Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 5995
• r ORDINANCE NO. FT. WORTH, TEX. ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR PART OF THE COST OF IMPROVING A PORTION OF___ CANNON STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS: FIXING CHARGES AND LIENS AGAINST ABUTTING PROPERTY THEREON, AND AGAINST THE OWNERS THEREOF: PROVIDING FOR THE COLLECTION OF SUCH ASSESSMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFI- CATES IN EVIDENCE THEREOF: RESERVING UNTO THE CITY COUNCIL THE RIGHT TO ALLOW CREDITS REDUCING THE AMOUNT OF THE RESPECTIVE ASSESSMENT TO THE EXTENT OF ANY CREDIT GRANTED: DIRECTING THE CITY SECRETARY TO EN- GROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE RECORDS OF SAID CITY: AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth,Texas, be improved by raising, grading, or filling same and by constructing thereon to-wit: PROJECT NO. 104-24000-178 1. CANNON STREET From the east line of Bryan Avenue to the west line of Crawford Street, -known and designated as Unit No. 1, to be im- proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a thirty-foot wide roadway, and by re- constructing existing driveways to proper alignment and grade and constructing six- inch thick concrete driveways where specified. 2. AIR ROAD From the east line of Muse Street to the east property lines of Lot 6R, Block 6 L =mot�1R, Block 3, Ryanwooddi- tion, know as Unit No. 2, to be i y cons�C� s„�yeven-inch .. kCL"Ic'hot-mix asphaltic concrete pav m' 4it on a six-inch thick lime stabilized subgrade on a sixty-foot wide roadway. 3. VERBENA STREET From the east line of New York Avenue to the west line of Bransford Street, known and des- ignated as Unit No. 3, to be improved by con- structing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a thirty-foot wide roadway, and by reconstructing existing driveways to proper alignment and grade and constructing six-inch thick concrete drive- ways where specified. 4. BINKLEY STREET From the north line of Bideker Street to the south line of Burchill Road South, known and designated as Unit No. 4, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a thirty-foot wide roadway, and by construc- ting six-inch thick concrete driveways where specified. 5. WHITSON STREET From the north line of East Lancaster Ave- nue to the north property lines of Lot 10, Block 8, and Lot 1, Block 9, Interurban Addition, 2nd Filing, known and designated as Unit No. 5, to be improved by construc- ting a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime sta- bilized subgrade on a thirty-foot wide road- way, and by constructing six-inch thick con- crete driveways where specified. 6. NEW YORK AVENUE From the north line of Cantey Street to the south line of Judd Street, known and desig- nated as Unit No. 6, to be improved by con- structing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized aubgrade on a thirty-foot wide roadway. 7. NEW YORK AVENUE From the north line of Judd Street to the south line of Morningside Drive, known and designated as Unit No. 7, to be improved by constructing a six-inch thick hot-mix asphal- tic concrete pavement on a six-inch thick lime stabilized subgrade on a thirty-foot wide roadway. 8. HATCHER STREET From the north line of Baylor Street to the south line of Griggs Court, known and desig- nated as Unit No. 8, to be improved by con- structing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a thirty-foot wide roadway. 9. MENZER ROAD From the east line of Oakcliff Road to 20 feet east of the west property line of Lot 20, Benmar Grove Addition, known and desig- nated as Unit No. 9, to be improved by con- structing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a thirty-foot wide roadway. 10. RAY ALVIN STREET From the north line of Alcannon Street to the south line of Pecos Street to the West, known and designated as Unit No. 10, to be improved by constructing a six-inch thick hot-mix asphaltic con crete pavement on a six-inch thick cement stabilized subgrade on a thirty-foot wide roadway, and by con- structing six-inch thick concrete drive- ways where specified. 11. HATCHETT STREET From the west line of Edgewood Terrace to the west property line of Lot 1, Block 5, Mount Vernon Heights Addition, and the east 45 feet of Lot 9, Block 3, Provine Addition, known and designated as Unit No. 11, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a thirty-foot wide roadway, and by recon- structing existing driveways to proper alignment and grade and constructing six- inch thick concrete driveways where specified. 12. ANDREW STREET From the north line of Ramey Avenue to the south line of Booker T. Street, known and designated as Unit No. 12, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a thirty- foot wide roadway. The above,together with combined concrete curbs and gutter on proper grade and line where same are not already so constructed, together with storm drains and other necessary incidentals and appurtenances; all of said improve- ments are to be so constructed as and where shown on the plans and in strict accordance with the Plans and Specifications therefor: and contract has been made and entered into with— GENERAL CONSTRUCTION COMPANY for the making and construction of such improvements on the above said portion of streets, avenues and public places. WHEREAS, estimates of the cost of the improvements of each such portion of streets, avenues and public places were prepared and filed and approved and adopted by the City Council of the City, and a time and place was fixed for a hearing and the proper notice of the time, place and purpose.of said hearing was given and said hearing was had and held at the time and place fixed therefor, to-wit, on the 9th day of Se t.ember 19 68 9:30 A.M. in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and at such hearing the following protests and objections were made, to-wit: — _ -protested that protested that protested that protested that __protested that protested that _---protested that __--protested that _protested that �_ --_ —_protested that and said hearing was continued to the present time in order to more fully accomplish,the purposes thereof, and all desiring to be heard were given full and fair opportunity to be heard, and the City Council of the City having, fully considered all proper matter, is of the opinion that the said hearing should be closed and assessments should be made and levied as herein ordered: NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Said hearing be, and the same is hereby, closed and the said protest and objections, and any and all other protests and objections, whether herein enumerated or or not, be and the same are hereby, overruled. II. The City Council, from the evidence, finds that the assessments herein levied should be made and levied against the respective parcels of property- abutting upon the said portions of streets, avenues and public places and against the owners of such property, and that such assessments and charges are right and proper and are substantially in proportion to the benefits to the respective parcels of property by means of the improvements in the unit for which such assessments are levied, and establish substantial justice and equality and uniformity between the respective owners of the respective properties, and between all parties concerned, considering the benefits received and burdens imposed, and further finds that in each case the abutting property assessed is specially benefited in enhanced value to the said property by means of the said improvements in the unit upon which the particular property abuts and for which assessment is levied and charge made, in a sum in excess of the said assessment and charge made against the same by this ordinance, and further finds that the apportion- ment of the cost of the improvements is in accordance with the law in force in this City, and the proceedings of the City heretofore had with reference to said improvements, and is in all respects valid and regular. IIL There shall be, and is hereby, levied and assessed against the parcels of property herein below mentioned, and against the real and true owners thereof (whether such owners be correctly named herein or not) the sums of money itemized below opposite the description of the respective parcels of property and the several amounts assessed against the same, and the owners thereof, as far as such owners are known, being as follows: IV. Where more than one person, firm or corporation owns an interest in any property above described, each said person, firm or corporation shall be personally liable only for its, her or his pro rata of the total assessment against such property in proportion as its, his or her respective interest bears to the total ownership of such property, and its, his or respective interest in such property may be released from the assessment lien upon pay- ment of such proportionate sum. V. The several sums above mentioned and assessed against the said parcels of property, and the owners thereof, and interest thereon at the rate of six per cent (6(�) per annum, together with reasonable attorney's fees and costs of collection, if incurred, are hereby declared to be and are made a lien upon the respective parcels of property against which the same are assessed, and a personal liability and charge against the real and true owners of such property, whether such owners be correctly named herein or not, and the said liens shall be and constitute the first enforceable lien and claim against the property on which such assessments are levied, and shall be a first and paramount lien thereon, superior to all other liens and claims, except State, County, School District and City ad valorem taxes. The sums so assessed against the abutting property and the owners thereof shall be and become due and payable as follows, to-wit: in five (5) equal installments, due respectively on or before thirty (30) days, one (1), two (2), three (3), and four (4) years from the date of completion and acceptance of the improvements in the respective unit, and the assessments against the property abutting upon the remaining units shall be and become due