array of effective , affordable power solutions . Kohler's entry into the power business can be traced to the years immediately following World War I. With no ba ckground in generators or engines , the company leveraged the emerging demand for electricity on farms , their expertise in cast iron and their own ingenuity to produce the revolutionary Kohler Automatic Power & Light 'power plant' in 1920. In an age when generators worked by charging a series of storage batteries, which in turn provided 32 volts of power, the Kohler Automatic furnished an unprecedented 110 volts directly t o power lines , turning itself on and off automatically in response to the demand for electricity. This tremendous power output combined with rugged rel iability and ease of operation to quickly make the Automatic a favorite in rural areas where utility power had not yet arrived . Aided by aggressive marketing and endorsements by the likes of Admiral Richard Byrd (who had taken several Koh ler generators along on his fi rst two expeditions to Antarctica i n the 1920s and 1930s,) the company firmly established itself as a bold innovator in a growing marketplace. A continuing focus on bringing new products t o a n energy-hungry publ ic continuec to guide the company's direction. US entry into World War I I marked Kohler's first foray into global power. Kohler generators were shipped to troops in ev ery t heater , supporting vital war efforts while serving as a bulwark against curtailed wartime demand for their plumbing goods. Not only were the generators good business, they proved the value of a d iversifiec product base -a philosophy held by the company to this day. The post -war years proved a boom for the generator business, with the introduction of Kohler d iesel generators and continuing development of ever-more powerful units throughout the 1950s and 1960s. Growth in these years was in part d riven by the need for emergency standby power in hospitals , factories , government installations and other facilities that required an assured source of power -a new concept at that time. Again, Koh le r prescience paid off. Forward to the mid-1980s , the company began to strengthen its distributor network and increase the size of its generators, m oving beyond the magic 750 kW mark that moves a generator into the big leagues . Together with a renewed focus on meeting the emerging needs of new markets , Kohler generators were again on the map, spending the rest of the 1980s and the better part of th e 1990s establishing its position . Today, Kohler has taken its rightful place on the leading edge of total solutions for residential , commercial and industrial standby/emergency power , d istributec power , recreational power , rental , power for specia l events and more . And as the company sees demand for new and different kin ds of power expanding to level s previously unseen , the commitment to innovative products, wo rld-class engineering , responsive after -sale support and unmatched value is stronger than ever . Born of a breakthrough and defined by breakthroughs for eight decades . Kohler Power Systems continues to be the benchmark by which a ll others compare. Copyright~ 2007 Kohler Co http://www.kohlerpower.com/aboutus/history .htm? contentNumber=501 10 /25 /2007 Kohler Rental Power, Inc . 1100 Avenue S Grand Prairie, Texas 75050 Tel. (972) 206-7070 Fax (972) 206 -7071 Mob . (214) 435-9572 Ms. Karen Andrews Intercon Environmental , Inc. 2214 FM 1187, Bldg. 6 Mansfield , Texas 76063 Dear Ms. Andrews: Kohler Rental Power, Inc. Employee Matrix The following are the employees that will work on the project we discussed . I have listed the employees that will be involved and their areas of responsibility as well as their years of experience in the industry. Name Todd Kinler Brian Mobley Dakota Roberts Job Title Account Mgr. Tasks Performed Project Management Senior Rental On Site Tech. Service Application Specialist Rental Application On Site Tech. Service Specialist Experience 6 years 10 years 5 years If you have any questions or need any additional information, please call me at (214) 435-9572. Sincerely , Todd Kinler Account Manager Certification of Contractor's Legal and Compliance History Complete ONE of the Following Certifications CertHlcation of Legal Action Reporl I certify under penalty of law tha t the attached Legal Action Report detailing Contractor's , Contractor's officers, Contractor's employees , and Contractor's proposed subcontractors legal and compliance history relating to the protection of the environment was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information , the information submitted is , to the best of my knowledge and belief, true , accurate , and complete. I am aware that there are significant penalties for submitting false information , including the possibility of fine and imprisonment for knoWing violations. CONTRACTOR: Signature Company Name Date Title Certification of NO Legal Action I certify under penalty of law that the legal and compliance history of Contractor, Contractor's officers, Contractor's employees, and Contractor's proposed subcontractors was researched under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information , I hereby certify that no legal action relating to the protection of the environment was brought against Contractor, Contractor's officers, Contractor's employees, or Contractor's proposed subcontractors within the preceding five years. To the best of my knowledge and belief, this statement is true, accurate , and complete. I am aware that there are significant penalties for submitting false information , including the possibility of fine and imprisonment for knowing violations. Company /O,.,.r:J[{-6 7 Date • Name #feC&rrt 11Jftc . it 2-26 c.:n ,;un1e u 1 :r v1stri1' wrs , Inc. iREEDER Gaso,line Diesel Lubricants D tSTRIBU TORSI 'INC. Bobtail & T r ansport Del iveries Main -817.429.5957 Fax -817.429.9052 HOME MISSION STATEMENT COMPANY HISTORY REEDER :FLEET l LUBRICANT DIVISION :j FUEL DIVISION .. -~ " •_1;1 ,i EQUIPMENT DIVISION . :~ CAREERS SALES TEAM CONTACT US MSDS FORMS ht tp://www.reederd istri butors.com/ ,, ,I , ,·l, People are our most precious resource Reeder Distributors, Inc. is one of the largest independent distributors of fuel and lubricants in North Texas. Our company has spent the last decade building a reputation of dependable service at competitive prices. We are independently owned, so we are sensitive to your need for consistent service. The last thing you need is another variable in your operation. Reeder Distributors is dedicated to providing dependable deliveries so you know when your product is going to arrive. We also understand your appreciation for competitive prices. It is our goal to provide those prices without taking shortcuts that affect service. Years of experience has enabled us to develop business procedures that allow us to optimize service and reduce cost. Gary Reeder President, R ee der Distributors, In c. \.-'age 1 ot l ., I 10 /30/200 7 We1c _~0_1_:<._ee_d_e_r_u_1s_tr_i_l::iu_t_o_rs_, _In_c_. ___________ \...,._,. --------------------P_( __ ~ ·~·REEDER Gasoline Diesel Lubricant s Di STRIBU TORSI 1NC. Bobtail & Transport D,el iveries Main -817.429.5957 Fax -817.429.9052 HOME MISSION STATEMENT COMP ANY IDSTORY REEDER FLEET LUBRICANT DIVISION FUEL DIVISION EQUIPMENT DIVISION CAREERS SALES TEAM CONTACT US MSDS FORMS I ,;, ... ,,~(t.tt;:· i j . ',? ····j 'l Reeder Distributors, Inc. Mission Statement RDI is a Christian owned wholesale petroleum products distribution company who doesn't measure success by what we have accomplished but by who we are. We are a safety conscious company who emphasizes service to our customers by unifying and encouraging our employees to be the best they can be . We believe that consistent, ethical, and quality performance with our customers , venders, employees, and community will result in loyal long term relationships. Glorifying God with our efforts is our desire. . \.j http://www .reederdi stributors.com/ 10 /30/20 07 elcome to :r 1J1stri utors, Inc. Page I ot l :REEDER Gasoline Diesel Lubricants D11STRIBU TORS, 'INC. Bobtail & Transport Deliveries Main -817.429.5957 Fax -817.429.9052 HOME MISSION STATEMENT COMPANY HISTORY REEDER FLEET LUBRICANT DIVISION FUEL DIVISION EQUIPMENT DIVISION CAREERS SALES TEAM CONTACT US MSDS FORMS I 1( lt 1:/ /www.rc cd c rdi stributors .com/ 1 .. ; Our new facilities reflect our company 's progressive approach. Reeder is constantly improving in order to stay on the cutting edge of technology and to continue to provide the kind of service our customers have come to expect. It is this commitment to progress that has allowed us to become a leader in the fuel and lubrication distribution industry. Our company has just incorporated the Good Mobile Messaging technology, which will give our sales team real-time access to their e-mail, contacts and calendars. This will allow them to come to you with the most current information. 10/30/200 7 elcome to ~r Distributors, Inc . ·~--ii :REEDER DISTRI BUTORSI 1 NC . Main -817.429.5957 Fax -817.429.9052 HOME MISSION STATEMENT COMPANY IDSTORY REEDER FLEET LUBRICANT DIVISION FUEL DIVISION EQUIPMENT DIVISION CAREE RS SALES TEAM CONTACT US MSDS FORMS ..... J , .... :J -. 'j ,., .itj !1 l i i)://wwvv. rccderd is tributors.co m/ Page 1 of 1 Gasoline Diesel Lubricants Bobtail & Transport Del iv,eri es Reeder Distributors , Inc. has a fleet of the finest delivery trucks available . We want to enforce the commitment to excellence and quality to our customers. To do this , we have a fleet that incorporates the latest technology including dual pumps. We offer both transport and bobtail delivery service. Our trucks are radio dispatched and offer one of the most competitive response times in the industry. i . ,I 10/3 0/2 007 Reeder Distributors, Inc. P.O. Box 8237 Fort Worth, Texas 76124 Tel. {817) 429-5957 Ext. 324 Fax {817) 477-9611 Mob . {817) 223-7916 M s . Karen Andrews Intercon Environmental , Inc. 2214 FM 1187 , Bldg. 6 Mansfield , Texas 76063 Reeder Distributors, Inc. Employee Matrix Dear Ms. Andrews: The following are the employees that will work on the project we discussed. I have listed the emplo yees that will be involved and their areas of responsibility as well as their y ears of experience in the industry. Name Sheila Griffin Steve Renfro Wayne Kamper Job Title Tasks Performed Sales Representati ve Project Management Equip. & Install Mgr Installations Fuel Driver On Site Tech. Service Experience 10 years 10+ y ears 15 y ears If you have any questions or need any additional information, please call me at (817) 223-7916. Sincerely , Sheila Griffin 10/31/2 00 7 0 8 :2 1 FAX 8 17 4294 5 6 4 Reede r Oi s tr i butors 141 001 /003 --·-------- I Ce~fication of Contractor's Legal and Compliance History · Complete ONE of the Following Certifications Certilicat1on ;o, Legal Action Report I certify und~ penalty of law that the attached Legal Action Report detaiting Contractor's , Contractor's qfflcers, Contractor's employees , and Contractor's proposed subcontractors legal and compliance hi5tory relating to the protection of the environment was prepared under my direction or supervision il'l accordanc;e With a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manag& the ~ystem, or those persons direcfly responsib le for gathering the information, the information s4bmitted is, to th& best of my knowledge and belief, true , accurate, and complete . I am aware ~ there are significa nt penalties for submitting false Information , In cluding the possibility of ffne and imprisonment for knowing Violations I CONTRACTOR : Signature Company Name Date Title I Crifl~on ~ NO Legal Action I certify unde ~ penalty of law that the legal and compliance history of Contractor , Contractor's officers , Contracto r's employees , and Contractor's proposed subcontractors was researched under my direction or supervis ion in accordance with a system designed to assure that qualified personnel property gather and evaluate the Information submitted . Based on my Inquiry of the person or persons who manage the system , or those persons directly responsible fo r gathering the information, I ~ereby certify that no lega l aetlon relating to the protection of the environment was brought agai nst Contracto r, Contractor's office~, Contractor's employees , or Contractor's proposed subcontractors within the preceding five years . To the best of my knowledge and belief, this statement ·is true , accurate , and complete . l am aware that there are significant penaltles for submitting false infom,ation , Including the posslbl llty of fine and imprisonment for knowing violations. CONTRACTOR : ~l~i 1$Q~ Company Name . J6(31)01J Date Co~c:so.k (Dfh91 G NI 1 ~ (1 '< t:..Q.., ~ Tit le 2-28 2.8. Bonds 2.8.1 . Bidder's Bond Bids must be accompanied by a bidder's bond in the amount of five percent (5%) of the largest possible total of the cost estimate . Alternatively , the C ity will accept a cashier's check , in said amoun t, with the City named as payee , to be held in escrow until the successful Contractor signs the project contract. This bond will serve as a guarantee that th e successful Contractor will enter into an agreement with the City to perform the project. The bid bond is subject to forfeiture in the event the successful Contractor fails to execute the contract documents within 1 O calendar days after the contract has been awarded . 2.8.2 . Payment and Performance Bonds Before beginning the work, the Contractor shall be required to execute to the City of Fort Worth , a payment bond if the contract is in excess of $25,000 , and a performance bond if the contract is in excess of $100 ,000 . The payment bond is solely for the protection and use of payment bond beneficiaries who have a direct contractual relationship with the Contractor or subcontractor to supply labor or material ; and in 100% the amount of the Contract. The performance bond is solely for the protection of the City of Fort Worth; in 100% the amount of the Contract; and conditioned on the faithful performance by Contractor of the work in accordance with the plans, specifications , and contract documents . Contractor must provide the payment and performance bonds , in the amounts and on the conditions required , within 14 calendar days after Notice of Award . 2.8.3. Requ ir ements for Sureties The bonds shall be issued by a corporate surety duly authorized and permitted to do business in the State of Texas that is of sufficient financial strength and solvency to the satisfaction of the City. The surety must meet all requirements of Article 7.19-1 of the Texas Insurance Code . All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code , as amended. In addition, the surety must (1) hold a certificate of authority from the Untied States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law ; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States Secretary of the Treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion , will determine the adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the Contract be determined unsatisfactory at any time by the City, notice will be given to the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the City. 2-12 ATTACH CASHIER'S CHECK OR BIDDER'S BOND HERE 2-13 THE AMERICAN INSTITUTE OF ARCHITECTS I A/A Document 1\310 Bid Bond # ZA29121 that we KNOW ALL MEN BY THESE PRESENTS, INTERCON ENVIRONMENT AL INC <Hue insert full name and address or fepl title of Contractor) TEXAS as Principal, hereinafter called the Principal , and ARCH INSURANCE COMPANY (Here insert full name and address or legal title of Surety) 3 Parkway, Suite 1500 , Philadelphia, PA 19102 a corporation duly organized under the laws of the State of MISSOURJ as Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF FORT WORTH (Here ins ,m lull name and address or lepl llrle of Owner) TEXAS as Obfigee, hereinafter called the Obligee, in the sum of FIVE PERCENT OF THE BID AMOUNT Dollars ($ TBD ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for DEM 07-12: APT {Here inserr full name, address and descriplion of pro;ecO VILLA DEL RIO & OAK HOLLOW APARTMENT COMPLEXES NOW, THEREFORE, if the Obllgee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obllgee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 19TH day of OCTOBER 2007 INTERCON ENVIRONMENT AL INC ..,,_~__,=Q...: _ __,c::__===· '-,,Q_J::=(W=i=tn=es::s,:: _______ (RCH INSURANCE COMP ANY AIA DOCUMENT A31D , BID BOND • AJA ~ • FEBRUARY 1970 ED • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y . AVE ., N.W., WASHINGTON, D. C. 20006 (Seal) (Seal) 1 POWER OF ATTORNEY Know All Men By These Presents : That the Arch Insurance Company , a corpo ration o rganized and existing under the laws of the State of Missouri , having its principal office in Kansas City , Missouri (hereinafter referred to as the "Company") does hereby appoint William A Bailey , Maria A Gonzalez , Anne M . Barber and Michael J. Friedrich of Bridgeview , IL (EACH ) its true and lawful Attorney(s)-in-Fact , to make , execute , sea l, and deliver from the date of issuance of th is power for and on its behalf as surety , and as its act and deed : Any and all bonds and undertakings EXCEPTION NO AUTHORITY is granted to make, execute , seal and deliver bonds or undertakings that guarantee the payment or collection of any promissory note , check, draft or letter of credit. Th is authority does not permit the same obligation to be split into two or more bonds in order to bring each such bond within the dollar limit of authority as set forth herein. The Company may revoke this appointment at any time . The execution of such bonds and undertakings in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes , as if the same had been duly executed and acknowledged by its regularly elected officers at its principal office in Kansas City, Missouri. This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on March 3, 2003, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect "VOTED, That the Chairman of the Board, the President, or any Vice President, or their appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys-in-fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto , bonds and undertakings , recognizances, contracts of indemnity and other writings, obligatory in the nature thereof , and any such officers of the Company may appoint agents for acceptance of process " This Power of Attorney is signed, sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of Directors of the Company on March 3, 2003 : VOTED, That the signature of the Chairman of the Board, the President. or any Vice President, or their appointees designated in writing and filed with the Secretary, and the signature of the Secretary, the seal of the Company, and certifications by the Secretary , may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on March 3, 2003, and any such power so executed , sealed and certified with respect to any bond or undertaking to which it is attached, shall continue to be valid and binding upon the Company . OOML0013 00 03 03 Page 1 of 2 Printed in U.S.A. In Testimo ny Whereof , the Company has caused th is i ns tr ument to be signed and its corporate seal to be affix ed by the ir au thorized officers . this 13th day of February , 20_0_6 __ Arch Insurance Compan y Attested and Certifi ed ,. Martin J . Nilsen , Secretary STATEOFNEWYORK SS COUNTY OF NEW YORK SS I Peter J. Calleo, a Notary Public . do hereby certify that Edward M. T itus and Martin J. Nil sen persona ll y know n to me to be the same persons whose names are respectively as Vice President and Secretary of the Arch Insurance Company , a Corporation organ ized and exist ing unde r the laws of the State of Missouri, subscribed to the foregoing instrument. appeared before me th is day in person and severally acknowledged tha t they be ing thereunto du ly authorized signed , sealed with the corporate sea l and de livered the sa id instrument as the free an voluntary act of sa id corporation and as thei r own f ree and voluntary acts for the uses and purposes therein set fo rth . n ~-. -...... PETERJ.CALLEO,ESQ. Notary Public , State of New Y.:>rk No. 02CA6109336 O t · :lifi ed i n New York County CERTIFICATION C omm i ssion E x pires May 3 , 200a I , Martin J. Nilsen, Secretary of the Arch Insurance Company , do hereby certify that the attached Power of Attorney dated on behal f of the person(s ) as listed above is a true and correct copy and that the same has been i n full fo rce and effect since the date thereof and is in full force and effect on the date of th is certificate ; and I do further cert ify that the said Edward M. Ti tus , who executed the Power of Attorney as V ice President, was on the date of execution of the attached Power of Attorney the duly elected Vice President of the Arch Insurance Compa ny. IN TESTIMONY WHEREOF . I have hereunto subscribed my name and affi x~d the corpora \1: sea l of the Arch Insurance Compa ny on this 19th day of OCT, 2007 , 20 __ . · f>·, , . < ~/ ; 1,0 .,.. 7 .}'_,.,/ · } ,/ :.,(,t..:,·i..,.~-~Y~· c.t t.---·· /. :/ Martin J ;N ilsen , Secretary This Power of Attorney lim its the acts of those named there in to the bonds and undertakings specifically named therein and they have no authority to b ind the Company excep t in the ma nner and to the extent herein stated . PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Surety 3 Parkway , Suite 1500 Philadelphia, PA 19102 OOML0 01 3 00 03 0 3 Page 2 of 2 Print ed in U.S.A. 2.9. Minority and Women Business Enterprise (M/WBE) Utilization Requirements An M/WBE goal of 26 percent has been established for this contract. Contractors shall make a good faith effort to subcontract with or purchase supplies from M/WBE firms. Contractors shall meet or exceed the stated goal or submit documentation of good faith effort for all applicable contracts to permit a determination of compliance with the specifications . M/WBE documentation consists of the Special Instructions To Bidders , the Subcontractor Utilization Form, the Prime Contractor Waiver Form, the Good Faith Effort Form, and the Joint Venture Form . Copies are provided in Appendix A -M/WBE Forms. 2.9.1. If Contractor equals or exceeds the project goal, they must submit the Subcontractor Utilization Form or the Joint Venture Form . 2.9.2. If Contractor does not have subcontracting and /or supplier opportunities , they must submit the Prime Contractor Waiver Form . 2.9 .3. If Contractor has subcontracting and/or supplier opportunities but does not include M/WBE participation in an amount which equals or exceeds the project goal, they must submit the Subcontractor Utilization Form and the Good Faith Effort Form and documentation. 2 .9.4 . If Contractor has subcontracting and/or supplier opportunities but does not include any M/WBE participation, they must submit the Subcontractor Utilization Form and the Good Faith Effort Form and documentation . All M/WBE firms must be currently certified or in the process of being certified by the North Central Texas Regional Certification Agency (NCTRCA), or Texas Department of Transportation (TXDOT), Highway Division and located in the nine county marketplace (Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall). For the purpose of determining contract compliance under the M/WBE ordinance, businesses listed as MBE or WBE within the Utilization Plan must be certified as such prior to a recommendation for award being made to the City Council. Contractor shall submit the Subcontractor Utilization Form and/or the Good Faith Effort Form or the Prime Contractor Waiver Form, or the Joint Venture Form ("and documentation") as appropriate. The Environmental Management Department must receive the documentation no later than 5:00 p.m., five City business days after the bid opening date, exclusive of the bid opening date. Contractor shall obtain a receipt from an employee of the Environmental Management Department. Such receipt shall be evidence that the City received the documentation. The submission of the applicable completed form(s) within the allotted time will be considered when determining the responsiveness of the bid. Failure to comply with the bid specifications, inclusive of the M/WBE requirements and documentation, shall render the bid non-responsive. The Good Faith Effort documentation shall demonstrate the Contractor's commitment and honest efforts to utilize M/WBE(s). The burden of preparing and submitting the Good Faith Effort information is on the Contractor and will be evaluated as part of the responsiveness to the bid/proposal. A Contractor who intentionally and /or knowingly misrepresents facts on the documentation submitted will constitute a basis for classification as non-responsive and possible debarment. 2-14 NOTE: Complete M/WBE requ irements are contained in City of Fort Worth ordinance 15530 , Minority and Women Bus iness Enterprises . Questions about M/WBE requirements may be directed to the City 's M/WBE Business Office at 817 .392.6104. Check the appropriate box/boxes : lxl The following M/WBE documents are included in this bid submittal , following this page , bound within the response : V Subcontractor Util ization Fo r m -- Joint Venture Form --- Prime Contractor Waiver Form --- v::::: Good Faith Effort Form 0 M/WBE documents will be delivered to the Environmental Management Department* no later than 5 :00 p.m., five City business days after the bid opening date , exclusive of the bid open ing date . c~ Si nature Karen Andrews Name President Title Intercon Env ironmenta l . I n c . Company 11 /1 /07 Date The Environmental Management Department's Administrative Offices are located in the City Hall Annex, 908 Monroe Street, f h Floor, Fort Worth, Texas 76102. The Department's mailing address is 1000 Throckmorton, Fort Worth , Texas 76102 . 2-15 FORT WORTH ~ City of Fort Worth Subcontractors/Suppliers Utilization Form ATTACHMENT 1A Page 1 of 4 PRIME COMPANY NAME: C heck applicable block to describe prime Intercon Environmental, Inc. PROJECT NAME : XI M/W/DBE I I NON -M/W/DBE Re mov al o f Asbesto s Co n t a i n i ng Materials & Demolit ion o f S tru c t u re s BID DATE at the Vi ll a Del Rio & Oak Ho llo w Apartment Complex es 11 /1 /0 7 City's M/WBE Project Goal: Prime 's M/WBE Project Utilization : PROJECT NU MB ER 26 % 7 .37% DEM 07-12: APT Identify all subcontractors/suppliers you will use on this project Failure to cqrnpi~t r (ti1s ·f6rf'!';''1h"\tils . ~i;iHr~w (f w· este~}qoc'Gmef\tatlcf11 ; arid received by the Managing Oep9~:11)ent:9n ·Or;,QefqrE3 5:dp, . ... ,, .. J )if9 :-Plfl §lfl~~~/9~,YS a~er. bid opening , exclusive ofbid opening date, will result iri :the bra 1b§lng{cb~si :~~f;?o'nsiv~rto%,itPs:peci~fati6frs. . " · . ,. ·, ~n • •;·; ·~ -~ >:H~ , .. •-' f K~ undersi~n .ff~?6f !1fi g'r . .. .. ~n .. \ ''f\f;;ttith the 'M/WBE firm(s.) listed in this utilization· .sohec:i11le~, conciitipi,~cl ]:µ:pop1 '.'~xecu.1 t :~ith :tfle City of Fort Worth . The .intentional and/or 'knowini{mi.srepresen t~fron i of f?9ts '-:i~rfgtsotti[l: · ,S ., <liF·CO!itSide f:atio frofdisqualification and will result in . the bid being -coriside r~Gl non-F8SJ)Orts1ve t p't5id :s~ecifi:catfpr;i's )dt:f,i: . '' .. M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson , Collin , Dallas , Denton , Ellis , Kaufman and Rockwall counties . ldentify 'eadj'Tier ,,i:eveI;'/;Tietis··thiiev~(of'· pril'he contractor to'a':~p,qcoptf~ptoi-. · . ong1de :n1:fa ·'',·•>h l' eJ~~f i:f:i'e p rimf cori.tra.cfor , i.e .,.adirect payment from the yme'rff t y•a s tibc ontrac.torto its supplier is Considered 2nd ::"/'.tr·~:/· .;,,:,·. :;,, ·'·· tier · ··· · · ·· · · ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AW ARD. Certification means those finns , located or doing business at the time of bid opening within the Marketplace , that have been detennined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency {NCTRCA), or the Texas Department of Transportation (TX DOT), highway division . Disadvantaged Business Enterprise (DBE ) is synon ymous with Minority/Women Business Enterprise (M/WBE). [f hauling services \a.fe ,utiHteii flne '.pfi iy~#':cti~~jt •iEis !J On:g ja.sth~M/WBE listed owns and operates at least . one full Y licensed '.and ,;operat iQn a:l;'trµ . ·.. d[·Qll' the >cenctract! The M/WBE may lease trucks from another M/WBE firm ;including'~If owrier:,. .. ' .:'and;'r~cei Y¢fglJ.MAyBEcied,it. The M/WBE may lease trucks from non-M/WBEs ; including owner--operators, butwi1Ion:1y ,receive l credit for :the fees and commissions earned by the M/WBE.as outl ined fo the lease eement ; .. .. . .... Rev . 5/30/03 A TI AC HMEN T 1 A Pag e 2 of 4 Pri mes are required to identify ALL su bcontractors/su ppliers, regardless of status ; i.e., Minority , Women and non-M/WBEs. Please list M/WBE firms fi rst, use add itional sheets if necessary . SUBCONTRACTOR/SUPPLIER Company Name Address Telephone/Fax CBA Services, Inc . 5877 Barnett, Ste A Krum, Texas 76249 940-482-9900 940-482-3457 Fax Certification (ch e ck one) r-~--~-- i N T e M WC X iM rs BT g ::., 1 E E ~ T .E A X X Deta il Subc ontracti ng W ork Asbestos Hauling Tomas Reyes Trucking, Inc . 1 X 3529 Peoria Street X Demolition Debris Ha uling Dallas, Texas 75212 214-631-2711 214-905-7565 Fax Aloha Environmental, LP P.O. Box 820584 Fort Worth, Texas 76182 817-348 -9901 817-348-9901 Fax Reed Hydromulching , Inc. P.O. Box 477 Blooming Grove, TX 76626 817-548-9120 903-695-2275 Fax Kohler Rental Power , Inc. 1100 Avenue S Grand Prairie, Texas 75050 972-206-7070 972-206 -7071 Fax Reeder Distributors, Inc. P.O. Box 8237 Fort Worth , Texas 76124 817-429-5957 X 324 81 7 -477-9611 1 X Portable Toilets 1 X Hydro Mu l ching 1 X Generator Rental 1 X Fuel Supplier Detai l Suppli es Purcha sed Dolla r Amo unt $50,00 0 .0 0 $60,000 .0 0 $ 1,200.00 $25,620.00 $ 6,000.00 $25,000.00 Rev. 5/30 /0 3 FORT WORTH ·---.,...-- A TIAC HME NT 1A Pag e 3 of 4 Prim es are re quired to id en tify ALL subco ntractor s/supp liers, regardl es s of status ; i.e., M inority , Women an d no n-M/WBEs . Please list M/WBE firm s fir st, use addit ional sheets if necessary. I! Certification (check one) SUBCONTRACTOR/SUPPLIER T If Iii Detai l Detai l Company Name i N T Address e M w C X S ubcon t rac t ing Work Suppl ies Purchased Dollar Amount Telephone/Fax r B B T D R 0 II:1 ' E E C T A l 'L Rev . 5/3 0 /03 FORT WORTH ~ Total Dollar Amount of M/WBE Subcontractors/Suppl iers Total Dollar A mount ofNon-M/WBE Subcontractors/Suppliers $ $ 11 0,000.00 5 7,8 20 .00 ATTACHMENT 1A Page 4 of 4 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 16 7 ,8 20 .00 The Contractor wHl nof~::rlce adcl1tions,• d~l~tjons ,·:'t>r}§t:1bst itu~{~@ :eto ithlfcettified/y.it without the prior approval of the Minority,and WgmenBusiness .. , ·se Office·M ... ·y •. r ,ox:de§i gne:e ilfr~ugh thesµbmittal of a Request for Approval o . Ctiange/,4dtlitioi(;.Any'+fuJustifi .·· . , ,,.,, ,,,,, eri.a.l .• h of;Qoiitract and may result in debarment in accord with 'the '.procedurtj s ':o:u '. l ..... ''"', inan~ , ' . '·., ctor ' . f sut>;mj(a detailed exp·l~nation of how the requeste<l change/~ddition or delefi , ... m:.atfectfhe ;co1Jllilitted MI WB.E goal. If the detail explanation is not submjtted, it wlll affeotthe final .comp[ifurcedeterrnination.t> . . .. . . ...... . . ' By affixing a signature to this form , the Offeror further agrees to provide, directly to the City upon request , complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books , records and file s held by their company. The bidder agrees to allow the transmission of interviews with owners , principals, officers , emplo y ees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City . An y intentional and /or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal , State or Local laws concerning false statements . Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from parti cipating in City work for a period ohime not less than one (1) year. President Title Intercon Environmental, Inc. Company Name 2214 FM 1187, Bldg 6 Address Mansfield, Texas 76063 City/State /Zip Karen Andrews Printed Signature Contact Name!fitle (if different) 817-477-9995 / 817-477-9996 Telephone and/or Fax karen@intercon-environmental.com E-mail Address 11/1/07 Date Rev . 5/30/03 NCTRCA . Disadvantaged Business Enterp:rise Certification Disadvantaged Business Enterprise ·sU-.• ~ ••I~ ~0 ·~. has filed with the Agency an Affidavit as defined by 49 CFR part ·26 and is hereby, certified toprovide service(s) in .the following areas: 562910 ; Asbestos Contractor and Removal: Remediation SeNices; August 2007 This Certification is v~Jid beginning and superse ded any registration or listing . previously issued. This certification must be updated annually by submission ofan Annual Update Affidavit. At any time there is a change in ownership or control. of the firm, notification must be made immediately to the North Central Texas Regional Certification Agency or an TUCP certifying enti t y. August 08 Certificate expirstion 20 -----------'' -- Certification Administrator lssued date August 2.fJ? ---------------' -- CERTIFICATION NO. W FD834659Y0808 FORT WORTH --,, . Ci ty of Fort Worth Good Faith Effort Form PR IME COMPANY NAME : Intercon Envi ronmental, Inc . R emoval of Asbestos Containing Materials & PROJECT NAME:Demoli tion of Structures at the Villa Del Rio & Oak Hollow Apartment Complexes City's M/WBE Project Goal : I PROJECT NUMBER 26 % DEM 07 -12: APT ATTACHMENT 1C Page 1 of 3 Check applicable block to descri be prime xi M1W1o s E I I NO N-M/W /DBE BID DATE 11/1/07 If you have J ailed to secure .M/\\'EJE i:>articipatio11 ar,cl jy~~·hav~ su~co:r:,tracUng and/or supplier opportunities or if your DBE participation -is less than the City's pr()ject goal/)•ou must complete .this form :• If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and /or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete ·t_his for.m , hi . its e_ntirety with' supporting documentation , and received by the Managing Department on or beforeS:<>O, p,m '.five :(s) .CiW b'.u~in.ess days after bid opening, exclusive of bid operling date, will resulUl'i the bic'I b~ing considered non~responsive to bid specifi.cations. 1.) Please list each and every subcontracting and /or supplier opportunity} for the completion of this project, regardless of whether it is to be provided by a MJWBE or non-M/WBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2nd tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Asbe s to s Was t e Ha u lino Fue l Supp l i ers Dem ol ition Debris Hau l inq Po rtable To ilet Rental Hv dro Mulch Generator Rental Rev. 05/30/03 ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than three (3) months old from the bid open date) list of M/WBE subcontractors and /or suppliers from the City's M/WBE Office . _X_Yes No Date of Listing -1.Q__/ 3 /~ 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed , at least ten ca l endar days prior to bid opening by mail , exclusive of the day the bids are opened? _X_Yes (If yes , attach M/WBE mail listing to include name of firm and address and a dated copy of letter mai l ed .) No 4.) Did you solicit bids from M/WBE firms, within the subcontracting and /or supplier areas previously listed , at least ten calendar days prior to bid opening by telephone , exclusive of the day the bids are opened? X __ Yes (If yes, attach list to include name of M/WBE firm , person contacted , phone number and date and time of contact.) No NOTE: A facsimi.le . may be .. used t9 comply with eith¢r,3 Or4, butmay not be used for both. If a facsimile is used,attach the fax .cohfirrnatie>11, Which is to · pfoxide M/WBE name, date, time, fax number and documentation.taxed.\.· · ..... , .s · .... <c ... NOT~: . If the\list ot.Nf/WE4Es f 9r a particµl~r sLJ~cot,ifi\ac(iffgYs1,fpplier 'c)pportunity is ten (1 o) or less, the bidder must coniact the ~ntire ;'l i;;t J <> 1>~:irj\c<>n,plJa@eyY'ifl]:q uestiorys 3 and 4. If the list of M/WBEs for a particular suocontracttng/~UPPM f . opporturilty j s ,.tenr{1of o f.;111<>re, the. bi.dd.er must contact at · ,east two- thirds . (2 l 3f ·of!the list Withjn such 'ar.e'a:of ·oppcirtuhityt but·nof less than ten to be in compliance with questions 3 °arid 4 : · ·. ··· · · ·· ·· ·" ·. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? X Yes __ No 6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection Ricochet Fuels 817-268 -5910 S am Brett Fuel Not Best Va l ue Cen-Tex Seeding, Inc. 817 -3 0 6-8510 Jeanee Sebik Hydro Mul ch Not Best Va l ue Dickey Landscape Cont. 817 -244-4800 John Dickey Hydro Mulch Not Best Value Hydromul ch Services 972-423 -4265 S usan Richmond Hydro Mul ch Not Best Value J -R Transport Cont . 817 -800-0468 Berlin Stoute Demo Hauli ng Not Best Value Ted Alvarez Trucking 972-572-7433 Ted Alvare z Demo Hauling Not Best Va lue Trucking & Const. Co. 817-558-0 525 Cindy Cornish Demo Hauling Not Best Va lue Mike's Trucking, I nc . 214-905-9202 Rau l Ta rango Demo Hauling Not Best Value Re v. 05/30 /03 ADDITIONAL INFORMATION: ATTACHMENT 1C Page 3 of 3 Please provi de additional information you f eel will further expla i n your good and honest efforts to obta i n M/WBE participation on this project. After obtaining the list of M/WBE subcontractors from the City's M/WBE Office on 10 /3 /07 , Keith Flowers, Intercon Demo Sales , & Bob McFadin, Demo Sales Manager telephoned each company on the list. In a few instances the phone and f a x numbers were not current; Mr. Flowers & Mr. McFadin che cked www .y e llowpages.com in t h e att e mpt to attain the correct number . Every endeavor was made to contact each subcontra ctor on the list . The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowi ng misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offerer and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by the)ity's M~E O~ice. ~ Ao .,1 ,..__l ~ Karen Andrews A~~nature -P~ri=n=te~d=S=i-g=na=t=u=rec..=.,.'-=-~~~~~~~~ President Title Intercon Environmental, Inc. Company Name 2214 FM 1187, Building 6 Address Mansfield, Texas 76063 City/State/Zip Contact Name and Title (if different) (817)477-9995 (817)477-9996 Phone Number Fax Number karen@intercon -environmenta1.com Ema i l Address 11/01/07 Date Rev. 05/30/03 MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 1 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/3/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work requ ired on City contracts . The City, therefore , will not guarantee , recommend or give warranty or other assurances as to the competency and /or fitness of certified M/WBE firms. At the present ti me , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City . These listings undergo continual revisions . The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace , prior to AWARD of the contract. The marketplace area includes the counties of: Tarrant, Parker, Johnson , Collin , Dallas, Denton , Ellis , Kaufman and Rockwall . Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change(s ) and/or questions. If a certified vendor's name does not appear on the listing(s), please call the M/WBE Office to verify. NOTE: An Offeror will be given credit toward the M/WBE goal only when the M/WBE supplier performs a commercially usefu l function. A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer. As defined in City Ordinance 15530, a Regular Dealer is a firm that owns , operates , or maintains a store, a warehouse , or other establishments in which the materials or supplies required for the contract are bought, kept in stock , and are regularly sold retail or wholesale. A Manufacturer is one that manufactures a product by hand or machinery suitable for uses ; the process of making wares . It is the responsibility of the Offeror to assure that the M/WBE supplier it list toward meeting the stated contract goal, also meet the City's requirements for a Manufacturer or Regular Dealer . M/WBE CONTRACTORS SIC LISTING FOR 495301 : HAZARDOUS WASTE TRANSPORT, DISPOSAL v<:RK Waste Haulers , Zuebonnet Waste ~BA Services, Inc. Inc Control, Inc. Marcus Knight Miguel Gonzales 525 South Sixth Avenue 1600 Singleton Boulevard Mansfield , TX 76063-Dallas , TX 75212 2309 PH : (214) 748-5221 PH : (817) 831-0964 FX : (214) 7 48-6886 FX : (817) 477-4787 lynnel@bluebonnetwaste.com arkwaste@aol .com Jana Osborn 5877 Barnett Road , Suite A Krum , TX 76249 PH: (940) 482-9900 FX : (940) 482-3457 janaosborn@hotmai I. com ~entury Disposal, Inc. ,,/,,..,,. / 1/i Empire Disposal, Ltd Sandra McGlothlin ~reen Planet, Inc. Glen White P.O. Box 250583 Plano , TX 75025 PH: (254) 554-3433 FX: (254) 554-3663 centurydisp 1@aol.com v('Knight Waste Services, Ltd. Richard Knight 525 South Sixth Street Mansfield , TX 76063- 2309 PH : (817) 477-2260 5301 Sun Valley Drive Fort Worth , TX 76119 PH : (817) 478-1288 FX : (817) 985-0512 sandra@empiredisposal.com / v{Response Remediation Services Company Mahesh Chandiramani 1701 North Greenville Avenue , Suite 503 Richardson , TX 75081 PH : (972) 907-8772 FX : (817) 477-4787 richard@knightwaste.com FX : (214) 722-0553 mpc@rrsc.us Virginia Belmore P.O . Box 743966 Dallas , TX 75374 PH : (972) 636-1515 FX: (972) 636-3948 vbelmore@greenplanetinc.com http ://www.fortworthgov.org/ app licati ons/mwbe _ siccode/Defa ul t.aspx I 0/3/2007 City of Fort Wo rth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response ARK Waste Haulers, Inc . 525 South Sixth Ave Mansfield, TX Invalid number. No listing on yellow 76063 Marcus Knight 817 -831 -0964 10/09/07 2 :45 PM pages .com Bluebonnet Waste Control, Inc . 1600 Singleton Blvd . Dallas, Laurel advises fax received and they TX 75212 Miguel Gonzales 214-748-5221 10/09/07 2 :52 PM are i nterested . CBA Services, Inc. 5877 Barnett Road, Suite A Krum , TX 762 4 9 Jana Osborn 940-482 -9900 10/09/07 2 :55 PM Jana Osborn to send quote . Century Disposal, Inc. P.O . Box 250583 Plano, TX Invalid number. Listing on yellow 75025 Glen White 254-554-3433 10/09/07 2:56 PM pages .com is not same company. Empire Disposal, Ltd . 5301 Sun Valley Drive Fort Wort, TX 76119 Sandra McGlothlin 817 -478 -1288 10/09/07 2:57 PM Leo advises he will look at this project. Green Planet , Inc . P.O. Box 743966 Dal las, TX 75374 Virginia Belmore 972-636-1515 10/09/07 3 :00 PM Pe r Virginia , no t in t erested . Knight Waste Services, Ltd. 525 South Sixth St r eet Mansfield, TX Per Richard Knight, does not do roll off 76063 -2 309 Richard Knight 817 -477 -2260 10/09/07 3 :10 PM work. Respon se Remediation Services Company 1701 North Greenville Ave ., Suite 503 Richardson, TX 75081 Mahesh Chandiramani 972-9 0 7-8772 10/09/07 3 :11 PM Per And y, no roll off work. City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response Both fax# and telephone# invalid . ARK Waste Haulers, Inc. 525 Considered to be out of business. No South Sixth Ave Mansfield, TX listing in yellowpages .com . Did not mail 76063 Marcus Knight 817 -477-4787 10/09/07 12:56 PM 1TB . Bluebonnet Waste Control, Inc. 1600 Singleton Blvd . Dallas, TX 75212 Miguel Gonzales 214-7 48-6886 10/09/07 12 :58 PM 1TB faxed. CBA Services, Inc . 5877 Barnett Road, Suite A Krum, TX 76249 Jana Osborn 940-482-3457 10/09/07 1:00 PM 1TB faxed. Century Disposal, Inc . P.O. Box 250583 Plano, TX Invalid number. Listing on yellow 75025 Glen White 254-554-3663 10/09/07 1 :01 PM pages .com is not same company. Empire Disposal, Ltd . 5301 Sun Valley Drive Fort Wort, TX 76119 Sandra McGlothlin 817-985-0512 10/09/07 1:02 PM 1TB faxed. Green Planet, Inc. P.O . Bo x 743966 Dallas, TX 753 74 Virginia Belmore 972-636-3948 10/09/07 1:04 PM 1TB faxed . Knight Waste Services, Ltd . 525 South Sixth Street Mansfield, TX 76063-2309 Richard Knight 817-477-2260 10/09/07 1:05 PM Invalid number. Mailed 1TB . Response Remediation Services Company 1701 North Greenville Ave ., Suite 503 Richardson, TX 75081 Mahesh Chandiramani 972-907-8772 10/09/07 1:06 PM 1TB faxed . ENV I RONMENTAL , I N C. 214 FM 1187 . Bu ildi ng 6. Mansf i e l d , Texa s 7 6063. Telephone (8 17 ) 477-9995. Facs i mi l e (817) 477-9996 ww w . i n te r co n-envi ro n m e nt al .com Request for Subcontractor Bids PROJEC T Company ARK Waste Haulers , Inc City of Fort Worth Contact Marcus Knight Bid No . DEM 07-12: APT Address 525 South Sixth Ave. Removal of asbestos containing materials and Mansfeld, TX 76063 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd ., Ft. Worth, TX 76111 Phone 817-831-0964 1"-.An I;!. Bids are Due 10/24/07 Fax 817 -4 77 -4 787 jjr,.,.J, ,:#--Time 10:00 AM E-mail arkwaste@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos conta ining materials (AC M) and the demolition of all structures present at the fonmer Oa k Holl ow an d Villa De l Rio Apartment comple xes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hau ling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refriqerant Recovery and Recyclinq X Bulb and Ballast Recyclinq and Disposal Soi l Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil T estinq/analysis Plans and/or specifications are available for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield , Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax (Results 1 -14 of 14)-Ark Waste Haulers Inc. Ft Worth TX -Simple Search-MSN Ye ... Page 1 of 2 Search Results for Ark Waste Haulers Inc. I Show Online Product Results Business names containing Ark Waste Haulers Inc No Exact Matches Found for Ark Waste Haulers lno . The closest matches are sort ed by deg ree of ma tch below Send us your~ to help improve our sea rch results All Listings Report Incorrect Listings > 64% 0 B Fi Fort Worth , TX 76117 phone map 64% O Arlington City· Departments Community Services Department Fort Worth , TX 76102 64% http://www .duncandisposal .com more info phone map Larry's Construction Cleaning & Hauling Service Services: Hauling http ://www .larryshaulingservice .co m more info phone ··emai 64% 0 TMC Hauling 64% Fort Worth , TX 76119 phone map Hornsby Hau ling http ://www .hornsbyhauling .com --.~---~--····-more info phone email 64% CJ Todd's Hau ling Service Services: Hauling 5450 boca bay dr #632, Fort worth , T X 76112 more info _pho ne _ emai l 64% D North Richland Hills City -Garage Services-Laidlaw 6100 Elliott Reeder Road . Fort Worth , TX 76117 http ://www.trinitywaste .com more info phone map 64% D Allied Waste Services -Customer Service 6 100 Elliott Reeder Road , Fort Worth , TX 76117 phone map 64% U Service Waste Inc 2301 Hemphill Street , Fort Worth , TX 76110 more info phone map Be the first to &!lti\ Be the firs t to !lJfil...ll Be the firs t to !lJfil...ll Be the firs t to &!lti\ Be the first to &!lti\ Be the first to &!!tit Be the firs t to Rate II Be the first to !lJfil...ll Be the firs t to~ Results 1 -14 of 14 Featured Sites http ://yellowpages.superpages.com/listings.jsp?STYPE=S&search=Find+It&SRC=msn&c ... 10 /9/2007 (Results 1 -14 of 14) -Ark Waste H aulers Inc. Ft Worth TX-Simple Search -MSN Ye ... Page 2 o f 2 63 % Young Remodeling PBA: A Key Solutions Services: Hauling Fort Worth , TX 76140 http://www .youn gremodeling .com more info phone email 63% Q lesi Texas Co rpo ration 4001 Old Denton Road , Haltom City , TX 7611 7 http ://www .ies i.com more info phone map 63% O Independent Environmental Service 4001 Old Denton Road , Haltom City , TX 76117 f)hone map. 63% Qi) Empire Dispo sa l Inc 5301 Sun Valley Drive , Fort Worth , TX 76119 ~.ho.ne map 63% £ti Arlington Disposa l 1212 Harrison Aven u e, Fort Wort h , TX 76102 http ://www .duncand isposal .com more info phone m.ap Data by Acxiom.Copyrig ht (tl2007 , Acxiom. In c Be the firs t to~ Be the first to~ Be the first to~ Be the firs t to~ Be the first to~ Report Incorrect Li sti ng s > Have a Business ? Want More Customers? Find them here. Powe r~dby superpages .com MSN privacy Legal Advertise RSS Results 1 -14 of 14 Feedback Help © 2007 Microsoft I http ://yellowpages. sup erp ages. com/list ings .j sp ?S TYPE=S&search= Find+ I t&S R C=msn &c ... 1 0/9 /200 7 ENV I RONMENTAL , INC. 214 F M 1187, Buil d ing 6, Mansfield Texas 76063 , Telephone (817 ) 477-9995, Facsimile (817) 477-9996 www .i n t e rcon-e n vi ron menta I .com Request for Subcontracto r Bids PROJECT Company Bluebonnet Waste Control, Inc. City of Fort Worth Contact Miguel Gonzales Bid No. DEM 07-12: APT Address 1600 Singleton Blvd. Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-748-5221 Bids are Due 10/24/07 Fax 214-748-6886 Time 10:00 AM E-mail lynnel@bluebonnetwaste.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos conta ining materials (ACM) and the demol ition of all structures present at the former Oa k Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo l ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air MonitorinQ UST Removal Soil TestinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::,::t lI I ' lC, F'EF'C'F'T YOUR LOGO YOUR rn x NO. Oct. 09 2007 12:56PM INTERCON-ENVIRONMENTAL INC 817-842-1710 NO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 12147486886 Oct.09 12:56PM 00'34 SND 01 OK TO TrnN CFF ~T, PRESS 'l"BIJ' 004. Tl-EN SELECT Cf"F BY US It£ ' +' ffi ' -' . Fffi FAX ~f'.O:: ASSIST,=t,CE, PLEASE o:t...L 1-800-t-ELP-FAX (435-7329). ENVIRONMENTAL, INC. 214 FM 1187, Bu il ding 6, Man sfie ld Texas 76063. Tele phone (8 17 ) 477-9995. Facsimile (817 ) 477-9996 www. i ntercon-environ mental .com Request for Subcontractor Bids PROJECT Company CBA Services, Inc. City of Fort Worth Contact Jana Osborn Bid No. DEM 07-12: APT Address 5877 Barnett Road Removal of asbestos containing materials and Suite A demolition of former Oak Hollow & Villa Del Rio Apts. Krum, TX 76249 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 940-482-9900 Bids are Due 10/24/07 Fax 940-482-3457 Time 10:00 AM E-mail janaosbom@hotmail.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos conta ining materials (ACM) and the demolition of all structures present at the forme r Oa k Hollow and Villa Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 . Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '=,El ff 1 l i fi F'EF'C:IF'T OTHER FACSIMILE 19404823457 YOUR LOGO YOUR FA X NO. Oct. 09 2007 12:59PM INTERCON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oc t.09 12:58PM 00'44 SND 01 OK TO Tl.RN CFF REPCRT , PRESS 'f'EtU ' 004. TI-EN SB..£CT ci.F BY USII£ '+' rn '-'. Fffi FAX ~PG: ASSISTi::N:E , PLEASE O:::U. 1-EHHEL.P-FAX (435-7329). ENVIRONMENTAL, INC. 214 FM 1187. Bu il ding 6 . Mansf ie ld Texas 76063 . Telephone (8 17 ) 4 77-9995. Facsimi le (817) 477-9996 www . i ntercon-env i ronmental .com Request for Subcontractor Bids PROJECT Company Century Disposal, Inc. City of Fort Worth Contact Glen White Bid No. DEM 07-12: APT Address P .0. Box 250583 Removal of asbestos containing materials and Plano, TX 75025 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 254-554-3433 Bids are Due 10/24/07 Fax 254-554-3663 P,,, ) I!:. Time 10:00 AM E-mail centurydisp1@aol.com Location Our Office Method Fax, E-mail , US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbest os containing materials (ACM ) and the demolition of all structu res present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax century disposal inc in Plano TX -YELLOWPA GES .COM Page 1 of 3 YELLOWPAGES.COM Home > Plano > Name Search • century disposal, inc . We found 2 businesses for "century disposal , inc ." in Plano TX and the surrounding area . You ca n refine you r search by se lecting Narrow By City below. Century Disposal Inc . Serv ing the Plano Area (214) 360-0630 Century Disposal Inc 5101 Mercanti le Row Da ll as , TX 75247 Ma p (214) 360-0630 Check Our Website For A Location Near You * * * * * Rev iew This Business ! Rate it I Read Reviews More Opti ons ***** Review Th is Bus iness ! Rate it I Read Reviews More Opti ons Visit Web Site RELATED BUSINESSES North American Shredding .... ~ ... ~ Serv ing Your Area (866) 946-6602 More Info I Web Sit e Iron Mountain Secure Shredding Serving Your Area (877) 737-4123 More Info I We b Site Shred-It Serving Yo ur Area More Info I Web Site http ://www.yellowpages.com/name/Plano -TX/century -d isp osal -inc?w= 1 &t=century+dis p ... 