HomeMy WebLinkAboutContract 37049 CITY SECRETARY CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING SERVICES This AGREEMENT is between the City of Fort Worth (the "CITY"), and HNTB Corporation, (the "ENGINEER"), for the purposes of contracting for engineering services for a PROJECT generally described as: NCTCOG Railroad Grant Project. Article I Scope of Services The Scope of Services is set forth in Attachment A. Article 11 Compensation The ENGINEER's compensation is set forth in Attachment B. Article III Terms of Payment Amendments to Article III, if any, are included in Attachment C. Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation to reasonably substantiate the invoices. (2) The Engineer will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and fm7jing customary services incidental thereto. .I B. Stan and of Care STANDARD ENGINEERING A REEMENT Pagg 1 of 11 ORIGINAL The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible plastic film sheets, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If, for any reason, the ENGINEER should make an on-site observation(s), on the basis of such on-site observations, if any, the STANDARD ENGINEERING AGREEMENT Paip 2 of 11 ENGINEER shall endeavor to keep the CITY informed of any deviation from the Contract Documents coming to the actual notice of ENGINEER regarding the PROJECT. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in, exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that are incorporated into the record drawings. I. Minority and Woman Business Enterprise (M/WBE) Participation In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result-44,the termination of this agreement and debarment from participating in City STANDARD ENGINEERING AGREEMENT Page 3 of 11 _ .. - ��1-7ifvLlWlflJ/ contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of three (3) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3)hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. ENGINEER's Insurance (1) Insurance coverage and limits: ENGINEER shall provide to the City certificate(s)of insurance documenting policies of the following coverage at minimum limits that are to be in effect prior to commencement of work on the PROJECT: Commercial General Liability $1,000,000 each occurrence $2,000,000 aggregate Automobile Liability $1,000,000 each accident on a combined single limit or $250,000 Property Damage $500,000 Bodily Injury per person per occurrence A commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non-owned when said vehicle is used in the course of the PROJECT. Worker's Compensation Coverage A: Statutory limits Coverage B: Employer's Liability $100,000 each accident $500,000 disease - policy limit $ 0 ,000 disease -each employee IT r r2,,t STANDARD ENGIN ) ING GREEMENT Page 4 of 11 9 J b�o Professional Liability $1,000,000 each claim $2,000,000 aggregate Professional liability shall be written on a claims-made basis and shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the City for each year following completion of the contract. (2) Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. (a) Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. (b) Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. (c) Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. (d) A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. (e) Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A: VII in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. (f) Deductible limits, or self insured retentions, affecting insurance required herein shall be acceptable to the CITY in its sole discretion; and, in lieu of traditional insurance, any alternative coverage maintained through insurance pools or risk retention groups must be also approved. Dedicated financial resources or letters of credit may also be acceptable to the City. (g) Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. (h) The City shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion, the ENGINEER may be required to provide proof of insurance premium payments. (i) The Commercial General Liability insurance policy shall have no exclusions by endorsements unless the CITY approves such exclusions in writing. (j) For all lines of coverage underwritten on a claims-made basis, other than Professional Liability, the retroactive date shall be coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. (k) The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement and all insurance required in this section, with the exception of Professional Liability, shall be written on an occurrence basis. STA DARQ ENGINEERING AGREEMENT (1) Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the ENGINEER will, if requested, assist the CITY in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Article V Obligations of the City A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services and will provide labor and safety equipment as required by the ENGINEER for such access. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other T < ` components of the CITY's facilities as may be required in connection with the sTANDARUENGINEERING AGREEMENT Page 6 of 11 ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule in Attachment A. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the STANDARD ENGINEERING AGREEMENT Page7of11 �y:1.• ENGINEER and there are no third-party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third- party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. if such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' STANDARD ENGINEERING AGREEMENT Page 8 of 11 written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing storage containers, microfilm, electronic data files, and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification (1) The ENGINEER agrees to indemnify and defend the CITY from any loss, cost, or expense claimed by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the ENGINEER, its employees, officers, and subcontractors in connection with the PROJECT. (2) If the negligence or willful misconduct of both the ENGINEER and the CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the ENGINEER and the CITY in proportion to their relative degrees of negligence or willful misconduct as determined pursuant to T.C.P. & R. Code, section 33.011(4) (Vernon Supplement 1996). G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction T . of the State of Texas shall govern the validity of this AGREEMENT, its interpr tation and performance, and any other claims related to it. The venue for any STANDARD ENGINEERING AGIF EEMENT Page 9 of 11 litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Alternate Dispute Resolution (1) All claims, disputes, and other matters in question between the CITY and ENGINEER arising out of, or in connection with this Agreement or the PROJECT, or any breach of any obligation or duty of CITY or ENGINEER hereunder, will be submitted to mediation. If mediation is unsuccessful, the claim, dispute or other matter in question shall be submitted to arbitration if both parties acting reasonably agree that the amount of the dispute is likely to be less than $50,000, exclusive of attorney's fees, costs and expenses. Arbitration shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association or other applicable rules of the Association then in effect. Any award rendered by the arbitrators less than $50,000, exclusive of attorney's fees, costs and expenses, will be final, judgment may be entered thereon in any court having jurisdiction, and will not be subject to appeal or modification except to the extent permitted by Sections 10 and 11 of the Federal Arbitration Act (9 U.S.C. Sections 10 and 11). (2) Any award greater than $50,000, exclusive of attorney's fees, costs and expenses, may be litigated by either party on a de novo basis. The award shall become final ninety (90) days from the date same is issued. If litigation is filed by either party within said ninety (90) day period, the award shall become null and void and shall not be used by either party for any purpose in the litigation. K. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.H., VI.I., and VI.J. shall survive termination of this AGREEMENT for any cause. L. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted during the term of this AGREEMENT by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all judgements or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. (Remainder of Page Intentionally Left Blank) S LDARD ENGINEERING AGREEMENT Page 10 of 11 Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A—Scope of Services Attachment B—Compensation Attachment C—Amendments to Standard Agreements for Engineering Services (not used) Attachment D— Project Schedule Attachment E— Location Map Executed this the� day of , 2008. ATTEST: CITY OF FORT WORTH Marty Hendrix " City Secretary Fernando Costa Assistant City Manager Contract huthorizatiox APP AL RECOMMENDED Date Greg P.E., Acting Director Trans d Public Works APPROV AS TO F AND LEGALITY Assistant ty Attorney Robert J. Slimp, P.E. Vice President HNTB Corporation ENGINEER ng STANDARD ENGINEERING AGREEMENT Page 11 of 11 ATTACHMENT A A. The CITY and the ENGINEER will furnish items and perform those services for fulfillment of the contract as identified in Attachment A-1 — Services To Be Provided By The CITY, and Attachment A-2 — Services To Be Provided By The ENGINEER. All services provided by the ENGINEER will conform to standard engineering practices and applicable rules and regulations of the Texas Engineering Practices Act, the rules of the Texas Board of Professional Engineers, and all work must be consistent with the TxDOT Local Government Project Procedures Modules. These procedures provide local government guidance for development projects under the oversight of TxDOT, and address both federal and state requirements. B. Task Orders shall be used to describe the parties' mutual agreement on the scope of services, schedule, and other particulars as stated therein. Task Orders shall be in the general form shown in Attachments A-3. Task Orders are binding only after acceptance and execution by duly authorized representatives of both parties. Each Task Order shall govern the parties' rights and obligations with respect to each assignment, but all within the framework of this Agreement. ATTACHMENT A Page 1 of 35 ,-P ATTACHMENT A-1 SERVICES TO BE PROVIDED BY THE CITY The proposed contract is an indefinite deliverable contract. Specific Task Orders shall detail specific work to be provided by the engineer. Task Orders developed under this contract may require, but are not limited to, the CITY providing the following: • Defining the location and limits of the specified improvement or corridor to be investigated • Initial coordination with local and regional governments • Initial coordination with local railroad companies • Provide any available City or TxDOT information or data required for the project, including detailed information on prior work performed for projects. • Provide a technical steering committee and/or technical representative to oversee work tasks. • Provide for timely reviews and approvals of all required documentation including working documents, reports, drawings, etc. • Social, economic, and environmental studies for public involvement including, but not limited to: o Available project development documents, environmental assessments or impacts, schematics, typical sections, public involvement records, etc. o Reviewing and processing all necessary environmental and public involvement documents prior to letting of the construction contract. o Assist in determining a location, advertising, and holding any public meetings. o The Engineer shall submit to the City applicable information and/or material to be presented at any public meetings or public hearings three weeks before any such event. The City will then take one week to review the information and material then return to the Engineer two weeks before any such meetings or hearings, if applicable. • Right-of-way data including: o Available existing right of way plans for the proposed project location. o Responsibility for required ROW appraisals and acquisitions where applicable. • Field surveying and photogrammmetry including: o Surveying control points such as horizontal control points, benchmark elevations and descriptions for vertical control, and listing of horizontal alignment coordinates for baseline control only, if available. o Aerial photographs (contact prints) of the proposed project area, if available. o Furnish existing roadway Cross-Sections from as-built plans or furnish DTM file to generate Cross Sections and contours, if available. o Available reproducible tracings; (planimetric drawing) showing existing features of the area and furnish a copy of the Microstation CADD files, if applicable. • Roadway design controls including: o Preliminary design concept conference, schematic layout and PS&E package checklists for the Engineer's use. o Example City of Fort Worth and/or TxDOT set of plans (if applicable) o As built plans of the existing facilities, if available. o Furnish the Engineer with a maximum estimated project cost to be used in the preparation of the preliminary design. • Signing, markings and signalization including: o Furnish traffic signal justification warrants, if applicable. o Available traffic counts, traffic projects and accident data, if available. • Miscellaneous (Roadway) including: ATTACHMENT A Page 2 of 35l � o Example estimates, general notes and standards, sample specification lists and related hard copy documentation for the Engineer's use in preparing the preliminary estimate, general notes and specifications. o Provide a maximum project cost to be used in the preparation of the preliminary design. o Furnish tabulation of current applicable bid process. o Negotiate with all the utility companies for any agreements and/or relocation required. • Bridge design including: o Furnish as-built plans of existing structures o Review and provide written approval of preliminary bridge layouts before bridge design work begins. • Additional responsibilities o Interface with local, regional, State and Federal agencies or other entities on behalf of Engineer, if needed. o Provide the Engineer with timely reviews and decisions in order to maintain the project schedule approved by the City o Available and applicable paper prints of design files containing example title sheet, plan profile sheet, plan sheet, sheet quantities and storm water pollution prevention plan (SW3P) sheet. o Review the Engineer's plans, specifications, and estimate documents when 30%, 75% and 100% complete. o Advertise the project, receive and open bids, and award the contract. ATTACHMENT Page 3 of 35 ATTACHMENT A-2 SERVICES TO BE PROVIDED BY THE ENGINEER A general scope of work is provided in this attachment. Specific scopes are included with each work task, by project location, in Attachment A-3. The CITY will use 2004 CIP funding, grant funds, and contributions for the design and construction of this project. It shall be the responsibility of the ENGINEER to determine, understand and utilize all current City, TxDOT, and railroad design standards. The ENGINEER will manage each project jointly with CITY staff. The construction will be under Local Lets contracts. The ENGINEER will perform duties as project manager, conduct public meetings, coordinate design and construction with railroad companies, design railroad and roadway PS&E, prepare project documentation, conduct construction inspection or oversight, and prepare as- built drawings. It is anticipated the railroads will perform design and construction on certain railroad facilities. CITY forces, including city inspectors, will manage the project and construct certain improvements using Local Force Account labor. The proposed contract is an indefinite deliverable contract. Specific Task Orders shall detail specific work to be provided by the engineer. Task Orders developed under this contract may require, but are not limited to, the ENGINEER providing the following tasks: • Inventory of existing freight systems: The Engineer will determine the general physical inventory of the existing freight system in the region to be analyzed. The rail inventory will include information regarding class of track, method and type of dispatching, number and location of main lines, secondary lines, sidings, set-out tracks, yards and applicable facilities. • Collection and review of previous study information: The Engineer will obtain and review previous work conducted within the past 5 years that are applicable to the project area, and incorporate applicable and credible information as part of this contract. • Coordination with local and regional governmental entities: The Engineer will coordinate with local and regional governmental entities during the course of work to obtain local and regional input on the existing and project growth trends, etc., to help identify constraints in the rail network and/or project area. • Perform schematic design that consist of drawings and other documents illustrating the scale and relationship of project components, and: o Evaluate existing facilities to provide the City with the most cost effective options for implementing Quiet Zones o Review the program established by the City to ascertain the requirements of each independent project and arrive at a mutual understanding of such requirements with the City. o Include a preliminary program, schedule, and construction budget, each in terms of the other o Review the City's alternative approaches to design and construction of projects • Provide site evaluations within designated project areas • Provide a boundary and topographic survey of the project area as applicable • Prepare design development drawings that consist of drawings and other documents to fix and describe the size and character of Projects as to civil and geotechnical engineering needs; architectural, structural, mechanical, and electrical systems materials and such other elements as may be appropriate • Perform "fatal flaw"' analyses of alternative evaluation methods • Provide for public meetings and presentations regarding proposed project purpose and ATTACHMENT A Page 4 of 35 recommendations by coordinating and assisting with pubic involvement throughout the project. This shall include coordinating stakeholder meetings and communications, developing presentations on findings, and recommendations for public and steering committee meetings. • Perform required railroad and agency coordination • Perform all necessary work associated with the survey and establishment of railroad quiet zones in accordance with Federal Railroad Administration recommendations and/or standards • Perform feasibility studies that include: o Preliminary design values o Preliminary traffic studies o Uncontrolled mapping that include, but are not limited to: ■ Constraints mapping ■ Preliminary location studies o Preliminary Right-of-Way requirements o Preliminary cost estimates o Preliminary environmental analyses that include, but are not limited to: ■ Investigation of fatal flaws ■ Reviews and assessments of applicable Federal/State/City regulations ■ Preparation of major environmental issues to be addressed ■ Identification of Environmental Assessment and/or Environmental Impact Statement requirements o Preliminary economic analyses • Perform route and design studies that include: o Route location studies o Traffic evaluations and projections o Preliminary hydrologic analyses o Preliminary cost estimates o Establishment of preliminary design schematics o Preliminary hydraulic design analyses o Preliminary hydraulic reports o Preliminary right-of-way requirements o Base and soil testing and core drilling • Perform social, economic and environmental studies and public involvement including: o Social, economic and environmental studies of proposed alternatives o Coordination with State, FHWA, STB, and federal and state resource and regulatory agencies o Preparation of environmental reports that may include Environmental Assessments (EA), Findings of no Significant Impact (FONSI), Environmental Impact Statements (EIS), Records of Decisions (ROD), Section 4(f) documents, Biological Assessments, and/or other environmental documents that may be required. o Alternatives development and screening processes o Public involvement program that includes, but is not limited to ■ Public outreach ■ Deliberative Polling Processes (DPP) ■ Project plans and policies ■ Project communications ■ Project contact points " ■ Meetings, briefings, and hearings ---�"' ■ Project team coordination meetings -ATrACH,MENTA Page 5 of 35 t6; t • Perform right-of-way data collection including: o Surveying o Mapping o Property description o Preparation of parcel plat information o Preparation of parcel tract information o Establishment of property descriptions and area calculation sheets o Abstract mapping o Preliminary right-of-way layout drawings o Right-of-way mapping • Provide design and/or construction surveying including: o Research, field work, analysis, computation, and documentation necessary to provide detailed topographic mapping of project sites, including: ■ Cross-sections ■ Approximate horizontal and vertical locations of utilities and improvements ■ Detailing of bridges and other structures ■ Review of right-of-way maps ■ Establishing control points o Reconnaissance, field work, analysis, computation and documentation necessary to provide the horizontal and vertical position of specific ground points to be used by the construction contractor for determining lines and grades o Design surveys including: ■ Obtaining cross sections and digital terrain models as needed ■ Locating exiting utilities ■ Locating topographical features and existing improvements ■ Providing details of existing bridge structures • Providing details of existing drainage features such as culverts, manholes, etc. ■ Establishing additional control points as needed ■ Locating existing rights-of-way ■ Reviewing right-of-way maps as required ■ Locating boreholes o Construction surveys including, but not limited to: ■ Staking of existing rights-of-way as required ■ Staking existing and proposed baselines as required ■ Staking proposed bridge structures ■ Staking proposed drainage structures such as manholes, culverts, etc. ■ Setting grade stakes ■ Recovering and checking existing control points • Setting additional control points as required • Provide roadway design controls, including, but not limited to: o Designing, preparing, and submitting Plans, Specifications, and Estimates (PS&E) documents associated with, but not limited to: ■ Alignment sheets ■ Benchmark data sheets ■ Plans and profiles o Grading design including, but not limited to: ■ Typical sections • Cross-section design ■ Pavement design • Provide drainage design including: ATTACHMENT A Page 6 of 35 o Preparation of drainage area maps o Performance of hydrology calculations o Performance of hydraulic calculations o Preparation of culvert