HomeMy WebLinkAboutContract 49776-CO2 CITY SECRETARY tJCZ 2 4 24�r' o-'GO`a FORTWORTH. City of Fort Worth CONTRACT N0. 49771 0VNsEct�E � Change Order Request Project Name HMAC 2017-13 HIR Street Rehabilitation City Sec# 1 49778 Client Project#(.$)l 100994 Project Removal and replacement of nonfunctional driveways,curbs and gutters and sidewalks,followed by recycling and mixing Description of the exisUng asphalt and an overlay of I"surface course asphalt. Contractorl Cutler Repaving Change Order# Date 6125/2019 City Project Mgr. Kristian Sugrim City Inspector Fiarad Souders Dept. TPW-Storm Contract Time Water Totals D Original Contract Amount $1,735,745.70 $1,735,745.70 180 Extras to Date $85,000,00 $85,000,00 130 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $11820 7.45:70.. t $1,820,745.70 310 Go to ADD&DEL Tabs to Enter CO Backup IL i 0;00J . 223 Revised Contract Amount 1;820,74510!.-'+ I'. i $1,820,745,70 533 Original Funds Available for Change Orders Remaining Funds Available for this CO $0;00!] ';t Additional Funding(if necessary) E CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -A90 MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) 2,169,682:13i N This Change Order is a time only request,The contractor had requested a delay of 113 days(121311 8-3/27/18),which was approved by management,due to conditions that were non-conduclve to the progedural activity.Also,this change order will compensate for 51 bad weather days and 59 days due to school activity on Evans Ave,(59 day delay consisted of a 22 day delay during initial paving conflicting with summer school activities and 37 days for installation and striping of the raised crosswalk used by students). It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or Incidental to,the above Change Order. The ProjectlProgram Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. m CutlerRepaving Charles R.Veskema nth WC Number M&C Date Approved C� �® ul SEL�i,`TARY FT WORTH,TX 0 � \ « m / k # \ E / » o e / � ƒ � a * 2 � � 7 � ƒ / CO k / ~ § E \ # - / A - \ \ y to a 2 § O an § k7 t � 25 a L f U-2 < m o o� % % � \ / � Iim � k \ \ 7 G a § k e CL2 EM m e a = E - \ 9 CL m ƒ 7 \ \ ƒ ® / / E / k I / o # § § § f cm � f : • 2 $ a § . \ ~ � : O O 4 U7 CL yam. p 7F � C C f?n p 7 N O N v w m a w c - O a 0 CD an c U 0 \ - ,- � £ k ± % m e a ° . \ U k A! 7 _ ƒ g - k f 2 ® A \ ^ § � & 2 � 7 k � / nLn 7 a 2� 0) 2 02 3 k Ln k � \ o ° k 2 U. - « § O �& \ \ . § U § � S \ S § £ U « W e / = k § � / 03 \ $ -EL\ e « 7 e w 2 CL � k2 ® # ® I a CD 3 $ z \ / \ CL \ � . v 2_ \ + u CD 2 & � a O O 6q U7 6I C a C d O � � O 0. a N 4" O N C1 na f0 L1. C O 41 N d N ^L V Q� L U MMBE Breakdown for this Change Order MWBE,Sub Type of Service Amount for this.CO N/A Total $0 00 Previous Change Orders co* -DATE AMOUNT None Total $O;DO JUSTIFICATION SUMMARY HMAC 2017-13 HIR STREET REHABILITATION CPN: 100994 In November 2018, Cutler Repaving, Inc. requested a 113 days suspension to their paving activities which was subsequently accepted by TPW. The resumption of construction activities occurred on March 4, 2019. This delay was because the low temperatures were not acceptable for the 1" hot-in-place recycling overlay. Also, this Change Order, for time only, will compensate for 51 rain days and 59 days from Morningside Elementary School Summer activities for a total additional time of 223 days. Prior to this request, we had added 130 days for additional base repairs and pavement markings. Therefore, the revised contract time will be 533 days. The effective date of the work order on this project was February 5, 2018, for an allowable time of 180 calendar days. At this time, all construction activities on this contract are completed and it's ready for close-out. i BIM 360 Document Management Page 1 of 2 AUTODESK'BIM 360' fortworthgov >100994-HMAC 2017-13 HIR Street Rehab- A KS =� Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews > Review detail CLOSED #10 Change Order Workflow Approval Export Report This review is closed. Name Description Ver PROGRESS 13 Change Order2 For Days 2017-13 HIR_1OO99... -- V] Initiator Initial Review v =! Change Order2 For Days 2017-13 HIR_1OO99... - V] Reviewer 1 Initial Review 1 n LZ Lane Zarate Sep 20,12:45 PM <lane.zarate@fortworthtexas.gov> r •,�} V! • g Y: Submitted to Reviewer 2 Approved.Additional justification on AWSt y• a the last page of the PDF. .4r Z. . y�"' Reviewer 2 Initial Review 2 n Maty J. Kaye , •ty ecretary LP Lauren Prieur Sep 20,12:53 PM <Lauren.prieur@fortworthtexas.gov> Submitted to Reviewer 3 No comments Reviewer 3 Initial Review 3 n WJ William Johnson Oct 1,12:21 PM <william.johnson@fortworthtexas.gov> Submitted to Reviewer 4 Reviewer 4 Initial Review 4 n DB Douglas Black Oct 7,1:51 PM <doug.black@fortworthtexas.gov> Submitted to Approver No legal issues.Final approval subject to staff satisfying William Johnson's concerns. OFFICIAL RECORD Approver Final Review n CITY SECRETARY DB Dana Burghdoff Oct 21,9:27 AM FT WOR,rH,TX <Jana.burghdoff@fortworthtexas.gov> Review ended htt.ns://does.b360.autodesk.com/nroi ects/4201 edb2-90ed-4782-a9a5-a609d368c6b9/reviews/7be6... 10/23/2019 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Su rim Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Kristian Su rim �^^-- Printed Name Signatu A ECORDETARYH, TX