10/15/2007 century disposal inc in Plano TX -YELLOWP AGES.COM -Serving Your Area (800) 215-0260 Page 2 of 3 More Info I Web Site Shred Nations SH RED NATIONS Serving Your Area (877) 291-6876 More Info I Web Site Cut 2 Shreds Serving Your Area (214) 354-9000 More Info I Web Site Vista Fibers 9233 Denton Dr Dallas , TX 75235 (214) 366-3800 More Info I Web Site Corrugated Services LP -' 2920 E Randol Mill Arlington , TX 76011 (817) 640-3111 More Info I Web Site Corporate Relocation Inc. 4117 Billy Mitchell Dr Addison, TX 75001 (469) 568-5900 More Info I Map It Shred Document Destruction http://www.yellowpages .com/name/Plano-TX/century-disposal-inc?w=l &t=century+disp... 10/15 /2007 century disposal inc in Plano TX -YELLOWPAGES.COM Part of the new at&t © 2007 YEL LOWPAGES .COM LLC . All rights reserved . Page 3 of 3 13921 Senlac Drive Dallas , TX 75234 (972) 247-3500 More Info I Map It © 2007 AT&T Knowledge Ve ntures . All rights reserved . AT&T , AT&T logo , Cingular and C ingul ar logos are trademarks of AT&T Know ledge Ventu re s and/or AT&T affiliated companies . Some data provided by~ and Acxiom . http ://www.yellowpages.com/name/Plano-TX/century-disposal-inc?w=l&t=century+disp ... 10 /15 /2007 ENVIRONMENTAL, INC. 21 4 FM 11 87 . B uilding 6. Mansfield T exas 760 6 3. T el ep ho n e (817) 477-9995. F acsi m i l e (817) 477 -9 99 6 www . i nterc on-env i ronmental .c om Request for Subcontractor Bids PROJECT Company Empire Disposal, Ltd. City of Fort Worth Contact Sandra McGlothlin Bid No. DEM 07-12: APT Address 5301 Sun Valley Drive Removal of asbestos containing materials and Fort Worth, TX 76119 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-478-1288 Bids are Due 10/24/07 Fax 817-985-0512 Time 10:00 AM E-mail sandra@empiredisposal.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demo li tion of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast RecvclinQ and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et II 1 J • 11::, F'EF'DF'T NO. OTHER FACSIMILE 01 8179850512 YOUR LOGO YOUR FR X NO. Oct. 09 200 7 01:02PM INTERCON-EN VIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PRGES RESULT Oct.09 01:01PM 00'53 SND 01 OK TO TLHN CFF REPffiT, PRESS 't'ENJ ' 004. f TIEN SB.£CT ITT BY USI1£ '+' rn '-'. FCR FAX ~ffiE ASSISTfff:E, PLEASE O:U.. 1-800-1-ELP-FAX (435-7329). I I ENVIRONMENTAL, INC. 214 FM 1187. Bu il ding 6. Mansfiel d Texas 76063. Telephone (8 1 7) 477 -99 95, Facsim ile (817) 477-9996 www . i ntercon-envi ron mental. com Request for Subcontracto r Bids PROJECT Company Green Planet, Inc. City of Fort Worth Contact Virginia Belmore Bid No. DEM 07-12: APT Address P.O. Box 743966 Removal of asbestos containing materials and Dallas, TX 75374 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-636-1515 Bids are Due 10/24/07 Fax 972-636-3948 Time 10:00 AM E-mail vbelmore@greenplanetinc.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos containing materials (ACM) and the demolition of all struct ures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo liti on Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate w ith your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::B II• I : 11::; F'EF'C:'F'T NO . OTHER FACSIMILE 01 19726363948 YOUR LOGO YOUR FA X NO. Oct. 09 2007 01:05PM INTERCON-EN VIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 01:04PM 00'42 SND 01 OK TO TU<N CFF ~T, PRESS 'l"BlJ' 004. Tl-EN SELECT (lT"F BY US I "6 ' +' CR ' -' . FCR FAX A])XNHO:: ASS I ST!'.N:E, PLEASE: CFl.l.. 1-Em-1-ELP-FAX (435-7329) . ·, ' ENVIRONMENTAL, INC. 214 F M 1187. Bu il ding 6. Mans fi eld , Texas 76063. Teleph o ne (817} 477-9995. F a csi m il e (81 7 ) 477-9 996 ww w . i n terc o n -e n v i ro n men t al .corn Request for Subcontractor Bids PROJECT Company Knight Waste Services, Ltd. City of Fort Worth Contact Richard Knight Bid No. DEM 07-12: APT Address 525 South Sixth Street Removal of asbestos containing materials and Mansfrield, TX 76063-2309 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-477-2260 S.9 ,~ j ,t Bids are Due 10/24/07 Fax 817-477-4787 J1 Ct.d . if-_ Time 10:00 AM E-mail richard@knightwaste.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of a ll asbestos con taining materials (ACM ) and t he demo liti o n of all st ruct ures present at t he forme r Oa k Hollow and V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo l it ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq X Fuel Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current cert ificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL , INC. 214 FM 1187 . Building 6. Mans field, Texas 760 63. Telephone (81 7) 477-9995. Facs imil e (817) 477-9996 www. i ntercon-env i r onmental .c om Request for Subcontractor Bids PROJECT Company Response Remediaton Services City of Fort Worth Company Bid No. DEM 07-12: APT Contact Mahesh Chandiramani Removal of asbestos containing materials and Address 1701 North Greenville Ave. demolition of former Oak Hollow & Villa Del Rio Apts. Suite 503 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Richardson, TX 75081 Bids are Due 10/24/07 Phone 972-907 -8772 Time 10:00 AM Fax 214-722-0553 Location Our Office E-mail mpc@rrsc.us Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the fonmer Oa k Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq X Fuel Refrigerant Recovery and RecyclinQ X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil TestinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current cert ifi cate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ::.Et JI, Ii 1[, FEFC:F'T NO. OTHER FACSIMILE 01 12147220553 YOUR LOGO YOUR FAX NO. Oct . 09 2007 01:07PM INTERCON-EN VIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 01:06PM 00'32 SND 01 OK TO TL.RN CFF REPCRT, PRESS 'f'Bl..J' 004. TI-EN SELECT ITT BY us11£ '+' rn '-'. : ' I Fffi FAX AD..Hfff'.O:: ASSIST!=N'.:E, PL.EASE GLL 1-Em-+-13...P-FAX (435-7329). i ! MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 1 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/3/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work required on City contracts . The City, therefore , will not guarantee , recommend or give warranty or other assurances as to the competency and/or fitness of certified M/WBE firms. At the present time , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City . These listings undergo continual revisions. The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace , prior to AWARD of the contract . The marketplace area includes the counties of: Tarrant, Parker , Johnson , Collin , Dallas , Denton , Ellis , Kaufman and Rockwall. Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change(s) and/or questions . If a certified vendor's name does not appear on the listing(s), please call the M/WBE Office to verify . NOTE: An Offeror will be given credit toward the M/WBE goa l only when the M/WBE supplier performs a commercially useful function . A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer . As defined in City Ordinance 15530, a Regular Dealer is a firm that owns , operates , or maintains a store , a warehouse , or other establishments in which the materials or supplies required for the contract are bought, kept in stock , and are regularly sold retail or wholesale . A Manufacturer is one that manufactures a product by hand or machinery suitable for uses ; the process of making wares. It is the responsibility of the Offeror to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. M/WBE CONTRACTORS SIC LISTING FOR 735903: PORTABLE TOILET RENTAL v<Murillo Modular Group, Ltd. dba MMG Disposal Salvador Murillo 1400 Bradley Lane Carrollton, TX 75007-4855 PH : (940) 387-7860 FX: (940) 387-8716 jonathan m@mmgdisposal.com ~pply Sanitation Systems, LLC. Sally Seegers 1450 Preston Forest Square , Suite 209 Dallas , TX 75230 PH : (972) 458-2555 FX : (972) 458-2566 sallys@supplysystemsusa .com http ://www.fortworthgov.org / applications/mwbe _ siccode/Default.aspx 10/3/2007 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response Murillo Modular Group, Ltd. Dba MMG Disposal 1400 Bradley Lane Telephone number has been Carrollton , TX 75007-4855 Salvador Murillo 940-387-7860 10/09/07 3 :14 PM disconnected . Supply Sanitation Systems, LLC. 1450 Preston Forest Square , Suite 209 Dallas, TX 75230 Sally Seegers 972 -458-2555 10/09/07 3:15 PM Barbara McGurrey has received fax . City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response Murillo Modular Group, Ltd. Oba MMG Disposal 1400 Bradley Lane Carrollton, TX 75007-4855 Salvador Murillo 940-387-8716 10/09/07 1:00 PM Invalid number. Supply Sanitation Systems, LLC. 1450 Preston Forest Square, Suite 209 Dallas, TX 75230 Sally Seegers 972-458-2566 10/09/07 1 :16 PM 1TB faxed . ENVIRONMENTAL , INC. 214 FM 1187, Bu il d i n g 6. Mansf i e l d T ex a s 76063 , T elephone (8 17 ) 477-9995 , Facsim ile (8 1 7) 477 -99 9 6 w ww. i nte rco n-envi ro nmental .c om Request for Subcontracto r Bids PROJECT Company Murillo Modular Group, Ltd. Dba City of Fort Worth MMG Disposal Bid No. DEM 07-12: APT Contact Salvador Murillo Removal of asbestos containing materials and Address 1400 Bradley Lane demolition of former Oak Hollow & Villa Del Rio Apts. Carrollton, TX 75007-4855 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 940-387 -7860 l) l~vv..£.d!J Time 10:00 AM Fax 940-387-8716 l:5o._)., I±. Location Our Office E-mail jonathanm@mmgdisposal.com Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos contain ing materia ls (ACM) and the demolition of all structures pre se nt at the forme r Oa k Hollow and Villa Del Rio Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toil et Rental Topsoil and Backfill Suoolier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax MSN Yellow Pages : Try Again Page 1 of 1 ]:!Qme_-+ Yellow Pages -+ Error No Yellow Pages listings found Suggestions : Simple Search • View Search Tips Send us your Feedback to help improve ou r search results . MSN privacy Lega l Advertise RSS Feedback Help © 2007 Microsoft I http ://yellowpages.superpages.corn/listings.j sp ?S RC=msn&CB=&R = N&STYPE=S&C=M ... 10 /9/2007 ENVIRONMENTAL, INC. 214 FM 1187 . Bu ildi ng 6 . Mansfield Texas 76063. Te l ephone (817) 477-9995 . Facsimile (817) 477-9996 www . i ntercon -envi ronment a l. com Request for Subcontractor Bids PROJECT Company Supply Sanitation Systems, LLC City of Fort Worth Contact Sally Seegers Bid No. DEM 07-12: APT Address 1450 Preston Forest Square Removal of asbestos containing materials and Suite 209 demolition of former Oak Hollow & Villa Del Rio Apts. Dallas, TX 75230 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-458-2555 Bids are Due 10/24/07 Fax 972-458-2566 Time 10:00 AM E-mail sallys@supplysystemsusa.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suppl ier Concrete Saw CuttinQ Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air MonitorinQ UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ':B ff I I lei FEF'C::F'T NO. OTHER FACSIMILE 01 19724582566 YOUR LOGO YOUR FA X NO. Oct. 09 2007 01:17PM INTERCON-ENVIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PAGES RESULT Oct.09 01:16PM 00'49 SND 01 OK TO TI.RN CFF ~T, PRESS 'ret.J' tl04. TJ-9' SELECT CJfF BY LE I t-13 ' +' CR ' - ' . i I Fffi FAX ~flr ~ISTf:N:E, PLEASE a:LL 1-800--+ELP-FAX (435-7329). MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page I of 2 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/3/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work required on City contracts . The City , therefore, will not guarantee , recommend or give warranty or othe r assurances as to the competency and/or fitness of certified M/WBE firms . At the present time , this list of certified M/WBE firms is be ing formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely fo r the purpose of d issem inating information of the availability of M/WBE businesses for the City . These listings undergo continual revisions. The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace , prior to AWARD of the contract. The marketplace area includes the counties of: Tarrant, Parker, Johnson , Collin , Dallas, Denton , Ellis , Kaufman and Rockwal l. Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change (s) and/or questions . If a certified vendor's name does not appear on the listing(s), please call the M/WBE Office to verify . NOTE: An Offeror will be given credit toward the M/WBE goal only when the M/WBE supplier performs a commercially useful function. A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regula r dealer . As defined in City Ordinance 15530, a Regular Dealer is a firm that owns , operates , or maintains a store , a warehouse , or other establishments in which the materials or supplies required for the contract are bought, kept in stock , and are regularly sold retail or wholesale. A Manufacturer is one that manufactures a product by hand or machinery suitable for uses : the process of making wares . It is the responsibility of the Offeror to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. M/WBE CONTRACTORS SIC LISTING FOR 078205 : SEEDING AND SODDING (Including Synthetic/Artificial Turf) K Tex Seeding, Inc. Jeanee Sebik P.O . Box 2077 Keller , TX 76244 PH : (817) 306-8510 FX : (817) 306-8901 /< ;,..,-2. Complete Lawn Maintenance Jose Salazar 13440 Winterhaven Farmers Branch , TX 75234 PH : (972) 484-9285 FX : (972) 720-3642 esp2moma@aol.com ~Fosters Garden Center Landscape, Inc. ~ Carter Construction Company, LLC Cynthia Carter Dan Foster 8112 S. Hampton Road Dallas , TX 75232 9720 Camp Bowie West Fort Worth , TX 76116 PH : (817) 244-3622 FX : (817) 244-8133 ~ckey Landscape Contractors, Inc. Mary Ann Dickey 9824 Camp Bowie West Fort Worth, TX 76121 PH : (817) 244-4800 FX : (817) 244-5497 dlandscape@sbcglobal .net ~ass Perfect, Inc. Jesus Piedra 820 S. Haynes Avenue Fort Worth , TX 76103 PH : (817) 881-9784 PH : (972) 224 -0131 cynth iacarter@carterconstructioncompany.com FX : (817) 536-8431 grassperfect@sbcglobal .net FX : (214) 363-9773 fostergci@sbcglobal.net ~reen Scaping ~dromulch Services, Inc. Company, LP Susan Richmond Cathleen Ruiz P.O . Box 94106·1 8917 Cardinal Lane Plano , TX 75094-1061 N. Richland Hills , TX PH: (972) 423-4265 76180 FX : (972) 422-5455 PH : (817) 577-9299 srich1@gte.net FX : (817) 577 -9331 4AVCOLawn Service Richard Navarrete ~hillip's Landscape Management, Inc. Phillip Gracia 7071 Anderson Boulevard vKvdrotech of Texas Mohammad Noshah 2004 W. Sublett Road Arlington , TX 76017 PH : (817) 784-1881 FX: (817) 557 -3200 hydrotechoftexas@comcast.net 4 Rohdes Services, Inc. Gregory Rohde 1651 Wall Street http ://www.fortworthgov .org/ applicati on s/mw be _ si ccode/Defaul t. asp x 10 /3/2007 MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 2 of 2 P.O . Box 163154 Fort Worth , TX 76161- 3154 PH : (817) 236-5666 FX: (817) 236-5631 nt~awn@aol.com Vii Texas Environmental Management -San Antonio, Inc Julie Prcin P.O. Box 369 Justin , TX 76247 PH : (940) 648-3640 Fort Worth , TX 76120 PH : (817) 446--4777 FX: (817) 446-4727 pg racia@phillipslandscape .net vK.as Hydro-Mulch Tammye Handy 8191 SW Loop 820 Benbrook, TX 76126 PH: (817) 249-6615 FX: (817) 249-6615 FX : (940) 648-3407 jprcin@texasenviro.com X ' 't/16. West Fork Hydromulch Donyea Walley 1125 Willow Ridge Drive Azle, TX 76020 PH : (817) 270-2165 FX: (817) 270-2165 Garland , TX 75041 PH : (972) 864-1934 FX : (972) 864-0128 grohde@greensense .net ~ and Growing Patty Wallace 7 48 Arbor Creek Drive DeSoto , TX 75115 PH : (972) 223-8643 FX : (972) 223-9777 jwall1954@aol.com http://www. fortworthgov. org/ appli cation s/mwbe _ siccode/Default.aspx 10 /3/2007 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response Cen -Tex Seedng , Inc. P.O. Box 2077 Keller, TX 76244 Jeanee Sebik 817 -306-8510 10/09/07 4:05 PM Per Wendy Hodges, will look at project. Complete Lawn Maintenance 13440 W i nterhaven Farmers Branch , TX 75234 Jose Salazar 972-484-9285 10/09/07 4:07 PM Left message on voicemail. Dickey Landscape Contractors, Inc . 9824 Camp Bowie West Fort Per Mary Anne Dickey, will look at Worth, TX 76121 Mary Ann Dickey 817-244-4800 10/09/07 4 :08 PM project. Fosters Garden Center Landscape, Inc. 8112 S. Hampton Rd . Dallas, TX 75232 Dan Foster 972 -224-0131 10/09/07 4 :14 PM Per Kim Foster, will consider project. GC Carter Construction Company, LLC 9720 Camp Bowie West Fort Worth, TX 76116 Cynthia Carter 817-244 -3622 10/09/07 4:21 PM Cynthia Carter received fax . Grass Perfect, Inc. 820 S. Haynes Avenue Fort Worth, TX 76121 Jesus Pidra 817 -881 -9784 10/09/07 4 :24 PM Per Jesus Pidra, will consider project. Green Scaping Company, LP 8917 Cardinal Lane N. Richland Hills, TX 76180 Cathleen Ruiz 817-577 -9299 10/09/07 4:26 PM Dana Loucks received fax Hydromulch Services, Inc. P.O . Box 941061 Plano, TX 75094-1061 Susan Richmond 972 -423 -4265 10/09/07 4 :28 PM Brad Bateman to look at project. Hydrotech of Texas 2004 W . Sublett Road Arlington, TX 76017 Mohammad Noshah 817-784-1881 10/09/07 4:35 PM Only number listed is a fax#. NAVCO Lawn Service P.O. Box 163154 Fort Worth , TX 76161 -3154 Richard Navarrete 817 -236-5666 10/09/07 4 :41 PM Richard Navarette received fax . ·-{" ..... [ I l l [ -l ... {_ ( L { l_ r if -r Phillip's Land . e Management, Inc. \.._ 7071 Anderson Blvd. Fort Worth, TX 76120 Phillip Gracia 817-446-4777 10/09/07 4:42 PM Suzanna Larson received fax. Rohdes Services, Inc. 1651 Wall Street Garland, TX 75041 Gregory Rohde 972-864-1934 10/09/07 4:44 PM Sally Sutton received fax. Texas Environmental Management -San Antonio, Inc. P.O. Box 369 Justin, TX 76247 Julie Prcin 940-648-3 640 10/11/07 3:07 PM Bill Borger received fax . Texas Hydro-Mulch 8191 SW Loop 820 Benbrook, TX 76126 Tammye Handy 817 -249-6615 10/11/07 3 :10 PM Tammye Handey received fax. Up and Growing 748 Arbor Creek Drive DeSoto, TX 75115 Patty Wallace 972-223-8643 10/11/07 3:13 PM Left message on voicemail. West Fork Hydromulch 1125 Willow Ridge Drive Azle, TX 76020 Donyea Walley 817-270-2165 10/15/07 3:13 PM Left message on voicemail. City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response Cen-Tex Seedng, Inc. P.O. Box 2077 Keller, TX 76244 Jeanee Sebik 817-306-8901 10/09/07 3 :12 PM 1TB faxed Complete Lawn Maintenance 13440 Winterhaven Farmers Branch, TX 75234 Jose Salazar 972-720-3642 10/09/07 3:15 PM 1TB faxed Dickey Landscape Contractors, Inc. 9824 Camp Bowie West Fort Worth, TX 76121 Mary Ann Dickey 817-244-5497 10/09/07 4 :07 PM 1TB faxed Fosters Garden Center Landscape, Inc. 8112 S. Hampton Rd. Dallas, TX 75232 Dan Foster 214-363-9773 10/09/07 3:19 PM 1TB faxed GC Carter Construction Company, LLC 9720 Camp Bowie West Fort Worth, TX 76116 Cynthia Carter 817-244-8133 10/09/07 3:21 PM 1TB faxed Grass Perfect, Inc. 820 S. Haynes Avenue Fort Worth, TX 76121 Jesus Pidra 817-536-8431 10/09/07 3:23 PM 1TB faxed Green Scaping Company, LP 8917 Cardinal Lane N . Richland Hills, TX 76180 Cathleen Ruiz 817-577-9331 10/09/07 3 :25 PM 1TB faxed Hydromulch Services, Inc. P.O. Box 941061 Plano, TX 75094-1061 Susan Richmond 972 -422-5455 10/09/07 3:26 PM 1TB faxed Hydrotech of Texas 2004 W. Sublett Road Arlington, TX 76017 Mohammad Noshah 817-557-3200 10/09/07 3 :27 PM 1TB faxed NAVCO Lawn Service P.O. Box 163154 Fort Worth, TX 76161-3154 Richard Navarrete 817-236-5631 10/09/07 3:29 PM 1TB faxed r r r r r r r r r I r I r I T Ph i llip 's Lan e Management, Inc. \.. 7071 Anderson Blvd . Fort Worth, TX 76120 Phillip Gracia 817-446-4727 10/09/07 3 :30 PM 1TB faxed Rohdes Services, Inc. 1651 Wall Street Garland, TX 75041 Gregory Rohde 972-864-0128 10/09/07 3:31 PM 1TB faxed Texas Environmental Management -San Antonio, Inc. P.O. Box 369 Justin, TX 76247 Julie Prcin 940-648-3407 10/09/07 3:32 PM 1TB faxed Texas Hydro-Mulch 8191 SW Loop 820 Benbrook, TX 76126 Tammye Handy 817-249-6615 10/09/07 3 :35 PM 1TB faxed Up and Growing 748 Arbor Creek Drive DeSoto, TX 75115 Patty Wallace 972 -223-9777 10/09/07 3:36 PM Invalid number. West Fork Hydromulch 1125 Willow Ridge Drive Azle, TX 76020 Donyea Walley 817-270-2165 10/15/07 1:46 PM 1TB faxed ENVIRONMENTAL , INC. 214 FM 1187. Building 6. Mansfield Texas 76063 . Telephone (8 17 ) 477 -9995 . Facsimi l e (817 ) 477-9996 www . i ntercon-e nvi ron me nta I . com Request for Subcontractor Bids PROJECT Company Cen-Tex Seeding, Inc. City of Fort Worth Contact Jeanee Sebik Bid No. DEM 07-12: APT Address P.O. Box 2077 Removal of asbestos containing materials and Keller, TX 76244 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-306-8510 Bids are Due 10/24/07 Fax 817-306-8901 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Dens ity and Compaction Testing X Hydro Mulch ·services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal X Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ::,El ff l I lC, F'EFCIF'T ~~O . OTHER FACSIMILE 01 8173068901 ' YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:13PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:12PM 00'50 SND 01 OK TO TLRN CFF ~T, PRESS 'ta-1.J' 004. TIEN SEl.£CT ITT BY USil-6 '+' ffi '-'. I i Fffi FA>< AIJUf=Nf~ ~ISTf:N::E, PLEASE CR.L 1-BEE--!-ELP-FA>< (435-7329). ENVIRONMENTAL , IN C. 214 FM 1187. Bu il d i ng 6. Mansfield , Te x as 76063. Telephone (817) 477-9995. Facsimile (817) 477-9996 www . i nterco n-envi ron men ta I. com Request for Subcontractor Bids PROJECT Company Complete Lawn Maintenance City of Fort Worth Contact Jose Salazar Bid No. DEM 07-12: APT Address 13440 Winterhaven Removal of asbestos containing materials and Farmers Branch, TX 75234 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-484-9285 Bids are Due 10/24/07 Fax 972-720-3642 Time 10:00 AM E-mail Esp2moma@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of al l asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To i let Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ' ! ii=iiilld=i=#i• YOUR LOGO YOUR FA X NO. Oct . 09 2007 03:15PM INTERCON-ENV IRONMENTAL INC 817-842-1710 t"O. OTHER FRCS IM I LE START TI ME USAGE TI ME MODE PAGES RESULT 01 19727203542197272035 Oct.09 03:15PM 00'49 SND 01 OK TO TlRN CFF REPffiT, PRESS ' l'BlJ' t:t04. TIEN SELECT CJf"F BY USI1£ '+' ffi '-'. I Fffi FAX~~ ASSISTFN:E, PlBlSE a:LL 1-800--+ELP-FRX (435-7329). I I ENV I RONMENTAL, INC. 214 F M 1187, Building 6, Mansfield , Texas 76063, Te l ephone (817) 477-9995, Facsimile (817) 477-9996 www .i n terc o n -environ mental .com Req ues t f o r Subcontracto r Bids PR OJECT Company Dickey Landscape Contractors, City of Fort Worth Inc. Bid No. DEM 07-12: APT Contact Mary Ann Dickey Removal of asbestos containing materials and Address 9824 Camp Bowie West demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth , TX 76121 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 817 -244-4800 Time 10:00 AM Fax 817 -244-5497 Location Our Office E-mail dlandscape<@sbcglobal.net Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con t aining mat e ria ls (ACM ) and th e demo lition of all structu res present at the forme r Oa k Ho ll ow an d V ill a De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul i ng Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refriqerant Recovery and Recycling X. Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-ma il Phone Fax '::El JI, It JC, F'EF'[IF'T r~O. OTHER FACSIMILE 01 8172445497 I ! ' YOUR LOGO YOUR FAX NO. Oct. 09 2007 03:1BPM INTERCON-EN VIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:17PM 00'44 SND 01 OK TO Tl.RN CFF ~T, PRESS 't'B-lJ' 004. TIEN SELECT ITT BY USI1'6 '+' ffi '-'. Fffi FAX Al)U'.:ffi"f'.G:: ~ISTFH:E, PL.EASE O:U... 1-800-tELP-FA>< (435-7329). ! '::.El ff , I t lC, F'EF'[F T NO. OTHER FACSIMILE 01 8172445497 YOUR LOGO YOUR FA X NO. Oct. 09 2007 04:07PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES .RESULT Oct.09 04:07PM 00'45 SND 01 OK TO Tl.RN CFF REPCRT, PRESS ' t"BU' t:104 . Tl-EN SELECT CfrF" BY LIS It£ ' +' rn ' -' . Fffi FAX ADU=Nri:ff ASSISTi:N:E, PL.EASE CTU... 1-Em-+EL.P-FAX (435-7329). I I ' tercon ENVIRONMENTAL, INC. 214 FM 1187. Bu ilding 6 . Mansf ield , Texas 76063. Telephone (817) 477-9995 . Facsimi le (817) 47 7-9 996 ww w .intercon-envi ron m en t a I . c om Request for Subcontracto r Bids PROJECT Company Fosters Garden Center Landscape , City of Fort Worth Inc. Bid No. DEM 07-12: APT Contact Dan Foster Removal of asbestos containing materials and Address 8112 S. Hampton Road demolition of former Oak Hollow & Villa Del Rio Apts. Dallas, TX 75232 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 972-224-0131 Time 10:00 AM Fax 214-363-9773 Location Our Office E-mail fostergci@sbcglobal.net Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental .com Scope of Work The scope of work cons ists of ; The remova l of all asbestos contain ing materia ls (ACM) and t he demol ition of a ll structures present at t he forme r Oa k Ho llow a nd Vi lla Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol it ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal X Soil Testing/analysis Plans and/or specifications are ava il able for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et lI 1 It lCi F'EF'DF'T t·-IO. OTHER FACSIMILE 01 12143639773 i YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:20PM INTERCDN-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:19PM 00'46 SND 01 OK TO llliN c:FF R$=>ffiT, PRESS 'l'BIJ ' 1:104. TIEN SELECT ffiF BY US I t'6 ' +' CR ' - ' . ! Fffi FAX ~f'.a= ASSISTi::N:E , PI....B=ISE CFLL 1-EHHELP-FAX C435-732SI). tercon ENVIRONMENTAL , INC. !2 21 4 FM 1187, B u ildi n g 6, Mansf iel d , Texas 76063 . T e l ephone (817} 477 -9995 , F acsim i le (817) 477-9996 www . in t e r con-e nv i r onmen t al .com Request for Subcontractor Bids PROJECT Company GC Carter Construction Company, City of Fort Worth LLC Bid No. DEM 07-12: APT Contact Cynthia Carter Removal of asbestos containing materials and Address 9720 Camp Bowie West demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76116 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 817-244-3622 Time 10:00 AM Fax 817-244-8133 Location Our Office E-mail · cynthlacarter@carterconstructloncompany .com Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos conta ining materials (ACM ) and the demolition of all structu res present at the forme r Oa k Hollow and V illa Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo li tion Debris Hauling Temporary Fence Rental X Portable To ilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soi l Density and Compaction TestinQ X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::,El ff, It l[, F'EF'r:::,::::·T r~O. OTHER FRCS IM I LE 01 8172448133 ' I YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:23PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct .09 03:21PM 01'09 SND 01 DK TO TlRN CFF REFffiT, PRESS ' l"B{.J' 004. TIEN sa..ECT (F;"F BY LJSI1£ '+' ffi '-'. Fffi FAX ~i::G:: ~IST~, PL.EASE m..L 1-f0H-H..P-FAX (435-7329). ENVIRONMENTAL, INC. 214 FM 1 1 8 7. Bu il d in g 6 . M a n s fi eld , Tex a s 76063. Tel e phone (817 ) 477-9995 . Fa csimile (817) 477 -9 996 www . i n t ercon-env i ron m enta l .c o m Request for Subcontractor Bids PROJECT Company Grass Perfect, Inc. City of Fort Worth Contact Jesus Piedra Bid No. DEM 07-12: APT Address 820 S. Haynes Ave. Removal of asbestos containing materials and Fort Worth, TX 76103 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-881-9784 Bids are Due 10/24/07 Fax 817-536-8431 Time 10:00 AM E-mail grassperfect@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ':B II I t IC.i F·EF C'F'T NO. OTHER FA CSIMILE 01 8175358431 ' YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:24PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:23PM 00'38 SND 01 DK TO Tl.RN CFF REPCRT, PRESS 'l"BU' tt04. TIEN SELECT (F,F BY LISI!'£'+' rn '-'. ' Fffi FAX ~i::G: ASSIST!=N:E, PLEASE au_ 1-800--+ELP-FAX (435-7329). ' I ENVIRONMENTAL, INC. 2 2 14 F M 1187. Building 6. Mansfield Texas 76063 . Telephone (817 ) 477-9995. Facsimile (817) 477-9996 w ww . i n terco n-e nv iron menta I .com Request for Subcontractor Bids PROJECT Company Green Scaping Company, LP City of Fort Worth Contact Cathleen Ruiz Bid No. DEM 07-12: APT Address 8917 Cardinal Lane Removal of asbestos containing materials and N. Richland Hills, TX 76180 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-577-9299 Bids are Due 10/24/07 Fax 817-577-9331 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith~intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM) and the demolition of all structures present at the forme r Oak Hollow and Villa Del Rio Apartment comp lexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental X Refriqerant Recovery and Recyclinq X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et II1 I I JC, F'EF'C:F T NO. OTHER FACSIMILE 01 8175779331 i YOUR LOGO YOUR FAX NO . Oct. 09 2007 03:26PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:25PM 00'45 SND 01 OK TD Tl..HN CFF ~T, PRESS ' 1'13-1..J' 004. I TIEN SELECT (F,F BY USI1£ '+'CR'-'. Fffi FAX ADU=NTFG: ~ISTf'.N:E, PLEASE CR.L 1-000-+EI....P-FAX (435-7329). ~---4,'\. tsfM A\! aP.Mi tercon ENV I RONMENTAL, INC. 214 FM 1187 . Building 6. Mansfield Texas 7 6063. Telephone (817) 477-9995. Facsimile (817) 477-9996 w w w. i nte r c o n-env i r on mental .c om Request for Subcontractor Bids PROJECT Company Hydromulch Services, Inc. City of Fort Worth Contact Susan Richmond Bid No. DEM 07-12: APT Address P.O. Box 941061 Removal of asbestos containing materials and Plano, TX 75094-1061 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-423-4265 Bids are Due 10/24/07 Fax 972-422-5455 Time 10:00 AM E-mail Srich1@gte.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the forme r Oa k Hollow an d V illa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul i ng X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutti ng Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itorinq UST Removal X Soil Testing/ana lysis Plans and/or specifications are ava i lab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield , Texas 76063 Please check one of the follow i ng : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate w ith your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ':B ff , l: 11::, F'EF'CF T NO. OTHER FACSIMILE 01 19724225455 YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:27PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:25PM 00'39 SND 01 OK TO Tl.RN CFF ~T, PRESS '1'13-l.J' 004. TI-EN SELECT CF,F BY US It£ ' +' ffi ' - ' . ' i Fffi FAX ADVf=tfT!=O:: ~ISTi:::t,CE, PLEASE CFl..L 1-Em-t-ELP-FAX (435-7329). ENVIRONMENTAL, INC. 214 FM 1187. Bu il d i ng 6. Ma nsfield Texas 76063. Telephone (817) 477 -9995. Facsimile (817) 477-9996 www . intercon-env i ronmen tal .c om Request for Subcontractor Bids PROJECT Company Hydrotech of Texas City of Fort Worth Contact Mohammad Noshah Bid No. DEM 07-12: APT Address 2004 W. Sublett Road Removal of asbestos containing materials and Arlington, TX 76017 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-784-1881 Bids are Due 10/24/07 Fax 817-557-3200 Time 10:00 AM E-mail hydrotechoftexas@comcaslnet Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo liti on Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your b id.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:28PM INTERCON -ENVIRONMENTAL INC 817-842-1710 NO . OTHER FA CSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 8175573200 Oct.09 03:27PM 00'56 SND 01 OK TO nRN CFF REPC:RT, PRESS ' l'BlJ' t:J04. TIEN SEL.ECT ITT BY LJSit-13 '+' ffi '-'. I i Fffi FAX ADl..Ji:NfffiE ASSISTi:K:E, PLEASE a:LL 1-800-+EL.P--FAX (435-7329). I I I I ENVIRONMENTAL , INC. 214 FM 1187 . Build i ng 6. Mansf ie ld , Texas 76063. T elephone (817) 477-9995. Facsimile (817) 477-9996 www . i n t ercon -envi ro nme n t a l .co m Req uest for Subcontracto r Bids PROJECT Company NAVCO Lawn Service City of Fort Worth Contact Richard Navarrete Bid No. DEM 07-12: APT Address P.O. Box 163154 Removal of asbestos containing materials and Fort Worth, TX 76161-3154 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-236-5666 Bids are Due 10/24/07 Fax 817-236-5631 Time 10:00 AM E-mail navcolawn@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of wo rk consists of ; The removal of all asbestos con taining materials (ACM ) and the demolition of all struct ures prese nt at th e forme r Oa k Hollow an d V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toi let Rental X Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitori ng UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certi fi ed? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on th is project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.El JI, It 11::i F'EF'[IF T J t'lO. OTHER FACSIMILE 01 8172365631 I YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:30PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:29PM 00'45 SND 01 OK TO l1RN EFF ~T, PRESS 'f'B.lJ' t:t04. nEN SELECT arr BY l.lSII£ '+' rn '-'. Fffi FAX Al)U'.:NfffiE ASSIST~. Pl.EASE O:U.. 1-EBH-EL.P-FAX (435-7329). ! ENV I RONMENTAL, INC. 214 FM 1187. Bu i lding 6. Ma n sfield Texas 76063 . Telephone (81 7) 477-9995 . Fa csimile (817) 4 77 -9996 www . in t e rco n -e nvi ron men ta I . c o m Request for Subcontractor Bids PROJECT Company Phillip's Landscape Management, City of Fort Worth Inc. Bid No. DEM 07-12: APT Contact Phillip Gracia Removal of asbestos containing materials and Address 7071 Anderson Blvd. demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76120 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 817-446-4777 Time 10:00 AM Fax 817-446-4727 Location Our Office E-mail pgracia@phillipslandscape.net Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutt ing Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et ff, l t JC, F'EF[FT NO. OTHER FA CSIMILE 01 8174464727 YOUR LOGO YOUR FAX NO. Oct. 09 2007 03:31PM INTERCON-ENVIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:30PM 00'50 SND 01 OK TD TLRN CFF Rlj:PffiT, PRESS 't'BU' i:i04. TI-EN SELECT (JrF BY US It£ ' +' CR ' - ' . I ! Fffi FAX RDWfffFG: ASSISTf:N'.:E, PL.EASE: au_ 1-E:03-t-ELP-FRX (435-7329). I I I : ENVIRONMENTAL, INC. 214 F M 11 8 7 . Bu i ld i n g 6, Mansf i e ld , Tex as 76063, T e l e ph one {8 1 7 ) 4 77-9995, F acsimile (817) 477 -999 6 www . inte r co n-env i ron mental .com Request for Subcontractor Bids PROJECT Company Rohdes Services, Inc. City of Fort Worth Contact Gregory Rohde Bid No. DEM 07-12: APT Address 1651 Wall Street Removal of asbestos containing materials and Garland, TX 75041 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-864-1934 Bids are Due 10/24/07 Fax 972-864-0128 Time 10:00 AM E-mail grohde@greensense.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soii Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air MonitorinQ UST Removal X Soil TestinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et lI 1 Ii lCi F'EF [IF·T J NO. OTHER FACSIMILE 01 19728640128 i YOUR LOGO YOUR FR X NO. Oct. 09 2007 03:32PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:31PM 00'36 SND 01 OK TO ~ CFF RS='ffiT, PRESS '!'BU' 004. TI-EN SELECT ITT BY LEI"6 '+' rn ·-·. Fffi FAX ADt .. HfHG:: ASSISTf'.N:E, PL.EASE ffi.1_ 1-800-tEI....P-FAX (435-7329). / I ENVIRONMENTAL , INC. 2 1 4 F M 1 1 8 7 , Bui I d i n g 6 • Mans fie I d T ex as 7 6 0-6-3 /, Te I e phone ( 8 1 7) 4 77 · 9 9 9 5 , Fa cs i mi I e ( 8 1 7) 4 7 7 -9 9 9 6 www. i ntercon-envi ron men ta I .com Request for Subcontractor Bids PROJECT Company Texas Environmental Management City of Fort Worth -San Antonio, Inc. Bid No. DEM 07-12: APT Contact Julie Prcin Removal of asbestos containing materials and Address P.O. Box 369 demolition of former Oak Hollow & Villa Del Rio Apts. Justin, TX 76247 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 940-648-3640 Time 10:00 AM Fax 940-648-3407 Location Our Office E-mail jprcin@texasenviro.com Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM) and the demolition of all structures present at the former Oa k Hollow and V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::B ff, I: f.i F'EF'['F'T NO. OTHER FA CSIMIL E 01 19406483407 YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:33PM INTERCON-ENVIRONMENTRL INC 817-842-1710 START TI ME USAGE TIME MODE PAGES RESULT Oct.09 03:32PM 01'05 SND 01 OK TO Tl.RN CFF REPffiT, PRESS 'l'BU' 004. Tl-EN SB.£CT ~ BY L.Elt-6 '+' ffi '-'. I Fffi FAX ADVl=ffi'FG:: A$srsT~. PLEASE o:t...L 1-~-FRX (435-7329). tercon ENVIRONMENTAL, I NC. 214 FM 1187. Building 6. Mansfield , Texas 76063. Telephone (817 ) 477-9995. Facsimile (817 ) 477-9996 www . intercon-envi ron mental .com Request for Subcontracto r Bids PROJECT Company Texas Hydro-Mulch City of Fort Worth Contact Tammye Handy Bid No. DEM 07-12: APT Address 8191 SW Loop 820 Removal of asbestos containing materials and Benbrook, TX 76126 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-249-6615 Bids are Due 10/24/07 Fax 817-249-6615 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Vi ll a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental X Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal So il Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal X So il T estinq/analvsis Plans and/or specifications are ava il able for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ~.Etff1Il[1 FEFC>F'T NO. OTHER FACSIMILE 01 8172496450 I YOUR LOGO YOUR FA X NO. Oct. 09 2007 03:JSPM INTERCON-ENVIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.09 03:JSPM 00'47 SND 01 OK TO TI.RN CFF ~T, PRESS 'l"IN.J' 004. TIEN SELECT ClfF BY USil'6 '+'CR'-'. ! Fm FAX~~ ASSIST~. PLEASE o:t..L 1-800--1-ELP-FAX (435-7329). I I ENVIRONMENTAL, I NC. 214 FM 1 1 87 . Bu il d i ng 6 . Mansfie l d Te x a s 76 0 6 3. Te l ep ho n e (817) 4 77-9995 . Fa c s im i le (817 ) 477 -99 9 6 w ww . i nterc on-e n vi r on m e nta l .com Request for Subcontractor Bids PROJECT Company Up and Growing City of Fort Worth Contact Pattv Wallace Bid No. DEM 07-12: APT Address 748 Arbor Creek Drive Removal of asbestos containing materials and DeSoto, TX 75115 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-223-8643 I _ J Bids are Due 10/24/07 Fax 972-223-9777 /sC{ ,,J # Time 10:00 AM E-mail Jwall1954@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos contain ing materials (ACM ) and t he demol it ion of all st ruct ures prese nt at t he form er Oa k Holl ow an d Vi ll a De l Rio Apartment comp lexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo li t ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Suoolier Concrete Saw Cutting Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal X Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL, INC. 2 14 FM 1 187 . B uil d i ng 6 . Ma n s fi e ld Tex a s 76 06 3 . T elep h one (8 17) 477-9995. Fa csi m i l e (817) 477-99 96 www .intercon-en v iron men ta I .com Request for Subcontractor Bids PROJECT Company West Fork Hydromulch City of Fort Worth Contact Donyea Walley Bid No. DEM 07-12: APT Address 1125 Willow Ridge Drive Removal of asbestos containing materials and Azle, TX 76020 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-270-2165 Bids are Due 10/24/07 Fax 817 -270-2165 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental X Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental X Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal X Soil Testinq/analysis Plans and/or specifications are available for review at lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ::.Et ff 1 I I JC, FEF'DF'T t,n OTHER FACSIMILE 01 8172702165 YOUR LOGO YOUR FA X NO. Oct. 15 2007 01:47PM INTERCON-EN UIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.15 01:46PM 00'52 SND 01 OK TO TL.RN CFF REPC::RT, PRESS ' 1'01.J' 004. TI-EN SB..ECT CF,F BY US I 1'13 ' +' ffi ' - ' . i i Fffi FAX A~lHE ASSISTPN::E, PL.EASE au.. 1-Em-+ELP-FAX (435-7329). i ! MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 1 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/3/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work requ ired on City contracts . The City , therefore , will not guarantee , recommend or give warranty or other assurances as to the competency and/or fitness of certified M/WBE firms. At the present time , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City. These listings undergo continual revisions . The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division ) in the marketplace , prior to AWARD of the contract . The marketplace area includes the counties of: Tarrant , Parker , Johnson , Collin , Dallas , Denton , Ellis , Kaufman and Rockwall. Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change(s ) and/or questions. If a certified vendor's name does not appear on the listing (s), please call the M/WBE Office to verify . NOTE: An Offerer will be given credit toward the M/WBE goal only when the M/WBE supplier performs a commercially useful function . A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer. As defined in C ity Ord inance 15530 , a Regular Dealer is a firm that owns, operates , or maintains a store , a warehouse , or other establishments in which the materials or supplies required for the contract are bought, kept in stock , and are regularly sold retail or wholesale . A Manufacturer is one that manufactures a product by hand or machinery suitable for uses ; the process of making wares. It is the responsibility of the Offerer to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. M/WBE CONTRACTORS SIC LISTING FOR 598300 : FUEL SUPPLIERS (WHOLESALE AND RETAIL) ·./~GE Refining, Inc. ~merican Petrox, Inc. gky Lady Oil Al Gonzalez 4570 Westgrove Drive , Suite 250 Addison, TX 75001 PH : (972) 458-7333 David Perry Company, Inc. P.O. Box 963473 Martha Sue Palmer Plano , TX 75086 107 NW 28th Street PH: (972) 612-5391 Fort Worth , TX 76106 FX: (972) 612-5407 PH : (817) 740-7400 FX : (972) 733-3960 ltrefger@agerefining .com Lmimex Resources, Inc. ampetr,ox@aol.com FX : (817) 7 40-0245 /. shulsey@luckylady .biz 5. Ricochet Fuel Naresh Vashisht 2001 Beach Street, Suite 81 0 Fort Worth , TX 76103 PH : (817) 735-1500 FX: (817) 735-8033 arnold_campos@omimexgroup.com Distributors, Inc. Kelly Roberts 1201 Royal Parkway Euless , TX 76040 PH : (817) 268-5910 FX : (817) 280-9981 kroberts@ricochetfuel .com http ://www.fortworthgov.org/ applicati ons/mw be _ si ccode/D efaul t.aspx 10/3/2007 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response AGE Refining, Inc. 4570 Westgrove Drive , Suite 250 Addison, TX 75001 Al Gonzalez 972-458-7333 10/11/07 11:13 AM Left message on voicemail. American Petrox, Inc . P.O. Box 963473 Plano , TX 75086 David Perry 972-612-5391 10/11/07 11:15 AM Per David Perry will submit bid. Lucky Lady Oil Company, Inc . 107 Left message on voicemail. Rick NW 28th Street Fort Kennedy called back and advises they Worth, TX 76106 Martha Sue Palmer 817 -7 40-7 400 10/11/07 11:17 AM will submit bid. Omimex Resources, Inc. 2001 Beach St., Suite 810 Fort Worth, TX 76103 Naresh Vashisht 817-735 -1500 10/11/07 11:20 AM Left message for Clark Storms. Ricochet Fuel Distributors, Inc. 1201 Royal Parkway Euless, TX 76040 Kelly Roberts 817-268-5910 10/11/07 11:22 AM Sam Brett to submit bid . ENVIRONMENTAL, INC. 214 FM 1187. Building 6. Mansfie ld , Te xas 76063. Telephone (817 ) 47 7 -9995 . Facsimile {817) 477-9996 www. i ntercon-envi ron men ta I .com Request for Subcontractor Bids PROJECT Company AGE Refining, Inc. City of Fort Worth Contact Al Gonzalez Bid No. DEM 07-12: APT Address 4570 Westgrove Drive Removal of asbestos containing materials and Suite 250 demolition of former Oak Hollow & Villa Del Rio Apts. Addison, TX 75001 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-458-7333 Bids are Due 10/24/07 Fax 972=J33-3960 Time 10:00 AM E-mail ltrefger@agerefining.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo li tion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoi l and Backfill Supplier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.Et /[1 I I l[1 F'i::F'DF'T ..J NO. OTHER FACSIMILE 01 19727333950 i ! i YOUR LOGO YOUR FAX NO. Oct. 11 2007 10:10AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 10:10AM 00'46 SND 01 OK TO TIBN CFF ~T, PRESS '1"B1J' 1:04. Tl-B-1 SELECT ClfF BY LE I 1-6 ' +' ffi ' - ' . I Fc::R FAX ADI.Hfff'.6:: ASSISTl=N:E, PLEASE m..L 1-800-+13...P-FAX (435-7329). I ENVIRONMENTAL, INC. 214 FM 1 1 87 . Bui l d i ng 6 . Ma nsf i e l d Te xas 760 6 3. T ele ph one (8 1 7) 477-9995. F acs i mile (817) 47 7-99 9 6 ww w . i n ter con-env i r o nm e ntal.com Request for Subcontracto r Bids PROJECT Company American Petrox, Inc. City of Fort Worth Contact David Perrv Bid No. DEM 07-12: APT Address P .0. Box 963473 Removal of asbestos containing materials and Plano, TX 75086 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-612-5391 Bids are Due 10/24/07 Fax 972-612-5407 Time 10:00 AM E-mail ampetrox@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all st ruct ures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Renta l Topsoil and Backfill Supplier Concrete Saw Cuttino X Fuel Refriqerant Recoverv and Recvclina X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitori nq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::-Et II· I 111:::, F'EF'CiF'T NO. OTHER FACSIMILE 01 19726125407 ' I YOUR LOGO YOUR FA X NO. Oc t. 11 2007 10:12AM INTER CON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 10:11AM 00'53 SND 01 OK TO ll1"N CFF R$=mT, PRESS 't'BLI ' l:i04. TIEN SELECT ClfF BY USil-6 '+' ffi ' - ' . j Fffi FAX ADIXtfH6:: ASSISTFN:E, PLEASE o:t..l.. 1-800-+ELP-FA>< (435-7329). I ENVIRONMENTAL , INC. 214 FM 1187. Bu i lding 6. M ansfield , Texas 76063. Telephone (817) 477-9995 . Facs i mile (81 7) 477-9996 ww w . i nte r c o n -envi r onmental .com Request for Subcontractor Bids PROJECT Company Lucky Lady Oil Company, Inc. City of Fort Worth Contact Martha Sue Palmer Bid No. DEM 07-12: APT Address 107 NW 28m Street Removal of asbestos containing materials and Fort Worth, TX 76106 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-740-7400 Bids are Due 10/24/07 Fax 817-7 40-0245 Time 10:00 AM E-mail shulsey@luckylady.biz Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con tain ing materials (ACM) and the demol iti on of all str uct ures present at the forme r Oa k Holl ow and Villa De l Ri o Apa rt ment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suoolier Concrete Saw Cuttinq X Fuel Refrigerant Recovery and Recycl ing X Bu lb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Testing/analysis Plans and/or specificat ions are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the follow ing : Is your company M/WBE or HUB cert ified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-ma il Phone Fax '::.Et II I ' IC, F'EF'C'F'T 1--10. OTHER FACSIMILE 01 8177400245 I YOUR LOGO YOUR FA X NO. Oct. 11 2007 10:13AM INTERCON-EN VI RONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 10:12AM 00'35 SND 01 OK TO Tl-RN CFF ~T, PRESS 'l'BIJ' 004. TIEN SB..ECT (]fF BY LJ.311-6 '+' CR'-'. ! Fffi FAX ~l=G: A$51ST~, PL.EASE m..L 1-Em---tELP-FAX (435-7329). I ENV I RONMENTAL, INC. 214 FM 1 187 , B uildi ng 6 , M a nsf ie ld Texas 76063 , T el ep hone (817 ) 477-9995, Facsi m il e (817} 477-9996 www . i n ter c o n -e n v i ronmental .com Request for Subcontracto r Bids PROJECT Company Omimex Resources, Inc. City of Fort Worth Contact Naresh Vashisht Bid No. DEM 07-12: APT Address 2001 Beach Street Removal of asbestos containing materials and Suite 810 demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76103 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-735-1500 Bids are Due 10/24/07 Fax 817-735-8033 Time 10:00 AM E-mail arnold_ cam pos@omimexgroup.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all st ructu res pres e nt at the forme r Oa k Hollow and Villa Del Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hau li ng Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting X Fuel Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mai l Phone Fax '::.El ff , Ir lCi F EF [.FT NCI. OTHER FA CS IMILE 01 8177358033 YO UR LOGO YOUR FA X NO. Oct. 11 2007 10:15AM INTERCON-ENVIRONMENTAL IN C 8 17-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 10:14AM 00'43 SND 01 OK TO ~ CFF REPCRT, PRESS ' l"EH...J' t:t04. I Tl-EN SB....ECT ~ BY USI1£ '+' rn '-'. I Fffi FAX ADU=Nfi:G: ASSIST~. Pl..EFISE CFl..L 1-800,-ELP-FAX (435-7329). ! tercon ENVIRONMENTAL, INC. 214 FM 1187. Build i ng 6. Mansfield , Texas 7606 3 . Telephone {81 7) 4 7 7 -9995. Fac s im ile (817 ) 477 -9996 www. i ntercon -envi ronmental .com Request for Subcontractor Bids PROJECT Company Ricochet Fuel Distributors, Inc. City of Fort Worth Contact Kelly Roberts Bid No. DEM 07-12: APT Address 1201 Royal Parkway Removal of asbestos containing materials and Euless, TX 76040 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd ., Ft. Worth, TX 76111 Phone 817 -268-5910 Bids are Due 10/24/07 Fax 817-280-9981 Time 10:00 AM E-mail kroberts@ricochetfuel .com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demol it ion of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suppl ier Concrete Saw Cutting X Fuel Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax YOUR LOGO YOUR FR >< NO. Oct. 11 2007 10:16AM INTERCON-ENVIRONMENTAL IN C 817-842-1710 NO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 8172809981 Oct. 11 10:15AM 00'39 SND 01 DK I TO Tl.RN CFF RIEP[HT, PRESS ' f13',IJ' "84. TI-EN SB...ECT ar BY USI"6 '+' ffi '-'. Fffi FAX ~Az: ASSISTi:N:::E, PLEASE CR...L 1-EHH-E3...P-FAX (435-7329). l MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 1 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/22/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work required on City contracts. The City , therefore , will not guarantee, recommend or give warranty or other assurances as to the competency and/or fitness of certified M/WBE firms . At the present time , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City . These listings undergo continual revisions . The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace, prior to AWARD of the contract. The marketplace area includes the counties of: Tarrant, Parker , Johnson , Collin , Dallas , Denton , Ellis, Kaufman and Rockwall. Please contact the Minority/Women Business Enterprise Office at (817) 392 -6104 for any subsequent change(s) and/or questions . If a certified vendor's name does not appear on the listing(s), please call the M/WBE Office to verify . NOTE: An Offeror will be given credit toward the M/WBE goal only when the M/WBE suppl ier performs a commercially usefu l function . A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer. As defined in City Ordinance 15530 , a Regular Dealer is a firm that owns, operates , or maintains a store ; a warehouse, or other establishments in which the materials or supplies required for the contract are bought , kept in stock , and are regularly sold retail or wholesale . A Manufacturer is one that manufactures a product by hand or machinery suitable for uses ; the process of making wares . It is the responsibility of the Offeror to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. M/WBE CONTRACTORS SIC LISTING FOR 362900 : GENERA TORS 1. AC/DC Electric Motor Service Elyas Gebresilassie 4822 Don Drive Dallas, TX 75247 PH : (214) 678-9997 FX: (214) 678-9950 acelyasdc@sbcg lobal. net http://www.fortworthgov.org/applications/mwbe _ siccode/Default.aspx 10/22 /2007 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response AC/DC Electric Motor Service 4822 Don Drive Received 1TB that was faxed . Does not Dallas , TX 75247 Elyas Gebresilassie 214-678-9997 10/22/07 4:52 PM rent generators, only repairs them . City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response AC/DC Electric Motor Service 4822 Don Drive Dallas, TX 75247 Elyas Gebresilassie 214-678 -9950 10/22/07 12:00 AM Faxed 1TB ENVIRONMENTAL, INC. 214 FM 1187 . Bu il di n g 6 . Ma ns f iel d T ex a s 76063 . T elephone {817} 477-9995 . Fa csi m ile (8 17) 4 77 -9 99 6 www . i n te r con -env i ron menta l .com Request for Subcontractor Bids PROJECT Company AC/DC Electric Motor Service City of Fort Worth Contact Elyas Gebresilassie Bid No. DEM 07-12: APT Address 4822 Don Drive Removal of asbestos containing materials and demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-678-9997 Bids are Due 10/24/07 Fax 214-678-9950 Time 10:00 AM E-mail acelyasdc<@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all st ructures present at the former Oa k Hollow and V illa Del Rio Apartment complexes. ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING Asbestos Waste Hauling Demolition Debris Hauling Temporary Fence Rental Portable Toilet Renta l Topsoil and Backfill Supplier Concrete Saw Cutting X Generator Rental Refrigerant Recovery and Recycling Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing Hydro Mulch Services Fire Sprinkler System Removal SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis .. Plans and/or spec1f1cations are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax NO. OTHER FACSIMILE 01 12146789950 ' YOUR LOGO YOUR FAX NO. Oct. 22 2007 04:43PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.22 04:42PM 00'51 SND 01 OK TO Tl.RN CFF ~T, PRESS 'l'BU' **04 . TIEN SELECT ~ BY US It-13 '+' ffi ' - ' . Fm FAX ADUPtfHO:: ASS I STi::N:E, PLEASE GU_ 1-800-t-ELP--FAX (435-7329). I I MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 1 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/22/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work required on City contracts . The City , therefore , will not guarantee , recommend or give warranty or other assurances as to the competency and/or fitness of certified M/WBE firms . At the present time , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City. These listings undergo continual revisions . The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace , prior to AWARD of the contract. The marketplace area includes the counties of: Tarrant, Parker , Johnson , Collin , Dallas , Denton , Ellis , Kaufman and Rockwall. Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change(s) and/or questions . If a certified vendor's name does not appear on the li sting (s), please call the M/WBE Office to verify. NOTE: An Offerer will be given credit toward the M/WBE goal only when the M/WBE supplier performs a commercially useful function. A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer. As defined in City Ordinance 15530, a Regular Dealer is a firm that owns , operates , or maintains a store ; a warehouse , or other establishments in which the materials or supplies required for the contract are bought , kept in stock , and are regularly sold retail or wholesale. A Manufacturer is one that manufactures a product by hand or machinery suitable for uses : the process of making wares. It is the responsibility of the Offerer to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. M/WBE CONTRACTORS SIC LISTING FOR 362900 : GENERA TORS 1. AC/DC Electric Motor Service Elyas Gebresilassie 4822 Don Drive Dallas, TX 75247 PH: (214) 678-9997 FX: (214) 678-9950 acelyasdc@sbcglobal.net http://www.fortworthgov.org/ applications/mwbe _ siccode/Default. aspx 10/22 /2007 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response AC/DC Electric Motor Service 4822 Don Drive Received 1TB that was faxed. Does not Dallas, TX 75247 Elyas Gebresilassie 214-678-9997 10/22/07 4 :52 PM rent generators, only repairs them . City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response AC/DC Electric Motor Service 4822 Don Drive Dallas, TX 75247 Elyas Gebresilassie 214-678-9950 10/22/07 12:00 AM Faxed 1TB ENVIRONMENTAL, INC. 214 FM 1187, Building 6, Mansfiel d , Texas 76063. Telephone (817) 477-9995. Facsimile (817) 477-9996 www. i nte rcon-en v i ronmenta I . com Request for Subcontractor Bids PROJECT Company AC/DC Electric Motor Service City of Fort Worth Contact Elyas Gebresilassie Bid No. DEM 07-12: APT Address 4822 Don Drive Removal of asbestos containing materials and demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-678-9997 Bids are Due 10/24/07 Fax 214-678-9950 Time 10:00 AM E-mail acelyasdcl@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oa k Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING Asbestos Waste Hauling Demolition Debris Hauling Temporary Fence Rental Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq X Generator Rental Refrigerant Recovery and Recycling Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing Hydro Mulch Services Fire Sprinkler System Removal SWPPP Plan OSHA A i r Mon itorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et ff, It JC.i F'EFC::F'T NO. OTHER FACSIMILE 01 12146789950 ' ! I YOUR LOGO YOUR FA >< NO. Oct. 22 2007 04:43PM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.22 04:42PM 00'51 SND 01 OK TO TL.RN CFF ~T, PRESS 'f'B,IJ' t:104. Tl-EN SELECT ClfF' BY US I "6 ' +' ffi ' - ' . i FOR FAX ADJ,=t·m=a: ASSISTA'U, PLEASE au_ 1-Em---+ELP-FA>< (435-7329). I I MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 1 of 5 CITY OF FORT WORTH MINORITY/WOMEN BUSINESS ENTERPRISE City Project Disclaimer -10/3/2007 Please be advised that the City of Fort Worth does not make any recommendations as to the capability or qualifications of any of these businesses to perform the work required on City contracts . The City , therefore , will not guarantee, recommend or give warranty or other assurances as to the competency and/or fitness of certified M/WBE firms . At the present time , this list of certified M/WBE firms is being formulated and maintained by the North Central Texas Regional Certification Agency (NCTRCA) solely for the purpose of disseminating information of the availability of M/WBE businesses for the City . These listings undergo continual revisions . The City of Fort Worth will accept certification of a vendor by the NCTRCA or Texas Department ofTransportation (highway division) in the marketplace , prior to AWARD of the contract . The marketplace area includes the counties of: Tarrant , Parker , Johnson , Collin, Dallas , Denton, Ellis , Kaufman and Rockwall. Please contact the Minority/Women Business Enterprise Office at (817) 392-6104 for any subsequent change(s) and/or questions . If a certified vendor's name does not appear on the listing(s), please call the M/WBE Office to verify. NOTE: An Offeror will be given credit toward the M/WBE goal only when the M/WBE supplier performs a commercially useful function . A M/WBE supplier is considered to have performed a commercially useful function when the M/WBE supplier is a manufacturer or a regular dealer. As defined in City Ordinance 15530 , a Regular Dealer is a firm that owns , operates , or maintains a store , a warehouse , or other establishments in wh ich the materials or supplies required for the contract are bought, kept in stock , and are regularly sold retail or wholesale . A Manufacturer is one that manufactures a product by hand or machinery suitable for uses ; the process of making wares. It is the responsibility of the Offeror to assure that the M/WBE supplier it list toward meeting the stated contract goal , also meet the City's requirements for a Manufacturer or Regular Dealer. C u, '--I-/;-. (_ +-/J-l L M/WBE CONTRACTORS SIC LISTING FOR .,, ~ ~ --I •.. , . ,. ' , I ,; --· 421200: HAULING BY DUMPTRUCK >( v'°1 . A. E. A. Transportation Alex Noriega 1006 Buckingham Drive Forney , TX 75126 PH : (469) 762-8063 FX : (469) 762-8063 aea alex@feccommunications .net ~~ant Trucking Company, Inc. Arthur Avant 3617 Dove Hollow Lane Justin , TX 76247 PH: (940) 648-8004 FX : (940) 648-3059 Xnda Price Trucking Brenda Price 152 W . Main Street Azle, TX 76020 PH : (817) 444-0836 FX : (817) 444-2639 bpt817@aol.com Xo. Clemons Trucking Company Beulah Clemons 7934 S. Lancaster Road Dallas, TX 75241 PH : (972) 224-1130 FX : (972) 228-0256 thelma88@prodigy .net ¥, Aguirre Trucking ,~;ias Trucking Alfonso Aguirre Eduardo Arias 5325 S Hampshire Boulevard 3814 Bremerton Street Fort Worth , TX 76112 Irving , TX 75062 PH: (817) 793-3488 PH : (214) 325-9811 FX : (817) 4 78-9661 FX: (214) 596-0013 emendez@mavericktruckins.com eariasirving@aol .com ·Xsanda Trucking Company Juan Banda 4828 Terrace Trail Fort Worth , TX 76114 PH : (817) 903-1862 FX: (817) 626-3358 jjbanda@earthlink.net X Bussey Trucking, Inc. Sam Bussey 3726 Toronto Street Dallas, TX 75212-3543 PH: (214) 630-5654 FX : (214) 631-0220 X. CLS & Associates, Inc. Christie Stewart P.O. Box 279 Seagoville , TX 75159 PH : (972) 287-3266 FX : (972) 474-9045 shartrucking@wiacomm .net ,.\,,.,' / 6. Barajas Trucking Diana G. Soto 5045 David Strickland Road , Suite 106 Fort Worth , TX 76119 PH: (817) 300-7440 FX: ~sco Contractors, Inc. Nicholas Jeffrey 5025 Sun Valley Drive Fort Worth , TX 76119 PH : (817) 294-9388 FX : (817) 294-9388 4contreras Trucking Roman Contreras 2606 W. Jefferson Boulevard Dallas , TX 75211 PH : (214) 331-6214 FX : (214) 467 -0480 rcontrucking@aol .com http://www .fortworthgov .org/applications/mwbe _ siccode/Default.aspx l 0/3/2007 MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 2 of 5 X. Cowboy Trucking Elfego V . Diaz 5812 Whispering Cedar Drive Dallas , TX 75236 PH : (972) 780-9094 FX: (972) 780-9343 ~ CRR Trucking Carolyn Fitzpatrick 2718 Boynton Dallas , TX 75212 PH : (214) 631-7480 FX : (214) 374-0266 ~ Dirt Trucking Company, Inc. Javier Alonzo 2407-D W. Arkansas Lane Arlington , TX 76013 PH : (817) 261 -3478 cowboy _trucking_service@Yahoo .com FX : (817) 469-9169 lx :uncan's Trucking Katie Duncan 1736 Caravan Trail Dallas , TX 75241 PH : (214) 375-2315 FX: (214) 375-2941 X Earth Haulers, Inc. Allen Tucker 11500 Mosier Valley Road Fort Worth , TX 76040 PH : (817) 540-2777 FX : (817) 571-4321 sales@earthhaulers .com . /~. G & 0 Diaz Trucking Pedro Diaz 9027 Winterset Avenue Dallas , TX 75232 PH : (214) 882-0515 FX : {/ 1_,/1 7. Eagle Aggregate Transportation, LLC Brenda Whitworth 4401 North 1-35 , Suite 113 Denton, TX 76207 PH : (940) 383-0096 FX : (940) 383-0097 brenda@eagle-trucking .com A. EEE Sand & Gravel, Inc. Pamela Evans 2400 Cloverhill Lane Seagoville , TX 75159 PH : (972) 287-3338 FX : (972) 287-3333 pevans67@yahoo .com \6 Girma Trucking, Inc. V\ Alem Girma 333 Melrose Drive Unit 33A Richardson , TX 75080 PH : (972) 644-1496 FX: (972) 238-5762 ~~@dirttrucking .com ~ Eagle Express Truck Services, Inc. Stormy Allen P.O . Box 1846 Mabank, TX 75147 PH : (903) 887-1707 FX : (903) 887-1424 stora3@aol .com t/~. Portillo Trucking, Inc. Fernando Portillo 1822 Spring Avenue Carrollton , TX 75006 PH : (972) 444-8669 FX : (972) 406-9291 ~Granados Trucking Roberto Granados 54 12 Kingslink Circle Fort Worth , TX 76135 PH : (817) 875 -2400 FX : (817) 237 -0055 Xouevara Dump Truck Services ~uido's Trucks ~ L H.J.G. Trucking Company V\.~~-aron Fentress Pedro Guevara Jose Ibarra 885 Blackland Road 1105 Mohawk Drive Royse City , TX 75189 Irving , TX 75061 PH : (972) 896-5430 PH : (972) 880-2811 FX : (972) 771-8724 FX : (972) 313-9705 701 Denair Fort Worth , TX 76111 PH : (817) 834-7181 FX : (817) 834-8240 hjgtruck@flash .net 1~. Henry & Eva Trucking • t~nry Wardsworth 623 Blue Grass Dallas , TX 75211 PH : (214) 337-0752 FX : (214) 337-0752 \ ,X 29. Herdez Trucking Company, v30.~ernandez Trucking Sand t/J\. Huertas's Trucking Augusto Huerta 523 Pueblo Street Dallas , TX 75212 Inc. & Gravel Hector Hernandez Rogelio Hernandez 6426 CF Hawn Freeway P.O. Box 541962 Dallas , TX 75217 Dallas , TX 75354 PH : (214) 826-9969 PH: (972) 286-7065 FX : (214) 826-5133 FX : (972) 286-7065 iJ':. J-R Transport Contractors 4 J. Higgins Trucking, Inc. Jose C . Romero Johnnie Higgins 3252 Highland Drive 362 Oaks Tra il , Suite 170 Dallas , TX 75234 Garland , TX 75043 http ://www.fortworthg ov .org/applications/mwbe _ siccode/Default.aspx 10 /3 /2007 MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 3 of 5 PH : (214) 752-6523 FX : (214) 698-9509 huertastrucking@aol.com \L: J. Rubio Trucking . v\ ~:~n Rubio · 9000 Country Road , #513 Alvarado , TX 76009 PH: (817) 688-3001 FX : (817) 790 -0560 jrubiotrucking@hotmail .com ~~JP Trucking Services ~~ctor Guajardo 9601 Simbra Lane Crowley , TX 76036 PH: (817) 297-1979 FX: (817) 297-7221 / ~-. ~nd Materials Avery Price P.O. Box 2858 DeSoto , TX 75123 PH : (214) 207-2072 FX: , }:;.; Lerma Trucking -\ J;~e Luis Lerma 2409 Rattkin Road Fort Worth, TX 76105 PH : (817) 501-4657 FX: V Lone Star Trucking and v ~;·c~vation Carmen Chavez 215 E. Mason Street Fort Worth, TX 76110 PH: (817) 927-2578 FX: chavez1428@sbcglobal.net ~Marks Trucking Marvin Marks 3601 Cliffwood Drive Alvarado , TX 76009 PH: (817) 783-3973 FX : (817) 783-3973 marvinmarks@peoplepc .com /s~elgar Trucking PH : (214) 837-0037 PH : (972) 203-3469 FX : (214) 837-0037 FX: (972) 203-2362 mlelgonzalez@sbcglobal .net higgins@j higginstrucking.com .x;; Joe Hernandez Enterprise, ~ohnny L. Punch Inc . JoHnny Punch Joe Hernandez 4404 Seay 7805 Wanebe Street Dallas , TX 75216 Dallas , TX 75235 PH : (214) 371-7930 PH: (972) 869-1694 FX : FX : (214) 574-4141 jhtruck@swbell.net \ ./' ,/ · L<::'. L. Flores Trucking ~9. LT. Equipment Company 1 r:is Flores Missy Jordan 3301 NW 25th Street 1702 S. Clark Road Fort Worth , TX 76106 Duncanville , TX 75137-3652 PH : (817) 625-8109 PH : (972) 780-2922 FX: 7780-9461 ~rry Rambo Trucking and 42. Leon Trucking Excavating lsai Leon Larry Rambo 2617 Virginia Court 501 Allison Lane Fort Worth , TX 76111 Fort Worth, TX 76140 PH: (817) 222-0337 PH : (817) 821-3704 FX : (817) 222-0116 FX : (817) 483-2820 4o-Rich Trucking Daryl Richardson 6512 Hartman Road Fort Worth , TX 76140 PH : (817) 483-8689 FX : (817) 483-8651 lrichardson6512@charter.net · ~ Luna's Trucking V ~r~nzo Luna 2100 N. Sylvania Fort Worth , TX 76111 PH : (817)834-8919 FX : vKgan Trucking, Inc. Andrew Logan 2533 Palo Alto Drive Dallas , TX 75241 PH: (972) 228-9159 FX : (972) 228-4121 ~ & M Construction Erit McDaniel 9725 Salorn Drive Crowley , TX 76036 PH : (817) 297-6280 FX : (817) 297-7511 mcdanieleric@sbcglobal .net ,~roney Excavation, LLC ~cRyan Hauling, Inc. Paula Maroney Judy Stinnett P.O . Box 368 P.O. Box 1669 Seagoville , TX 75159-0368 Roanoke , TX 76262 PH : (972) 287-2221 PH : (817) 430-3213 FX: (972) 287-2173 FX : (817) 636-2209 maroneyexcavation@joimail.com judy@mcryanhauling .com 1/~:-Metro Trucking ~~ MG Trucking http://www.fortworthgov.org/applications/mwbe _ siccode/Default.aspx 10/3/2007 MWBE Standard Industrial Classification (SIC) Vendor Listing Report Page 4 of 5 Francis R.Melgar 2608 San Sabastian Circle Grand Prairie, TX 75052 PH: (972) 262-3953 FX: francismelg ar@sbcglobal .net ~-Miko Trucking, Inc. Mike Robinson 1100 Crest Ridge Court Irving , TX 75061 PH : (214) 905-9202 FX : (214) 905-1975 mikotrucking@aol.com 1K.. Ornelas & Son's Trucking · I ~:~nuel Ornelas 809 N. Hampton Road Dallas , TX 75208 PH : (214) 943-5516 FX : (214) 943-3454 ornelas&son's@aol.com 6~eyna's Trucking Johnny Reyna 7825 Longfield Drive Fort Worth, TX 76108 PH : (817) 367-1542 FX : (817) 367-2118 Anna Segovia 8603 Old Homestead Dallas , TX 75217 PH : (214) 398-5583 FX : (214) 557-1705 ' ~: ~itchell General v ~~ntracting, Inc. Henry Mitchell 4650 S. Hampton Road , Suite 106 Dallas, TX 75232 PH : (214) 331-1691 FX: (214) 331-1693 \ 7nsulting@comcast.net V\ ;::.~~tlaw Hauling and \Sawing Javier Elizondo P.O. Box 181253 Arlington , TX 75096 PH : (817) 680-3560 FX : (81,.]f277-7147 \ o~iawhauling@aol.com '.~2. Rocha Trucking, Inc. Patricio Rocha 2309 SE 14th Street Grand Prairie , TX 75051 PH : (972) 262-0568 FX : (972) 237-2950 rochatransport@netzero .net · ~ Santiago Castillo Trucking 1: Saucedo Construction '~antiago Castillo J'ose Saucedo 2018 S Polk Street 3621 Reagan Drive Dallas , TX 75224 Fort Worth, TX 76116 PH : (214) 882-0091 PH : (817) 560-3325 FX : (972) 242-5827 FX : )< 1'Y.;.; Statewide Trucking Corporation 68. Stephy's, Inc. · \;<~y Gracy Beverly Gipson P.O . Box 169 10 Equestrian Trail Fate , TX 75132 Duncanville , TX 75116-2034 PH : (972) 771-1203 PH : (214) 330-0523 FX : (972) 771-1249 FX : (214) 330-0523 gipson80@msn .com y N-T Trucking V r~:~io Vieira 5209 Sandy Point Drive Arlington , TX 76018 PH : (817 ) 467-6589 4-d Alvarez Trucking Ted Alvarez 4906 Oak Hollow Drive Grand Prairie , TX 75052 PH : (214) 695-8805 German Lopez 114 E. Fairmeadows Drive Duncanville , TX 75116 PH : (214 ) 869-5475 FX : (214 ) 869-54 75 ' ~orth Texas Trucking, Inc. v\ ;~v 1 i~ Davila P.O. Box 542842 Dallas , TX 75354 PH : (214 ) 904-0693 FX: (214) 904-8089 northtt@msn .com 4-rez Trucking Company Rafael Perez 1005 W. Drew Street Fort Worth , TX 76110 PH : (817 ) 657-0129 FX : /' >( ~3 .. Saldana's Trucking Company, Inc. Edward Saldana 209 SE 19th Street Grand Prairie , TX 75050 PH : (972) 264-5313 FX : (972) 264-5516 sa ldanastrucking@sbcg lob al . net 1 66. Speedy Hauling · Espiridion Juarez 2424 NW 24th Street Fort Worth , TX 76106 PH : (817) 626-6829 FX : (817) 626-4547 ~unset Transportation, Inc. v ~:g~y Alexander 2400 Handley Ederville Road 2nd Floor Fort Worth , TX 76118 PH: (817) 589-7063 FX : (817) 284-9855 peggy@suntrans .org K.Texas Sand & Gravel Brenda Nimitz P.O. Box 2158 Mansfield , TX 76063 PH : (817) 225-0059 http ://www.fortworthgo v .org/applications/mw be_siccode/Default.aspx 10 /3/2007 MWBE Standard Industrial Clas sifi cation (SIC) Vendor Listin g Report Page 5 of 5 FX : (972) 467-6589 srv259@aol.com #, Texas Star Transport, LP , Te resa M. Coronado 6330 Toronto Street Dallas , TX 75212 PH : (214) 630-3725 FX : (214) 688-0071 texasstartransport@aol .com "V Trucking and Construction v \ 6~mpany of Texas C indy Cornish P.O. Box 951 Keene , TX 76059 PH : (817) 558-0525 FX : ( 817) 645-6441 tcc1979@sbcglobal.net V. W. Loudermill's Trucking & v\ ~;~avating, Inc. Walter Loudermill 12 70 Pemberton Hi ll Dallas , TX 75217 PH : (214) 398 -2410 FX : (972) 617-3645 ~-Wheeler Trucking Company \ ~:veil Wheeler 1212 Post Oak DeSoto , TX 75115 PH : (972) 342-1459 FX : (972) 228-0784 rwheeler_98@yahoo .com FX : (972) 572-7461 \ / // 1" 74. Tomas Reyes T rucking , Inc. Tomas Reyes 3529 Peoria Street Dallas , TX 75212 PH : (2 14 ) 631-27 11 FX : (214 ) 905-7565 ¥v & S Concrete, Inc. V ernell Sturns 612 Highwoods Trail Fort Worth , TX 76112 PH : (817) 368-0898 FX : (817 ) 870-5057 vsturns@sbcglobal .ne t ' ~ W. M. Bussey Trucking v\ ;:rvice William Bussey 402 7 North Westmoreland Dallas , TX 75212 PH : (214) 631-4610 FX : (214 ) 631-4611 FX : (817 ) 225-0063 kn imi texassandandgrave l.net 7 . Total Direct Environmenta l Solutions, Inc. Marilyn Shelton 3 12 Hallma rk Dr ive W . Fort Worth , TX 76134 PH : (8 17) 293-0435 FX : (81 7) 293 -3484 m mshelton2@sbcglobal.net · \Lsquez Trucking, Inc. \ ~~p=-~~azquez 4700 No lan Street Fort Worth , TX 76119 PH : (817 ) 531-2930 FX: (817 ) 535-71 05 vasquez .truck ing@sbcg lobal .net ~da Murphy Sand & Gravel Wanda Mu rphy 828 Lancaster-Hutch ins Road Lancaste r, TX 75146 PH : (214 ) 212-7012 FX : (972 ) 227 -6793 http://www.fortworthgov .org/ applications/mwbe _ sicco de/Defau lt.aspx 10/3/200 7 City of Fort Worth MWBE Telephone Contact Log Telephone Company Name Contact Person Number Date Time Response A.E.A . Transportation 1006 Buckingham Drive Forney, TX Phone# not valid . No listing in yellow 75126 Alex Noriega 469-762 -8063 10/11/07 3 :52pm pages .com Aguirre Trucking 5325 S. Hampshire Blvd . Fort Worth, TX 76112 Alfonso Aguirre 817-793 -3488 10/11/07 3 :00pm Left msg on machine Arias Trucking 3814 Bremerton Street Irving, TX 75062 Eduardo Arias 214-325 -9811 10/11/07 3 :57pm Eduardo Arias advises not interested . Avant Trucking Company, Inc . 3617 Dove Hollow Lane Justin, TX Per Arthur Avant does not have right 76247 Arthur Avant 940-648-8004 10/11/07 3 :59pm equipment for this job Banda Trucking Company 4828 Terrace Trail Fort Worth, TX 76114 Juan Banda 817 -903 -1862 10/12/07 10:35am Left message for Jesse Banda Barajas Trucking 5045 David Strickland Road, Suite Left message on voicemail. Diana Soto 106 Fort called back and requested fax to 8 17-563 - Worth, TX 76119 Diana G. Soto 817-300-7440 10/12/07 10:36am 1993 Brenda Price Trucking 152 W. Main Street Azle, TX 76020 Brenda Price 817-444-0836 10/12/07 11:09am Barbara Tillman will send response Bussey Trucking, Inc . 3726 Toronto Street Dallas , TX Sam Bussey requested we fax info again . 75212 -3543 Sam Bussey 214-630-5654 10/12/07 11 :26am Info faxed again . Cesco Contractors, Inc. 5025 Sun Valley Drive Fort Worth, TX 76119 Nicholas Jeffrey 817-294-9388 10/12/07 11:30am Left message on voicemail. r If If I'.' [_ I'.' ·-·· r · C (__ [__ [_ -r r · r ·-[ Clemons Truck ompany 7934 S. Lancaster Road Dallas, TX Thelma Clemons received fax . Not 75241 Beulah Clemons 972-224-1130 10/12/07 11 :32am interested . CLS & Associates, Inc. P.O. Box 279 Seagoville, TX 75159 Christie Stewart 972-287 -3266 10/12/07 11:33am Left message on voicemail. Contreras Trucking 2606 W . Jefferson Blvd . Dallas, TX 75211 Roman Contreras 214-331 -6214 10/12/07 11:34am Claudia Contreras confirmed receipt of fax . Cowboy Trucking 5812 No answer to phone call. No answering Whispering Cedar Drive Dallas , TX machine or voicemail. Unable to leave 75236 Elfego V. Diaz 972 -780-9094 10/12/07 11:39am message . CRR Trucking 2718 Boynton Dallas, TX 75212 Carolyn Fitzpatrick 214-631-7480 10/12/07 11 :41 AM Left message on voicemail. Dirt Trucking Company, Inc . 2407- D W . Arkansas Lane Arlington, TX 76013 Javier Alonzo 817-261-3478 10/12/07 11:43 AM Martha Reyes received fax . Duncan's Trucking 1736 Caravan Trail Dallas, TX 75241 Katie Duncan 214-375-2315 10/12/07 11:44am Left message on voicemail Eagle Aggregate Transportation, LLC 4401 North 1-35, Suite 113 Denton, TX 76207 Brenda Whitworth 940-383-0096 10/12/07 11 :47am Veronica Belmonte received fax Eagle Express Truck Services, Inc. P.O. Box 1846 Mabank, TX 75147 Stormy Allen 903-887-1707 10/12/07 11 :49am Left message on voicemail. Earth Haulers, Inc . 11500 Mosier Valley Road Fort Worth, Per Martha Delacruz fax not received . TX 76040 Allen Tucker 817-540-2777 10/12/07 11:50am Sent 1TB by fax again . EEE Sand & Gravel, Inc . 2400 Out of business. Refered to Derrick Ray Cloverhill Lane Seagoville, TX with Deer Trucking Company . Called Mr. 75159 Pamela Evans 214 -869 -1189 10/12/07 11:51am Ray and sent 1TB by fax. F. Portillo Trucking, Inc. 1822 Phone# not valid . Found listing in yellow Spring Avenue Carrollton, TX pages .com of 972 -506-8441. Left message 75006 Fernando Portillo 972 -444-8669 10/12/07 1 :15pm on voicemail r . I. -L L ~ L.. L L.. L.. r.; L L L L L L L G & 0 Diaz Tru ., 9027 Winterset Ave. Dallas, Pedro Diaz gave new fax# of 469-567- TX 75232 Pedro Diaz 214-882-0515 10/12/07 1:23pm 8007. Faxed 1TB Girma Trucking, Inc . 333 Melrose Drive Unit 33A Richardson, Left message on voicemail asking for new TX 75080 Alem Girma 972-644-1496 10/12/07 1:30pm fax# Granados Trucking 5412 Kingslink Circle Fort Worth, TX 76135 Roberto Granados 817-875-2400 10/12/07 1:33pm Per Robert Granados not interested. Guevara Dump Truck Services 885 Blackland Road Royse City, TX 75189 Pedro Guevara 972-896-5430 10/12/07 1:35pm Tony Guevara received fax . Guido's Trucks 1105 Mohawk Drive lrvng, TX 75061 Jose Ibarra 972-880-2811 10/12/07 1:42pm Jose Ibarra will send response. H.J .G. Trucking Company 701 Denair Fort Worth, TX 76111 Sharon Fentress 817-834-7181 10/12/07 1:44 PM Per Loretta, do not haul debris. Henry & Eva Trucking 623 Blue Grass Dallas, TX Eva Wardsworth advises fax out of order. 75211 Henry Wardsworth 214-337-0752 10/12/07 1:45 PM Not interested at this time. Herdez Trucking Company, Inc . No answer to phone call. No answering 6426 C F Hawn Frwy. Dallas, machine or voicemail. Unable to leave TX 75217 Hector Hernandez 214-826-9969 10/12/07 1:47 PM message. Hernandez Trucking Sand & Gravel P.O. Box 541962 Marco Hernandez requested we re -fax 1TB. Dallas, TX 75354 Rogelio Hernandez 972 -286-7065 10/12/07 1:53 PM Faxed 1TB . Huertas's Trucking 523 Not a working number. New listing of 214- Pueblo Street Dallas, TX 752-8488 from yellowpages.com is a fax#. 75212 Augusto Huerta 214-752-6523 10/12/07 1:50 PM Faxed 1TB . J-R Transport Contractors 3252 Left msg. on voicemail. 10/15/07 Jose Highland Drive Dallas, TX Romero called and requested 1TB be faxed 75234 Jose C. Romero 214-837-0037 10/12/07 2:00 PM to 972-445-2216 J. Higgins Trucking, Inc. 362 Oaks Trail , Suite 170 Garland, TX Tawanda Barns will forward message to 75043 Johnnie Higgins 972-203-3469 10/12/07 2 :01 PM Johnnie Higgins regarding 1TB. [_ a;.__ --L L _____. L__ L...._c L______,, L ~ L..___., L-c__ (__ L__ L L J. Rubio Trucki r\ 9000 Country Road #513 Alvarado, TX Invalid phone #. No listing in 76009 Juan Rubio 817-688-3001 10/12/07 2:04 PM yellowpages .com Joe Hernandez Enterprise, Inc. 7805 Wanebe Street Dallas, TX 75235 Joe Hernandez 972-869-1694 10/12/07 2:07 PM Left message on voicemail. Johnny L. Punch 4404 Seay Dallas, TX 75216 Johnny Punch 214-371-7930 10/12/07 2:09 PM Per Mrs. Punch, out of business. JP Trucking Services 9601 Simbra Lane Crowley, TX 76036 Victor Guajardo 817-297-1973 10/12/07 2:10 PM Left message on voicemail. L. Flores Trucking 3301 NW 25th Street Fort Worth, TX 76106 Luis Flores 817-625-8109 10/12/07 2:11 PM Left message on voicemail. L.T . Equipment Company 1702 S. Clark Road Duncanville, TX 75137-3652 Missy Jordan 972-780-2922 10/12/07 2:14 PM Left message on voicemail. Land Materials P.O. Box 2858 Invalid phone #. No listing in DeSoto, TX 75123 Avery Price 214-207-2072 10/12/07 2:16 PM yellowpages.com Larry Kamoo I ruc1<ing and Excavating 501 Allison Lane Fort Worth, TX 76140 Larry Rambo 817-821-3704 10/12/07 2:18 PM Left message on voicemail. Leon Trucking 2617 Virginia Court Fort Invalid phone#. No listing in Worth, TX 76111 lsai Leon 817 -222 -0337 10/12/07 2:19 PM yellowpages.com Lerma Trucking 2409 Rattkin Road Fort Jose Lerma asked for us to mail 1TB Worth, TX 76105 Jose Luis Lerma 817 -501-4657 10/12/07 2:23 PM because he does not have a fax machine Lo -Rich Trucking 6512 Hartman Road Fort Worth, TX 76140 Daryl Richardson 817-483-8689 10/12/07 2 :27 PM Linda Richardson asked for re-fax. Logan Trucking, Inc . 2533 No answer to phone call. No answering Palo Alto Drive Dallas, TX machine or voice mail. Unable to leave 75241 Andrew Logan 972 -228-9159 10/12/07 2 :51 PM message. L, L t. L.. L. L. L.-. L ~ E;". L ; L-L L (_ (___ -.-_ Lone Star True 3,. Excavation 215 E. Mason Street Fort Only number listed is a fax. Unable to Worth, TX 76110 Carmen Chavez 817-927-2578 10/12/07 2:53 PM verify if it is the correct company . Luna's Trucking Left message on voicemail. Alonzo Luna 2100 N. Sylvania Fort called back and requested copy of 1TB be Worth, TX 76111 Alonzo Luna 817-834-8919 10/12/07 2:57 PM mailed to him . M & M Construction 9725 Salorn Drive Crowley, TX ' 76036 Eric McDaniel 817-297-6280 10/12/07 3:03 PM Left message on voicemail. Marks Trucking 3601 Cliffwood Drive Alvarado, TX 76009 Marvin Marks 817-783-3973 10/12/07 3 :06 PM Left message on voicemail. Maroney Excavation, LLC P.O. Box 368 Seagoville, Per Barbara Warren , not interested at this TX 75159-0368 Paula Maroney 972-287-2221 10/12/07 3 :09 PM time . McRyan Hauling, Inc. P.O . Box 1669 Roanoke, TX Judy Stinnett requests we re -fax 1TB. 76262 Judy Stinnett 817-430-3213 10/12/07 3:23 PM Faxed 1TB. Melgar Trucking No answer to phone call. No answering 2608 San Sebastian Circle Grand machine or voicemail. Unable to leave Prairie, TX 75052 Francis R. Melgar 972-262-3953 10/12/07 3:30 PM message . Metro Trucking 8603 Old Homestead Dallas , Phone# not valid. No listing in yellow TX 75217 Anna Segovia 214-398-5583 10/12/07 3:39 PM pages .com MG Trucking 114 E. Fairmeadows Drive Duncanville, TX 75116 German Lopez 214-869-5475 10/12/07 3:41 PM Left message on voicemail. Miko Trucking, Inc . 100 Crest Ridge Court Irving, TX 75061 Mike Robinson 214-905-9202 10/12/07 3:42 PM Raul Tarango will fax quote . Mitchell General Contracting,lnc. 4650 S. Hampton Road, Suite 106 Dallas, TX 75232 Henry Mitchell 214-331-1691 10/12/07 3 :43 PM Left message on voicemail. North Texas Trucking, Inc . P.O. Box 542842 Dallas , TX 75354 David Davila 214-904-0693 10/12/07 3:44 PM Danny Delacruz has received fax . r I" I_ (_ (_ I" r: -c . r: ·-~ L (__ I c_ L L Ornelas & Son' ,eking 809 N. Hampton Road Dallas, TX 75208 Manuel Ornelas 214-943-5516 10/12/07 3 :48 PM Left message on voicemail. Outlaw Hauling and Sawing Phone number forwards to cell phone P.O. Box 181253 voicemail. Mailbox full, unable to leave Arlington, TX 75096 Javier Elizondo 817-680-3560 10/12/07 3:50 PM message. Perez Trucking Company 1005 W. Drew Street Left message on voicemail. Mailed copy of Fort Woth, TX 76110 Rafael Perez 817-657-0129 10/12/07 3:51 PM 1TB by US mail. Reyna's Trucking 7825 Longfield Drive Fort Worth, TX 76108 Johnny Reyna 817-367-1542 10/12/07 3:54 PM Left message on voicemail. Rocha Trucking, Inc . No answer to phone call. No answering 2309 SE 14th Street machine or voicemail. Unable to leave Grand Prairie, TX 75051 Patricio Rocha 972-262 -0568 10/12/07 3 :56 PM message . Saldana's Trucking Company, Inc . 209 SE 19th Street Grand Prairie, TX 75050 Edward Saldana 972-264-5313 10/12/07 3 :58 PM Left message on voicemail. Santiago Castillo Trucking 2018 S. Polk Street Santiago Castillo asked for copy to be Dallas, TX 75224 Santiago Castillo 214-882-0091 10/12/07 4:02 PM faxed to 214-337-1533. Faxed 1TB Saucedo Construction Spoke with Jose Saucedo . He does not 3621 Reagan Drive have a fax machine . Sent copy of 1TB via Fort Worth, TX 76116 Jose Saucedo 817 -560-3325 10/12/07 4:05 PM US mail. Speedy Hauling 2424 NW 24th Street Fort Worth, TX 76106 Espiridion Juarez 817-626 -6829 10/12/07 4:07 PM Per Sara Juarez, fax was received . Statewide Trucking Corporation P.O. Box 169 Fate , TX 75132 Kay Gracy 972 -771-1203 10/12/07 4:11 PM Per Junior Barry . Not interested . Stephy's, Inc. 10 Equestrian Trail Duncanville, TX 75116 -2034 Beverly Gipson 214-330-0523 10/12/07 4:15 PM Left message on voicemail. Sunset Transportation, Inc. 2400 Handley Ederville Road 2nd Floor D.J . Patterson in dispatch gave new fax# of Fort Worth, TX 76118 Peggy Alexander 817-589-7063 10/12/07 4 :17 PM 817 -595 -2001. Faxed 1TB . r r r I'' r · r .... .... r· ... ... ... ... ... r ( T-N-T Trucking 5209 Sandy Point Drive Arlington, TX 76018 Antonio Vieira 817-467-6589 10/12/07 4:23 PM Left message on voicemail. Ted Alvarez Trucking 4906 Oak Hollow Drive Grand Prairie, TX 75052 Ted Alvarez 214-695-8805 10/12/07 4:24 PM Ted Jr. advises he has received fax. Texas Sand & Gravel P.O. Box 2158 Debbie Green asked us to re-fax 1TB . Mansfield, TX 76063 Brenda Nimitz 817-225-0059 10/12/07 4 :32 PM Faxed 1TB. Texas Star Transport, LP 6330 Toronto Street Dallas, TX 75212 Teresa M. Coronado 214-630-3725 10/12/07 4 :35 PM Ismael Coronado has received fax . Tomas Reyes Trucking, Inc . 3529 Peoria Street Dallas, TX 75212 Tomas Reyes 214-631-2711 10/12/07 4 :38 PM Jesse Velasquez will send quote . Total Direct Environmental Solutions, Inc. Phone answered by machine as Dunlap 312 Hallmark Drive W. residence, not as Total Direct Env . Did not Fort Worth, TX 76134 Marilyn Shelton 817-293-0435 10/12/07 4:39 PM leave message. Trucking and Construction Company of Texas P.O . Box 951 Keene, TX Cindy Cornish asked us to re-fax 1TB . Faxed 76059 Cindy Cornish 817-558-0525 10/12/07 4 :42 PM 1TB again. V & S Concrete, Inc . 612 Highwoods Trail Per Vernell Sturns, does not do debris Fort Worth, TX 76112 Vernell Sturns 817-368-0898 10/12/07 4 :53 PM hauling. Vasquez Trucking, Inc. 4700 Nolan Street Fort Worth, TX 76119 Lupe Vazquez 817-531-2930 10/12/07 4 :55 PM Per Lupe Vasquez , fax received. W . Loudermill's Trucking & Excavating, Inc . 1270 Pemberton Hill Dallas, TX 75217 Walter Loudermill 214-398-2410 10/12/07 4:57 PM Left message on voicemail. W. M . Bussey Trucking Service 4027 Nor:th Westmoreland Dallas, TX 75212 William Bussey 214-631-4610 10/12/07 4:56 PM Per William Bussey, not interested . Wanda Murph ,d & Gravel 828 Lancaster-Hutchins Road Lancaster, TX 75146 Wheeler Trucking Company 1212 Post Oak DeSoto , TX 75115 Wanda Murphy Revell Wheeler 214-212-7012 10/12/07 4:54 PM Left message on voicemail. Revell Wheeler advises he is no longer in 972-342-1459 10/12/07 4:55 PM business. City of Fort Worth MWBE Mail and or Fax Contact Log Telephone Company Name Contact Person Number Date Time Response A.E.A. Transportation 1006 Buckingham Drive Forney, TX 75126 Alex Noriega 469-762-8063 10/11/07 7 :52 AM 1TB Faxed Aguirre Trucking 5325 S. Hampshire Blvd. Fort Worth, TX 76112 Alfonso Aguirre 817-478-9661 10/11/07 7 :53 AM 1TB Faxed Arias Trucking 3814 Bremerton Street Irving, Invalid number. Per Telephone TX 75062 Eduardo Arias 214-596-0013 10/11/07 7:54 AM contact, not interested . Avant Trucking Company, Inc. 3617 Dove Hollow Lane Justin, TX 76247 Arthur Avant 940-648-3059 10/11/07 7 :56 AM 1TB Faxed Banda Trucking Company 4828 Terrace Trail Fort Worth, TX 76114 Juan Banda 817-626-3358 10/11/07 7:57 AM 1TB Faxed Barajas Trucking 5045 David Strickland Road, Suite 106 Fort Worth, TX 76119 Diana G. Soto 817-563-1998 10/12/07 10:42 AM 1TB Faxed Brenda Price Trucking 152 W. Main Street Azle, TX 76020 Brenda Price 817-444-2639 10/11/07 7 :59 AM 1TB Faxed Bussey Trucking, Inc . 3726 Toronto Street Dallas, TX 75212-3543 Sam Bussey 214-631 -0220 10/11/07 8 :01 AM 1TB Faxed Cesco Contractors, Inc . 5025 Sun Valley Drive Fort Worth, TX 76119 Nicholas Jeffrey 817-294-9388 10/11/07 8 :02 AM Invalid number. Clemons Trucking Company 7934 S. Lancaster Road Dallas, TX 7 5 24 1 Beulah Clemons 972-228-0256 10/11/07 8 :04AM 1TB Faxed L It. C. L L--C. c:_ L a:; L L L t.. (_ (_ [ -CLS & Associat ,C. P.O. Box 279 Seagoville , TX 75159 Christie Stewart 972-474-9045 10/11/07 8 :05 AM Invalid number. Contreras Trucking 2606 W . Jefferson Blvd . Dallas, TX 75211 Roman Contreras 214-467-0480 10/11/07 8 :07 AM 1TB Faxed Cowboy Trucking 5812 Whispering Cedar Drive Dallas, TX 75236 Elfego V. Diaz 972-780-9343 10/11/07 8 :08 AM 1TB Faxed CRR Trucking 2718 Boynton Dallas , TX 75212 Carolyn Fitzpatrick 214-374-0266 10/11/07 8 :10AM 1TB Faxed Dirt Trucking Company, Inc. 2407 - D W . Arkansas Lane Arlington, TX 76013 Javier Alonzo 817 -469-9169 10/11/07 8:11 AM 1TB Faxed Duncan's Trucking 1736 Caravan Trail Dallas, TX 75241 Katie Duncan 214-375 -2941 10/11/07 8:12 AM Invalid number. Eagle Aggregate Transportation , LLC 4401 North 1-35, Suite 113 Denton, TX 76207 Brenda Whitworth 940-383 -0097 10/11/07 8:13 AM 1TB Faxed Eagle Express Truck Services , Inc . P.O . Box 1846 Mabank, TX 75147 Stormy Allen 903-887 -1424 10/11/07 8:15 AM 1TB Faxed Earth Haulers, Inc. 11500 Mosier Valley Road Fo rt Worth, 10/11/07 8:17 : AM TX 76040 Allen Tucker 817-571 -4321 10/12/07 11:50AM 1TB Faxed EEE Sand & Gravel, Inc. 2400 Cloverhill Lane Seagoville, TX 75159 Pamela Evans 972 -287-3333 10/11/07 8 :18AM 1TB Faxed F. Portillo Trucking, Inc. 1822 Spring Avenue Carrollton , TX 75006 Fernando Portillo 972-406-9291 10/11/07 8 :20AM 1TB Faxed G & 0 Diaz Trucking 9027 Winterset Ave. Dallas, TX 75232 Pedro Diaz No Fax Listing 10/12/07 1:21 PM 1TB Faxed (_ r__ r-. (. 't. L.. £ L 'L-. ~ 'L..,_ L L (_ [_ [_ r --Girma Truckin 333 Melrose Drive Unit 33A Richardson, TX 75080 Alem Girma 972 -238-5762 10/11/07 8 :21 AM Invalid number. Granados Trucking 5412 Kingslink Circle Fort Worth, TX 76135 Roberto Granados 817-237-0055 10/11/07 8:26 AM 1TB Faxed Guevara Dump Truck Services 885 Blackland Road Royse City, TX 75189 Pedro Guevara 972-771-8724 10/11/07 8:29 AM 1TB Faxed Guido's Trucks 1105 Mohawk Drive lrvng, TX 75061 Jose Ibarra 972-313-9705 10/11/07 8:31 AM 1TB Faxed H.J.G . Trucking Company 701 Denair Fort Worth, TX 76111 Sharon Fentress 817-834-8240 10/11/07 8:32 AM 1TB Faxed Henry & Eva Trucking 623 Blue Grass Dallas, TX 75211 Henry Wardsworth 214-337-0752 10/11/07 8:33 AM Invalid number. Herdez Trucking Company, Inc. 6426 CF Hawn Frwy. Dallas, TX 75217 Hector Hernandez 214-826-5133 10/11/07 8:35 AM 1TB Faxed Hernandez Trucking Sand & Gravel P.O. Box 541962 Dallas, TX 75354 Rogelio Hernandez 972-286-7065 10/11/07 8 :37 AM 1TB Faxed Huertas's Trucking 523 Pueblo Street Dallas, TX 75212 Augusto Huerta 214-698-9509 10/12/07 1:56 PM 1TB Faxed J-R Transport Contractors 3252 Highland Drive Dallas, TX 75234 Jose C. Romero 214-837-0037 10/15/07 9:04AM 1TB Faxed J. Higgins Trucking, Inc . 362 Oaks Trail , Suite 170 Garland, TX 75043 Johnnie Higgins 972-203-2362 10/11/07 8 :42 AM 1TB Faxed J. Rubio Trucking 9000 Country Road #513 Alvarado, TX 76009 Juan Rubio 817-790-0560 10/11/07 8:43 AM Invalid number. r;_ L.. r; ~ ~ ~ 1L-L-,:,;___ t. c_ L. L L [_ ( (" ,..-- Joe Hernandez .:rprise, Inc. 7805 Wanebe Street Dallas, TX 75235 Joe Hernandez 214-574-4141 10/11/07 8:46 AM 1TB Faxed Johnny L. Punch 4404 Seay Dallas, TX 75216 Johnny Punch No Fax Listing 10/11/07 8:47 AM No Fax Listing JP Trucking Services 9601 Simbra Lane Crowley, TX 76036 Victor Guajardo 817-297-7221 10/11/07 8 :48 AM 1TB Faxed L. Flores Trucking 3301 NW 25th Street Fort Worth, TX 76106 Luis Flores No Fax Listing 10/11/07 8:49 AM No Fax Listing L.T. Equipment Company 1702 S. Clark Road Duncanville, TX 75137 -3652 Missy Jordan 972-780-9461 10/11/07 8 :50 AM 1TB Faxed Land Materials P.O . Box 2858 DeSoto, TX 75123 Avery Price No Fax Listing 10/11/07 8:51 AM Invalid number. Larry Rambo Trucking and Excavating 501 Allison Lane Fort Worth, TX 76140 Larry Rambo 817-483 -2820 10/11/07 8:51 AM 1TB Faxed Leon Trucking 2617 Virginia Court Fort Worth, TX 76111 lsai Leon 817-222-0116 10/11/07 8:53 AM Invalid number. Lerma Trucking 2409 Rattkin Road Fort Worth, TX 76105 Jose Luis Lerma No Fax Listing 10/15/07 10:00am Mailed 1TB Lo -Rich Trucking 6512 Hartman Road Fort Worth, TX 76140 Daryl Richardson 817 -483 -8651 10/11/07 8:54 AM 1TB Faxed Logan Trucking, Inc . 2533 Palo Alto Drive Dallas, TX 75241 Andrew Logan 972-228-4121 10/11/07 8:56 AM 1TB Faxed Lone Star Trucking & Excavation 215 E. Mason Street Fort Worth, TX 76110 Carmen Chavez No Fax Listing 10/11/07 8:57 AM Invalid number. L L.. = I!' L .. L. L ,, L--·'I-. I; .:,_ L-L -(_ L L. L -i..una's Truckin 2100 N. Sylvania Fort Worth, TX 76111 Alonzo Luna No Fax Listing 10/15/07 10:00am Mailed 1TB M & M Construction 9725 Salorn Drive Crowley, TX 76036 Eric McDaniel 817-297-7511 10/11/07 8:58AM 1TB Faxed Marks Trucking 3601 Cliffwood Drive Alvarado, TX 76009 Marvin Marks 817-783-3973 10/11/07 8:59 AM Invalid number. Maroney Excavation, LLC P.O. Box 368 Seagoville, TX 75159-0368 Paula Maroney 972-287-2173 10/11/07 9 :03 AM 1TB Faxed McRyan Hauling, Inc . P.O . Box 1669 Roanoke, TX 76262 Judy Stinnett 817-636-2209 10/11/07 9:05 AM 1TB Faxed Melgar Trucking 2608 San Sebastian Circle Grand Prairie, TX 75052 Francis R. Melgar No Fax Listing 10/11/07 9:06AM Invalid number. Metro Trucking 8603 Old Homestead Dallas, TX 75217 Anna Segovia 214-557-1705 10/11/07 9 :07 AM Invalid number. MG Trucking 114 E. Fairmeadows Drive Duncanville, TX 75116 German Lopez 214-869-54 7 5 10/11/07 9:07 AM Invalid number. Miko Trucking, Inc. 100 Crest Ridge Court Irving, TX 75061 Mike Robinson 214-905-1975 10/11/07 9 :11 AM 1TB Faxed Mitchell General Contracting,lnc. 4650 S. Hampton Road, Suite 106 Dallas, TX 75232 Henry Mitchell 214-331-1693 10/11/07 9:12 AM 1TB Faxed North Texas Trucking, Inc. P.O. Box 542842 Dallas, TX 75354 David Davila 214-904-8089 10/11/07 9 :13 AM 1TB Faxed Ornelas & Son's Trucking 809 N. Hampton Road Dallas, TX 75208 Manuel Ornelas 214-943-3454 10/11/07 9 :14AM Invalid number. r [ ... ... r ,y r 1'. r T_ r r r r r r J' -Outlaw Haulin Sawing P.O. Box 181253 Arlington, TX 75096 Javier Elizondo 817-277-7147 10/11/07 9:17 AM 1TB Faxed Perez Trucking Company 1005 W. Drew Street Fort Woth, TX 76110 Rafael Perez No Fax Listing 10/15/07 10:00am Mailed 1TB Reyna's Trucking 7825 Longfield Drive Fort Worth, TX 76108 Johnny Reyna 817-367-2118 10/11/07 9 :19 AM 1TB Faxed Rocha Trucking, Inc . 2309 SE 14th Street Grand Prairie, TX 75051 Patricio Rocha 972-237-2950 10/11/07 9:28 AM 1TB Faxed Saldana's Trucking Company, Inc. 209 SE 19th Street Grand Prairie, TX 75050 Edward Saldana 972-264-5316 10/11/07 9 :30AM 1TB Faxed Santiago Castillo Trucking 2018 S. Polk Street Dallas, TX 75224 Santiago Castillo 972 -242-5827 10/12/07 3:59 PM 1TB Faxed Saucedo Construction 3621 Reagan Drive Fort Worth, TX 76116 Jose Saucedo No Fax Listing 10/15/07 10:00am Mailed 1TB Speedy Hauling 2424 NW 24th Street Fort Worth, TX 76106 Espiridion Juarez 817-626-4547 10/11/07 9:34AM 1TB Faxed Statewide Trucking Corporation P.O. Box 169 Fate, TX 75132 Kay Gracy 972-771 -1249 10/11/07 9:36 AM 1TB Faxed Stephy 's, Inc. 10 Equestrian Trail Duncanville, TX 75116-2034 Beverly Gipson 214-330-0523 10/11/07 9:37 AM Invalid number. Sunset Transportation, Inc . 2400 Handley Ederville Road 2nd Floor Fort Worth, TX 76118 Peggy Alexander 817-284-9855 10/12/07 4:17 PM 1TB Faxed T-N -T Trucking 5209 Sandy Point Drive Arlington, TX 76018 Antonio Vieira 817-467-6589 10/11/07 9 :38 AM Invalid number. I' I[ ( [ C '1:__ I[ ~ I, ~ t,_ L I. ( I' I ---red Alvarez Tr .g 4906 Oak Hollow Drive Grand Prairie, TX 75052 Ted Alvarez 972-572-7461 10/11/07 9:46AM 1TB Faxed Texas Sand & Gravel P.O. Box 2158 Mansfield, TX 76063 Brenda Nimitz 817-225-0063 10/12/07 4 :30 PM 1TB Faxed Texas Star Transport, LP 6330 Toronto Street Dallas, TX 75212 Teresa M . Coronado 214-688-0071 10/11/07 9:51 AM 1TB Faxed Tomas Reyes Trucking, Inc. 3529 Peoria Street Dallas, TX 75212 Tomas Reyes 214-905-7565 10/11/07 9 :52 AM 1TB Faxed Total Direct Environmental Solutions, Inc. 312 Hallmark Drive W. Fort Worth, TX 76134 Marilyn Shelton 817-293-3484 10/11/07 9:54 AM 1TB Faxed Trucking and Construction Company of Texas P.O. Box 951 Keene, TX 76059 Cindy Cornish 817-645-6441 10/12/07 4 :43 PM 1TB Faxed V & S Concrete, Inc. 612 Highwoods Trail Fort Worth, TX 76112 Vernell Sturns 817-870-5057 10/11/07 9 :57 AM 1TB Faxed Vasquez Trucking, Inc . 4700 Nolan Street Fort Worth, TX 76119 Lupe Vazquez 817-535-7105 10/12/07 4 :58 PM 1TB Faxed W. Loudermill's Trucking & Excavating, Inc. 1270 Pemberton Hill Dallas, TX 75217 Walter Loudermill 972-617-3645 10/11/07 9 :59 AM Invalid number. W. M . Bussey Trucking Service 4027 North Westmoreland Dallas, TX 75212 William Bussey 214-631-4611 10/11/07 10:01 AM 1TB Faxed Wanda Murphy Sand & Gravel 828 Lancaster-Hutchins Road Lancaster, TX 75146 Wanda Murphy 972-227-6793 10/11/07 10:03 AM 1TB Faxed ~ _ompany 1212 Post Oak DeSoto, TX 75115 Revell Wheeler 972-228-0784 10/11/07 10:05 AM Invalid number. ENVIRONMENTAL, I NC. 214 F M 1187. Build in g 6. Mansfield Texas 76063 . T elephone (817) 477-9995 . Facsimile (817) 477-9996 www . i n terco n -env i r onmental .c o m Request for Subcontractor Bids PROJECT Company A.E.A. Transportation City of Fort Worth Contact Alex Noriega Bid No. DEM 07-12: APT Address 1006 Buckingham Dr. Removal of asbestos containing materials and Forney, TX 75126 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 469-762-8063 Bids are Due 10/24/07 Fax 469-762-8063 Time 10:00 AM E-mail Aea alex@feccommunications.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@.intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of al l asbestos containing ma terials (ACM) and the demolition of all stru ct ure s p resent at the forme r Oa k Hollow an d V ill a Del R io Apartment complexes. ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itorinq UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current cert ificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et JI , I I![, F'EF'C::F'T NO. OTHER FACSIMILE START TIME 01 14697628063 Oct. 11 07:52AM i YOUR LOGO YOUR FA X NO. Oct. 11 2007 07:53AM INTERCON-ENVIRONMENTAL INC 817-842-1710 USAGE TIME MODE PAGES RESULT 00'56 SND 01 OK TO TlRN CFF REPl:RT, PRESS '1"EH...J' **04. I TI-EN SB....ECT (]fF BY USil'6 '+' ffi '-'. I I Fffi FAX AIX.rnTl'.lE ASSISTf:N'.:E, PLEASE a:t...L 1-ED3-t-EL.P-FAX (435-7329). I I YELLOWP AGES.COM YELLOWPAGES.COM Please revise your search, then select Find. We didn't find any matches for "A.EA TRansportation" Part of the new at&t © 2007 YELL OWPAG ES .COM LLC . Al l rights reserved . Page 1 of 1 © 2007 AT&T Knowledge Ventures. All rights reserved . AT&T , AT&T logo , Cingular and Cingular logos are trademarks of AT&T Knowledge Ventures and/or AT&T affiliated companies . Some data provided by~ and Acxiom . http://www.yellowpages.com/no -results?w= 1 &t=A.E.A. + TRansportation&g=F omey-TX... 10/11 /2 007 ENVIRONMENTAL, INC. 214 FM 1187. Building 6. M ansfield , T exas 76063 . Telephone (817 ) 477-9995 . Facsimile (817) 4 77-9996 www . i ntercon-envi ronmental .com Request for Subcontractor Bids PROJECT Company Aguirre Trucking City of Fort Worth Contact Alfonso Aguirre Bid No. DEM 07-12: APT Address 5325 S. Hampshire Blvd. Removal of asbestos containing materials and Fort Worth, TX 76112 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-793-3488 Bids are Due 10/24/07 Fax 817-478-9661 Time 10:00 AM E-mail emendez@mavericktruckins.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartme nt complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.El I[ I t I[, F'EF'DF'T .J NO . OTHER FACSIMILE 01 8174789651 YOUR LOGO YOUR FR >< NO. Oct. 11 2007 07:54AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 07:53AM 00'42 SND 01 OK TO l1RN CFF RE:PlFT, PRESS '113-1...J' it04. TIEN SELECT [JfF BY US It£ ' +' ffi ' - ' . Fffi FAX ~i:::G:: ASSISTftt'.:E, PI....EASE m..L 1-800-t-EY-FAX (435-7329). 1 I ENVIRONMENTAL, INC. 214 FM 1187. Bui l d i ng 6. Mansfield Texas 76063 . Telephone (8 17 ) 477-9995 . Facs i m il e (817 } 477-9996 www .i ntercon-environmental .com Request for Subcontractor Bids PROJECT Company Arias Trucking City of Fort Worth Contact Eduardo Arias Bid No. DEM 07-12: APT Address 3814 Bremerton St. Removal of asbestos containing materials and Irving, TX 75062 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-325-9811 -Bids are Due 10/24/07 Fax 214-596-0013 ir<1 )L r:;;. . c,, Time 10:00 AM E-mail eariasirving@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos conta ining materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol iti on Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL, I NC. 2214 FM 1187. Building 6 . Mansfield Texas 76063. Telephone (817) 477-9995 . Facsimile (817) 477-9996 www .i n te rcon -env i ron m ent al . co m Request for Subcontractor Bids PROJECT Company Avant Trucking Company, Inc. City of Fort Worth Contact Arthur Avant Bid No. DEM 07-12: APT Address 3617 Dove Hollow Lane Removal of asbestos containing materials and Justin, TX 76247 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 940-648-8004 Bids are Due 10/24/07 Fax 940-648-3059 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos con ta ining mat eria ls (ACM ) and the demoliti on of all st ruct ure s presen t at t he former Oa k Hollow and V illa Del Rio Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul ing X Demo li tion Debris Hauling Temporary Fence Renta l X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Dens ity and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate w ith your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.El ff , I ; fi F'EF'C:iF'T ~~O. OTHER FACSIMILE 01 19406483059 ' I I YOUR LOGO YOUR FAX NO. Oct. 11 2007 07:57AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 07:56AM 00'52 SND 01 OK TO TI.RN CFF ~T, PRESS 'f'B,lJ' **04. ~ SELECT ~ BY LISI!£ '+' ffi '-'. I Fffi FAX AIX..H{T~ ASSISTFN::E, PLEASE ffi.L 1-~-FAX (435-7329). I I ENVIRONMENTAL , INC. 214 F M 1187 . B u ilding 6. Mansf ield, T ex a s 76063 . Telephone (817) 477-9995 . Facs imile (81 7) 477 -9996 ww w . i nte rc on-en vi ron m e n t a l .c o m Request for Subcontractor Bids PROJECT Company Banda Trucking Company City of Fort Worth Contact Juan Banda Bid No. DEM 07-12: APT Address 4828 Terrace Trail Removal of asbestos containing materials and Fort Worth, TX 76114 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-903-1862 Bids are Due 10/24/07 Fax 817 -626-3358 Time 10:00 AM E-mail jjbanda@earthlink.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos con t aining materials (ACM ) and the demo liti on of all structu res present at t he forme r Oa k Holl ow and Vi ll a De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Renta l Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and D isposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analvsis Plans and/or specifications are available for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ':'.Et JI , I · JC, F'EF'CIF'T NO. OTHER FACSIMILE 01 8176263358 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 07:58AM INTERCON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 07:57AM 00'46 SND 01 OK TO TL.RN CFF Rl!:PffiT, PRESS 'l"ENJ' f:t04. n-Et..r SB..£CT ITT BY us11£ '+' rn '-'. ! Fffi FAX ADU=Nri=a:= ~ISTR-CE, A....EASE ffi..L 1-Em-+f3...P-FAX (435-7329). ! ENVIRONMENTAL , INC. 21 4 FM 1187 . B uildin g 6 . Mansfield Tex a s 76063 . Telephone (817 ) 477-9995. Facs i m il e (817) 477-9996 www. in te rc on -env i ron mental . com Request for Subcontractor Bids PROJECT Company Barajas Trucking City of Fort Worth Contact Diana G. Soto Bid No. DEM 07-12: APT Address 5045 David Strickland Road Removal of asbestos containing materials and Suite 106 demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76119 at 581 -7-& 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-300-7440 Bids are Due 10/24/07 Fax c'\/ 7-~l3-/9C/I! Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing mat erials (ACM ) and the demol ition of all structures present at the former Oa k Hollow and V ill a Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temoorarv Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recyclino X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testino X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.El ff , I t 11~ F'EF'DF'T YOUR LOGO YO UR FA X NO. Oct. 12 2007 10:43RM INTERCON-ENUIRDNMENTRL INC 817-842-1710 NO. OTHER FRCSIMILE STRRT TIME USRGE TIME MODE PRGES RESULT 01 8175631998 Oct. 12 10:42RM 00'47 SND 01 DK i TO TL.RN CFF REPrnT, PRESS ' l'BIJ' t:104. I TIEN SELECT CFF BY USII£ '+' CR'-'. ! I Fffi FAX RIX..mTFG:: ASSISTf'.NJ=, PLEASE C1U... 1-800-tEL.P-FA>< (435-7329). I i I ENVIRONMENTAL, INC. 2 14 FM 1187. Bu i lding 6 , Mansfield Tex a s 7 606 3 , Telephone (817 ) 4 7 7-999 5. F a cs i m i l e (817 ) 477-9996 www. i nterc on-en v i r onmenta I .com Request for Subcontractor Bids PROJECT Company Brenda Price Trucking City of Fort Worth Contact Brenda Price Bid No. DEM 07-12: APT Address 152 W. Main St. Removal of asbestos containing materials and Azle, TX 76020 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-444-0836 Bids are Due 10/24/07 Fax 817-444-2639 Time 10:00 AM E-mail Bpt817@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolit ion of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suoolier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and RecyclinQ X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil T estinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::B ff I I JC, F EF'C: FT YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:00AM INTERCON-EN VIRONMENTAL IN C 817-842-1710 NO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 8174442639 Oct. 11 07:59AM 00'51 SND 01 OK TO Tl.RN CFF ~T, PRESS 'l'EH...J' ~- TI-EN SELECT (F,F BY US It£ ' +' rn ' -' . Fffi FAX AD .. ,~fHO:: A!j>SISTf:N:E, PLEASE CFLL. 1-Em-+ELP-FAX (435-7329). tercon ENVIRONMENTAL, INC. 214 F M 1187 . B u ilding 6 . M ansfield Texas 76063 . T elephone (817) 477-9995. Facsimile (817) 477-9996 ww w . i ntercon -en v i r onm e n ta l .com Request for Subcontractor Bids PROJECT Company Bussey Trucking, Inc. City of Fort Worth Contact Sam Bussey Bid No. DEM 07-12: APT Address 3726 Toronto St. Removal of asbestos containing materials and Dallas, TX 75212-3543 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-630-5654 Bids are Due 10/24/07 Fax 214-631-0220 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con taining materia ls (AC M) and the demolition of all structures present at t he former Oa k Ho ll ow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTI NG X Asbestos Waste Hauling X Demo li t ion Debris Haul ing Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current cert ificate with your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-mail Phone Fax HO. OTHER FACSIMILE 01 12146310220 I YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:02AM INTERCON-ENVIRONMENTAL I NC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:01AM 00'50 SND 01 OK TO Tl..HN CFF ~T, PRESS '11:N...1' 004. TIEN SELECT ITT BY USII£ '+' ffi '-'. I Fffi FAX Al)l.)fNfi:::G: RSSIST!