layouts, cross sections, and detail sheets o Preparation of plan and profile sheets • Prepare signing, pavement markings, signalization including, but not limited to: o Signing through the project limits including those limits that are considered incidental to the project limits o Pavement marking o Isolated signals including, but not limited to: ■ Existing traffic signal warrant studies ■ Pedestrian signals ■ Determination of traffic and pedestrian counts as required o Development and design of new traffic signals for temporary and/or permanent applications, including timing plans • Prepare design requirements for continuous and safety lighting for conventional, and underpass lighting including: o Preliminary layouts o Circuit wiring diagrams o Flashing beacon and traffic signal coordination o Coordination of existing lighting systems within the proposed project area with proposed designs • Prepare retaining wall and miscellaneous structure design including: o Cut and fill walls o Mechanically Stabilized Earth (MSE)walls • Prepare traffic control plans/detours/sequencing of construction including: o Coordination with local/state traffic control authorities o Establishing phase narratives • Preparing layouts for phase of sequencing of construction • Perform bridge design including: o Bridge layout o Bridge detail summary o Bridge structure detail including, but not limited to: ■ Calculation and design of bridge abutments ■ Calculation and design of bridge slabs ■ Calculations to determine elevations of bridge substructure and superstructure elements. ■ Calculations for bridge box beam design o Preparation of necessary PS&E's • Performing construction phase services including, but not limited to: o Review and approval of shop drawings o Review and approval of forming details o Responding to requests for information (RFIs) o Providing minor redesign (major redesign should be handled with a contract supplement) o Answering general questions o Providing clarification o Other project related tasks in support of the City during construction • Provide general management including, but not limited to: o Preparation and development of work schedules including milestone activities and/or ATTACHMENT Page 7 0135 deliverables o Attendance to meetings as required o Providing quality control and assurance (QA/QC) on deliverables associated with projects • Provide Railroad Intelligent Transportation Systems (RR-ITS) design including: o Strategic planning o Telecommunications system design o Incident detection and traffic management systems o Construction and implementation management • Provide 3D graphic services including: o Animation and video production (including compositing, rendering, shooting, editing video and adding narration, music and other graphics) o Multi-media authoring, script/copy writing, virtual interactive tours • Provide additional GIS services not previously mentioned including: o Needs assessments, implementation planning, custom application development, system design, base map creation, data integration, data acquisition/conversion, database design, data modeling, GIS enhancements, software training • Provide Application Development services including: o Content management systems, dashboards, document management tools, business intelligence applications, project management tools, custom workflow applications, SharePoint applications, Microsoft Office custom tool extensions, ITS applications, • Provide Quiet Zone planning, design and implementation services that include: o Conduct preliminary data review including work done by City of Fort Worth to date o Collect additional field data for use in concept and alternatives development o Develop quiet zone treatment alternatives o Prepare conceptual plans and order of magnitude cost estimates o Conduct public meetings to solicit input and determine final alternatives o Conduct diagnostic team meetings to finalize project details o Prepare plans and estimates for quiet zone projects o Provide coordination with railroad to obtain plans, estimates and agreements for railroad work required o Provide coordination with railroad for construction of quiet zone improvements o Prepare draft FRA notices for City of Fort Worth submittal o Update Grade Crossing Inventory as required • Project Controls o Establish and maintain project budgets (income and expenses) for ENGINEER and CITY utilizing the guidelines and funding table shown below as a guide. Funding Table Project Total Cost Peach Street Area $2,828,514 Hemphill West $849,479 Magnolia Avenue $419,520 Sycamore School Road $154,453 Total $4,251 ,966 ATTACHMENT A Page 8 of 35 Attachment A-3—Task Orders Task Order 1 — Peach Street Area CSJ: 0902-48-688 CSJ: 0902-48-689 There are two components to this Task Order. The first centers on providing pedestrian access routes where Peach Street crosses the BNSF and UPRR railroad tracks. The second component addresses vehicular travel, in particular that associated with Emergency Service personnel, and the most effective method to provide un-interrupted response times, essentially be either minimizing trains blocking the roadway, or the creation of alternative routes for vehicular travel. In order to provide continually reliable access to and from the Samuels/Rock Island neighborhood, it is proposed to redirect Live Oak Street and connect it to E. 4th Street. The north end of this connector would begin near a point where Peach Street intersects Live Oak Street, proceed along the east side of the UP tracks, and finally intersect with E. 4th Street at a T-intersection. There are six railroad crossings to be evaluated in this project. 1. UP & E 1 st Street 2. UP/BNSF & E 1st Street 3. UP/BNSF & Peach Street 4. BNSF & Peach Street 5. BNSF & E 1st Street 6. BNSF & Samuels Scope of Services Objective: To provide continually reliable, safe access to and from the Rock Island neighborhood, including emergency services, school crossings, personal vehicles, and public service vehicles while improving the quality of life by reducing train horn noise. Services for this Scope of Work will be provided through three phases as well as providing project controls through the project. Phase One: Develop Alternative Conceptual Plans Phase Two: Develop Final Plans and Specifications Phase Three: Construction Management Project Controls: Monitor project funding and expenses for services associated with the PSA project, including those provided by CFW staff. Phase One Scope of Work: Data Collection and Conceptual Plans 1. Data Collection: Obtain all known information that is available through the City, County, and State agencies. Obtain maps and aerial photographs of the area. In addition to government agencies, information will be researched and obtained from the Union Pacific Railroad and BNSF Railroad such as their Right-of-Way Plans, Track Plans and Condensed Profiles. An on-sight visual inspection will be used to obtain photographs of the area and observe the local traffic patterns. 1.1. One project start-up meeting t ATTACHMENT A Page 9 of 35 1.1.1. Review the program established by the City to ascertain the requirements of each independent project and arrive at a mutual understanding of such requirements with the City. 1.1.2. Include a preliminary program, schedule, and construction budget, each in terms of the other 1.1.3. The meeting will officially establish the basic features and schematic design criteria for the project. The engineer will establish design criteria with input from the City. 1.2. Obtain Right-of-Way plans, track plans, condensed profiles, signal and dispatch information, train speeds, timetables and operating information for the track limits within the project from the BNSF Railroad 1.3. Obtain Right-of-Way plans, track plans, condensed profiles, signal and dispatch information, train speeds, timetables and operating information for the track limits within the project from the Union Pacific Railroad 1.4. Research and obtain maps, street plans, and other relevant data such as existing traffic signals and traffic data from the City of Fort Worth 1.5. Research and obtain maps, street plans, and other relevant data from Tarrant County 1.6. Research and obtain maps, street plans, and other relevant data from TxDOT 1.7. Research, obtain and review information on major utilities and investigate potential impacts to the project. Refinements to the conceptual layouts will be considered, when feasible, to avoid or minimize costly major utility adjustments and/or relocations. Major utilities to be identified include high pressure natural gas and petroleum pipelines, overhead electric transmission lines, underground fiber optic duct banks, canals or other utilities with significant costs associated with adjustment or relocation. When it is not possible to adjust the conceptual alignment to avoid conflicts, costs for the utility adjustments and/or relocations shall be included in the cost estimate. 1.8. Develop a Design Summary Report to document guidelines that will be followed throughout the course of the project 1.9. Conduct the appropriate field reconnaissance to establish the validity of the existing features and collect the appropriate data including a photographic record to document important landmarks that exist along the project area for future reference if needed. Photos shall be prepared in JPG digital format. 1.10. Research and identify signal hardware and software data at all crossings for the RR-ITS process 2. Evaluate Existing Conditions: Using Land Use Planning principals, identify and locate land owner parcel information, determine the existence of any physical access easements, property appraisal values and establish cost estimates on projects that may require property acquisition. Identify the local stakeholders, neighborhood groups, industries, and businesses that are involved in the project area and arrange for and conduct meetings to gain an in-depth understanding of the traffic flow, transportation needs, and pedestrian needs. Meet with the various emergency response sources such as the fire department, police, and medical teams to obtain detailed information regarding their originations and most frequent destinations within the project area. 2.1. One meeting with FBM 2.2. Two meetings with Trinity Bluff Development 2.3. One meeting with Purina Mills 2.4. One meeting with Property Owners as required 2.5. One meeting with Downtown Fort Worth Inc(DFWlnc) 2.6. One with Nash Elementary School representatives I 2.7. One meeting with each of the emergency response groups (Fire Department — Fire Station No. 1, Police epartment— Neighborhood Police Officer, and Ambulance Service) ATTACHMENT A Page 10 of 35 � 1 C 2.8.One overall neighborhood stakeholder meeting. HNTB will prepare, organize and host one Community Open House. The CONSULTANT will be responsible for meeting logistics which include planning, agenda, staffing sign-in sheets, comment sheets, (directional signing will be provided by the city or neighborhood organizations), meeting summaries and final report. The City will work with the neighborhood organizations for meeting announcements. 2.8.1. Open House Planning, Design 2.8.2. Open House Event Management/Staffing 2.8.3. Open House PowerPoint— English only 2.8.4. Open House PowerPoint production —English only 2.8.5. Open House Agenda — English only 2.8.6. Open House Sign in Sheets and Directional Signage — English only 2.9. Identify property ownership and appraisal values within the project limits 2.10. Develop a constraints map of the project study area, suitable for display at the public meetings using aerial, schematics and data obtained through data collection procedures to help show the potential impacts of the proposed project. Data to be included are public and community facilities such as schools, churches, police/fire/emergency, parklands, businesses and industries, and existing/potential historical sites. 3. Develop Conceptual Plans: Meet with the City of Fort Worth to define the type and style of pedestrian crossings, final location of the Live Oak connector roads, the street closure of East 1st Street at the UPRR Railroad tracks, and the Railroad Intelligent Transportation System (RR-ITS). The conceptual plans will incorporate the transportation patterns and needs identified in the Evaluation of Existing Conditions step with continual coordination with the Stakeholders, especially with the FBM and Purina Mills businesses and railroads. To date, six individual projects have been identified: 1. Railroad ITS System 2. Pedestrian Crossing at BNSF and Peach 3. Pedestrian Crossing at UP/BNSF and Peach 4. Road closure at UP/BNSF and East 1st Street 5. Live Oak Connector 6. Closure near Purina Conceptual Plans and Details will be developed to a sufficient level to generate a realistic construction cost estimate and will be considered as the 30% Submittal plan set. 3.1. One Conceptual Design meeting with the City to discuss the results of the Data Collection and the Evaluation of Existing Condition steps of the Phase One Scope of Work. Using this information the objective of this meeting will be to confirm the final design approach for the pedestrian crossings, final location of the Live Oak connector roads, the street closure of East 1st Street at the UPRR/BNSF Railroad tracks, and the RR-ITS approach for some or all of the crossings. 3.2. Draft a Design Memorandum defining the conclusions from the Conceptual Design Meeting. 3.3. RR-ITS Process 3.3.1. Evaluate need and alternatives for all crossings 3.3.2. Submit a summary report defining the RR-ITS to be designed for the best compatibility and results given the existing conditions and equipment 3.3.3. Engineering Cost Estimate for final RR-ITS 3.4. Pedestrian Crossing: Peach Street at BNSF Railroad near Grant Ave. 3.4.1.__.Establish the parameters associated with providing pedestrian access after ATACHMENTA the best alternative is identified. Alternatives at this crossing include: ';ATTA Page 11 of 35 3.4.1.1. Peach underpass 3.4.1.2. Bluff pedestrian bridge 3.4.1.3. Gounah sidewalk route 3.4.1.4. An alternative not yet defined 3.4.1.5. Do nothing 3.4.1.6. BNSF Double Track Project with a Peach Street closure 3.4.2. Provide conceptual plans indicating alternatives analyzed, and approximate costs associated with each alternative. 3.4.3. Provide plans showing roadway and railroad alignments, ROW, pedestrian crossing type (bridge, tunnel, or status quo crossing), existing utilities, existing structures 3.4.4. Elevation of East and West ends of the pedestrian crossing showing relative location to Peach and/or Bluff Streets, track profile, existing utilities, existing structures 3.4.5. Section through the pedestrian crossing showing track section, existing and proposed ground profiles 3.4.6. Cross Sections showing typical wall, roof, and floor sections 3.4.7. One conceptual sketch of the pedestrian crossing alternatives of a quality and size for use at a neighborhood stakeholders meeting 3.4.8. Engineering Cost Estimate for the construction of the Pedestrian crossing alternatives 3.5. Pedestrian Crossing: Peach Street at UPRR/BNSF Railroad near North Hays Street 3.5.1. Plan showing roadway and railroad alignments, ROW, Pedestrian Crossing, existing utilities, existing structures 3.5.2. Elevation of East and West ends of the Pedestrian Crossing showing relative location to Peach Street, track profile, existing utilities, existing structures 3.5.3. Section through the Pedestrian Crossing showing track section, existing and proposed ground profiles 3.5.4. Cross Sections showing typical wall, roof, and floor sections 3.5.5. One conceptual sketch of the pedestrian crossing of a quality and size for use at a neighborhood stakeholders meeting 3.5.6. Engineering Cost Estimate for the construction of the Pedestrian Crossing 3.6. Street Closure at East 1st Street and the UPRR at-grade crossing 3.6.1. Plan showing roadway and railroad alignments, ROW, existing utilities, existing structures, existing grade crossing 3.6.2. Profile and Details showing the existing roadway profile across the grade crossing and proposed removal of the grade crossing and road 3.6.3. Engineering Cost Estimate for the removal of the grade crossing and road closure 3.7. Live Oak Connection Road 3.7.1. Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 3.7.2. Plan and Profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (4 sheets) 3.7.3. Engineering Cost Estimate 3.8. Street Closure and Purina Mills Access Road 3.8.1. Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 3.8.2. Plan and Profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (2 sheets) 3.8.3. Engineering Cost Estimate 3.9. Develop median barrier standards for the CITY that are acceptable for quiet zone use. 3._10.Upon-determination of the preferred alternative(s) for the six identified projects previously listed in phis section, HNTB will submit thirty percent (30%) conceptual plans and cost ATTACHMENT - � $Mc e'12 6 35 � 1 estimates for review, address City's comments, and incorporate them into the 75% submittal. HNTB will continue with the development of the 75% Plans during the City's review of the 30% submittal. Phase Two Scope of Work: Develop Final Plans and Specifications 4. Surveys and Geotechnical Work: Using the recommended preferred alternative design, determine and obtain the needed survey data, utility locations, and geotechnical data needed for the design activities. 5. Ground control for aerial mapping, supplemental ground surveying and applicable cross sections: 5.1. Ground Control for Aerial Mapping - Set aerial panels in accordance with Texas Department of Transportation — Fort Worth District Aerial Mapping Specifications. Control information will be provided in hard copy and ASCII digital format to HNTB and to the Client. A control plan sheet will be provided 5.2. Supplemental Ground Surveying — On-the-ground topographic (DTM) survey data will be obtained at the following locations: 5.2.1. A 150-wide section on Peach Street extending 500 feet east and west of the BNSF Railroad. 5.2.2. For a distance of 300 feet west of the intersection of the BNSF Railroad and Peach Street to North Hays Street and 120 feet east to the intersection Peach Street and North Live Oak Street. 5.2.3. For a distance of 550 feet along East First Street between Hampton Street and North Live Oak Street. 5.2.4. A 150 feet wide section along the east side of the Union Pacific Railroad Right-of-Way between Peach Street and East 4th Street. 5.2.5. A 75 feet width each side of North Live Oak Street between Weatherford Street and East 4th Street. 5.2.6. The area bounded by Peach Street, BNSF Railroad, E 4th Street and Live Oak Street. The actual area shall extend 75 feet past those boundaries. RIGHT-OF-WAY SURVEYS The following services will be provided in connection with right-of-way document preparation for the project: 6. Field Surveys 7. Utilize project survey control points established for the aerial mapping. We will define the horizontal control with additional traverse points as needed for the right-of-way survey. 8. Perform a right-of-way survey of the project area. Monuments marking property corners of the properties from which right-of-way is to be obtained will be recovered and tied to the project control. 9. Boundary Analysis 10. Utilizing the deed study and the data from the field survey, a Registered Surveyor will analyze the results of the survey with assistance from the survey technician in performing computations related to the analysis. The surveyor will determine location of the existing right-of-way lines and the side property lines of each of the subject properties. The City will be notified of boundary line conflicts that become apparent as a result of the field survey. Resolution of these conflicts is not a budgeted item since the number or extent of such conflicts cannot be quantified at this time. 11. Preparation of Documents ATTACHMENT A i Page 13 of 35 11.1. Utilizing the boundary surveys performed by HNTB and the proposed right-of-way line location provided by the City, we will compute the boundaries of the right-of-way parcels for each of the subject properties. 11.2. Draft the right-of-way plans to a scale of 1-inch equals 50 feet based upon TxDOT ROW Manual specifications. We estimate that there will be approximately 11 plan sheets including an index sheet and a plan cover sheet. A closure computation will be prepared for each right-of-way parcel on the plans. 11.3. Draft plats and field notes for each of the right-of-way parcels or parts of parcels. According to the tax maps available on the TCAD web page, there are approximately thirty-nine (39) parcels for which surveys must be completed and plats and descriptions prepared. The plats will be prepared on 8 '/2" x 11" pages at a scale of 1 inch equals 50 or 100 feet, depending on the parcel size, A closure computation will be prepared for each of the plats and field notes. 12. All of the above described survey documents (right-of-way plans, plats, descriptions, and closure computations) will be submitted to the client for their review. Upon the completion of review of all right-of-way survey documents, HNTB will make corrections and address concerns. Corrected documents will be returned to the client in final format. GEOTECHNICAL SERVICES 13. The work to be performed by the Engineer shall consist of providing geotechnical engineering services required for the preparation of Plans, Specifications, and Estimates (PS&E) for the construction of the Peach Street Area Project. This investigation is to determine subgrade conditions beneath the proposed pavements for use in pavement thickness design and the proposed pedestrian crossing structures. The geotechnical engineering study for this project shall be conducted using a combination of both Texas Department of Transportation (TxDOT) and American Society for Testing Materials (ASTM) test methods and procedures, investigation and pavement design analysis for the project will include field, laboratory and engineering phases. 14. HNTB will provide the necessary personnel, equipment and materials to complete the requirements outlined in this scope of services. The services include the field program, laboratory testing, engineering analysis, and report preparation phases outlined below. HNTB shall obtain required Right-of-Entry with all property owners associated with the project geotechnical exploration efforts. 15. Field services for the geotechnical study are expected to consist of approximately fourteen (14) soil borings. The Engineer shall adjust the number, locations, and depths of borings as warranted by documented field observations, in order to provide complete data for the Engineer's roadway and structures. Both the locations and ground surface elevations of the borings will be established in the field by the project surveyor. Six (6) of the borings are to be drilled to a depth of approximately 60 feet at the proposed pedestrian crossing with the remaining eight (8) borings are to be drilled to a depth of approximately 7 feet for the purpose of guiding the design and construction of the roadways. 