and payable in such installments after the date of the completion and acceptance of such respective units, and shall bear interest from said date at the rate of six per cent (611":) per annum, payable annually with each install- ment, except as to the first installment, which shall be due and payable at the maturity thereof, so that upon the completion and acceptance of the improvements in a particular unit, assessments against the property abutting upon such completed and accepted unit shall be and become due and payable in such installments, and with interest from the date of such completion and acceptance. Provided, however, that any owner shall have the right to pay the entire assessment, or any installment thereof, before maturity by payment of principal and accrued interest, and provided further that if default shall be made in the payment of principal or interest promptly as the same matures, then the entire amount of the assessment upon which such default is made shall, at the option of said City of Fort Worth, or its assigns, be and become immediately due and payable, and shall be collectable, together with reasonable attorney's fees and cost of collection, if incurred, PROVIDED, however, that acting through its duly authorized Director of Public Works the City of Fort Worth retains the right to authorize payment of the sums assesed against abutting property upon such completed and accepted unit in not more than forty-eight (48) equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than thirty (30) days after the completion and acceptance by the City of the particular unit. PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums of lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result; and PROVIDED FURTHER, that such method of payments shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment bY said owner or owners according to the terms thereof of the sums assessed against such property. If default shall be made in the payment of any assessment, collection thereof shall be enforced either by the sale of the property by the Assessor and Collector of Taxes of said City as near as possible in the same man- ner provided for the sale of property for the non-payment of ad valorem taxes, or at the option of the City of Fort Worth, or its assigns, payment of said sums shall be enforced by suit in any court of competent jurisdic- tion, or as provided in any mechanic's or materialman's contract as aforesaid, and said City shall exercise all of its lawful powers to aid in the enforcement and collection of said assessments. VII. The total amount assessed against the respective parcels of abutting property, and the owners thereof, is in accordance with the proceedings of the City relating to said improvements and assessments thereof, and is less than the proportion of the cost allowed and permitted by the law in force in the City. VIII. Although the aforementioned charges have been fixed, levied, and assessed in the respective amounts hereinabove stated, the City Council does hereby reserve unto itself the right to reduce the aforementioned assessments by allowing credits to certain property owners where deemed appropriate. Notwithstanding the City Council has herein reserved the right to issue credits, it shall not be required to issue credits, and will not do so, if same would result in any equity and/or unjust discrimination. The principal amount of each of the several assessment certificates to be issued the City of Fort Worth, Texas, as hereinafter provided, shall be fixed and determined by deducting from the amount of any assessment hereinabove levied such amount or amounts, if any, as may hereafter be allowed by the City Council as a credit against the respective assessments. IX. For the purpose of evidencing the several.sums assessed against the respective parcels of abutting prop- erty and the owners thereof, and the time and terms of payment, and to aid in the enforcement and collection thereof, assignable certificates in the principal amount of the respective assessments less the amount of any re- spective credit allowed thereon, shall be issued by the City of Fort Worth, Texas, upon completion and accept- ance by the City of the improvements in each unit of improvement as the work in such unit is completed and accepted, which certificates shall be executed by the mayor in the name of the City and attested by the City Secretary, with the corporate seal of the City impressed thereon, and shall be payable to the City of Fort Worth, or its assigns, and shall declare the said amounts, time and terms of payment, rate of interest, and the date of the completion and acceptance of the improvements abutting upon such property for which the certificate is issued, and shall contain the name of the owner or owners, if known, description of the property by lot and block number, or front feet thereon, or such other desciption as may otherwise identify the same; and if the said property shall be owned by an estate, then the description of same as so owned shall be sufficient and no error or mistake in describing any property, or in giving the name of the owner, shall invalidate or in anywise impair such certificate, to the assessments levied. The certificates shall provide substantially that if same shall not be paid promptly upon maturity, then they shall be collectable, with reasonable attorney's fees and costs of collection, if incurred, and shall provide substantially that the amounts evidenced thereby shall be paid to the Assessor and Collector of Taxes of the City of Fort Worth, Texas, who shall issue his receipt therefor, which shall be evidence of such payment on any demand for the same, and the Assessor and Collector of Taxes shall deposit the sums so received by him forth- with with the City Treasurer to be kept and held by him in a separate fund, and when any payment shall be made in the City the Assessor and Collector of Taxes upon such certificate shall, upon presentation to him of the certificate by the holder thereof endorse said payment thereof. If such certificate be assigned then the holder thereof shall be entitled to receive from the City Treasurer the amount paid upon the presentation to him of such certificate so endorsed and credited; and such endorsement and credit shall be the Treasurer's Warrant for making such payment. Such payments by the Treasurer shall be receipted for the holder of such certificate in writing and by surrender thereof when the principal, together with accrued interest and all costs of collection and reasonable attorney's fees, if incurred, have been paid in full. Said certificates shall further recite substantially that the proceedings with reference to making the improvements have been regularly had in compliance with the law, and that all prerequisites to the fixing of the assessment lien against the property described in such certificate and the personal liability of the owners thereof have been performed, and such recitals shall be prima facie evidence of all the matters recited in such certificates, and no further proof thereof shall be required in any court. Said certificates may have coupons attached thereto in evidence of each or any of the several installments thereof, or may have coupons for each of the first four installments, leaving the main certificate to serve for the fifth installment, which coupons may be payable to the City of Fort Worth, or its assigns may be signed with the facsimile signatures of the Mayor and City Secretary. r • Said certificates shall further recite that the City of Fort Worth, Texas shall exercise all of its lawful powers, when requested so to do, to aid in the enforcement and collection thereof, and may contain recitals sub- stantially in accordance with the above and other additional recitals pertinent or appropriate thereof, and it shall not be necessary that the recitals be in the exact form above set forth, but the substance thereof shall be sufficient. The fact that such improvements may be omitted on any portion of any of said units adjacent to any premises exempt from the lien of such assessments shall not in anywise invalidate, affect or impair the lien of such assessments upon other premises. X. Full power to make and levy reassessments and to correct mistakes, errors, invalidities or irregularities, either in the assessments or in the certificates issued in evidence thereof, is,in accordance with the law in force in this City, vested in the City. XI. All assessments levied are a personal liability and charge against the real and true owners of the premises described, notwithstanding such owners may not be named, or may be incorrectly named. XII. The assessments so levied are for the improvements in the particular unit upon which the property described abuts, and the assessments for the improvements in any unit are in nowise affected by the improve- ments or assessments in any other unit, and in making assessments and in holding said hearing, the amounts assessed for improvements in any one unit have been in nowise connected with the improvements or the assess- ments therefor in any other unit. XIII. The assessments levied are made and levied under and by virtue of the terms, powers and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, known as Chapter 106 of the Acts of said Session and now shown as Article 1105b of Vernon's Texas Civil Statutes, which Act has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas. XIV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete Ordinance in the appro- priate Ordinance Records of said City. XV. This ordinance shall take effect and be in full force and effect from and after the date of its passage and it is so ordained. PASSED AND APPROVED this�day of �� 1968. APPROVED AS TO FORM AND LEGALITY: City Attorney FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below. Estimates of the total cost of improvements on a portion of CANNON STREET and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-178, UNIT NO. 1: CANNON STREET FROM THE EAST LINE OF BRYAN AVENUE TO THE WEST LINE OF CRAWFORD STREET, to be improved by constructing a six-inch thick hot-nix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing existing driveways to proper alignment and grade and constructing six-inch thick concrete drive- ways where specified. The following assessment rates have been established: Seven-inch curb and two-foot guttero.. ..... . ............ .$2046 per L.F. Two-foot gutter only.... . ... ............... . ...... ..... .. 1,23 per L,,F. Six-inch H.M.A.C. Pavement (Commercial Zoning)..... .b.. ., 4.80 per L.F. Six-inch thick concrete driveway .85 per S.F. PROJECT 04-24000-1 8 UNIT NO. 2: BRENTWOOD STAIR ROAD FROM THE INE OF MUSE STREET TO THE LAST PROPERTY LINES OF LOT 6R BLOCK 6 AND LOT 1R CK 3, RYANWOOD NORTH ADDITION, to be�oved by constructing a seven-inc ick hot-nix asphaltic concrete pavement on a six- thick lime stabilized grade, seven-inch high concrete curbs and two-foot wide concrete bpi so tha a finished street will consist of one sixty-foot wide roadway. The following assessment rates een established: Seven-inch and two-foot gutter......... .......... ...$"Z,4er L.F. Seven- H.M.A.C. Pavement (Residential Zoning)........ 2.97 per-LZ, 1 a PROJECT NO, 104-24000-178, UNIT NO, 3: VERBENA STREET FROM THE EAST LINE OF NEW YORK AVENUE TO THE WEST LINE OF BRANSFORD STREET, to be improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter,.,.,.... per L,F;. Two-foot gutter only.,,... 1.23 per L.F, Six-inch H.M.A.C. Pavement (Residential Zoning)...,,,,.., 2.94 per L.F., Six-inch thick concrete .85 per S,;F,. PROJECT NO. 104-24000-178. UNIT NO. 4: BINKLEY STREET FROM THE NORTH LINE OF BIDEKER STREET TO THE SOUTH LINE OF BURCHILL ROAD SOUTH, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been establisheds Seven-inch curb and two-foot gutter......................$2.43 per L.F, Six-inch H,M,A.C. Pavement (Residential Zoning).......... 2.97 per L.F. Six-inch thick concrete driveway„o,..,..o........,..".. ,85 per S.F. PROJECT NO 104-24000-178. UNIT NO. 5: WHITSON STREET FROM THE NORTH LINE OF EAST LAN- CASTER.AVENUE TO THE NORTH PROPERTY LINES OF LOT 10fl BLOCK 8, AND LOT 1, BLOCK 9, INTER- URBAN ADDITION, 2ND FILING, to be improved by constructing a six-inch thick hot-mix as- phaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will con- sist of one thirty-foot wide roadway, and by constructing six-inch thick concrete drive- ways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter .o....... . .....$2.43 per L.F Six-inch H.M.A.C. Pavement (Commercial Zoning),.,,....... 4,77 per L.F. Six-inch thick concrete driveway .85 per S.F. PROJECT NO. 104-24000-178, UNIT NO. 6: NEW YORK AVENUE FROM THE NORTH LINE OF CANTEY STREET TO THE SOUTH LINE OF JUDD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rates have been established: Seven-inch curb and two-foot per L„F, Six-inch H.M.A,C. Pavement (Residential Zoning)....,...... 2.97 per L,F,, 2 PROJECT NO. lO4-24000=178. UNIT NO. 7: NEW YORK AVENUE FROM THE NORTH LINE OF JUDD STREET TO THE SOUTH LINE OF MORNINGSIDE DRIVE, to be improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rates have been established- Seven-inch curb and two-foot, gutter......... ............$2.43 per L.F. Six-inch H.M.A.C. Pavement (Residential Zon.ing). .. .. ..... 2.97 per L.F. PROJECT NO. 104-24000-1.78,, UNIT NO, 8. HATCHER STREET FROM THE NORTH LINE OF BAYLOR STREET TO THE SOUTH LINE OF GRIGGS COURT, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade,' so that the finished street will consist of one thirty-foot wide roadway. The following assessment rate has been established- Six-inch H.M.A.C. Pavement (Residential Zoning)......0...$4.77 per L.F. PROJECT N0. 104-24000-178g UNIT N0. 9° MENZER ROAD FROM THE EAST LINE OF OAKCLIFF ROAD TO 20 FEET EAST OF THE WEST PROPERTY LINE OF LOT 20� BEMAR GROVE ADDITION, to be im- proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rates have been established° Seven-inch curb and two-foot gutters .. . o ., .d.e .. .... . . .0,$2.46 per L.F. Six-inch H.M.A.C. Pavement (Residential Zoning). ,.. ...o., 2.94 per L.F. PROJECT NO, 104-24000m178n UNIT NO. 10. RAY ALVIN STREET FROM THE NORTH LINE OF ALCANNON STREET TO THE SOUTH LINE OF PECOS STREET TO THE WEST, to be unproved by constructing a six-inch thick hot-nix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wade concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six inch thick concrete driveways where specified. The following assessment rates have been, established- Seven-inch curb and two-foot gutter. .....` ,. . ...... ....$2.46 per L.F. Six-inch H.M.A.C. Pavement (,Commercial Zonin g—oz,..... . 4.80 per L.F. Six-inch H,M.A.C. Pavement (Residential Zoning).,.... ... . 2,94 per L,F. Six-inch thick concrete driveway.. .. . . . .85 per S.F. 3 PROJECT NO. 104-24000-178. UNIT NO. 11: HATCHETT STREET FROM THE WEST LINE OF EDGEWOOD TERRACE TO THE WEST PROPERTY LINES OF LOT 1, BLOCK 5, MOUNT VERNON HEIGHTS ADDITION, AND THE EAST 45 FEET OF LOT 9, BLOCK 3, PROVINE ADDITION, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified, The following assessment rates have been established Seven-inch curb and two-foot gutter. ......,, . .. .—e .. ... $2.43 per L.F. Two-foot gutter only.. ., ,a...a....... ,aa. „ 1.21 per L.F. Six-inch H,M.A.C. Pavement (Residential Zoning).,.. . ..... 2.97 per L.F. Six-inch thick concrete drivewayo.. 00a.... ,. ... a.a...,... .85 per S.F. PROJECT NO. 104-240000-178. UNIT NO. 12: ANDREW STREET FROM THE NORTH LINE OF RAMEY AVENUE TO THE SOUTH LINE OF BOOKER T. STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lame stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rates have been established: Seven-inch curb and two-foot gutter... . ................ ..$2.43 per L.F. Six-inch HnM.A.C. Pavement (Commercial Zoning).... ....... 4.77 per L.F. Six-inch H.M.A.C. Pavement (Residential Zoning).......... 2.97 per L.F. The assessments result in the following division of costs: Total Property Owners° cost for curb and gutter.. .. ,,..$12,928.79 Total Property Owners° cost for improvements other than curb and gutter..nna, a , .. .. . . a „a.. 24,899.38 TOTAL PROPERTY OWNERSP COST $ 37,828.17 Total City of Fort Worth cost for curb and gutter......$13,459.17 Total City of Fort Worth cost for improvements other r7 than curb and gutter. .... e .oaa.000a.000n 69,620,8 TOTAL CITY OF FORT WORTH COST § S2L080.04 TOTAL ESTIMATED CONSTRUCTION COST 120 908:21 4 PROJECT NO. 104-24000-178, UNIT N0, 1: CANNON STREET FROM THE EAST LINE OF BRYAN AVENUE TO THE WEST LINE OF CRAWFORD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing existing driveways to proper alignment and grade and constructing six-inch thick concrete drive- ways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF BRYAN AVENUE AND CANNON STREET NORTH SIDE OF STREET TUCKER'S ADDITION Walter Womack "D'" 36 953 Pavement $4.80 $456.00 665 Bryan Avenue Apt. 18' Curb and Gutter 2.46 44.28 77' Gutter only 1.23 94.71 157.50 S. F. Drive .85 133,88 $ 728s87 Johnnie B. Austin "G" 36 95° Pavement $4.80 $456.00 666 Crawford Street Apt, 95o Gutter only 1.23 116.85 35 S. F, Drive .85 29.75 $ 602.60 CRAWFORD STREET INTERSECTS SOUTH SIDE OF STREET Mrs. Hattie Simon "H" 37 500 Pavement $4.80 $240.00 214 East Cannon Street Apt. 50' Gutter only 1.23 61.50 $ 301.50 F. Z. Williams "G" 37 50' Pavement $4.80 $240.00 208 East Cannon Street Apt. 50' Gutter only 1.23 61.50 $ 301,50 C. B. Beasley "F" 7 100' Pavement $4.80 $480.00 205 N.W. 7th Street Apt. 100' Curb and Gutter 2.46 246.00 9.50 S. F. Drive .85 8.08 $ 734.08 COST TO PROPERTY OWNERS - ASSESSMENT $2,668.55 COST TO CITY OF FORT WORTH 2,995.35 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 1 5 66 .90 5 PROJECT NO. 104-24000-178 UNIT NO. 2: -BRENTWOOD STAIR ROAD FROM THE EAST LINE OF MUSE STREET TO HE EAST PROPERTY LINES OF LOT 6R BLOCK 6 AND LOT 1R BLOCK 3, RYANWOOD NORTH ADDITN4, to be improved by constructing a seven-inch thick hot-nix asphaltic concrete pa v t on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-f t wide concrete gutters, so that the finished street will consist of one sixty-foot wi roadway. BLOCK OWNER ZONING FRONTAGE RATE OUNT ASSESSMENT BEGINNING AT THE NORTHWEST CO OF MUSE STREET AND BRENTWOOD STA AD NORTH SIDE OF STREET RYANWOOD NORTH ADDI N Jerrell T. Lowe 6R 6 1141 AdJusted 1621 Muse Street Res. 1001 Paveme $2.97 $297.00 OOf Curb d Gutter 2.43 243.00 $ 540.00 SOUTH SIDE OF STREET Allen U. Hulings 1R 1140 Adjuster to 1701 Muse Street Re 1009 Pavement $2.97 $297.00 1009 Curb and G er 2.43 243.00 $ 540.00 r COS' TO PROPERTY OWNERS - ASSESSMENT $10080.00 COST TO CITY OF FORT WORTH 4,528.08 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 2 .5 608.08 6 / PROJECT NO. 104-24000m178. UNIT NO. 3: VERBENA STREET FROM THE EAST LINE OF NEW YORK AVENUE TO THE WEST LINE OF BRANSFORD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF NEW YORK AVENUE AND VERBENA STREET NORTH SIDE OF STREET LAKE PARK PLACE ADDITION Booker T. Washington W. 50' 6 501 Pavement $2.94 $147.00 934 East Terrell of "H1' Res. 151 Curb and Gutter 2.46 36.90 35e Gutter only 1.23 43.05 $ 226.95 Labitha Little E. 811 6 811 Pavement $2.94 $238.14 1216 East Hattie of "H" Res. 81e Curb and Gutter 2.46 199,26 $ 437.40 A. Harvey "E" 6 1311 Adjusted to 1216 East Hattie Res. 1001 Pavement $2 94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 ILL INOIS AVENUE INTERSECTS Rochofsky & Feldman 4-H 5 1001 Pavement $2.94 $294.00 2418 Elm Street Res. 100t Curb and Gutter 2.46 246.00 Dallas, Texas $ 540.00 Rochofsky & Feldman 4-I & W. 5 38.51 Pavement $2.94 $113.19 2418 Elm Street 71f of Res. 38.51 Curb and Gutt. 2.46 94.71 Dallas, Texas Closed $ 207.90 Alley Rachel Hansford 3-F & E. 5 47.5' Pavement $2.94 $139.65 1061 East Verbena I' of Res. 47.5' Curb and Gutt. 2.46 116.85 Closed 96.25 S. F. Drive .85 81.81 Alley $ 338,31 Theria B. Mitchell 3-E �� 911 Pavement $2.94 $267.54 1012 Missouri Res. 911 Curb and Gutter 2.46 223.86 96.25 S. F. Drive .85 81.81 $ 573.21 7 UNIT NO. 3: CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET LAKE PARK PLACE ADDITION Hampton Huse 2-C 2 72.51 Pavement $2.94 $213.15 1122 Oak Grove Res. 72.51 Gutter only 1.23 89.18 $ 302.33 Joe Lesok 2-I 2 58.51 Pavement $2�94 $171.99 3417 Worth Hills Res, 101 Curb and Gutter 2.46 24.60 48.51 Gutter only 1.23 59.66 $ 256.25 Mary T. R. Carson 1-A 2 1311 Adjusted to 1101 Illinois Res, 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 ILLINOIS AVENUE INTERSECTS Stanley M. Berliner 2-C 1 1311 Adjusted to 1100 Illinois Res, 100' Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 96.25 S. F. Drive .85 81.81 $ 621.81 Marcelitte H. Linton 1-B 1 65.51 Pavement $2.94 $192.57 958 East Humbolt Res. 65.51 Gutter only 1023 80,57 I.T60 S. F. Drive .85 14.88 $ 288.02 Marcelitte H. Linton l A 1 65.51 Pavement $2,94 $192.57 958 East Humbolt Res. 65.51 Gutter only 1,,23 80.57 26�25 S. F. Drive .85 22.31 $ 295.45 COST TO PROPERTY OWNERS m ASSESSMENT $ 5ol67.63 COST TO CITY OF FORT WORTH 144910.40 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 3 20 0 8.0 8 PROJECT NO, 104-24000-178, UNIT NO. 4: BINKLFY STREET FROM THE NORTH LINE OF BIDEKER STREET TO THE SOUTH LINE OF BURCHILL ROAD SOUTH, to be improved by constructing a six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF BIDEKER STREET AND BINKLEY STREET WEST SIDE OF STREET BURCHILL ADDITION. 