=N:E, PLEASE O:U.. 1-Em-tELP-FA>< (435-7329). I i ':B JI , l t [i F'EF 'C:F 'T NO. OTHER FACSIMILE 01 12146310220 YOUR LOGO YOUR FA X NO. Oct. 12 2007 11:29AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 11:28AM 00'50 SND 01 OK TO TLRN CFF R$Prnr, PRESS 'l'BI.J' "84. TIEN SELECT [F,F BY LIS I l'6 ' +' ffi ' - ' . i Fffi FAX~~ AisISTi::N:E, PL.EASE au.. 1-800-+B...P-FAX (435-7329). I ! ENVIRONMENTAL , INC. 214 F M 11 87 . Bu i ld ing 6 . Mansfield , Te x a s 760 6 3 . T e leph one (817) 477-9995 . Fac simi le (81 7 ) 477-9996 www . i ntercon -envi ronmental .com Request for Subcontractor Bids PROJECT Company Cesco Contractors, Inc. City of Fort Worth Contact Nicholas Jeffrey Bid No. DEM 07-12: APT Address 5025 Sun Valley Dr. Removal of asbestos containing materials and Fort Worth, TX 76119 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-294-9388 Bids are Due 10/24/07 Fax 817-294-9388 p ), ,, ., .. , ·, P--Time 10:00 AM E-mail '-/ . Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL , INC. 22 1 4 FM 1187 . Bu il ding 6. Mansf iel d Texa s 76063 . Telephone (817 ) 477-9995. Facs i m ile (817 ) 477-9996 www . i n t e rcon-en v i r on mental .com Request for Subcontractor Bids PROJECT Company Clemons Trucking Company City of Fort Worth Contact Beulah Clemons Bid No . DEM 07-12: APT Address 7934 S. Lancaster Rd. Removal of asbestos containing materials and Dallas, TX 75241 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-224-1130 Bids are Due 10/24/07 Fax 972-228-0256 Time 10:00 AM E-mail Thelma88@prodigy .net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@ intercon-environmental.com Scope of Work The scope of work consis ts of ; The remova l of all asbestos conta ining materials (ACM ) and t he demol iti o n of all st ructu res pres en t at the fo rme r Oa k Ho ll ow and V illa De l Rio Apartment complexes . { X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul ing Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analvs is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Pe rson E-mail Phone Fax '::.Et JI I i JC, F EF'[ F'T ~n OTHER FACSIMILE 01 19722280256 I YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:05AM I NTERCON-EN VIRONMENTAL IN C 81 7-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:04AM 00'40 SND 01 OK TO TlRN CFF REPffiT, PRESS '113"-.J' 004. TIEN SB..ECT ITT BY USil'6 '+' rn ·-·. I Fm FAX ~r:G= ~IST!=N:::E, PLEASE CR.L 1-800-t-B...P-FAX (435-7329). ! ENVIRONMENTAL , INC. 214 FM 11 8 7 , Bu il d in g 6 , M a n s f i e l d T e x a s 7 6 0 6 3 , T ele p hone (8 1 7) 477 -9995 , Fa cs im il e (8 1 7) 4 77 -9996 ww w . i n te rc on -e nv i ro nm e n tal .c o m Request for Subcontractor Bids PROJECT Company CLS & Associates, Inc. City of Fort Worth Contact Christie Stewart Bid No. DEM 07-12: APT Address P.O. Box 279 Removal of asbestos containing materials and Seagoville, TX 75159 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-287 -3266 Bids are Due 10/24/07 Fax 972-474-9045 /jc, )' ff,. Time 10:00 AM E-mail shartrucking@wiacomm.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos con tain i ng mate ri a ls (ACM ) and t he demoliti on of all st ru ctu res present at t he former Oak Ho ll ow a nd V illa Del Ri o Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable To il et Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the follow ing : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL, INC. 214 F M 118 7 , Bu ildi ng 6 . Mansfie l d Texas 76063, T e l ephone (817} 477-9995 . Facs imile (817) 477-9996 w ww . intercon-envi ron men tal .com Request for Subcontractor Bids PROJECT Company Contreras Truckina City of Fort Worth Contact Roman Contreras Bid No. DEM 07-12: APT Address 2606 W. Jefferson Blvd. Removal of asbestos containing materials and Dallas, TX 75211 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-331-6214 Bids are Due 10/24/07 Fax 214-467 -0480 Time 10:00 AM E-mail rcontrucking@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos con tain ing materials (ACM ) a nd t he demol it ion of a ll stru ct ures present at the forme r Oa k Hollow and V ill a Del Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttino Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and D isposal Soi l Density and Compaction Testi nq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El )[,I I J1~ F'EF'C:IF'T t'-10. OTHER FACSIMILE 01 12144670480 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:08AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:07AM 01'03 SND 01 OK TO Tl.RN CFF ~T, PRESS 'l"ENJ' 004. Tl-EN SELECT ITT BY us I I'£ ' +' ffi ' - ' . I Fffi FAX ~i=G:: AfISTi:N::E, Pl£ASE: o:u_ 1-Em-1-ELP-FAX (435-7329). ENVIRONMENTAL, INC. L214 FM 1187 . Bu il ding 6 . Mansfield , Texas 7 6063. T elephone (817) 477 -9995 . Fa csimile (817) 477 -9996 www .i ntercon-env i r onmen t a I .com Request for Subcontractor Bids PROJECT Company Cowboy Trucking City of Fort Worth Contact Elfego V. Diaz Bid No. DEM 07-12: APT Address 5812 Whispering Cedar Dr. Removal of asbestos containing materials and Dallas, TX 75236 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-780-9094 Bids are Due 10/24/07 Fax 972-780-9343 Time 10:00 AM E-mail cowboy _trucking_service@yahoo.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structures present at the fonner Oa k Hollow and V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El JI, I I JC, F'EF'C: F'T t-lO. OTHER FA CSIMILE 01 19727809343 ! YOUR LOGO YOUR FAX NO. Oct . 11 2007 08:09AM INTERCON-ENVIRDNMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:08AM 00'46 SND 01 DK TO TlRN (FF REPCRT, PRESS 'l'EH..J ' i:i04. TI-EN SELECT ClfF BY US I 1£ '+' ffi ' -' . i Fffi FAX Rl)(..H{fi:6E ASSIST~. Pl.EASE ffi..L 1-800--H3...P--FAX (435-7329). I ; ENVIRONMENTAL, INC. 214 FM 1187. Bu il d in g 6. Mansfield Texas 76063 . Teleph one (817 ) 477-9995. Fac simile (817 ) 477-9996 www .intercon-envi ronmental .com Request for Subcontractor Bids PROJECT Company CRR Trucking City of Fort Worth Contact Carolyn Fitzpatrick Bid No. DEM 07-12: APT Address 2718 Boynton Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-631-7480 Bids are Due 10/24/07 Fax 214-374-0266 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycl in g X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Ph one Fax '::.Et ff It JC, F'EF'[ F'T NO. OTHER FACSIMILE 01 12143740266 i YOUR LOGO YOUR FAX NO. Oct. 11 2007 08:11AM INTERCON-EN VI RONMENTAL INC 81 7-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:10AM 01'11 SND 01 DK TO Tl.RN CFF ~T, PRESS '!'EHJ' it04. TIEN SB....ECT (]fF BY US I l'6 '+' ffi ' - ' . I Fffi FAX ADVl=ffi"t=G: A$SISTi:N:E, Pl.£ASE CFLL 1-Em-tELP-FAX (435-7329). I I ! ENVIRONMENTAL, INC. 214 FM 1 1 87. Building 6 . Mansfield , T exas 76063 . Te le p hone (817 ) 477-9995 . F acsimile (817) 477 -9996 w w w . i n t ercon-e nv i ron mental . com Request for Subcontractor Bids PROJECT Company Dirt Trucking Company, Inc. City of Fort Worth Contact Javier Alonzo Bid No. DEM 07-12: APT Address 2407-D W. Arkansas Lane Removal of asbestos containing materials and Arlington, TX 76013 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-261-3478 Bids are Due 10/24/07 Fax 817-469-9169 Time 10:00 AM E-mail javier@dirttrucking.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax YOUR LOGO YOUR FA >< NO. Oct. 11 2007 08:12AM INTER CON-EN UIRONMENTAL IN C 817-842-1710 t-n OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 8174699169 Oct.11 08:11AM 00'40 SND 01 OK TO Tl.RN c:FF REFffi I , PRESS ' 1"'01.J' U04. TIEN SELECT CJfF BY USI1'6 '+' ffi '-'. ! Fffi FAX AD ... H{HG:: ASS I STi:N::E, PLEASE O:U.. 1-BEE-tELP-FAX C435-7329) . I ENV I RONMENTAL , INC. 214 FM 1187 . Bui ldi ng 6 . Mansf ield Texas 76063 . Telephone (817) 477-9995. Fa csimi le (817) 4 77-9996 www .i n te r c on -env i r on m en tal .co m Request for Subcontractor Bids PROJECT Company Duncan's Trucking City of Fort Worth Contact Katie Duncan Bid No. DEM 07-12: APT Address 1736 Caravan Trail Removal of asbestos containing materials and Dallas, TX 75241 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-375-2315 I Bids are Due 10/24/07 Fax 214-375-2941 -ic j IL Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of wo rk cons ists of ; The remova l of a ll asbestos con t aining mate ri als (AC M) and the demolit ion of all struct ures present at th e fo rme r Oa k Holl ow a nd V ill a Del Rio Apartment comple xes . { X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Testinq/analvs is Plans and/or specifications are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-ma i l Phone Fa x Choose a category to complete yo ur search for d uncan's truckin g in D allas T X -YELLO ... YELLOWPAGES .COM We didn't find an exact match for "duncan's trucking" in the Dallas , TX area . Expand your search area or try a diffe re nt searc h. Cont inue searching for busi ness names containing "duncan's" or "trucking." Or search in these related catego ri es : Local Trucking Service (88) T rucki ng (191) T rucking Transportation Brokers (39) Trucking-Heavy Hauling (14) Trucking-Light Hauling (3) Trucking-Liquid Or Dry Bu lk (6) Trucking-Motor F reight (75) Part of the new at&t © 200 7 YELLOWPAGES .COM LLC . All rights reserved . Page 1 of 1 © 2007 AT&T Knowledge Ventures . All rights reserved . AT&T , AT&T logo , Cingular and Cingular logos are trademarks of AT&T Knowledge Ventures and /or AT&T affiliated companies . Some data provided by Amaca i and Acxiom . http :/ /www.yellowpages .com/combo/Dallas-TX/duncans-trucking?m=any&w=O&t=dunc ... 10/12 /2007 ENVIRONMENTAL, INC. 2214 F M 11 8 7 . Bu ilding 6 . Mansfie l d T exas 76063 . Te l ephon e (817 ) 477 -9995 . F a csimi le (817 ) 477-9996 w w w . i ntercon -en vi r on m ental . com Request for Subcontractor Bids PROJECT Company Eagle Aggregate Transportation, City of Fort Worth LLC Bid No. DEM 07-12: APT Contact Brenda Whitworth Removal of asbestos containing materials and Address 4401 North 1-35 demolition of former Oak Hollow & Villa Del Rio Apts. Suite 113 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Denton, TX 76207 Bids are Due 10/24/07 Phone 940-383-0096 Time 10:00 AM Fax 940-383-0097 Location Our Office E-mail brenda@eagle-trucking.com Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos con taining mat e ri als (ACM ) and the demol ition of all st ru ct ures prese nt at the fo rm er Oa k Hollow a nd V ill a De l Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol it ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and D isposa l Soi l Density and Compaction Testinq X Hydro Mulch Serv ices Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Con tact Person E-ma il Pho ne Fax '::.Et ff, It 1C::, F'EF OF'T ~n OTHER FACSIMILE 01 19403830097 YOUR LOGO YOUR FR X NO. Oct. 11 2007 08:14AM INTERCON-ENVIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:13AM 00'53 SND 01 OK TO Tl.RN CFF ~T, PRESS 'l'El'lJ' 004. Tl-EN SELECT (F.F BY USil'6 '+' rn '-'. i ! FOR FAX AI:lU=Nri::G: A$SISTP1-CE, PLEASE CTU.. 1-800-+ELP-FAX (435-7329). ! I ENVIRONMENTAL, INC. 21 4 FM 1187 , Bu il d in g 6 . Mans field, Texas 76063 , Teleph one (817} 477-9995 , Facs i mile (817} 477 -9996 www . i nterco n-envi ro n mental .com Request for Subcontractor Bids PROJECT Company Eagle Express Truck Services, Inc. City of Fort Worth Contact Stormy Allen Bid No. DEM 07-12: APT Address P.0.1846 Removal of asbestos containing materials and Mabank, TX 75147 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 903-887-1707 Bids are Due 10/24/07 Fax 903-887-1424 Time 10:00 AM E-mail stora3@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(Wintercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos contain ing materials (ACM ) and the demolition of all structu res present at the former Oak Hollow and Villa De l Rio Apartmen t complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El ff , I 11Ci F'EF'CIF T ~~O. OTHER FACSIMILE 01 19038871424 I YOUR LOGO YOUR FA >< NO. Oct. 11 2007 08:16AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:15AM 00'39 SND 01 OK TO Tl.RN CFF R$PrnT, PRESS 'l"'BIJ' 004. Tl-EN SELECT I BY LEit-13 '+' CR ,_,. Fffi FAX ADl ... ~,ffl'.O:: ~ISTFN:E, PLEASE CH..L 1-802HELP-FAX (435-7329). I I ' ENVIRONMENTAL, INC. 214 F M 1187 . Building 6 . Mansf ield Texas 76063 . T elephone (8 17 ) 477-9995. Facs i mile (817) 477 -9996 w ww . i n t e r co n-en v i r onm e ntal.co m Request for Subcontracto r Bids PROJECT Company Earth Haulers, Inc. City of Fort Worth Contact Allen Tucker Bid No. DEM 07-12: APT Address 11500 Mosier Valley Rd. Removal of asbestos containing materials and Fort Worth, TX 76040 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-540-2777 Bids are Due 10/24/07 Fax 817-571-4321 Time 10:00 AM E-mail sales@earthhaulers.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structu res present at the former Oa k Hollow and V illa Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itori ng UST Removal Soil Test i ng/analysis Plans and/or specifications are availab le for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax HO. OTHER FACS IMILE 01 8175714321 I / i YOUR LOGO YOUR FR >< NO. Oct. 11 2007 08:17RM INTERCON-ENVIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PRGES RESULT Oct. 11 08:17RM 00'41 SND 01 OK TO TL.RN CFF REFffiT, PRESS ' l"ENJ' 004. TIEN =H..ECT [lfF BY US I l'6 ' +' ffi ' - ' . Fffi FAX ~i:G:: ~ISTFN:E, PL.EASE O:U.. 1-E03---tE._P-FAX (435-7329). '::.Et lI 1 I : l[, F'EF'C:F'T tm. OTHER FACSIMILE [11 8175714321 YOUR LOGO YOUR FA X NO. Oct. 12 2007 11:51AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 12 11:50AM 00'41 SND 01 OK TO Tl.RN CFF ~T, PRESS 'f'ENJ' 004. Tl-Bl SELECT ~ BY USil-ll '+' ffi '-'. I Fffi FAX ADVANTffiE ;51sr~. PL.EASE au_ 1-ED3-tELP-FAX (435-7329). ; ENVIRONMENTAL, INC. 22 14 F M 1187 . Bu ild ing 6 . M ansf ie l d T exas 7 6063 . Teleph one (81 7) 477-9995 . Facsimile (817) 477 -9996 www . in t e r con-envi ronmental .com //,.. -7> Request for Subcontractor Bids PROJECT L-r t.-. ( .-/ ' Company EEE Sand & Gravel, Inc. City of Fort Worth Contact Pamela Evans Bid No. DEM 07-12: APT Address 2400 Cloverhill Lane Removal of asbestos containing materials and Seagoville, TX 75159 demolition of former Oak Hollow & Villa Del Rio Apts. 2-,I '-/-g"fof -!/8'9 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-287 -3338 Bids are Due 10/24/07 Fax 972-287 -3333 Time 10:00 AM E-mail Pevans67@yahoo.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa De l Rio Apartmen t complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air MonitorinQ UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et ff , I t 11:::i F'EF DF'T NO. OTHER FACSIMILE 01 19722873333 YOUR LOGO YOUR rn x NO. Oct. 11 2007 08:19AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:18AM 01'06 SND 01 OK TO Tl.RN CFF R$PrnT, PRESS 'f"ENJ' 004. TIEN SELECT c:JfF BY USit-6 '+' ffi '-'. I i Fffi FAX AD,.HfH:O:: ~ I STr:N:E, Pl....EF6E au_ 1-Em-t-ELP-FAX (435-7329) . ENVIRONMENTAL, INC. 2214 FM 1187 . Bu il d i ng 6 . Ma nsfie ld Te xas 76063 . T elephone (817 ) 477-9995 .-Fa csi m ile (817 ) 477 -9996 www . i ntercon-envi ron mental .com Request for Subcontractor Bids PROJECT Company F. Portillo Trucking, Inc. City of Fort Worth Contact Fernando Portillo Bid No. DEM 07-12: APT Address 1822 Spr8ing Ave. Removal of asbestos containing materials and Carrollton, TX 75006 demolition of former Oak Hollow & Villa Del Rio Apts. '772.. ,·4.:, ,c,..,,J -.) -·-(_~ r at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-444-8669 Bids are Due 10/24/07 Fax 972-406-9291 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of al l asbestos containing materials (A CM ) and the demolition of all structures present at the former Oak Holl ow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et II It IC, F EF'C.F'T t-m. OTHER FACSIMILE 01 19724069291 YOUR LOGO YOUR FAX NO. Oct. 11 2007 08:21AM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:20AM 01'03 SND 01 OK TO TL.RN CFF ~T, PRESS '1"B1J' i:104. Tl-EN SELECT ClfF BY USI1£ '+' CF'-'. i FCF FAX ADI..Jf'.lslTf:U:: AySISTi:::N:E, Pl.EASE OU.. 1-Em-+ELP-FAX (435-7329). I fportillo trucking in Carrollton TX -YELLOWPAGES.COM Page 1 of 2 YELLOWPAGES.COM Horne > Carrollton > Name Search -f. portillo trucking We found 1 business for "f. portillo trucking" in Carrollton TX and the surrounding area . You can select Save This Search on the right to store this search in MY YELLOWPAGES .COM F Portillo Trucking Inc . 10550 Goodn ight Ln Dallas , TX 75220 Map (972) 506-8441 ***** Review Th is Business ! Rate it I Read Reviews More Options a RELATED BUSINESSES Associated Transportation Systems, Inc Serving Your Area (888) 424-7406 More Info I Web Site AOL Freight Solutions -. Serving Your Area (866) 709-037 4 More Info I We b Site Comet National Shipping Corporation -. . • Serving Your Area (800) 831-5376 More Info I Web Site Matt Benton Agency Serving Your Area (800) 460-1329 More Info I Web Site http ://www.yellowpages .com/name/Carrollton-TX/f-portillo-trucking?-w= 1 &t=f.+portillo ... 10/1 2 /200 7 ENVIRONMENTAL, INC. 214 FM 1 187 . Bu i ld i ng 6. Man sfiel d Te x as 7 60 6 3 . Teleph on e (8 1 7) 4 77-999 5 . Fa c s i mile (817 ) 4 77 -9996 www . i ntercon-envi ron mental .com Request for Subcontractor Bids PROJECT Company G & 0 Diaz Trucking City of Fort Worth Contact Pedro Diaz Bid No. DEM 07-12: APT Address 9027 Winterset Ave. Removal of asbestos containing materials and Dallas, TX 75232 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-882-0515 Bids are Due 10/24/07 Fax t.;/(E'-. •' , •. , 7 '"'.·' ,-,,~ ·; I "-'"" .... t_~ .. t.,-. Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con taining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suoolier Concrete Saw Cuttinq Generator Rental Refriqerant Recovery and Recyclinq X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-m ail Phone Fax '::.Et ff , I t JC, F'EF'C:'F'T NO. OTHER FA CSIMILE 0 1 14695678007 I I YOUR LOGO YOUR FA X NO. Oct. 12 2007 01:22PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 01:21PM 01'05 SND 01 OK TO nRN CFF ~T, PRESS 'f'B-1.J' t:t04. TIEN SELECT Clf"F BY US I "6 ' +' CR ' -' . i FOR FAX ~ACE ASSIST~, PLEASE CA...L 1-8120-1-ELP--FAX (435-7329). i i ! ENV I RONMENTAL , INC. 2214 FM 1187 , Building 6 , Mans fi e l d Texas 76063 , Tel ep h one (817 ) 477-9995, Facsimile (817) 477-9996 www .i n tercon-en v i ro n m ental .com Request for Subcontractor Bids PROJECT Company Girma Trucking, Inc. City of Fort Worth Contact Alem Girma Bid No. DEM 07-12: APT Address 333 Melrose Drive Removal of asbestos containing materials and Unit 33A demolition of former Oak Hollow & Villa Del Rio Apts. Richardson, TX 75080 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-644-1496 Bids are Due 10/24/07 Fax 972-238-5762 t o.. J' tt;. Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbest os con tainin g mat eria ls (ACM ) and the demo li t ion of all structu res prese nt at th e fonm e r Oa k Ho ll ow an d Vill a De l Rio Apartme nt co mplexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul i ng Temporary Fence Rental X Portab le To ilet Rental Topsoil and Backfill Supplier Concrete Saw Cutt i ng Generator Rental Refrigerant Recovery and Recycl ing X Bulb and Ballast Recyclinq and Disposal Soil Density and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A i r Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Co ntact Person E-mail Phone Fa x ENVIRONMENTAL , INC. 22 1 4 F M 1187 . Bu il d in g 6 . Mansfield T exas 76063 . T e le p h one (817) 477-9995. Fa csimile (817) 477 -9996 www .i n t e r con -env iro n me n t a l .c om Request for Subcontractor Bids PROJECT Company Granados Trucing City of Fort Worth Contact Roberto Granados Bid No. DEM 07-12: APT Address 5412 Kingslink Circle Removal of asbestos containing materials and Fort Worth, TX 76135 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth , TX 76111 Phone 817-875-2400 Bids are Due 10/24/07 Fax 817-237-0055 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos co nta ining m ateria ls (AC M) and t he demolit ion of a ll st ruct ures pres ent at the former Oa k Hollo w and V ill a Del Rio Apa rt ment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul i ng X Demol ition Debris Haul ing Temporary Fence Rental X Portable To il et Rental Topsoil and Backfill Suppl ier Concrete Saw Cutt i ng Gener ator Rental Refrigerant Recovery and Recycl ing X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A i r Mon itoring UST Removal Soil Testing/analysis Plans and/or specificat ions are ava il able for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield , Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes__ No (Please send a copy of your current certificate w ith your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '=,El JI 1 I t JC, F'EF'DF'T NO. OTHER FA CSIM ILE 01 8172370055 YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:27AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:26AM 00'48 SND 01 OK TO Tl.RN CFF R$PffiT, PRESS ' 1"B1J' 004. TIEN SELECT ffiF BY LISI!£'+' rn '-'. I J Fffi FAX A~i:D:: ASSIST!=N:E, Pl.EASE O:U.. 1-800-t-B.....P-FAX (435-7329). I ! ENVIRONMENTAL, INC. 2214 FM 1187 . B u ildi n g 6 . M ansfield, Tex a s 76063. T e l ephone {817 ) 477-9995. Facsimile (817 ) 477-9996 www. i nt ercon-envi ro nmenta I .c o m Request for Subcontractor Bids PROJECT Company Guevara Dump Truck Services City of Fort Worth Contact Pedro Guevara Bid No. DEM 07-12: APT Address 885 Blackland Rd. Removal of asbestos containing materials and Royse City, TX 75189 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-896-5430 Bids are Due 10/24/07 Fax 972-771-8724 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM) and the demolition of all structures present at the former Oa k Hollow and V illa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analvsis Plans and/or specifications are ava ilable for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '=,El ff, It JC:, F'EF'DF'T NO. OTHER FACSIMILE 01 9727718724 YO UR LOGO YOUR FA X NO. Oct. 11 2007 08:30AM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:29AM 00'57 SND 01 DK TO TL.RN CFF Rl;P[RT, PRESS 't'BI.J' 004. TIEN SB..ECT ITT BY US I 1£ ' +' rn ' -' . ', Fffi FAX ~f=tE A$5ISTfN:E, PLEASE o:t_L 1-800-H3....P-FAX (435-7329). I ' ENVIRONMENTAL , INC. 22 1 4 FM 1187 , B ui ld i ng 6 , Man sfi e l d T ex a s 76063 , T elep hone (8 1 7 ) 4 77 -9995 , Fa cs i m ile (817 ) 477 -9996 www . i ntercon-envi r on men ta I.com Request for Subcontractor Bids PROJECT Company Guido's Trucks City of Fort Worth Contact Jose Ibarra Bid No. DEM 07-12: APT Address 1105 Mohawk Dr. Removal of asbestos containing materials and Irving, TX 75061 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-880-2811 Bids are Due 10/24/07 Fax 972-313-9705 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos con taining materials (ACM ) and the demo lition of all structures prese nt at the fo rm e r Oa k Ho ll ow a nd Villa Del Ri o Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan -OSHA Air Mon itoring UST Removal Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the follow i ng : Is your company M/WBE or HUB cert ified? Yes No __ (Please send a copy of your current certificate with your b id.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::B II • It f.i F'EF'C'F'T t'-10. OTHER FACSIMILE 01 9 723139705 i YOUR LOGO YO UR FR >< NO. Oct. 11 2007 08:32AM INTERCON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:31AM 01'04 SND 01 OK TO TLRN CFF ~T, PRESS 'l"EN..I' t:t04. TI-EN SB...ECT c:iF BY us rt£ • + • rn • - • . I Fffi FAX AIX.HffffiE Af'ISTf'.N:E, PLEASE O:U.. 1-Em-t-ELP-FAX (435-7329). ; ENVIRONMENTAL, INC. 2214 FM 1187 . Building 6 . Ma n s field, Texas 76063 . Telephone (8 1 7) 477 -999 5. F acsimile (817} 477-9996 www .intercon-envi ronm e n t al .com Request for Subcontractor Bids PROJECT Company H.J.G. Trucking Company City of Fort Worth Contact Sharon Fentress Bid No. DEM 07-12: APT Address 701 Denair Removal of asbestos containing materials and Fort Worth, TX 76111 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-834-7181 Bids are Due 10/24/07 Fax 817-834-8240 Time 10:00 AM E-mail hjgtruck@flash.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-m ail Phone Fax '::.Et ff, It fi F'EF'C::,F'T ~n OTHER FACSIMILE 01 8178348240 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:33AM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:32AM 00'48 SND 01 OK TO TrnN CFF REPCRT, PRESS 'l'BIJ' 004. TI-EN SELECT (F,F BY l.lSil'6 '+' CF'-'. ' Fffi FAX AI)l.Jf'.l..jTfH= A$sISTi::::tCE, PLEASE au_ 1-800-H3_P-FA>< (435-7329). I ENVIRONMENTAL , INC. 2214 F M 1187. Build ing 6, Mansfield T exas 76063, Te l ep h one (817) 477-9995 . Facsimile (817) 4 77-99 96 ww w . i n t e rco n -en v i ro n men ta I .com Request for Subcontractor Bids PROJECT Company Henry & Eva Trucking City of Fort Worth Contact Henry Wardsworth Bid No. DEM 07-12: APT Address 623 Blue Grass Removal of asbestos containing materials and Dallas, TX 75211 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-337-0752 Bids are Due 10/24/07 Fax 214-337-0752 6 ~ i:l c,,c,,/ Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at th e former Oa k Ho ll ow an d V illa Del Rio Apartment comple xes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL , I NC. 214 F M 1187 , Building 6 , Mansf i eld Texas 76063 , Telephone {817 ) 477-9995, Facs i mile (817) 477-9996 ww w. i n tercon-env i r onm e ntal .com Request for Subcontractor Bids PROJECT Company Herdez Trucking Company, Inc. City of Fort Worth Contact Hector Hernandez Bid No. DEM 07-12: APT Address 6426 C F Hawn Freeway Removal of asbestos containing materials and Dallas, TX 75217 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-826-9969 Bids are Due 10/24/07 Fax 214-826-5133 Time 10:00 AM E-mail Location Our Office Method Fax , E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of a ll asbestos containing materials (ACM ) and the demolit ion of al l structu res present at t he form e r Oa k Hollow and V illa De l Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refriqerant Recovery and Recyclinq X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-ma il Phone Fax :::,Et JI 1 Ii JC, F'EF'D F'T t--10. OTHER FACSIMILE 01 12148255133 ' YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:35AM INTERCDN-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:35AM 01'01 SND 01 DK TO Tl.RN [FF R$fflr, PRESS ' f'BlJ' i:104. Tl-EN SELECT (lfF BY l.1511£ '+' ffi '-'. i I Fffi FAX ~f'.G:: A$SIST~. PL.EASE o:t..L 1-Em-+ELP-FAX (435-7329). ENVIRONMENTAL, INC. 2 14 FM 11 8 7 , B u il ding 6 . M a n sf i eld Texas 7606 3 . Telep h one (81 7) 477 -9995, Fa c sim il e (8 17 ) 4 77 -9996 ww w . i n t erco n -e nvi ro n menta I .com Request for Subcontractor Bids PROJECT Company Hernandez Trucking Sand & Gravel City of Fort Worth Contact Rogelio Hernandez Bid No. DEM 07-12: APT Address P.O. Box 541962 Removal of asbestos containing materials and Dallas, TX 75354 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-286-7065 Bids are Due 10/24/07 Fax 972-286-7065 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analysis Plans and/or specifications are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::Et JI , I t JC:, F'EF'DF T NO. OTHER FACSIMILE 01 19722857065 YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:38AM INTERCDN-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:37AM 01'19 SND 01 OK TO Tl.RN CFF ~T, PRESS 'f'Bl.J' t:t04. Tl-B-.1 SB...ECT CJfF BY US I "6 ' +' ffi ' -' . i Fffi FAX ADlX=tm=a: ~ I ST!=N:E, PLEASE au_ 1-800-+ELP-FRX (435-7329). i M=iildd#=fii' I i t~O. OTHER FACSIMILE 01 19722867065 I ' I YOUR LOGO YOUR FA X NO. Oct. 12 2007 01:SSPM INTERCON-EN UIRDNMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 01:54PM 01'19 SND 01 DK TO T~ CFF RlfPffiT, PRESS 'l'BU' 004. TIEN SELECT (F;F BY US I 1-6 ' +' CF1 ' - ' . I ' Fffi FAX A~f.'.O:: ASSIST!=N:E, PLEASE CFLL 1-800---tl3....P-FAX (435-7329). I i ENVIRONMENTAL, INC. 22 14 FM 1187 . B u i lding 6 . Mansfield, Texas 76063 . Telephone (817) 477 -9995 . Fac s imile {817) 477-9996 w w w . i nterco n -env i ronment al .com Request for Subcontractor Bids PROJECT Company Huertas's Trucking City of Fort Worth Contact Augusto Huerta Bid No. DEM 07-12: APT Address 523 Pueblo Street Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. ;;U '-(-7 ~-2--gL/ ?? at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-752-6523 6~ r.1--Bids are Due 10/24/07 Fax 214-698-9509 p,,_A r£ Time 10:00 AM E-mail huertastrucking@aol.com Location Our Office Method Fax, E-mail , US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work T he scope of work co ns ists of ; The remova l of a ll asbest os co nt a inin g materia ls (AC M) and the demo liti o n of al l st ructure s p re sen t at the fo rmer O ak Hollow a nd V illa Del Ri o Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Renta l Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/ana lys is Plans and/or specifications are available for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fa x huertas trucking in Dallas TX - YE LL OWPAGES .COM YELLOWPAGES.COM Home > Dallas > Name Search -huerta's trucking We found 1 business for "huerta's trucking" in the Dallas, TX area . You can refine your search by select ing Narrow By City below . Huerta's Trucking 1025 W Commerce St Dallas , TX 7 5208 Ma p (214) 752-8488 Part of the new at&t © 2007 Y ELL OWPAG ES.COM LLC . All rights rese rv ed . * * * * * Review This Business ! Rate it I Read Reviews More O ptions Pag e 1 of 1 RELATED BUSINESSES Associated Transportation Systems, Inc Servin g Y o ur A rea (888) 424-7406 More Info I Web S ite AOL Freight Solutions --Se rving Your Area (866) 709-0374 More Info I Web S ite Serving Your Area (800) 831-5376 More Info I Web Site Matt Benton Agency Serving Your A rea (800) 460-1329 More Info I Web Site © 2007 AT&T Knowledge Ventures . All rig hts rese rved . AT&T , AT&T logo , Cin gula r and Cingular logos are trademark s of AT&T Knowledge V entures and /or AT&T affil iated companies . Some data provided by A macai and Acx iom . h ttp://www. yell owpage s . com/name/Dallas-TX/huertas-truck.i ng?t=huerta %2 7 s+trucking 10/12/2007 '::.Et ff , I t 1Ci F'EF'C.F'T HO . OTHER FACSIMILE 01 12147528488 YOUR LOGO YOUR FA X NO. Oct. 12 2007 01:57PM INTERCON-EN VIRONME NTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 01:56PM 00'54 SND 01 OK TO l11"N CFF ~T, PRESS 'f'BIJ' i:104. TI-B..i SELECT CffF BY USI"6 '+' rn '-'. i FOR FAX Al)IJf'.:ffi"f'.=G:: ASSIST!'.N:E, Pl.EASE: au. 1-Em-t-13....P-FAX (435-7329). ENVIRONMENTAL, INC. 22 14 FM 1 187 , B u i l d in g 6 , M ansfield , Texas 76063 , Telephone (8 1 7) 477-9995 , Fa csimile (817} 477-9996 www . intercon -e n vi r o nm ental .com Request for Subcontractor Bids PROJECT Company J-R Transport Contractors City of Fort Worth Contact Jose C. Romero Bid No. DEM 07-12: APT Address 3252 Highland Drive Removal of asbestos containing materials and Dallas, TX 75234 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-837-0037 I Bids are Due 10/24/07 Fax .-----214-837-0037 /:;t,._J 0.-Time 10:00 AM E-mail ( mlelgonzalez@sbcglobal.net Location Our Office \_ ---Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of wo rk consists of ; The remova l of all asbestos containing mate rials (ACM ) and the demolition of all st ruct ures present at the f ormer Oa k Ho ll ow and V ill a De l Rio Apartmen t complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project ? Yes No __ Company Name Contact Person E-ma il Phone Fax -:=.Et ff , I I 1[i F'EF'DF'T YOUR LOGO YOUR FAX NO. Oct. 15 2007 09:05AM INTERCON-ENVIRONMENTAL INC 817-842-1710 1-,io. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 9724452216 Oct.15 09:04AM 00'41 SND 01 OK TO Tl.RN CFF R$PffiT, PRESS ' l'BIJ' 004. TIEN SELECT (F,F BY LJSI!-1:J '+' CR'-'. Fffi FAX ADVi'.NHO:: ASSIST~. PLEASE CTU... 1-800-t-B...P-FAX (435-7329). j ENVIRONMENTAL , INC. 2214 FM 118 7 . Bu ild ing 6 , Ma nsfield Texas 76063 . Te lephone (817) 477-9995 . Facsimile (817) 477-9996 www. i ntercon-env i ron menta l .com Request for Subcontractor Bids PROJECT Company J. Higgins Trucking, Inc. City of Fort Worth Contact Johnnie Higgins Bid No. DEM 07-12: APT Address 362 Oaks Trail Removal of asbestos containing materials and Suite 170 demolition of former Oak Hollow & Villa Del Rio Apts. Garland, TX 75043 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-203-3469 Bids are Due 10/24/07 Fax 972-203-2362 Time 10:00 AM E-mail higgins@jhigginstrucking.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toil et Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil TestinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ':B lI1 I I ff:i FEF'DF'T NO. OTHER FACSIMILE 01 19722032362 YOUR LOGO YOUR FA X t--JO. Oct. 11 2007 08:43AM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:42AM 00'53 SND 01 OK TO Tl.RN c:FF RE:PIFT, PRESS ' 1'0,1.J' 004. TI-EN SELECT ITT BY usrt£ '+' rn '-'. I i Fffi FAX AIX..HfT~ ASSIST!=N::E, Pl....ffiSE ~ 1-~-FAX (435-7329). j ENVIRONMENTAL, INC. 2214 FM 1187 . Bu il ding 6 . Mansf ie l d Texas 760 63 . T elephone (817 ) 47 7-9995 . F acsimile (817) 477-9996 w w w . i nt e rcon-en vi ron men ta l .co m Request for Subcontractor Bids PROJECT Company J. Rubio Trucking City of Fort Worth Contact Juan Rubio Bid No. DEM 07-12: APT Address 9000 Country Road, #513 Removal of asbestos containing materials and Alvarado, TX 76009 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-688-3001 (jc, .{, f±:; Bids are Due 10/24/07 Fax 817-790-0560 &I p-· Time 10:00 AM E-mail jrubiotrucking@hotmail.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and V illa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul ing X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutt ing Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Test inq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Choose a category to complete yo ur search for j. rubio trucking in A lvarado TX -YELLO ... Page 1 of 1 YELLOWPAGES.COM We didn't find an exact match for "j. rubio trucking" in the Alvarado, TX area . Expand your search area or try a different search . Continue search ing for business names containing "j." or "rubio" or "trucking." Or search in these related categories : Local Trucking Service (9) Trucking (40 ) Trucking Transportation Brokers (7) Trucking-Heavy Hau ling (6) Tru cking-Light Hauling (2) Truckin g-Liquid Or Dry Bulk (3) Tru cking-Motor F reight (14) Part of the new at&t ~ 2007 YELLOWPAG ES .COM LLC . All rights reserved . <O 2007 AT&T Knowledge Vent ures . All rights reserved . AT&T , AT&T logo , Cingular and Cingular logos are trademarks of AT&T Knowledge Ventures and /or AT&T affiliated companies . Some data provided by Amacai and Acxiom . http://www.yellowpages.com/combo/ Al varado-TX/j-rubio-trucking ?m=any&w=O&t=j. +r... 10/12 /2007 ENVIRONMENTAL , INC. 2214 F M 1187. Bu i lding 6 . Mansfield Texas 76063 . Te lephone {817) 477-9995. Facsimile (817) 477-9996 ww w . i n te r con -e nvi ro nmental . co m Request for Subcontractor Bids PROJECT Company Joe Hernandez Enterprise, Inc. City of Fort Worth Contact Joe Hernandez Bid No. DEM 07-12: APT Address 7805 Wanebe Street Removal of asbestos containing materials and Dallas, TX 75235 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth , TX 76111 Phone 972-869-1694 Bids are Due 10/24/07 Fax 214-57 4-4141 Time 10:00 AM E-mail jhtruck@swbell.net Location Our Office Method Fax , E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbest os con ta inin g materials (ACM ) and the demoli t io n of a ll st ruct ures prese nt at the fo rme r Oa k Holl ow a nd V ill a De l Ri o Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul i ng X Demol ition Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplier Concrete Saw Cutt ing Generator Rental Refrigerant Recovery and Recycl ing X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A i r Mon itoring UST Removal So il Testing /analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes__ No (Please send a copy of your current certificate with your b id .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-ma il Phone Fax YOUR LOGO YOUR FAX NO. Oct. 11 2007 08:47AM INTERCON-EN VIRONMENTAL IN C 817-842-1710 NO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 12145744141 Oct. 11 08:46AM 00'42 SND 01 OK j TO ~ c::FF ~T, PRESS 'l'BIJ' 004. TI-EN SELECT ITT BY us It£ • + • rn · -· . Fffi FAX ~i:G: ASSISTR-CE, Pl.EASE au._ 1-800-1-El.P-FAX (435-7329). ENVIRONMENTAL, I NC. 2214 FM 1187 , B u i lding 6 . Mansfield , Texas 76063 . Te l ephone (817} 477-9995. Facs imile (817} 477 -9996 w ww . i nterco n-e n v i ro n m e n t al .com Request for Subcontractor Bids PROJECT City of Fort Worth Contact Bid No. DEM 07-12: APT Address Removal of asbestos containing materials and Dallas, TX 75216 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-371-7930 Bids are Due 10/24/07 Fax Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbest os con tainin g mate ri als (ACM ) and t he demolit ion of a ll stru ctures pres e nt at t he fo rm er Oa k Hollow and Vill a De l Rio Apartme nt comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul ing Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil Test inq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-ma il Phone Fax tercon ENVIRONMENTAL , INC. 22 1 4 F M 1187 . B u i ldin g 6 . M a nsf i eld Te x as 7606 3 . T e l ephone {817) 477 -999 5 . F a c si m ile {817 ) 477 -99 96 w w w.i nt ercon -e n v iron me n tal .c o m Request for Subcontractor B ids PROJECT Comoanv JP Truckina Services City of Fort Worth Contact Victor Guajardo Bid No. DEM 07-12: APT Address 9601 Simbra Lane Removal of asbestos containing materials and Crowley, TX 76036 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-297-1979 Bids are Due 10/24/07 Fax 817-297-7221 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining mate ri als (ACM ) and the demo li ti on of all struct ures prese nt at the former Oa k Holl ow and Vil la Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo li t ion Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplie r Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Test ing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax ~.Et ff, me; FEF'[,FT YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:49AM INTERCON-ENVIRDNMENTAL INC 817-842-1710 t--10. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 8172977221 Oct.11 08:48AM 00'46 SND 01 DK TO TL.RN CFF REPffiT, PRESS ' l"Bl..l' 004. TI-EN SELECT ITT BY us11£ '+' rn ·-·. Fffi FAX AD\.Jl=ffi°f:G: ASSISTi=N:::E, PLEASE O:U... 1-800---tE....P-FAX (435-7329). ENVIRONMENTAL, INC. 221 4 FM 1187 . Build ing 6. Mansf iel d , Tex as 76063 . Teleph one (817 } 477-9995. Fa csimile (817 ) 477-9996 www . intercon-envi ronmen tal .co m Request for Subcontractor Bids PROJECT L. Flores Truckin City of Fort Worth Contact Luis Flores Bid No. DEM 07-12: APT Address 3301 NW 25 Street Removal of asbestos containing materials and Fort Worth, TX 76106 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone Bids are Due 10/24/07 Fax Time 10:00 AM E-mail Location Our Office Method Fax, E-mail , US Mail Estimator Keith Flowers E-mail keith(@,intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL, INC. 2214 FM 1187. Bui l ding 6. Mansfie l d , Tex a s 76063 . T elephone (817 ) 477-9995. Facsi m ile (817) 4 77 -99 96 www .i nte r con-env i ron mental .com Request for Subcontractor Bids PROJECT Company LT. Equipment Company City of Fort Worth Contact Missy Jordan Bid No. DEM 07-12: APT Address 1702 S. Clark Rd. Removal of asbestos containing materials and Duncanville, TX 75137-3652 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-780-2922 Bids are Due 10/24/07 Fax 972-780-9461 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of al l structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::Et l[ I I t H::, F'EF' C:'F' T NO. OTHER FACSIMILE 01 19727809451 YOUR LOGO YOUR FA X NO . Oct. 11 2007 08:51AM INTERCON-EN UIRDNMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:50AM 00'45 SND 01 DK TO TL.RN CFF ~T, PRESS 'l"EH.J' it04. I TIEN SELECT CF.F BY LISI!£'+' ffi '-'. FOR FAX Al)(.,Jt=f,ITi:::6E ASSIST~. PLEASE au_ 1-~-FAX (435-7329). i I ; ENVIRONMENTAL , INC. 2214 FM 1187, Bu ildin g 6 , Mans field Te xas 76063 , Telephon e (817) 4 77-9995 , Facs imile (817 ) 477-9996 w w w . i n t ercon-e nvi ron menta l .com Request for Subcontractor Bids PROJECT Company Land Materials City of Fort Worth Contact Avery Price Bid No. DEM 07 -12: APT Address P.O. Box 2858 Removal of asbestos containing materials and DeSoto, TX 75123 demolition of former Oak Hollow & Villa Del Rio Apts. I at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-207-2072 /YA.d #=-Bids are Due 10/24/07 Fax Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbest os contai ni ng m ate ri als (ACM ) an d t he demolit ion of all st ru ctures pres ent at t he former Oa k Holl ow a nd Vill a De l Rio Apartmen t complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topso i l and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Dens ity and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itorinQ UST Removal Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current cert ificate with your bid .) Do you i ntend to bid on th is project? Yes__ No __ Company Name Contact Person E-mail Phone Fa x Ch oose a cat egory to complete yo ur search fo r lan d mater ial s in Desoto TX -YELLOWP... Page 1 of 1 YELLOWPAGES.COM We didn't find an exact match for "land materials" in t he Desoto, TX area . Ex pa11d y our searc h area o r try a diffe ren t search. Continue search ing fo r business names conta in ing "land " or "mate r ia ls." Or sea rch in t hese related ca tegori es : Acoustical Materials (3) Building Materials (29) Building Materials-Wholesale & Manufacturers (4) Concrete Curing & Treating Materials (1) Display Fixtures & Materials (5) Du st Control Materials (1) Educational Materials (3) Fence Materials (7) Fireproofing Materials (1) Floor Materials (18) Floor Materials-Wholesale & Manufacturers (1) Gift Wrapping Materials (2) Haz ardous Material Control & Removal (6) Insulation Materi als (6) Land Surveyors (3) Material Handling Equipment (14) Material Handling Equipment-Wholesale & Manufacturers (1) Movino Services-Labor & Materials (36) Needlework & Needlework Materials (1) Pack aging Materials (8) Packaging Materials-Wholesale & Manufacturers (5) Paving Materials ( 1) Pipe & Boiler Covering Ma terials (1) Plastics-Raw Materials-Colorants Compounds Liquids Powders Res ins Etc (1) Quilting Materia ls & Supplies (5) Siding Materials (1) Solid Surface Materi als (3) Waterproofing Materials (1) Part of the new at&t © 20 07 YELLOWPAGES .COM LL C. A ll rights reserved . © 20 07 AT&T Knowledge Ventures . All rights reserved . AT&T , AT&T logo , Cingula r and Cingular logos are tradema rks of AT&T Knowledge Ventures and /or AT&T affil iated companies . Some da ta prov ided by Ama cai and Ac x iom . http://www.yellowpages .com/combo/Desoto -TX/land-materials?m=any&w=O&t=land+m. .. 10/12/2007 ENVIRONMENTAL, INC. 214 F M 1 1 87 . Bu il d i ng 6. Mansfield , T e x as 76063 . Telephone (817 ) 4 7 7-9 995 . Facsi m i l e (8 1 7 ) 477-9996 www .int e rcon-env i ronmenta l .com Request for Subcontractor Bids PROJECT Company Larry Rambo Trucking and City of Fort Worth Excavating Bid No. DEM 07-12: APT Contact Larry Rambo Removal of asbestos containing materials and Address 501 Allison Lane demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76140 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 817-821-3704 Time 10:00 AM Fax 817-483-2820 Location Our Office E-mail Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental .com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ':B JI, I I JC, F'EF'CIF'T t--JO . OTHER FACSIMILE 01 8174832820 YOUR LOGO YOUR FR >< NO. Oct. 11 2007 08:52AM INTERCON-EN VIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:51AM 00'55 SND 01 OK TO Tl.FN CFF REPffiT, PRESS ' l"BlJ' 004. Tl-Bl SELECT (JfF BY US I l'6 ' +' rn ' -' . I Fm FAX AD,X=t,.rn=•E ASS I ST/l'-CE, Pl.EASE rn__L_ 1-800-tELP-FAX (435-7329) . I ENV I RONMENTAL, INC. 2214 FM 1187. Bui ldi ng 6 . Mansfield Texas 76063 . T el ephone (8 1 7) 477-9995. Facs imi le (817) 4 77-9996 w ww .int e rcon-env i ro n menta l .co m Request for Subcontractor Bids PROJECT Company Leon Trucking City of Fort Worth Contact lsai Leon Bid No. DEM 07-12: APT Address 2617 Virginia Court Removal of asbestos containing materials and Fort Worth, TX 76111 demolition of former Oak Hollow & Villa Del Rio Apts. · at 5817 & 5901 Boca Raton Blvd ., Ft. Worth, TX 76111 Phone 817-222-0337 I Bids are Due 10/24/07 Fax 817-222-0116 _II o__ c)__J,[-Time 10:00 AM E-mail Location Our Office Method Fax , E-mail, US Mail Estimator Keith Flowers E-mail keithc@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos contain ing materials (ACM ) and the demolition of all struct ures present at the forme r Oa k Hollow and V illa Del Rio Apartment comple xes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplier Concrete Saw CuttinQ Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir Monitoring UST Removal Soil TestinQ/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax Choose a category to complete your search for leon trucking in Fort Worth TX -YELLO... Page 1 of 1 YELLOWPAGES.COM We didn't find an exact match for "leon trucking" in the Fort Worth, TX area . Expand your search area o r try a different search . Continue searching for business names containing "leon" or "trucking." Or search in these related categories : Local Trucking Service (59) T rucking (145) Tru ck ing T ransportation Brokers (56 ) Trucking-Heavy Hauling (22) Trucking-Light Ha uling (4) Trucking-Liquid Or Dry Bulk (12 ) T rucking-Motor Freight (6 1) Part of the new at&t © 2007 Y ELLOWPAGES .COM LLC . All rights reserved . © 2007 AT&T Knowledg e Ventures. All rights reserved . AT&T , AT&T logo , Cingular and Cingular logos are trademarks of AT&T Knowledge Ventures and /or AT&T affiliated companies . Some data provided by Amacai and Acxiom . http://www.yellowpages.com/combo/Fort-Worth-TX/leon-trucking?m=any&w=O&t=leo ... 10 /12/2007 ~" ibl.fktercon ENVIRONMENTAL, INC. 2214 FM 11 87, Bu il d i ng , Mansf i e l d , Texas 76063, Telephone (817) 477-9995, Facs i m il e (817) 477 -9996 www .intercon-environmental .com Request for Subcontractor Bids PROJECT Company ) Lerma Trucking City of Fort Worth Contact i Jose Luis Lerma Bid No. DEM 07-12: APT Address I 2409 Rattkln Road Removal of asbestos containing materlals and iFort Worth, TX 76105 demolltlon of former Oak Hollow & VIiia Del Rio Apts. \ at 5817 & 5901 Boca Raton Blvd., Ft Worth, TX 76111 Phone I 817-501-4657 Bids are Due 10/24/07 Fax ! Time 10:00 AM E-mall I I Location Our Office Method Fax, E-mail, US Mall Estimator Keith Flowers E-mall keltht@lntercon-envlronmental.com Scope of Work i The scope of work consis~ of ; The removal of all asbestqs containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and V ill a Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Wastr Hauling X Demolition Debris Hauling Temporary Ferice Rental X Portable Toilet Rental Topsoil and Bapkfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Balla$t Recycling and Disposal Soil Density and Compaction Testino X Hvdro Mulch S~rvices Fire Sprinkler System Removal X SWPPP Plan I OSHA Air Monitoring i UST Removal ; Soil Testino/analvsis Plans and/or specifications are available for review at: I lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one bt the following: Is your company M/VVBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bi8 on this project? Yes No __ Company Name 1 Contact Person E-mail Phone Fax Name and Ad dress o f Send er Arti cle N umber 1. i)Q.uo D'1· ,z: APr 2. 3 .. _lli_tv\o 0'7 . 1·2J APT 4. lRMo O 1 -rz : A-P, 5 . 6. 7 . 8. __ _.,.-, -/ - To tal Number of Piece s To ta l Number o f Pieces C heck type o f m a il or se rv ice : U C ertifi ed 0 COD U Recorded Delivery (In ternational) Cl Regis lered 0 Deli very Confir mati o n [J Express M ail D Return Receip l fo r M erchand ise fl Signa lure Con fir ma llon ·----Ll Insured ·--·· ·-··- Adctessee (Narre, Street, City, Stale, & ZIP Code) ---·-· ·-----··----~-l.£ r Mo.Truck i "6 HJ.h.: -J~~ l,.v.-1.: ~r""'°- .J'-t o q '20.. lH:.i "-Q. oHf. ----k,· f-(,L) 0 i;-1::h_T_y: ... , &~ - lu rw .. ' s. T rv c r_irt s A,~! A-Loi\. -z.c, L0 A O- Z t DO N. s ·.._,1110,v-)c,._ _:_fu d :-~.....b.tlt:L :-7k _ 7-fu . f _L 1--____ _ ~~7... Tn.,z_k)A5 ~: ~a..~l Pe,ez /005 w. _Lu '.?+, ---------l-----1-·--- ,3 s ,r' ,3~ ___ fed:-_ Lu.n cl:.'6.1;>S; __ ']j;,J_10 ____ -·------------ .5a.vc-e d D (1 "s -h\'.l ct>:" n A44: ---b s-e_ s ~uce cL Q '34,2 1 e e.~n l)n'"'(' __ £ed=_~_b_ u __ 7J, IL~ ____________ _ , 3 .s ---··----------------·---------------..... _, - -·----------· -------·----·-·---'·----·------~ ------- ! ~ ,i -----------____ ,_ ·-----~·------_L _____ --- Lis led by Se nder 4 Receiv~-a t_P_o_st_O_f-fic-·e--'--'--_:_-J-__ See Privacy Act Statement on Reverse I'S h ,n n 3077, Februnry 200 2 (Paye ·t o f 2) ENVIRONMENTAL, I NC. 2214 F M 1187 . B u ild i ng 6 . Mansfield Texas 76063 . T elephone {817) 477-9995 . Facsimile (817) 477-9996 www.i nt ercon -env i ro nm en tal .c om Request for Subcontractor Bids PROJECT Company Lo-Rich Trucking City of Fort Worth Contact Daryl Richardson Bid No. DEM 07-12: APT Address 6512 Hartman Rd. Removal of asbestos containing materials and Fort Worth, TX 76140 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-483-8689 Bids are Due 10/24/07 Fax 817-483-8651 Time 10:00 AM E-mail Lrichardson6512@charter .net Location Our Office Method Fax , E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon -environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oa k Ho ll ow and Villa Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Renta l X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the follow ing : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et ff l I lCi F'EF'[iF'T ~n OTHER FACSIMILE 01 8174838551 I i YOUR LOGO YOUR FAX NO. Oct. 11 2007 08:55AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 08:54AM 00'55 SND 01 OK TO Tl.RN c::FF REPrnT, PRESS 't'EN.J' 004. I TIEN SELECT 00F BY US I l'f:i '+' ffi ' -' . I ' Fffi FAX~~ ASSISTi=N:E, PLEASE ffi..L 1-800-tELP-FAX (435-7329). i i ' ' HO. OTHER FACSIMILE 01 E:1 74838651 YOUR LOGO YOUR FA X NO. Oct. 12 2007 02:27PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 02:26PM 00'53 SND 01 OK TO nHN CFF ~T, PRESS 'l"BLJ' t:104. llEN SELECT ClfF BY US I "6 ' +' rn ' - ' . FOR FA>< ADV~fHO:: ~IST!'.N:E, PLEASE O:U. 1-800-+ELP-FA>< (435-7329). I I i i ENVIRONMENTAL , INC. 2214 F M 1187. Bu i lding 6 . Man sfield , Texas 76063 . Telephone (817 ) 477-9995. Facsimile (817) 47 7-9996 www . i ntercon-env i ronmenta I .com Request for Subcontractor Bids PROJECT Company Logan Trucking, Inc. City of Fort Worth Contact Andrew Logan Bid No. DEM 07-12: APT Address 2533 Palo Alto Drive Removal of asbestos containing materials and Dallas, TX 75241 demolition of former Oak Hollow & Villa Del Rio Apts . at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-228-9159 Ba.) ff;. Bids are Due 10/24/07 Fax 972-228-4121 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work Th e scope of work consists of ; The remova l of all asbestos con tain ing materi als (ACM ) and t he demoliti on of a ll struct ures prese nt at t he f orm er Oa k Hollow and Vill a De l Rio Apartmen t comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable To i let Rental Topsoil and Backfill Supplier Concrete Saw CuttinQ Generator Rental Refrigerant Recovery and Recycli ng X Bulb and Ballast Recycling and Disposal Soil Dens ity and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itori nQ UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on th is project? Yes No __ Company Name Contact Person E-ma il Pho ne Fax '::HJ[, I r IC:, F'EF'DF'T t·~O. OTHER FRCSIMILE 01 19722284121 i i YOUR LOGO YOUR FA X NO. Oct. 11 2007 08:57RM INTERCON-ENVIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PRGES RESULT Oct.11 08:56RM 00'59 SND 01 OK TO Tl.RN CFF ~T, PRESS '1"B1J' 004. Tl-EN SELECT ITT BY LISI!