16. Field Investigation 16.1. Boring locations will be established in accessible areas with minimal disturbance to site features (i.e. removal of fences, clearing of vegetation, etc.). 17. Laboratory Testing 17.1. Laboratory tests (natural water contents, Atterberg limits, and partial gradation analyses) will be performed to classify soil strata, evaluate plasticity, and shrink/swell potential of on- site materials. Unconfined compression tests will be conducted on selected intact soil specimens to evaluate the compressive strength of the subsurface strata. In addition, soluble sulfate tests will be performed on soil samples to indicate if the phenomenon of ATTACHMENT A Page 14 of 35 sulfate induced heave will be a potential problem if lime stabilized subgrade is to be considered in the pavement design and pedestrian tunnels structures. 18. Engineering Report 18.1. Engineering analyses of the results of the field and laboratory data will be made to develop pavement thickness design for the roadway and foundation design for the under/overpass structures. The report will include the following: 18.1.1. General subsurface conditions, discussion of site geology, boring logs with descriptions of strata and laboratory test results, and water levels obtained at the time of drilling; 18.1.2. Boring location plan; 18.1.3. Flexible pavement thickness design in accordance with TxDOT FPS-19 Design Methodology with a mechanistic check, and based on provided traffic loading information; and 18.1.4. Pavement construction recommandations. 18.1.5. Foundation design recommendations for the pedestrian tunnel structures. 19. Assumptions: The Geotechnical Services scope of work is based on the following: 19.1. Boring locations can be accessed with an all-terrain (ATV) drill rig and site clearing is not required. 19.2. The actual boring locations will be marked in the field after drilling for others to obtain locations and elevations. We will obtain latitude and longitude coordinates of the boring location using a hand-held GPS device; and 19.2.1. The estimated fee may be exceeded if site conditions are significantly different than anticipated or changes in work are required or requested. However, the estimated maximum fee will not be exceeded without the client's prior authorization. Required additions to the above scope of services would be invoiced in accordance with the contract fee schedule. 20. Plans, Specifications and Cost Estimates (PS&E): Prepare detailed Plans, Specifications and Cost Estimates of sufficient detail for construction. 20.1. 75% PS&E Submittal 20.1.1. RR-ITS Process 20.1.1.1. Determine modifications needed to convert the existing signal system to an RR-ITS 20.1.1.2. Develop Plans, Details, and Specifications 20.1.1.2.1. Peach Street 20.1.1.2.1.1. Plan showing existing roadway and railroad alignment, existing structures, existing utilities, and proposed equipment 20.1.1.2.1.2. Elevation and Details of proposed and existing equipment showing relative locations of existing track and roads 20.1.1.2.2. East 1 st Street 20.1.1.2.2.1. Plan showing existing roadway and railroad alignment, existing structures, existing utilities, and proposed equipment where applicable 20.1.1.2.2.2. Elevation and Details of proposed and existing equipment showing relative locations of existing track and roads 20.1.1.3. Report detailing how new equipment will be incorporated into the existing system, into the emergency response agencies, command center design and operational planning, type of equipment, and how the ITS will function 20.1.1.4. Engineering Cost Estimate for final RR-ITS 20.1.2. Pedestrian crossing: Peach Street at BNSF Railroad (if applicable). ATTACHMENT A Page 15 of 35 , 20.1.2.1. Expand information on Plan showing roadway and railroad alignments, ROW, Pedestrian Crossing, existing utilities, existing structures 20.1.2.2. Expand information on Elevation of East and West ends of the Pedestrian Crossing showing relative location to Peach Street, track profile, existing utilities, existing structures 20.1.2.3. Expand information on Section through the Pedestrian Crossing showing track section, existing and proposed ground profiles 20.1.2.4. Expand information on Cross Sections showing typical wall, roof, and floor sections 20.1.2.5. Add additional details and cross sections to sufficiently describe all information needed for construction 20.1.2.6. Concrete Reinforcing Details and Sections 20.1.2.7. Design Calculations 20.1.2.8. Construction Sequence (3 sheets) 20.1.2.9. Engineering Cost Estimate for the construction of the Pedestrian Crossing 20.1.3. Pedestrian Crossing: Peach Street at BNSF/UPRR Railroad near North Hays Street 20.1.3.1. Expand information on Plan showing roadway and railroad alignments, ROW, Pedestrian Crossing, existing utilities, existing structures 20.1.3.2. Expand information on Elevation of East and West ends of the Pedestrian Crossing showing relative location to Peach Street, track profile, existing utilities, existing structures 20.1.3.3. Expand information on Section through the Pedestrian Crossing showing track section, existing and proposed ground profiles 20.1.3.4. Expand information on Cross Sections showing typical wall, roof, and floor sections 20.1.3.5. Add additional details and cross sections to sufficiently describe all information needed for construction 20.1.3.6. Concrete Reinforcing Details and Sections 20.1.3.7. Design Calculations 20.1.3.8. Construction Sequence (3 sheets) 20.1.3.9. Engineering Cost Estimate for the construction of the Pedestrian Crossing 20.1.4. Street Closure at East 1st Street and the UPRR at-grade crossing if closure not handled directly by City of Fort Worth personnel 20.1.4.1. Expand information on Plan showing roadway and railroad alignments, ROW, existing utilities, existing structures, existing grade crossing 20.1.4.2. Expand information on Profile and Details showing the existing roadway profile across the grade crossing and proposed removal of the grade crossing and road 20.1.4.3. Typical roadway details and track sections 20.1.4.4. Details of road barricades 20.1.4.5. Engineering Cost Estimate for the removal of the grade crossing and road closure 20.1.5. Live Oak Connector Road 20.1.5.1. Expand information on Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 20.1.5.2. Expand information on Plan and Profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (4 sheets) R 1.5.3. Develop Cross Sections every 50' (6 sheets) A GeoPak roadway geometry model will be developed. GeoPak Cross Sections will be plotted and will show original terrain, finished grade, centerline, and ROW at intervals of 50'. Earthwork calculations will be based upon these cross sections. 20.1.5.4. Typical roadway sections and details (2 sheets) 20.1.5.5. Street Crossing Details 20.1.5.5.1. Bluff Street 20.1.5.5.1.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.5.5.1.2. Profiles across the intersection for both streets 20.1.5.5.2. Belknap Street 20.1.5.5.2.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed vertical and horizontal clearances 20.1.5.5.2.2. Profiles across the intersection for both streets 20.1.5.5.3. Weatherford Street 20.1.5.5.3.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed vertical and horizontal clearances 20.1.5.5.3.2. Profiles across the intersection for both streets 20.1.5.5.4. East 1 st Street 20.1.5.5.4.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.5.5.4.2. Profiles across the intersection for both streets 20.1.5.5.5. East 2"d Street 20.1.5.5.5.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.5.5.5.2. Profiles across the intersection for both streets 20.1.5.5.6. East 4tn Street 20.1.5.5.6.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.5.5.6.2. Profiles across the intersection for both streets 20.1.5.5.7. Typical roadway details 20.1.5.5.8. Traffic Control (signal) details to be evaluated and determined. 20.1.5.6. Engineering Cost Estimate 20.1.6. Street Closure and Purina Mills Access Road 20.1.6.1. Expand information on Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 20.1.6.2. Expand information on Plan and Profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (2 sheets) 20.1.6.3. Develop Cross Sections every 50' (6 sheets) A GeoPak roadway geometry model will be developed. GeoPak Cross Sections will be plotted and will show original terrain, finished grade, centerline, and ROW at intervals of 50'. Earthwork calculations will be based upon these cross sections. 20.1.6.4. Typical roadway sections and details (2 sheets) 20.1.6.5. Street Crossing Details 20.1.6.5.1. East 1st Street 20.1.6.5.1.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.6.5.1.2. Profiles across the intersection for both streets 20.1.6.5.2. East 2"d Street 20.1.6.5.2.1. Plan Sheet showing road alignments, existing structures, existing -�-� utilities, existing and proposed traffic control ATTACHMENT A,_ Page 17 of 35 p 1 v� 'n 20.1.6.5.2.2. Profiles across the intersection for both streets 20.1.6.5.3. East 3`d Street Turnaround 20.1.6.5.3.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.6.5.3.2. Profiles across the intersection for both streets 20.1.6.5.4. East 4ch Street Closure 20.1.6.5.4.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.1.6.5.4.2. Profiles across the intersection for both streets 20.1.6.5.5. Typical roadway details 20.1.6.5.6. Traffic Control Details 20.1.6.6. Engineering Cost Estimate 20.1.7. HNTB will submit seventy-five percent (75%) conceptual plans and cost estimates for review, address City's comments and incorporate them into the final submittal. HNTB will continue with the development of the final Plans during the City's review of the 75% submittal. 20.2. Final PSBE Submittal 20.2.1. RR-ITS 20.2.1.1. Develop Plans, Details, and Specifications 20.2.1.1.1. Deployment locations (sites) 20.2.1.1.1.1. Complete Plan showing existing roadway and railroad alignment, existing structures, existing utilities, and proposed equipment 20.2.1.1.1.2. Complete Elevation and Details of proposed and existing equipment showing relative locations of existing track and roads 20.2.1.1.2. Plans and Details of RR-ITS equipment installation at the emergency response agencies, and command center(6 sheets) 20.2.1.1.3. Specifications for RR-ITS equipment 20.2.1.2. Final Report detailing how new equipment will be incorporated into the existing system, into the emergency response agencies, command center design and operational planning, type of equipment, and how the RR-ITS will function 20.2.1.2.1. Engineering Cost Estimate for final RR-ITS 20.2.2. Pedestrian crossing: Peach Street at BNSF Railroad. 20.2.2.1. Complete Plan showing roadway and railroad alignments, ROW, Pedestrian crossing, existing utilities, existing structures (if applicable) 20.2.2.2. Complete Elevation of East and West ends of the Pedestrian Crossing showing relative location to Peach Street, track profile, existing utilities, existing structures 20.2.2.3. Complete Section through the Pedestrian Crossing showing track section, existing and proposed ground profiles 20.2.2.4. Complete Cross Sections showing typical wall, roof, and floor sections 20.2.2.5. Complete details and cross sections to sufficiently describe all information needed for construction 20.2.2.6. Complete concrete reinforcing details and sections 20.2.2.7. Reinforcing bar schedule 20.2.2.8. Design calculations 20.2.2.9. Construction Sequence (3 sheets) 20.2.2.10. Hydrologic Analysis and hydrological data (drainage area map, drainage area size, time of concentration, hydrological method used, etc) will be included in the plan set. The engineer will prepare detail drawings for proposed culvert crossings. Hydraulic data will be included in the plan set. Storm sewers will be designed according to design criteria. Storm Sewer plan and profile sheets shall be produced at a scale 1" = 200'. Storm sewers will be designed for the ultimate facility and stub-outs will be shown on the PS&E sheets to allow for the expansion of the roadway in the future if required.. The stub-outs will allow for the expansion of the roadway to the ultimate section. SW3P sheets will be designed according to NPDES design guidelines. Plan sheets shall be produces at a scale 1" = 200' (double bank). 20.2.2.11. Grading, drainage and erosion control 20.2.2.12. Erosion notes and details 20.2.2.13. Specifications 20.2.2.14. Engineering cost estimate for the construction of the Pedestrian Tunnel 20.2.3. Pedestrian Crossing: Peach Street at BNSF/UPRR Railroad near North Hays Street 20.2.3.1. Complete plan showing roadway and railroad alignments, ROW, Pedestrian Crossing, existing utilities, existing structures 20.2.3.2. Complete elevation of east and west ends of the Pedestrian Crossing showing relative location to Peach Street, track profile, existing utilities, existing structures 20.2.3.3. Complete section through the Pedestrian Crossing showing track section, existing and proposed ground profiles 20.2.3.4. Complete cross sections showing typical wall, roof, and floor sections 20.2.3.5. Complete details and cross sections to sufficiently describe all information needed for construction 20.2.3.6. Complete concrete reinforcing details and sections 20.2.3.7. Reinforcing bar schedule 20.2.3.8. Design calculations 20.2.3.9. Construction Sequence (3 sheets) 20.2.3.10. Hydrologic Analysis and hydrological data (drainage area map, drainage area size, time of concentration, hydrological method used, etc) will be included in the plan set. The engineer will prepare detail drawings for proposed culvert crossings. Hydraulic data will be included in the plan set. Storm sewers will be designed according to design criteria. Storm Sewer plan and profile sheets shall be produced at a scale 1" = 200'. Storm sewers will be designed for the ultimate facility and stub-outs will be shown on the PS&E sheets to allow for the expansion of the roadway in the future if required. SW3P sheets will be designed according to NPDES design guidelines. Plan sheets shall be produces at a scale 1" = 200' (double bank). 20.2.3.11. Grading, drainage and erosion control 20.2.3.12. Erosion notes and details 20.2.3.13. Specifications 20.2.3.14. Engineering cost estimate for the construction of the Pedestrian Crossing 20.2.4. Street Closure at East 1st Street and the UPRR at-grade crossing 20.2.4.1. Complete plan showing roadway and railroad alignments, ROW, existing utilities, existing structures, existing grade crossing 20.2.4.2. Complete profile and details showing the existing roadway profile across the grade crossing and proposed removal of the grade crossing and road 20.2.4.3. Complete typical roadway details and track sections 20.2.4.4. Complete details of road barricades 20.2.4.5. Grading, drainage and erosion control 20.2.4.6. Erosion notes and details 2 Specifications ATTACHMENT A ,�li'.0 Page 19 of 35 20.2.4.8. Engineering Cost Estimate for the removal of the grade crossing and road closure 20.2.5. Live Oak Connector Road 20.2.5.1. Complete site plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 20.2.5.2. Complete plan and profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (4 sheets) 20.2.5.3. Complete Cross Sections every 50' (6 sheets) 20.2.5.4. Complete Typical roadway sections and details (2 sheets) 20.2.5.5. Street Crossing Details 20.2.5.5.1. Bluff Street 20.2.5.5.1.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.5.5.1.2. Complete profiles across the intersection for both streets 20.2.5.5.2. Belknap Street 20.2.5.5.2.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed horizontal and vertical clearances 20.2.5.5.3. Weatherford Street 20.2.5.5.3.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed horizontal and vertical clearances. 20.2.5.5.4. East 1 st Street 20.2.5.5.4.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.5.5.4.2. Complete profiles across the intersection for both streets 20.2.5.5.5. East 2nd Street 20.2.5.5.5.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.5.5.5.2. Complete profiles across the intersection for both streets 20.2.5.5.6. East 4th Street 20.2.5.5.6.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.5.5.6.2. Complete profiles across the intersection for both streets 20.2.5.5.7. Typical roadway details 20.2.5.5.8. Traffic Control Details 20.2.5.6. Hydrologic Analysis and hydrological data (drainage area map, drainage area size, time of concentration, hydrological method used, etc) will be included in the plan set. The engineer will prepare detail drawings for proposed culvert crossings. Hydraulic data will be included in the plan set. Storm sewers will be designed according to design criteria. Storm Sewer plan and profile sheets shall be produced at a scale 1" = 200'. Storm sewers will be designed for the ultimate facility and stub-outs will be shown on the PSBE sheets to allow for the expansion of the roadway in the future if required. SW3P sheets will be designed according to NPDES design guidelines. Plan sheets shall be produces at a scale 1" = 200' (double bank). 20.2.5.7. Grading, drainage and erosion control 20.2.5.8. Erosion notes and details 20.2.5.9. Specifications ATTACHMENT A Page 20 of 35 20.2.5.10. Engineering Cost Estimate 20.2.6. Street Closure and Purina Mills Access Road 20.2.6.1. Complete site plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 20.2.6.2. Complete plan and profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (2 sheets) 20.2.6.3. Complete cross sections every 50' (3 sheets) 20.2.6.4. Complete typical roadway sections and details (2 sheets) 20.2.6.5. Street Crossing Details 20.2.6.5.1. East 1 s` Street 20.2.6.5.1.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.6.5.1.2. Complete profiles across the intersection for both streets 20.2.6.5.2. East 2nd Street 20.2.6.5.2.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.6.5.2.2. Complete profiles across the intersection for both streets 20.2.6.5.3. East Td Street Turnaround 20.2.6.5.3.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.6.5.3.2. Complete profiles across the intersection for both streets 20.2.6.5.4. East 4th Street Closure 20.2.6.5.4.1. Complete plan sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 20.2.6.5.4.2. Complete profiles across the intersection for both streets 20.2.6.5.5. Typical roadway details 20.2.6.5.6. Traffic Control Details 20.2.6.6. Hydrologic Analysis and hydrological data (drainage area map, drainage area size, time of concentration, hydrological method used, etc) will be included in the plan set. The engineer will prepare detail drawings for proposed culvert crossings. Hydraulic data will be included in the plan set. Storm sewers will be designed according to design criteria. Storm Sewer plan and profile sheets shall be produced at a scale 1" = 200'. Storm sewers will be designed for the ultimate facility and stub-outs will be shown on the PS&E sheets to allow for the expansion of the roadway in the future if required. SW3P sheets will be designed according to NPDES design guidelines. Plan sheets shall be produces at a scale 1" = 200' (double bank). 20.2.6.7. Grading, drainage and erosion control 20.2.6.8. Erosion notes and details 20.2.6.9. Specifications 20.2.6.10. Engineering Cost Estimate 20.2.7. HNTB will submit final plans, specifications and cost estimates for review, address City's comments and incorporate them into the final set of plans, specifications and cost estimates. 21. Critical Path and Timeline: Throughout the construction of the grade crossing program, it will be critical to maintain minimum disruption to traffic flow, emergency vehicles, train operations, and business access. A construction schedule will be provided showing the overall construction timeline, sequence, and critical path. 21.1. Develop a construction schedule for each the six separate projects: RR-ITS; two ATTACHMENT A Page 21 of 35 ' i Pedestrian crossings; East 151 Street Closure; Live Oak Connector; and Street Closure 21.2. Develop a construction schedule incorporating all six projects 22.Approvals and Coordination: As the Plans and Specifications progress, submittals will be coordinated with various governmental entities as well as the Union Pacific Railroad and BNSF Railroad through their final approval. At the various levels of development, assistance will be provided to the City through the public involvement process with the, businesses, industries, and Stakeholders. 22.1. City of Fort Worth 22.1.1. One meeting at conclusion of public meeting 22.1.2. RR-ITS 22.1.2.1. One meeting to review 30% PS&E comments 22.1.2.2. One meeting to review 75% PS&E comments 22.1.2.3. One meeting to review final PS&E comments 22.1.3. Pedestrian crossing: Peach Street at BNSF Railroad 22.1.3.1. One meeting to review 30% PS&E comments 22.1.3.2. One meeting to review 75% PS&E comments 22.1.3.3. One meeting to review final PS&E comments 22.1.4. Pedestrian Crossing Peach Street at BNSF/UPRR Railroad near North Hays Street 22.1.4.1. One meeting to review 30% PS&E comments 22.1.4.2. One meeting to review 75% PS&E comments 22.1.4.3. One meeting to review final PS&E comments 22.1.5. Street Closure at East 1"Street and the UPRR at-grade crossing 22.1.5.1. One meeting to review 30% PS&E comments 22.1.5.2. One meeting to review 75% PS&E comments 22.1.5.3. One meeting to review final PS&E comments 22.1.6. Live Oak Connector Road 22.1.6.1. One meeting to review 30% PS&E comments 22.1.6.2. One meeting to review 75% PS&E comments 22.1.6.3. One meeting to review final PS&E comments 22.1.7. Street Closure and Purina Mills Access Road 22.1.7.1. One meeting to review 30% PS&E comments 22.1.7.2. One meeting to review 75% PS&E comments 22.1.7.3. One meeting to review final PS&E comments 22.2. Union Pacific Railroad 22.2.1. East 1 s' Street Closure 22.2.1.1. One Meeting at Fort Worth 22.2.1.2. Submit 30% PS&E for review 22.2.1.3. Meet with City to incorporate railroad comments into documents 22.2.1.4. Submit 75% PS&E for review 22.2.1.5. Meet with City to incorporate railroad comments into documents 22.2.1.6. Submit final PS&E for review 22.2.1.7. Meet with City to incorporate railroad comments into documents 22.2.2. Peach Street Pedestrian Crossing 22.2.2.1. One Meeting at Fort Worth 22.2.2.2. Submit 30% PS&E for review 22.2.2.3. Meet with City to incorporate railroad comments into documents 22.2.2.4. Submit 75% PS&E for review 22.2.2.5. Meet with City to incorporate railroad comments into documents 22.2.2.6. Submit final PS&E for review 2.7. Meet with City to incorporate railroad comments into documents ATTACHMENT A Page 22 of 35 .Y' 22.3. BNSF Railroad 22.3.1. Peach Street Pedestrian Crossing 22.3.1.1. One Meeting at Fort Worth 22.3.1.2. Submit 30% PS&E for review 22.3.1.3. Meet with City to incorporate railroad comments into documents 22.3.1.4. Submit 75% PS&E for review 22.3.1.5. Meet with City to incorporate railroad comments into documents 22.3.1.6. Submit final PS&E for review 22.3.1.7. Meet with City to incorporate railroad comments into documents 22.3.2. Peach Street Pedestrian Crossing at UPRR Tracks 22.3.2.1. One Meeting at Fort Worth 22.3.2.2. Submit 30% PS&E for review 22.3.2.3. Meet with City to incorporate railroad comments into documents 22.3.2.4. Submit 75% PS&E for review 22.3.2.5. Meet with City to incorporate railroad comments into documents 22.3.2.6. Submit final PS&E for review 22.3.2.7. Meet with City to incorporate railroad comments into documents 22.3.3. East 1 st Street Closure 22.3.3.1. One Meeting at Fort Worth 22.3.3.2. Submit 30% PS&E for review 22.3.3.3. Meet with City to incorporate railroad comments into documents 22.3.3.4. Submit 75% PS&E for review 22.3.3.5. Meet with City to incorporate railroad comments into documents 22.3.3.6. Submit final PS&E for review 22.3.3.7. Meet with City to incorporate railroad comments into documents 22.4. Purina Mills 22.4.1. Meeting at 30% PS&E submittal 22.4.2. Meeting at final PS&E submittal 22.5. FBM 22.5.1. Meeting at 30% PS&E submittal 22.5.2. Meeting at final PS&E submittal 22.6. Trinity Bluff Developer 22.6.1. Meeting at 30% PS&E submittal 22.6.2. Meeting at final PS&E submittal 23. Construction Documents: In addition to the Plans, Specifications, and Engineering Cost Estimate, assistance will be provided to the City in the preparation of the construction contract documents including identification of Special Provisions and the bidding process. Throughout the construction contract bidding phase, responses will be provided to the City for any questions submitted by the contractors. 