2ND FILING Mattie M. Hurley 1 11 1401 Adjusted to 2937 Bideker Res, 1001 Pavement $2.97 $297.00 loot Curb and Gutter 2,43 243.00 96.25 S. F. Drive .85 81.81 $ 621.81 W. R. James 20 11 1401 Adjusted to 3125 Pecos Street Res, 1001 Pavement $2.97 $297�00 1001 Curb and Gutter 2.43 243.00 $ 540.00 BURCHILL ROAD SOUTH INTERSECTS EAST SIDE OF STREET Paul Reasor N. 1051 10 1051 Adjusted to 3000 Burchill Road S. of 14 Res, 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 96.25 S. F. Drive .85 81,81 $ 621.81 Mrs. Virginia Matthews S. 351 10 351 Pavement $2.97 $103-95 2605 Binkley of 14 Res. 351 Curb and Gutter 2.43 85.05 96.25 S. F. Drive .85 81.81 $ 270.81 Hattie Attaway and 13 10 1401 Adjusted to Henry Chandler Res. 1001 Pavement $2.97 $297.00 3909 Millet 1007 Curb and Gutter 2.43 243.00 $ 540.00 COST TO PROPERTY OWNERS - ASSESSMENT $2s594.43 COST TO CITY OF FORT WORTH 669.20 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO, 4 $7,263.63 9 PROJECT NO, 104-24000-178,, UNIT NO. 5-. ,WHITSON STREET FROM THE; NORTH LINE OF EAST LANCAS- TER TO THE NORTH PROPERTY LINERS OF LOT 10. BLOCK 8, AND LOT 1, BLOCK 9, INTERURBAN ADDI- TION, 2ND FILING, to be improved by constructing a six-inch thick hot-nix asphaltic con- crete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF EAST LANCASTER, AND WHITSON STREET WEST SIDE OF STREET INTERURBAN ADDITION, 2ND FILING W. E. Bilderback, Jr, 11 8 130' Pavement $4.77 $620,10 1700 Yolanda Drive Ind, $ 620.10 W. E. Bilderback, Jr, 10 8 150" Pavement $4.77 $715,,50 1700 Yolanda Drive Ind. 150' Curb and Gutter 2.43 364,50 $19080.00 BOMAR STREET INTERSECTS EAST SIDE OF STREET F. M. Cross 1 1571 Pavement $4,77 $748.89 4721 Meadowbrook Drive Ind,; 157' Curb and Gutter 2.43 381.51 945 S, F. Drive .85 803,25 $1,933, 65 Abigail Curlee Holbrook 10 0� 1371 Pavement $4,M $653.49 P. 0. Box 1391 Ind, 1371 Curb and Gutter 2.43 332.91 Austin, Texas 236,25 S, F. Drive .85 200.81 $1,187.21 COST TO PROPERTY OWNERS - ASSESSMENT $4,820.96 COST TO CITY OF FORT WORTH 2,512.46 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. ,5 .42 10 PROJECT NO, 104-24000-178. UNIT NO. 6: .NEW YORK AVENUE FROM THE NORTH LINE OF CANTEY STREET TO THE SOUTH LINE OF JUDD STREET' to be improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street wi.11 con- sist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF CANTEY STREET AND NEW YORK AVENUE WEST SIDE OF STREET RYAN SOUTHEAST ADDITION Edward Grooms, Sr. 16 43 1201 Adjusted to 957 Cantey Street Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 $ 540.00 Lemuel Dunn 15 43 1201 Adjusted to 956 Judd Street Res. 1001 Pavement $2.97 $297.00 $ 297.00 JUDD STREET INTERSECTS EAST SIDE OF STREET Rev. Willie 1 44 120➢ Adjusted to Lincoln Brown Res, 1001 Pavement $2-97 $297.00 1000 Judd Street $ 297.00 Travis T. Johnson 36 __44 1201 Adjusted to 1001 Cantey Street Res. 1001 Pavement $2.97 $297.00 $ 297.00 COST TO PROPERTY OWNERS - ASSESSMENT $19431.00 COST TO CITY OF FORT WORTH 1. 1' . � TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 6 11 PROJECT NO. 104-24000-178, UNIT NO. 7: NEW YORK AVENUE FROM THE NORTH LINE OF JUDD STREET TO THE SOUTH LINE OF MORNINGSIDE DRIVE, to be improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF JUDD STREET AND NEW YORK AVENUE WEST SIDE OF STREET RYAN SOUTHEAST ADDITION Mabel M. Smith 16 40 , 120, Adjusted to 2708 New York Avenue Res. 1001 Pavement $2.97 $297.00 $ 297.00 Max Doughty 15 40 1201 Adjusted to 956 Morningside Drive Res. 1001 Pavement $2,,97 $297.00 941 Curb and Gutter 2.43 228.42 $ 525.i�2 MORNINGSIDE DRIVE INTERSECTS EAST SIDE OF STREET Joann Weber Carr 1 39 1201 Adjusted to 1000 Morningside Drive Res. 1001 Pavement $2.97 $297.00 941 Curb and Gutter 2.43 228.42 $ 525.42 Revodia Lee Johnson 36 _39 1201 Adjusted to 2707 New York Avenue Res 1001 Pavement $2.97 $297.00 $ 297v00 COST TO PROPERTY OWNERS - ASSESSMENT $18644.84 COST TO CITY OF FORT WORTH 1,749.56 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 7 5 3 49 -40 12 PROJECT NO. 104-24000-178, UNIT NO. 8: HATCHER STREET FROM THE NORTH LINE OF BAYLOR STREET TO THE SOUTH LINE OF GRIGGS COURT, to be improved by constructing a sic-inch thick hot- mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF BAYLOR STREET AND HATCHER STREET WEST SIDE OF STREET WHITEHALL ADDITION H. C. Gordon 11 6 1101 Adjusted to c/o Mortgage & Trust Res. 1001 Pavement $4.77 $477.00 1200 West Freeway $ 477.00 GRIGGS COURT INTERSECTS EAST SIDE OF STREET MIDWEST ESTATES Alfred Hawkins 1-B 2 651 Adjusted to 3963 Hatcher Res. 401 Pavement $4.77 $190.80 $ 190.80 Billy G. Walter 1-C 2 70t Adjusted to 3967 Hatcher Res. 65i Pavement $4,.77 $310.05 $ 310.05 COST TO PROPERTY OWNERS - ASSESSMENT $ 977,,85 COST TO CITY OF FORT WORTH 1.651,,98 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO,, 8 2 629-8 13 PROJECT NO. 104-24000-178, UNIT NO. 9> MENZER ROAD FROM THE EAST LINE OF OAKCLIFF ROAD TO 2a 0 FEET EAST OF THE WEST PROPERTY LINE OF LOT 20, BENMAR GROVE ADDITION, to be im- proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF MENZER ROAD AND OAKCLIFF ROAD NORTH SIDE OF STREET J. H. Davis R.O.W. 700' - No Assessment Engineer - Manager South per Turnpike Agreement Texas Turnpike Side of $ -0- Authority Turnpike 6434 Maple Avenue Dallas, Texas SOUTH SIDE OF STREET SCENERY HILL PARK ADDITION J. C. Glover 1-R-1 2 1201 Adjusted to 824 Wheelwood Drive Res. 1001 Pavement $2.94 $294.00 Hurst, Texas 1001 Curb and Gutter 2.46 246,00 $ 540.00 J. C. Glover 1-R-2 2 771 Adjusted to 824 Wheelwood Drive Res„ 62t Pavement $2.94 $182.28 Hurst, Texas 621 Curb and Gutter 2.46 152,52 $ 334.80 J. C. Glover 1-R-3 2 77' Adjusted to 824 Wheelwood Drive Res. 621 Pavement $2.94 $182028 Hurst, Texas 621 Curb and Gutter 2,46 152,52 $ 334.80 BENMAR GROVE ADDITION S. W. Taylor 14, 15, 2601 Pavement $2.94 $764.40 1440 Eagle Drive 16 & 17 Res,; 2601 Curb and Gutter 2.,46 639.60 $1,404.00 S. W. Taylor 18 651 Pavement $2,94 $191.10 1440 Eagle Drive Res. 651 Curb and Gutter 2,46 159.90 $ 351.00 Donald C. Cartmell 19 651 Pavement $2.94 $191.10 4109 Benmar Res. 651 Curb and Gutter 2.46 159.90 $ 351.00 14 UNIT NO. 9 m CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET BENMAR GROVE ADDITION Donald C. Cartmell 20 65f Adjusted to 4109 Benmar Res. 201 Pavement $2.94 $ 58.80 20, Curb and Gutter 2.46 49.20 $ 108.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 3,423.60 COST TO CITY OF FORT WORTH 16.457.80 TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO,; 9 19.,881.1 15 PROJECT NO. 104-24000-178, UNIT NO. 10; RAY ALVIN STREET FROM THE NORTH LINE OF ALCANNON STREET TO THE SOUTH LINE OF PECOS STREET TO THE WEST, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF ALCANNON STREET AND RAY ALVIN STREET WEST SIDE OF STREET VICKERY ACRES ADDITION Don Wilson Griffin S, 1021 2 102c Pavement $4.80 $489;,60 2933 Alcannon of 21 Comm, 1021 Curb and Gutter 2.46 250.92 $ 740-52 Don Wilson Griffin N. 98' 2 981 Adjusted to 2933 Alcannon of 21 Res. 781 Pavement $2.94 $229.32 781 Curb and Gutter 2,46 191,88 157.50 S. F„ Drive .85 133.88 $ 555.08 Don Wilson Griffin 21-A 2 1201 Adjusted to 2933 Alcannon Res. 100' Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 157,50 So F. Drive .85 133.88 $ 673.88 LUCINDA LANE INTERSECTS Stafford Abernathy 1 2 1221 Adjusted to 5000 Ray Alvin Res. 1001 Pavement $2.94 $294:00 1001 Curb and Gutter 2,46 246..00 $ 540.00 Stafford Abernathy 1-A 2 2001 Adjusted to 5000 Ray Alvin Res,, 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 PECOS STREET TO THE WEST INTERSECTS EAST SIDE OF STREET TARRANT ADDITION Charline Ricketts and 10 3 2001 Adjusted to James D. Ricketts Res. 1001 Pavement $2.94 $294.00 c/o Gen. Amer. Life Ins., Co. 100, Curb and Gutter 2.46 246.00 1501 Locust Street $ 540.00 St. Louis, Missouri 16 UNIT NO. 10 CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT PECOS STREET TO THE EAST INTERSECTS EAST SIDE OF STREET TARRANT ADDITION E. L. Gillingham 18 5 2001 Adjusted to 3000 Pecos Street Res. 100, Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 VICKERY ACRES ADDITION Jack Russell N. 157.51 1 157.5' Adjusted to 400 Union Bank Bldg. of 17 Res. 