£'+' ffi '-'. l I Fffi FAX A]J .. x:~,m=cE ASSISTi:u::E, PI...EASE: CR..L 1-Em-1-13....P--FAX (435-7329). I ENVIRONMENTAL, INC. 22 14 FM 1187 . Bu ilding 6 . Ma n sf ield T exas 76063 . T e l epho n e (817 ) 477 -9995 . Facs i mile (81 7 ) 477-9 9 96 www . i nte rc on-env i ro nmental .com Request for Subcontractor Bids PROJECT Company Lone Star Trucking and Excavation City of Fort Worth Contact Carmen Chavez Bid No. DEM 07 -12: APT Address 215 E. Mason Street Removal of asbestos containing materials and Fort Worth, TX 76110 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-927 -2578 jj q d, :1C Bids are Due 10/24/07 Fax Time 10:00 AM E-mail chavez1428@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suoolier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Lone Star Trucking and Excavation in Fort W orth TX -YELLOWPAGES.COM P age 1 of 5 YELLOWPAGES.COM Home > Fort Worth > Name Search -Lone Star Trucking and Excavation We found 428 businesses for 11 Lone Star Trucking and Excavation " in the Fort Worth, TX area . See 338 _businesses in categories related to "Lone Star Trucking and Excavation." Tri-Star Mechanical Services,J nc . . + 'Tri.Star 11:~meatSM~ . -~ . . . ~ .. llmlJlltf & Air ccna1ing (817) 293-3200 Lone StarTrucking_Safety Consultants Serving the Fort Worth Area (817) 457-0056 Lone _Star Overnight _LP Serving the Fort Worth Area (800) 800-8984 Sdlf{ ~-· .. ' . . . f;;{{ Exceptional service and s.iivin,gs; _ Contact Us Today for Additional Information More Info: Products & Services I In Business Since Lone Star Forklift 4213 Forest Ln Garland , TX 75042 Map (972) 494-5438 Call * l!one Star Forlihft DALLAS HOUSTON FT.WORTH .Amtour.Lone Star Coaches (972) 623-1100 ~ Review This Business ! Rate it I Read Reviews More Options a Review This Business ! Ratejt i Read Reviews Visit.Web . Site See Yellow Pages Ad Review This Business! Rate it I Read Reviews More Options ....... ·=--· a Visit Web S ite See Yellow Pages Ad MoreJnfo: P roducts &_Services I Brands I Hours of.Operation More Info : "· .. Department *Lone Star Forklift ... Any Time . Lone Star Forklift .. .Worth *Lo11e Star _Forklift ... " httn ://www.vellowoaQ"es .com/name/Fort -Worth-TX/Lone-Star-Tru ckin g -an d-Excavation?... 10/15 /2007 'lj'~ ,t~iercon ENVIRONMENTAL, INC. 2 214 FM 11 8 7 . Build in g ls. Mans fi eld I Texas 76063. Te l epho n e {8 1 7) 4 77 -9 995. Facs imil e (81 7 ) 4 77 -9 9 96 www . i nte r con -envi r on me nta I .com Request for Subcontractor Bids PROJECT Company I Luna's Trucking ' Cltv of Fort Worth Contact I Alonzo Luna Bid No. DEM 07-12: APT Address i 2100 N. Sytvanla Removal of asbestos containing materials and ! Fort Worth, TX 76111 demolition of fonner Oak Hollow & VIiia Del Rio Apts. i at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone ! 817-834-8919 Bids are Due 10/24/07 Fax I ; Time 10:00AM E-mail i Location Our Office Method Fax, E-mail, US Mall Estimator Keith Flowers E-mail kelth@lntercon-envlronmental.com Scope of Work , The scope of work consisl s of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartment comp lexes . ' ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Was~e Hauling X Demolition Debris Hauling I Temporary Fe~ce Rental X Portable Toilet Rental Topso il and Ba~kfill Suoolier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch S~rvices Fire Sprinkler System Removal X SWPPP Plan , OSHA Air Monitoring I UST Removal : Soil Testing/analvsis Plans and/or specifications are available for review at: I lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/\JVBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax Name and Address o f Sende r C h ecl< type o f m a il o r se r v ice : LJ Cerlili ed [l COD 0 Delivery Confi rm a ti o n [l Express Mall _____ _Q_ In sured __ Article Numbe r 1 . j)Quo o,. ,z ~ APr 2 . 3 . 4 . 5. 6. 7 . 8 . Total Numb er or Piece s Total Numbe r o f Pi eces ~s~~l~,~-~end er ~--Hece iv~-a t Post O ffi ce P ei Fo11ll 31177, Fe l>niary 2002 (1-'a ye ·1 o f 2) U Record ecl De live ry (Int erna ti o nal) [] Registered Ll R e turn Receipl for M e rcha 11Ui se r ·1 Signature Confirma llon 3 _$' / ·-~-- ,, Jr· '----, .. --·-. .,--I -----··-,, -------~ ~-------""'' ·--------------· /· '" See Privacy Act Statement on Reverse ENVIRONMENTAL, INC. 214 FM 1 1 87 . B uilding 6 . Mansfie l d Texas 7606 3 . Te l epho n e (8 1 7 ) 477-9995. F acsi m ile (817) 477-9996 ww w .i ntercon-envi ronmenta I .com Request for Subcontractor Bids PROJECT Company M & M Construction City of Fort Worth Contact Eric McDaniel Bid No. DEM 07-12: APT Address 9725 Salorn Drive Removal of asbestos containing materials and Crowley, TX 76036 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-297-6280 Bids are Due 10/24/07 Fax 817-297-7511 Time 10:00 AM E-mail mcdanieleric@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing mate rials (ACM ) and the demolition of all struct ures pre sent at the former Oa k Hollow and Villa Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ':'B JI1 It lC.1 F'EFCIF'T t,n OTHER FACSIMILE 01 8172977511 l I YOUR LOGO YOUR FA >< NO. Oct. 11 2007 08:59AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 08:SBAM 00'45 SND 01 OK TO Tl.H-1 CFF REPCJH, PRESS 'l"'BIJ' «04. TI-EN SELECT ITT BY us I l'6 . +. CR • -•. ! ! I FOR FAX AJ)l..,x:tlTFll: A$SI5Ti::N::E, PLEASE CA...L 1-B02HELP-FAX (435-7329). i I ' ENVIRONMENTAL, INC. 2214 F M 1 187 . B uildi n g 6 . M an s fi e l d T exas 76063 , Tele p hone (817) 477 -9995. F acsimi l e (817) 477-9996 www . i nt e r c o n -e n v i ro n m enta l .c om Request for Subcontractor Bids PROJECT Company Marks Trucking City of Fort Worth Contact Marvin Marks Bid No. DEM 07-12: APT Address 3601 Cliffwood Drive Removal of asbestos containing materials and Alvarado, TX 76009 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-783-3973 Bids are Due 10/24/07 Fax 817-783-3973 f ,v):i.t_ Time 10:00 AM E-mail marvinmarks@peoplepc.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbest os co nt aini ng materials (AC M) an d the demo lit ion of all st ructures present at t he fo rmer Oa k Hollow an d V ill a Del R io Apartme nt comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul i ng X Demolit ion Debris Haul ing Temporary Fence Renta l X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are ava ilab le for rev iew at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-mai l Phone Fax ENVIRONMENTAL, INC. 214 F M 1187 , B uilding 6 , M a n sfield , T exas 76063 , T elephone (8 1 7} 477 -9995 , F acsimi l e (817 ) 477-9996 www .i ntercon-e n vi ron menta l. c om Request for Subcontractor Bids PROJECT Company Maroney Excavation, LLC City of Fort Worth Contact Paula Maroney Bid No. DEM 07-12: APT Address P.O. Box 368 Removal of asbestos containing materials and Seagoville, TX 75159-0368 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-287-2221 Bids are Due 10/24/07 Fax 972-287 -2173 Time 10:00 AM E-mail maroneyexcavation@joimail.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of al l asbestos containing mat eria ls (ACM ) and the demolition of all structures present at the former Oa k Hollow and Vil la Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El /Ir I t l[i F'EF'DF'T t,JO. OTHER FACS I MI LE 01 19722872173 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:03AM I NTER CON -EN VI RDNME NTA L INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oc t.11 09:03AM 00'45 SND 01 DK TO TrnN CFF REPC:RT, PRESS '!"BU' tt04. I llEN SELECT CFF BY U5It£ '+' ffi '-'. I I Fffi FAX A~f:O:: ASSISTi:::N::E, PLEASE rn..L 1-~-FAX (435-7329). ENVIRONMENTAL, I NC. 2214 FM 1187 . Bu i lding 6 Man sfield Texas 76063 . T elep hone (8 17) 477-9995. Fa csi m il e (817) 477-9996 www . i n t ercon-e nviron m e nta l .com Request for Subcontractor Bids PROJECT Company McRyan Hauling, Inc. City of Fort Worth Contact Judy Stinnett Bid No. DEM 07-12: APT Address P .O. Box 1669 Removal of asbestos containing materials and Roanoke, TX 76262 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-430-3213 Bids are Due 10/24/07 Fax 817-636-2209 Time 10:00 AM E-mail judy@mcryanhauling .com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all as bes tos co nt ain ing mate ria ls (ACM ) and t he demol iti on of all st ructures prese nt at t he fo rme r O ak Hollow a nd V ill a Del Ri o Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul i ng Temporary Fence Rental X Portable To ilet Rental Topso il and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Co nt act Person E-mail Phone Fax t'-10. OTHER FACSIMILE 01 18176362209 ' i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:06AM INTERCDN-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:05AM 00'39 SND 01 OK TD Tl.RN CFF ~T, PRESS ' l"'Bl.J' **04. TI-Bsl SELECT ITT BY USil'6 '+' CR'-'. I i FCR FAX ADI..HfTf'.£1:: ~ISTl'.ff:E, Pl...B=ISE CTLL 1-800-+BY-FAX (435-7329). '.=.Et JI , I t !Ci F'EF'C:PT t·m. OTHER FACS IM I LE 01 18176362209 ! ' I I YOUR LOGO YOUR FA X NO. Oct. 12 2007 03:23PM INTERCON-EN VIRONME NTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 03:23PM 00'39 SND 01 OK TO ~ CFF RIEPCRT, PRESS 'l"Bl.J' ~- TI-B-l SELECT (JfF BY US I 1£ '+' ffi ' - ' . i I Fffi FA>< RDVf::VfHff ASS I STf'.N:E, PLEASE CFLL 1-Em---+ELP-FA>< (435-7329) . ENVIRONMENTAL, INC. 2214 FM 11 87 . Bu il d i ng 6 . Mansf i eld Texas 7 6063. Telepho ne (8 1 7 ) 477-9995 . Facs i m il e (817) 4 77-9 99 6 www . i ntercon-envi ronmental .co m Request for Subcontractor Bids PROJECT Company Melgar Trucking City of Fort Worth Contact Francis R. Melgar Bid No. DEM 07-12 : APT Address 2608 San Sebastian Circle Removal of asbestos containing materials and Grand Prairie, TX 75052 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-262-3953 Bids are Due 10/24/07 Fax Time 10:00 AM E-mail francismelgar@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith{@intercon-environmental.com Scope of Work The scope of work consists of ; The rem oval of all asbestos conta ining materials (A CM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Choose a category to complete your search for melgar trucking in Grand Prairie TX -YE... Page 1 of 1 YELLOWPAGES.COM We didn't find an exact match for "melgar trucking" in the Grand Prairie, TX area. Expand your search ar~a or try a different sea rch . Continue searching for business names containing "melgar" or "trucking." Or search in these related categories : Loca l T rucking Service (33) T rucking (53 ) Trucking Transportation Broke rs (18 ) Tru cking-Heavy Haulin g (8) Trucking-Light Hauling (1) T rucking-Li quid Or Dry Bulk (1) Trucking -Mo tor Freight (22) Part of the new at&t el 2007 YELLOWP AG ES .COM LLC . All rights reserved . © 2007 AT&T Knowledge Ventures . All rights reserved . AT&T , AT&T logo , Cingu lar and Cingular logos are trademarks of AT&T Knowledge Ventures and /or AT&T affiliated companies . Some data provided by Amacai and Acxiom . http://www.yellowpages.com/combo/Grand-Prairie-TX/melgar-trucking?m=any&w=O&t... 10 /12 /2007 ENVIRONMENTAL, INC. 2214 FM 1187 . Bu ilding 6. Mansfield T exas 76063 . T elepho n e (817) 477-9995 . Facsimile (817) 477 -9996 www . i nte rc o n-envi ron mental . com Request for Subcontractor Bids PROJECT Company Metro Trucking City of Fort Worth Contact Anna Segovia Bid No. DEM 07-12: APT Address 8603 Old Homestead Removal of asbestos containing materials and Dallas, TX 75217 demolition of former Oak Hollow & Villa Del Rio Apts. • at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-398-5583 /;c,.~{ .J-1 Bids are Due 10/24/07 Fax 214-557-1705 j f e, d f/-Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolit ion of all st ructures presen t at the former Oa k Hollow and V ill a De l Ri o Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recyclinq X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Ch oose a category to complete your se arch fo r metro t ru cking in D all as TX -YELL O WP... Page 1 of 1 YELLOWPAGES.COM We didn 't find an exact match for "metro trucking" i n the Dallas, TX area . Ex pand yo 1.1r search area or try a d ifferent se arch . Con tin ue sea rch in g for busi ness names containi ng "met ro " o r "t ruc ki ng ." Or sea rch in t hese rel ated ca te go ri es : Local Trucking Service (88) Trucking (191) Trucking T ransportation Brokers (39) Trucking-Heavy Hauling (14) Trucking-Light Hauling (3) Trucking-Li quid Or Dry Bulk (6) Trucking-Motor F reight (7 5 ) Part of the new at&t © 2007 YELLOWP AGES .COM LLC . A ll rights reserved. © 2007 AT&T Knowledge Ventures . All rights reserved . AT&T , AT&T logo , Cingular and Cingular logos are trademarks of AT&T Know ledge Ventures and /or AT&T affiliated companies . Some data provided by Amaca i and Acxiom . http ://wwv,,.yellowpages .com/combo/Dallas-TX/metro -trucking?m=any &w-O&t=metro+... 10 /12 /2007 ENVIRONMENTAL, INC. 2214 F M 1187 , Bu i lding 6 , Man sfiel d , Texas 76063, Telep hone (817) 477-9995 , Fac simile (817) 477-9996 www . i nt ercon-e n v i ro n me nta l .c o m Request for Subcontractor Bids PROJECT Company MG Trucking City of Fort Worth Contact German Lopez Bid No. DEM 07-12: APT Address 114 E. Fairmeadows Dr. Removal of asbestos containing materials and Duncanville, TX 75116 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-869-5475 Bids are Due 10/24/07 Fax 214-869-5475 r .e, ) rL Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of wo rk consists of ; The remova l of al l asbestos con taini ng materials (ACM ) and th e demoli tion of all structures p resen t at t he fo rmer Oak Holl ow and Vil la De l Rio Apartme nt comp lexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol ition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprink ler System Removal X SWPPP Plan OSHA Air Mon itorinq UST Removal Soil Testing/analysis Plans and/or specificat ions are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to b id on this project? Yes__ No __ Company Name Co ntact Pe rson E-mail Phone Fa x ENVIRONMENTAL, INC. 2214 FM 118 7 . Bu i l d i ng 6 . Mansf ield , Texas 76063 . Te l eph o ne (817) 477-9995 , Fa csi m ile (817 ) 477-9996 www . i ntercon-envi ronmental .com Request for Subcontractor Bids PROJECT Company Miko Trucking, Inc. City of Fort Worth Contact Mike Robinson Bid No. DEM 07 -12: APT Address 1100 Crest Ridge Court Removal of asbestos containing materials and Irving, TX 75061 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-905-9202 Bids are Due 10/24/07 Fax 214-905-1975 Time 10:00 AM E-mail mikotrucking@aol .com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon it oring UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.Et ff , I I JC, F'EF'CIF'T NO. OTHER FACSIMILE 01 12149051975 YOUR LOGO YOUR FAX NO. Oct. 11 2007 09:11AM INTERCON-ENUIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:11AM 00'38 SND 01 OK TO TWN CFF REPffiT, PRESS 'l"'BIJ' 004. I TI-EN SELECT ClfF BY USI!-13 '+' ffi '-'. Fffi FA>< ADI..Jf=Nri=w:E ASSIST!=N:E, PLEASE CFt..L 1-800-t-ELP-FA>< (435-7329). ENV I RONMENTAL, I NC. 2 2 1 4 F M 1 1 87 . Bu il d in g 6 . M a n sfi e l d T ex a s 76063 . T ele p hone (817) 477-9995 . F acsimile (817 ) 477-9996 w ww . i nte rco n -en v i r o n me n t a l . co m Request for Subcontractor Bids PROJECT Company Mitchell General Contracting, Inc. City of Fort Worth Contact Henry Mitchell Bid No. DEM 07 -12: APT Address 4650 S. Hampton Road Removal of asbestos containing materials and Suite 106 demolition of former Oak Hollow & Villa Del Rio Apts. Dallas, TX 75232 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-331-1691 Bids are Due 10/24/07 Fax 214-331-1693 Time 10:00 AM E-mail mgcconsulting@comcast.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@.intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos contain ing mate ria ls (ACM ) and t he demol ition of all struct ures pres e nt at t he fo rm er Oak Ho ll ow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are ava ilable for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-ma il Phone Fax '::.El ff, I I JC, FEF'CPT NO. OTHER FACSIMILE 01 12143311693 YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:13AM INTERCON-ENVIRDNMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:12AM 00'33 SND 01 OK TO Tl.RN CFF RIEPffiT, PRESS 'l'BIJ' t:t04. Tl-EN SELECT ClfF BY l.JSil-[j '+' ffi '-'. I i I Fffi FAX AD...mT!=G: ASSISTi::N:E, PLEASE au_ 1-Em-+ELP-FAX (435-7329). I ! ENVIRONMENTAL, INC. 22 14 FM 1187 . Bu ilding 6 . M ansfield , Texas 76063 . T ele p hone (817 } 477-9995 . F acsimile (817) 477-9996 www. i nt e rcon-env i r on men ta I .com Request for Subcontractor Bids PROJECT Company North Texas Trucking, Inc. City of Fort Worth Contact David Davila Bid No. DEM 07-12: APT Address P .0. Box 542842 Removal of asbestos containing materials and Dallas, TX 75354 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-904-0693 Bids are Due 10/24/07 Fax 214-904-8089 Time 10:00 AM E-mail northtt@msn.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing ma terials (ACM ) and the demolition of all structures present at the former Oak Hollow and V illa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw CuttinQ Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::.Et JI , I t K., F'EF'C::IF'T OTHER FACSIMILE 12149048089 ! YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:14AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:13AM 00'40 SND 01 DK TO Tl.RN CFF REPCRT, PRESS ' l"Et-l.J' l:t04. TI-EN SELECT ITT BY us 11-6 • + • rn · -· . I FOR FAX ~i=fiE ASSISTpt.CE, PL.EASE au_ 1-Be0-+ELP--FAX (435-7329). i i ENVIRONMENTAL, INC. 2214 FM 1187. Bu i lding 6. Mansf i eld Texas 76063. Telephone (817) 477-9995 . Facsimi le (81 7) 477-9996 www . intercon-envi ron mental .com Request for Subcontractor Bids PROJECT Company Ornelas & Son's Trucking City of Fort Worth Contact Manuel Ornelas Bid No. DEM 07-12: APT Address 809 N. Hampton Road Removal of asbestos containing materials and Dallas, TX 75208 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-943-5516 Bids are Due 10/24/07 Fax 214-943-3454 .&c( .d:" Time 10:00 AM E-mail ornelas&son's@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of al l asbestos containing materials (ACM) and the demol ition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate w ith your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fa x ENVIRONMENTAL , INC. 22 1 4 F M 118 7 . B u i ldi n g 6. M ansf i el d T e x as 7 6 0 6 3 . Telephon e (81 7) 4 77-9 9 95. F a c si mil e (8 1 7) 4 7 7-9996 ww w . int e rc o n -e n vi ron m e ntal .com Request for Subcontractor Bids PROJECT Company Outlaw Hauling and Sawing City of Fort Worth Contact Javier Elizondo Bid No. DEM 07 -12: APT Address P .O> Box 181253 Removal of asbestos containing materials and Arlington , TX 75096 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-680-3560 Bids are Due 10/24/07 Fax 817-277-7147 Time 10:00 AM E-mail outlawhauling@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos conta ining ma terials (ACM ) a nd the demolition of all structures present at the form e r Oa k Ho ll ow and Villa Del Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Suppl ier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycl ing and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Remova l So il Testinq/analvsis Plans and/or spec ifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on th is project? Yes__ No __ Company Name Contact Person E-mail P ho ne Fa x '3E t JI 1 I t JC.i F'EP CI F'T NO. OTHER FACSIMILE 01 8172777147 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:1BAM INTERCON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:17AM 00'48 SND 01 OK TO Tl.RN CFF R$PrnT, PRESS 'taU' 004. TIEN SELECT ClfF BY USil-6 '+' CF '-'. i FOR FAX ~i=GE ASSIST!=N:E, PLEASE o:l..L 1-800-tH...P-FAX (435-7329). I ENVIRONMENTAL, INC. 2214 FM 1187, Bu il ding !6. Mansfield, Texas 76063 . Telephone (817 ) 477-9995, Facs i m il e (8 1 7 ) 477-9996 www . i nte rcon-env i ronmenta I .com Request for Subcontractor Bids PROJECT Company ~erez Trucking Company City of Fort Worth Contact ! Rafael Perez Bid No. DEM 07-12: APT Address i 1005 W. Drew Street Removal of asbestos containing materials and ! Fort Worth, TX 76110 demolltlon of former Oak Hollow & VIiia Del Rio Apts. I at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone ; 817-657-0129 I Bids are Due 10/24/07 Fax I Time 10:00 AM E-mail ; Location Our Office Method Fax, E-mall, US Mall Estimator Keith Flowers E-mall kelth@lntercon-environmental.com Scope of Work . ; The scope of work consists of ; The removal of all asbesths containing materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ' ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling I I Temporary Fence Rental X Portable Toilet Rental Topsoil and Ba,bkfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Balla$t Recycling and Disposal Soil Density and Compaction Testino X Hydro Mulch S!3rvices Fire Sprinkler System Removal X SWPPP Plan : OSHA Air Monitoring UST Removal : Soil Testino/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one 6f the following : Is your company MVWBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bi~ on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Name a 11 d Address o f Sender Arlide Nu111t>e 1 I. j)QJ..AO 0'1-, 2. ~ AP, 2 . 3. futAo 0'7 -n _i APT 4 . 5. 6 . 7 . 8 . To la! Numbe r ot Pieces Lis led by Sende r LI-T o lal Number o f Pie ces Hecelve al Post Office C h eck lype o f m a il or service: U Certifi ed U COD CJ Deli very Co11firmalio11 U Express Mall _________ O In sured . __ LJ Re corded De livery (lnlernallo nal) Cl Ll i"J Registered Re lurn R eceipt for Merchandise Signa lure Co nfir111 a ilon Addressee (Name. Street, City , Slate. & ZIP Oxle) Lz r M; T N ck -i 1\6---- /ll-h,: -,,.lb,S'g (v,1;· l-~ r M,Q.... .:l'-1 oq eo..t+b I\ Q, oP.-d ____ k,-_/-u)o~~--IY __ 7~_ill5 Lu n o..'!:. T rvc b 'n 0 A<\-~; A-(.Q I\. Le Lu f\0- 21()() N. $' ... 1lv0,v-!<?, ___ Sru:.t: w bcft._~ 7fu IJ .1. fl.:. re. 7.. T rvc_!c,.," 5 ftH-tn J ~a.c-t;' l p~(f"l,: /00 5 W, _--<:'..= ~+, ____ foci::-_ lu hs:±h_l]S. ___ ']1,J LI) __ _ Sa.vce d !>. O:,"s;h0c+. .. n Al-1-jl\: ,_~se._ S a..,,.ce do 3~2.1 1:'..Q.~() i)n'.r(;' _Yee '=---~-~b .U .. 7ki L?,» ----·------'---'------,__,__ ___ I-- PS Form 3877, Feb 1u a ry 200 2 (P age ·/ of 2) Affix S tamp Here (II issued as a cerlilica le o f mailing, or for addillonal copias of /his oil/) See Privacy A c t Statement on Reverse ---r-•• ------' ·- ---r. -··------------- ' I, ENVIRONMENTAL, INC. 221 4 F M 1187. B uilding 6 , Mansfield Texas 76063 . T eleph o n e (8 1 7) 477-9995. F acsimile (817 ) 477-9996 www . i nt erco n -e nvi ron me ntal .co m Request for Subcontractor Bids PROJECT Company Reyna's Trucking City of Fort Worth Contact Johnny Reyna Bid No. DEM 07-12: APT Address 7825 Longfield Drive Removal of asbestos containing materials and Fort Worth, TX 76108 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-367-1542 Bids are Due 10/24/07 Fax 817-367-2118 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all st ructures pres e nt at t he former Oa k Holl ow and V illa De l Ri o Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To ilet Renta l Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental RefriQerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction TestinQ X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil TestinQ/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ·:=,Et ff, I I JC, F'EF'CIF'T ~,tO. OTHER FACSIMILE 01 8173672118 i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:20AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:19AM 01'06 SND 01 OK TO nRN CFF ~T, PRESS 'f'Et,IJ' t:i04. n-e,.i SEL.ECT ITT BY usrt£ '+' rn '-'. : ; ; Fffi FAX ADU=Nffa= ASSISTFN::E, PLEASE CFLL 1-EOHELP-FAX (435-7329). i ENVIRONMENTAL, INC. 2214 FM 1187. B u ildi ng 6. M ansfield Texas 76063. Telephone (817) 477-9995 . F acsimile (817} 477-9996 w ww . i nterco n -env i r onm e nta I .c om Request for Subcontractor Bids PROJECT Company Rocha Trucking, Inc. City of Fort Worth Contact Patricio Rocha Bid No. DEM 07-12: APT Address 2309 SE 14m Street Removal of asbestos containing materials and Grand Prairie, TX 75051 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-262-0568 Bids are Due 10/24/07 Fax 972-237-2950 Time 10:00 AM E-mail rochatransport@netzero.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@.intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of al l asbestos conta ining materials (ACM ) and the demolition of all structures pres e nt at the former Oa k Hollow an d Vi ll a Del Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are avai lab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fa x '::.El ff1 Ii f.1 F'EF'DF'T NO. OTHER FACSIMILE 01 9722372950 i i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:29AM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:28AM 01'01 SND 01 OK TO TL.RN CFF ~T, PRESS 'f"Et,lJ' "84. Tl-EN SELECT [F,F BY US I "6 ' +' ffi ' - ' . FOR FAX~~ ASSISTf=N:E, PL.EASE~ 1-EOH-B..P-FAX (435-7329). I i ENVIRONMENTAL, INC. 2214 FM 1187 . Building 6. Mansfield Texas 76063 . Telephone (817) 477-9995 . Fa csimile (81 7 ) 477-9996 www. i ntercon-envi ron mental .c om Request for Subcontractor Bids PROJECT Company Saldana's Trucking Company, Inc. City of Fort Worth Contact Edward Saldana Bid No. DEM 07-12: APT Address 209 SE 19m Street Removal of asbestos containing materials and Grand Prairie, TX 75050 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-264-5313 Bids are Due 10/24/07 Fax 972-264-5516 Time 10:00 AM E-mail saldanastrucking@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexe s . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toi let Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified ? Yes__ No __ (Please send a copy of your current certificate w it h your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '=B JI , It 11~ F'EF'C:F'T NO. OTHER FA CS IMILE 01 9722645516 I ! YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:30AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:30AM 00'39 SND 01 OK TO TLHN CFF ~T, PRESS 'l'Etl.J' 004. Tl-EN SELECT CJfF BY USI1£ '+' OR'-'. I I FOR FAX A~i:G:: ASSISTPN:E, PLEASE a:l..L 1-EHH-ELP-FAX (435-7329). ENVIRONMENTAL, INC. 2214 FM 11 87 . Buil d ing 6 . Mansfield Texas 76063 . Telephone (817) 477-9995 . Facs i m il e (817 ) 477 -9996 www . i nt e r co n-env i r on m e ntal .com Request for Subcontractor Bids PROJECT Company Santiago Castillo Trucking City of Fort Worth Contact Santiago Castillo Bid No. DEM 07-12: APT Address 2018 S. Polk Street Removal of asbestos containing materials and Dallas, TX 75224 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-882-0091 Bids are Due 10/24/07 Fax 972-242-5827 fj; J_ ;::; .. Time 10:00 AM E-mail ..;2..1 L(-33'7-/'S°:?3 Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of a ll structures present at the former Oa k Hollow and V illa Del Rio Apartmen t comp lexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc. 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El ff , I I J1::; F'EF'CIF'T OTHER FACSIMILE 01 12173371533 YOUR LOGO YOUR FA X NO. Oct. 12 2007 04:00PM INTERCON-ENUIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 03:59PM 00'54 SND 01 OK TO Tl.RN CFF RIEPl:FT, PRESS ' l'Bl.J' **04. TIEN SELECT ITT BY us11£ •+• rn '-'. ! i FOR FAX~~ ~ISTi=N:E, PLEASE CFl.L 1-E03-tELP-FA>< (435-7329). 91" ,ffi4ktercon ENVIRONMENTAL, INC. 2214 FM 1187, Bu i lc!ing .6, Mansfie l d, Texas 76063, Telephone (817) 477-9995, Facsimile (817) 477-9996 www . I ntercon-e nvi ron mental . com Request for Subcontractor Bids PROJECT Company I Saucedo Construction City of Fort Worth Contact l Jose Saucedo Bid No. DEM 07-12: APT Address I 3621 Reagan Drive Removal of asbestos containing materials and i Fort Worth, TX 76116 demolltlon of former Oak Hollow & VIiia Del Rio Apts. ! at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone I 817-560-3325 Bids are Due 10/24/07 Fax i Time 10:00AM E-mail \ I Location Our Office Method Fax, E-mail, US Mall Estimator Keith Flowers E-mall kelth@lntercon-envlronmental.com Scope of Work I The scope of work consists of ; The removal of all asbestps containing materials (ACM) and the demolition of all structures p resent at the former Oak Hollow and Villa Del Rio Apartment complexes . I ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Was~e Hauling X Demolition Deb ri s Hauling Temporary Ferice Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recoverv and Recycl ing X Bulb and Ballast Recycling and Disposal Soil Density and Compaction TestinQ X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan : OSHA Air Monitoring UST Removal , Soil TestinQ/analysis Plans and/or specif:ications are available for review at: . lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M?WBE or HUB certified? Yes No __ (P lease send a copy of your current certificate with your bid .) Do you intend to bi~ on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax Name a nd Address of Sende r A rti cle Nur11b e 1 1. De2uo 0'7 -,z ~ AP r 2 . 3 . 4. 5. 6. 7 . [L To la/ N11rnb er of Pie ces To tal NumUe r o f Pi eces _u:t~ :ende r Lj--Recelvr+a l Post O ffi ce 1•:; ro:,n 3877, fclJ ru or y 20 0 2 (!'aye I c,f 2) C h ecl< type o f m a il or se rvi c e : U C erlifie d [l C OD [J Delivery C on fi m,allo n [l Express Mall ______ _o_ In sured __ . _ U Re corded Delivery (International) 1~1 rJ 1·1 Regis tered Retum Receipl for Merch anUise Signature Confirma llon Addressee (Name, St.-ee( City Stalt;, & ZIP Oxle) Pos lage 3s / -----· -·----------·-··------·- Pos m sl er, Per N ame ~~l, Affix S tamp Here (II issuBd a s a .'.\l>~f~ 1·'0 sc,, cerliflca le o f mailing, .J.. ..-·-k ,tJ,~-~" ~;•q ~~ or for addition al ••• ~ i r, i,;;;i e-....:s '"':'=:""':;:;..,.,,,, copies of lllis bill) l J Li :::, ·. -p O 9 fl 9 3 B ", '] Pos tm ark and ~, ·· • 0 q Da l e o f Rec!!}p~---9 11 f , 1 8 (J 1 . 4 · '' D C 1 1 S Cl 1 Handling Actu al Va lue /fil,.[i;ecf. Due i0f>IJ>1Jl(I . ITJfO 1 ZIV ;GEIi' flD ( ufa'l } --~harge_ U Reglsle recl ~--~_!2 -_!':~~ _!'~-~~ ..!'~': __ !e.e_ Fee i ·.~-. 1. ,.; ' -• -><:e:i,--- ' ------ . ' ----·-· ~ -------·', '. - , .. See Privac y Act Statement on Reverse Co mplete by Typewriter, Ink, or Ball P o int Pen ENVIRONMENTAL, INC. 2214 FM 1187. Bu ilding 6. Mansfield Texas 76063 . Telephone (817) 477 -9995, Facsimile (817 ) 477-9996 www . i nt ercon-envi ronmen tal .co m Request for Subcontractor Bids PROJECT Company Speedy Hauling City of Fort Worth Contact Espiridion Juarez Bid No. DEM 07-12: APT Address 2424 NW 24m Street Removal of asbestos containing materials and Fort Worth, TX 76106 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-626-6829 Bids are Due 10/24/07 Fax 817-626-4547 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con taining materials (A CM ) and the demol it ion of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demol iti on Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recyclinq X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes__ No __ (Please send a copy of your current cert ificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '=,Et ff , l I JG F'EF'[>F'T ~~o . OTHER mes IM I LE 01 8176264547 YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:35AM INTERCON-ENVIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:34AM 01'04 SND 01 OK TO TrnN CFF R$FmT, PRESS ' l'EH.J' 004. TIEN SELECT ClfF BY US I 1-6 ' +' ffi ' - ' . I Fffi FAX ~Tf'.fiE ASsISTi=K:E, PLEASE OU.. 1-Em-t-ELP-FAX (435-7329). i I ENVIRONMENTAL, INC. 22 1 4 F M 1 1 87 . Bu ildi ng 6 . Ma n s fi e l d , Te x as 760 6 3 . Te l ep hone (8 1 7 ) 477-9995 , Facsimile (817) 4 77 -99 96 www . i nt e r con -en vi ro n men ta l . com Request for Subcontractor Bids PROJECT Company Statewide Trucking Corporation City of Fort Worth Contact Kay Gracy Bid No. DEM 07-12: APT Address P.O. Box 169 Removal of asbestos containing materials and Fate, TX 75132 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-771-1203 Bids are Due 10/24/07 Fax 972-771-1249 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work cons ist s of ; The remova l of all asbestos con tain ing ma terials (ACM ) and the demolit ion of all structu res pres e nt at t he fo rme r Oa k Ho ll ow and V ill a De l Rio Apa rt ment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo lition Debris Haul ing Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-ma il Phone Fax '::.Et JI , It 11::i F'EF'C:PT t-n OTHER FACSIMILE 01 9727711249 I YOUR LOGO YOUR rn x NO. Oc t. 11 2007 09:37AM INTER CON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:36AM 00'43 SND 01 OK TO Tl.F1N CFF ~T, PRESS ' f'Et"-J' 004. TIEN SELECT ITT BY us11-£ •+• rn ·-·. I Fffi FAX ~ffiE RSSISTA'U, PLEASE ffi...L 1-800-tELP-FAX (435-7329). I I I ENVIRONMENTAL, INC. 2214 F M 1187 . Bui l d ing 6 . M ansfield , Texas 76063. Telephone (8 1 7) 477 -9995 . F acsimile (817) 477-9996 www. intercon-envi ron men t al .c o m Request for Subcontractor Bids PROJECT Company Stephy's, Inc. City of Fort Worth Contact Beverly Gipson Bid No. DEM 07-12: APT Address 10 Equestrian Trail Removal of asbestos containing materials and Duncanville, TX 75116-2034 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-330-0523 I Bids are Due 10/24/07 Fax 214-330-0523 3 a..~J -,;. Time 10:00 AM E-mail gipson80@msn.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consis ts of ; The remova l of all asbestos containing materials (ACM ) and the demolition of all structures presen t at the former Oa k Ho ll ow and V illa Del Rio Apartmen t complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolit ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Suppl ier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analys is Plans and/or specifications are ava ilab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB cert ified? Yes__ No __ (Please send a copy of your current cert ificate with your bid .) Do you intend to b id on th is project? Yes No __ Company Name Contact Person E-mail Phone Fa x ENVIRONMENTAL , I NC. 2214 F M 1 1 87 , Build i ng 6. Mansfield T exas 76063, Telephone (817 ) 477-9995. Facsimile (817) 477-9996 www. i nte r con-env i r on m en ta I .com Request for Subcontractor Bids PROJECT Company Sunset Transportation, Inc. City of Fort Worth Contact Peaav Alexander Bid No . DEM 07-12: APT Address 2400 Handley Ederville Road Removal of asbestos containing materials and 2n" Floor demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth, TX 76118 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-589-7063 Bids are Due 10/24/07 Fax /817-284-9855 Time 10:00 AM E-mail ( peggy@suntrans .org Location Our Office ·~-;>/ /·:_ <_r (~ .• -· --,00 f , _., ! -~ c:::.-/ Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos con taining materials (ACM) and the demolition of all st ructu res present at the forme r Oa k Hollow and V illa Del Rio Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hau ling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recvcl inq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal So il Testing/analys is Plans and/or specificat ions are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::.El JI1 l r JC.i F'EF'DF'T t'10. OTHER FACSIMILE 01 8172849855 YOUR LOGO YOUR FA >< NO. Oct. 11 2007 09:44AM l NTERCON-EN UJRONME NTAL JNC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:43AM 00'48 SND 01 OK TD TL.RN CFF RE:PC:RT, PRESS 'l'BI.J' 004. I TIEN SELECT (JfF BY US It£ '+' DR ' -' . i Fffi FAX AI)Jf:t,m=o:: A$5IST~. PLEASE: au_ 1-800-tELP-FAX (435-7329). I '::.Et ff , It lC, F'EF 'C:1F'T t,~o. OTHER FACSIMILE 01 8175952001 ' I YOUR LOGO YOUR FA X NO. Oct. 12 2007 04:17PM INTERCON-ENVIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 12 04:17PM 00'49 SND 01 OK TO TL.RN CFF ~T, PRESS 'f"B,IJ' it04. TIEN SELECT ITT BY us I l'6 • + • rn · -• . ! I Fffi FAX ADVANTACx: A$5ISTt=N:E, PLEASE o:LL 1-Em--+ELP-FAX (435-7329). i ENVIRONMENTAL, INC. 2 2 14 FM 11 87 . Building 6 . Mansfield Tex a s 76063 . Telephone (817 } 477-9995. Facsimile (817 } 477-9996 w w w . i n terc o n -en vi r onmental .com Request for Subcontractor Bids PROJECT Company T-N-T Trucking City of Fort Worth Contact Antonio Vieira Bid No. DEM 07-12: APT Address 5209 Sandy Point Drive Removal of asbestos containing materials and Arlington, TX 76018 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-467-6589 I Bids are Due 10/24/07 Fax 972-467-6589 0 1' .J .: •. Time 10:00 AM E-mail srv259@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demol ition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL , INC. 2214 FM 1187 , Bu il din g 6 , Mans fie ld , Texas 76063 , Te l eph one (817 ) 477-9995, Facsimile (817 ) 477 -9996 www . i ntercon-envi ron me n tal .c om Request for Subcontractor Bids PROJECT Company Ted Alvarez Trucking City of Fort Worth Contact Ted Alvarez Bid No. DEM 07-12: APT Address 4906 Oak Hollow Drive Removal of asbestos containing materials and Grand Prairie, TX 75052 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-695-8805 Bids are Due 10/24/07 Fax 972-572-7461 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and the demolition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo li tion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Mon itorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ::,Etff 1 IiJ1::, FEF'C:1FT NO. OTHER FACSIMILE 01 19725727461 YOUR LOGO YOUR FAX NO. Oct. 11 2007 09:47RM INTERCON-EN UIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PRGES RESULT Oct.11 09:46RM 01'03 SND 01 DK TO TI.RN CFF REPffiT, PRESS 'M:NJ' 004. I Tl-EN SB..£CT CFF BY LISI!£ '+' ffi '-'. ' Fc::R FRX RIX.mTi::G: ASSISTf'.N:E, PLEASE a:t..l.. 1-800-1-ELP-FRX (435-7329). ! L. ... ~ .. ,• ·,., ENVIRONMENTAL , INC. 1187 , Building 6 , Mansf i eld Texa s 76063 , T elephone (8 1 7 ) 477-9995, F acsimile (81 7 ) 477-9996 www . inter con-e nvi ronmental .com Request for Subcontractor Bids PROJECT Company Texas Sand & Gravel City of Fort Worth Contact Brenda Nimitz Bid No. DEM 07-12: APT Address P.O. Box 2158 Removal of asbestos containing materials and Mansfield, TX 76063 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-225-0059 Bids are Due 10/24/07 Fax 817-225-0063 Time 10:00 AM E-mail knimitz@texassandandgravel.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos con taining materia ls (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal So il Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fa x '::,Et JI, It 11:; F'EF'CIF'T NO. OTHER FA CSIM ILE 01 8172250053 ' YOUR LOGO YOUR FAX NO. Oct. 11 2007 09:50AM INTERCON-ENVIRDNMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:49AM 00'45 SND 01 DK TO Tl...RN CFF REPC:JH, PRESS ' f"B-IJ' t:i04. TI-EN SELECT ITT BY us 1 I'£ • + • rn · -• . ! ! Fffi FAX A~Ac:i:: ASSIST!=N:E, PLEASE o:LL 1-Em-+ELP-FAX (435-7329). I I '::B JI , I I JC, F'EF'C:iF'T t JIJ. OTHER FACSIMILE 01 E: 1 72250063 YOUR LOGO YOUR FA X NO . Oct. 12 2007 04:30PM INTERCON-EN UI RONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 04:30PM 00'46 SND 01 OK TO TrnN CFF Re'ffiT, PRESS ' l'EM.J' 004. TIEN SELECT ITT BY USil-6 '+' rn '-'. ! I ! Fffi FAX ADVANTffl:: A$sISTi::N:E, FLEASE au_ 1-E021--+E.P-FAX (435-7329). ENV I RONMENTAL, INC. 2214 F M 118 7 , B ui ld i n g 6 , Mansf i e l d Tex as 76063 , T ele p hone (8 17) 4 77 -9995 , F acsi m ile (817) 4 77-999 6 www . inte r con-env i ron mental .com Request for Subcontractor Bids PROJECT Company Texas Star Transport, LP City of Fort Worth Contact Teresa M. Coronado Bid No. DEM 07 -12: APT Address 6330 Toronto St. Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-630-3725 Bids are Due 10/24/07 Fax 214-688-0071 Time 10:00 AM E-mail texasstartransport@aol.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith(@.intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM) and t he demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartmen t complexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Haul ing Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat 1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to b id on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax r~O . OTHER FACSIMILE 01 12146880071 I j YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:52AM INTERCON-EN UIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:51AM 01'06 SND 01 DK TO Tl.RN CFF RfjPffiT, PRESS ' t'ENJ' 004. TIEN SELECT ClfF BY US I 1£ ' +' rn ' - ' . i Fffi FAX A~f'.G:: ASSISTf=N:E, PLEASE rn_t_ 1-800-tE.P--FAX (435-7329). i ENVIRONMENTAL , INC. 2 21 4 FM 11 8 7 . B uil d ing o. M ansfield T exas 76063 . T el e phone (817 ) 477-9995 . F a csimi l e (81 7 } 477-9996 www .i n te r c on -env i ron mental .com Request for Subcontractor Bids PROJECT Company Tomas Reyes Trucking, Inc. City of Fort Worth Contact Tomas Reyes Bid No. DEM 07-12: APT Address 3529 Peoria Street Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-631-2711 Bids are Due 10/24/07 Fax 214-905-7565 Time 10:00 AM E-mail maricela@reyestrucking.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of a ll structures present at the forme r Oak Hollow and Villa Del Rio Apartment comp lexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax M=l•iilM=l#i' I l I I \ t--10. OTHER FACSIMILE J START TIME 01 12149057565 Oct. 11 09:52AM I i YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:53AM INTERCON-EN UIRONMENTAL IN C 817-842-1710 USAGE TIME MODE PAGES RESULT 00' 40 SND 01 OK TO TI.RN CFF ~T, PRESS 'l'Bl.J' 004. Tl-EN SELECT [JfF BY US I "6 ' +' ffi ' -' . I i FCF FAX AIX.HfHO:: ASSIST~, PLEASE CFLL 1-!3EE-tEL.P-FAX (435-7329). I ENVIRONMENTAL, INC. 2214 FM 1187, Bu il d i n g 6 , Mansf i e l d , Texas 76063 , Telephone (8 1 7) 477 -9995, F acsimile (817) 477-9996 www .i nt e rcon-en v i ronm en t a l .c o m Request for Subcontractor Bids PROJECT Company Total Direct Environmental City of Fort Worth Solutions, Inc. Bid No. DEM 07-12: APT Contact Marilyn Shelton Removal of asbestos containing materials and Address 312 Hallmark Drive W. demolition of former Oak Hollow & Villa Del Rio Apts. Fort Worth , TX 76134 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 817-293-0435 Time 10:00 AM Fax 817-293-3484 Location Our Office E-mail mmshelton2@sbcglobal.net Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos contain ing materials (ACM ) and the demoli tion of all stru ct ures present at the former Oa k Holl ow and V illa Del Rio . Apartmen t comp lexes. ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable To ilet Rental Topsoil and Backfill Supplier Concrete Saw CuttinQ Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA A ir MonitorinQ UST Removal Soil TestinQ/analys is Plans and/or specifications are availab le for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No (Please send a copy of your current certificate w ith your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fa x ':B II1 It JC, F'EF'C:iF'T ~--ID. OTHER FACSIMILE 01 8172933484 YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:54AM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:54AM 00'34 SND 01 OK TO TURN !FF ~T, PRESS 'f'BU' 004. TIEN SELECT C1yF BY USil'6 '+' rn '-'. I l Fffi FA>< A~i=llE ASSIST!=N:E, PLEASE: O:U.. 1-800-1-B...P--FA>< (435-7329). i i l tercon ENVIRONMENTAL , I NC. 22 14 F M 1187 . B ui ld i n g 6 . M an s field T exas 7 6 063 . T ele ph one (817) 477-9995 . F acsi m ile (8 17 ) 477-9996 www. in ter c on -e n v i ronm e n ta I .c om Request for Subcontractor Bids PROJECT Company Trucking and Construction City of Fort Worth Company of Texas Bid No. DEM 07-12: APT Contact Cindy Cornish Removal of asbestos containing materials and Address P.O. Box 951 demolition of former Oak Hollow & Villa Del Rio Apts. Keene, TX 76059 at 5817 & 5901 Boca Raton Blvd., Ft. Worth , TX 76111 Bids are Due 10/24/07 Phone 817-558-0525 Time 10:00 AM Fax 817-645-6441 Location Our Office E-mail tcc1979@sbcglobal.net Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos containing materials (ACM ) and the demolition of all structures present at the former Oa k Hollow and Villa Del Rio Apartment complexes . ( X ) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttinq Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::B ff , I • JC, F'EF'DF'T t'-10. OTHER FACSIMILE 01 18175455441 i YOUR LOGO YOUR FRX NO. Oct. 11 2007 09:55AM INTERCON-EN VIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct. 11 09:55AM 00'51 SND 01 OK TO Tl.RN CFF REPCRT, PRESS ' l'Et-lJ' 004. TIEN SELECT ITT BY us11£ '+' rn '-'. i Fffi FAX ADl.mT~ ASSISTf'.N:E, PLEASE o:t..L 1-~-FAX (435-7329). ! I SEt ff, It f.1 F'EF'C::F'T tm. [ITHER FACSIMILE D1 18176456441 i YOUR LOGO YOUR FA >< NO. Oct . 12 2007 04:44PM INTERCON-ENUIRONMENTAL IN C 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 04:43PM 01'02 SND 01 OK TO TL.RN CFF ~T, PRESS '11:NJ' 004. TIEN SELECT ITT BY USil'6 '+' ffi '-'. Fffi FAX ADIJl'.=ffi"f'.O:: ASiSISTR-CE, PLEASE CFLL 1-~-FAX (435-7329). I ENVIRONMENTAL, INC. 22 14 FM 1 187 . B uilding 6 . Mansf i eld T ex a s 760 63 . Tele p hone (817) 477 -9995 . Facsim ile (817) 477-9996 ww w . interco n-en vi r o nm e ntal .com Request for Subcontractor Bids PROJECT Company V & S Concrete, Inc. City of Fort Worth Contact Vernell Sturns Bid No. DEM 07-12: APT Address 612 Highwoods Trail Removal of asbestos containing materials and Fort Worth, TX 76112 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817 -368-0898 Bids are Due 10/24/07 Fax 817-870-5057 Time 10:00 AM E-mail vsturns@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work cons ists of ; The removal of all asbestos containing materials (ACM) and the demo lit ion of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analvsis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes No __ Company Name Contact Person E-mail Phone Fax '::B ff · I i 11::i F'EF 'CF'T t~O. OTHER FACSIMILE 01 8178705057 J YOUR LOGO YOUR FA >< NO. Oct. 11 2007 09:SBAM INTERCON-EN VIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 09:57AM 00'53 SND 0 1 OK TO TL.RN CFF R$PrnT, PRESS 'teU' 004. TIEN SELECT CJfF BY LISI!£'+' CR'-'. i FCR FAX ~Fa= ASSISTFN:E, PL.EASE au... 1-EOH-ELP-FAX (435-7329). I ENVIRONMENTAL, INC. 2214 FM 1187, Building 6. Mansfie l d Texas 76063. Teleph o ne {817) 477-9995. Facs i m ile (8 1 7) 477-9996 www. i ntercon-envi ronmental .com Request for Subcontractor Bids PROJECT Company Vasquez Trucking, Inc. City of Fort Worth Contact Lupe Vazquez Bid No. DEM 07-12: APT Address 4700 Nolan Street Removal of asbestos containing materials and Fort Worth, TX 76119 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 817-531-2930 Bids are Due 10/24/07 Fax 817-535-7105 Time 10:00 AM E-mail vasquez.trucking@sbcglobal.net Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of al l asbestos conta ining materials (ACM) and the demolition of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recvclinq and Disposal Soil Density and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal Soil Testing/analysis .. Plans and/or spec1f1cat1ons are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::B JI , I t JI~ F'EF'[:F'T t·~O. OTHER FR CS IM I LE 01 8175357105 ! YOUR LOGO YOUR FA X NO. Oct. 11 2007 09:59RM INTERCON-ENUIRONMENTRL INC 817-842-1710 STRRT TIME USRGE TIME MODE PAGES RESULT Oct.11 09:58RM 00'37 SND 01 OK TO Tl.RN CFF ~T, PRESS 'telJ' 004. TIEN SELECT i BY USil-6 '+' OR '-'. FOR FAX AJX..mT~ ASSISTi:N:E, PLEASE m...L 1-800-1-ELP--FAX (435-7329). i I ! ~,Et ff, I t 11::; F'EF'C:PT 1'10. OTHER FACSIMILE 01 8175357105 YOUR LOGO YOUR FA X NO. Oct. 12 2007 04:58PM INTERCON-ENVIRONMENTAL INC 817-842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.12 04:58PM 00'35 SND 01 OK TO TlRN CFF RS:PffiT, PRESS '1'B1J' ti04. TI-EN SELECT ITT BY US I l'6 ' +' ffi ' - ' . 1 FCR FAX A~ffiE A$5ISTFN:E, PL.EASE au... 1-80a-tELP-FAX (435-7329). ENVIRONMENTAL , INC. 2214 FM 11 87 . Bu i l d in g 6 . Ma nsfiel d Te x a s 760 6 3 . Teleph o n e (8 1 7) 477-9995 . F ac s i m il e (817) 4 77-9996 www. i ntercon-envi ronmenta l .com Request for Subcontractor Bids PROJECT Company W. Loudermill's Trucking & City of Fort Worth Excavating, Inc. Bid No. DEM 07-12: APT Contact Walter Loudermill Removal of asbestos containing materials and Address 1270 Pemberton Hill demolition of former Oak Hollow & Villa Del Rio Apts. Dallas, TX 75217 at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Bids are Due 10/24/07 Phone 214-398-2410 Time 10:00 AM Fax 972-617-3645 b,), ';±:: Location Our Office E-mail Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keitht@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demoli tion of all structures present at the former Oak Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Haul in g X Demol it ion Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compact ion Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current cert ifi cate with your bid .) Do you intend to b id on th is project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ENVIRONMENTAL, INC. 2214 FM 1187 . Build in g 6 . Mansfield T exas 76063 , Telephone {817) 477-9995 . Fa csimile (817) 477-9996 www . i nterco n-envi ron menta l.c om Request for Subcontractor Bids PROJECT Company W. M. Bussey Trucking Service City of Fort Worth Contact William Bussey Bid No. DEM 07-12: APT Address 4027 North Westmoreland Removal of asbestos containing materials and Dallas, TX 75212 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-631-4610 /\Jc;t" h i f;;,<,; ;'/,; Bids are Due 10/24/07 Fax 214-631-4611 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining materials (ACM ) and the demolition of all structures present at the former Oak Hollow and Villa De l Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refriqerant Recovery and Recycling X Bulb and Ballast Recyclinq and Disposal Soil Density and Compaction Testinq X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitoring UST Removal So il Testing/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes__ No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax '::B ff , l l lC, FEF'C:1FT ~n OTHER FACSIMILE 01 12145314611 YOUR LOGO YOUR FA X NO. Oct. 11 2007 10:02AM INTERCON-ENVIRONMENTAL IN C 817 -842-1710 START TIME USAGE TIME MODE PAGES RESULT Oct.11 10:01AM 00'48 SND 01 OK TO TlRN CFF RliPrnT, PRESS ' 1'B1J' lt04. 11-EN SELECT [F,F BY US I 1-13 '+' CF ' -' . i FOR FAX ADUANTA:x: ~ISTi::N:E, PI....EflSE CA.J.. 1-800-tEL.P--FAX (435-7329). ' i ENVIRONMENTAL, INC. 2214 F M 1187 . Bu il d ing 6. Mansfield Texas 76063 . Telephone (817 ) 477-9995. F acsimile (817) 477-9996 www . in te rc o n -env iro n mental .com Request for Subcontractor Bids PROJECT Company Wanda Murphy Sand & Gravel City of Fort Worth Contact Wanda Murphy Bid No. DEM 07-12: APT Address 828 Lancaster-Hutchins Road Removal of asbestos containing materials and Lancaster, TX 75146 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 214-212-7012 Lfk ·.~ Bids are Due 10/24/07 Fax 972-227 -6793 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keithl@intercon-environmental.com Scope of Work The scope of work consists of ; The removal of all asbestos conta ining ma terials (ACM ) and the demolit ion of all structures present at the forme r Oa k Hollow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cuttino Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid.) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-ma il Phone Fax '=,El JI , I 11[, F'EF'DF'T YOUR LOGO YOUR FA X NO. Oct. 11 2007 10:03AM INTERCON-ENVIRONMENTAL INC 817-842-1710 t-lO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 19722276793 Oct.11 10:03AM 00'40 SND 01 OK I TO TURN c::FF REPffiT, PRESS 'f'BI.J' 004. I TI-EN SELECT CJfF BY L.ISil'fi '+' ffi '-'. i Fffi FAX RI)(..H{TACE ~ISTl=N:E, PI....B=ISE CFLL 1-EDH-BY-FAX (435-7329). I ENVIRONMENTAL, INC. 2214 F M 1187. Building 6. Mansfie l d Texas 76063. T ele p hone (817) 477-9995 . F acsimile (817) 477-9996 w ww . in t e rc on -en v i r o nmental .co m Request for Subcontractor Bids PROJECT Company Wheeler Trucking Company City of Fort Worth Contact Revell Wheeler Bid No. DEM 07-12: APT Address 1212 Post Oak Removal of asbestos containing materials and DeSoto, TX 75115 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-342-1459 Bids are Due 10/24/07 Fax 912-228-0784 .Ai JJ:... Time 10:00 AM E-mail rwheeler 98@yahoo.com Location Our Office Method Fax, E-mail, US Mail Estimator Keith Flowers E-mail keith<@intercon-environmental.com Scope of Work The scope of work cons ists of ; The remova l of all asbestos containing materials (ACM ) and the demo lition of all stru ctures present at t he fonm e r Oa k Holl ow and Villa Del Ri o Apartment comple xes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demo lition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topso il and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Dens ity and Compaction Testinq X Hydro Mulch Services Fire Sprink ler System Removal X SWPPP Plan OSHA Air Monitorinq UST Removal Soil Testinq/analysis Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following: Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ '"::ompany Name Contact Person ·1 Phone Fa x ENVIRONMENTAL, INC. 214 FM 1187 , Buildi n g 6 . Mansfield Texas 76063 , Te l ephone (817) 477-9995, Facsim il e (817) 477-9996 w ww.in tercon-e n viro nmental.com Request for Subcontractor Bids PROJECT Company Deer Trucking Company City of Fort Worth Contact Derrick Ray Bid No. DEM 07-12: APT Address 1325 Essex Drive Removal of asbestos containing materials and DeSoto, TX 75115 demolition of former Oak Hollow & Villa Del Rio Apts. at 5817 & 5901 Boca Raton Blvd., Ft. Worth, TX 76111 Phone 972-670-7207 Bids are Due 10/24/07 Fax 972-228-4615 Time 10:00 AM E-mail Location Our Office Method Fax, E-mail, US Mail Estimator Jerrold Andrews E-mail jerry@intercon-environmental.com Scope of Work The scope of work consists of ; The remova l of all asbestos containing ma terials (ACM ) and the demolition of all structu res present at the fo rme r Oa k Ho ll ow and Villa Del Rio Apartment complexes . ( X) ITEMS ARE AVAILABLE FOR SUB CONTRACTING X Asbestos Waste Hauling X Demolition Debris Hauling Temporary Fence Rental X Portable Toilet Rental Topsoil and Backfill Supplier Concrete Saw Cutting Generator Rental Refrigerant Recovery and Recycling X Bulb and Ballast Recycling and Disposal Soil Density and Compaction Testing X Hydro Mulch Services Fire Sprinkler System Removal X SWPPP Plan OSHA Air MonitorinQ UST Removal Soil Testing/analys is Plans and/or specifications are available for review at: lntercon Environmental, Inc . 2214 FM 1187, Bldg# 6 Mansfield, Texas 76063 Please check one of the following : Is your company M/WBE or HUB certified? Yes No __ (Please send a copy of your current certificate with your bid .) Do you intend to bid on this project? Yes__ No __ Company Name Contact Person E-mail Phone Fax ':B JI,J I lC.i FEF'C.F'T YOUR LOGO YOUR FR >< NO. Oct. 12 2007 02:49PM INTERCON-ENVIRONMENTRL INC 817-842-1710 ~~O. OTHER FRCS IM I LE STRRT TIME USRGE TIME MODE PRGES RESULT 1211 19722284515 Oct .12 02:48PM 00'48 SND 01 OK TO TlFN CFF ~T, PRESS 'l"'l:::N-1' 004. TI-EN SELECT CJrF BY LE It£ ' +' rn ' - ' . I Fffi FR>< RI:lU=INTFG:: ~IST~, PLEASE a=t..L 1-1:03-1-ELP--FR>< (435-7329). ,) p ';; \ ___ ,_ .. ~ I '·· t--· -·' ~.. ... . .- ii :_/J ' I f 1 ..,..._ /-.-t, __ ,!,_ ·(·-' .!---· I I 1.·' r I 2.1 O. Statement of Residency The following information is required by the City of Fort Worth in order to comply with provisions of state law, TEXAS GOVERNMENT CODE § 2252.001 , State or Political Subdivision Contracts for Construction , Supplies , Serv ices ; Bids by Nonresident. Every bidder shall affirmatively state its principal place of business in its response to a bid invitation . Failure to provide the required information shall result in your bid being declared non-responsive. Bidders' cooperat ion in this regard will avoid costly time delays in the award of bids by the City of Fort Worth . For this reason , each Bidder shall complete and return, with its bid , the Statement of Residency Form. Failure to provide all required information shall result in the bid being considered non-responsive . TEXAS GOVERNMENT CODE § 2252 .001 defines a Texas "resident bidder" as a bidder whose principal place of business* is in the state of Texas , including a contractor whose ultimate parent company or majority owner has its principal place of business in the state of Texas. TEXAS GOVERNMENT CODE § 2252.001 defines a "Nonresident bidder" as a bidder whose parent company or majority owner does not have its principal place of business* in the state of Texas . Bidder's complete company name Intercon Environmental, Inc. State your business address in the 2214 FM 118 7 , Bldg 6 adjacent space provided if you are a Texas Resident bidder: Mansfield, Texas 76063 State your business address in the adjacent space provided if you are a Nonresident bidder: *The State Purchasing and General Services Commission defines Principal Place of Business as follows: Principal Place of Business in Texas means, for any type of business entity recognized in the State of Texas, that the business entity o has at least one permanent office located within the State of Texas, from which business activities other than submitting bids to governmental agencies are conducted and from which the bid is submitted, and o has at least one employee who works in the Texas office Form (Section 2.10) prepared by: Name Karen Andrews Title President Date 2-16 2.11. Nondiscrimination All City contractors are required to comply with Chapter 17 , "Human Relations," Article Ill , "Discrimination," Division 3, "Employment Practices ," of the Code of the City of Fort Worth , prohibiting discrimination in employment practices . Contractor agrees that Contractor, its employees , officers , agents , or subcontractors , have fully complied with all provisions of such Ordinance , and that no employee, participant , applicant, contractor or subcontractor has been discriminated against according to the terms of such Ordinance by Contractor , its employees , officers , agents , or subcontractors herein . Intercon Env i r onment a l , I n c. Company Karen Andrews 11/1 /07 Name Date President Title 2-17 2.12 . Prevailing Wage Rates The Contractor selected for this project w ill be required to comply with TEXAS GOVERNMENT CODE , Chapter 2258, with respect to payment of Prevailing Wage Rates for public works contracts. The current wage scale for members of the Building and Construction trade immediately follows this page. A worker employed on a public work by or on behalf of the City of Fort Worth shall be paid not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the work is performed; and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. A worker is employed on a public work if the worker is employed by a contractor or subcontractor in the execution of a contract for the public work with the City of Fort Worth . The contractor who is awarded a public work contract , or a subcontractor of the contractor, shall pay not less than the prevailing wage rates to a worker employed by it in the execution of the contract. A contractor or subcontractor who violates this requirement shall pay to the City of Fort Worth , $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. This requirement does not prohibit the contractor or subcontractor from paying an employee an amount greater than the prevailing wage rate . · The undersigned acknowledges the requirements of Chapter 2258 of the Texas Government Code , and intends to comply with same in the execution of this project. co~ Sig ature Karen Andrews Name President Title Intercon Environmental. Inc. Company Date 2-18 .. .~;~~i.t.-Eti"--.Ml~~m:.~mli1~~ofJEor,;!_Worth ~ii ii!.· -~ .. l)t'~;~f~ ,,,!'t ii~-f,.,·.i: ---~ Builoing &'-(fonstructio :rfaaes .. ,,. ., , ¥,, \, ·~ ;,, ,i~ · ?I --:;:r JC'W: ,. .Presrailing Wage Rates For· 2006 ~-. Classifications Hourly Rates Classifications Hourly Rates Air Conditioninq Mechanic $23.95 Sheetrock Hanqer $13 .37 Air Cond itioning Mechanic Helper $15 .00 Sheetrock Hanqer Helper $9.48 Acoustic Ceilinq Installer $16.25 Sprinkler System Installer $17 .86 Acoustic Ceilinq Installer Helper $10 .53 Sprinkler Svstem Installer Helper $13 .33 Bricklayer/Stone Mason $19 .88 Steel Worker Structural $16.20 Bricklayer/Stone Mason Helper $10.54 Steel Worker Structural Helper $11 .71 Carpenter $19.03 Welder $18.82 Carpenter Helper $14.69 Welder Helper $13.95 Concrete Finisher $14.95 Concrete Finisher Helper $10 .09 Concrete Form Builder $15.40 Concrete Form Builder Helper $8.81 Drywall Taper $13 .00 Drywall Taper Helper $9 .00 Electric ian Journeyman $23.00 Heavv EQuipment Operators Hourly Rates Crane , Clamshell , Backhoe , Electrician Helpe r $16.51 Derrick, Draqline, Shovel $16 .07 Electronic Technician $23 .18 Forklift Operator $13 .33 Electronic Technic ian Helper $13.36 Foundation Drill Operator $17.55 Floor Layer (Carpet) $15.17 Front End Loader Operator $13 .1 6 Floor Laver (Resilient) $15.94 Truck Driver $17 .17 Floor Laver Helper $11.00 Glazier $21.92 Glazier Helper $15 .82 Insulator (Pipe) $17 .95 Insulator Helper (Pipe) $13.40 Laborer Common $11.93 Laborer Skilled $14.98 Lather $18 .60 Lather Helper $11 .12 Metal Buildinq Assembler $14.29 Metal Buildinq Assembler Helper $9.33 Painter $17.42 Painter Helper $8.00 Pipefitter $20.82 Pipefitter Helper $14 .77 Plasterer $19.93 Plasterer Helper $14 .16 Reinforcing Steel Setter $12.50 Roofer $14.00 Roofer Helper $10.00 Source is Fort Worth Chapter Sheet Metal Worker $19.45 Associated General Contractors (www.Quoin.org) Sheet Metal Worker Helper $14 .52 9/25/2007 2 -19 2.13. Insurance Certificates A successful Contractor will be requ ired by the contract to have insurance coverage as detailed below . Contractor must provide Certificates of Insurance in the amounts and for the coverages required to the Environmenta l Management Department , Administrative Offices , within 14 calendar days after Notice of Award. (a) Insurance cove ra ge and limi ts : (b ) 1. Commercial General Liability Insurance o $1,000 ,000 each occurrence o $2 ,000,000 aggregate 2. Professional Liability Insurance -NOT APPLICABLE. 3. Automobi le Liability Insurance 4 . 5. 6. 1. Coverage on ve hi cles involved in the work performed under this contract: o $1 ,000,000 per accident on a combined single limit basis or: o $500 ,000 bodily injury each person; $1,000 ,000 bodily injury each accident; and $250 ,000 property damage The named insured and employees of Contractor shall be covered under this policy. The City of Fort Worth shall be named an Additional Insured , as its interests may appear. Liability for damage occurring while loading , unloading and transporting materials collected under the Contract shall be included under this policy. Worker 's Compensation o Coverage A : statutory limits o Coverage B: $100 ,000 each accident $500 ,000 disease -policy limit $100 ,000 disease -each employee Environmental Impairment Liability (Ell) and/or Pollution Liability $2 ,000 ,000 per occurrence. Ell coverage(s) must be included in policies listed in subsections 1 and 2 above ; or , such insurance shall be provided under separate policy(s). Liability for damage occurring while loading , unloading and transporting materials collected under the contract shall be included under the Automobile Liability insurance or other policy(s). Asbestos Abatement Insurance -$2 ,000 ,000 each occurrence with no Sunset Clause. Certificates of Insurance evidencing that the Contractor has obtained all required insurance shall be delivered to the City prior to Contractor proceeding with the contract. Applicable polic ies shall be endorsed to name the City an Additional Insured thereon , as its interests may appear. The term City shall include its employees, officers , officials , agents, and volunteers as respects the contracted services. 2-20 2. Certificate(s ) of Insurance shall document that insurance coverage specified according to items in section 2.13{a) are provided under applicable policies documented t hereon . 3 . Any f ailure on part of t he City t o request required in surance documentation shall not constitute a waiver of the in surance requirements . 4. A minimum of thirty (30) days notice of cancellat ion or material change in coverage shall be provided to the City . A ten (10) days notice shall be acceptable in the event of non-payment of premium . Such terms shall be endorsed onto Contractor's insurance policies . Notice shall be sent to Brian Boerner , Director, Environmental Management Department , City of Fort Worth , 1000 Throckmorton St., Fort Worth , Texas 76102 . 5. Insurers for all policies must be authorized to do business in the state of Texas or be otherwise approved by the City ; and, such insurers shall be acceptable to the City in terms of their financia l strength and solvency . 6. Deductible limits, or self-i nsured retentions , affecting insurance required herein shall be acceptable to the City in its sole discretion ; and , in lieu of traditional insurance , any alternative coverage maintained through insurance pools or risk retention groups must be also approved . Ded icated financial resources or Letters of Credit may also be acceptable to the City . 7. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the City as respects the contract. 8 . The City shall be entitled, upon its request and without incurring expense , to review the Contractor's insurance policies including endorsements thereto and , at the City's discretion, the Contractor may be requ ired to provide proof of insurance premium payments . 9. The Commercial General Liability insurance policy shall have no exclusions by endorsements unless the City approves such exclusions. 10. The City shall not be responsible for the direct payment of any insurance premiums required by the contract. It is understood that insurance cost is an allowable component of Contractor's overhead . 11 . All insurance required in Section 2.13{a) above , except for the Professional Liability insurance policy, shall be written on an occurrence basis in order to be approved by the City. 12. Subcontractors to the Contractor shall be required by the Contractor to maintain the same or reasonably equivalent insurance coverage as required for the Contractor. When subcontractors maintain insurance coverage , Contractor shall provide City with documentat ion thereof on a certificate of insurance. Notwithstanding anything to the contrary contained herein , in the event a subcontractor's insurance coverage is canceled or terminated , such 2-21 cancellation or termination shall not constitute a breach by Contractor of the contract. FOR PURPOSES OF EVALUATING THIS BID, PLEASE ATTACH A COPY OF YOUR CURRENT INSURANCE CERTIFICATE($) HERE AND BOUND WITHIN THE BID PACKAGE . 2-22 2.14. Contractor's Responsibilities Co ntractor is responsible for becoming familiar with the character , quality , quantity of wo rk to be performed , materials and equipment required. Contractor shall procure all permits and licenses, pay all charges , costs , and fees , and give all notices necessary and incident to the due and lawfu l prosecution of the work , unless otherwise specified in this Invitation to Bid. All costs associated with preparing a Bid in response to the Solicitation shall be borne by the Bidder . The undersigned acknowledges the requirements of this section , and intends to comply with same in the execution of this project. c~ Signature Karen Andrews Name President Title Intercon Environmental. Inc. Company 11 /1 /07 Date 2-23 2.15. Contractor's Legal and Compliance History Contractor's legal and compl iance history is a cr iti ca l component of this Invitation to Bid . Read this section with care and respond accordingly . Failure of the Contractor to provide all the information requested and to certify the report , will result in the Contractor's submittal being declared non-responsive. Contractor shall attach a written report of legal action brought against Contractor , Contractor's officers , Contractor's employees , AND Contractor 's proposed subcontractors relating to the protection of the environment. The terms "legal action " and "relating to the protection of the environment" are defined below . The report shall include all legal action brought within five (5) years of the closing date of this Invitation to Bid . The report shall detail the substance, status , and outcome of such legal action. This includes without limitation the names of the agency and /or persons bringing the action , all relevant dates , and all fines , judgments , and /or settlements . Include the following information for each case at a minimum : • Style of Case ( X vs. Y) • Settlement Information (as appropriate ) • Cause Number • Names / Addresses of all parties named • Court • Counsel List and phone numbers • Date of Disposition • Judgment and Order of Judgment "LEGAL ACTION " means: ANY enforcement action by the Un ited States Environmental Protection Agency , the Occupational Safety and Health Administration, any other federa l agency , the Texas Commission on Environmental Quality (in cluding its predecessor agency the Texas Natural Resource ConseNation Commission), the Texas Department of State Health SeNices (including its predecessor agency the Texas Department of Health), and any other state agency , commission or department , whether in Texas or elsewhere, when such enforcement action is a result of violations, real or alleged , of any laws, licenses , permits , judicial orders, or administrative orders , relating to the protection of the environment. In this context, enforcement action shall include without limitation , written warnings, notices of violation , consent orders or agreements, compliance orders , administrative hearings , civil litigation and criminal prosecution . Legal action also means any civil litigation brought by any person relating to the protection of the environment. "RELATING TO THE PROTECTION OF THE ENVIRONMENT" means : requirements pertaining to the manufacture , processing , distribution , use , handling , storage , transportation, reporting , records keeping, permitting , licensing , t reatment , disposal , emission, discharge , spill , release, or threatened release of hazardous materials , hazardous substances, hazardous wastes, toxic substances , petroleum , industrial waste , solid waste, pollutants or contaminants into or onto the air , surface water , drinking water , groundwater, storm water, publicly owned treatment works , or land. THE REPORT SHALL BE SIGNED AND CERTIFIED by an authorized representative of the Contractor, using the following form. The top portion of the form is to be completed if a report of legal action is attached. The bottom portion of the form is to be comp leted if Contractor has no legal action to report. Make certain that the appropriate portion of the form is filled out and signed. 2-24 AN AUTHORIZED REPRESENTATIVE OF THE CONTRACTOR shall mean: (1) if the Contractor is a corporation: the president, secretary, or treasurer, or a vice president of the corporation in charge of a principal business function , or any other person who performs similar policy or decision-making functions for the corporation ; (2) if the Contractor is a partnership , a general partner; and (3) if the Contractor is a sole proprietorship , the sole proprietor . INCLUDE A COPY OF THE REPORT OF LEGAL ACTION FOLLOWING THE CERTIFICATION OF CONTRACTOR'S LEGAL AND COMPLIANCE HISTORY BOUND WITHIN THE BID 2-25 Certification of Contractor's Legal and Compliance History Complete ONE of the Followin g Certifications Certification of Legal Action Report I certify unde r penalty of law that the attached Legal Acti on Repo rt detail ing Co ntractor's , Contractor's officers , Contractor's employees , and Contracto r's proposed subcontractors legal and compliance history relating to the protection of the environmen t was prepared under my direction or supervision in accordance with a system designed to assure that qualified personne l properly gather and evaluate the information subm itted . Based on my inquiry of the person or persons who manage the system , or those persons directly responsible for gathering the information , the information submitted is , to the best of my knowledge and belief , true , accurate , and complete . I am aware that there are significant penalties for submitt ing false information , including the possibility of fine and imprisonment for knowing violations . CONTRACTOR : Signature Company Name Date Title i Certification of NO Legal Action I certify under penalty of law that the legal and compliance history of Contractor , Contractor 's officers, Contractor's employees , and Contractor's proposed subcontractors was researched under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the . person or persons who manage the system , or those persons directly responsible for gathering the information , I hereby certify that no legal action relat ing to the protection of the environment was brought against Contractor, Contractor's officers , Contracto r's employees , or Contractor's proposed subcontractors within the preceding five years . To the best of my knowledge and belief, this statement is true , accurate, and complete . I am aware that there are significant penalties for submitting false information , including the possibility of fine and imprisonment for knowing violations . Signature Karen An d r e ws Name Pres i dent Title Intercon Env iro n me n t al , I n c . Company 11/1 /0 7 Date 2-26 ATTACHMENT B TREE ORDINANCE Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 22 ORDINANCE N0.17228-10-2006 AN ORDINANCE AMENDING THE COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF FORT WORTH, BEING ORDINANCE NO. 13896, AS AMENDED, CODIFIED AS APPENDIX" A" OF THE CODE OF THE CITY OF FORT WORTH BY AMENDING SUBSECTION K "PRESERVATION OF TREES" OF SECTION 6.301 "LANDSCAPING" OF ARTICLE 3, "LANDSCAPING AND BUFFERS" TO ADD REGULATIONS ON THE REMOVAL OF PROTECTED TREES EQUAL TO OR GREATER THAN SIX INCHES IN DIAMETER ON A PARCEL OF LAND GREATER THAN ONE ACRE; TO AMEND CHAPTER 9 "DEFINITIONS" TO ADD DEFINITIONS RELATED TO TREE PRESERVATION; PROVIDING A SA VIN GS CLAUSE; PROVIDING A PENAL TY CLAUSE; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, in order to maintain and enhance a positive image and a livable city it is important to promote site planning which furthers the preservation of mature trees and to protect trees during construction, to facilitate site design and construction which contribute to the long term viability of existing trees and to control the removal of trees when necessary WHEREAS, at the November 2, and 9, 2004 City Council meetings, citizens spoke about concerns of clear cutting in their community, provided numerous pictures and testimony about actual examples of clear cutting that has happened in areas surrounding their homes and neighborhoods, and requested the City Council to put an immediate moratorium on clear cutting; WHEREAS, on November 16, 2004, the City Council approved Ordinance Number 16208 (Mayor and Council Communication PZ-2556) establishing a thirty day moratorium on the removal of protected trees equal to or greater than six inches in diameter on an acre or larger parcel of land without a permit from the City Forester; WHEREAS, the moratorium was enacted and continued in order to maintain the status quo while the Citizen Advisory Committee continued to the study of the adoption of a tree preservation ordinance; WHEREAS, the Government and Neighborhood Relations Committee established a committee consisting of two City Council members, a Zoning Commission member, representatives from neighborhood and builder associations, Scenic Fort Worth, the Fort Worth Garden Club, utility companies, real estate investors, urban forestry and other interested parties to study the practices in other cities and advise the Council Committee on possible regulations related to tree preservation; WHEREAS, it is anticipated that the Citizen Advisory Committee will be prepared to make a recommendation on regulations related to tree preservation to the Council Committee in February 2005; WHEREAS, the Citizen Advisory Committee recommended the adoption of interim regulations to regulate the removal of protected trees during the time the committee compares and analyzes other tree preservation ordinances in order to make a recommendation on regulations to the Council Committee and the full City Council; WHEREAS, on December 14, 2004, the City Council approved Ordinance Number 16232 (Mayor and Council Communication G-14617) extending the moratorium until January 28, 2005 to allow time for the Zoning Commission and City Council to consider interim regulations; WHEREAS, on January 18, 2005, the City Council approved Ordinance Number 16270 establishing interim regulations in order to allow the City to complete the public process for consideration of amendments to the Zoning Ordinance to provide regulations for the protection and replacement of trees as recommended by the citizen advisory committee; WHEREAS, the Citizens Advisory Committee recommended to the City Council provisions that would better meet the needs of the city and those recommendations were reviewed by the public 2 through citizen information meetings and Zoning Commission hearings; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1. Subsection K "Preservation of Trees" of Section 6.301 "Landscaping" of Article 3, "Landscaping and Buffers" is hereby amended to add new language related to tree coverage, preservation, planting and maintenance to read as follows: K. Tree coverage, preservation, planting and maintenance 1. Intent a. It is recognized that there is a need to establish regulations addressing the protection of healthy and significant trees and to provide for the replacement and replanting of trees that are necessarily removed during construction, development or redevelopment. b. It is the intent of these regulations to limit the removal of tree canopy, promote a multi-aged urban forest, to promote the orderly development of the City of Fort Worth, and to protect the public health, safety and general welfare of the citizens of the City of Fort Worth. It is not the intent of these regulations to deny development rights protected by law. c. Further, it is the intent of the City to address the removal, replacement, maintenance and replanting of trees that are necessarily removed during construction, development or redevelopment in an expeditious manner and with due regard for the legal rights of property owners in Fort Worth. d. The process of development with its alteration of natural topography, vegetation and creation of impervious cover can have a negative effect on the ecological balance on an area by causing increases in air temperature and accelerating the processes of runoff, erosion and sedimentation. Recognizing that the general objectives of this section are to promote and protect the health, safety and welfare of the public, it is declared that this section is adopted with the following objectives: 1. Eliminate the process of clear cutting; 2. Promote the preservation/ conservation of trees throughout the city; 3 3. Recognize the benefits of trees in the urban environment; 4. Encourage planting and preservation of quality trees that are suitable to an area; 5. Promote a safe environment that includes trees; 6. Aid in stabilizing the environment's ecological balance by contributing to the processes of air purification, oxygen regeneration, ground-water recharge and storm water runoff retardation, while at the same time aiding in noise, glare, wind and heat abatement; 7. To provide visual buffering within and between land uses of differing character to alleviate the harshness of urban life; 8. Enhance the beautification of the city; 9. To safeguard and enhance property values and to protect public and private investment; 10. To conserve energy; 11. To provide habitat for wildlife; and 12. To encourage the preservation oflarge trees which, once removed, can be replaced only after generations . 2. Tree coverage a. The municipal urban forestry strategy is to achieve citywide tree canopy coverage of 30%. To achieve the citywide 30% tree canopy coverage goal, these tree regulations are directed toward preservation, planting and maintenance. b. The citywide 3 0% canopy coverage goal will be achieved through residential land uses ( one and two family dwelling units) having 40% canopy coverage, commercial land uses having 30% canopy coverage and industrial land uses having 20% canopy coverage. The 40% canopy coverage for one and two family developments will be reduced by 15% canopy coverage if one tree per residential lot is placed on all lots up to 5000 square feet in area and one additional tree for each additional 5000 square feet or faction thereof up to a maximum of nine (9) trees per residential lot. The remaining 25% canopy coverage to be provided in public right of ways, parks, Homeowner Association lots or boundary street parkways. For other residential uses and mixed used areas, 50% of the required open space will have canopy coverage through planting or preservation. c. To achieve the 30% citywide canopy coverage goal, all parking areas for all developments other than one or two family developments shall have a 40% canopy coverage achieved through preservation of existing or tree planting within the parking field and drives. Planting within the parkway will be credited to the coverage requirements. d. Public projects such as city water, sewer or street projects shall have a 30% canopy coverage if the project can not be classified as residential or industrial. City 4 projects that are residential or industrial in nature will be required to meet the canopy coverage for those land uses. 3. Tree preservation / retention of existing canopy a Preservation of existing canopy coverage regardless of tree type 1. On all properties of land greater than one acre, a minimum retention of existing canopy shall be 25%. The existing canopy can be determined via recent air photo, on the ground survey or other approved method by the City Forester. 2. Property located in floodplains or located in areas that will be dedicated to public spaces will be counted toward the required 25% minimum retention. 3. Calculation of all canopy coverage and retention areas will not include utility right of ways or easements covered under the rules and regulation of the Public Utility Commission 4. To remove more than the minimum retention will require a waiver from the Urban Forestry Board. b. Preservation of existing canopy coverage for protected trees only 1. Retention of quality trees (protected trees) only will be allowed if an additional 5% is preserved (a total preservation of30% of the existing canopy of protected trees) and planting/preservation will ensure an additional 5% coverage (residential coverage would be a minimum of 45%, commercial coverage would be a minimum of 35% and industrial would be a minimum of 25%) 2. To determine the existing tree canopy coverage for protected trees only will require an onsite tree survey noting the location, size( diameter of trees 6 inches or greater) and canopy coverage of each tree. 3. Protected trees include the following species: Redbud Mexican plum Cbeny laurel Eve's necklace Crabapple Bradford pear Golden Raintree Caddo Maple Red Maple Bigtooth maple Bur oak Ch inquapin oak Cercis Canadensis Prunus mexicana Prunus caroliniana Sophora ajfinis Ma/us angustifolia Pyrus ca/leryana var. Bradford Koelrueteria paniculata Acer saccharum Acerrubrum Acer grandidentatum Quercus macrocarpa Quercus muhlenbergli 5 Live oak Shumard red oak Texas red oak Post oak Blackjack oak Pecan Lacebark elm Cedar elm American elm Bald cypress Black walnut Green ash Texas ash Southern magnolia Quercus virginiana Quercus shumardii Quercus texana Quercus stalla/JJ Quercus marllandica Carya /llinoensis Ulmas parvifoTia Ulmas crassifolia Ulmas amer/cana Taxodium distichum Caryanlgra Fraxtnus pennsylvanica Fraxinus Magnolia grandiflora 4. Tree preservation / significant or large trees a. Significant or large trees 30 inches in diameter (94.25 inches in circumference) for the entire city or 20 inch diameter ( 62.83 inches in circumference) for Post Oaks and Blackjack Oaks east oflnterstate Highway 35 West can only be removed by permit of the City Forester. The reduced diameter for Post Oaks and Blackjack Oaks east ofl 35 Wis in recognition of the naturally occurring Post Oak Savannahs within the Cross Timbers Zone. Preservation of a significant or large tree will be credited to the required canopy cover 1.5 times the actual canopy size. b. Criteria for granting the permit will be one of the following conditions; 1. Removal will be granted if an area 1 Yz times the area of the specific tree's canopy is retained on the same site. The 1 Yz retention of existing trees shall be in excess of the required tree coverage on the site/tract, or 2. Removal will be granted if planting of new trees at five (5) times greater in canopy area than the removed specific tree canopy. The additional planting of 5 to 1 will be in excess of the required tree coverage on the site, or 3. Payment into the tree fund based upon the total diameter of the specific tree times $200 per diameter inch, or 4. Urban Forestry Board approved plan that mitigates the removal of the large tree c. Replacement any tree preserved and that dies within five years due to construction or development activities will be the responsibility of the original applicant Replacement will be new trees with a minimum of 3 inches each in diameter and equal to five times the lost canopy. Tree replacement will be guarantee for a period of two years. 5. Tree Planting to achieve the goal of canopy coverage 6 ORDINANCE NO. 17228-10-2006 AN ORDINANCE AMENDING THE COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF FORT WORTH, BEING ORDINANCE NO. 13896, AS AMENDED, CODIFIED AS APPENDIX" A" OF THE CODE OF THE CITY OF FORT WORTH BY AMENDING SUBSECTION K "PRESERVATION OF TREES" OF SECTION 6.301 "LANDSCAPING" OF ARTICLE 3, "LANDSCAPING AND BUFFERS" TO ADD REGULATIONS ON THE REMOVAL OF PROTECTED TREES EQUAL TO OR GREATER THAN SIX INCHES IN DIAMETER ON A PARCEL OF LAND GREATER THAN ONE ACRE; TO AMEND CHAPTER 9 "DEFINITIONS" TO ADD DEFINITIONS RELATED TO TREE PRESERVATION; PROVIDING A SA VJNGS CLAUSE; PROVIDING A PENAL TY CLAUSE; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, in order to maintain and enhance a positive image and a livable city it is important to promote site planning which furthers the preservation of mature trees and to protect trees during construction, to facilitate site design and construction which contribute to the long term viability of existing trees and to control the removal of trees when necessary WHEREAS, at the November 2, and 9, 2004 City Council meetings, citizens spoke about concerns of clear cutting in their community, provided numerous pictures and testimony about actual examples of clear cutting that has happened in areas surrounding their homes and neighborhoods, and requested the City Council to put an immediate moratorium on clear cutting; WHEREAS, on November 16, 2004, the City Council approved Ordinance Number 16208 (Mayor and Council Communication PZ-2556) establishing a thirty day moratorium on the removal of protected trees equal to or greater than six inches in diameter on an acre or larger parcel of land without a permit from the City Forester; WHEREAS, the moratorium was enacted and continued in order to maintain the status quo while the Citizen Advisory Committee continued to the study of the adoption of a tree preservation ordinance; WHEREAS, the Government and Neighborhood Relations Committee established a committee consisting of two City Council members, a Zoning Commission member, representatives from neighborhood and builder associations, Scenic Fort Worth, the Fort Worth Garden Club, utility companies, real estate investors, urban forestry and other interested parties to study the practices in other cities and advise the Council Committee on possible regulations related to tree preservation; WHEREAS, it is anticipated that the Citizen Advisory Committee will be prepared to make a recommendation on regulations related to tree preservation to the Council Committee in February 2005; WHEREAS, the Citizen Advisory Committee recommended the adoption of interim regulations to regulate the removal of protected trees during the time the committee compares and analyzes other tree preservation ordinances in order to make a recommendation on regulations to the Council Committee and the full City Council; WHEREAS, on December 14, 2004, the City Council approved Ordinance Number 16232 (Mayor and Council Communication G-14617) extending the moratorium until January 28, 2005 to allow time for the Zoning Commission and City Council to consider interim regulations; WHEREAS, on January 18, 2005, the City Council approved Ordinance Number 16270 establishing interim regulations in order to allow the City to complete the public process for consideration of amendments to the Zoning Ordinance to provide regulations for the protection and replacement of trees as recommended by the citizen advisory committee; WHEREAS, the Citizens Advisory Committee recommended to the City Council provisions that would better meet the needs of the city and those recommendations were reviewed by the public 2 through citizen information meetings and Zoning Commission hearings; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1. Subsection K "Preservation of Trees" of Section 6.301 "Landscaping" of Article 3, "Landscaping and Buffers" is hereby amended to add new language related to tree coverage, preservation, planting and maintenance to read as follows: K. Tree coverage, preservation, planting and maintenance 1. Intent a. It is recognized that there is a need to establish regulations addressing the protection of healthy and significant trees and to provide for the replacement and replanting of trees that are necessarily removed during construction, development or redevelopment. b. It is the intent of these regulations to limit the removal of tree canopy, promote a multi-aged urban forest, to promote the orderly development of the City of Fort Worth, and to protect the public health, safety and general welfare of the citizens of the City of Fort Worth. It is not the intent of these regulations to deny development rights protected by law. c. Further, it is the intent of the City to address the removal, replacement, maintenance and replanting of trees that are necessarily removed during construction, development or redevelopment in an expeditious manner and with due regard for the legal rights of property owners in Fort Worth. d. The process of development with its alteration of natural topography, vegetation and creation of impervious cover can have a negative effect on the ecological balance on an area by causing increases in air temperature and accelerating the processes of runoff, erosion and sedimentation. Recognizing that the general objectives of this section are to promote and protect the health, safety and welfare of the public, it is declared that this section is adopted with the following objectives: 1. Eliminate the process of clear cutting; 2. Promote the preservation/ conservation of trees throughout the city; 3 3. Recognize the benefits of trees in the urban environment; 4. Encourage planting and preservation of quality trees that are suitable to an area; 5. Promote a safe environment that includes trees; 6. Aid in stabilizing the environment's ecological balance by contributing to the processes of air purification, oxygen regeneration, ground-water recharge and storm water runoff retardation, while at the same time aiding in noise, glare, wind and heat abatement; 7. To provide visual buffering within and between land uses of differing character to alleviate the harshness of urban life; 8. Enhance the beautification of the city; 9. To safeguard and enhance property values and to protect public and private investment; 10. To conserve energy; 11. To provide habitat for wildlife; and 12. To encourage the preservation of large trees which, once removed, can be replaced only after generations. 2. Tree coverage a. The municipal urban forestry strategy is to achieve citywide tree canopy coverage of 30%. To achieve the citywide 30% tree canopy coverage goal, these tree regulations are directed toward preservation, planting and maintenance. b. The citywide 3 0% canopy coverage goal will be achieved through residential land uses ( one and two family dwelling units) having 40% canopy coverage, commercial land uses having 30% canopy coverage and industrial land uses having 20% canopy coverage. The 40% canopy coverage for one and two family developments will be reduced by 15% canopy coverage if one tree per residential lot is placed on all lots up to 5000 square feet in area and one additional tree for each additional 5000 square feet or faction thereof up to a maximum of nine (9) trees per residential lot. The remaining 25% canopy coverage to be provided in public right of ways, parks, Homeowner Association lots or boundary street parkways. For otherresidential uses and mixed used areas, 50% of the required open space will have canopy coverage through planting or preservation. c. To achieve the 30% citywide canopy coverage goal , all parking areas for all developments other than one or two family developments shall have a 40% canopy coverage achieved through preservation of existing or tree planting within the parking field and drives . Planting within the parkway will be credited to the coverage requirements. d. Public projects such as city water, sewer or street projects shall have a 30% canopy coverage if the project can not be classified as residential or industrial. City 4 projects that are residential or industrial in nature will be required to meet the canopy coverage for those land uses. 3. Tree preservation / retention of existing canopy a Preservation of existing canopy coverage regardless of tree type 1. On all properties of land greater than one acre, a minimum retention of existing canopy shall be 25%. The existing canopy can be determined via recent air photo, on the ground survey or other approved method by the City Forester. 2. Property located in floodplruns or located in areas that will be dedicated to public spaces will be counted toward the required 25% minimum retention. 3. Calculation of all canopy coverage and retention areas will not include utility right of ways or easements covered under the rules and regulation of the Public Utility Commission 4. To remove more than the minimum retention will require a waiver from the Urban Forestry Board. b. Preservation of existing canopy coverage for protected trees only 1. Retention of quality trees (protected trees) only will be allowed if an additional 5% is preserved (a total preservation of 30% of the existing canopy of protected trees) and planting/preservation will ensure an additional 5% coverage (residential coverage would be a minimum of 45%, commercial coverage would be a minimum of 35% and industrial would be a minimum of25%) 2. To determine the existing tree canopy coverage for protected trees only will require an onsite tree survey noting the location, size( diameter of trees 6 inches or greater) and canopy coverage of each tree. 3. Protected trees include the following species: Redbud Mexican plum Cheny laurel Eve's necklace Crab apple Bradford pear Golden Raintree Caddo Maple Red Maple Bigtooth maple Bur oak Chinquapin oak Cercis Canadensis Prunus mexicana Prunus caroliniana Sophora affinis Ma/us angustifolia Pyrus calleryana var. Bradford Koelrueteria paniculata Acer saccharum Acerrubrum Acer grandidentatum Quercus macrocarpa Quercus muhlenbergil 5 Liveoak Shumard red oak Texas red oak Post oak Blackjack oak Pecan Lacebark elm Cedar elm American elm Bald cypress Black walnut Green ash Texas ash Southern magnolia Quercus virginiana Quercus shwnardii Quercus texona Quercus stallato Quercus marilandica Carya lllinoensis Ulmas parvifolia Vlmas crassifolia Vlmas amerlcana Taxodium dislichum Caryanigra Fraxinus pennsylvanlca Fraxinus Magnolia grandijlora 4. Tree preservation / significant or large trees a. Significant or large trees 30 inches in diameter (94.25 inches in circwnference) for the entire city or 20 inch diameter ( 62.83 inches in circumference) for Post Oaks and Blackjack Oaks east of Interstate Highway 3 5 West can only be removed by permit of the City Forester. The reduced diameter for Post Oaks and Blackjack Oaks east ofl 35 Wis in recognition of the naturally occurring Post Oak Savannahs within the Cross Timbers Zone. Preservation of a significant or large tree will be credited to the required canopy cover 1.5 times the actual canopy size. b. Criteria for granting the permit will be one of the following conditions; 1. Removal will be granted if an area 1 Yz times the area of the specific tree's canopy is retained on the same site. The 1 Y2 retention of existing trees shall be in excess of the required tree coverage on the site/tract, or 2. Removal will be granted if planting of new trees at five ( 5) times greater in canopy area than the removed specific tree canopy. The additional planting of 5 to 1 will be in excess of the required tree coverage on the site, or 3. Payment into the tree fund based upon the total diameter of the specific tree times $200 per diameter inch, or 4. Urban Forestry Board approved plan that mitigates the removal of the large tree c. Replacement any tree preserved and that dies within five years due to construction or development activities will be the responsibility of the original applicant. Replacement will be new trees with a minimum of 3 inches each in diameter and equal to five times the lost canopy. Tree replacement will be guarantee for a period of two years. 5. Tree Planting to achieve the goal of canopy coverage 6 a. Trees planting to provide canopy coverage shall be a minimum of 3 inches each in diameter and will be credited its canopy coverage at normal maturity. These credits are as follows: 1. Large canopy tree with typical crown width of 50 feet in diameter - 2000 square feet (minimum spacing of 40 feet on center) 2. Medium canopy tree with typical crown width of 30 feet in diameter- 700 square feet (minimum spacing of24 feet on center) 3. Small canopy tree with typical crown width of 10 feet in diameter-I 00 square feet (minimum spacing of 8 feet on center) 6. Tree Protections and Maintenance a. All trees being preserved for canopy coverage or a significant tree covered under section 4 due to size will be protected during any development activities. Development activities will include vegetation removal, grading, installation of utilities and/or construction of structures and site amenities. b. Protective measures must occur on all trees located within 50 feet of development activities . c. Protective measures are required at the critical root zone (the critical root zone radius is defined as one (1) foot per inch diameter measured at breast height (four and 12 feet) of the tree. d. The following activities within the critical root zone are prohibited: I. No material intended for use in construction or waste material accumulated due to excavation or demolition shall be place within the limits of the critical root zone of any preserved tree; 2. No equipment shall be cleaned or other liquids deposited or allowed to flow overland with the limits of the critical root zone of a preserved tree. This includes, without limitations, paint, oil, solvents, asphalt, concrete, mortar or similar materials; 3. No signs, wires or other attachments, other than those of a protective nature, shall be attached to any preserved tree; 4. No vehicular and/or construction equipment traffic or parking shall take place within the limits of the critical root zone of any protected tree other than on existing street pavement; or 7 5. No heavy equipment, including but not limited to trucks, tractors, trailers, bulldozers, bobcat tractors, trenchers, compressors and hoists shall be allow inside the critical root zone of any preserved tree on any construction site without the specific approval of the City Forester. 6. No grade change within the critical root zone without submission of a certified arborist/forester report dealing with protections and the report acceptance by the City Forester. e. Procedures required prior to development activities 1. Protective fencing: Prior to development activities, the contractor or subcontractor shall construct and maintain, for each preserved tree or tree cluster on a tract, a protective fence which encircles the outer limits of the critical root zone of the tree to protect it from development activities. All protective fencing shall be in place prior to commencement of any site work and remain in place until all exterior work has been completed. (add minimum requirements on size and material of protective fencing) 2. Bark Protection: In situation where a preserved tree remains in immediate area of intended construction and the City Forester determines the tree bark to be in danger of damage by development activities, the contractor or subcontractor shall protect the tree by enclosing the entire circumference of the tree with 2" x 4" lumber encircled with wire or other means that does not damage the tree. The intent is to protect the bark of the tree against incidental contract by large construction equipment. f. Construction methods 1. Boring: Boring of utilities under preserved trees shall be required in those circumstances where it is not possible to trench around the critical root zone of the preserved tree. When required, the length of the bore shall be the width of the critical root zone at a minimum and shall be a minimum depth of 48 inches. 2. Grade Change: In situation in which the City Forester approves a grade change within the critical root zone of a preserved tree, procedures and special conditions shall be approved by the City Forester in advance of any work. 3. Trenching: All trenching shall be designed to avoid trenching across the critical root zone of any preserved tree, unless otherwise approved by the City Forester. All work within the critical root zone requires advance approval by the City Forester. The placement of underground utility lines such as electric, phone, gas, etc., is encouraged to be located outside the critical root zone of preserved trees. Trenching for an irrigation system shall be place outside the critical root 8 zone, except into the critical root zone perpendicular to the tree trunk and in the manner that has the least possible encroachment into the critical root zone. Boring is required for all underground utility lines that cross the critical root zone. 4. Root Pruning: All roots two inches or larger in diameter which are exposed as a result of trenching or other excavation shall be cut off square with a sharp mediwn tooth saw and covered with pruning compound within two hours of initial exposure. 5. Underground utilities: All onsite underground utilities with backfill other than onsite material shall have a clay dam every 200 feet for the entire length of the utility placement. 6. Paving: No paving is allowed within the critical root zone of any preserved tree unless otherwise approved by the City Forester. Approvals will be based upon best management practices for tree preservation. g. Warranty/ Replacement 1. Any preserved tree that dies or becomes hazardous due to the construction activities within 5 years following the completion of the development activities shall be replaced following the criteria outlined above for tree preservation and significant tree replacement by the original applicant or assigned party. 