23.1. Submit a list of Special Provisions to be incorporated into the bid documents 23.2. Review overall construction bid package 23.3. Attend Pre-Bid meeting 23.4. Respond to contractor questions during bidding Phase Three Scope of Work: Construction Management 29. Bid Evaluation: With receipt of bids from the contractors, assistance will be provided to City for the evaluation of the bids and award of the construction contract. 29.1. Review contractor's construction bids 29.2. Provide written recommendations regarding contractor's construction bids 30. Construction Management and Inspection: Throughout the construction contract, services ATTACHMENT Page 23 of 35 will be provided by responding to contractor's Request for Information (RFI), critical field inspections, construction material testing, review and recommendations for approval of contractor's invoices, and resolution of contractor's change order submittals. 30.1. Review and approval of shop drawings 30.2. Review and approval of forming details 30.3. Responding to requests for information (RFIs) 30.4. Perform construction inspection services 30.5. Providing minor redesign (major redesign should be handled with a contract supplement) 30.6. Answering general questions 30.7. Providing clarification 30.8. Review contractor's invoices 30.9. Review contractor's proposed change orders 30.10. Other project related tasks in support of the City during construction 31. Coordination: Throughout the construction contract, provide coordination activities with the stakeholders, railroads, emergency vehicles, government agencies, and industries. 31.1. Respond to questions or concerns voiced throughout the construction phase 32. Close-Out: At the conclusion of the construction, assist the City with final acceptance and construction contract close-out. 32.1. Verify construction work compliance with PS&E documents Schedule ENGINEER shall perform the Services and deliver the related Documents (if any) according to the schedule shown in Attachment D, Project Schedules, Task Order 1 Compensation In return for the performance of the foregoing obligations, CITY shall pay to ENGINEER the amount payable according to the terms detailed in Attachment B2, Fee Schedules, Task Order 1. Attachment A-3 — Task Orders Task Order 2 — Hemphill West CSJ: 0902-48-686 The Hemphill West project is a single corridor with five BNSF crossings, and several nearby UPRR crossings that may be examined in the project in order to provide a complete quiet zone benefit to the community. The current intent of this project is to upgrade five BNSF railroad crossings to improve crossing safety and deploy a quiet zone at the group of crossings consisting of: 1. Jennings Avenue crossing the BNSF 2. Page Street crossing the BNSF 3. Hemphill West crossing the BNSF 4. Capps Street crossing the BNSF 5. Lipscomb Street crossing the BNSF The considerations for investigating improvement alternatives will include upgrades to the railroad crossing gate systems, the analysis and determination of quiet zone devices and their subsequent implementation, as well as street and sidewalk improvements near each crossing. Scope of Services Objective: Provi iet zone at the group of five BNSF crossings from Jennings Avenue to Lipscomb Street and;i prove the quality of life by reducing train horn noise. ATTACHMENT A Page 24 of 35 I:l Services for this Scope of Work will be provided through three phases: Phase One: Develop Alternative Conceptual Plans Phase Two: Develop Final Plans and Specifications Phase Three: Construction Management Project Controls: Monitor project funding and expenses for services associated with the Hemphill West project, including those provided by CFW staff. Phase One Scope of Work: Develop Alternative Conceptual Plans 1. Data Collection: All known information that is available through the City, County, and State agencies pertinent to this project will be obtained. Obtain maps and aerial photographs of the area. In addition to government agencies, information will be researched and obtained from the Union Pacific Railroad and BNSF Railroad such as their Right-of-Way Plans, Track Plans and Condensed Profiles. An on-sight visual inspection will be used to obtain photographs of the area and observe the local traffic patterns. 1.1. One project start-up meeting 1.2. Review previous work done by CFW to date 1.3. Conduct preliminary on-site review of BNSF in the Hemphill West corridor and collect appropriate field data and photographic record to develop preliminary concepts 1.4. Conduct preliminary on-site review of UPRR in the Hemphill East corridor and collect appropriate field data and photographic record to develop preliminary concepts 1.5. Update the FRA Grade Crossing Inventory for each of the grade crossings in both the UPRR and BNSF corridors defined as Hemphill East and Hemphill West 2. Develop Conceptual Plans: A list of possible solutions and/or combination of solutions will be generated that will achieve the objective of this project. A conceptual plan will be developed for each of the possible solutions that are identified. Plans and details will be developed to a sufficient level to generate a realistic construction cost estimate for each identified solution. 2.1. Develop possible alternatives with CFW 2.2. Discuss with BNSF and UPRR to determine feasibility 2.3. Prepare conceptual plans of proposed SSMs and possible crossing closures 2.4. Meet with major landowners for Hemphill East crossings 2.5. Prepare, organize and host one overall neighborhood stakeholder meeting which includes planning, preparing the agenda, staffing sign-in sheets, comment sheets, (directional signing will be provided by the city or neighborhood organizations), meeting summaries and final report. The City will work with the neighborhood organizations for meeting announcements. 2.6. Conduct site demonstrations of wayside horn technology. 2.7. Achieve neighborhood approval of final preliminary plan working with their traffic committees 2.8. Review final preliminary plan with FRA 2.9. Prepare for public meetings and Planning Commission for closures/vacations Phase Two Scope of Work: Develop Final Plans and Specifications 3. Diagnostic Review: On-site diagnostic team meetings with BNSF, UPRR, TxDOT, FRA and CFW will be conducted to finalize project details for each grade crossing in the proposed Quiet Zone. The diagnostic team meetings will define the railroad force account work required as well as finalizing pedestrian treatments, roadway modifications, and signing requirements. 3.1. Conduct diagnostic team meetings with BNSF, TxDOT, FRA and CFW __.--3.2. Con uct d agnostic team meetings with UPRR, TxDOT, FRA and CFW 3.3. Record and document findings of diagnostic team meetings ATTACHMENT A Page 25 of 35 y 4. Develop Final Plans: Final plans will be prepared for the railroad's use in preparing their plans, estimates and agreements. Final PS&E will be prepared for roadway modifications, as well as signing and marking details. 4.1. Prepare final layout plans for BNSF and UPRR use in preparing plans, estimates, and agreements 4.2. Prepare PS&E for roadway modifications including signing and markings 4.3. Secure TxDOT approval of 30%, 75%, and final plans Phase Three Scope of Work: Construction Management S. Project Coordination: Provide coordination activities with BNSF, UPRR, CFW and TxDOT so that project plans, estimates and agreements are completed accurately and promptly. Assist CFW with evaluation of bids and award of construction contract for roadway work. 5.1. Conduct regular project review meetings and report status to BNSF, UPRR, CFW and TxDOT 5.2. Review and provide comment on plans and estimates submitted by BNSF and UPRR 5.3. Review contractor's construction bids 5.4. Provide written recommendations regarding contractor's construction bids 6. Construction Management and Inspection: Throughout the construction contract, services will be provided by responding to contractor's Request for Information (RFI), critical field inspections, construction material testing, review and recommendations for approval of contractor's invoices, and resolution of contractor's change order submittals. 6.1. Responding to requests for information (RFIs) 6.2. Perform construction inspection services 6.3. Providing minor redesign (major redesign should be handled with a contract supplement) 6.4. Answering general questions 6.5. Providing clarification 6.6. Review contractor's invoices 6.7. Review contractor's proposed change orders 6.8. Other project related tasks in support of the City during construction 7. Coordination: Throughout the construction contract, provide coordination activities with the stakeholders, railroads, emergency vehicles, government agencies, and industries. 7.1. Respond to questions or concerns voiced throughout the construction phase 7.2. Assist CFW with preparations of appropriate notifications 7.3. Update FRA Grade Crossing Inventory records for each crossing 8. Close-Out: At the conclusion of the construction, assist the City with final acceptance and construction contract close-out. Project will be certified and as-built drawings will be prepared Schedule ENGINEER shall perform the Services and deliver the related Documents (if any) according to the schedule shown in Attachment D, Project Schedules, Task Order 2 Compensation In return for the performance of the foregoing obligations, CITY shall pay to ENGINEER the amount payable according to the terms detailed in Attachment B2, Fee Schedules, Task Order 2. ^.� ATTACHMENT A Page 26 of 35 Attachment A-3— Task Orders Task Order 3— Magnolia Avenue CSJ: 0902-48-687 The Magnolia Avenue project intends to resolve problems associated with restricted access to properties landlocked by stopped trains on the UPRR and BNSF tracks by Magnolia Avenue. The initial project intent is to review the potential solutions, and implement a new roadway/route to the impacted businesses, thus closing both Magnolia Avenue crossings at the UPRR and BNSF tracks. Services for this Scope of Work will be provided through three phases: Phase One: Data Collection and Alternative Conceptual Plan Development Phase Two: Develop Final Plans and Specifications Phase Three: Construction Management Project Controls: Monitor project funding and expenses for services associated with the Magnolia Avenue project, including those provided by CFW staff. Section A. - Scope of Services Phase One Scope of Work: Data Collection and Conceptual Plans 1. Data Collection: Obtain all known information that is available through the City, County, and State agencies. Obtain maps and aerial photographs of the area. In addition to government agencies, information will be researched and obtained from the Union Pacific Railroad and BNSF Railroad such as their Right-of-Way Plans, Track Plans and Condensed Profiles. An on-sight visual inspection will be used to obtain photographs of the area and observe the local traffic patterns. 1.1. One project start-up meeting 1.1.1. Review the program established by the City to ascertain the requirements of each independent project and arrive at a mutual understanding of such requirements with the City. 1.1.2. Include a preliminary program, schedule, and construction budget, each in terms of the other 1.1.3. The meeting will officially establish the basic features and schematic design criteria for the project. The engineer will establish design criteria with input from the City. 1.2. Obtain Right-of-Way plans, track plans, condensed profiles, signal and dispatch information, train speeds, timetables and operating information for the track limits within the project from the BNSF Railroad 1.3. Obtain Right-of-Way plans, track plans, condensed profiles, signal and dispatch information, train speeds, timetables and operating information for the track limits within the project from the Union Pacific Railroad 1.4. Research and obtain maps, street plans, and other relevant data such as existing traffic signals and traffic data from the City of Fort Worth 1.5. Research and obtain maps, street plans, and other relevant data from Tarrant County 1.6. Research and obtain maps, street plans, and other relevant data from TxDOT 1.7. Research, obtain and review information on major utilities and investigate potential impacts to the project. Refinements to the conceptual layouts will be considered, when feasible, to avoid or minimize costly major utility adjustments and/or relocations. Major utilities to be identified include high pressure natural gas and petroleum pipelines, overhead electric transmission lines, underground fiber optic duct banks, canals or other utilities-With significant costs associated with adjustment or relocation. When it is not possible to adjust the conceptual alignment to avoid conflicts, costs for the utility ATTACHMENT A Page 27 of 35_ - � adjustments and/or relocations shall be included in the cost estimate. 1.8. Develop a Design Summary Report to document guidelines that will be followed throughout the course of the project 1.9. Conduct the appropriate field reconnaissance to establish the validity of the existing features and collect the appropriate data including a photographic record to document important landmarks that exist along the project area for future reference if needed. Photos shall be prepared in JPG digital format. 2. Evaluate Existing Conditions: Using Land Use Planning principals, identify and locate land owner parcel information, determine the existence of any physical access easements, property appraisal values and establish cost estimates on projects that may require property acquisition. Identify the local stakeholders, neighborhood groups, industries, and businesses that are involved in the project area and arrange for and conduct meetings to gain an in-depth understanding of the traffic flow, transportation needs, and pedestrian needs. Meet with the various emergency response sources such as the fire department, police, and medical teams to obtain detailed information regarding their originations and most frequent destinations within the project area. 2.1. Meet and coordinate with the BNSF and UPRR Railroads to determine their respective capacity expansion projects that may impact the area. 2.2. Meet and coordinate with existing business owners to determine their respective plans, etc., for growth and development in the area. 2.3. Identify property ownership and appraisal values within the project limits 2.4. Develop a constraints map of the project study area, suitable for display at the public meetings using aerial, schematics and data obtained through data collection procedures to help show the potential impacts of the proposed project. Data to be included are public and community facilities such as schools, churches, police/fire/emergency, parklands, businesses and industries, and existing/potential historical sites. 3. Develop Conceptual Plans: Meet with the City of Fort Worth to define the type and style of connector roads, and street closures at the UPRR/BNSF Railroad tracks. The conceptual plans will incorporate the transportation patterns and needs identified in the Evaluation of Existing Conditions step with continual coordination with the Stakeholders. Conceptual Plans and Details will be developed to a sufficient level to generate a realistic construction cost estimate and will be considered as the 30% Submittal plan set. 3.1. One Conceptual Design meeting with the City to discuss the results of the Data Collection and the Evaluation of Existing Condition steps of the Phase One Scope of Work. Using this information the objective of this meeting will be to confirm the final design approach for the work associated with the next steps of the Magnolia Avenue project. 3.2. Draft a Design Memorandum defining the conclusions from the Conceptual Design Meeting. 3.3. Street Closure at the UPRR/BNSF at-grade crossing 3.3.1. Plan showing roadway and railroad alignments, ROW, existing utilities, existing structures, existing grade crossing 3.3.2. Profile and Details showing the existing roadway profile across the grade crossing and proposed removal of the grade crossing and road 3.3.3. Engineering Cost Estimate for the removal of the grade crossing and road closure 3.3.4. HNTB will submit thirty percent (30%) conceptual plans and cost estimates for review, address City's comments and incorporate them into the 75% submittal. HNTB will continue with development of the 75% Plans during the City's review of 0% submittal. 3.4. Anal�z,,A impact and potential requirement for city traffic signal operations at ATTACHMENTA �j�e Page 28 of 35 - . connecting roadways. 3.5. Street Closures and Access Road(s) 3.5.1. Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 3.5.2. Plan and Profile (1" = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (2 sheets) 3.5.3. Engineering Cost Estimate 3.5.4. HNTB will submit thirty percent (30%) conceptual plans and cost estimates for review, address City's comments and incorporate them into the 75% submittal. HNTB will continue with development of the 75% Plans during the City's review of the 30% submittal. Phase Two Scope of Work: Develop Final Plans and Specifications 4. Surveys and Geotechnical Work: Using the recommended grade crossing program, determine and obtain the needed survey data, utility locations, and geotechnical data needed for the design activities. 5. Ground control for aerial mapping, supplemental ground surveying and applicable cross sections: 5.1.Ground Control for Aerial Mapping - Set aerial panels in accordance with Texas Department of Transportation — Fort Worth District Aerial Mapping Specifications. Control information will be provided in hard copy and ASCII digital format to HNTB and to the Client. A control plan sheet will be provided 5.2.Supplemental Ground Surveying — On-the-ground topographic (DTM) survey data will be obtained at the locations bounded by Rosedale to the North, the UPRR and BNSF railroad tracks on the east and west, and Main Street to the South. RIGHT-OF-WAY SURVEYS The following services will be provided in connection with right-of-way document preparation for the project: 6. Field Surveys 7. Utilize project survey control points established for the aerial mapping. The Engineer will define the horizontal control with additional traverse points as needed for the right-of-way survey. 8. Perform a right-of-way survey of the project area. Monuments marking property corners of the properties from which right-of-way is to be obtained will be recovered and tied to the project control. 9. Boundary Analysis 10. Utilizing the deed study and the data from the field survey, a Registered Surveyor will analyze the results of the survey with assistance from the survey technician in performing computations related to the analysis. The surveyor will determine location of the existing right-of-way lines and the side property lines of each of the subject properties. The City will be notified of boundary line conflicts that become apparent as a result of the field survey. Resolution of these conflicts is not a budgeted item since the number or extent of such conflicts cannot be quantified at this time. 11. Preparation of Documents 11.1. Utilizing the boundary surveys performed by HNTB and the proposed right-of-way line location provided by the City, we will compute the boundaries of the right-of-way rcels for each of the subject properties. ATTACHMENT Page 29 of35, 11.2. Draft the right-of-way plans to a scale of 1-inch equals 50 feet based upon TxDOT ROW Manual specifications. We estimate that there will be approximately 10 plan sheets including an index sheet and a plan cover sheet. A closure computation will be prepared for each right-of-way parcel on the plans. 11.3. Draft plats and field notes for each of the right-of-way parcels or parts of parcels. According to the tax maps available on the TCAD web page, there are approximately sixteen (39) parcels for which surveys must be completed and plats and descriptions prepared. The plats will be prepared on 8 '/2" x 11" pages at a scale of 1 inch equals 50 or 100 feet, depending on the parcel size. A closure computation will be prepared for each of the plats and field notes. 12. All of the above described survey documents (right-of-way plans, plats, descriptions, and closure computations) will be submitted to the City for their review. Upon the completion of review of all right-of-way survey documents, HNTB will make corrections and address concerns. Corrected documents will be returned to the client in final format. GEOTECHNICAL SERVICES 13. The work to be performed by the Engineer shall consist of providing geotechnical engineering services required for the preparation of Plans, Specifications, and Estimates (PS&E) for the construction of the Peach Street Area Project. This investigation is to determine,subgrade conditions beneath the proposed pavements for use in pavement thickness design and the proposed pedestrian crossing structures. The geotechnical engineering study for this project shall be conducted using a combination of both Texas Department of Transportation (TxDOT) and American Society for Testing Materials (ASTM) test methods and procedures, investigation and pavement design analysis for the project will include field, laboratory and engineering phases. 14. HNTB will provide the necessary personnel, equipment and materials to complete the requirements outlined in this scope of services. The services include the field program, laboratory testing, engineering analysis and report preparation phases outlined below. HNTB shall obtain required Right-of-Entry with all property owners associated with the project geotechnical exploration efforts. 