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 Mrs, Lillian Faulkner N. 77.51 1 77.5' Pavement $2.94 $227.85 3001 Alcannon of S. Res. 77.5' Curb and Gutt. 2.46 190.65 157.5' of 17 96.25 S. F. Drive .85 81.81 $ 500.31 Mrs. Lillian Faulkner S. 801 1 801 Pavement $4.80 $384.00 3001 Alcannon of S. Comm. 80t Curb and Gutter 2.46 196.80 157.5' of 17 $ 580.80 COST TO PROPERTY OWNERS m ASSESSMENT $5,750.59 COST TO CITY OF FORT WORTH 9,866.38 TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO. 10 $15,616,t2Z 17 PROJECT NO. 104-24000-1788, UNIT NO, 11: HATCHETT STREET FROM THE WEST LINE OF EDGEWOOD TERRACE TO THE WEST PROPERTY LINE OF LOT 1. BLOCK 5, MOUNT VERNON HEIGHTS ADDITION, AND THE EAST 45 FEET OF LOT 9, BLOCK 3, PROVINE ADDITION., to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHEAST CORNER OF EDGEWOOD TERRACE AND HATCHETT STREET SOUTH SIDE OF STREET MOUNT VERNON HEIGHTS ADDITION Vernon Y. Cain 4 2 80.61 Pavement $2.97 $239.38 4520 Hatchett Res. 65.61 Gutter only 1.21 79.38 $ 318d76 Vernon Y. Cain 3 2 801 Pavement $2.97 $237.60 4520 Hatchett Res. 809 Gutter only 1.21 96.80 $ 334.40 Florence Alice Ashley 2 2 801 Pavement $2.97 $237.60 4512 Hatchett Res. 801 Gutter only 1,21 96.80 26.25 S. F. Drive .85 22.31 $ 356.71 Mrs. W. F. Gambill 1 2 66.61 Pavement $2.97 $197.80 4508 Hatchett Res. 66.61 Gutter only 1,21 80.59 26.25 S. F. Drive .85 22.31 $ 300„70 Luther Meacham 2 831 Pavement $2.97 $246-51 4504 Hatchett Res. 831 Gutter only 1.21 100,43 $ 346.94 B. J, Hayes 1 �, 821 Pavement $2.97 $243.54 4500 Hatchett Res. $ 24.3.54 NORTH SIDE OF STREET PROVINE ADDITION Clifton Brignac 9 � 451 No Acosee m No Assessment 4458 Normandy Drive Res. $ -Om 18 UNIT NO. 11 m CONTINUED BLOCK OWNER TAT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET MOUNT VERNON HEIGHTS ADDITION Clifton Brignac 4 & W. 6 901 Pavement $2.97 $267.30 4458 Normandy Drive of 3 Res. 901 Gutter only 1.21 108.90 $ 376.20 Leroy Noble E. 6 30s Pavement $2.97 $ 89.10 4509 Hatchett of 3 Res. 30' Gutter only 1,21 36,30 $ 125.40 Leroy Noble 8 1 66.61 Pavement $2.97 $197.80 4509 Hatchett Res. 66.61 Gutter only 1..21 80.59 $ 278.39 Wallis M. Smith 7 1 801 Pavement $2.97 $237.60 4513 Hatchett Res. 801 Curb and Gutter 2.43 194.40 $ 432.00 Charles H. Peele, Jr. 6 1 801 Pavement $2.97 $237.60 2913 Pacific Court Res. 801 Curb and Gutter 2.43 194.40 Irving, Texas 75060 $ 432.00 Charles H. Peele, Jr. 5 1 80.61 Pavement $2.97 $239.38 2913 Pacific Court Res. 65.6t Curb and Gutt. 2.43 159.41 Irving, Texas 75060 $ 398.79 COST TO PROPERTY OWNERS m ASSESSMENT $39943.83 COST TO CITY OF FORT WORTH 99015.00 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO, 11. 1.2,958,8 19 PROJECT 140. 104-24000-178, UNIT NO. 12e ANDREW STREET FROM THE NORTH LINE OF RAMEY. AVENUIE TO THE SOUTH LINE OF BOOKER T. STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF RAMEY AVENUE AND ANDREW STREET WEST SIDE OF STREET PERKINS-CLARK SUBDIVISION Rufus Clark 2 B 112 551 Adjusted to 5337 Ramey Reno 100v Pavement $2,97 $297.00 1001 Curb and Gutter 2.43 243.00 $ 540.00 Rufus Clark 1 B 112,551 Adjusted to 5337 Ramey Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2,43 243.00 $ 540.00 RICKENBACKER PLACE INTERSECTS J. Andrew & Rosa Perkins 2 A 152,11 Adjusted to 1828 Dillard Res. 1002 Pavement $2.97 $297„00 1001 Curb and Gutter 2.43 243-00 $ 540.00 J. Andrew & Rosa Perkins 1 A 153,27 Adjusted to 1828 Dillard Res. 100, Pavement $2.97 $297.00 1001 Curb and Gutter 2,43 243,00 $ 540.00 BOOKER T. STREET INTERSECTS EAST SIDE OF STREET WALTER WILLI SUBDIVISION OF DAN DULANEY SURVEY Mrs. Bunion Clarrette Tr. 250.841 Adjusted to Route 1, Box 63-C Res. 150,841 Pavement $2.97 $447.99 Mansfield, Texas 150,841 Curb and Gut.2,;43 366.54 $ 814.53 20 UNIT NO. 12 m CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT RICKE NBA.CKER PLACE INTERSECTS EAST SIDE OF STREET WOODS ADDITION H. D. Edmondson 24 112.55' Adjusted to 5400 Ramey Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 $ 540.00 H. D. Edmondson 1 112.551 Pavement $4.77 $536.86 5400 Ramey Comm. 112.551 Curb and Gut.2.43 273.50 $ 810.36 COST TO PROPERTY OWNERS m ASSESSMENT $49324.89 COST TO CITY OF FORT WORTH 8,566.28 TOTAL ESTIMATED CONSTRUCTION COST ® UNIT NO. 12 12 891.1 21 �„ • • m cgs" all IS will PPFP IL V ,,don ..._ NMISEE A sill, a OR ■�.: :gip ASSESSrENT PAVING AT 12 LOCATT ON THE SOUTHEAST SIDE PROJECT NO. 104-- ,00-178 UNIT 8 - HATCHER STREET UNIT 11 - HATCHET STREET t G 718 19 lid 7ry J L.A 1 0 0 64 5 58 57 /-Q A I1 53�� 1 4 IS A a I �7I 3 4 5 6 `7 4 �' I�ORM�1P.l.A ,.5 I I I� 5 9 10 11 I C /,3 4 9 .4 IL. �` 0 11 !0 s �� • C` I S oRlvc. Af 7 B 9 to i AV* ` O t I'1 1 6 �r /C r l4 •^, 2 S 4 3 2 1 = /. lea 2? i c UNIT 9 - ME=ER ROAD UNIT 12 - ANDREW STREET I l 8Cs 8A. u u o ;,-ZTF4111Z 400 K� a ''v r'I`114 IS 16 D 0I i 3 E R C 5 4 or[ \162 /o s t A X3 MARCUS Ic4 x RICK_11FS�CICEQ PLACE Z 12 /9 1410 C b 2 24 iZ3 Z2 21120 19 is 17 esiIc115 3 10 Z /' F \ g ft Z 1 2 3j4 5'6 7 8 9 IOi II a ' 3 h6 t14 E V5. 00 71 UNIT 10 - RAY ALVIN STREET PE COS pQ :iBASCDEF I + Q ee 2 /a /7 /6 /S Pf 3 t C9 BUi3B A2BZAII3 A LUCINDA LANE 191RA A ZIfS I I'I 16 ' 19 ?Q 21 17 14 15 I4 13 12 r a oN CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 12 LOCATIONS - SOUTHEAST SIDE PROJECT NO. 104-24000-178 A Neighborhood Meeting was conducted at Do McRae Elementary School by the Engineering Division on July 29, 1968, for 12 Locations - Southeast Side, Project No. 104-24000-178, The procedures concerning owner participation in the cost of paving, inclu- ding methods and policies of determining assessments and street construction standards, were explained by members of the staff to the 22 people in attendance, The meeting was then opened for a question and answer period, Mr, C. B, Beasley, 205 NW 7th Street, owner of Lot F, Block 37, Tucker's Addition on Cannon Street, began by asking why he had to pay full rate for paving when his property was considered in a residential area. It was explained that since his property was zoned "C" Apartment he would have to pay full or commercial rate, Mr. Beasley also ques- tioned the necessity for sidewalk in this block, Mr. Schmidt answered this by saying that at the present time the policy regarding sidewalks is that they should be con- structed in areas within 2 blocks of major or arterial streets which have heavy pedestrian traffic; (i.e., within 2 blocks of streets served by bus lines, for exam- ple, or within 2 blocks any direction from a school) , Mrs, Mary Carson, 1101 Illinois Avenue, owner of Lot 1-A,__Block 2, Lake Park Place Addition on Verbena Street, questioned the paving of Verbena Street be- cause she felt that Illinois Avenue was much more in need of improvement at this time. It was explained that a petition, signed by over 50% of the property owners on Verbena Street, had been accepted to be included in a paving project, Mrs, Carson stated there was a bad drainage problem in front of her home on Illinois Avenue and (2) Resume - 12 Locations SF Side Cont. it was explained this problem would be referred to the proper department for consid- eration. Mrs. Virginia Matthews, 2605 Binkley Street, owner of the S. 35' of Lot 14, Block 10, Burchill Addition 2nd Filing, asked about building a driveway on her pro- perty since she only has 6 feet clearance between her house and the fence. Mr. Schmidt explained that only the driveway approach, from the back of the curb line to the pro- perty line, would be built. He further explained that the inspector for this project would check on the proposed dimensions of this driveway approach before it was actually constructed. Mr. B. J. Hayes, 4500 Hatchett Street, owner of Lot 1, Block 5, Mount Vernon Heights Addition on Hatchett Street, asked why it was considered necessary to build a cul-de-sac since this street had no outlet to the west at the present time. It was explained to him that it is not probable the street will be extended in the forsee- able future and it is necessary to have the cul-de-sac in order to provide enough room for emergency vehicles to turn around without backing into property ownersw yards. Mr. Hayes stated that the design of the cul-de-sac as it has been finalized (i.e., hammerhead type turn-around) is quite satisfactory. Several miscellaneous questions about individual assessments were answered at this time. No other objections were voiced at this meeting, Attachment IIBII 12 Locations - Southeast Side Page 1 of 13 Project No. 104-24000-178 ROADI,,:AY UNIT STREET LIMITS WIDTH R.O.W. 1 Cannon Street Bryan To Crawford 30 50 2 Brentwood Stair Road Muse To 1141 East 60 80 3 Verbena Street New York To Bransford 30 50 4 Binkley Street Bideker To Burchill S. 30 50 5 Whitson Street E. Lancaster To Bomar 30 50 6 New York Avenue Cantey To Judd 30 80 7 New York Avenue Judd To Morningsicle 30 80 8 Hatcher Street Baylor To Griggs Ct. 30 50 9 Menzer Road Oakcliff To 7001 East 30 50 — 65 10 Ray Alvin Street Alcannon To Pecos W. 30 50 11 Hatehett Street Edgewood Ter. To 4721 W. 30 50 12 Andrew Stre-t Ramey To Booker T. 30 50 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 8,056.7 2,994.8 863.00 4,198.9 PER CENT 100.0 37.2 10.7 52.1 PARCELS OF PROPERTY 76 co 26 10 40 rER CENT 100.0 H 34.2 13.2 52.6 z NO. OF PROPERTY OWNERS 59 18 8 33 PER CENT 100.0 30.5 13,6 55.9 Q H OWNERS LIVING ON STREET 37 H 12 4 21 PER CENT 100.0 H 32.4 10.8 56.8 OWNERS LIVING ELSEWHERE 22 W 6 4 12 PER CENT 100.0 2-7.3 18.2 54.5 C J Attachment "B" 12 Locations - Southeast Side Page 2 of 13 Project No. 104-24000-178 Cannon Street - Unit 1 3L fa T/E s�- JO /Oo JO 1 eZ -c 90 7f /+v Ql /e0 f0' S 60 'fin !t x r e n E.. C.9N/1/0 _ kki N- -e GAOS O o �= oi o 'i J Z 11 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 390.0 195.0 -0- 95.0 295.0 PER CENT 100.0 50.0 -0- 24.4 75.6 PARCELS OF PROPERTY 5 3 —0— 1 4 PER CENT 100.0 60.0 -0- 20.0 80.0 NO. OF PROPERTY OWNERS 5 3 —0— 1 4 PER CENT 100.0 60.0 -0- 20.0 80.0 OWNERS LIVING ON STREET 4 3 -0- 1 3 PER CENT 100.0 75.0 -0- 25.0 75.0 OWNERS LIVING ELSEWHERE 1 —0— —0— —0— 1 PER CENT 100.0 -0- -0- -0- 100.0 tittachment "B" 12 Locations - Southeast Side Page 3 of 13 Project No. 104-24000-178 .3rentwood Stair Road - nit 2 1 12 uI I . J I2 . 1 2 11 2 11 2 11 2 N 3 a A 3 — "� p:. G.56 Ac. 4 9 < 4 �j 9 r•• 4 9 4 - 5 8 s u' S (� B 5 9Cf w t 6A 7A 6R� 7-0. q 6 0. 7A 6R, J _ ORENTWOOCJ S"i Alr' 120/1IJ d 26-R 19 8.s 26-R o 1-R oM 2.7 " 1 r ' 25-R F 2-2 °u 25R ° 2-R �, 26 2 17 i u 6.w 3 24 R 3 R ';� 24 p— \V^ a 3-R 27 `�1 - 3 P f._....: 23 R • 4--P- 'a_ 2;i-2 a 42 22 R .. � 21•R ° 6-R 21 R 6R -- --- - - - 21 TR-.3-G imi SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 228.0 -0- 114.0 114.0 1 PER CENT 100.0 -0- 50.0 50.0 PARCELS OF PROPERTY 2 -0- 1 1 PER CENT 100.0 Q -0- 50.0 50.0 W E-4 NO. OF PROPERTY OWNERS 2 H -0- 1 1 PER CENT 100.0 H -0- 50.0 50.0 F�- OWNERS LIVING ON STREET 2 y t —0— 1 1 PER CENT 100.0 -0- 50.0 50.0 U OWNERS LIVING ELSEWHERE -0- -0- -0- -0- PER CENT -0- -0- -0- -0- Attachment "B" 12 Locations - Southeast Side Page 4 of 13 Project No. 104-24000-178 Verbena Street - Unit 3 ---f---' ----a--- �•..