HomeMy WebLinkAboutContract 53009 Received Date: Nov 4,2019
Received Time: 8:34 AM
Developer and Project Information Cover Sheet:
Developer Company Name: HRUS Alliance LLC
Address,State,Zip Code: 609 Main St., Suite 2400,Houston,TX,77002
Phone&Email: 713-327-5600,mark.coverahines.com
Authorized Signatory,Title: Mark A. Cover, Senior Managing Director/CFO
Project Name: Northlink Logistics Center 24"Water Line Improvements
Brief Description: Water
Project Location: Southwest of the intersection of Hwy 114 and FM 156
Plat Case Number: Plat Name:
Mapsco: Council District: 7
CFA Number: CFA19-0088 City Project Number: 102189
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvemen OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 1 of 14 CITY SECRETARY
FT. WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 53009
WHEREAS, HRUS Alliance LLC ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Northlink Logistics Center 24" Water Line Improvements
("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improveme t�FFOCf�1l RECORD
CFA Official Release Date:02.20.2017
Page 2 of 14 CITY SECRETARY
FT. WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ❑, Paving (B) ❑, Storm Drain(B-1) ❑, Street Lights & Signs
(C) ❑.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 3 of 14
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 4 of 14
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 5 of 14
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 6 of 14
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of the contract.
R. IMMIGRATION AND NATIONALITY ACT. Developer shall verify the identity and
employment eligibility of its employees who perform work under this Agreement, including
completing the Employment Eligibility Verification Form (I-9). Upon request by City,
Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall
adhere to all Federal and State laws as well as establish appropriate procedures and controls
so that no services will be performed by any Developer employee who is not legally eligible
to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY
HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO
VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S
EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for
violations of this provision by Developer.
S. CITY PARTICIPATION. Developer is required to construct a twelve inch water line for
Developer's Project. City intends to oversize the water line from a twelve inch water line to
a twenty-four inch water line. In anticipation of approval of the City's participation in this
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 7 of 14
Agreement, Developer has designed a twenty-four inch water line. In order to avoid delays,
Developer desires to execute this Agreement: (1)based on an engineer's estimate of probable
cost before the Project is publicly bid; and (2) before the City Council considers whether to
approve the City's participation in this Agreement to oversize the water line.
i. If the City Council approves the City's participation in this Agreement, Developer
agrees to: (1) construct a twenty-four inch water line as depicted in the approved
plans; (2) amend this Agreement to include the City's Participation and make any
revisions to the cost, including material testing and inspection fees, based on the
construction costs determined from the public bidding; (3)pay to the City the CFA
Amendment Fee in the amount of $2,300.00; and (4) increase the financial
guarantee if it is lower than the construction cost in the winning bid.
ii. If the City Council does not approve City participation in this Agreement:
(1) City agrees to allow Developer to revise the Construction Plans in order for
Developer to construct a twelve inch water line;
(2) Developer agrees to amend this Agreement, if necessary, and pay the CFA
Amendment Fee in the amount of$2,300.00 in order to make revisions to
the cost based on the construction costs determined from the public bid,
increase the financial guarantee if it lower than the construction cost in the
winning bid, and pay any shortage in estimated material testing and
inspection fees.
iii. The water line, whether it is ultimately a twelve inch or a twenty-four inch water
line, must be constructed by Developer and accepted by the City before the City
will issue a certificate of occupancy for the Northlink Logistics Center.
iv. The City will release the hold related to the community facilities agreements on the
final plat for the property once this Agreement is executed and the community
facilities agreement for CFA 19-0089 for Northlink Logistics Center — Major
Infrastructure is executed.