15. Field services for the geotechnical study are expected to consist of approximately fourteen (14) soil borings. The Engineer shall adjust the number, locations, and depths of borings as warranted by documented field observations, in order to provide complete data for the Engineer's roadway and structures. Both the locations and ground surface elevations of the borings will be established in the field by the project surveyor. Eight (8) borings are to be drilled to a depth of approximately 7 feet for the purpose of guiding the design and construction of the roadways. 16. Field Investigation 16.1.Boring locations will be established in accessible areas with minimal disturbance to site features (i.e. removal of fences, clearing of vegetation, etc.). 17. Laboratory Testing 17.1.Laboratory tests (natural water contents, Atterberg limits, and partial gradation analyses) will be performed to classify soil strata, evaluate plasticity, and shrink/swell potential of on-site materials. Unconfined compression tests will be conducted on selected intact soil specimens to evaluate the compressive strength of the subsurface strata. In addition, soluble sulfate tests will be performed on soil samples to indicate if the phenomenon of sulfate induced heave will be a potential problem if lime stabilized subgrade is to be considered in the pavement design and pedestrian tunnels structures. 18. Engineering ort ATTACHMENT Page 30 of 35 'vl` +� 18.1.Engineering analyses of the results of the field and laboratory data will be made to develop pavement thickness design for the roadway and foundation design for the under/overpass structures. The report will include the following: 19. General subsurface conditions, discussion of site geology, boring logs with descriptions of strata and laboratory test results, and water levels obtained at the time of drilling; 20. Boring location plan; 21. Flexible pavement thickness design in accordance with TxDOT FPS-19 Design Methodology with a mechanistic check, and based on provided traffic loading information; and 22. Pavement construction recommandations. 23. Foundation design recommendations for the pedestrian tunnel structures. 24. Assumptions: The Geotechnical Services scope of work is based on the following: 24.1. Boring locations can be accessed with an all-terrain (ATV) drill rig and site clearing is not required. 24.2. The actual boring locations will be marked in the field after drilling for others to obtain locations and elevations. We will obtain latitude and longitude coordinates of the boring location using a hand-held GPS device; and 24.2.1. The estimated fee may be exceeded if site conditions are significantly different than anticipated or changes in work are required or requested. However, the estimated maximum fee will not be exceeded without the client's prior authorization. Required additions to the above scope of services would be invoiced in accordance with the contract fee schedule. 25. Plans, Specifications and Cost Estimates (PS&E): Prepare detailed Plans, Specifications and Cost Estimates of sufficient detail for construction. 25.1. 75% PS&E Submittal 25.1.1. Develop Plans, Details, and Specifications 25.1.2. Plan showing existing roadway and railroad alignment, existing structures, existing utilities, and proposed equipment 25.1.3. Elevation and Details of proposed and existing equipment showing relative locations of existing track and roads 25.1.4. Design Calculations 25.1.5. Construction Sequence (3 sheets) 25.1.6. Engineering Cost Estimate for the construction of the roadway 25.1.7. Expand information on Site Plan showing relative existing roads, railroads, buildings, trees, utilities, and new connection road 25.1.8. Expand information on Plan and Profile (V = 50') showing new connection road alignment, existing utilities, existing roads, ROW and property lines, easements, profile grades (4 sheets) 25.1.9. Develop Cross Sections every 50'. A GeoPak roadway geometry model will be developed. GeoPak Cross Sections will be plotted and will show original terrain, finished grade, centerline, and ROW at intervals of 50'. Earthwork calculations will be based upon these cross sections. 25.1.10. Typical roadway sections and details (2 sheets) 25.1.11. Street Crossing Details 25.1.11.1. Rosedale or Main Street 25.1.11.1.1. Plan Sheet showing road alignments, existing structures, existing utilities, existing and proposed traffic control 25.1.11.1.2. Profiles across the intersection at the preferred alternative street 25.1.11.2. Typical roadway details 25.1.11.3. Traffic Control Details ATTACHMENT A Page 31 of 35 i — 25.1.12. Engineering Cost Estimate 26. Final PS&E Submittal 26.1. Hydrologic Analysis and hydrological data (drainage area map, drainage area size, time of concentration, hydrological method used, etc) will be included in the plan set. The engineer will prepare detail drawings for proposed culvert crossings if any. Hydraulic data will be included in the plan set. Storm sewers will be designed according to design criteria. Storm Sewer plan and profile sheets shall be produced at a scale 1" = 200'. Storm sewers will be designed for the ultimate facility. SW3P sheets will be designed according to NPDES design guidelines. Plan sheets shall be produces at a scale 1" _ 200' (double bank). 26.2. Grading, drainage and erosion control 26.3. Erosion notes and details 26.4. Specifications 26.5. Engineering cost estimate for the construction of the access roadway 27. HNTB will submit final plans, specifications and cost estimates for review, address City's comments and incorporate them into the final set of plans, specifications and cost estimates. 28. Critical Path and Timeline: Throughout the construction of the grade crossing program, it will be critical to maintain minimum disruption to traffic flow, emergency vehicles, train operations, and business access. A construction schedule will be provided showing the overall construction timeline, sequence, and critical path. 29. Approvals and Coordination: As the Plans and Specifications progress, submittals will be coordinated with various governmental entities as well as the Union Pacific Railroad and BNSF Railroad through their final approval. At the various levels of development, assistance will be provided to the City through the public involvement process with the, businesses, industries, and Stakeholders. 29.1. City of Fort Worth 29.1.1. One meeting at conclusion of public meeting 29.2. Union Pacific Railroad 29.2.1. One Meeting at Fort Worth 29.2.2. Submit 30% PS&E for review 29.2.3. Meet with City to incorporate railroad comments into documents 29.2.4. Submit 75% PS&E for review 29.2.5. Meet with City to incorporate railroad comments into documents 29.2.6. Submit final PS&E for review 29.2.7. Meet with City to incorporate railroad comments into documents 29.3. BNSF Railroad 29.3.1. One Meeting at Fort Worth 29.3.2. Submit 30% PS&E for review 29.3.3. Meet with City to incorporate railroad comments into documents 29.3.4. Submit 75% PS&E for review 29.3.5. Meet with City to incorporate railroad comments into documents 29.3.6. Submit final PS&E for review 29.3.7. Meet with City to incorporate railroad comments into documents 30. Construction Documents: In addition to the Plans, Specifications, and Engineering Cost Estimate, assistance will be provided to the City in the preparation of the construction contract documents including identification of Special Provisions and the bidding process. Throughout the construction contract bidding phase, responses will be provided to the City for any questions submitted by the contractors. —30.1. Submit-,a list of Special Provisions to be incorporated into the bid documents 30.2. Review overall construction bid package ATTACHMENT 7 Page 32 of 35 1 30.3. Attend Pre-Bid meeting 30.4. Respond to contractor questions during bidding Phase Three Scope of Work: Construction Management 33. Bid Evaluation: With receipt of bids from the contractors, assistance will be provided to City for the evaluation of the bids and award of the construction contract. 33.1. Review contractor's construction bids 33.2. Provide written recommendations regarding contractor's construction bids 34. Construction Management and Inspection: Throughout the construction contract, services will be provided by responding to contractor's Request for Information (RFI), critical field inspections, construction material testing, review and recommendations for approval of contractor's invoices, and resolution of contractor's change order submittals. 34.1. Review and approval of shop drawings 34.2. Review and approval of forming details 34.3. Responding to requests for information (RFIs) 34.4. Perform construction inspection services 34.5. Providing minor redesign (major redesign should be handled with a contract supplement) 34.6. Answering general questions 34.7. Providing clarification 34.8. Review contractor's invoices 34.9. Review contractor's proposed change orders 34.10. Other project related tasks in support of the City during construction 35. Coordination: Throughout the construction contract, provide coordination activities with the stakeholders, railroads, emergency vehicles, government agencies, and industries. 35.1. Respond to questions or concerns voiced throughout the construction phase 36. Close-Out: At the conclusion of the construction, assist the City with final acceptance and construction contract close-out. 36.1. Verify construction work compliance with PS&E documents Schedule ENGINEER shall perform the Services and deliver the related Documents (if any) according to the schedule shown in Attachment D, Project Schedules, Task Order 3. Compensation In return for the performance of the foregoing obligations, CITY shall pay to ENGINEER the amount payable according to the terms detailed in Attachment B2, Fee Schedules, Task Order 3. Attachment A-3— Task Orders Task Order 4— Sycamore School Road CSJ: 0902-48-685 The Sycamore School road Quiet Zone project is to upgrade two railroad crossings to improve crossing safety and to deploy a quiet zone at each of the following two locations: 1. Sycamore School Road crossing the UPRR 2. Sycamore School Road crossing the BNSF The considerations for investigating improvement alternatives will include upgrades to the railroad crossing gate systems, the analysis and determination of quiet zone devices and their subsequent implementation, as well as street and sidewalk improvements near each crossing. ATTACHMENT Page 33 of 35 ?� �Sy7 i Section A. - Scope of Services Provide a Quiet Zone at each crossing to improve the quality of life by reducing train horn noise. Pedestrian sidewalks at the crossings are to be considered as well. Services for this Scope of Work will be provided through three phases: Phase One: Develop Alternative Conceptual Plans Phase Two: Develop Final Plans and Specifications Phase Three: Construction Management Project Controls: Monitor project funding and expenses for services associated with the Sycamore School Road project, including those provided by CFW staff. Phase One Scope of Work: Develop Alternative Conceptual Plans 1. Data Collection: All known information that is available through the City, County, and State agencies pertinent to this project will be obtained. Obtain maps and aerial photographs of the area. In addition to government agencies, information will be researched and obtained from the Union Pacific Railroad and BNSF Railroad such as their Right-of-Way Plans, Track Plans and Condensed Profiles. An on-sight visual inspection will be used to obtain photographs of the area and observe the local traffic patterns. 1.1. One project start-up meeting 1.2. Review previous work done by CFW to date 1.3. Conduct preliminary on-site review of BNSF Sycamore School Road crossing and collect appropriate field data and photographic record to develop preliminary concepts 1.4. Conduct preliminary on-site review of UPRR Sycamore School Road crossing and collect appropriate field data and photographic record to develop preliminary concepts 1.5. Update the FRA Grade Crossing Inventory for each of the grade crossings 2. Develop Conceptual Plans: A list of possible solutions and/or combination of solutions will be generated that will achieve the objective of this project. A conceptual plan will be developed for each of the possible solutions that are identified. Plans and details will be developed to a sufficient level to generate a realistic construction cost estimate for each identified solution. 2.1. Develop possible alternatives with CFW 2.2. Discuss with BNSF and UPRR to determine feasibility 2.3. Review final preliminary plan with FRA Phase Two Scope of Work: Develop Final Plans and Specifications 3. Diagnostic Review: On-site diagnostic team meetings with BNSF, UPRR, TxDOT, FRA and CFW will be conducted to finalize project details for each grade crossing in the proposed Quiet Zone. The diagnostic team meetings will define the railroad force account work required as well as finalizing pedestrian treatments, roadway modifications, and signing requirements. 3.1. Conduct diagnostic team meetings with BNSF, TxDOT, FRA and CFW 3.2. Conduct diagnostic team meetings with UPRR, TxDOT, FRA and CFW 3.3. Record and document findings of diagnostic team meetings 4. Develop Final Plans: Final plans will be prepared for the railroad's use in preparing their plans, estimates and agreements. Final PS&E will be prepared for roadway modifications, as well signing and marking details. 4.1. Prepare final layout plans for BNSF and UPRR use in preparing plans, estimates, and agreements — 4.2. Prep PS&E for roadway modifications including signing and markings ATTACHMENTA Page 34 of 3& 4.3. Secure TxDOT approval of 30%, 75%, and final plans Phase Three Scope of Work: Construction Management 5. Project Coordination: Provide coordination activities with BNSF, UPRR, CFW and TxDOT to ensure project plans, estimates and agreements are completed accurately and promptly. Assist CFW with evaluation of bids and award of construction contract for roadway work. 5.1. Conduct regular project review meetings and report status to BNSF, UPRR, CFW and TxDOT 5.2. Review and provide comment on plans and estimates submitted by BNSF and UPRR 5.3. Review contractor's construction bids 5.4. Provide written recommendations regarding contractor's construction bids 6. Construction Management and Inspection: Throughout the construction contract, services will be provided by responding to contractor's Request for Information (RFI), critical field inspections, construction material testing, review and recommendations for approval of contractor's invoices, and resolution of contractor's change order submittals. 6.1. Responding to requests for information (RFIs) 6.2. Perform construction inspection services 6.3. Providing minor redesign (major redesign should be handled with a contract supplement) 6.4. Answering general questions 6.5. Providing clarification 6.6. Review contractor's invoices 6.7. Review contractor's proposed change orders 6.8. Other project related tasks in support of the City during construction 7. Coordination: Throughout the construction contract, provide coordination activities with the stakeholders, railroads, emergency vehicles, government agencies, and industries. 7.1. Respond to questions or concerns voiced throughout the construction phase 7.2. Assist CFW with preparations of appropriate notifications 7.3. Update FRA Grade Crossing Inventory records for each crossing 8. Close-Out: At the conclusion of the construction, assist the City with final acceptance and construction contract close-out. Project will be certified and as-built drawings will be prepared. Schedule ENGINEER shall perform the Services and deliver the related Documents (if any) according to the schedule shown in Attachment D, Project Schedules, Task Order 4. Compensation In return for the performance of the foregoing obligations, CITY shall pay to ENGINEER the amount payable according to the terms detailed in Attachment B2, Fee Schedules, Task Order 4. ATTACHMENT A « Page 35 of 35 ATTACHMENT B FEE SCHEDULE This attachment provides the basis of payment and fee schedule. The basis of payment for this contract shall be direct and indirect costs incurred plus a pro rata share of the fixed fee based on the ratio of labor and overhead costs incurred to total estimated labor and overhead cost in the Final Cost Proposal (FCP) shown in Attachment B-1, or the percentage of work completed. The invoices must itemize labor rates, hours worked, and other direct and indirect costs. The Engineer may be required to provide documentation of hours worked and any eligible direct costs claimed. The provisional overhead rate charged is subject to audit and annual adjustment to actual rates incurred. The FCP shows the hourly rates for labor, rates for other direct expenses including but not limited to travel and allowable materials, provisional overhead rate and the fixed fee. Actual wages must be within the allowable range shown on the Final Cost Proposal. A. The maximum amount payable for this contract is $967,280.00 B. Task Orders shall be used to describe the parties' mutual agreement on the scope, schedule and compensation for all services stated therein. C. * This dollar value reflects the aggregate amount of all Task Orders. The maximum amount payable per each Task Order is established in Attachment B-2. D. The basis of payment is identified in Attachment B-1, Fee Schedule. Reimbursement of costs incurred under a Task Order shall be in accordance with Attachments B-2, Fee Schedule. E. To be eligible for reimbursement, the Engineer's costs must be (1) incurred in accordance with the terms of a valid Task Order; (2) in accordance with Attachment B, Fee Schedule; and (3) satisfactory progress of work shall be maintained as a condition of payment. F. Should the services under this Agreement include products or services that are commercially priced by ENGINEER, such amounts shall be invoiced to CITY at the catalog price(s) offered by ENGINEER and are not subject to audit on the basis of costs incurred. ATTACHMENT B'sJ Page 1 of 34 ) ATTACHMENT B-1 FINAL COST PROPOSAL (FCP) -SUPPORTING BASIS OF PAYMENT GENERAL-OVERALL CONTRACT HNTB Project No,46378 PRIME OR SUBPROVIDER NAME: HNTB Corporation Labor Rate Per Hour Maximum Maximum Maximum LaborlStaff Classification Minimum FY 200712008 FY 2009 FY 2011 Project Principle $40 $ 90.00 $ 93.60 $ 97.34 Project Director $35 $ 80.00 S 83.20 $ 86-53 Pro ect Manager $30 $ 70.00 $ 72.80 $ 75.71 Project Business Manager $25 $ 55.00 $ 57.20 $ 59.49 Project Administrator $20 $ 35,00 $ 36.40 $ 37,86 Clerical $10 $ 20.00 $ 2080. $ 21.63 Senior Desi n Engineer $30 $ 61.00 $ 63.44 $ 65.98 Engineer V $25 $ 55.00 $ 57.20 $ 5949 Engineer IV $25 $ 45.00 $ 46.80 $ 48,67 Engineer III $20 $ 35.00 $ 36.40 $ 37.86 Engineer II $20 $ 28.00 $ 29,12 $ 30.28 Engineer I $20 $ 25.00 $ 26.00 $ 27.04 Technician IV $15 $ 30.00 $ 31.20 $ 3245 Technician III $10 $ 25,00 $ 26.00 $ 27.04 Senior Architect $10 $ 50.00 $ 52.00 $ 54.08 Architect IV $10 $ 40.00 $ 41,60 $ 43.26 Architect III $10 $ 30,00 $ 31.20 $ 32,45 Architect II $10 $ 25.00 $ 26.00 $ 27.04 Senior Urban Desi ner $20 $ 55.00 $ 5720 $ 5949 Urban Designer III $15 $ 40.00 $ 41.60 $ 43.26 Urban Designer 11 $15 $ 35.00 $ 36.40 $ 37.86 Urban Desi ner $10 $ 30.00 $ 31.20 $ 32.45 en Sior Landsca e Architect $20 $ 45.00 $ 46.80 $ 48.67 Landscape Architect III $15 $ 40.00 $ 41.60 $ 43.26 Landscape Architect II $15 $ 35.00 $ 36.40 $ 37.86 Landscape Architect 1 $10 $ 30.00 $ 31,20 $ 32.45 Senior Biologist $10 $ 40.00 $ 41.60 $ 43.26 Biologist $10 $ 30,00 $ 31.20 $ 32,45 Project Environmental Manager $25 $ 65.00 $ 67.60 $ 70.30 Senior Environmental Planner $25 $ 55.00 $ 57.20 $ 59.49 Environmental Planner IV $20 $ 45.00 $ 46.80 $ 48.67 Environmental Planner 111 $15 $ 40.00 $ 41.60 $ 43.26 Environmental Planner II $10 $ 35.00 $ 36.40 $ 37.86 Environmental Specialist S10 $ 30.00 $ 31,20 $ 32.45 GIS Specialist $15 $ 35.00 $ 36.40 S 37.86 Public Involvement Director $25 $ 50,00 $ 52.00 1$ 54.08 Public Involvement Manager $20 $ 40.00 $ 41.60 $ 43.26 Public Involvement Coordinator $10 $ 35.00 $ 36.40 $ 37.86 Technolo ies-Director $30 $ 70.CO $ 72.80 $ 75.71 Technologies-Manager $30 $ 60.00 $ 62.40 $ 64.90 Technologies-Graphic Artist $20 $ 45.00 $ 46,80 $ 48.67 Technologies-3D modeler $20 $ 35.00 $ 36.40 $ 37.86 Technologies-ITS Specialist $25 $ 50.00 $ 52.00 $ 54.08 Technol ies- " Maximum labor rates increase at a 4%annual rate for subsequent years FAR Overhead Rate: 155.59%"" Actual rates to be billed not to exceed the maximum shown. Negotiated Profit Rate. 15% Minimum rate to be billed if actual is less. 2007 Federal Audited Rate(FAR).Most current rate to be used annual) Other Direct Expenses: Cost Lodging Maximum-taxes/fees not included Per Night* Meals (Overnight stay required) Per Da(Per Person' Mileage Per Mile' Car Rental(Maximum-taxes/fees not included) Not to Exceed$60/Da Air Travel Coach/Business Class round trip" 8 112"X 11"copies S.101sheet 8 1/2"X 11"copies color $.75/sheet 11"X 17"cones $.25/sheet 11"X 17"copies color $1.10/sheet 11"X 17"M lar $2.00/sheet Digital Plotter $2 00/sq It Overnight Mail-Letter Size At Cost- Overnight Mail-Oversized Box At Cost'" Postage At Cost- Telephone At Cost- GIS Data Files $850 per data scource HazMat Database Report $1501mile land coverage Aerial Photographs 1'=500'scale) $65/er photograph GPS Rental $1,000/Per Da Courthouse Fees " Miscellaneous Expenses-Task Order Specific " lFornined in overhead will not be reimbursed as miscellaneous direct expenses. of hours worked,receipts or usage logs,as applicable,for direct expenses are necessary ent. Profit not allowed on Other Direct Expenses. current TxDOT state rate e determined during negotiation of work authorizations. ATTACHMENT Page 2 of 34 HNTB Project No.46378 PRIME OR SUBPROVIDER NAME:Campbell Technology Corporation Labor Rate Per Hour Maximum Maximum Maximum Labor/Staff Classification Minimum FY 2007/2008 FY 2009 FY 2010— Project Manager $30 $ 70.00 $ 72.80 $ 75.71 Project Engineer $25 $ 55.00 $ 57.20 $ 59.49 Signal Designer $25 $ 45.00 $ 46.80 $ 48.67 " Maximum labor rates increase at a 4%annual rate for subsequent years Overhead Rate: 125.00% Actual rates to be billed not to exceed the maximum shown. Negotiated Profit Rate: 15% Minimum rate to be billed if actual is less. Other Direct Expenses: Cost Lodging Maximum-taxes/fees not included Per Night* Meals(Overnight stay required) Per Day/Per Person` Mileage Per Mile' Car Rental (Maximum-taxes/fees not included) Not to Exceed$60/Da Air Travel Coach/Business Class round trip** 8 1/2"X 11"copies $.10/sheet 8 1/2"X I V copies color $.75/sheet 11"X 17"copies $.25/sheet 11"X 17"copies(color) $1.10/sheet 11"X 17"Mylar $2.00/sheet Digital Plotter $2.00/sq ft Overnight Mail-Letter Size At Cost— Overnight Mail-Oversized Box At Cost" Postage At