7. Urban Forestry Plan/ Permits a. Except as otherwise provided herein, no tree removal ( 6 inches in diameter or larger, all species) will be allowed within the City ofF ort Worth without the approval of an Urban Forestry Plan by the City Forester on and after the effective date of this ordinance. b. An approved Urban Forestry Plan/ Permit will run with the land and can only be amended by the Urban Forestry Board. c. Notice of Application -The City shall post on the City's Website a notice of application within seven calendar days of receipt. The website posting shall include the location, applicant's name and address, and general description of the requested forestry activities. The City shall not approve an Urban Forestry Plan/ Permit until 21 calendar days have past since the website posting. d. Credit for preserved or planted trees shall be given for trees located outside the subject property within the parkway of adjacent streets or on property designated for public use in the immediate area. 9 e. Submittal requirements: Prior to any development, disruptive activities ( including clearing and grading) or tree removal, the following information must be submitted to the City Forester: Phase One Documents I . A scaled diagram of the subject property in which development, disruption or tree removal is proposed. The scaled diagram may be an engineered drawing, survey, air photo or other City Forester approved illustration. The first sheet will reflect the existing condition by including the following information: i.Boundaries of the property and its calculated area i.e. acres , square feet. ii.Location map showing the proximately of the property to the nearest streets. iii.Outline of the existing tree canopy area on the property and the calculated area (square feet or acres) of existing canopy coverage. iv .Scaled existing or proposed utilities regulated by the Public Utility Commission. Indicate the calculated area (square footage or acres) for these rights of ways or easements. v.Location of each large or significant tree as defined in Section 4 , its type and canopy area vi. The following tables: Square Feet Acres Gross area of property Utility Right of Ways -- or Easements regulated by the Public Utility Commission Net Urban Forestry Area Required Tree Canoov Area Square feet Acres Net Urban Forestry Area Land Use/ Canopy Coverage ratio X One or two family ( 40% coverage) One or two family with trees planted on individual lots (25% coverage) Commercial (30% coverage) Industrial (20% coverage) 10 Preservation I Square feet Acres Retention of Existing Canoov Existing tree canopy area Preservation X0.25 X0.25 requirement Additional 5% if only protected trees are being preserved Minimum retention vii. Upon completion and approval of phase one documentation, removals will be granted if a minimum of 50% of the existing tree canopy is retained. The documentation pre-development canopy coverage will run with the property until development occurs. The required retention noted in phase one documentation will have to be achieved within the area remaining after the initial clearing. Phase Two Documents The second sheet will overlay the proposed improvements and removals/preservations/plantings. The sheet should include the following information: i. Scaled site plan depicting the location of proposed structures, parking areas, drives and amenities; ii. Outline the canopy areas that are desired to be removed; 111. Depiction of trees (large, medium or small canopy crown) that will be planted; iv. The following charts: Square feet Acres Area of existing tree canopy retained 11 Planting -large canopy trees @ 2000 square feet per tree medium - canopy trees @ 700 square feet per tree __ small canopy trees @ 100 square feet per tree Total preservation and planting Parking Areas for Square feet Acres Commercial or Industrial Uses Area of parking and drives Required canopy X0.4 X0.4 coverage of parking areas Required canopy coverage Area of canopy coverage being provided 8. Tree Planting Requirements a The following list of trees is considered desirable and adapted trees for the Fort Worth area. Planting of trees from this list is acceptable. Other trees will be considered by the City Forester and granted on a case-by-case basis. The approval of additional species will be judged on adaptability, long-term health and growing characteristic of the tree type. Trees Ca a illinoensis Deodar Cedar Cedrus deodara Green Ash Southern M olia# Bur Oak* Chin ua in Oak Shumard Oak # 12 Texas Red Oak Ouercus buc/deyi Live Oak* Ouercus virf!iniana American Elm Ulmus Americana Cedar Elm* Ulmus crassifolia Lacebark Elm Ulmus parvi(olia Medium Canoov Trees Caddo Maple * Acer barbatum var. Caddo Bigtooth Maple * Acer wandidentatum Common Persimmon Diosvvros virf!iniana Texas Ash Fraxinus texensis Ginkgo Ginkf!O biloba Kentockv Coffeetree Gvmnocladus dioicus Eastern Red-Cedar * Juniperus virf!iniana Golden Raintree Koelreuteria paniculata Eldarica (Afl?han) Pine * Pinus eldarica Italian Stone Pine Pinus vinea Chinese Pistache -* Pistacia chinensis Honey Mesquite * Prosopis f![andulosa Blackjack Oak* Quercus marilandica Monterrey (Mex white) Oak * ()uercuspo[ymorpha Western Soapberry * Sapindus drummondii Pond Cypress Taxodium ascenders Bald Cypress * Taxodium distichum Small Canoov Trees Japanese Maole # Acer palmatum Common button-bush Cepha/anthus occidentalis Redbud* Cercis Canadensis Desert Willow * Chilopsis linearis Rou2:h-leafDogwood # Cornus drummondii Texas Persimmon "' Diosvvros texana Carolina buckthorn # Frangula caroliniana Y aupon Holly * flex vomitoria Deciduous Holly flex deciduas Crepe Myrtle * Laf!erstroemia incica Mexican Plum * Prunus mexicana White Sin Oak * ()uercus sinuate var. breviloba Flameleaf Sumac * Rhus lanceolata Eve's Necklace* Sophora a[finis Mexican buckeye * U$!nadia speciosa Rusty Blackhaw Viburnum rufidulum 13 * Drought tolerant species # Not recommended for parking lots or high heat areas b. The minimum size of tree planted will be 3 inches in diameter measured one foot above ground level. If the tree is multi trunk, the main stem will be given full credit for its diameter and all other stems will receive Yi credit. The total of all must be 3 inches or greater. c. All trees that die within two years of the date of project completion will be replaced by another replacement tree. The replacement tree carries the same two-year replacement requirement. The requirement to replace the trees shall run with the land. d. A minimum of 16 square feet of permeable surfaces must be provided for all tree plantings. 9. Exceptions to the tree coverage, preservation, planting and maintenance provisions a Any existing residential lot one acre or less in size either zoned or used as residential with a residential structure upon it is exempted from these regulations. All other uses e.g. commercial, institutional , industrial must comply with these regulations regardless of lot size. b. The removal of any tree in the case of an emergency, such as due to storm damage or utilities, shall not be subject to these regulations or require an Urban Forestry Plan/ Permit. c. Any tree that is deemed to be in unsafe condition, or is injurious to common good, or to electrical, gas or water utilities , or sewer pipes, pavement or improvements, or is infested and dangerous to other trees or conflicts with other ordinances or regulations. d. Any permits or projects vested per Chapter 245 of the Local Government Code. e. Agriculture development will require documentation of the existing canopy coverage and detailed tree survey of the property. The tree survey will include the location, size and type of tree. At the time of development a payment of $200 per diameter inch will be required for 25% of the removed trees . The documented canopy coverage and total diameter inch total will run with the land. f. Areas within mixed used zoning districts or within the boundaries of the Downtown Urban Design District are exempted from the preservation/ retention provisions. Mixed used zoned properties must provide through either preservation or planting 50% canopy coverage of required open space. Downtown Urban Design District projects require a minimum 40% provision of canopy coverage on 14 surface parking lots, in addition to any other landscape regulation required under the adopted Downtown Urban Design Standards . g. Special districts with tree or landscape requirements -Should other special districts be established other than the Downtown Design District, the special district guidelines will apply if the requirements are more restrictive than those outlined within this section. h . Gas Well Sites -Only urban and high impact wells will require tree preservation and/or planting measures. Well classifications are established through there proximity to protected uses. A 30% tree canopy requirement through preservation and/or planting will apply to urban classified wells. A 40% tree canopy requirement through preservation and/or planting will apply to high impact classified wells. The following requirements apply to both urban and high impact wells; 10. Appeals. 1. A minimum retention of25% of the existing trees will be required as with other land uses unless removal necessary for location of equipment as determined by the Gas Inspector. 11. No more than 25% of the same species may be planted at one site. 111. A minimum of 25% of the planted trees must be evergreen species . iv. A minimum of 75% of the planted trees must be located between the gas well site and protected uses or public way. An administrative waiver of the 75% placement can be approved by the City Forester with proof that the proposed planting will screen the negative views into the well site from the protected uses. v. All planted trees that die within two years of the date for project completion ·will be replaced by another replacement tree. The replacement tree carries the same two-year replacement requirement. A replacement of any tree that dies within two-years of planting will be replaced by the Gas Well Operator or agent and a new two-year guarantee will begin at the time of replacement. a If the City Forrester, or other city official refuses to accept or issue an Urban Forestry Plan / Permit, or the applicant disagrees with the decision of the City Forester, the applicant may appeal the decision to the Urban Forestry Board. The 15 appeal shall be in writing and shall be transmitted to the Executive Secretary of the Urban Forestry Board within ten days after receipt of notification that the City Forester will not accept the Urban Forestry plan/ permit. b. The Urban Forestry Board shall consider the appeal within 30 days after the appeal is received by the Board's Executive Secretary, unless the applicant requests a later hearing. The Urban Forestry Board shall not release the applicant from the requirements of this ordinance, unless the applicant first presents credible evidence from which the Board can reasonably conclude application of this ordinance to the applicant would be likely to deprive the applicant of rights protected by law. c. The Board may take the following actions on an appeal: 1. Deny the appeal, in which case the Urban Forestry Plan /Permit shall not be accepted or granted; or, 2. Grant the appeal, and direct the City Forester to accept and approve the Urban Forestry Plan/ Permit; or, 3. Grant the appeal subject to such provisions, conditions, or limitations as deemed appropriate by the Board. d. In no event shall acceptance of an application guarantee that the City will issue the Urban Forestry Plan/ Permit, unless the permit application is in compliance with all applicable codes, laws and regulations. e . Appeals of the Urban Forestry Board will be handled by the City's Board of Adjustment. 11. Penalty Any person, firm, or corporation who violates , disobeys, omits, neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be assessed a penalty of Two Hundred Dollars ($200 .00) per diameter inch of trees removed or damaged without a valid Urban Forestry Plan / Permit, Four Hundred Dollars ($400.00) per diameter inch of significant tree removed or damaged without a valid Urban Forestry Plan/ Permit and be guilty of a misdemeanor and upon conviction shall be fined not more than Five Hundred Dollars ($500.00) for the removal or damage of each tree. 12. Enforcement Any Code Enforcement Officer, the City Forester or his/her designee shall have the authority to enforce the provisions of this ordinance. SECTION 2. 16 Ordinance No. 13896, the zoning ordinance of the City of Fort Worth, Section 9.101, "Defined Terms," is hereby amended by adding new definitions related to tree preservation as follows: (1) CITY FORESTER: For the purpose of tree preservation, that person or persons designated by the Parks and Community Services Director to provide administrative review of Urban Forestry Plans/ Permits. (2) DIAMETER OF AN EXISTING TREE: That measurement of the size/diameter of a tree as determined by measuring at four and one-half feet (4.5') above ground. For a multi-trunk tree, the diameter shall be the total diameter of the largest trunk plus half (1/2) the diameter of each additional trunk. (3) URBAN FORESTRY PLAN: A plan showing the location of existing canopy coverage and any trees that are classified as large or significant as per Section 4 on the site, the location of all easements, the location of all proposed buildings, a grading plan, if applicable; the trees desired to be removed, the trees that shall remain on the site, and an accompanying document indicating the reason for the proposed removal of any tree, and if applicable, a description on how the existing healthy trees proposed to be retained will be protected from damage from construction. ( 4) TREE REMOVAL: The cutting, destroying, removing, moving, poisoning, banding, marking, or effectively destroying through damaging, any tree 6 inches or greater in diameter situated on property regulated by the Zoning Ordinance without first obtaining a Urban Forestry Plan/ Permit from the City Forester. (5) CRITICAL ROOT ZONE: Area next to the trunk of the tree that is equal to radius of one foot per inch diameter measured at breast height (four feet six inches) of the tree. SECTION 3. This ordinance shall be cumulative of all provisions of ordinances and of the Code of the City of Fort Worth, Texas (1986), as amended, except where the provisions of this ordinance are in direct conflict with the provisions of such ordinances and such Code, in which event conflicting provisions of such ordinances and such Code are hereby repealed. 17 SECTION4. It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses and phrases of this ordinance are severable, and, if any phrase, clause, sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTIONS. Any person, firm, or corporation who violates, disobeys, omits, neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be assessed a penalty of Two Hundred Dollars ($200.00) per diameter inch of the protected trees that is greater than 6 inches and less than 30 inches in diameter or Four Hundred Dollars ($400.00) per diameter inch of any tree that is 3 0 inches or greater in diameter removed or damaged without a valid Tree Removal Permit and be guilty of a misdemeanor and upon conviction shall be fined not more than Five Hundred Dollars ($500.00) for removal or damage of each tree. SECTION 6. All rights and remedies of the City of Fort Worth, Texas, are expressly saved as to any and all violations of the provisions of Ordinance No. 13 896 which have accrued at the time of the effective date of this ordinance and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. 18 SECTION 7. The City Secretary of the City ofFort Worth, Texas, is hereby directed to publish the caption, penalty clause and effective date of this ordinance for two (2) days in the official newspaper of the City of Fort Worth, Texas, as authorized by Section 52.013 , Texas Local Government Code. SECTIONS. This ordinance shall take effect on January 30, 2007 after adoption and publication as required by law. APPROVED AS TO FORM AND LEGALITY: ADOPTED: October 3, 2006 EFFECTIVE:------ 19 ATTACHMENT C ABATEMENT SPECIFICATIONS Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 23 Industrial Hygiene and Safety Technology, Inc. 2235 Keller Way Carrollton , TX 75006 Phone: (972) 478-7415 Fax: (972) 478-7615 http://www.i hst.com Leaders in Quality, Service and Innovation SPECIFICATIONS FOR ASBESTOS ABATEMENT Prepared for: City of Fort Worth Texas 1000 Throckmorton Fort Worth, Texas 76102 Project: Oak Hollow Apartments 5901 Boca Raton Fort Worth, Texas 76112 & Villa Del Rio Apartments 5817 Boca Raton Fort Worth, Texas 76112 DATE: September 24, 2007 Specifications Prepared by: Tracy K. Bramlett, CIH, CSP TDSHS LICENSE #10-5040 Expiration: 12/31/07 Prepared by: Industrial Hygiene & Safety Technology, Inc. 2235 Keller Way Carrollton, Texas 75006 972-478-7415 TABLE OF CONTENTS Asbestos Abatement Specifications Oak Hollow Apartments 5901 Boca Raton Fort Worth, Texas 76112 & Villa Del Rio Apartments 5817 Boca Raton Fort Worth, Texas 76112 I.I. SUMMARY OF THE WORK ............................................................................................................................... l 1 .1.1. CONTRACT DOCUMENTS AND RELATED REQUIREMENTS : ....................................................... 1 1 .1.2 . EXTENT OF WORK: .................................................................................................................................. 1 1 .1.4 . CONTRACTORS USE OF PREMISES : .................................................................................................. 3 1.2. DIF FERJNG SITE CONDITIONS : ....................................................................................................................... 3 1.3 . STOP AS BESTO S REMOVAL : ........................................................................................................................... 3 1.4. CODE S AND RE GULATIONS: .......................................................................................................................... .4 1.4.1. GENERAL APPLICABILITY OF CODES , REGULATIONS AND STANDARDS : ............................ .4 1.4.2 . CONTRACTOR RESPONSIBILITY: ....................................................................................................... .4 1.4 .3. STATE REQUIREMENTS : ....................................................................................................................... .4 1.4.4 . LOCAL REQUIREMENTS: ....................................................................................................................... .4 1.4 .5. NOTICES: .................................................................................................................................................... 5 1.4 .6 . PERMITS : .................................................................................................................................................... 5 1.4 .8 . POSTING AND FILING OF REGULATIONS : ........................................................................................ 5 1.5. PRO JECT CO ORDINATI ON: .............................................................................................................................. 5 1 .5.1 . PERSONNEL: ............................................................................................................................................. 5 1.6 . RES P IRATORY PROTECTION: ......................................................................................................................... 6 1 .6 .1. GENERAL: ................................................................................................................................................... 6 1.6.2. RESPIRATORS FOR ABATEMENT OPERATIONS : ........................................................................... 6 1.7. WORKERPROTECTION: ................................................................................................................................... 7 1 .7 .1. TRAINING PRIOR TO ENGAGING INABATEMENTWORK: ............................................................ 7 1. 7 .2. MEDICAL EXAMINATIONS : ..................................................................................................................... 7 1 .7.3 . PROTECTIVE CLOTHING : ....................................................................................................................... 7 1 .7.4 . ENTERING AND EXITING PROCEDURES : .......................................................................................... 7 1 .7 .5. DECONTAMINATION PROCEDURES: .................................................................................................. 7 1.7 .6. LIMITATIONS WITHIN WORK AREA: .................................................................................................... 8 1.8 . DECONTAMINATION FACILITIES: ................................................................................................................. 9 1 .8 .1. DESCRIPTION : ........................................................................................................................................... 9 1 .8.2 . GENERAL REQUIREMENTS : .................................................................................................................. 9 1 .8.3. TEMPORARY UTILITIES TO PDF AND EDF : ....................................................................................... 9 1.8.4 . PERSONNEL DECONTAMINATION FACILITIES (PDF): ................................................................... 9 1.8 .5 . EQUIPMENT DECONTAMINATION FACILITIES (EDF): .................................................................. 11 1.8 .6 . EDF-DECONTAMINATION PROCEDURES : ....................................................................................... I I 1.9. NEGATIVE PRESSURE FILTRATION SYSTEMS : ........................................................................................ 11 1 .9.2 . PRESSURE DIFFERENTIAL: ................................................................................................................. 12 1.9.3. MONITORING : .......................................................................................................................................... 12 1.9.4. TESTING THE SYSTEM : ........................................................................................................................ 12 1 .9 .5 . DEMONSTRATION OF NEGATIVE AIR SYSTEM OPERATION : ................................................... 12 1.9.6 . USE OF SYSTEM DURING ABATEMENT OPERATIONS: .............................................................. 12 1.9.7 . DISMANTLING THE SYSTEM: .............................................................................................................. 13 1.10 . CONTAINME T BARRIERS AND COVERINGS OF WORK AREA: ........................................................ 13 1.10 .1. GENERAL: ............................................................................................................................................... 13 1.10 .2 . PREPARATION PRIOR TO SEALING OFF: ..................................................................................... 13 1.10 .3. CONTROL ACCESS TO WORK AREA: ............................................................................................. 13 1.10.4. CRITICAL BARRIERS: .......................................................................................................................... 13 1.10 .5. PRIMARY BARRIERS : .......................................................................................................................... 14 1.10.6 . EXTENSION OF WORK AREA: ........................................................................................................... 14 1.10 . 7. SECONDARY BARRIERS : ................................................................................................................... 14 1.11 . MONITORING , INSPECTION AND TESTING : ............................................................................................ 14 1.11 .1. GENERAL: ............................................................................................................................................... 14 1.11 .2. OUTLINE SCOPE OF SERVICES OF THE OWNER'S CONSUL TANT: ...................................... 15 1.11.3. MONITORING , INSPECTION AND TESTING BY ABATEMENT CONTRACTOR: ..................... 16 1.11.4. ANALYSIS : .............................................................................................................................................. 16 PART 2 -EXECUTION .............................................................................................................................................. 17 2.1 . PREABATEMENT ACTIVITIES: ..................................................................................................................... 17 2.1 .1. PREABATEMENT MEETING : ................................................................................................................ 17 2.1.2. PREABATEMENT INSPECTION AND PREPARATIONS : ................................................................ 17 2.1.3. PREABATEMENT CONSTRUCTION AND OPERATIONS : .............................................................. 18 2.2. REMOVAL OF ACM AND ACE: ...................................................................................................................... 18 2.2.1 . WETIING MATERIALS : .......................................................................................................................... 18 2.2.2 . SITE PREPARATION : ............................................................................................................................. 18 2 .2.3. PERSONAL PROTECTION : ................................................................................................................... 19 2 .2.5 WALL AND CEILING TEXTURE ............................................................................................................. 20 2.3 . DISPOSAL OF ACM AND ACE WASTE MATERIAL: .................................................................................. 21 2 .3.1. GENERAL: ................................................................................................................................................. 21 2.3.2 . PROCEDURES : ........................................................................................................................................ 22 2.4. PROJECT DECONTAMINATION : ................................................................................................................... 22 2 .4 .1. GENERAL: ................................................................................................................................................. 22 2.4 .2. WORK AREA CLEARANCE : .................................................................................................................. 22 2.4 .3. WORK DESCRIPTION : ........................................................................................................................... 22 2 .4.4 . PRE-DECONTAMINATION CONDITIONS: ......................................................................................... 23 2.4.5 . FIRST CLEANING : ................................................................................................................................... 23 2.4 .6. SECOND CLEANING : ............................................................................................................................. 23 2.4 .7. PRE-CLEARANCE INSPECTION AND TESTING : ............................................................................. 23 2.4 .8. LOCK-BACK ENCAPSULATION : .......................................................................................................... 23 2.5. FINAL AIR CLEARANCE TESTING ............................................................................................................... 24 2.5.1. GENERAL: ................................................................................................................................................. 24 2.5.2. FINAL TESTING : ...................................................................................................................................... 24 2 .5.3. FINAL TESTING PROCEDURES : ......................................................................................................... 24 2.5.4 . SCHEDULE OF AIR SAMPLES WITH PCM: ....................................................................................... 24 2 .5.5. LABORATORY TESTING FOR PCM: ................................................................................................... 25 2.5 .7. FINAL AIR TESTING REQUIREMENTS : ............................................................................................. 25 2.6. ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE: ......................................................... 26 2 .6.1. COMPLETION OF ABATEMENT WORK: ............................................................................................ 26 2 .6.2 . CERTIFICATE OF COMPLETION BY CONTRACTORS : .................................................................. 26 Appendix A: Attachments Appendix B: Specification Drawings Appendix C: Texas Department of State Health Services Notifications I ASBESTOS REMOVAL PART 1 -GENERAL SECTION , ASBESTOS REMOVAL SPECIFICATIONS 1.1. SUMMARY OF THE WORK 1.1.1. CONTRACT DOCUMENTS AND RELATED REQUIREMENTS: Genera l provisions of the contract, including general and supplementary cond itions , apply to the work of this section . The contract documents show the work of the contract and related re- quirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations , notices and permits , existing site conditions and restrictions on use of the site , requirements for partial owner occupancy during work , coordination with other work and phasing of work . Whenever there is a conflict or overlap of the above refer- ences , the more stringent provisions apply. 1.1.2. EXTENT OF WORK: A brief summary of the extent of the work and non-binding to the contract documents is as fol- lows: BASE BID: Removal and disposal of asbestos-containing materials (ACM) and asbestos-contaminated elements (ACE) utilizing wet methods within full, negative-pressure conta inments equipped with HEPA ventilation from specified areas of the buildings . There are two apartment complexes which comprise this bid. The Oak Hollow Apartments contain 32 one bedroom/one bath apartments , 32 one bed- room/one and one half bathroom apartments , 64 two bedroom/two bathroom apartments, 32 two bedroom/two and one half bathroom townhouse apartments , and 16 three bedroom/three bathroom townhouse apartments for a total of 176 apartments . The office at the Oak Hollow Apartments is not included with this bid. The Villa Del Rio Apartments contain thirty two , one bedroom/1 bath units , forty two bedroom/1 bath units, twenty two bedroom/2 bath units , and sixteen efficiency apartments in the building . The following asbestos-containing materials (ACM) will be removed at the properties where ap- plicable . 0 k HI a o low Apartments Sampled Material II Location II Quantity I Sheetrock texture and JC I Walls and ceilinqs throuohout comp lex l 808 ,720 SF Floor tile and black mastic I Throughout buildinqs l -20 ,000 SF** ** All of the floor tile and black mastic in the building 1s assumed to contain asbestos . The Con- tractor must verify the quantities of linoleum in the buildings and bid accordingly to remove all of the material. )(~ I( 6,am(r TDSH License 10-5040, Expires 12 -31-07 IHST Project #17619 Page 1 I ASBESTOS REMOVAL VII D IR. A t ,a e 10 ,partmen s Sampled Material II Location II Quantity I Sheetrock texture and JC I Walls and ceilings throughout complex I 335 ,199 SF Floor tile and black mastic I Throuqhout buildings I -7,400 SF** **All of the linoleum in the building which is under floor tile is assumed to contain asbestos. The Contractor must verify the quantities of linoleum in the buildings and bid accordingly to remove all of the material. The Work Area will be inclusive of the locations and the quantities noted above , in the attached drawings , and as directed by a representative of IHST . The Work may be broken down into multiple Work Areas at the discretion of the Contractor. However, the Contractor will receive no additional time to perform the work on the basis of having multiple Work Areas and associated Cleaning Sequences . The Contractor will be responsible for the removal and disposal of the asbestos-containing ma- terial and asbestos-contaminated materials in accordance with Texas Department of State Health Services (TDSHS), OSHA 29 CFR 1926.1101 , Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part 763 , and the National Emission Standards for Hazardous Air Pollut- ants (NESHAP) Regulations 40 CFR Part 61. 1.1.3. TASKS: The work , located at the summarized briefly as follows : The PROJECT requires the removal of the materials outlined in Section 1.1.2 . The asbestos abatement will be performed in accordance with these specifications and procedures as out- lined . Asbestos Removal within full Containment: The Contractor will use wet methods for all re- moval operations. The Contractor is responsible for prompt clean-up and disposal of waste and debris contaminated with asbestos in leak tight containers . The Contractor will conduct a wet decontamination of equipment and tools before final clearance sampling in the work area . The Contractor will use the existing interior walls and ceilings in the buildings to provide struc- tural support for an asbestos containment work area provided the containment remains sound and is not in danger of collapse. The Contractor should make every effort not to damage the in- terior walls of the building during the project. The Contractor will establish critical barriers over all openings into the work area . ACM debris should be adequately wetted prior to establishing perimeter critical barriers . The Contractor will erect the containment on the exterior of the fire station entrance. Remove the transite ceiling panels and the sheetrock ceiling directly above the transite . Clean the af- fected area and dispose of all debris . )(~ I( 6/)(,#f(r TOSH License 10-5040 , Expires 12-31-07 IHST Project #17619 Page 2 ASBESTOS REMOVAL After the ACM has been removed and the work area cleaned , a detailed visual clearance in- spection will be conducted to determine if ACM or asbestos-contaminated elements (ACE) re- main prior to final clearance and work completion . OSHA personnel and area monitoring will be conducted with analysis by (PCM). Final air clearance sampling will be conducted utilizing PCM . Respiratory protection will require full face or half-face , air-purifying respirators (PAPR) with NIOSH-approved P-100 (HEPA) cartridges during removal of the asbestos-containing materials . 1.1.4. CONTRACTORS USE OF PREMISES: Cooperate fully with the Owner's Representative to minimize conflicts and to facilitate Owner's safe and smooth usage of buildings . Perform the work in accordance with specifications , draw- ings , and phasing plan . Use existing facilities in building strictly within the limits shown in contract documents and the approved pre-abatement plan of action . Asbestos Abatement Specification Drawings show the limits of containment , the placement of the decontamination facilities for people and for equip- ment, the temporary location of bagged waste material and the path of transportation of con- taminated waste to the outside from the regulated area . Variations from the arrangements shown on drawings will be secured in writing from the Owner's Representative through the pre- abatement plan of action. 1.2. DIFFERING SITE CONDITIONS: The quantities and location of ACM indicated on the drawings and the extent of work included in this section are only best estimates which can be limited by the physical constraints imposed by structural enclosures or by occupancy of the build ing. Locations of same type of ACM different than indicated on drawings but with in the limits of the work area are considered as having no impact on contract price and time of this contract. The CONTRACTOR is responsible to verify site conditions and estimated quantities of ACM to be removed and determining the quantity of ACM delineated for removal prior to abatement described in these specifica- tions and associated drawings. The Contractor by placing a bid for this project agrees with all quantity estimates and there bid reflects there price to remove all of the material at the two apartment complex's. 1.3. STOP ASBESTOS REMOVAL: If the Owner's Representative presents a written Stop Asbestos Removal Order , immediately stop all asbestos removal and initiate fiber reduction activities . Do not resume asbestos removal until authorized in writing by Owner's Representative. A Stop Asbestos Removal Order will be issued at any time the Owner or Owner's Representative determines abatement conditions are not within specifications requirements . Stoppage will continue until conditions have been cor- rected . Standby time and cost required for corrective action is at Contractor's expense . The occurrence of the following events will be reported in writing to the Owner's Representative and will require the Contractor to automatically stop asbestos removal and initiate fiber reduction ac- tivities : )(~I(-B,,x.,.,/i/r° TOSH License 10-5040, Expires 12-31-07 IHST Project #17619 Page 3 ASBESTOS REMOVAL A. Excessive airborne fibers outside containment area (0 .01 flee or greater). B. Break in containment barriers . C. Loss of negative air pressure (at or above 0.01 inches of water) D. Serious injury within the containment area . E. Fire and safety emergency F. Respiratory system failure. G . Power failure . H. Excessive airborne fibers inside containment area (0 .1 flee or greater when wet methods are employed). 1.4. CODES AND REGULATIONS: 1.4.1. GENERAL APPLICABILITY OF CODES, REGULATIONS AND STANDARDS: Except to the extent that more expl icit or more stringent requirements are written directly into the contract documents, all applicable codes , regulations , and standards have the same force and effect (and are made a part of the contract documents by reference) as if copied directly into the contract documents , or as if published copies are bound herewith . 1.4.2. CONTRACTOR RESPONSIBILITY: The Asbestos Abatement Contractor will assume full responsibility and liability for the compli- ance with all applicable federal , state , and local regulations pertaining to work practices , hauling and disposal of ACM and ACE , and protection of workers , visitors to the site , and persons oc- cupying areas adjacent to the site. Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable federal, state , and local regulations . Contractor will hold the Owner and Consultants harmless for failure to comply with any applicable work, hauling, disposal , safety , health or other on the part of himself, his employees , or his subcontractors. Contractor incurs all costs to comp ly with OSHA regulations . The Abatement Contractor will determine the applicability of any process patents he/she may be employing and be responsible for paying any fees , royalties or licenses that may be required for the use of patented processes. 1.4.3. STATE REQUIREMENTS: State requirements which govern asbestos abatement work or hauling and disposal of asbest os waste materials include but are not limited to the following : Texas Department of State Health Services , Texas Asbestos Health Protection Act, as amended, Chapter 1954 , Texas Occupations Code , effective June 1, 2003 , formerly Texas Civil Statutes , Article 4477-3a. 1.4.4. LOCAL REQUIREMENTS: The Contractor is responsible to comply with all applicable local requirements regarding asbes- tos abatement activities. IHST Project #17619 Page 4 ASBESTOS REMOVAL 1.4.5. NOTICES: STATE OF TEXAS, TEXAS DEPARTMENT OF STATE HEALTH SERVICES Send Written Notification as required by the State of Texas ,Texas Asbestos Health Protection Act, as amended , Chapter 1954, Texas Occupations Code , effective June 1, 2003 , formerly Texas Civil Statutes , Article 4477-3a. Send at least 10 working days prior to asbestos abate- ment activities to the following address : Texas Department of State Health Services Toxic Substances Control Division Asbestos Programs Branch P.O. Box 143538 Austin, Texas 78714-3538 512-834-6600 or 1-800-572-5548 The notifications must be completely filled out. In the event that a section is not applicable to the project , the section must be marked as not applicable . Copies of the Texas Department of State Health Services and other notifications will be submit- ted to the Owner for the facility's records in the same time frame that notification is given to EPA, state, and local authorities . In the event of a change in the starting date the Contractor will notify regulatory agencies in accordance with the Texas Department of State Health Services (Texas Civil Statutes , Article 4477-3a , Section 12) asbestos regulations. 1.4.6. PERMITS: The Contractor will be responsible for any permits. 1.4. 7. LICENSES: Maintain current licenses as required by the Texas Department of State Health Services Rules as adopted under Texas Civil Statutes, Article 4477-3a , Section 12 for the removal , transporting, disposal or other regulated activity relative to the work of this contract. 1.4.8. POSTING AND FILING OF REGULATIONS: Maintain two (2) copies of applicab le federal, state and location regulations . Post one copy of each at the job site where workers will have ready , easy and daily exposure to the text . Keep on file in Contractor's office one copy of each . 1.5. PROJECT COORDINATION: Minimum administrative and supervisory requirements necessary for coordination of work on the project are personnel , contingency arrangements and security. 1.5.1. PERSONNEL: Administrative and Supervisory Personnel : will consist of a qualified general superintendent, and appropriate number of qualified or competent foremen to complete abatement within con- tract time . IHST Project #17619 Page 5 ASBESTOS REMOVAL Non-Supervisory Personnel: An adequate number of qualified personnel will be able to meet the schedule requirements of the project. Laborers employed for abatement throughout the pro- ject will meet the minimum qualifications criteria described in paragraph 3 below . Personnel employed in this abatement work will be pre-approved by the Owner's representative . Submit a request for approval for any person intended to be employed in the project with name , social security , qualifications , "Certificate of Worker's Acknowledgment" (Attachment #2). Submit to the Owner's Representative documentation indicating worker registration in accordance with Texas Department of State Health Services rules and regulations . 1.6. RESPIRATORY PROTECTION: 1.6.1. GENERAL: Provide respiratory protection in accordance with these specifications, the OSHA regulations 29 CFR 1910.1001, 29 CFR 1910.134 and 29 CFR 1926.1101 , EPA regulations 40 CFR 763 .120 , 121 , ANSI standards Z88.2-1980 , CGS Pamphlet G-7 and specification G-7.1 , the NIOSH and MSHA standards and the Texas Department of State Health Services Protection Rules . In case of conflict , the most stringent requirements are applicable for this project. 1.6.2. RESPIRATORS FOR ABATEMENT OPERATIONS: Where a person is or could reasonably be expected to be exposed during abatement operat ions to airborne asbestos above 0 .1 flee or where ACM debris is visible , the following maximum level of respiratory protection is required: If it is reasonably anticipated that fiber counts generated during abatement will not exceed the protection factor of a half-face respirator, and this can be verified by on-site fiber counts , a half-face respirator may be used . If verification cannot be made , a full face PAPR must be used . PAPR must be used for friable surfac- ing or thermal system insulation removal until fiber counts are confirmed consis- tently below the PEL and STEL . Head coverings: PAPR respirators will be equipped with full facepieces . Full facepieces will be worn with either a bonnet-type disposable head cover/hood or with a full head cover/hood which is part of a fully encapsulating protective garment. Respirator straps will be located under the hoods . This allows removal of the head covering prior to showering without disturbing the respi- rator (which is worn into the shower). Exemptions from maximum respiratory protection during abatement operations: When the abatement contractor has demonstrated to the Owner's satisfaction that levels of airborne as- bestos fibers in the work area are consistently below 0.1 flee , a full facepiece or half face respi- rator with HEPA cartridges may be used . The Certified Industrial Hygienist will determine if a lesser form of respiratory protection may be used . IHST Project #17619 Page 6 ASBESTOS REMOVAL 1.7. WORKER PROTECTION: 1. 7.1. TRAINING PRIOR TO ENGAGING INABA TEMENT WORK: Train workers in accordance with OSHA 29 CFR 1926 .1101 and the Texas Asbestos Health Protection Rules and this section . Workers will be trained and be knowledgeable on the follow- ing topics : Methods of recognizing ACM; health effects of asbestos exposure ; effects of smok- ing and asbestos exposure ; activities that could result in hazardous exposures ; protective con- trols , practices and procedures to minimize exposure including engineering controls , work prac- tices , respirators , housekeeping procedures, hygiene facilities , protective clothing , decontamina- tion procedures, emergency procedures and waste transportation and disposal ; review OSHA 29 CFR 1910 .134 for respirators ; medical surveillance program; review OSHA 29 CFR 1926.1101 , and for air monitoring , personnel and area; review this section of the project specifi- cations . 1.7.2. MEDICAL EXAMINATIONS: Provide medical examinations for all workers and any other employee entering the work area per OSHA 29 CFR 1926 .1101 regardless of exposure levels. 1.7.3. PROTECTIVE CLOTHING: Provide boots , safety glasses and gloves for all workers . Equipment will meet OSHA require- ments for personal protection. Provide all persons entering the work area with disposable full body coveralls, disposable head covers and rubber boots . 1.7.4. ENTERING AND EXITING PROCEDURES: Provide worker protection per most stringent applicable requirements . Provide as a minimum the following : Ensure that each time workers enter the work area , they remove all street clothes in the chang- ing room of the personnel decontamination unit and put on new disposable coveralls, new head covers , and clean respirators , then proceed through shower room to equipment room , and put on work boots . 1.7.5. DECONTAMINATION PROCEDURES: Require all workers to adhere to the following personal decontamination procedures whenever they leave the work area of a full decontamination unit: Three-stage Wet Decontamination: Require that all workers use the following decontamination procedure as a minimum require- ment whenever leaving the work area: 1. When exiting work area , remove disposable coveralls, and all other clothes disposable head covers , and disposable footwear covers or boots in the equipment room . 2 . Still wearing respirators , and completely naked proceed to showers. Showering is man- datory . Care must be taken to follow reasonable procedures in removing the respirator IHST Project #17619 Page 7 ASBESTOS REMOVAL to avoid asbestos fibers while showering . The following procedure is required as a minimum : a. Thoroughly wet body including hair and face . If using a Powered Air-Purifying Respi- rator (PAPR) hold blower unit above head to keep canisters dry . b. With respirator still in place thoroughly wash body , hair, respirator face piece , and all parts of the respirator except the blower unit and battery pack on a PAPR. Pay par- ticular attention to clean seal between face and respirator and under straps . c . Take a deep breath , hold it and/or exhale slowly , completely wet hair , face , and respi- rator. While still holding breath, remove respirator and hold it away from face before starting to breath . 3. Carefully wash facepiece of respirator inside and out. If using PAPR , shut down in the following sequence , first cap inlets to filter cartridges , then turn off blower unit (this se- quence will help keep debris which has collected on the inlet side of filter from dislodging and contaminating the outside of the unit). Thoroughly wash blower unit and hoses . Carefully wash battery pack with wet rag . Be extremely cautions of getting water in bat- tery pack as this will short out and destroy battery . 4 . Shower completely with soap and water. Rinse thoroughly . 5. Rinse shower room walls and floor prior to exit. 6 . Proceed from shower to Changing Room and change into street clothes or into new dis- posable work items . Air Purifying-Negative Pressure Respirators: Require that all workers use the following decontamination procedure as a minimum require- ment whenever leaving the work area with a full face cartridge type respirator: 1. When exiting area , remove disposable coveralls , and all other clothes disposable head- covers , and disposable footwear covers or boots in the equipment room . 2 . Still wearing respirators and completely naked , proceed to showers. Showering is man- datory . Care must be taken to follow reasonable procedures in removing the respirator and filters to avoid asbestos filters while showering. The following procedure is requ i red as a minimum : a. Thoroughly wet body from neck down . Wet hair as thoroughly as possible without wetting the respirator filter if using an air purifying type respirator. b. Take a deep breath, hold it and/or exhale slowly, complete wetting of hair, thoroughly wetting face , respirator and filter (air purifying respirator). While still holding breath , remove respirator and hold it away from face before starting to breath . 3. Dispose of wet filters from air purifying respirator. 4 . Carefully wash facepiece of respirator inside and out. 5. Shower completely with soap and water. Rinse thoroughly. 6. Rinse shower room walls and floor prior to exit. 7. Proceed from shower to Changing Room and change into street clothes or into new disposable work items . 1.7.6. LIMITATIONS WITHIN WORK AREA: Ensure that workers do not eat , drink, smoke , chew gum or tobacco , or in any way break the protection of the respiratory protection system in the work area . IHST Project #17619 Page 8 ASBESTOS REMOVAL 1.8. DECONTAMINATION FACILITIES: 1.8.1. DESCRIPTION: Provide each work area with separate personnel decontamination facility (PDF) and equipment decontamination facility (EDF). Ensure that the PDF is the only means of ingress and egress for the work area and that all equipment , bagged waste material and other material exit the work area only through the EDF or the PDF . 1.8.2. GENERAL REQUIREMENTS: All persons entering and exiting the work area will follow the entry and exit procedures required by the applicable regulations and these specifications . Process all equipment and material exit- ing the work area through the EDF or PDF and decontaminate as required by the specifications . Construct walls and ceilings of PDF and EDF airtight with at least 6 mil polyethylene sheeting and attach to existing building components or to a temporary framework. The EDF and PDF may be combined if the size of the work area will not permit both . Use a minimum of two layers of 6-mil opaque polyethylene to cover floor under PDF. Construct doors from overlapping polyethylene sheets so that they overlap adjacent surfaces. Weight sheets at bottom so that they quickly close after release . Put arrows on sheets showing direc- tion of overlap and travel. 