V. Developer acknowledges and agrees that due to Developer's election to execute
this Agreement before the City Council determines whether to approve the City's
Participation in the oversized water main, the potential exists for technical,
delivery, or acceptance problems, or delays in the construction of the Project, or
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 8 of 14
other claims made against City or Developer. BY CHOOSING TO EXECUTE
THIS AGREEMENT BEFORE THE CITY COUNCIL HAS MADE A
DETERMINATION WHETHER THE CITY WILL PARTICIPATE IN
THIS AGREEMENT, DEVELOPER ASSUMES ALL RISKS AND
DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND
ALL DAMAGES, INCLUDING BUT NOT LIMITED TO, ANY AND ALL
ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGES
AND PERSONAL INJURY (INCLUDING DEATH), OF ANY KIND OR
CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER
HEREBY EXPRESSLY RELEASES AND DISCHARGES CITY FROM
ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT
LIMITED TO, ANY AND ALL ECONOMIC DAMAGES, PROPERTY
LOSS, PROPERTY DAMAGE AND PERSONAL INJURY (INCLUDING
DEATH)ARISING OUT OF OR IN CONNECTION WITH,DIRECTLY OR
INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR
DEVELOPER'S DECISION TO EXECUTE THIS AGREEMENT BEFORE
THE CITY COUNCIL DETERMINES WHETHER TO APPROVE THE
CITY'S PARTICIPATION IN THIS AGREEMENT.DEVELOPER,AT ITS
SOLE COST AND EXPENSE, AGREES TO AND DOES HEREBY
INDEMNIFY,DEFEND, PROTECT,AND HOLD HARMLESS CITY,AND
CITY'S OFFICERS, REPRESENTATIVES,AGENTS, EMPLOYEES,AND
SERVANTS FOR, FROM AND AGAINST ANY AND ALL CLAIMS
(WHETHER AT LAW OR IN EQUITY), LIABILITIES, DAMAGES
(INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY
LOSS, PROPERTY DAMAGES AND PERSONAL INJURIES INCLUDING
DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS
AND EXPENSES (INCLUDING,BUT NOT LIMITED TO,COURT COSTS,
ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY
NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE
BY OR IN ANY WAY RELEATED TO CONSTRUCTION OF THE
IMPROVEMENTS OR DEVELOPER'S CHOICE TO EXECUTE THIS
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 9 of 14
AGREEMENT BEFORE THE CITY COUNCIL DETERMINES
WHETHER TO APPROVE THE CITY'S PARTICIPATION IN THIS
AGREEMENT; OR (2) BY REASON OF ANY OTHER CLAIM
WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR
ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE
CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S
CHOICE TO EXECUTE THIS AGREEMENT BEFORE THE CITY
COUNCIL DETERMINES WHETHER TO APPROVE THE CITY'S
PARTICIPATION IN THIS AGREEMENT, WHETHER OR NOT SUCH
INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT
WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 10 of 14
Cost Summary Sheet
Project Name:Northlink Logistics Center 24"Water Line Improvements
CFA No.: CFA19-0088 City Project No.: 102189
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 302,900.25
2.Sewer Construction
Water and Sewer Construction Total $ 302,900.25
B. TPW Construction
1.Street $ -
2.Storm Drain $ -
3.Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 302,900.25
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 6,058.01
D. Water/Sewer Material Testing Fee(2%) $ 6,058.01
Sub-Total for Water Construction Fees $ 12,116.02
E. TPW Inspection Fee(4%) $ -
F. TPW Material Testing(2%) $ -
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 12,116.02
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 302,900.25 x
Completion Agreement=100%/Holds Plat $ 302,900.25
Cash Escrow Water/Sanity Sewer-125% $ 378,625.31
Cash Escrow Paving/Storm Drain=125% $ -
Letter of Credit=125%w/2 r expiration period $ 378,625.31
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 11 of 14
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of
the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
HRUS Alliance LLC
By:HRUS REIT III LLC,
Dana Burghdoff(NK 1,2019) Its sole member
Dana Burghdoff By:Hines HRUS MM LLC,
Interim Assistant City Manager Its manager
Date: Nov 1,2019 By:Hines HRUS Associates Limited
Partnership,
: Its sole member
Recommended by: By:Hines Investment Management
Holdings Limited Partnership,
&yf{ .Z- cz rn"k Its general partner
Jennifer 17Ezernack(Nov 1,2019) By:MIMH GP LLC,
Evelyn Roberts/Jennifer Ezernack Its general partner
Project Assistant By:Hines Real Estate Holdings
Planning and Development Limited Partnership,
Its sole member
By:JCH Investments,Inc.,
Its general partner
Approved as to Form &Legality:
Richard A.McCracken(Nov 1,2019) Mark Cover 2019)
Richard A. McCracken Name: Mark A. Cover
Assistant City Attorney Title: Senior Managing Director/CFO
M&C No.
Date: Nov 1,2019 F®fRT!�` Date: Nov 1,2019
Form 1295:
_ Contract Compliance Manager:
ATTEST: By signing, I acknowledge that I am the
person responsible for the monitoring and
MarvT. Kayser ' .7EX administration of this contract,including
Mary J.Kayser(No%4,2019) ensuring all performance and reporting
Mary J. Kayser/Ronald Gonzales requirements.