Cost" Telephone At Cost" GIS Data Files $850 per data scource HazMat Database Report $150/mile land coverage Aerial Photographs(1'=500'scale) $65/per photograph GPS Rental $1,000/Per Da Courthouse Fees Miscellaneous Expenses-Task Order Specific Costs included in overhead will not be reimbursed as miscellaneous direct expenses. Documentation of hours worked,receipts or usage logs,as applicable,for direct expenses are necessary for reimbursement. Profit not allowed on Other Direct Expenses. Not to exceed current TxDOT state rate The cost will be determined during negotiation of work authorizations. ATTACHMENTS Page 3 of 34 HNTB Project No.46378 PRIME OR SUBPROVIDER NAME: STL Engineers Labor Rate Per Hour Maximum Maximum Maximum Labor/Staff Classification Minimum FY 2007/2008 FY 2009 FY 2010*** Project Manager $ 53.84 $ 55.99 $ 58.23 Senior Engineer $ 45.67 $ 47.50 $ 49.40 Project Engineer $ 38.96 $ 40.52 $ 42.14 Senior Engineer Tech $ 19.50 $ 20.28 $ 21.09 Engineer Tech $ 14.50 $ 15.08 $ 15.68 Junior Engineer Tech $ 12.50 $ 13.00 $ 13.52 CADD Operator $ 16.50 $ 17.16 $ 17.85 Admin/Clerical $ 16.50 $ 17.16 $ 17.85 ** Maximum labor rates increase at a 4%annual rate for subsequent years FAR Overhead Rate: 145.00%**** Actual rates to be billed not to exceed the maximum shown. Negotiated Profit Rate: 10% Minimum rate to be billed if actual is less. ***2007 Federal Audited Rate(FAR).Most current rate to be used annual) Other Direct Expenses: Cost Lodging Maximum-taxes/fees not included Per Night* Meals(Overnight stay required) Per Day/Per Person* Mileage Per Mile* Car Rental (Maximum-taxes/fees not included) Not to Exceed$60/Da Air Travel Coach/Business Class round trip** 8 1/2"X 11"copies $.10/sheet 8 1/2"X 11"copies color $.75/sheet 11"X 17"copies $.25/sheet 11"X 17"copies color $1.10/sheet 11"X 17"M lar $2.00/sheet Digital Plotter $2.001s ft Overnight Mail-Letter Size At Cost** Overnight Mail-Oversized Box At Cost- Postage At Cost- Telephone At Cost** GIS Data Files $850 per data scource HazMat Database Report $150/mile land coverage Aerial Photographs 1'=500'scale $65/ er photograph GPS Rental $1,000/Per Da Courthouse Fees ** Miscellaneous Ex ensee-Task Order Specific ** Costs included in overhead will not be reimbursed as miscellaneous direct expenses. Documentation of hours worked,receipts or usage logs,as applicable,for direct expenses are necessary for reimbursement. Profit not allowed on Other Direct Expenses. * Not to exceed current TxDOT state rate ** The cost will be determined during negotiation of work authorizations. ATT-&6, NT Ra'��?i=9 HNTB Project No.46378 PRIME OR SUBPROVIDER NAME: Gorrondona&Associates Negotiated Hourly Contract Rate Contract Rate Contract Rate LaborlStaff Classification Base Rate FY 07/08 FY 09 FY 10 Project Mana er/RPLS $ 33.08 $ 101.19 $ 105.24 $ 109.45 Tech/RPLS $ 26.25 $ 80.30 $ 83.51 $ 86.85 2-Man Field Part $ 34.65 $ 105.99 $ 110.23 $ 114.64 3-Man Field Part $ 44.63 $ 136.52 $ 141.98 $ 147.66 CADD Tech $ 20.48 $ 62.65 $ 65.15 $ 67.76 Admin/Clerical $ 14.70 $ 44.97 $ 46.77 $ 48.64 OL"B"Service Loaded Rate $ 312.28 $ 312.28 $ 324.77 $ 337.76 Contract Rates include labor,overhead,and profit. Negotiated Overhead Rate: 166.00% Contract Rates to be used to derive lump sum totals. Negotiated Profit Rate: 15% All rates are negotiated rates and are not subject to change or adjustment. Other Direct Expenses: Cost Lodging Maximum-taxes/fees not included Per Night* Meals(Overnight stay required) Per Day/Per Person* Mileage Per Mile* Car Rental (Maximum-taxes/fees not included) **Not to Exceed$60/Da Air Travel Coach/Business Class **Not to Exceed$200/round trip 8 1/2"X 11"copies $0.10/Sheet 8 1/2"X 11"copies color $0.75/Sheet 11"X 17"copies $0.25/Sheet 11"X 17"copies color $1.10/Sheet 11"X 17"M lar $5.00/Sheet Scroll Plots $2.50/s .ft. Digital Plotter $2.00/s .ft. Overnight Mail-Letter Size **Not to Exceed$20.00/mailin Overnight Mail-Oversized Box(up to 20 Ibs **Not to Exceed$35.00/mailin Postage **Not to Exceed$10.00/ er package Traffic Control $50/da GIS Data Files **Not to Exceed$850/data source HazMat Database Report **Not to Exceed$150/land mile Aerial Photographs 1'=500'scale **Not to Exceed$65/ hoto ra h GPS Rental **Not to Exceed$1,000/da Courthouse Fees ** Miscellaneous Expenses-Task Order Specific ** Documentation of hours worked,receipts or usage logs for direct expenses not required. Percent complete to be billed. * Not to exceed current state rate **Cost to be determined during negotiation of work authorization. ATTACHMENT B Page 5 of 34 , ATTACHMENT B-2 FINAL COST PROPOSAL (FCP)— SUPPORTING BASIS OF PAYMENT TASK ORDER RELATED Task Order 1 — Peach Street Area (PSA) CSJ: 0902-48-688 and CSJ: 0902-48-689 A. - Compensation A.1. In return for the performance of the foregoing obligations, City shall pay to Engineer an amount not to exceed $383,487.00 for preliminary engineering and an amount not to exceed $122,699.00 for engineering services related to construction management, payable according to the following terms: Monthly billing based on work performed and fee earned, per the fee schedules shown for this Task Order. A.2. Compensation for Additional Services (if any)shall be paid by City to Engineer according to the following terms: As needed, and as negotiated independently. B. - Owner's Responsibilities City shall perform and/or provide the following in a timely manner so as not to delay the Services of Engineer. Unless otherwise provided in this Task Order, City shall bear all costs incident to compliance with the following: None C. - Other Provisions The parties agree to the following provisions with respect to this specific Task Order: None D. - Fee Schedule: Preliminary Engineering ATTACHMENT B Page 6 of 34 =r,a^ !r r p'7 �i q FEE SCHEDULE HNTB Salary Classification Sala Ran a Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Principal $40 $90.00 $75.00 4 0 0 $300 $0 $0 $300 Director $35 $80.00 $70.00 176 0 0 $12 320 $0 $0 $12,320 PM $30 $70.00 $68.00 180 0 0 $12 240 $0 $0 $12,240 Business M r $25 $55.00 $45.00 8 0 0 $360 $0 $0 $360 Pro'ectAdmin $20 $35.00 $30.00 48 0 0 $1,440 $0 $0 $1,440 Clerical $10 $20.00 $18.00 1 28 0 0 $504 $0 $0 $504 Sr Des En r $30 $61.00 $55.00 64 0 0 $3,520 $0 1 $0 $3,520 Eng V $25 $55.00 $51.00 368 0 0 $18,768 $0 1 $0 $18,768 Eng IV $25 $50.00 $49.00 96 0 0 $4,704 $0 $0 $4,704 Eng III $20 $45.00 $40.00 168 0 0 $6,720 $0 $0 $6,720 Eng 1 $20 $28.00 $26.00 56 0 0 $1,456 $0 $0 $1,456 Tech IV $15 $30.00 $29.00 260 0 0 $7,540 $0 $0 $7,540 Sr Urb Planner $20 $55.00 1 $50.00 8 0 0 $400 $0 $0 $400 Urb Des 11 $15 $35.00 $33.00 48 0 0 $1 584 $0 $0 $1,584 Sr.Land Arch $20 $45.00 $43.00 16 0 0 $688 $0 $0 $688 Land Arch 11 $15 $35.00 $32.00 48 0 0 $1,536 $0 $0 $1,536 PI Dir $25 $50.00 $45.00 24 0 0 $1,080 $0 $0 $1,080 PI Mcir $20 $45.00 $30.00 76 0 0 $2,280 $0 $0 $2,280 PI Coord $10 $35.00 $25.00 38 0 0 $950 $0 $0 1 $950 Tech Dir $30 $70.00 $65.00 12 0 0 $780 $0 $0 $780 Tech M r $30 $60.00 $57.00 112 0 0 $6,384 $0 $0 $6 384 Tech Graphic Art $20 $45.00 $41.00 56 0 0 $2,296 $0 $0 $2 296 Tech Modeler $20 $35.00 $32.00 32 0 0 $1,024 $0 $0 $1 024 Tech ITS Spec $25 $50.00 $48.00 104 0 0 $4,992 $0 $0 $4.992 Totals 2,030 0 0 $93,866 $0 $0 $93,866 Overhead 155.59/ $146,046 $0 1 $0 $146,046 Subtotals $239,912 $0 $0 $239,912 Fixed Fee 15.00% $35,987 $0 $0 $35,987 Direct Expenses see attached $17,458 $17,458 Totals $293,357 $0 $0 $293,357 Subconsultant DBE HUB FC 110 FC 130 FC 150 Total Campbell Technologies Corporation $25,309 $0 $0 $25,309 Gorrondonna x x $0 $19,404 $23,966 $43,370 STL x x $21,451 $0 $0 $21,451 Subtotal-Subcontracted Expenses $46,760 1 $19,404 $23,96611 $90,130 *DBE/HUB Firms FC 110 FC 164 FC 390 Total TOTALS- $340,117 $19,404 $23,966 $383,487 Maximum Fee for Work Authorization $383,487 Total Fixed Fee for Work Authorization $35,987 ��P`�' i ATTACHMENT B Page 7 of 34 MANHOUR ESTIMATE-STAFF Tech Tech Tech ITS Totals Func. Task "oord Tech Dir Tech Mgr Graphic Modeler Spec Code Art 110 ILive Oak Connector Phase I Schematic Design) Data gathering.Obtain as-built plans from City for the existin 60 utility system 160 Prepare a conceptual plan,profile,and typical section 60 Prepare cost estimates 38 Public meetings 220 Project Controls 110 1 ILive Oak Connector Phase II Final Design) 16 Perform field survey and geotechnical work 28 Pre are existing utilities plans 8 Coordinate with various clovernmental entities Prepare detailed roadway plans,specifications and estimate 240 ro'ect Prepare detailed water and wastewater plans,specifications 104 for Water Department 20 Pre are right-of-way lans 16 Public meetings 20 Obtain approval from TxDOT,TDLR,etc... 36 Assist City in bidding project 110 Peach Street Ped Grade Separation Phase 1 Schematic Data gathering.Obtain as-built plans from City for the existir 28 uti 1tv s stem 160 Prepare a conceptual plan,profile,and t 28 typical section Prepare cost estimates 28 16 Public meetings 110 1 IlDeach Street Ped Grade Sep Phase II Final Design) Perform field survey and geotechnical work 8 Prepare existing utilities plans 20 Coordinate with various governmental entities 4 Prepare detailed plans,specifications and estimate for the 220 Prepare right-of-way lans 12 Public meetings 14 Obtain approval from TxDOT,TDLR,etc... 24 Assist City in bidding project 20 110 JlRailroad ITS Data gathering and evaluation 41 16 24 48 Pre are conceptual plans and cost estimates 41 16 24 32 76 Prepare summary report of RR-ITS components for evaluati 24 24 48 Prepare final plans and cost estimate 2 16 32 32 82 ITS implementation 2 401 8 1 16 70 110 IPublic Involvement Project Management and Administration 14 Client Meetings 6 Project Meetings Internal 2 8 Organize Community open house meeting 1 8 Meeting setup and attendance 16 28 Meetin material development 8 18 Meeting mailers/flyers 6 Public meeting summary 41 24 Power point preparation 81 14 TOTAL 38 12 1121 561 32 104 2,030 ATTACHMENT B Page 8 of 34 FEE SCHEDULE Direct Expenses-HNTB Item Quantity Units Rate Total Office Expenses Printing Digital Plotter 550 SF $2.00 = $1,100.00 11"x17"Mylar 100 Sheet $2.00 = $200.00 8 1/2"x 11"B/W Paper copies 2,000 Sheet $0.10 = 5200.00 11"x17"B/W Paper Copies 1,600 Sheet $0.25 = $400.00 8 1/2"x 11"Color paper copies 1,000 Sheet $0.75 = $750.00 11"x17"Color Copies 1,100 Sheet $1.10 = $1,210.00 Miscellaneous Office Expenses Postage Standard Postage 900 @ cost $0.39 = $351.00 Express mail 20 @ cost $10.00 = $200.00 Overnight Mail-Letter Size 20 @ cost $20.00 = $400.00 Overnight Mail-Oversized Box 12 @ cost $50.00 = $600.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 1,250 miles $0.505 = $631.25 Airfare($750 max) RT $750.00 = $0.00 Airfare RT $500.00 = $0.00 Airfare 6 RT $250.00 = $1,500.00 Garage Parking($15 daily maximum) 16 days @ $15.00 = $240.00 Lodging($85 daily maximum excluding tax) 8 days @ $85,00 = $680.00 Meals($36 daily maximum) 16 days @ $36.00 = $576.00 Car Rental($60 daily maximum without fuel) 16 days @ $60.00 = $960.00 Miscellaneous Expenses Website development 1 @cost $5,000,00 = $5,000.00 Website maintenance 24 month $40,00 = $960.00 Court reporter 1 @cost $500.00 = $500,00 Public meeting brocures 1 @cost $1,000,00 = $1,000.00 Techical use of computer hourly $17,00 = $0.00 SUBTOTAL-FUNCTION CODE 110 = $17,458.25 PERCENTAGE TO ENGINEER= 100% _ $17,458.25 FEE SCHEDULE CTC Salary Classification SalaryRan a Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $40 $90.00 $61.00 100 0 0 $6,100 $0 $0 $6,100 Project Engineer $35 $80.00 $44.00 68 0 0 $2,992 $0 $0 $2,992 Signal Designer $30 $70.00 $36.00 0 0 0 $0 $0 $0 $0 Totals 168 0 0 $9,092 $0 $0 $9,092 Overhead 125.00% $11,365 $0 $0 $11,365 Subtotals $201457 Fixed Fee 15.00% $3,069 $0 $0 $3,069 Direct Expenses see attached $1,783 $1,783 Totals $25,309 $0 $0 $25,309 *DBE/HUB Firms FC 110 FC 164 FC 390 Total TOTALS- $25,309 $0 $0 $25,309 Maximum Fee for Work Authorization $25,309 Total Fixed Fee for Work Authorization $3,069 ATTACHMENT EV Page 9 of 34 CSJ: 0902-48-688/689-Peach Street Area Project FEE SCHEDULE CTC MANHOUR ESTIMATE-STAFF Func. Task Project Project Signal Totals Code Manager Engineer Desi ner 110 TASK 1 -Data Collection Start-Up Meeting 4 4 8 Conduct preliminary data collection 8 8 16 Conduct on-site investigation/data collection 161 8 24 110 ITASK 2-QZ Concept Development Concept Development 16 8 24 110 ITASK 3-Project Development Concept Development/Alternatives Screening 8 8 16 Corridor Diagnostic/Safety Diagnostic/Safety Analysis 8 8 16 Concept Plans/Estimates 16 8 24 110 ITASK 4-QZ Final Design&Construction RR Desi n/Estimate/A reement Coordination 24 16 40 TOTAL 1 1001 681 0 168 FEE SCHEDULE Direct Expenses-CTC Item Quantity Units Rate Total Office Expenses Printing Digital Plotter SF $2.00 = $0.00 11"x17"Mylar Sheet $2.00 = $0.00 8 112"x 11"BIW Paper copies 1,000 Sheet $0.10 = $100.00 11"x17"B/W Paper Copies Sheet $0.25 = $0.00 8 1/2"x 11"Color paper copies 500 Sheet $0.75 = $375.00 11"07"Color Copies 500 Sheet $1.10 = $550.00 Miscellaneous Office Expenses Travel Expenses Mileage(TxDOT allowable mileage rate) 1,500 miles $0,505 = $757.50 SUBTOTAL-FUNCTION CODE 110 = $1,782.50 PERCENTAGE TO ENGINEER= 100% _ $1,782.50 FEE SCHEDULE Gorrondona Salary Classification Sala Range Rate Used Hours Direct Labor Min Max For Calculations FC 130 FC 150 FC 390 FC 130 FC 150 FC 390 Total Project Mana er/RPLS $25 $ 33.08 $ 33.08 10 13 0 $331 $430 $0 $761 Tech/RPLS $20 $ 26.25 $ 26.25 140 17 0 $3,675 $446 $0 $4,121 2-Man Field Part $25 $ 34.65 $ 34.65 26 8 0 $901 $277 $0 $1,178 3-Man Field Part $20 $ 44.63 $ 44.63 0 108 0 $0 $4,820 $0 $4,820 CADD Tech $10 $ 20.48 $ 20.48 68 88 0 $1,393 $1,802 $0 $3,195 Admin/Clerical $10 $ 14.70 1$ 14.70 3 4 1 0 $44 1 $59 1 $0 $103 Totals 247 238 1 3 1 $7,835 1 $0 $14,178 Overhead 166.00% 1 1 $10 530 1 $13,005 1 $0 $23,535 Subtotals 1 $16,873 $20,840 $0 $37,713 Fixed Fee 15.00% $2,531 $3,126 1 $0 $5,657 Direct Expenses see attached $0 1 $0 Totals $19,404 $23,966 1 $0 $43,370 FC 130 FC 150 FC 390 Total TOTALS- $19,404 $23,966 $0 $43,370 Maximum Fee for Work Authorization $43,370 Total Fixed Fee for Work Authorization $5,657 ATTACHMENT Page 10 of 34 CSJ:0902-48-688/689(Peach Street) Gorrondona MANHOUR ESTIMATE- STAFF Func. Project Tech/RPL 2-Man 3-Man CADD Admin/ Ma nPaLgS r/R S Field Party Field Party Tech lerical Code Task Totals 130 ITASK 1- ROW Parcel Acquisition Survey 1. Research property owners 8 2 10 2.)Prepare a right-of-,ay map of the existing right-of-rears d property lines 2 20 16 60 98 3. Prepare six(6)right-of-rcay acquisition documents 6 96 10 1 113 4. Prepare m o mil oad agrecment documents 2 24 26 150 ITASK 2-TOPOGRAPHICIDESIGN SURVEYING 1. Establish horizontal and vertical control for the project 1 2 36 1 40 2.)To o gra hic surr-e services 4 4 72 8 88 3. Locate bore holes 1 8 1 10 4.)Deliverables 8 10 80 2 100 TOTAL 1 231 157 34 108 156 7 485 FEE SCHEDULE STL Engineers Salary Classification Salary Range Rate Used Hours Direct Labor Min Max crCalculatioi FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $35 $53.84 $53.84 26 0 0 $1,400 $0 $0 $1,400 Project Engineer $25 $38.96 $38.96 48 0 0 $1,870 $0 $0 $1,870 Senior Engineer Tech $15 $19.50 $19.50 2 0 0 $39 $0 $0 $39 CADD Operator $10 $16.50 $16.50 4 0 0 $66 $0 $0 $66 Admin/Clerical $10 $16.50 $16.50 2 0 0 $33 $0 $0 $33 Totals 82 0 0 $3,408 $0 $0 $3,408 Overhead 145.00% $4,941 $0 $0 $4,941 Subtotals $8,349 $0 $0 $8,349 Fixed Fee 10.00% $835 $0 $0 $835 Direct Expenses see attached $12,267 $12,267 Totals $21,451 $0 $0 $21,451 Fg 110 FC 164 FC 390 Total TOTALS- $21,451 $0 $0 $21,451 Maximum Fee for Work Authorization $21,451 Total Fixed Fee for Work Authorization 835 CSJ: 0902-48-6881689-Peach Street Area Project STL Engineers MANHOUR ESTIMATE- STAFF Func. Project Project Sr.Eng'r CADD Admin/C Code Task Manager Engineer Tech Operator lerical Totals 110 ITASK 1- Field Studies Site Reconnaisance and Marking Boring Locations 3 3 6 Coordination of Utility Marking at Boring Locations 3 2 5 City of Fort Worth Drilling Permits and Traffic Control Plans 7 7 110 ITASK 2-Laboratory Studies Examination of Samples and Assignment of Tests 4 4 110 TASK 3- ngineering Analysis and Report Boring Log Preparation 3 2 5 Plan of Borings 2 2 Tunnel Analysis 6 12 18 Pavement Analysis 4 8 1 12 Re ort Pre aration 8 Review 4 8 2 14 110 TASK 4-Project Administration Projec eetin s 8 8 Invoicing 1 1 TOTAL 26 48 2 4 2 82 rAT�TACHMENT B of 34 FEE SCHEDULE Direct Expenses-STL Engineers Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11"B/W Paper copies 125 Sheet $0.10 = $12.50 11"xl7"B/W Paper Copies 5 Sheet $0.25 = $1.25 Miscellaneous Office Expenses Postage Overnight Mail-Letter Size 1 @ cost $20.00 = $20.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 180 miles $0.505 = $90.90 Miscellaneous Expenses Drilling City of Fort Worth Drilling Permits 2 each @ $50.00 = $100.00 Drill Rig Mobilization/Demobilization 1 each @ $300.00 = $300.00 Pavement Penetration/Patching 4 each @ $50.00 = $200.00 Soil Drilling w/Intermittent Sampling 70 feet @ $12.50 = $875.00 Continuous Rock Coring 220 feet @ $27.00 = $5,940.00 Miscellaneous Expenses Laboratory Moisture Content&Pocket Penetrometer 27 each @ $4.50 = $121.50 Atterberg Limit Tests 10 each @ $45,00 = $450.00 Percent Passing#200 Sieve 5 each @ $30.00 = $150.00 Soluble Sulfates,TxDOT Method 5 each @ $90.00 = $450.00 Atterberg Limit Lime Series,6 points 3 each @ $240.00 = $720,00 Unconsolidated-Undrained Triaxial Strength 7 each @ $60.00 = $420.00 Unconfined Compressive Strength of Rock 44 each @ $45.00 = $1,980.00 Swell Tests 5 each @ $60.00 = $300.00 Techical use of computer 8 hourly $17.00 = $136.00 SUBTOTAL-FUNCTION CODE 110 = $12,267.15 PERCENTAGE TO ENGINEER= 100% _ $12,267.15 E. - Fee Schedule: Engineering Services- Construction Management FEE SCHEDULE HNTB Salary Classification Salary Range Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Principal $40 $90.00 $75.00 4 0 0 $300 $0 $0 $300 Director $35 $80.00 $70.00 32 0 0 $2,240 $0 $0 $2,240 PM $30 $70.00 $68.00 176 0 0 $11,968 $0 $0 $11,968 Clerical $10 $20.00 $18.00 8 0 0 $144 $0 $0 $144 PI M r $20 $45.00 $30.00 4 0 0 $120 $0 $0 $120 PI Coord $10 $35.00 $25.00 4 0 0 $100 $0 $0 $2$100 Totals 8 0 0 $14,872 $0 $0 $14,872 Overhead 155.901. $23,185 $0 $0 3,185 Subtotals 1 $38,057 $0 $0 $38,057 Fixed Fee A 15.00% $5,709 $0 $0 $5,709 Direct Ex enses see attached $2,359 $2,359 Totals $46,125 $0 $0 $46,125 Subconsultant DBE HUB FC 110 FC 130 FC 390 Total Campbell Technologies Corporation $0 $0 $0 $0 Gorrondonna x x $0 $76,574 $0 $76,574 STL x x $0 $0 $0 $0 Subtotal-Subcontracted Expenses $0 $76,574 $0 $76,574 `DBE/HUB Firms FC 110 FC 130 FC 390 Total TOTALS- $46,125 $76,574 $0 $122,699 Maximum Fee for Work Authorization $122,699 Total Fixed Fee for Work Authorization $5,709 1 711_10� ATTACHMENT B r� E Page 12 of 34 FEE SCHEDULE HNTB MANHOUR ESTIMATE-STAFF Func. Task Principal Director PM Clerical PI Mgr PI Coord Totals Code 110 Live Oak Connector Phase III Construction Management) Assist City in the evaluation of bids and award of construction contract 16 8 24 Provide construction management and inspection services 56 56 Public meetings 4 4 8 Contract closeout 2 40 42 110 JPeach Street Ped Grade Sep Phase III CM Assist City in the evaluation of bids and award of construction contract 4 4 Provide construction management and inspection services 56 56 Public meetings 4 4 4 4 Contract closeout 2 8 12 TOTAL 4 32 176 8 4 414 FEE SCHEDULE Direct Expenses-HNTB Item Quantity Units Rate Total Travel Expenses Mileage(TxDOT allowable mileage rate) 1,250 miles $0.505 = $631.25 Airfare($750 max) RT $750.00 = $0.00 Airfare RT $500.00 = $0.00 Airfare 2 RT $250,00 = $500.00 Garage Parking($15 daily maximum) 8 days @ $15,00 = $120,00 Lodging($85 daily maximum excluding tax) 4 days @ $85.00 = $340.00 Meals($36 daily maximum) 8 days @ $36.00 = $288.00 Car Rental($60 daily maximum without fuel) 8 days @ $60.00 = $480.00 SUBTOTAL-FUNCTION CODE 110 = $2,359.25 FEE SCHEDULE Gorrondona Salary Classification Salary Range Rate Used Hours Direct Labor Min Max For Calculations FC 130 FC 150 FC 390 FC 130 FC 150 FC 390 Total Project Mana er/RPLS $25 $ 33.08 $ 33.08 20 0 0 $662 $0 $0 $662 Admin/Clerical $10 $ 14.70 $ 14.70 2 0 0 $29 $0 $0 $29 QL"B"Service $49 $ 102,09 $ 102.09 32 0 0 $3,267 $0 $0 $3,267 Inspection $20 $ 29.27 $ 29.27 720 0 0 $21,074 $0 $0 $21,074 Totals 774 0 0 $25,032 $0 $0 $25,032 Overhead a 166.00% $41,554 1 $0 $0 $41,554 Subtotals $66,586 $0 $0 $66,586 Fixed Fee& 15.00% $9,988 $0 $0 $9,988 Direct Expenses see attached $0 $0 Totals $76,574 $0 $0 $76,574 FC 130 FC 150 FC 390 Total TOTALS- $76,574 $0 $0 $76,574 Maximum Fee for Work Authorization $76,574 Total Fixed Fee for Work Authorization $9,988 CSJ:0902-48-688/689(Peach Street) Gorrondona MANHOUR ESTIMATE- STAFF Func. Project Code Task Manager/RAdrical QL"c Inspector Totals Code PLS lerical Service 130 TASK 3-Inspection&SUE 1. Provide inspection services during road construction 20 2 720 742 2. As requested QL"B"services will be provided 32 32 TOTAL i 201 21 321 720 774 , TTACHMENT B age 13 of 34 ATTACHMENT B-2 FINAL COST PROPOSAL (FCP)— SUPPORTING BASIS OF PAYMENT TASK ORDER RELATED Task Order 2 — Hemphill West CSJ: 0902-48-686 A. - Compensation A.1. In return for the performance of the foregoing obligations, City shall pay to Engineer an amount not to exceed $135,044.00 for preliminary roadway engineering design and an amount not to exceed $119,124.00 for engineering services related to quiet zone implementation and construction management, payable according to the following terms: Monthly billing based on work performed and fee earned, per the fee schedules shown for this Task Order. A.2. Compensation for Additional Services (if any) shall be paid by City to Engineer according to the following terms: As needed, and as negotiated independently. B. - Owner's Responsibilities City shall perform and/or provide the following in a timely manner so as not to delay the Services of Engineer. Unless otherwise provided in this Task Order, City shall bear all costs incident to compliance with the following: None C. - Other Provisions The parties agree to the following provisions with respect to this specific Task Order: None D. - Fee Schedule: Preliminary Engineering — Roadway Design ATTACHMENT B Page 14 of 34 .o FEE SCHEDULE HNTB Salary Classification Salary Ran a Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 150 FC 390 FC 110 FC 150 FC 390 Total Principal $40 $90.00 $65.00 2 0 0 $130 $0 $0 $130 Director $35 $80.00 $70.00 48 0 0 $3,360 $0 $0 $3,360 PM $30 $70.00 $66.00 72 0 0 $4,752 $0 $0 $4,752 Business M r $25 $55.00 $45.00 8 0 0 $360 $0 $0 $360 Pro ect Admin $20 $35.00 $30.00 24 0 0 $720 $0 $0 $720 Clerical $10 $20.00 $18.00 24 0 0 $432 $0 $0 $432 Sr Des En r $30 1$61.00 $55.00 64 0 0 $3,520 $0 $0 $3,520 Eng V $25 $55.00 $51.00 152 0 0 $7,752 $0 $C $7,752 Eng IV $25 $50,00 $49.00 32 0 0 $1,568 $0 $0 $1,568 Encl III $20 $45.00 $40,00 64 0 0 $2,560 $0 $0 $2,560 Eng 1 $20 $28.00 $26.00 0 0 0 $0 $0 $0 $0 Tech IV $15 $30.00 $29.00 92 0 0 $2,668 $0 $0 $2,668 Sr Urb Planner $20 $55.00 $50.00 8 0 0 $400 $0 $0 $400 Urb Des II $15 $35.00 $33.00 16 0 0 $528 $0 $0 $528 Sr.Land Arch $20 $45.00 $43.00 8 0 0 $344 $0 $0 $344 Land Arch II $15 $35.00 $32.00 16 0 0 $512 $0 $0 $512 Totals 630 0 0 $29,606 $0 $0 $29,606 Overhead 2 155.59% $46,064 $0 $0 $46,064 Subtotals $75,670 $0 $0 $75,670 Fixed Fee a 15,00% $11,351 $0 $0 $11,351 Direct Expense see attached $3,169 $3,169 Totals $90,190 $0 $0 $90,190 Subconsultant DBE HUB FC 110 FC 130 FC 150 Total Campbell Technologies Corporation $0 $0 $0 $0 Gorrondonna x x $0 $4,997 $32,676 $37,673 STL x x $7,18$1 $0 $0 $7,181 Subtotal-Subcontracted Expenses $7,181 $4,997 $32,676 $44,854 `DBE/HUB Firms FC 110 FC 130 FC 150 Total TOTALS- $97,371 $4,997 $32,676 $135,044 Maximum Fee for Work Authorization $135,044 Total Fixed Fee for Work Authorization $11,351 ATTACHMENT B Page 15 of 34 10'Oro� NN W � �Otp ID tD O A O H a- l0 U �Q a � J U c¢ O � N p_ cn � C Na N N O N F O O O O O O O O O O O O O O O O O O � O OO,n,(JO O O O O O O O O O O O O O O p, 0 O O O N I` O N m m l� th O O,n O fA fA m O m Ip 75 W O.