1.8.3. TEMPORARY UTILITIES TO PDF AND EDF: Provide temporary water serv ice connection to the PDF and the EDF . Provide backflow protec- tion at the point of connection to the Owner's system. Hot water may be secured from the building hot water system if authorized in writing by the Owner or Owner's Representative and provided that backflow protection will be installed at the point of connection. Water supply must be properly pressured and temperature balanced at shower discharge. Provide adequate temporary electric power with ground fault protection and overhead wiring throughout the PDF and the EDF . Provide a sub-panel for all temporary power in changing room. Provide adequate lighting to reach 50 foot candles throughout PDF and EDF. Provide temporary heat to maintain 70°F throughout the PDF and EDF except that the shower of the PDF will be maintained at 75°F . 1.8.4. PERSONNEL DECONTAMINATION FACILITIES (PDF): Provide a PDF consisting of serial arrangement of clean room , showers room and equipment room . Provide adequately sized PDF to accommodate the number of employees scheduled for the project. The center chamber of the three chamber PDF will be fitted with as many portable walk through shower stalls as necessary so that all employees will be able to go through the en- tire decontamination procedure within 15 minutes . Construct PDF of opaque or colored polyeth- ylene for privacy . Construct PDF so that it will not allow for parallel routes of exit without show- ering . IHST Project #17619 Page 9 ASBESTOS REMOVAL Clean Room of PDF: The clean room of the PDF must be physically and visually separated from the rest of the building for the purpose of worker changing into protective clothing or dressing into street clothing . Construct using two layers of 6-mil , minimum thickness , polyethylene sheet- ing to provide an airtight room. Provide a minimum of two (2), three-feet (3') wide flapped door- ways constructed from sheet polyethylene . One doorway will be from the outside and one from the shower . Maintain floor of this room dry and clean at all times . Do not allow overflow from shower into this room. Damp wipe all surfaces twice after each sh ift change with a disinfectant solution. Provide in this room adequate supply of disposable bath towels and disposable pro- tective clothing. Provide one (1) storage locker per employee , benches for employees to sit on and all other components, as indicated on the drawings . Provide a portable Type "ABC" fire ex- tinguisher in this room as per NFPA Standard 10 . Require all persons to remove all street clothes in this room dress in disposable protective clothes , and respiratory protection equip- ment. Ensure that any person entering th is room w ill do so either from the outside with street clothes or from the showers completely naked and thoroughly washed . If a female is required to enter or exit the work area make all necessary provisions to ensure her privacy throughout the decontamination process by posting guards at both entry points of the PDF so that no male will enter or exit during her stay in the PDF . Shower Room of PDF : The showers room of the PDF provides a completely water tight opera- tional compartment to be used for transit of all persons entering the work area from the chang- ing room , or for showering by all persons headed out of the work area after undressing in the equipment room . Construct each stall and shower walls so that water running down the walls will drip into the pan. Install a freely-draining smooth raised floor on top of shower pan . Sepa- rate this room from the rest of the building and the adjacent tool and changing rooms with air tight walls fabricated of a minimum of two layers of 6-mil polyethylene. Provide splash proof en- trances to changing and equipment rooms with two doors arranged as follows: 1. At each entrance to the shower room , construct a rigid door frame . Attach to the frame two overlapping flaps of rubber roofing material , fastened at the head and jambs . Over- lap flaps at least 6" in a direction that presents a shingle-like configuration to the water stream from the shower. Overlap sill by 1-1/2" minimum. Arrange so that any air movement from the work area will cause the flaps to seal against the door frame. At one foot (1 ') toward shower from each entrance to the shower room construct a second 2x4 door head . Attach to this head a one piece flap of rubber roofing material fastened at the top , overlapping onto each side of shower unit by 1-1 /2" minimum and stopping 1" clear of floor. Provide shower heads and controls , temporary cold and hot water and dra inage , soap dish and continuous supply of soap and maintain sanitary conditions . Ar- range controls so that a single individual can shower without assistance . Provide flexible hoses shower head, hose bib and all other items shown on drawings . Pump waste wa- ter to drain. If pumped to drain , provide 20 micron and 5 micron waste water filters in line to drain. Change filters daily . Locate filters inside shower so that water lost during filter changes drains into shower pan. Hose down all surfaces of the showers room after each shift and clean debris from the shower pan . Dispose of residue as asbestos con- taminated waste . Equipment Room of PDF : The equipment room of the PDF provides a completely airtight com- partment to be used to store work equipment, reusable footwear and warm cloth ing and as a transit and change station. Separate this room from the work area by a minimum three-feet (3') wide flap door of 6-mil polyethylene sheeting . Separate this room from the shower room , the work area and other rooms with airtight walls and ceiling constructed of a minimum of two (2) IHST Project #17619 Page 10 ASBESTOS REMOVAL layers of 6-mil polyethylene sheeting. If the airborne asbestos level in the work area is expected to be higher than .5 flee (i.e., dry removal operations), add an intermediate cleaning space be- tween the rooms with double flaps of 6-mil polyethylene sheeting . 1.8.5. EQUIPMENT DECONTAMINATION FACILITIES (EDF): Provide an EDF consisting of a serial arrangement of wash room , holding room and clean room for removal of equipment and material from work area . Do not allow entry or exit of people through EDF for other than emergencies. Clean debris and residue from inside EDF on a daily basis . Wipe down or hose down all surfaces after each shift and clean shower pan from debris . Wash Down Station : Provide an enclosed shower unit located in work area just outside Wash Room as an equipment, bag and container cleaning station . Wash Room: Provide wash room for cleaning of bagged or containerized asbestos-containing waste materials passed from the work area . Construct wash room of rigid framing and polyeth- ylene sheeting , at least 6-mil in thickness . Locate room so that packaged materials , after being wiped clean can be passed to the Holding Room . Separate this room from the work area by a single flap of 6-mil polyethylene sheeting . Holding Room: Provide Holding Room as a drop location for bagged asbestos-containing mate- rials passed from the Wash Room. Construct Holding Room of rigid framing and polyethylene sheeting , at least 6-mil in thickness and located so that bagged materials cannot be passed from the Wash Room through the Holding Room to the Clean Room . Separate this room from the adjacent rooms by double flaps fabricated from+/-1/16" thick single ply rubber roofing ma- terial either EPDM (ethylene-propylene diene monomer) or Neoprene . Clean Room: Provide a clean room to isolate the Holding Room from the bu ilding exterior. Construct Clean Room of rigid framing and two (2) layers of polyethylene sheeting , at least 6-mil in thickness and located to provide access to the Holding Room from the building exterior. Separate th is room from the exterior by a single flap of 6-mil polyethylene sheeting . 1.8.6. EDF-DECONTAMINATION PROCEDURES: At washdown station, thoroughly wet-clean contaminated equipment and/or sealed polyethylene bags and pass into wash room. When passing equipment and/or containers into the wash room , close all doorways of the EDF , other than the doorway between the washdown station and the wash room. Keep all outside personnel clear of the EDF . Once inside the washroom , wet-clean the bags and/or equipment. When cleaning is complete pass items into Holding Room . Close all doorways except the doorway between the holding room and the clean room . Workers from the building exterior will enter Holding Room area and remove decontaminated equipment and/or containers for disposal. Require these workers to wear full protective clothing and appropriate respiratory protection . At no time is a worker from an uncontaminated area al- lowed to enter the enclosure when a removal worker is inside . 1.9. NEGATIVE PRESSURE FILTRATION SYSTEMS: The Asbestos Abatement Contractor will provide enough HEPA-filtered negative air units to completely exchange the work air four (4) times per hour. Contractor will demonstrate the num- ber of units needed per work area for 4 room air changes by calculating the volume flow rate (cfm) delivered by each unit under 2" pressure drop across filters . Provide at least one standby IHST Project #17619 Page 11 ASBESTOS REMOVAL unit in the event of a machine failure or emergency such as contamination in surrounding non- work area . When a pressure differential system is selected provide enough HEPA filtration units to filter and recirculate the air in the work area at a rate of four (4) room air changes per hour. 1.9.2. PRESSURE DIFFERENTIAL: Provide a fully operational negative air system within the work area continuously maintaining a pressure differential across work area enclosures of -0 .02 inches of water . Demonstrate to the Owner's Representative the pressure differential by use of a pressure differential meter or a manometer, before disturbance of any asbestos containing materials . This pressure differential will be used for either negative air system or pressure differential system . 1.9.3. MONITORING: Continuously monitor and record the pressure differential between the work area and the build- ing outside of the work area with a monitoring device incorporating a strip chart recorder. Make the strip chart record part of the project log. 1.9.4. TESTING THE SYSTEM: Test negative-pressure system before any ACM is wetted or removed . After the work area has been prepared, the decontamination facility set up , and the exhaust unit(s) installed , start the unit(s) (one at a time). Demonstrate operation and testing of negative-pressure system to the Owner's Representat ive . 1.9.5. DEMONSTRATION OF NEGATIVE AIR SYSTEM OPERATION: Demonstrate the operation of the negative-pressure system to the Owner's Representative to include , but not be limited to , the following : 1. Demonstrate pressure differential system will maintain -0.02" of water. 2. Emergency shutoff will operate in case of fire . 1.9.6. USE OF SYSTEM DURING ABATEMENT OPERATIONS: Start exhaust units before beginning work (before any ACM is disturbed). After abatement work has begun, run units continuously to maintain a constant negative-pressure until decontamina- tion of the work area is complete. Do not turn off units at the end of the work shift or when abatement operations temporarily stop . Do not shut down negative air system during abatement operations procedures , unless author- ized by the Owner's Representative in writing . Start abatement work at a location farthest from the exhaust units and proceed toward them. If an electric power failure occurs , immediately stop all removal work and do not resume until power is restored and all exhaust units are operating again. At completion of abatement work , allow exhaust units to run as specified under this section , to remove airborne fibers that may have been generated during abatement work and cleanup and to purge the work area with clean makeup air. Units may be required to run after decontamina- tion , if dry or only partially wetted asbestos material was encountered during any abatement work . IHST Project #17619 Page 12 ASBESTOS REMOVAL 1.9.7. DISMANTLING THE SYSTEM: When a final inspection and the results of the final air tests indicate that the area has been de- contaminated , exhaust units may be removed from the work area. Before removal from the work area , remove and properly dispose of pre-filters, and seal intake to the machine with 6-mil polyethylene to prevent environmental contamination from the pre-filters . 1.10. CONTAINMENT BARRIERS AND COVERINGS OF WORK AREA: 1.10.1. GENERAL: Seal off perimeter of work area to completely isolate abatement areas and to contain all air- borne asbestos contamination created by abatement work. Cover all surfaces of the work area to protect them from cross contamination , to facilitate more efficient cleanup, and to protect the finishes from the asbestos abatement work . Should the area beyond the seal off limits become contaminated as a consequence of the work , clean those areas in accordance with procedures described in this section at no additional cost. 1.10.2. PREPARATION PRIOR TO SEALING OFF: Place all tools , staging , etc. necessary for the work in the area to be isolated prior to erection of temporary plastic sheeting enclosure. Disable ventilating systems or any other system bringing air into or out of the work area . Disable system utilizing positive means that will prevent acci- dental premature restarting of equipment, i.e., disconnecting wires , removing circuit breakers , lockable switch , etc. 1.10.3. CONTROL ACCESS TO WORK AREA: Permit access to the work area only through the PDF. All other means of access will be closed off and sealed and warning signs displayed on the clean side of the sealed access. Where the work area is immediately adjacent to or within view of occupied areas , provide a visual barrier of opaque polyethylene sheeting at least 6-mil in thickness so that the work procedures are not visible to building occupants. Where the area adjacent to the work area is accessible to the public , construct a barrier of plywood or other suitable material at least eight feet (8') in height that is able to withstand the negative pressure as specified. Post warning signs at each visual and physical barrier per OSHA requirements. Alternate method of containing the work area or different definition of the limits of seal-off from the one shown on the drawings may be submitted to the Owner's Representative for approval in accor- dance with this section . Do not proceed with any such alternatives without prior written approval by the Owner's . 1.10.4. CRITICAL BARRIERS: Completely separate the work area from other portions of the building, and the outside by sheet polyethylene barriers at least 6 mil in thickness and sealing with duct tape. Individually seal all ventilation openings (supply and exhaust), lighting fixtures , doorways , windows , and other open- ings into the work area with duct tape alone and with polyethylene sheeting at least 6-mil in thickness , taped securely in place with duct tape. Maintain seal until all work including project decontamination is completed. Take care in sealing off lighting fixtures to avoid melting or burn- IHST Project #17619 Page 13 ASBESTOS REMOVAL ing of sheeting . Provide sheet plastic barriers at least 6-mil in thickness as required to com- pletely seal openings from the work area into adjacent areas. Seal the perimeter of all sheet plastic barriers with duct tape or spray cement. 1.10.5. PRIMARY BARRIERS: The primary barrier of the full containment walls will consist of a minimum of Primary barriers for full containment shall consist of two (2) layers of minimum 4-mil polyethylene sheeting for the walls securely anchored from the floors to the ceiling . The containment for the removal of the li- noleum flooring will require a minimum 4-mil polyethylene sheeting for the ceiling. Polyethylene sheeting shall meet ASTM requirements in accordance with TDSHS regulations. Visible open- ings observed along the perimeter walls and the ceiling shall be completely sealed polyethylene sheeting and the wall corners of the containment should be attached with an overlap of at least twelve inches . The primary barrier construction should form an airtight, impermeable , perma- nent barrier around the ACM and ACM debris to contain the release of asbestos fibers into the air. 1.10.6. EXTENSION OF WORK AREA: If the enclosure barrier is breached in any manner that could allow the passage of asbestos de- bris or airborne fibers , then where possible , add affected area to the work area . Enclose it as required by this Section of the specification and decontaminate it as described elsewhere in this section . If contaminated area cannot be added to work area , decontamination measures will start immediately after contamination is discovered and work will stop in work area . Decontami- nation procedures will continue until exposure returns to background levels . 1.10.7. SECONDARY BARRIERS: Secondary barriers should be established in areas to separate any non-related work activity from the abatement containment to prevent dust or debris from potentially contaminating fresh air (make-up air) into the containment or regulated asbestos removal area. 1.11. MONITORING, INSPECTION AND TESTING: 1.11.1. GENERAL: Perform throughout abatement work monitoring, inspection and testing inside the work area in accordance with OSHA requirements and these specifications . I.H . Technician will continuously inspect and monitor conditions inside the work area to ensure compliance with these specifica- tions. In addition , the I.H. will personally manage air sample collection , analysis and evaluation for personnel and work area samples to satisfy OSHA requirements. Additional inspection and testing requirements are specified in other parts of this section . The Owner will employ a Certified Industrial Hygienist (C .I.H.) representative to perform various services on behalf of the Owner. The C.I.H . representative or representative under the direction of a C.1.H. will perform the necessary monitoring, inspection , testing and other support services to ensure that the Owner, employees and visitors will not be adversely impacted by the abate- ment worked , and that the abatement work proceeds in accordance with these specifications , that the abated areas or abated buildings have been successfully decontaminated. The work of the C.I.H . representative in no way relieves the abatement Contractor from his responsibility to IHST Project #17619 Page 14 ASBESTOS REMOVAL perform his work in accordance with contract documents, to perform continuous inspection, monitoring and testing for the safety of his employees , and to perform other such services as specified in this section . The cost of the CIH representative and his services will be born by the Owner except for repeated final inspection and testing that may be required due to unsatisfac- tory initial results. These repeated final inspections and testing , if required , will be paid for by the Contractor. The Asbestos Abatement Contracto r may request confirmation of above results. This request must be in writing and submitted to the Owner's Representative . Cost for the confirmation of re- sults will be born by the Contractor for both the collection and analysis of samples and for the time delay that may result for this confirmation . Confirmation sampling and analysis will be the responsibility of the Contractor with review and approva l by the C.I.H. 1.11.2. OUTLINE SCOPE OF SERVICES OF THE OWNER'S CONSULTANT: The purpose of the work of the Owner's Representative is to : assure quality, resolve problems , and prevent the spread of contamination beyond the work area . In addition , the consultants work include performance of final inspection and testing to determine whether a space or a building has been adequately decontaminated . All air monitoring is to be done utilizing PCM sampling procedures with final clearance to be performed by TEM . The Owner's Representa- tive will perform the following tasks: TASK 1: Establ ish background levels before abatement work will start . Th is w ill in- clude taking background samples (at least 3) and retaining samples for pos- sible TEM analysis . TASK 2 : Perform continuous air monitoring , inspection and testing outside the work area during actual abatement work area. In addition , the Owner's Represen- tative will be required to detect any faults in the work area isolation and any adverse impact of surroundings from work area activities . TASK 3: Perform unannounced site visits to spot check overall compliance of work with cont ract documents. These visits may include any inspection , monitoring and testing inside and outside the work area and all aspects of operation ex- cept personnel monitoring . TASK 4 : Provide support to the Owner such as evaluation of submittals from the abatement contractor, resolution of unforeseen developments in abatement work , etc . TASK 5: Perform final inspection and testing of a decontaminated area or building at the conclusion of the abatement and cleanup work to certify compliance with Owner's decontamination standards. TASK 6 : Issue certificate of decontamination for each area or building and a final project report . TASK 7: The Owner's Representative will have authority to require building materials to be removed and disposed of as ACM waste where visible ACM debris is pre- sent. All data , inspection results and testing results generated by the Owner's Representative will be available to the Contractor for information and consideration. Contractor will provide coopera- tion and support to the Owner's Representative for efficient and smooth performance of their work . IHST Project #17619 Page 15 ASBESTOS REMOVAL Monitoring and inspection results of the Owner's Representative will be used by the Owner to issue any Stop Asbestos Removal Orders to the contractor during abatement work and to ac- cept or reject an area or a building as decontaminated. The Owner's Representative will make available to the Contractor the plan for sample collection and analysis for continuous monitoring outside the work areas and the plan of final inspection and testing for each space or building prior to executing each plan . Plan will include location for samples , name and qualification of person taking samples , whether on site analysis and/or lab analysis will be utilized , methodol- ogy of analys is, lab information and qualifications of on-site analyst. 1.11.3. MONITORING, INSPECTION AND TESTING BY ABATEMENT CONTRACTOR: The Contractor is responsible for managing all monitoring , inspection and testing required by these specifications and the OSHA requirements . The analytical laboratory that will be used by the Contractor to analyze the samples will be AIHA PAT. Accredited and Texas Department of State Health Services Licensed. Keep a daily log of personnel samples taken and analyzed and make log available to the Owner's Representa - tive . Log will contain information on the persons sampled , the date of sample collection the time of sample start and finish , flow rate , sample volume and fibers/cc . Take and analyze personnel samples for at least 25% of the workers in each shift , but not less than two where active abate- ment takes place . 1.11.4. ANALYSIS: Bulk samples (if requ ired) will be analyzed at a laboratory that is Accredited by the National Vol- untary Laboratory Accreditation Program (NVLAP). Proof of accreditation must be submitted prior to the project start date. Polarized light microscopy will be used to analyze bulk samples . Air samples will be analyzed by an individual participating in the ·American Industrial Hyg iene Association 's (AIHA) Proficiency Analytical Testing Program . In addition to the continuous monito ring required , the Owner's Representative will perform in- spection and testing at the final stages of abatement for each work area or building as specified elsewhere in this section. 1.12.5. SUBMITTALS AT COMPLETION OF ABATEMENT: The Contractor will submit a final project report consisting of the daily log book and the docu- mentation of events during abatement including the original disposal manifests signed by the operator of licensed landfill. The project report will include a certificate of completion , dated and signed by the Contractor. All certificates and original disposal manifests are due to the Owner's Representative office within 30 (thirty) days after completion of abatement work . IHST Project #17619 Page 16 ASBESTOS REMOVAL PART 2 -EXECUTION 2.1. PREABATEMENT ACTIVITIES: 2.1.1. PREABA TEMENT MEETING: The Owner's Representative , upon receipt , review and substantial approval of all preabatement submittals and upon verification that all material and equipment required for the project are on site , will arrange for a preabatement meeting between the Asbestos Abatement Contractor , su- perintendent and foremen and the Owner's Representatives . The purpose of the meeting is discuss any aspects of the submittals needing clarification or amplification and to discuss any aspects of the project execution and the sequence of operations. The Asbestos Abatement Contractor and his employees will be prepared to provide any sup- plemental evidence and information to the Owner's Representative pertaining to any aspects of the submittals or the materials and equipment. No abatement work of any kind described in the following provisions of these specifications will be initiated prior to the preabatement meeting. 2.1.2. PREABA TEMENT INSPECTION AND PREPARATIONS: Before any work begins on the containment barriers , the contractor will : 1. Conduct a space-by-space inspection with an authorized Owner's Representative , and prepare a written inventory of all existing damage in those spaces where asbestos re- moval work will occur. Still or video photography may be used to supplement this written damage inventory . Documents will be signed and certified as accurate by both parties . 2. Ensure that all furniture , machinery , equipment , curtains drapes , blinds and other mov- able objects wh ich the contractor is bound to remove from the work area have been re- moved or protected . 3. Notify the Owner's Representative of systems that need to be shut down as soon as practical in advance. The Owner's Representative will coordinate shutdown with Con- tractor and Owner's Facility Representative . The Owner's Facility Representative will perform and monitor shutdown as required by Contractor. a. Shutdown and seal off all heating , cooling , ventilating or other air handling systems serving the work area. The environment of the work area will be completely isolated from all other air flows in the building. Owner's Representative will monitor shut- down . b. Shut down all electrical circuits which pose a potential hazard on the job. Exact elec- trical arrangements will be tailored to the particular space and systems involved. All electrical circuits will be turned off at the box outside the removal area , not just the wall switch . Potential for electrical shock is a major threat to life in a work area where large amounts of water will be sprayed on ceil ings , conduits, lighting fixtures and other electrical items . Electrical lines which are used to power work lights and equipment will conform to all electrical safety standards and will be protected by a ground fault interrupter. The Asbestos Abatement Contractor will be responsible for all OSHA lockout/tagout requirements . A copy of the Asbestos Abatement Contrac- tor's lockout/tagout program must be submitted for review prior to asbestos abate- ment operations . IHST Project #17619 Page 17 ASBESTOS REMOVAL 2.1.3. PREABA TEMENT CONSTRUCT/ON AND OPERATIONS: Perform all preparatory work for the first work area in accordance with the approved detailed work schedule. Execute the preparatory work in accordance with this specification . Upon completion of all preparatory work, the Owner's Representative will inspect the work and systems to assure work is in accordance with these Specifications. The Owner's Representa- tive may require that, upon satisfactory inspection, the Contractor's employees perform all major aspects of the approved SOP especially on worker protection , respiratory protection , contin- gency plans, decontamination procedures and monitoring to demonstrate satisfactory operation . The operating systems for respiratory protection and negative pressure air systems will be demonstrated for performance . Upon satisfactory inspection of the installation and systems and satisfactory demonstration of operations the Owner's Representative will notify the Contractor to proceed with abatement work . 2.2. REMOVAL OF ACM AND ACE: 2.2.1. WETTING MATERIALS: The Asbestos Abatement Contractor will adequately wet and remove all ACM as follows : 1. Spray wetting agent on the asbestos containing materials. 2 . After wetting and removal, seal all ACM waste in leaktight two layers of 6-mil polyethyl- ene while wet. For waste material not fitting into containers without additional breaking , put material into leaktight wrapping . 3. Label containers and wrapped material using warning labels as specified by OSHA 29 CFR 1910 .1001 or 1926.1101 and the NESHAPS regulations . 4 . For ACM being transported off the facility site, label ACM waste containers and wrapped material with the name of the waste generator and the location where the waste was generated. 2.2.2. SITE PREPARATION: Erect critical barriers at all doors and windows entering the regulated areas. This project will be conducted by establishing critical barriers over all openings into the work area . A three stage wet decontamination unit will be erected for worker entrance and exit into the work area. The Contractor must establish negative air in the containment and maintain a pressure differential of -0.02 inches of water column pressure differential. The following requirements must be followed in areas where a full containment enclosure or a pressure differential of -0 .02 inches cannot be established: • A negative pressure enclosure NPE must be used where the configuration of the work area does not make erection of full containment enclosure feasible. • The negative pressure enclosure may be of any configuration. • At least 4 air changes per hour is to be maintained in the NPE . • The NPE must be kept under negative pressure throughout the period of its use, and • Air movement must be directed away from employees performing asbestos work within the enclosure , and toward a HEPA filtration system . IHST Project #17619 Page 18 ASBESTOS REMOVAL • A competent person must supervise all work and be licensed in Texas , as an asbestos supervisor . 2.2.3. PERSONAL PROTECTION: One (1) layer of disposable clothing and full-face or half face , air-purifying respirators (APR) with NIOSH-approved HEPA cartr idges shall be worn by all personnel during removal of the asbes- tos-containing sheetrock joint compound. Provide boots , safety g lasses and g loves for all workers . Equipment will meet OSHA require- ments for personal protection. Provide all persons entering the work area with disposable full body coveralls , disposable head covers and rubber boots . 2.2.4. FLOOR TILE AND MASTIC: Those areas normally exposed to heavy foot traffic patterns usually have tiles adhered the tight- est. As a matter of good practice in starting the tile removal , those sections which rece ive the least traffic should be the locations selected for starting the removal of the tile. Since tiles are normally in a 9" x 9" or 12" x 12" dimension , it should be the goal to remove individual tiles as a complete unit to the best extent possible. Start the removal by carefully wedging the wall scraper in the seam of two adjoining tiles and gradually forcing the edge of one of the tiles up and away from the floor . Do not break off pieces of the tile but continue to force the balance of the tile up by working the scraper beneath the tile and exerting both a forward pressure and a twisting action on the blade to promote re- lease of the tile from the adhesive and the floor. When the first tile is removed , place it , without breaking into smaller pieces , in the heavy-duty impermeable waste bag or closed impermeable container which will be used for disposal. With the removal of the first tile accessibility of the other tiles is improved. Force the wall scraper under the exposed edge of another tile and continue to exert a prying twisting force to the scraper as it is moved under the tile until the tile released from the floor . Again , dispose of the tile , and succeeding tiles , by placing in the heavy-duty bag or closed container without additional breaking . Some tiles will release quite easily while others require varying degrees of force . Where the adhesive is spread heavily or is quite hard, it may prove easier to force the scraper through the tightly adhered areas by striking the scraper handle with a hammer using blows of moderate force while maintaining the scraper at a 25° to 30° angle to the floor. Caution: Use safety gog- gles. If some areas are encountered where even the technique detailed in the previous paragraph proves to be inadequate , the removal procedure can be simplified by thoroughly heating the tile(s) with a hot air blower until the heat penetrates through the tile and softens the adhesive. Note 1: Handle the hot air blower, tiles, and adhesive carefully to avoid personal burns . Note 2: Do not handle the heated tiles and adhesive without suitable glove protection for the hands . IHST Project #17619 Page 19 ASBESTOS REMOVAL As small areas of subfloor are cleared of tile, the adhesive remaining on the floor must be scraped up with the 4" hand scraper until only a thin , smooth film remains. In those area where deposits are heavy or difficult to scrape, the removal can be expedited by heating with the hot air blower prior to scraping. Deposit scrapings in a heavy-duty impermeable trash bag or closed impermeable container. Thoroughly spread approved mastic biodegradable cleaner/solvent onto all mastic with a garden sprayer (Note The solvent used to remove the mastic must have a flash point of >140 degrees F. Submittals for the solvent must include a Material Safety Data Sheet. Let the solution stand for at least 15 minutes. Use an industrial buffer with coarse pads to dislodge the material or a squeegee. Squeegee , or use scrapers to push material into a cen- tral location for final mopping and cleanup . Hand-scraping may be done at the Contractor's op- tion , or as required to completely remove all material. As indicated in previous paragraphs, tiles should be placed immediately in a waste disposal bags or closed impermeable container. Do not attempt to break tiles after they are in the bag . When all tiles , mastic and sorbent material have been removed from the floor and placed in polyethylene waste bags at least 6-mil thick or closed containers , seal the bags securely for dis- posal. "Shot blaster" or "bead blaster" machines will not be allowed to remove the floor tile and mastic. Alternate removal techniques may be used if approved by the CIH . 2.2.5 WALL AND CEILING TEXTURE The asbestos texture will be kept wet and removed by wet scraping or as intact sheetrock and ceiling tile sections utilizing hand tools and a low water volume , short distance power diffusing "Airless" sprayer. The asbestos plaster texture and texture on CMU block will be kept wet and removed utilizing hand tools and a low water volume , short distance power diffusing "Airless" sprayer. The minimum crew size for the operation is three : one member performs the actual removal , the second directs the spray wand at the work and the third worker collects and contains the wet ACM debris generated during the work. It is recommended that four workers be utilized in the procedure . The fourth person provides support during the work , making sure tools and supplies are readily available , and is on hand in case of emergency. All crew members should be trained in the use of the wet scraping procedure . The Contractor will erect critical barriers and establish negative air filtration . Rope off work area and place warning signs. Bring the necessary materials into the work area. Have a HEPA vac- uum system available at all times . The HEPA vacuum will be used to remove debris which may settle in remote areas such as corners, cracks or crevices in the work area . Make sure visible ACM debris and dust in the area have been wetted with amended water and cleaned with the proper methods before beginning the procedure to avoid confusion concerning the source of the material. Cover floor with a minimum of two layers of 6 mil plastic sheeting if flooring is not being re- moved , and cover wall surfaces with a minimum of two layers of 4 mil plastic sheeting. The top IHST Project #17619 Page 20 ASBESTOS REMOVAL polyethylene sheeting layer may be removed as part of the deta il cleaning process after gross removal. Hard hats , disposable clothing and full-face PAPR respirators will be worn by all persons per- forming the ACM removal. Establish negative air filtrat ion in the containment before any removal operations take place . The containment may be smoke tested to assure the negative pressure inside the containment is adequately sealed. Assemble the smoke tube and bulb . Generate short bursts of smoke in the containment particularly at seams , joints and corners and critical barriers . Observe the direc- tion of the smoke trail. Watch for leaks , and seal any leaks with duct tape . Wet the plaster and surfacing material adequately to suppress any generation of airborne dust or debris , keeping it wet throughout the entire operation . As sections of ACM are removed , keep the material wet and shovel debris carefully into the bot- tom of a disposal bag . Wipe all cleaned surfaces with a wet rag and put the rag in the bottom of a 6 mil disposal bag . Rinse and wipe the inside of the disposal bag. Clean up any debris or water on the floor with wet rags and/or the HEPA vacuum. As in any asbestos related project , the work area should be kept free of debris. Any contamina- tion should be cleaned up immediately. When the work day is complete , (or as soon as the pro- ject is complete) the work area should be cleaned using wet methods and a HEPA vacuum. All asbestos material and associated debris should be removed and placed in double layer 6 mil asbestos disposal bags before the end of the work day . Dispose of waste in accordance with regulations for asbestos waste found in these specifications . Workers should pass through a complete three-stage wet decontamination facility prior to exit- ing the building . If a disposal bag develops a leak , stop work inside the containment. Catch the water in a plastic disposal bag . Lift and move the bag so that water stops running out. Do not "pump" the bag in a way that would force air out. Twist the bag in the area of the puncture to form a stem , dry the surface and tape it securely closed. Clean up the contaminated water and debris from the floor immediately using wet methods and the HEPA vacuum . Dispose of the waste properly. 2.3. DISPOSAL OF ACM AND ACE WASTE MATERIAL: 2.3.1. GENERAL: The Asbestos Abatement Contractor will dispose of friable ACM and debris which is packaged in accordance with these specifications at the approved landfi ll. Dispose of non-friable ACM in accordance with the applicable regulat ions for friable asbestos. The transporter must be Ii- IHST Project #17619 Page 21 ASBESTOS REMOVAL censed in accordance with the Texas Department of State Health Services Asbestos Rules and Regulations . The truck transporting the waste must have the following noted on the shipping papers , manifests and trucks: Hazardous Material Proper Shipping Name : hazardous substance solid , N.O .S. DOT Hazard Class: Class 9 PG . Ill Identification Number: NA 2212 (friable waste) Reportable Quantity : RQ Name and Address of Generator 2.3.2. PROCEDURES: Carefully load containerized waste on sealed trucks for transport . Ensure that unauthorized persons do not have access to the material outside of the work area. Take bags from the work area directly through the EDF process to a sealed truck. Double bagged material may be trans- ported in open trucks only if they are first loaded in sealed drums. Label drums with same warn- ing labels as bags. Dispose drums as contaminated, do not attempt to empty them for reuse . Advise the sanitary landfill operator, at least twenty-four hours in advance of transport , of the quantity of material to be delivered. At the burial site, sealed plastic bags may be carefully dumped from the truck . If bags are broken or damaged, leave in the truck and decontaminate entire truck and contents using procedures set forth elsewhere in this section . 2.4. PROJECT DECONTAMINATION: 2.4.1. GENERAL: The entire work of project decontamination will be performed under the close superv ision and monitoring of the Owner's Representative . 2.4.2. WORK AREA CLEARANCE: Air testing and other requirements which must be met before release of Contractor and reoccu- pancy of the work area are specified elsewhere in this Section . Air Clearance will be performed utilizing Phase Contrast Microscopy with an airborne level of <0.01 Flee . 2.4.3. WORK DESCRIPTION: The work of decontamination includes the decontamination floor and air within the work area and the decontamination and removal of temporary facilities installed prior to abatement work including Primary and Critical Barrier , Decontamination Facilities (PDF and EDF) and Negative Pressure Systems . The work of decontamination includes the cleaning , and decontam ination of all surfaces (ceiling , walls , floor) of the Work Area, or equipment in the Work Area . IHST Project #17619 Page 22 ASBESTOS REMOVAL 2.4.4. PRE-DECONTAMINATION CONDITIONS: Before decontamination work starts , all ACM and ACE will be removed from the work area and disposed of along with any gross debris generated by the work. At the start of work for decontamination , the following will be in place : 1 Critical barrier which forms the sole barrier between the work area and other portions of the building or the outside. 2 . Critical barrier sheeting over lighting fixtures , ventilation openings , doorways , convectors , speakers and other openings. 3 . Decontamination facilities for personnel and equipment in operating condition and nega- tive pressure system in operation . 2.4.5. FIRST CLEANING: The Asbestos Abatement Contractor will carry out a first cleaning of all surfaces of the work area including items of remaining sheeting , tools , scaffolding and/or staging by use of damp- cleaning and mopping , and a HEPA filtered vacuum. Do not perform dry dusting or dry sweep- ing. Use each surface of a cleaning cloth one time only and then dispose of as contaminated waste . Continue this cleaning until there is no visible debris from removed materials or residue on plastic sheeting or other surfaces . Remove all filters in air handling system(s) and dispose of as asbestos containing waste in accordance with requirements of these specifications . 2.4.6. SECOND CLEANING: If the Asbestos Project Manager is not satisfied with the first cleaning , the Contractor will per- form a second cleaning inside containment. If the containment fails to pass final air clearance criteria, the Contractor will perform additional wet cleaning inside containment. 2.4. 7. PRE-CLEARANCE INSPECTION AND TESTING: The Owner's Representative will perform a thorough and detailed visual inspection at the end of the second cleaning to determine whether there are any signs of visible ACM or dust in the work area. If the visual inspection is satisfactory, the Contractor will then encapsulate all surfaces in- side the containment. Final air clearance will be performed in accordance with these Specifica- tions . 2.4.8. LOCK-BACK ENCAPSULATION: With the express permission of the Owner's Representative, the Asbestos Abatement Contrac- tor will perform a lock-back encapsulation of all surfaces from which ACM was removed . Exe- cute in accordance with provisions specified elsewhere and performance requirements as speci- fied in Paragraph 2 .2 .2 of this Specification . Maintain negative pressure in work area during en- capsulation work . IHST Project #17619 Page 23 ASBESTOS REMOVAL 2.5. FINAL AIR CLEARANCE TESTING 2.5.1. GENERAL: The Asbestos Abatement Contractor will notify the Owner's Representative in advance for the performance of the final visual inspection and testing . The final air clearance will be performed by the Owner's Representative starting after completion of the encapsulation of the containment and the material is dry . 2.5.2. FINAL TESTING: After a satisfactory final visual inspection and encapsulation , The Owner's Representative , will undertake the final testing . Air samples will be taken and analyzed in accordance with the pro- cedures for PCM specified elsewhere in this section . If release criteria are not met , the con- tractor will repeat final cleaning and continue decontamination procedure from that point. Addi- tional inspection and testing will be at the expense of the Contractor. If results of PCM air samples are satisfactory , remove the critical barriers and shut down and remove HEPA units as specified under Abatement Closeout. Any small quantities of residue material found upon removal of the plastic sheeting will be removed with a HEPA filtered vac- uum cleaner and localized isolation . If significant quantities , as determined by the Owner's Consultant , are found then the entire area affected will be decontaminated as specified herein for the Final Cleaning . If release criter ia are met the Contractor will perform the abatement closeout and issue the cer- tificate of compliance in accordance with these specifications . 2.5.3. FINAL TESTING PROCEDURES: CONTRACTORS RELEASE CRITERIA: Work in an area is complete when the work area is visually clean and airborne fiber levels have been reduced to less than 0.01 fibers/cc by PCM analysis. AIR MONITORING AND FINAL CLEARANCE SAMPLING: To determine if the elevated air- borne fiber counts encountered during abatement operations have been reduced to the speci- fied level , the Owner's representative will secure samples and analyze them according to the following procedures : 1. Fibers Counted : "Fibers" referred to in this section will be either all fibers regardless of composition as counted in the NIOSH 7400 method , or asbestos fibers of any size as counted using PCM; and 2.5.4. SCHEDULE OF AIR SAMPLES WITH PCM: The Owner's Consultant will perform background , perimeter and work area samples during con- struction and abatement. These samples will be analyzed by PCM. At least three (3) background samples will be taken before work begins for a baseline meas- urement. The Owner's Representative will sample at a rate of one sample per 1,000 sq . ft . of work area with a minimum of two area samples for small containment areas. A minimum of 1,250 liters of air will be collected for all baseline and clearance samples . IHST Project #17619 Page 24 ASBESTOS REMOVAL From start of actual removal of asbestos-containing materials the Owner will take the follow ing samples on a daily basis . The number of samples may vary according to site plan and approval from the CIH . DAILY SCHEDULE OF AIR SAMPLES Location Sampled Number of Sam-Analytical Method Detection Limit Minimum Vol -Rate LPM oles Fibers/cc. ume (Liters) Each Work Area 3 PCM 0 .02 750 2-15 Outside Each Work 2-3 PCM 0 .01 1,000 2-15 Outs ide Entrance to De-1 PCM 0 .01 1,000 2-15 "ontamination Facilitv Outs ide Bag-out Area 1 PCM 0.01 1,000 2-15 Output Negative 1 PCM 0 .01 1,000 2-15 Pressure System If airborne fiber counts exceed allowed limits , additional samples will be taken as necessary to monitor fiber levels . *At a minimum , five (5) samples will be collected per containment area over the duration of work in that area each day . 2.5.5. LABORATORY TESTING FOR PCM: The services of a AIHA P.A.T. accredited testing laboratory will be employed by the Owner to perform PCM analysis of the air samples collected prior to final clearance testing . A technician will be at the job site , and samples will be analyzed on-site . A complete record , certified by the testing laboratory, of all air monitoring tests and results will be furnished to the Owner and the Abatement Contractor. The analytical laboratory must be licensed in accordance with State of Texas Civil Statutes Article 4477-3a pg. 295 .54 in addition to being AIHA P.A.T. Accredited . 2.5. 7. FINAL AIR TESTING REQUIREMENTS: Final air testing will be performed by Phase Contrast Microscopy (PCM). Final air testing re- quirements are outlined below : In each homogeneous work area after completion of all cleaning work , a minimum of three (3) samples will be taken and analyzed as follows: PHASE CONTRAST MICROSCOPY CLEARANCE CRITERIA Location Number of Analysis Analytical Sensi-Recommended Rate Sampled Samples Method tivity Volume LPM s/mm2. (Liters) Each Work Area 3 PCM <0 .005 1,250 < 15 Work Area Blank 1 PCM <0005 0 Open for 30 Seconds Outside Blank 1 PCM <0.005 0 Open for 30 Seconds Laboratory Blank 1 PCM <0 .005 0 Do Not Open IHST Project #17619 Page 25 ASBESTOS REMOVAL Release Criteria: Decontamination of the work site is complete when every work area sample is at or below 0.01 FIBERS/CC. 2.6. ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE: 2.6.1. COMPLETION OF ABATEMENT WORK: The asbestos abatement contractor will seal negative air machines with 6 mil polyethylene sheet and duct tape to form a tight seal at intake end before being moved from work area. Complete asbestos abatement work upon meeting the work area clearance criteria and fulfilling the following: Remove all equipment, materials, debris from the work site. Dispose of all asbestos containing waste material as specified elsewhere in this section. Repair or replace all interior finishes damaged during the course of asbestos abatement work . Replace all asbestos containing insulation and other ACM with suitable non-asbestos material so that facility is fully functional and safe as prior to abatement if required by these specifications. Fulfill other project closeout requirements as specified elsewhere in this section. 2.6.2. CERT/FICA TE OF COMPLETION BY CONTRACTORS: The Contractor will complete and sign a "Certificate of Completion" in accordance with attach- ment #1 at the completion of the abatement and decontamination of a work area. IHST Project #17619 Page 26 Appendix A Attachments CERT/FICA TE OF COMPLETION PROJECT : DATE ------------------------ LOCATION : ______________________ _ 1. I certify that I have personally inspected , monitored and supervised the abatement work of (Specify Work Area or Building) which took place from _________ to---------- (Beginning of Work) (End of Work) 2. That throughout the work all applicable regulations and the specifications were ob - served. 3. That any person who entered this area was protected with the appropriate clothing and respirators systems and that they followed the proper entry and exit procedures and the proper operation procedures throughout the work . 4. That all employees of the contractor engaged in this work were trained in respiratory pro- tection , experienced with abatement work , had proper medical records and were not ex- posed at any time during the work to asbestos without the benefit of adequate respira- tory protection. 5. That I performed and supervised all inspection and testing specified and required by ap- plicable regulations and the specifications. 6. That the condition inside the work area were always safe and the maximum asbestos fi- ber count never exceeded 0.5 flee. Except as describe here : 7 . That the negative pressure air systems were installed and operated properly maintaining the specified negative pressure in the work area throughout the work . CONTRACTOR/SUPERVISOR COMPANY NAME CONTRACTOR ADDRESS ATTACHMENT#1 Asbestos Abatement Page 1 ATTACHMENT D WORK SCHEDULE Contract for Demolition and Abatement CRL 12.23.07 Via Del Rio & Oak Hollow Page 24 i t