City Secretary/Assistant City Secretary
.Tanio Scarlet t Morales
Janie Scarlett Morales(Nov 1,2019)
Name: Janie Morales
Title: Development Manager
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 12 of 14 FT. WORTH,TIC
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
❑ Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
❑ Exhibit B: Paving Improvements
❑ Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 13 of 14
ATTACIEMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 102189
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center 24"Water Line Improvements
CFA Official Release Date: 02.20.2017
Page 14 of 14
ENGINEER'S OPINION OF PROBABLE COST
Project Northlink Logistics Center
Date: September 23,2019 Hi""s
Location: City of Fort Worth
Job No. 10822
Page: 1 of 1
ITEM UNIT TOTAL
No. DESCRIPTION UNIT QUANTITY PRICE COST
Water Facilities
I. 12" DR-14, C-900 PVC L.F. 2,043 $45.00 $91,935.00
2. 6" DR-14, C-900 PVC L.F. 23 $24.00 $552.00
3. 12" D.I.P. WATER LINE L.F. 244 $80.00 $19,520.00
4. 12" Gate Valve& Box Ea. 7 $2,300.00 $16,100.00
5. Std. Fire Hydrant Assembly Ea. 4 $3,800.00 $15,200.00
w/6" Gate Valve & Box $0.00
6. C.I.R.T. Fittings Ton 1.5 $5,000.00 $7,500.00
7. Trench Safety L.F. 2,066 $0.25 $516.50
8. Water Testing L.F. 2,310 $1.00 $2,310.00
9. 24" Casing Pipe by Other Than L.F. 200 $225.00 $45,000.00
Open Cut
10. 12" PVC C900 WL CLSM Backfill L.F. 10 $50.00 $500,00
11. 1" Combination Air Release Valve Ea. 1 $2,800.00 $2,800.00
WATER FACILITIES SUBTOTAL $201,933.50
50% CONTINGENCY $100,966.75
WATER FACILITIES TOTAL $302,900.25
S.WEAVER
=57
This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgment as a design professional. It must be recognized that any evaluation GOOD■r�7li�li1�T
1
of work to be performed to construct this project must by necessity be speculative in nature until AA D� L�T�r TT d
completion of its actual detailed design. in addition the engineer has no control over the cost of 1' RS11`�LLI
labor,material,or services to be furnished by others or over market conditions. Accordingly dYLBI -RAMMM-
OLMWtUM
Goodwin&Marshall,Inc.can not guarantee that actual costs will not vary from the opinions
expressed here in. eperwpmr-wpert-ueMrrll-lt�M�1
HIGHWAY 114 TEXAS MOTOR
�j SPEED WA Y
RR(9.�HC1(
LOCA TION
F �
EAGLE PKW Y
O U� Il�
W Z
/ C J
Q
I
AVONDALE
HASLE WESTP RT PKWY
VHC ngHTY MAP
NTS
QQ
° NORTHT
a I I�\\
U C����n\�T�� U
N
L(OC 111L ED J.LN
O
c C HTY ®F FORT OR]1 H9 TEXAS
0
c
Af"SCO# 108 T
C
COUNCIL DISTRICT 7
CPN.•102189
OWNEIRMEVEILOPOL
PREPARED BY:
(3®®D
N HRUS Alliance, LLC ���°S° g
CIVIL ENGINEERS—PLANNERS—SURVEYORS
CD
2200 ROSS AVENUE,SUITE 420OW SEPTEMBER 2,C 2 9 2405 Mustang Drive,Grapevine,Texas 76051
DALLAS,TX 75201 9 Metro(817)329-4373
972-716-0152 713-927-0152
w
N
WE NORTHLJS.NK
S LOGHS HCS CENTER
GRAPHIC SCALE 1"=300 WATER
1GLilll7L 1T"A"
0 300 600 900 CPN. 102189
X lf'1L1L.el - 26096
N
_ L_
Z
Y
u F-(D
pia �
Q U
C,>r� h0
N U
J
O
> R
LOT 1, BLOCK A
BUILDING A LOT 3, BLOCK A Q O
C LOGI ORCS CENTER BUILDING C Oo N
y NORTHLINK C p
-1;1
10 12" WA TER LINE L oGls rics CENTER z
AA
Qo
2-12' GV 12" WATER LINE
2-12' G V M . . . . . . . . . . . . . . . . . . . . . . . . . . . O
12" G V w
00
12" WATER LINE ��
12" W �Q
AIR RELEASE 12" WA -NE & F M
VAL VE 24 " CASING PIP
REMAINDER OF CALLED
73.362 ACRES 12' G V 12" G V
JEANNE SHELTON
INST. NO. 1999-115848 REMAINDER OF CALLED
D.R.D.C.T. 73.567 ACRES, TRACT 2
ALLIANCE-156 PARTNERS, L.P.
INST. NO. 2 010-110 4 4 9
D.R.D.C.T.
NOTE : 12' WL SHOWN PARALLEL TO FM 156 WILL ULTIMATELY BE CONSTRUCTED AS A
24' WL, WITH CITY OF FORT WORTH PARTICIPATION FOR THE UPSIZE FROM A 12' WL TO
A 24' WL . CFA-19-0088 WILL BE AMENDED BY THE OWNER ONCE THE 24' WL PLANS ARE
PUBLICLY BID .
LEGEND
PROPOSED WATER LINE
EXISTING WATER LINE
PPJEPAPM BY:
py®®DWffN. PROPOSED FIRE HYDRANT ASSEMBLY
]L][, 4 EXISTING FIRE HYDRANT ASSEMBLY
CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 76051 H PROPOSED GATE VALVE
Metro(817)329-4373
D4 EXISTING GATE VALVE
E \10822 — Hines FM 156\Plans\northlink logistics center.pro 16 Sep 2019