-FA Ifl�N tA��N In NtA��t7 � EA to to fA fA U3 to t9 to fA to Ivj mvm co Q N W � � � M II II II 11 II II II II II II II II II II II II 11 II 11 II W m m m m N V m m m N O, W O m Q O1 N O O1 OOOIn�nO m000O ,n 0000000 fA fA fA to I�,(J N fA to fA to c0 m Q fA fA fA N N II V W w a,a,dv 000o dHHH dUdUdU@� w N C N N NNNNNN 'E a'a'a' �•�•�• z W w : J o f ���� a a a a a`¢ o w Ww o000 oo,n In w N W O O ¢ W m LL U Z LL v m v v v v m m Q e v m m 0 W n U a o U w z a LL N y E = a _ p E 3 H � w � 0 0 o w- rn N a x E E N a nUm z o ,� E''�_ m m a a d w = - m >.Ea E m~ o n a x^ X� o EE w a m a 00 >:ii¢ It H w 10 a p a � � n m m Z 3 w v 0 m aI, Eo-, cm °'9'm'3�o mds� oc ¢ z' vmm � a�'iE�cv='a oOca�'i � E v c d d d E `0 m F �`^ `m mn o `mo u`m t0moc to = m m c E`t a I, o o v � O O ~ c a f u U m EL FEE SCHEDULE Gorrondona Salary Classification Salary Range Rate Used Hours Direct Labor Min Max For Calculations FC 130 FC 150 FC 390 FC 130 FC 150 FC 390 Total Project Manager/RPLS $25 $ 33.08 $ 33.08 0 5 0 $0 $165 $0 $165 Tech/RPLS $20 $ 26.25 $ 26.25 0 25 0 $0 $656 $0 $656 2-Man Field Part $25 $ 34.65 $ 34.65 0 190 0 $0 $6,584 $0 $6,584 CADD Tech $10 $ 20.48 $ 20.48 0 160 0 $0 $3,277 $0 $3,277 QL"B"Service $49 $ 102.09 $ 102.09 16 0 0 $1,633 $0 $0 $1,633 Inspection $20 $ 29.27 $ 29.27 0 1 0 0 $0 1 $0 1 $0 $0 Totals 16 380 0 $1,633 $10,682 $0 $12,315 Overhead @ 166.00% $2,712 $17,732 1 $0 F $20,444 Subtotals $4,345 $28,414 $0 $32,759 Fixed Fee @ 15.00% $652 $4,262 $0 $4,914 Direct Expenses (see attached) $0 $0 Totals $4,997 $32,676 $0 $37,673 FC 130 FC 150 FC 390 Total TOTALS- $4,997 $32,676 $0 $37,673 CSJ:0902-48-686(Hemphill West) Gorrondona MANHOUR ESTIMATE- STAFF Func. Project Tech/RPL 2-Man CADD QL"B" Code Task Ma PLSr/R S Field Party Tech Service Totals 150 ITASK 1- ROW Parcel Acquisition Survey 1.)Establish horizontal and vertical control for the project 5 5 30 40 2.)Research property owners 20 20 3.)Locate property corners and establish property lines and existing right-of-way Tines 5 30 40 75 4.)Provide a topographic survey of five(5)railroad crossing: 5 120 125 5.)Locate bore hoes as required by the Engineer 5 10 15 6.)Deliverables 5 100 105 130 TASK 2-SUE As requested QL"B"services will be provided 16 16 TOTAL 1 51 251 1901 160 1611396 FEE SCHEDULE STL Engineers Salary Classification SalaryRan a Rate Used Hours Direct Labor Min Max rCalculatioi FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $35 $53.84 $53.84 7 0 0 $377 $0 $0 $377 Project Engineer $25 $38.96 $38,96 22 0 0 $857 $0 $0 $857 Senior Engineer Tech $15 $19,50 $19.50 2 0 0 $39 $0 $0 $39 CADD Operator $10 $16.50 $16.50 3 0 0 $50 $0 $0 $50 Totals 34 0 0 $1,323 $0 $0 F $1,323 Overhead 145.00% $1,918 $0 $0 1 $1,918 Subtotals $3,241 $0 $0 $3,241 Fixed Fee C& 10.00% $324 $0 $0 $324 Direct Expenses see attached $3,617 $3,617 Totals $7,181 $0 $0 $7,181 FC 110 FC 164 FC 390 Total TOTALS- $7,181 $0 $0 $7,181 Maximum Fee for Work Authorization $7,181 Total Fixed Fee for Work Authorization $324 71 ATTACHMEfJ7'13- Page 17 of 32 ui�t`I CSJ: 0902-48-686(Hemphill West) STL Enaineers MANHOUR ESTIMATE- STAFF Func. Task Project Project Sr. Eng'r CADD Totals Code Manager Engineer Tech Operator 110 ITASK 1- Field Studies Site Reconnaisance and Marking Boring Locations 3 3 Coordination of Utility Marking at Boring Locations 2 2 City of Fort Worth Drilling Permits and Traffic Control Plans 3 3 110 ITASK 2-Laboratory Studies Examination of Samples and Assignment of Tests 3 3 110 ITASK 3-Engineering Analysis and Report Boring Log Preparation 3 1 4 Plan of Borings 1 2 2 Pavement Analysis 1 4 5 Report Preparation&Review 2 6 8 110 1 ITASK 4-Project Administration Project Meetings 1 3 3 Invoicing1 1 TOTAL 1 71 221 21 3 34 FEE SCHEDULE Direct Expenses-STL Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11"B/W Paper copies 100 Sheet $0.10 = $10.00 11"x17"B/W Paper Copies 5 Sheet $0.25 = $1.25 Postage Overnight Mail-Letter Size 1 @ cost $20.00 = $20.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 180 miles $0.445 = $80.10 Miscellaneous Expenses Drilling City of Fort Worth Drilling Permits 1 each @ $50.00 = $50.00 Drill Rig Mobilization/Demobilization 1 each @ $300.00 = $300.00 Pavement Penetration/Patching 5 each @ $50.00 = $250.00 Soil Drilling w/Intermittent Sampling 50 feet @ $12.50 = $625.00 Miscellaneous Expenses Laboratory Moisture Content&Pocket Penetrometer 15 each @ $4.50 = $67.50 Atterberg Limit Tests 5 each @ $45.00 = $225.00 Percent Passing#200 Sieve 5 each @ $30.00 = $150.00 Soluble Sulfates,TxDOT Method 5 each @ $90.00 = $450.00 Atterberg Limit Lime Series,6 points 3 each @ $240.00 = $720.00 Unconsolidated-Undrained Triaxial Strength 5 each @ $60.00 = $300.00 Swell Tests 5 each @ $60.00 = $300.00 Techical use of computer 4 hourly $17.00 = $68.00 SUBTOTAL-FUNCTION CODE 110 = $3,616.85 ATTACHMENT B Page 18 of 32 E. - Fee Schedule: Engineering Services— Quiet Zone Implementation and Construction Management FEE SCHEDULE HNTB Salary Classification SalaryRan a Rate Used Hours Direct Labor Min I Max For Calculations FC 110 FC 150 FC 390V$4,488 10 FC 150 FC 390 Total Princi al 0 90.00 $65.00 2 0 0 $130 $0 $0 $130 Director $35 $80.00 $70.00 48 0 0 ,360 $0 $0 $3,360 PM $30 $70.00 $66.00 68 0 0 $0 $0 $4,488 Clerical $10 $20.00 $18.00 8 0 0 $144 $0 $0 $144 1 $20 $28.00 $26,00 220 0 0 ,720 $0 $0 $5,720 Totals 346 1 0 0 $13,842 $0 $0 $13,842 Overhead a� 155,59% $21537 1 $0 $0 $21,537 Subtotals $35,379 $0 $0 $35,379 Fixed Fee'Z 15.00% $5,307 $0 $0 $5,307 Direct Expenses see attached $1,130 $1,130 Totals 1,816 0 0 $41,816 Subconsultant DBE HUB FC 110 FC 150 FC 390 Total Campbell Technologies Corporation $77,308 $0 $0 $77,308 Gorrondonna x x $0 $0 $0 $0 STL x x $0 $0 $0 $0 Subtotal-Subcontracted Expenses $77,308 sol $77,308 `DBE/HUB Firms FC 110 FC 150 FC 390 Total TOTALS- $119,124 $0 $0 $119,124 Maximum Fee for Work Authorization $119,124 Total Fixed Fee for Work Authorization $5,307 FEE SCHEDULE HNTB MANHOUR ESTIMATE-STAFF Func. Task Principal Director PM Clerical Eng I Totals Code 110 lHemphill West-Quiet Zone activities Data gathering.Obtain as-built plans from City for the existing street and utility system 8 4 12 Diagnostic Team meeting 8 4 12 QZ reports 4 4 QZ implementation 81 1 1 8 110 Hemphill West-Construction Phase CM Assist City in the evaluation of bids and award of construction contract 16 16 32 Provide construction management and inspection services 24 200 224 Public meetings 4 4 8 16 Contract closeout 21 16 201 TOTAL 2 48 68 8 220 346 FEE SCHEDULE Direct Expenses-HNTB Item Quantity Units Rate Total Travel Expenses Mileage (TxDOT allowable mileage rate) miles $0.505 = $0.00 Airfare($750 max) RT $750.00 = $0.00 Airfare RT $500.00 = $0.00 Airfare 1 RT $250.00 = $250.00 Garage Parking($15 daily maximum) 4 days @ $15.00 — $60.00 Lodging ($85 daily maximum excluding tax) 4 days @ $85.00 = S340.00 Meals($36 daily maximum) 5 days @ $36.00 = $180.00 Car Rental($60 daily maximum without fuel) 5 days @ $60.00 = $300.00 SUBTOTAL-FUNCTION CODE 110 = $1,130.00 PERCENTAGE TO ENGINEER= 100% ATTACHMENT B ^' Page 19 of 32_. FEE SCHEDULE CTC `Salary Classification Sala Ran a Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 1 FC 110 FC 164 FC 390 Total Project Manager $30 $70.00 $61.00 182 0 0 $11,102 $0 $0 $11,102 Pro'ect Engineer $25 $55.00 $44.00 302 0 0 $13,288 $0 $0 $13,288 Signal Designer $25 $45.00 $36.00 136 0 $$4,896 $0 $0 $4,896 Totals 620 0 0 $29,286 $0 $0 $29,286 Overhead 125.00% $36,608 $0 $0 $36,608 Subtotals $65,894 $0 $0 $65,894 Fixed Fee& 15.00% $9,884 $0 $0 $9,884 Direct Expenses see attached $1,530 $1,530 Totals $77,308 $0 1 $0 $77,308 `DBE/HUB Firms FC 110 FC 164 FC 390 Total TOTALS- $77,308 $0 $0 $77,308 Maximum Fee for Work Authorization $77,308 Total Fixed Fee for Work Authorization $9,884 CSJ:0902-48-686-Hemphill West Project FEE SCHEDULE CTC MANHOUR ESTIMATE-STAFF Func. Task Project Project Signal Totals Code Mana er Engineer Designer 110 ITASK 1-Data Collection Start-Up Meeting 4 4 8 Review previous work by CFW 4 8 12 Conduct preliminary data collection 16 16 Prepare FRA grade crossing inventory updates 1 8 8 Conduct on-site investi ation/data collection 241 40 64 110 ITASK 2-QZ Concept Development Develop possible alternatives with CFW 8 8 16 Discuss with BNSF/UPRR to determine feasibility 8 8 16 Conduct site demonstrations of wayside horn 4 4 8 Meet with neighborhood groups and other stakeholders 16 16 32 Public Meeting 1 8 8 8 24 Status Meeting 1 4 4 8 Prepare conceptual plans 1 8 401 48 Public Meeting 2 81 8 8 24 Status Meeting 2 4 4 8 Achieve neighborhood approval of final preliminary plan 8 8 16 Review final preliminary plan with FRA 4 4 8 Prepare for Planning Commission re:closures 8 16 24 City Council Presentation 4 4 8 110 ITASK 3-QZ Diagnostic Review Conduct diagnostic team meetings-BNSF/UPRR corridors 16 16 32 Prepare diagnostic team report 8 16 24 Status Meeting 3 4 4 8 110 ITASK 4-QZ Final Design Prepare final layout plans for RR 8 24 40 72 Prepare PSBE for roadway modifications 0 Secure TxDOT approval of 30%,75%and final plans 0 Status Meeting 4 21 2 4 110 TASK 5-QZ Project Coordination/Construction Management Conduct monthly project review meetings 16 16 32 Review and provide comments on RR plans and estimates 4 8 12 Review and provide comments on contractor's construction bids 8 8 Perform construction management and inspection services 16 40 56 110 ITASK 6-QZ Implementation Prepare FRA grade crossing inventory updates 4 8 12 Assist CFW with preparation of Quiet Zone Notices 4 8 12 TOTAL 182 302 136 620 ATTACHMENT Page 20 of 32 FEE SCHEDULE Direct Expenses-CTC Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11" B/W Paper copies 1,000 Sheet $0.10 = $100.00 8 1/2"x 11"Color paper copies 500 Sheet $0.75 = $375.00 11"x17"Color Copies 500 Sheet $1.10 = $550.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 1,000 miles $0.505 = $505.00 SUBTOTAL-FUNCTION CODE 110 = $1,530.00 PERCENTAGE TO ENGINEER= 100% _ $1,530.00 ATTACHMENT B Page 21 of 32 ATTACHMENT B-2 FINAL COST PROPOSAL (FCP)- SUPPORTING BASIS OF PAYMENT TASK ORDER RELATED Task Order 3- Magnolia Avenue CSJ: 0902-48-687 A. - Compensation A.1. In return for the performance of the foregoing obligations, City shall pay to Engineer an amount not to exceed $74,993.00 for preliminary roadway engineering design and an amount not to exceed $80,643.00 for engineering services related to quiet zone implementation and construction management, payable according to the following terms: Monthly billing based on work performed and fee earned, per the fee schedules shown for this Task Order. A.2. Compensation for Additional Services (if any) shall be paid by City to Engineer according to the following terms: As needed, and as negotiated independently. B. - Owner's Responsibilities City shall perform and/or provide the following in a timely manner so as not to delay the Services of Engineer. Unless otherwise provided in this Task Order, City shall bear all costs incident to compliance with the following: C. - Other Provisions The parties agree to the following provisions with respect to this specific Task Order: None. D. - Fee Schedule: Preliminary Engineering - Roadway Design FEE SCHEDULE HNTB Salary Classification Salary Range Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Principal $40 $90.00 $65.00 0 0 0 $0 $0 $0 $0 Director $35 $80.00 $70.00 8 0 0 $560 $0 $0 $560 PM $30 $70.00 $66.00 62 0 0 $4,092 SO $0 $4,092 Business Mgr $25 $55.00 $45.00 4 0 0 $180 $0 $0 $180 Project Admin $20 $35.00 $30.00 8 0 0 $240 $0 $0 $240 Clerical $10 $20.00 $18.00 4 0 0 $72 $0 $0 $72 En V $25 $55.00 $51.00 122 0 0 $6,222 $0 $0 $6,222 Tech IV $15 $30.00 $29.00 90 0 0 $2,610 $0 $0 $2,610 Sr Urb Planner $20 $55.00 $50.00 16 0 0 $800 $0 $0 $800 Urb Des II $15 $35.00 $33.00 40 0 0 $1,320 $0 $0 $1,320 Totals 354 0 0 $16,096 $0 $0 $16,096 Overhead a 155.59% $25,044 $0 $0 $25,044 Subtotals $41,140 $0 $0 $41,140 Fixed Fee @ 15.00% $6,171 $0 $0 $6,171 Direct Expenses see attached $3,944 $3,944 Totals $51,255 $0 $0 $51,255 Subconsultant DBE HUB FC 110 FC 130 FC 150 Total Campbell Technologies Corporation $0 $0 $0 $0 Gorrondonna x x $0 $10,337 $7,816 $18,153 STL x x $5,585 $0 $0 1 $5,585 Subtotal-Subcontracted Expenses $5,585 $10,337 1 $7,816 1 $23,738 `DBE/HUB Firms FC 110 FC 130 FC 150 Total TOTALS- $56,840 $10,337 $7,816 $74,993 Maximum Fee for Work Authorization $74,993 Total Fixed Fee for Work Authorization $6,171 ATTACHMENT B Page 22 of 32 � �.� FEE SCHEDULE HNTB MANHOUR ESTIMATE-STAFF Func. Task Principal Director PM Business Project Clerical Eng V Tech IV Sr Urb Urb Des Totals Code M r Admin Planner II 110 Ma nolia Connector Phase I Schematic Design) Data gathering.Obtain as-built plans from City for the existing street and utility system 2 6 8 Prepare a conceptual plan,profile,and typical section 8 16 24 8 16 72 Prepare cost estimates 4 4 8 Public meetings 4 4 4 8 4 24 110 Magnolia Connector Phase II iFinal Design) Perform field survey and geotechnical work 8 8 16 Prepare existing utilities plans 4 16 10 30 Coordinate with various governmental entities 8 8 Prepare detailed roadway plans,specifications and estimate for the project 8 32 32 8 24 104 Prepare right-of-way lans 4 8 8 20 Public meetings 4 4 8 Obtain approval from TxDOT TDLR etc... 4 16 20 Assist City in bidding project 4 16 16 36 TOTAL 1 01 81 621 41 81 41 1221 901 161 401 354 FEE SCHEDULE Direct Expenses-HNTB Item Quantity Units Rate Total Office Expenses Printing Digital Plotter 500 SF $2.00 = $1,000.00 11"xl7"Mylar 50 Sheet $2.00 = $100.00 8 112"x 11"B/W Paper copies 500 Sheet $0.10 = $50.00 1 I"x17"B/W Paper Copies 450 Sheet $0.25 = $112.50 8 1/2"x 11"Color paper copies 500 Sheet $0.75 = $375,00 11'k17"Color Copies 500 Sheet $1.10 = $550.00 Miscellaneous Office Expenses Postage Standard Postage 200 @ cost $0.39 = $78.00 Express mail 5 @ cost $10.00 = $50.00 Overnight Mail-Letter Size 5 @ cost $20.00 = $100.00 Overnight Mail-Oversized Box 4 @ cost $50.00 = 5200.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 1,000 miles $0,505 = $505.00 Airfare($750 max) RT $750.00 = $0,00 Airfare RT $500.00 = $0.00 Airfare 1 RT $250.00 = $250,00 Garage Parking($15 daily maximum) 2 days @ $15.00 = $30,00 Lodging($85 daily maximum excluding tax) 3 days @ $85.00 = $255.00 Meals($36 daily maximum) 3 days @ $36.00 = $108.00 Car Rental($60 daily maximum without fuel) 3 days @ $60.00 = $1 30.00 SUBTOTAL-FUNCTION CODE 110 = $3,943.50 PERCENTAGE TO ENGINEER= 100% = $3,943.50 FEE SCHEDULE Gorrondona Salary ClassificationK$49 Salary Range Rate Used Hours Direct Labor Max For Calculations FC 130 FC 150 FC 390PFC0 FC 150 FC 390 Total Project Mana er/RPLS $ 33.08 $ 33.08 3 2 0 $99 $66 $0 $165 Tech/RPLS $ 26.25 $ 26.25 44 5 0 ,155 $131 $0 $1,286 2-Man Field Part $ 34.65 $ 34.65 18 34 0 $624 $1,178 $0 $1,802 3-Man Field Part $ 44.63 $ 44.63 0 12 0 $0 $536 $0 $536 CADD Tech $ 20.48 $ 20.48 32 30 0 $655 $614 $0 $1,270 Admin/Clerical $ 14.70 $ 14.70 2 2 0 $29 $29 $0 $59 OIL"B"Service $ 102.09102.09 8 0 0 $817 $0 $0 $817 Ins ection $ 29.27 $ 29.27 0 0 0 $0 $0 $0 $0 Totals 107 85 0 $3,379 $2,555 $0 $5,934 Overhead 166.00% $5,610 $4,241 $0 $9,851 Subtotals $8,989 $6,796 $0 $15,785 Fixed Fee d'� 15.00% $1,348 $1,020 $0 $2,368 Direct Expenses see attached $0 $0 Totals $10,337 1 $7,816 $0 $18,153 FC 130 FC 150 FC 390 Total TOTALS- $10,337 $7,816 $0 $18,153 Maximum Fee for Work Authorization $18,153 Total Fixed Fee for Work Authorization $2,368 ATTACHMENT B Page 23 of 32 CSJ:0902.48-687(Magnolia Avenue) Gorronciona MANHOUR ESTIMATE-STAFF Func, Project TechIRPL 2-Man 3-Man CADD Admin/C QL"B„ Sr. Code Task ManPa Ser/R S Field Pany Field Party Tech leriral Service Inspector Totals 130 TASK 1-ROW Parcel Ac uisition Survey 1.)Research propert,ue eM 6 1 7 2.)Prepare ROW Map of the existing dcht of-Nay&property lines 1 4 12 26 43 3.)Prepare too 12)right-of- av acquisition documents 2 40 6 1 49 150 TASK2-TOPOGRAPHICIDESIGN SURVEYING 1_))[Establish horizontal and kertical control for the project 1 2 12 1 16 2-)T010 gr, hic sun'ev senices 1 30 31 3.)Locate bore hoes u required b%the Engineer 1 4 5 4.)Deli,'erables 2 30 1 33 130 ITASK 3-Inspection 8 SUE As requested OCR services will be provided 8 8 TOTAL 1 51 491 521 121 621 41 al 192 FEE SCHEDULE STL Engineers Salary Classification Salary Range Rate Used Hours Direct Labor Min Max r Calculatioi FC 110 FC 164 FC 390 FC 1110 FC 164 FC 390 Total Project Manager $35 $53.84 $53.84 7 0 0 $377 $0 $0 $377 Project Engineer $25 $38.96 $38.96 18 0 0 $701 $0 $0 $701 Senior Engineer Tech $15 $19.50 $19.50 2 0 0 $39 $0 $0 $39 CADD Operator $10 $16.50 $16.50 3 0 0 $50 $0 $0 $50 Totals 30 0 1 0 1 $1,167 $0 $0 $1,167 Overhead 145.00% 1 1 1 $1,692 $0 $0 $1,692 Subtotals $2,859 $0 $0 $2,859 Fixed Fee a 10.00% $286 $0 $0 $286 Direct Expenses see attachedl $2,441 1 $2,441 Totals $5,585 $0 $0 $5,585 FC 110 FC 164 FC 390 Total TOTALS- $5,585 $0 $0 $5,585 Maximum Fee for Work Authorization $5,585 Total Fixed Fee for Work Authorization $286 CSJ: 0902-48-687 Magnolia Avenue STL Engineers MANHOUR ESTIMATE- STAFF Func. Task Project Project Sr.Eng'r CADD Totals Code Manager Engineer Tech Operator 110 ITASK 1- Field Studies Site Reconnaisance and Marking Boring Locations 2 2 Coordination of Utility Marking at Bo ing Locations 2 2 City of Fort Worth Drilling Permits and Traffic Control Plans 2 2 110 ITASK 2-Laboratory Studies Examination of Samples and Assignment of Tests 2 2 110 TASK 3-En ineerin Analysis and Report Boring Log Preparation 2 1 3 Plan of Borings 2 2 Pavement Analysis 1 4 5 Report Preparation&Review 2 6 8 110 TASK 4-Pro ect Administration Project Meetings 3 3 Invoicing 1 1 TOTAL 71 18 21 311 30 -sue ATTACHMENT B, 2, 7 Page 24 of 32; ;1.J 4��n FEE SCHEDULE Direct Expenses-STL Engineers Item Quantity Units Rate Total Office Expenses Printing 8 112"x 11"B/W Paper copies 100 Sheet $0.10 = $10.00 11"x17"B/W Paper Copies 5 Sheet $0.25 = $1.25 Postage Overnight Mail-Letter Size 1 @ cost $20.00 = $20.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 180 miles $0.505 = $90.90 Miscellaneous Expenses Drilling City of Fort Worth Drilling Permits 1 each @ $50.00 = $50.00 Drill Rig Mobilization/Demobilization 1 each @ $300.00 = $300.00 Pavement Penetration/Patching 3 each @ $50.00 = $150.00 Soil Drilling w/Intermittent Sampling 30 feet @ $12.50 = $375.00 Miscellaneous Expenses Laboratory Moisture Content&Pocket Penetrometer 9 each @ $4.50 = $40.50 Atterberg Limit Tests 3 each @ $45.00 = $135.00 Percent Passing#200 Sieve 3 each @ $30.00 = $90.00 Soluble Sulfates,TxDOT Method 3 each @ $90.00 = $270.00 Atterberg Limit Lime Series,6 points 2 each @ $240.00 = $480.00 Unconsolidated-Undrained Triaxial Strength 3 each @ $60.00 = $180.00 Swell Tests 3 each @ $60.00 = $180.00 Techical use of computer 4 hourly $17.00 = $68.00 SUBTOTAL-FUNCTION CODE 110 = $2,440.65 PERCENTAGE TO ENGINEER= 100% _ $2,440.65 E. - Fee Schedule: Engineering Services - QZ Implementation and Construction Management FEE SCHEDULE HNTB Salary Classification Sala Pane Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 150 FC 390 FC 110 FC 150 FC 390 Total Principal $40 $90.00 $65.00 2 0 0 $130 $0 $0 $130 Director $35 $80.00 $70.00 8 0 0 $560 $0 $0 $560 PM $30 $70.00 $66.00 120 0 0 $7,920 $0 $0 $7,920 Tech IV $15 $30.00 $29.00 530 0 0 $15,370 $0 $0 $15,370 Totals 660 0 0 $23,980 $0 $0 $23,980 Overhead 155.59% $37,310 $0 $0 $37,310 Subtotals $61,290 $0 $0 $61,290 Fixed Fee 15.00% $9,194 $0 $0 $9,194 Direct Expenses see attached $773 $773 Totals $71,257 $0 $0 $71,257 Subconsultant DBE HUB FC 110 FC 150 FC 390 Total Campbell Technologies Corporation 1 $9,386 $0 $0 $9,386 Gorrondonna x x $0 $0 $0 $0 STL x x $0 $0 $0 $0 Subtotal-Subcontracted Expenses $9,386 $0 $0 $9,386 'DBE/HUB Firms FC 110 FC 150 FC 390 Total TOTALS- $80,643 $0 $0 $80,643 Maximum Fee for Work Authorization $80,643 Total Fixed Fee for Work Authorization $9,194 ATTACHMENT 6 Page 25 off�32 FEE SCHEDULE HNTB MANHOUR ESTIMATE-STAFF Func. Task Principal Director PM Tech IV Totals Code 110 Magnolia Connector Phase III Construction Management) Assist City in the evaluation of bids and award of construction contract 16 16 Provide construction management and inspection services 80 450 530 Public meetings 8 8 Contract closeout 21 8 16 80 106 TOTAL 1 21 81 1201 530 660 FEE SCHEDULE Direct Expenses-HNTB Item Quantity Units Rate Total Travel Expenses Mileage(TxDOT allowable mileage rate) miles $0.505 = $0.00 Airfare($750 max) RT $750.00 = $0.00 Airfare RT $500.00 = $0.00 Airfare 1 RT $200.00 = $200.00 Garage Parking($15 daily maximum) 2 days @ $15.00 = $30.00 Lodging($85 daily maximum excluding tax) 3 days @ $85.00 = $255.00 Meals($36 daily maximum) 3 days @ $36.00 = $108.00 Car Rental($60 daily maximum without fuel) 3 days @ $60.00 = $180.00 SUBTOTAL-FUNCTION CODE 110 = $773.00 PERCENTAGE TO ENGINEER= 100% _ $773.00 FEE SCHEDULE CTC Salary Classification Salary Range Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $40 $90.00 $61.00 44 0 0 $2,684 $0 $0 $2,684 Project Engineer $35 $80.00 $44.00 8 0 0 $352 $0 $0 $352 Totals 52 0 0 $3,036 $0 $0 $3,036 Overhead @ 125.00% $3,795 $0 $0 $3,795 Subtotals $6,831 $0 $0 $6,831 Fixed Fee @ 15.00% $1,025 $0 $0 $1,025 Direct Expenses (see attached) $1,530 $1,530 Totals $9,386 $0 $0 $9,386 *DBE/HUB Firms FC 110 FC 164 FC 390 Total TOTALS- $9,386 $0 $0 $9,386 Maximum Fee for Work Authorization $9,386 Total Fixed Fee for Work Authorization $1,025 ATTACHMENT B Page 26 of 32 CSJ: 090248-687 Magnolia Ave Area Project FEE SCHEDULE CTC MANHOUR ESTIMATE-STAFF Func. Task Project Project Totals Code Mana er En ineer 110 TASK 1 -Data Collection Start-Up Meeting 4 4 Conduct on-site investigation/data collection 8 8 110 ITASK 2-QZ Concept Development Concept Development 8 8 110 ITASK 3-Project Development Concept Development/Alternatives Screening 4 4 8 Concept Plans/Estimates 8 4 12 1 .0 ITASK 4-QZ Final Design&Construction RR Design/Estimate/Agreement Coordination 12 12 TOTAL I 44 8 52 FEE SCHEDULE Direct Expenses-CTC Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11"B/W Paper copies 1,000 Sheet $0.10 = $100.00 8 1/2"x 11"Color paper copies 500 Sheet $0.75 = $375.00 