�� Abe`'`- R ,I o9 78 79 do e1 8X e3 e1 1 7 III 110 IO! 1.8 lox ta! I.7 14 Iy E G k E l�s, tt,7 Itf Itt Ili- 116 1(7 11B 119 lto f v I 1 H D Ir F So ` I o J• - So Jo I r 2 li Q °1 P 3 4 S c y B 9 10 to' I 3 4 .Z IO Y f 7 G w' lJ ZS 11 Io 9 B \c� 22 Z3 12 B �' � y £ t 1 S ° I c y SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1,063.0 604.0 178.5 419.0 465.5 PER CENT 100.0 56.8 16.8 39.4 43.8 PARCELS OF PROPERTY 13 7 2 5 6 PER CENT 100.0 53.8 15.4 38.4 46.2 NO. OF PROPERTY OWNERS 11 6 2 4 5 PER CENT 100.0 54.5 18.2 36.4 45.4 OWNERS LIVING ON STREET 3 1 2 1 —0— PER CENT 100.0 33.3 66.7 33.3 -0- OWNERS LIVING ELSEWHERE 8 5 —0— 3 5 PER CENT 100.0 62.5 -0- 37.5 62.5 attachment "B" 12 Locations - Southeast Side Page 5 of 13 Froject No. 104-24000-178 Binkley Jtreet - Unit 4 r l rJ z rap /L L —r — I /T H 19 .Co J9 IS l6 17 18 l9 20 21 1 (n G S 3 2 I ` Zo 7 6 ZJ IR /Z 7 G e i B/LJ�XE"T2 s F IJ IG IT IB 19 20 11 R 213 Z-1 15 l6 17 rB l4 20 a IJ 1L 17 IO /S EO 31 2.t IP li IO 9 0 J. I t SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 560.0 420.0 315.0 105.0 140.0 PER CENT 100.0 75.0 56.3 18.7 25.0 PARCELS OF PROPERTY 5 4 3 1 1 PER CENT 100.0 80.0 60.0 20.0 20.0 NO. OF PROPERTY OWNERS 5 4 3 1 1 PER CENT 100.0 8010 60.0 20.0 20.0 OWNERS LIVING ON STREET 3 3 2 1 -0- PER CENT lco 0 10010 66.7 33.3 —0— OWNERS LIVING ELSEWHERE 2 1 1 —0— 1 PER CENT 100.0 50.0 50.0 -0- 50.0 Attachment "B" 12 Locations - Southeast aide Page 6 of 13 Project No. 104-24000-178 .,hitson Street - Unit r-sdo 4 5�,-- 7 B 9 !0 'Z 2 3 5 I ! 2 3 4 S 6 7 I 8 9 10 ` 2 2 3 \4 S l .20 J9 18 17 16 IS 74 13 1 {�71 '20 J 19 16 I 1/S G14 13 2 Jl -.Z6 2S 24 23 2Z j? YrYYY 1� d p.M.A I 2 3 4 S 6 7 8 9 Ja 1 3 4 S 5 7 8 9 10 1 I 2 3 4 3 r 20 /9 19 17 76 1-5- !4 !3 12 II 20' [g [B 17 J6 !S 14 13 12 II' '10 9 9 7 6 sa Df3LLAS� E'. Lf31-1CAS TER FIVE SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 574.0 437.0 574.0 -0- -0- PER CENT 100.0 76.1 100.0 -0- -0- PARCELS OF PROPERTY 4 3 4 -0- -0- PER CENT 100.0 75.0 100.0 -0- -0- NO. OF PROPERTY OWNERS 3 2 3 —0— —0— PER CENT 100.0 66.7 100.0 -0- -D- OWNERS LIVING ON STREET —0— —0— —0— —0— —0— PER CENT —0— —0— —0— -0— —D— OWNERS LIVING ELSEWHERE 3 2 3 —0— —0— PER CENT 100.0 66.7 100.0 -0- -0- Attachment IT" 12 Locations - Southeast Side 'age 8 of 13 Project No. 104-24000-178 New York Avenue - Unit 7 ivy sio� aMy7r Jo 9 4 l i 7 a qu 1*7 x yJ ffo 20 so f 1 4 • "r Ile 4 0 1 .1, ILI 7-0, zf X6 -Z 2. 13 22 nil OW/V r4, y 4 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 480.0 240.0 -0- -0- 480,0 PER CENT 100.0 L:0.0 --0- -0- 100.0 PARCELS OF PROPERTY 4 2 -0- -0- 4 PER CENT 100.0 50.0 -0- -0- 100.0 NO. OF PROPERTY OWNERS 4 2 -0- -0- 4 PER CENT 100.0 50.0 -0- -0- 100.0 OWNERS LIVING ON STREET 4 2 -0- -0- 4 PER CENT 100.0 50.0 -G- 10010 OWNERS LIVING ELSEWHERE -.0- -0- --Q- -0- -0- PER CENT -0- -0- -0- -0- -0- T41% ttachIr.,ent "B" 12 Locations - Southeast Side Page 9 of 13 Project No. 104-24000-178 Hatcher 3'ureet - Unit 8 ----- . .. ........... .......... .......... ......... .. ........ r T� - Q., a 1 10 It SA CJ to 1, 16 DRIVES& 5 to 45 C AD" Z-)t 3-A 4 3 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST 140 OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 245.0 135.0 135,0 -0- 11010 PER CENT 100.0 55.1 55.1 -0- 44.9 PARCELS OF PROPERTY 3 2 2 -.0- PER CENT 100.0 66.7 66.7 -0- 33.3 NO. OF PROPERTY OWNERS 3 2 2 -0- 1 PER CENT 10010 66.7 66.7 -0- 33.3 OWNERS LIVING ON STREET 3 2 2 -0- 1 PER CENT 100.0 66.7 66.7 -0- 33.3 OWNERS LIVING ELSEWHERE -0- -0- -0- -0- -0- PER CENT -0- -0- -0- Attachment "B" 12 Locations — Southeast Side Wage 10 of 13 YroJect No. 104-24000-178 Iienzer Road — Unit 9 Q 1 � S ti 1 � I r R ti /f /S /6 /1 /9 /9 10 Z/ V�D � I 4 `.A•1 _ _i0' Iiip_Fe riri✓/o Pu6/'c U/ili 1� --- __ - R y• i.R•i o _ � ENS , � 1 2 /1 /0 9 8 7 6 BfNMAP s T Q ,4 L SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 729.0 455.0 325.0 130.0 274.0 PER CENT 100.0 62.4 44.6 17.8 37.6 PARCELS OF PROPERTY 10 7 5 2 3 PER CENT 100.0 70.0 50.0 20.0 30.0 NO. OF PROPERTY OWNERS 3 2 1 1 1 PER CENT 100.0 66.7 33.4 33.3 33.3 OWNERS LIVING ON STREET —O— -0- -0- -0- -0- PER CENT —0— -0- -0- -0- —0— OWNERS LIVING ELSEWHERE 3 2 1 1 PER CENT 100.0 66.7 33.4 33.3-" ;�3� 3 i i 1•� Attachment IIBII 12 Locations - Southeast Side Page 11 of 13 Project No. 104-24000-178 Ray Alvin Street - Unit 10 EC o5 ST 0 10 11 12 13 14 15 16 17 18 i 10 `Y F PECO N�' 1-6 1-► 16 17 16 1 14 13 12 11 10 9 LUCIND a Z 17 16 15 1 13 12 11 10 11 1, IW ( a - ACC CANNON c P SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1,357•0 8 2.0 -0- 515,0 PER CENT 100.0 62.8 -0- 37.2 PARCELS OF PROPERTY 8 5 -0- 3 PER CENT 100.0 62.5 -0- 37.5 A W NO. OF PROPERTY OWNERS 6 a 3 -0- 3 PER CENT 100.0 H 50.0 -0- 50.0 OWNERS LIVING ON STREET 5 3 -0- 2 PER CENT 100.0 P-A 60.0 —0— 40.0 U OWNERS LIVING ELSEWHERE 1 -0- -0- 1 PER CENT 100.0 —0— —0— 10010 1. Attachment "B" 12 Locations - Southeast ride Page 12 of 13 Project No. 104-24000-178 Hatchett Street - Unit 11 -DAI/E �:,_� ( - r .. .a 74 65 oC rim rs 1y I! IJ • 7 9 9 � o f A_r A e 2 r1 bo s IS ' s � 0� J• 171 s Q `�: c-e pv ; p = A ..� A 4 3 B 7 6 s I 19 ,° • 1 ` gam____.� j �?_Q_— 62 NA MA,QT H#1 e R lz �.{ 7 ISO po SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 944.4 648.8 80.0 -0- 864.4 PER CENT 100.0 68.7 8.5 -0- 91.5 PARCELS OF PROPERTY 11 9 1 —0— 10 PER CENT 100.0 81.8 9.1 -0- 90.9 NO. OF PROPERTY OWNERS 9 7 1 —0— 8 PER CENT 100.0 77.8 11.1 -0- 88.9 OWNERS LIVING ON STREET 7 7 1 —0— 6 PER CENT 100.0 100.0 1.4.3 -0- 85.7 OWNERS LIVING ELSEWHERE 2 —0— -0- —0— PER CENT 100.0 -0- -0- -0- 100.0 1 Attachment "B" 12 Locations - Southeast Side Page 13 of 13 Project No. 104-24000-178 Andrew Street - Unit 12 7 /6-C ` ._ r. f• r- A � Y a /6A /6.8 /6 O' 8-D C-C 8-6 8-A v f. A 800A'Z-R � T Vf.L� !. S T.9 ,7,f� • n.J fi.f a . • { ST. - - - - ' q2V - .. T L L C 6 P' TR 7-c �/ TR //A, ! 7-R. 7-,0 N+ TR 7-4- F / E Q 6 a z Tes-B ; RIC KEIVgA 0 20 Jf 1 �If 15 122 121 ,20 �/9 r/B �/,r ./ L/ S 6 A , r �Z� Y �J ;� 6 7 iB 9 1i.f fi.f >e. Yf1. f `IS `Jr.r `(. `!J l` {1 ` {• ` SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1,006.3 755.3 305.3 -0- 701.0 PER CENT 100.0 75.1 30.3 -0- 69.7 PARCELS OF PROPERTY 7 6 2 -0- 5 PER CENT 100.0 85.7 28.6 -0- 71.4 NO. OF PROPERTY OWNERS 4 3 1 -0- 3 PER CENT 100.0 75.0 25.0 -0- 75.0 OWNERS LIVING ON STREET 2 2 —0— —0— 2 PER CENT 100.0 100.0 -0- -0- 100.0 S OWNERS LIVING ELSEWHERE 2 1 1 -0- 1 PER CENT 100.0 50.0 50.0 -0- 50.0 FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below. Estimates of the total cost of improvements on a portion of CANNON STREET and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-178, UNIT NO. 1: CANNON STREET FROM THE EAST LINE OF BRYAN AVENUE TO THE WEST LINE OF CRAWFORD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing existing driveways to proper alignment and grade and constructing six-inch thick concrete drive- ways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter..... . . . . . .. ... . .. . . .$2 ,46 per L.F. Two—foot gutter only...e . . .. . . .. .0. . ...e. . . . .ee .. oe .. .. . 0 1,,23 per L.F. Six-inch H.M.A,C. Pavement (Commercial Zoning),, . , . . . - . . . 4.80 per L.F. Six-inch thick concrete driveway. .... .eeeceao. .p. ceo.n... .85 per S.F. PROJECT NO. 104-24000-178, UNIT NO. 2: BRENTWOOD STAIR ROAD FROM THE EAST LINE OF MUSE STREET TO THE EAST PROPERTY LINES OF LOT 6R, BLOCK 6, AND LOT 1R, BLOCK 3, RYANWOOD NORTH ADDITION, to be improved by constructing a seven-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one sixty-foot wide roadway. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . eee.e, .,.. .. .$2.43 per L.F.. Seven-inch H_M.A.C. Pavement (Residential Zoning)........ 2.97 per L.F. 1 PROJECT NO, 104-24000-178, UNIT NO, 3: VERBENA STREET FROM THE EAST LINE OF NEW YORK AVENUE TO THE WEST LINE OF BRANSFORD STREET, to be improved by constructing a stc-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified, The following assessment rates have been established: Seven-inch curb and two-foot gutter, . ,... per L.F. Two-foot gutter only_. _ _ __. ___ .. . . o . ... ... . — 1.23 per L.:F, Six-inch H M.A,,C. Pavement (Residential Zoning).. .o<< "o 2.94 per L.F, Six-inch thick concrete .85 per SF,, PROJECT NO. 104-24000-178. UNIT NO. 4: BINKLEY STREET FROM THE NORTH LINE OF BIDEKER. STREET TO THE SOUTH LINE OF BURCHILL ROAD SOUTH, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been establisheds Seven-inch curb and two-foot gutter .. .. . .. ,,$2:43 per L,F, Six-inch H.M.A.C. Pavement (Residential Zoning).., ,,. . ... 2.97 per L,F,, Six-inch thick concrete driveway..o. ..o.. o ... ...o.a.a.o . . . .85 per S.F. PROJECT NO 104-24000-178, UNIT NO. 5: WHITSON STREET FROM THE NORTH LINE OF EAST LANZ CASTER,AVENUE TO THE NORTH PROPERTY LINES OF LOT 1.0, BLOCK g, AND LOT 1., BLOCK 9, INTER- URBAN ADDITION, 2ND FILING, to be improved by constructing a six-inch thick hot-mix as- phaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will con- sist of one thirty-foot wide roadway, and by constructing six-inch thick concrete drive- ways where specified, The following assessment rates have been established-, Seven-inch curb and two-foot gutter ;,....a000 . .se .$2.43 Per L.F, Six-inch H.M.A.C. Pavement (Commercial Zoning), ,.. . .. „ , 4.77 Per L,F. Six-inch thick concrete 85 per S.F,, PROJECT NO. 104-24000-178, UNIT NO. 6: NEW YORK AVENUE FROM THE NORTH LINE OF CANTEY STREET TO THE SOUTH LINE OF JUDD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-Inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, The following assessment rates have been established.: Seven-inch curb and two-foot gutter. ......... ... . .. ... .$2�1�,3 Six-inch H.M.A,C. Pavement (Residential Zoning).. . .... .. . 2.9 ie,r � ;Ea t , PROJECT NO. 104-24000-178, UNIT NO. 7: NEW YORK AVENUE FROM THE NORTH LINE OF JUDD STREET TO THE SOUTH LINE OF MORNINGSIDE DRIVE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot, wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment, rates have been established- Seven-inch curb and two-foot gut,ter. .......... .... .......$2.43 per L.F. Six-inch H.M.M. Pavement (.Residential Zoning). ,. . . .#fee 2.97 per L.F. PROJECT N0. 104-24000a178,UNIT NO, 8, HATCHER STREET FROM THE NORTH LINE OF BAYLOR STREET TO THE SOUTH LINE OF GRIGGS COURT, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick line stabilized subgrade, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rate has been established- Six-inch H.M.A.C. Pavement (Residential. Zoning).