11"x17"Color Copies 500 Sheet $1.10 = $550.00 Mileage(TxDOT allowable mileage rate) 1,000 miles $0.505 = $505.00 SUBTOTAL-FUNCTION CODE 110 = $1,530.00 PERCENTAGE TO ENGINEER= 100% _ $1,530.00 J ATTACHMENT B Page 27 of 32 ATTACHMENT B-2 FINAL COST PROPOSAL (FCP)—SUPPORTING BASIS OF PAYMENT TASK ORDER RELATED Task Order 4— Sycamore School Road C SJ: 0902-48-685 A. - Compensation A.1. In return for the performance of the foregoing obligations, City shall pay to Engineer an amount not to exceed $24,974.00 for preliminary quiet zone analysis and diagnostic evaluation and an amount not to exceed $26,316.00 for engineering services related to quiet zone implementation and construction management, payable according to the following terms: Monthly billing based on work performed and fee earned, per the fee schedules shown for this Task Order. A.2. Compensation for Additional Services (if any) shall be paid by City to Engineer according to the following terms: As needed, and as negotiated independently. B. - Owner's Responsibilities City shall perform and/or provide the following in a timely manner so as not to delay the Services of Engineer. Unless otherwise provided in this Task Order, City shall bear all costs incident to compliance with the following: C. - Other Provisions The parties agree to the following provisions with respect to this specific Task Order: None. D. - Fee Schedule: Preliminary Engineering — Quiet Zone Diagnostics/Analysis FEE SCHEDULE HNTB Salary Classification Sala r Ran e Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 150 FC 390 FC 110 FC 150 FC 390 Total Principal $40 1$90.00 $75.00 0 0 0 $0 $0 $0 $0 Director $35 $80.00 $68.00 0 0 0 $0 $0 $0 $0 En III $20 $45.00 $40.00 0 0 0 $0 $0 $0 $0 Totals 0 0 0 $0 $0 $0 $0 Overhead 9 155.59% $0 $0 $0 $0 Subtotals $0 $0 $0 $0 Fixed Fee P 15.00% $0 $0 $0 $0 Direct Expenses see attached $0 $0 Totals $0 $0 $0 $0 Subconsultant DBE HUB FC 110 FC 130 FC 150 Total Campbell Technologies Corporation $15,729 $0 $0 $15,729 Gorrondonna x x $0 $2,499 $6,746 $9,245 STL x x $0 $0 $0 $0 Subtotal-Subcontracted Expenses $15,729 $2,499 $6,746 $24,974 `DBE/HUB Firms FC 110 FC 130 FC 150 Total TOTALS- $15,729 $2,499 $6,746 $24,974 Maximum Fee for Work Authorization $24,974 Total Fixed Fee for Work Authorization $0 Total DBEIHUB Participation $9,245 DBEIHUB Participation 37.00 ^t ATTACHMENT B S Page 28 of 32 q - FEE SCHEDULE CTC Salary Classification SalaryRan a Rate Used Hours Direct Labor Min Max For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $35 $70.00 $61.00 40 0 0 $2,440 $0 $0 $2,440 Project Engineer $25 $55.00 $43.00 64 0 0 $2,752 $0 $0 $2,752 Signal Designer $25 $45.00 $40.00 16 0 0 $640 $0 $0 $640 Totals 120 0 0 $5,832 $0 $0 $5,832 Overhead 125.00% $7,290 $0 $0 $7,290 Subtotals $13,122 $0 $0 $13,122 Fixed Fee A 15.00% $1,968 $0 $0 $1,968 Direct Expenses see attached $639 $639 Totals $15,729 $0 $0 $15,729 FC 110 FC 164 FC 390 Total TOTALS- $15,729 $0 $0 $15,729 Maximum Fee for Work Authorization $15,729 Total Fixed Fee for Work Authorization $1,968 CSJ:0902-48-685-Sycamore School Road Project CTC MANHOUR ESTIMATE- STAFF Func. Task Project Project Signal Totals Code Manacter En ineer Desi ner 110 ITASK 1-Data Collection Start-Up Meeting 4 4 8 Review previous work by CFW 2 2 4 Conduct preliminary data collection 8 8 Prepare FRA grade crossing inventory updates 4 4 Conduct on-site investigation/data collection 41 4 1 8 110 ITASK 2-QZ Concept Development Develop possible alternatives with CFW 4 4 8 Discuss with BNSF/UPRR to determine feasibility 4 4 8 Status Meeting 1 2 2 4 Prepare conceptual plans 4 8 12 Review final preliminary plan with FRA 2 2 4 City Council Presentation 4 4 8 110 ITASK 3-QZ Diagnostic Review Conduct diagnostic team meetings-BNSF/UPRR corridors 8 4 12 Prepare diagnostic team report 8 8 Status Meeting 2 4 4 8 110 ITASK 4-QZ Final Design Prepare final layout plans for RR 4 8 12 Prepare PSBE for roadway modifications 0 Secure TxDOT a roval of 30%,60%and final plans 0 Status Meeting 3 21 2 4 TOTAL 1 401 64 16 120 FEE SCHEDULE Direct Expenses-CTC Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11"B/W Paper copies 500 Sheet $0.10 = $50.00 8 1/2"x 11"Color paper copies 250 Sheet $0.75 = $187.50 1 Vx17"Color Copies 250 Sheet $1.10 = $275.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 250 miles $0.505 = $126.25 SUBTOTAL-FUNCTION CODE 110 = $638.75 PERCENTAGE TO ENGINEER= 100% _ $638.75 ATTACHMENT 6 Page 29 of 32 FEE SCHEDULE Gorrondona Salary Classification Salar Range Rate Used Hours Direct Labor Min Max For Calculations FC 130 FC 150 FC 390 FC 130 FC 150 FC 390 Total Project Mana er/RPLS $25 $ 33.0E 33.08 0 1 0 0 $33 $0 $33 Tech/RPLS $20 $ 26.25 $ 26.25 0 5 0 $0 $131 $0 $131 2-Man Field Part $25 $ 34.65 $ 34.65 0 40 0 $0 $1,386 $0 $1,386 CADD Tech $10 $ 20.48 $ 20.48 0 32 0 $0 $655 $0 $655 QL"B"Service $49 $ 102.09 $ 102.09 8 0 0 $817 $0 $0 $817 Inspection $20 $ 29.27 $ 29.27 0 0 0 $0 $0 $0 $0 Totals 8 1 78 1 0 $817 $2,206 $0 $3,022 Overhead A 166.00% $1,356 $3,661 $0 $5,017 Subtotals $2,173 $5,867 $0 $8,039 Fixed Fee& 15.00% $326 1 $880 $0 $1,206 Direct Expenses see attached $0 $0 Totals $2,499 1 $6,747 0 9,245 FC 130 FC 150 FC 390 Total TOTALS- $2,499 $6,747 $0 $9,245 Maximum Fee for Work Authorization $9,245 Total Fixed Fee for Work Authorization 1,206 CSJ:0902-48-685(Sycamore School Road) Gorrondona MANHOUR ESTIMATE-(STAFF) Func. Project Tech/RPL 2-Man CADD QL"B" Code Task ManPLSer/R S Field Party Tech Service Totals 150 ITASK 1- ROW Parcel Acquisition Survey 1.)Fstablish horizontal and vertical control for the project 1 1 6 8 2.)Research pi operl}owners 4 4 3.)Locate pzopert coi-neisand establish ro ert-lines and existing ri ght-of-r%.a�lines 1 6 8 15 4.)Topographic surce services 1 20 21 5.)Locate bore hoes as required by the Engineer 1 2 3 6.)Deli,embles 1 20 21 13 TTASK 2-SUE As requested QL"B"services will be provided 8 8 TOTAL 1 5 34 32 80 E. - Fee Schedule: Engineering Services- QZ Implementation and Construction Management FEE SCHEDULE HNTB Salary Classification Salary Ran a Rate Used Hours Direct Labor Min I Max For Calculations FC 110 FC 150 FC 390 FC 110 FC 150 FC 390 Total Principal $40 $90.00 $75.00 0 0 0 $0 $0 $0 $0 Director $35 $80.00 $70.00 32 0 0 $2,240 $0 $0 $2,240 PM $30 $70.00 $66.00 4 0 0 $264 $0 $0 $264 Project Admin $20 $35.00 $28.00 2 0 0 $56 $0 $0 $56 Sr Des En r $30 $61.00 $55.00 16 0 0 $880 $0 $0 $880 Eng III $20 $45.00 $40.00 56 0 0 $2,240 $0 $0 $2,240 Eng 1 $20 $28.00 $26.00 16 0 0 $416 $0 $0 $416 Tech IV $15 $30.00 $29.00 16 0 0 $464 $0 $0 $464 Totals 142 0 0 $6,560 $0 $0 $6,560 Overhead 155.59% $10,207 $0 $0 $10,207 Subtotals $16,767 $0 $0 $16,767 Fixed Fee 15.00% $2,515 $0 $0 $2,515 Direct Expenses see attached $1,294 $1,294 Totals $20,576 $0 $0 $20,576 Subconsultant DBE HUB FC 110 FC 150 FC 390 Total Campbell Technologies Corporation $5,740 $0 $0 $5,740 Gorrondonna x x $0 $0 $0 $0 STL x x $0 $0 $0 $0 Subtotal-Subcontracted Expenses $5,740 $0 $0 $5,740 "DBE/HUB Firms FC 110 FC 150 FC 390 Total TOTALS- $26,316 $0 $0 $26,316 Maximum Fee for Work Authorization $26,316 Total Fixed Fee for Work Authorization $2,515 ATTACHMENT B Page 30 of 32 FEE SCHEDULE HNTB MANHOUR ESTIMATE-STAFF fun Task Principai Director PM Project Sr Des Eng III Eng I Tech IV Totals Admin En r ITASK 5-QZ Project Coordination/Construction Management Conduct monthly project review meetings 8 2 10 Review and provide comments on RR plans and estimates 8 4 8 20 Review and provide comments on contractor's construction bids 4 4 8 8 24 Perform construction management and inspection services 4 8 16 28 110 1 ITASK6-QZ implementation Pre are FRA grade crossinginventoryupdates 4 8 24 36 Assist CFW with preparation of Quiet Zone Notices 8 16 24 TOTAL 1 01 321 41 21 161 561 16 16 142 Direct Expenses-HNTB Item Quantity Units Rate Total Office Expenses Printing Digital Plotter 50 SF $2.00 = $100.00 11"x17"Mylar 10 Sheet $2.00 = $20.00 8 1/2"x 11"BAN Paper copies 100 Sheet $0.10 = $10.00 11"x17"B/W Paper Copies 50 Sheet $0.25 = $12.50 8 1/2"x 11"Color paper copies 50 Sheet $0.75 = $37.50 11'x17"Color Copies 100 Sheet $1.10 = $110.00 Postage Standard Postage 50 @ cost $0.39 = $19.50 Express mail 2 @ cost $10.00 = $20.00 Overnight Mail-Letter Size 1 @ cost $20.00 = $20.00 Overnight Mail-Oversized Box 1 @ cost $50.00 = $50.00 Travel Expenses Mileage(TxDOT allowable mileage rate) 500 miles $0.505 = $252.50 Airfare 1 RT $250.00 = $250.00 Garage Parking($15 daily maximum) 2 days @ $15.00 = $30.00 Lodging($85 daily maximum excluding tax) 2 days @ $85,00 = $170,00 Meals($36 daily maximum) 2 days @ $36.00 = $72.00 Car Rental($60 daily maximum without fuel) 2 days @ $60.00 = $120.00 SUBTOTAL-FUNCTION CODE 110 = $1,294.00 PERCENTAGE TO ENGINEER= 100% = $1,294.00 FEE SCHEDULE CTC Salary Classification Sala Ran a Rate Used Hours Direct Labor Min MaxI For Calculations FC 110 FC 164 FC 390 FC 110 FC 164 FC 390 Total Project Manager $35 $70.00 1 02 16 0 0 $976 $0 $0 $976 Project Engineer $25 $55.00 $43.00 14 0 0 $602 $0 $0 $602 Signal Designer $25 $45.00 $40.00 16 0 0 $640 $0 $0 $640 Totals 46 0 0 $2,218 $0 $0 $2,218 Overhead 125.00% $2,773 $0 $0 $2,773 Subtotals $4,991 $0 $0 $4,991 Fixed Fee 15.00% $749 $0 $0 $749 Direct Expenses see attached $0 $0 Totals $5,740 $0 $0 $5,740 FC 110 FC 164 FC 390 Total TOTALS- $5,740 $0 $0 $5,740 Maximum Fee for Work Authorization $5,740 Total Fixed Fee for Work Authorization $749 �. J ATTACHMENT B. Page 31 of 32 CSJ: 0902-48-685-Sycamore School Road Project CTC MANHOUR ESTIMATE- STAFF Func. Task Project Project Signal Totals Code Mana er En ineer Desi ner 110 TASK 5-QZ Project Coordination/Construction Management Conduct monthly project review meetings 8 8 Review and provide comments on RR plans and estimates 2 4 6 Review and provide comments on contractor's construction bids 4 4 Perform construction management and inspection services 1 1 16 16 110 ITASK 6-QZ Implementation Prepare FRA grade crossing inventory updates 4 41 8 Assist CFW with preparation of Quiet Zone Notices 21 21 4 TOTAL 1 161 14 16 46 FEE SCHEDULE Direct Expenses-CTC Item Quantity Units Rate Total Office Expenses Printing 8 1/2"x 11"B/W Paper copies Sheet $0.10 = $0.00 8 1/2"x 11"Color paper copies Sheet $0.75 = $0.00 11"x17"Color Copies Sheet $1.10 = $0.00 Travel Expenses Mileage(TxDOT allowable mileage rate) miles $0.505 = $0.00 SUBTOTAL-FUNCTION CODE 110 = $0.00 PERCENTAGE TO ENGINEER= 100% _ $0.00 �J -otir , ATTACHMENT B_ Page 32 of 32 Attachment C Article III, Terms of Payment, Section A, item 4 is amended to read: "In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. The City will provide written notice to Engineer of any contested amounts." Article IV, Section I, Minority and Woman Business Enterprise (M/WBE) Participation, is amended to read: "In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. The ENGINEER, as prime provider, must perform at least 30% of the work." Article IV, Section K, ENGINEER's Insurance, item 2, sub-item (g) is amended to read: "Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. This does not apply to professional liability." Article V, Section K, Changes, is amended to read: "The CITY may make or approve changes within the general Scope of Services in this AGREEMENT which will be in writing and signed by City and Engineer. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI, Section D Termination, is amended to include item (4)to read as: (4) "ENGINEER shall not be liable for any errors or omissions contained in deliverables which are incomplete as a result of a suspension or termination where ENGINEER is deprived of the opportunity to complete ENGINEER's services. ENGINEER will not be responsible for maintaining copies of any submitted electronic files after acceptance by CITY and shall not be held liable for completeness or accuracy of the electronic data after the acceptance thereof." Article VI, Section F Indemnification, item (1) is amended to read: "The ENGINEER agrees to indemnify and hold harmless the CITY from any loss, cost, or expense claimed by third parties for property damage and bodily injury, including death, to the extent caused solely by the negligence or willful misconduct of the ENGINEER, its employees, officers, and in connection with the PROJECT." Article VI, Section K Severability and Survival, is amended to read: "If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not --` affect any ther provision, and this AGREEMENT shall be construed as if such invalid, illegal, -ATTACHMENT wl IG r1 Page 1 of 2 5 or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., VI.I., and VI.J. shall survive termination of this AGREEMENT for any cause." ATTACHMENT G 11,( Page 2of2 " Attachment D—Project Schedule Task Order 1 — Peach Street Area (PSA) CSJ: 0902-48-688 CSJ: 0902-48-689 A. - Schedule Engineer shall perform the Services and deliver the related Documents (if any) according to the following schedule: City of Fort Worth, Texas NCTCOG Railroad Grant Projects - Peach Street Area - CSJ 0902-48-688/689 Project Duration(Shown in Months) Project Tasks 1 2 3 4 1 5 6 7 1 8 1 9 10 11 112 Start-Up Meeting Data Collection Evaluate Existing Conditions Develop Conceptual Plans Submission of Conceptual Plans-City Review Incorporate City comments Stakeholder meeting(s) Finalization of Conceptual Plans Field Survey-Geotechnical Work Prepare 30%Plan Sets Submission of Plan Sets-City Review Incorporate City comments Prepare 75%Plan Sets,S ecifications,Cost Estimates Submission of Plan Sets-City Review Incorporate City comments Prepare 100%Plan Sets,Specifications,Cost Estimates Submission of Plan Sets-City Review Incorporate City comments Assist CFW with bid package proposal preparation Assist CFW with project bidding/letting End Design Phase f4 VL Attachment D—Project Schedule Task Order 2 — Hemphill West CSJ: 0902-48-686 A. - Schedule Engineer shall perform the Services and deliver the related Documents(if any) according to the following schedule: City of Fort Worth,Texas NCTCOG Railroad Grant Projects-Hemphill West-CSJ 0902-48-686 Project Duration(Shown in Weeks) Project Tasks 1 2 3 a 1 5 1 6 7 a 9 10 11 12 24 76 77 78 79 80 Data Collection Stan-U Meetin Review revious work b CFW Conduct preliminary data collection Prepare FRA grade crossing inventory updates Conduct on-site investigation/data collection TASK 2-QZ Concept Development M —_ Develop possigle altematives with CFW Discuss with BNSF IUPRR to determine feasibility Conduct site demonstrations of wayside horn Meet with neighborhood groups and other stakeholders Public Meeting 1 Status Meeting 1 Prepare conceptual plans Public Meeting 2 Status Meeting 2 Achieve neighborhood approval of final preliminary plan Review final preliminary plan with FRA Prepare for Planning Commission re:closures City Council Presentation TASK 3-QZ Diagnostic Review Conduct diagnostic team meetings-BN FIUPRR corridors Prepare diagnostic team report Status Meeting 3 IL inal Design to Prepare final layout plans for RR's use in preparing lans,estimates&agreements Prepare PS&E for roadway modifications Secure TxDOT approval of 30%,60%and final plans Status Meeting 4 TA roject CoordinatiorgConstruction Management Conduct month) ro'ect review meetin s Review and provide comments on RR plans and estimates Review and provide comments on contractor's construction bids Perform construction management and inspection services mpeme on Prepare FRA grade crossing inventory updates Assist CFW with preparation of Quiet Zone Notices QZ Implemented ATTACHMENT D, IZ\ Page 2 of 4 j Attachment D—Project Schedule Task Order 3— Magnolia Avenue CSJ: 0902-48-687 A. - Schedule Engineer shall perform the Services and deliver the related Documents (if any) according to the following schedule: City of Fort Worth, Texas NCTCOG Railroad Grant Projects - Magnolia Avenue -CSJ 0902-48-687 Project Duration(Shown in Months) Project Tasks 1 2 3 4 5 s 1 7 8 1 9 10 11 12 Start-Up Meeting Data Collection Evaluate Existing Conditions Develo Conce tual Plans Submission of Conceptual Plans-City Review Incorporate City comments Stakeholder meeting(s) Finalization of Conceptual Plans Field Survey-Geotechnical Work Prepare 30%Plan Sets Submission of Plan Sets-City Review Incorporate City comments Prepare 75%Plan Sets,Specifications,Cost Estimates Submission of Plan Sets-City Review Incorporate City comments Prepare 100%Plan Sets,Specifications,Cost Estimates Submission of Plan Sets-City Review Incorporate City comments Assist CFW with bid package proposal preparation Assist CFW with project bidding/letting End Desi n Phase Page 3 of 4-' •,n Attachment D—Project Schedule Task Order 4—Sycamore School Road CSJ: 0902-48-685 A. - Schedule Engineer shall perform the Services and deliver the related Documents (if any)according to the following schedule: City of Fort Worth,Texas NCTCOG Railroad Grant Projects-Sycamore School Road-CSJ 0902-48-685 Project Duration(Shown in Weeks) Project Tasks 1 1 2 1 3 1 4 5 6 7 1 8 1 9 101 22 741 751 76 77 1781 Wilebtlon Start-Up Meeting Review previous work by CFW Conduct preliminary data collection Prepare FRA grade crossing inventory updates Conduct on-site investigation/data collection TASK 2-QZ Concept Development Develop possible alternatives with CFW Discuss with nNSF IUPRR to determine feasibility Status Meeting 1 P are conceptual plans Review anal reliminary plan with FRA City Council Presec•: TASK 3-OZ Diagnostic RoAaw Conduct di nostic team meetings-13N F UPRR corridors Prepare dia-oostic team re OR Status Meet:: F.-In-al Design Pre re final layout plans for RR's use in preparing plans,estimates&—agreements Prepare PS&E for roadway modifications SOWN—.approval of 30%,60%and final plans Status Meeting 13 TASK 5•UZ Protect Coordination onstruction Management Conduct monthly project review meetings Review and provide comments on RR plans and estimates Review and provide comments on contractor's construction bids Perform construction management and inspection services TASK - mplementatton ,Prepare FRA grade crossing inventory updates Assist CFW with preparation of Quiet Zone Notices aZ Implemented ATTACHMENT D Page 4 of 4 n Attachment E-Location Map Task Order 1 - Peach Street Area (PSA) CSJ: 0902-48-688 CSJ: 0902-48-689 A. - Project Location I E 1. [j�Y$ t• 7 r�.1 YY jfJ1 287 2� ,J Attachment E—Location Map Task Order 2— Hemphill West CSJ: 0902-48-686 A. — Project Location � I I r t� c f : t 287 Attachment E—Location Map Task Order 3— Magnolia Avenue CSJ: 0902-48-687 A. — Project Location I 1 r r 1R- Attachment E—Location Map Task Order 4—Sycamore School Road CSJ: 0902-48-685 A.— Project Location 4 t s ATTACNMIENT.E_ C" CARRY FT, IVDr,"��, TEX, Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication I Room COUNCIL ACTION: Approved on 4/22/2008 DATE: Tuesday, April 22, 2008 LOG NAME: 201HNTB REFERENCE NO.: C-22780 SUBJECT: Authorize Execution of a Professional Services Agreement with HNTB Corporation to Assist with North Central Texas Council of Governments Railroad Grant Projects RECOMMENDATION: It is recommended that the City Council a prize the City Manager to execute an agreement with HNTB Corporation in the amount of $967,43 assist with North Central Texas Council of Governments (NCTCOG) Railroad Projects. DISCUSSION: In December 2006, (M&C C-21910, G-15544, C-21909, C-21912), Council approved project agreements with the Texas Department of Transportation (TxDOT)for railroad crossing safety and quiet zone projects at four groups of railroad crossings collectively known as the NCTCOG Railroad Grant Project. This engineering services contract is to retain an engineering firm to plan, design, and manage each project noted below: 1. Peach Street Area Project, 6 crossings 2. Hemphill West Project, 5 crossings 3. Magnolia Avenue Project, 2 crossings 4. Sycamore School Road Project, 2 crossings In 2003, in a call-for-projects under the NCTCOG Railroad Crossing Reliability Partnership Program, the Transportation and Public Works department (TPW) submitted thirteen project proposals (MSC G-14128). As a result, the City of Fort Worth was awarded four of the projects, capturing 61 percent of the program's total available funds. In the same year, the City of Fort Worth adopted the 2003 Federal Legislative Program (M&C G-13945) that included earmarking a request for the Peach Street Area Railroad Safety Improvement Project. In sum, the total dollars for these projects including funds from federal, state, CIP, BNSF Railway and Union Pacific Railroad total $4,251,966. The Peach Street Area project is to upgrade area railroad crossings to improve crossing safety and to deploy a quiet zone. Together both the NCTCOG railroad grant and the Federal Earmark are to solve the severe access problems caused by stopped trains blocking crossings in the Samuels Avenue/Rock Island neighborhood. The Hemphill West, Magnolia Avenue, and Sycamore School Road projects are to upgrade area railroad crossings to improve crossing safety and to deploy quiet zones. Within this effort, each project will determine the specific improvements, perform the design, and conduct the construction of the improvements. Based on the original 2003 project grant submission and subsequent approval by the Regional Transportation Commission, the Federal Highway Administration, TxDOT, and the December 2006 City Council M&C's stated above, the projects are to accomplish improved crossing safety and the creation of quiet zones. Possible improvements include, but are not limited to, ADA compliant pedestrian http://apps.cfwnet.org/council_packet(Reports/mc_print.asp 4/23/2008 Page 2 of 2 sidewalks, pedestrian under or overpasses, street closures at railroad crossings, new connector streets to bypass a closed railroad crossing, barricades and cul-de-sacs at closed streets, new railroad crossing gate and signal systems, traffic cameras and advanced systems for emergency service notification of blocked railroad crossings, etc. For these projects, TPW intends to engage HNTB as a professional engineering consultant to assist with project management, conduct public meetings, coordinate design and construction with the railroad companies, prepare railroad and roadway design, prepare project documentation, and conduct construction oversight. TPW and HNTB will also initiate construction contracts for railroad and roadway projects. HNTB Corporation is in compliance with the City's M/ BE Ordinance by committing to 23 percent MWBE participation. The City's goal for this project is 20 percent. These projects are located in COUNCIL DISTRICTS 6, 8 and 9. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Grants Fund. TO Fund/Account/Centers FROM Fund/Account/Centers GR76 531200 020302156300 $24,974.00 GR76 531200 020302156800 $26,316.00 GR76 531200 020302159300 $74,993.00 GR76 531200 020302159800 $80,643.00 GR76 531200 020302158300 $135,044.00 GR76 531200 020302158800 $119,124.00 GR76 531200 020302157300 $383,487.00 GR76 531200 020302157800 $122,854.00 Submitted for City Manager's Office by- Femando Costa (8042) Originating Department Head: Greg Simmons (7862) Additional Information Contact: Russell Wiles (7978)