— . .. . . . .$4.77 per L.F. PROJECT NO. 104-24000-178, UNIT NO. 9- MENZER ROAD FROM THE EAST LINE OF OAKCLIFF ROAD TO 20 FEET EAST OF THE WEST PROPERTY LINE OF LOT 20„BENMAR GROVE ADDITION, to be im- proved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-:inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will, consist of one thirty-foot wide roadway, The following assessment rates have been established. Seven-inch curb and two-foot gutter. ,. . ,.. .d., ...... o. eo.$2.46 per L.F. Six-inch H.M.A.C, Pavement (Residential. Zoning).. ... .. ... 2.94 per L.F. PROJECT NO, 104-24000-178n UNIT NO. 10- RAY ALVTN STREET FROM THE NORTH LINE OF ALCANNON STREET TO THE SOUTH LINE OF_PE_CO_S STREET TO THE NEST, to be improved by constructing a six-inch tick hot-mix mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway., and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been. established,. Seven-inch curb and two-foot gutter, ..e per L.F. Six-inch H.M.A.C, Pavement (Commercial. Zoning, ,,,,..,, .,, 4.80 per L.F. Six-inch H.M.A.C. Pavement (Residential Zoning)...... ... . 2.94 per L.F. Six-inch thick concrete driveway. ,. . . . , 85 per S.F. 0 0. n . . .a .u e..u. . e. • y0 PROJECT NO. 104-24000-178, UNIT NO. 11: HATCHETT STREET FROM THE WEST LINE OF EDGEWOOD TERRACE TO THE WEST PROPERTY LINES OF LOT 1, BLOCK 5, MOUNT VERNON HEIGHTS ADDITION, AND THE EAST 45 FEET OF LOT 9, BLOCK 3. PROVINE ADDITION, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified, The following assessment rates have been established- Seven-inch curb and two-foot gutters ... ,o. ., ..e,. .e. .. . . .$2.43 Per L.F. Two-foot gutter onlyc. ,,,.. ..,..a.ee.„eeeoo.oe.. 00eoo. a . 1.21 per L.F. Six-inch H,M.A.C. Pavement (Residential Zoning)... . , ..... 2.97 per L.F. Six-inch thick concrete driveway... . . ... .85 Per S.F. PROJECT NO. 104 24000m1 8, UNIT NO. 12: ANDREW STREET FROM THE NORTH LINE OF RAMEY AVENUE TO THE SOUTH LINE OF BOOKER T. STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. The following assessment rates have been established: Seven-inch curb and two-foot gutter.o .....auea....e. e..oe$2.43 per L.F, Six-inch H,M.A.C. Pavement (Commercial Zoning)... . ..e.... 4.77 per L.F. Six-inch H.M.A.C. Pavement (Residential Zoning)......... . 2.97 per L.F. The assessments result in the following division of costs: Total Property Owners' cost for curb and gutter.... ....$12,928.79 Total Property Owners' cost for improvements other than curb and gutter... . ., o . ...... . . .... 24,899.38 TOTAL PROPERTY OWNERSP COST $ 37,828.17 Total City of Fort Worth cost for curb and gutter......$13,459.17 Total City of Fort Worth cost for improvements other than Curb and gutter. ...eoe000e000aeo .00 69,620,87 TOTAL CITY OF FORT WORTH COST $ 83.080.04 TOTAL ESTIMATED CONSTRUCTION COST $120,908,21 4 PROJECT NO. 104-24000-178. UNIT NO. 1: CANNON STREET FROM THE EAST LINE OF BRYAN AVENUE TO THE WEST LINE OF CRAWFORD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing existing driveways to proper alignment and grade and constructing six-inch thick concrete drive- ways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF BRYAN AVENUE AND CANNON STREET NORTH SIDE OF STREET TUCKER'S ADDITION Walter Womack "DII 959 Pavement $4.80 $456.00 665 Bryan Avenue Apt. 183 Curb and Gutter 2,46 44.28 77� Gutter only 1.23 94,,71 157.50 S. F. Drive .85 133.88 $ 728.87 Johnnie B. Austin "G" _,36 � 95° Pavement $4.80 $456.00 666 Crawford Street Apt. 95o Gutter only 1.23 116,85 35 S, F. Drive .85 29.75 $ 602.6o CRAWFORD STREET INTERSECTS SOUTH SIDE OF STREET Mrs. Hattie Simon "H" 37 509 Pavement $4.80 $240.00 214 East Cannon Street Apt. 50' Gutter only 1.23 61.50 $ 301.50 F. Z. Williams "G" __2L 50' Pavement $4.80 $240.00 208 East Cannon Street Apt. 50P Gutter only 1.23 61.50 $ 301,50 C. B. Beasley "F" 7 100e Pavement $4.80 $480.00 205 N.W. 7th Street Apt. 1001 Curb and Gutter 2.46 246.00 9.50 S. F. Drive .85 8.08 734.08. COST TO PROPERTY OWNERS ® ASSESSMENT $28668.55 COST TO CITY OF FORT WORTH 2 99 . 5 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 1 . 5 6 0 5 PROJECT NO. 104-24000-178, UNIT NO. 2: BRENTWOOD STAIR ROAD FROM THE EAST LINE OF MUSE STREET TO THE EAST PROPERTY LINES OF LOT 6R, BLOCK 6, AND LOT 1R, BLOCK 3, RYANW00D NORTH ADDITION, to be improved by constructing a seven-inch thick hot-aix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one sixty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF MUSE STREET AND BRENTWOOD STAIR ROAD NORTH SIDE OF STREET RYANWOOD NORTH ADDITION Jerrell T. Lowe 6R 6 11W Adjusted to 1621 Muse Street Res. 1009 Pavement $2.97 $297.00 100a Curb and Gutter 2.43 243.00 $ 540.00 SOUTH SIDE OF STREET Allen U. Hulings 1R, 114a Adjusted to 1701 Muse Street Res. 1001 Pavement $2.97 $297.00 1009 Curb and Gutter 2.43 243.00 $ 540.00 COST TO PROPERTY OWNERS m ASSESSMENT $10080.00 COST TO CITY OF FORT WORTH 4,528.08 TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO. 2 $5,608.08 '4A J PROTECT NO. 104-24000-178, UNIT NO. 3: VERBENA STREET FROM THE EAST LINE OF NEW YORK AVENUE TO THE WEST LINE OF BRANSFORD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF NEW YORK AVENUE AND VERBENA STREET NORTH SIDE OF STREET LAKE PARK PLACE ADDITION Booker T. Washington W. 501 6 501 Pavement $2.94 $147.00 934 East Terrell of "H" Res. 151 Curb and Gutter 2.46 36.90 351 Gutter only 1.23 43.05 $ 226.95 Labitha Little E. 81' 6 811 Pavement $2.94 $238.14 1216 East Hattie of "H" Res. 811 Curb and Gutter 2.46 199,26 $ 437.40 A. Harvey "E" 6 1312 Adjusted to 1216 East Hattie Res. 1001 Pavement $2;,94 $294.00 100' Curb and Gutter 2.46 246.00 $ 540.00 ILLINOIS AVENUE INTERSECTS Rochofsky & Feldman 4-H 1001 Pavement $2.94 $294.00 2418 Elm Street Res. 100t Curb and Gutter 2.46 246.00 Dallas, Texas $ 540.00 Rochofsky & Feldman 4-I & W. 5 38.51 Pavement $2.94 $113.19 2418 Elm Street If of Res. 38.51 Curb and Gutt. 2.46 94.71 Dallas, Texas Closed $ 207.90 Alley Rachel Hansford 3-F & E. 5 47.5' Pavement $2.94 $139.65 1061 East Verbena 11 of Res. 47.5' Curb and Gutt. 2.46 116.85 Closed 96.25 S. F. Drive .85 81.81 Alley $ 338,31 Theria B. Mitchell 3-E 5 911 Pavement $2.94 $267.54 1012 Missouri Res. 911 Curb and Gutter 2.46 223,86 96.25 S. F. Drive .85 81.81 $ 573.21 7 UNIT NO. 3: CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET LAKE PARK PLACE ADDITION Hampton Huse 2-C 2 72.51 Pavement $2.94 $213.15 1122 Oak Grove Res. 72.51 Gutter only 1.23 89.18 $ 302.33 Joe Lesok 2-I 2 58.51 Pavement $2.94 $171.99 3417 Worth Hills Res. 101 Curb and Gutter 2.46 24.60 48.51 Gutter only 1.23 59.66 $ 256.25 Mary T. R. Carson lA 2 1311 Adjusted to 1101 Illinois Res, 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 $ 540.00 ILLINOIS AVENUE INTERSECTS Stanley M. Berliner 2-C 1 1311 Adjusted to 1100 Illinois Res. 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 96.25 S. F. Drive .85 81.81 $ 621.81 Marcelitte H. Linton 1-B 1 b5.51 Pavement $2.94 $192.57 958 East Humbolt Res. 65.51 Gutter only 1023 80,57 17-50 S. F. Drive .85 14.88 $ 288.02 Marcelitte H. Linton 1 A 1 65.51 Pavement $2.94 $192.57 958 East Humbolt Res. 65.51 Gutter only 1.23 80.57 26�25 S. F. Drive .85 22.31 $ 295.45 COST TO PROPERTY OWNERS - ASSESSMENT $ 59167.63 COST TO CITY OF FORT WORTH 14fl910.40 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 3 �9n n78 03 - ' 8 PROJECT NO, 104-24000-178, UNIT NO. 4: BINKLEY STREET FROM THE NORTH LINE OF BIDEKER STREET TO THE SOUTH LINE OF BURCHILL ROAD SOUTH9 to be improved by constructing a sax inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF BIDEKER STREET AND BINKLEY STREET WEST SIDE OF STREET BURCHILL ADDITION. 2ND FILING Mattie M. Hurley 1 11 1401 Adjusted to 2937 Bideker Res. 1001 Pavement $2.97 $297-00 1001 Curb and Gutter 2,,43 243.00 96.25 S. F. Drive .85 81,81 $ 621.81 W. R. James 20 11 1401 Adjusted. to 3125 Pecos Street Res. 1001 Pavement $2.97 $297�00 100E Curb and Gutter 2.43 243.00 $ 540.00 BURCHILL ROAD SOUTH INTERSECTS EAST SIDE OF STREET Paul Reasor N. 1051 10 1051 Adjusted to 3000 Burchill Road S. of 14 Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 96.25 S. F. Drive .85 81 81 $ 621.81 Mrs. Virginia Matthews S. 351 10 35' Pavement $2.97 $103-95 2605 Binkley of 14 Res. 351 Curb and Gutter 2.43 85.05 96.25 S. F. Drive .85 81.81 $ 270.81 Hattie Attaway and 13 10 1401 Adjusted to Henry Chandler Res. 1001 Pavement $2.97 $297.00 3909 Millet 1001 Curb and Gutter 2.43 243.00 $ 540.0® COST TO PROPERTY OWNERS ASSESSMENT $29594.43.- COST TO CITY OF FORT WORTH TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO. 4 \ .6 �y1ti �s a, 9 PROJECT NO, 104-24000-178, UNIT NO. 5: WHITSON STREET FROM THE NORTH LINE OF EAST LANCAS- TER TO THE NORTH PROPERTY LINES OF LOT 10, BLOCK 8, AND LOT 1, BLOCK 9, INTERURBAN ADDI- TION, 2ND FILING, to be improved by constructing a six-inch thick hot mix asphaltic con- crete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF EAST LANCASTER AND WHITSON STREET WEST SIDE OF STREET INTERURBAN ADDITION, 2ND FILING W. E. Bilderback, Jr. 11 8 1301 Pavement $4.77 $620,10 1700 Yolanda Drive Ind, $ 620.10 W. E. Bilderback, Jr, 10 8 1502 Pavement $4.77 $715.50 1700 Yolanda Drive Ind. 1501 Curb and Gutter 2.43 364.60 $10080.00 BOMAR STREET INTERSECTS EAST SIDE OF STREET F. M. Cross 1 .. 1571 Pavement $4.77 $748.89 4721 Meadowbrook Drive Ind,; 1571 Curb and Gutter 2.43 381-51 945 S. F, Drive .85 801,25 $1,933,65 Abigail Curlee Holbrook 10 1371 Pavement $4.77 $653.49 P. 0. Box 1391 Ind,, 137' Curb and Gutter 2.43 332.91 Austin, Texas 236 25 S, F. Drive .85 200.81 $1,187,21 COST TO PROPERTY OWNERS - ASSESSMENT $4,820.96 COST TO CITY OF FORT WORTH 2 5�46 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. ,5 ,333.42 r PROJECT NO. 104-24000-178, UNIT NO. 6: NEW YORK AVENUE FROM THE NORTH LINE OF CANTEY STREET TO THE SOUTH LINE OF JUDD STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will con- sist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF CANTEY STREET AND NEW YORK AVENUE WEST SIDE OF STREET RYAN SOUTHEAST ADDITION Edward Grooms, Sr. 16 43 1201 Adjusted to 957 Cantey Street Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 $ 540.00 Lemuel Dunn 15 43 1201 Adjusted to 956 Judd Street Res. 1001 Pavement $2.97 $297.00 $ 297.00 JUDD STREET INTERSECTS FAST SIDE OF STREET Rev. Willie 1 1 120T Adjusted to Lincoln Brown Res„ 1001 Pavement $2.97 $297.00 1000 Judd Street $ 297.00 Travis T. Johnson 36 1201 Adjusted to 1001 Cantey Street Res. 1001 Pavement $2.97 $297.00 $ 297.00 COST TO PROPERTY OWNERS - ASSESSMENT $1,431.00 COST TO CITY OF FORT WORTH 4.157.55 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO, 6 `-Lit - 'a PROJECT NO. 104-24000-178, UNIT NO. : NEW YORK AVENUE FROM THE NORTH LINE OF JUDD STREET TO THE SOUTH LINE OF MORNINGSIDE DRIVE, to be improved by constructing a six-inch thick hot-nix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. BLACK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF JUDD STREET AND NEW YORK AVENUE WEST SIDE OF STREET RYAN SOUTHEAST ADDITION Mabel M. Smith 16 40 1201 Adjusted to 2708 New York Avenue Res, 1001 Pavement $2.97 $297.00 $ 297.00 Max Doughty 15 10 1201 Adjusted to 956 Morningside Drive Res. 1001 Pavement $2.97 $297.00 941 Curb and Gutter 2.43 228,42 $ 525.42 MORNINGSIDE DRIVE INTERSECTS EAST SIDE OF STREET Joann Weber Carr 1 39 120, Adjusted to 1000 Morningside Drive Res. 1001 Pavement $2.97 $297.00 941 Curb and Gutter 2,43 228.42 $ 525-42 Revodia Lee Johnson 36 39 1201 Adjusted to 2707 New York Avenue Res, 1001 Pavement $2.97 $297*00 $ 2974©0 COST TO PROPERTY OWNERS - ASSESSMENT $1,9644.84 COST TO CITY OF FORT WORTH ,3,749.56 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 7 ,0 12 PROJECT NO. 104-24000-178, UNIT NO. 8: HATCHER STREET FROM THE NORTH LINE OF BAYLOR STREET TO THE SOUTH LINE OF GRIGGS COURT, to be improved by constructing a six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF BAYLOR STREET AND HATCHER STREET WEST SIDE OF STREET WHITEHALL ADDITION H. C. Gordon 11 6 1101 Adjusted to c/o Mortgage & Trust Res. 1001 Pavement $4.77 $477.00 1200 West Freeway $ 477.00 GRIGGS COURT INTERSECTS EAST SIDE OF STREET MIDWEST ESTATES Alfred Hawkins 1-B 2 65, Adjusted to 3963 Hatcher Res. 401 Pavement $4..77 $190.80 $ 190,80 Billy G. Walter 1-C 2 701 Adjusted to 3967 Hatcher Res. b5i Pavement $4.77 $310.05 $ 310.05 COST TO PROPERTY OWNERS - ASSESSMENT $ 977.85 COST TO CITY OF FORT WORTH 1,651-,98 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 8 2 62 ,.8,� 13`� PROJECT NO. 104-24000-178, UNIT NO. 9: MENZER ROAD FROM THE EAST LINE OF OAKCLIFF ROAD TO 20 FEET EAST OF THE WEST PROPERTY LINE OF LOT 20. BENMAR GROVE ADDITION, to be im- proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF MENZER ROAD AND OAKCLIFF ROAD NORTH SIDE OF STREET J. H. Davis R.O.W. 7001 - No Assessments Engineer - Manager South per Turnpike Agreement Texas Turnpike Side of $ -0- Authority Turnpike 6434 Maple Avenue Dallas, Texas SOUTH SIDE OF STREET SCENERY HILL PARK ADDITION J. C. Glover 1-R-1 2 1201 Adjusted to 824 Wheelwood Drive Res, 1001 Pavement $2.94 $294.00 Hurst, Texas 1001 Curb and Gutter 2.46 246.00 $ 540.00 J. C. Glover 1-R-2 2 771 Adjusted to 824 Wheelwood Drive Res, 62Q Pavement $2.94 $182.28 Hurst, Texas 621 Curb and Gutter 2.46 152.52 $ 334.80 J. C. Glover 1-R-3 2 77' Adjusted to 824 Wheelwood Drive Res, 621 Pavement $2.94 $182.28 Hurst, Texas 62, Curb and Gutter 2.46 152.52 $ 334.80 BENMAR GROVE ADDITION S. W. Taylor 14, 15, 260, Pavement $2.94 $764.40 1"0 Eagle Drive 16 & 17 Res, 260, Curb and Gutter 2,46 639.60 $1,404.00 S. W. Taylor 18 651 Pavement $2,,94 $191.10 1440 Eagle Drive Res. 65' Curb and Gutter 2.46 159.90 $ 351.00 Donald C. Cartmell 19 b51 Pavement $2.94 $191.10 4109 Benmar Res, 651 Curb and Gutter 2.46 159.90 t, $ 3 51.00 S. 4 i UNIT NO. 9 _ CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET BENMAR GROVE ADDITION Donald C. Cartmell 20 65f Adjusted to 4109 Benmar Res. 201 Pavement $2�94 $ 58.80 201 Curb and Gutter 2.46 49.20 $ 108.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 3,423.60 COST TO CITY OF FORT WORTH 16.457.80 TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO, 9 L9-882,.40 15 U it PROJECT NO. 104-24000-178, UNIT NO. 10: RAY ALVIN STREET FROM THE NORTH LINE OF ALCANNON STREET TO THE SOUTH LINE OF PECOS STREET TO THE WEST, to be improved by constructing a six-inch thick hot—nix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF ALCANNON STREET AND RAY ALVIN STREET WEST SIDE OF STREET VICKERY ACRES ADDITION Don Wilson Griffin Se 1021 2 102t Pavement $4.80 $489,60 2933 Alcannon of 21 Comm. 1021 Curb and Gutter 2.46 250.92 $ 740-52 Don Wilson Griffin N. 98, 2 981 Adjusted to 2933 Alcannon of 21 Res. 781 Pavement $2.94 $229.32 781 Curb and Gutter 2,46 191,88 157.50 S. F„ Drive .85 133.88 $ 555.08 Don Wilson Griffin 21-A 2 1201 Adjusted to 2933 Alcannon Res. 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246.00 157,50 S, F. Drive .85 133.88 $ 673.88 LUCINDA LANE INTERSECTS Stafford Abernathy 1 2 1221 Adjusted to 5000 Ray Alvin Res. 1001 Pavement $2.94 $294�00 1001 Curb and Gutter 2,46 246„00 $ 540.00 Stafford Abernathy 1-A 2 2001 Adjusted to 5000 Ray Alvin Res,, 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2,46 246.00 $ 540.00 PECOS STREET TO THE WEST INTERSECTS EAST SIDE OF STREET TARRANT ADDITION Charline Ricketts and 10 33 0, 2001 Adjusted to. James D. Ricketts Res. 1001 Pavement $2.94 $294.00 c/o Gen. Amer. Life Ins, Co. 1,001 Curb and Gutter 2,46 246.00 1501 Locust Street $ 540.00 St, Louis, Missouri ,t 16 UNIT NO. 10 CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT PECOS STREET TO THE EAST INTERSECTS EAST SIDE OF STREET TARRANT ADDITION E. L. Gillingham 18 5 2001 Adjusted to 3000 Pecos Street Res. 1001 Pavement $2.94 $294,,00 1001 Curb and Gutter 2.46 246.00 $ 540.00 VICKERY ACRES ADDITION Jack Russell N. 157.5' 1 157,5' Adjusted to 400 Union Bank Bldg. of 17 Res. 1001 Pavement $2.94 $294.00 1001 Curb and Gutter 2.46 246,00 w 540000 Mrs. Lillian Faulkner N. 77.5' 1 77.5' Pavement $2.94 $227.85 3001 Alcannon of S. Res. 77,5t Curb and Gutt. 2,46 190.65 157.5' of 17 96.25 S. F. Drive .85 81.81 $ 500.31 Mrs. Lillian Faulkner S,, 801 1 80' Pavement $4.80 $384.00 3001 Alcannon of S. Comm. 80' Curb and Gutter 2.46 196.80 157.5' of 17 $ 580.80 COST TO PROPERTY OWNERS - ASSESSMENT $59750.59 COST TO CITY OF FORT WORTH 9,866.38 TOTAL ESTIMATED CONSTRUCTION COST m UNIT NO, 10 69 16.97 17 ; PROJECT NO, 104 24000-17g UNIT NO, 11: HATCHETT STREET FROM THE WEST LINE OF EDGEWOOD TERRACE TO THE WEST PROPERTY LINE OF LOT 1. BLOCK 59 MOUNT VERNON HEIGHTS ADDITION AND THE EAST 45 FEET OF LOT 9, BLOCK 3, PROVINE ADDITIONf, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by reconstructing ex- isting driveways to proper alignment and grade and constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHEAST CORNER OF EDGEWOOD TERRACE AND HATCHETT STREET SOUTH SIDE OF STREET MOUNT VERNON HEIGHTS ADDITION Vernon Y. Cain 4 2 80.61 Pavement $2.97 $239.38 4520 Hatchett Res. 65.69 Gutter only 1.21 79.38 $ 318.76 Vernon Y. Cain 3 2 801 Pavement $2.97 $237.60 4520 Hatchett Res. 809 Gutter only 1.21 96.80 $ 334.40 Florence Alice Ashley 2 2 809 Pavement $2.97 $237.60 4512 Hatchett Res. 801 Gutter only 1.21 96.80 26.25 S. F. Drive .85 22,31 $ 356.71 Mrs. W. F. Gambill 1 2 66.61 Pavement $2.97 $197,80 4508 Hatchett Res. 66.61 Gutter only 1.21 80.59 26.25 S. F. Drive .85 22.31 $ 300.70 Luther Meacham 2 _. 839 Pavement $2.97 $246.51 4504 Hatchett Res. 831 Gutter only 1,21 100,43 $ 346,94 B: J. Hayes 1 ` 821 Pavement $2.97 $243.54 4500 Hatchett Res. $ 243.54 NORTH SIDE OF STREET PROVINE ADDITION Clifton Brignac 9 45, No Access m No Assessment 4458 Normandy Drive Res. $ -Om 18 UNIT NO. 11 - CONTINUED BLOCK OWNER. LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET MOUNT VERNON HEIGHTS ADDITION Clifton Brignac 4 & W. 6 90t Pavement $2.97 $267.30 4458 Normandy Drive of 3 Res. 901 Gutter only 1,21 108.90 $ 376.20 Leroy Noble E. 6 301 Pavement $2.97 $ 89,10 4509 Hatchett of 3 Res. 301 Gutter only 1.21 36JO $ 125.40 Leroy Noble 8 1 66.6t Pavement $2.97 $197.80 4509 Hatchett Res. 66.61 Gutter only 1.21 80.59 $ 278,39 Wallis M. Smith 7 1 801 Pavement $2.97 $237.60 4513 Hatchett Res. 80t Curb and Gutter 2.43 194.40 $ 432.00 Charles H. Peele, Jr. 6 1 801 Pavement $2.97 $237.60 2913 Pacific Court Res. 801 Curb and Gutter 2.43 194.40 Irving, Texas 75060 $ 432.00 Charles H. Peele, Jr. 5 1 80.6t Pavement $2.97 $239.38 2913 Pacific Court Res. 65.61 Curb and Gutt. 2.43 159.41 Irving, Texas 75060 $ 398.79 COST TO PROPERTY OWNERS m ASSESSMENT $3,943.83 COST TO CITY OF FORT WORTH 9.015.00 TOTAL ESTIMATED CONSTRUCTION COST m UNIT N0,, 11 12 81& 19 1 ._ I ` 4 PROJECT NO, 10424000-178, UNIT NO. 12: ANDREW STREET FROM THE NORTH LINE OF RAMEY AVENUE TO THE SOUTH LINE OF BOOKER T. STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF RAMEY AVENUE AND ANDREW STREET WEST SIDE OF STREET PERKINS-CLARK SUBDIVISION Rufus Clark 2 B 112„551 Adjusted to 5337 Ramey Res. 100, Pavement $2.97 $297.00 1001 Curb and Gutter 2,43 243,00 $ 540.00 Rufus Clark 1 B 112,551 Adjusted to 5337 Ramey Res, 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243,00 $ 540.00 RICKENBACKER PLACE INTERSECTS J. Andrew & Rosa Perkins 2 A 152.11 Adjusted to 1828 Dillard Res, 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2,43 243.00 $ 540.00 J. Andrew & Rosa Perkins 1 a,.A 153,21 Adjusted to 1828 Dillard Res. 1001 Pavement $2.97 $297.00 100, Curb and Gutter 2.43 243,00 $ 540.00 BOOKER T. STREET INTERSECTS EAST SIDE OF STREET WALTER WILLI SUBDIVISION OF DAN DULANEY SURVEY Mrs. Bunion Clarrette Tr. 4 250,841 Adjusted to Route 1, Box 63-C Res, 150.841 Pavement $2.97 $447.99 Mansfield, Texas 150.841 Curb and Gut.2.43 366.54 $ 814.53 20 UNIT NO. 12 _ CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT RICKENBACKER PLACE INTERSECTS EAST SIDE OF STREET WOODS ADDITION H. D. Edmondson 24 112.551 Adjusted to 5400 Ramey Res. 1001 Pavement $2.97 $297.00 1001 Curb and Gutter 2.43 243.00 $ 540.00 H. D. Edmondson 1 112.551 Pavement $4.77 $536.86 5400 Ramey Comm. 112.551 Curb and Gut.2.43 273.50 $ 810.36 COST TO PROPERTY OWNERS m ASSESSMENT $4,324.89 COST TO CITY OF FORT WORTH 8,566.28 TOTAL ESTIMATED CONSTRUCTION COST UNIT NO. 12 $12,891.17 21 1