Loading...
HomeMy WebLinkAboutContract 53011 Received Date: Nov 4,2019 Received Time: 8:43 AM Developer and Project Information Cover Sheet: Developer Company Name: Castle Development Group,Inc. Address, State,Zip Code: 251 E. Southlake,TX,76092 Phone&Email: 817-337-3433 ,amiller(i�cast1edevgr0up.com Authorized Signatory,Title: Andrew Miller,Manager Partner Project Name: Harris Parkway Medical Development Brief Description: Water, Sewer,Paving Project Location: 6840 Hams Parkway,Fort Worth,TX 76132 Plat Case Number: FP-18-132 Plat Name: Chisholm Trail Hospital Add Mapsco: Council District: 6 CFA Number: CFA19-011 City Project Number: 36T36T36T101900 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Hams Parkway Medical Development CITY SECRETARI( CFA Official Release Date:02.20.2017 Page 1 of 11 FT WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 53011 WHEREAS, Castle Development Group, Inc. , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Harris Parkway Medical Development ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas I —` Standard Community Facilities Agreement-Hams Parkway Medical Developme-11 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT. WORTH, TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ❑, Street Lights & Signs (C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Harris Parkway Medical Development CFA No.: CFA19-011 City Project No.: 36T36T36T101900 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 166,560.00 2.Sewer Construction $ 22,939.00 Water and Sewer Construction Total $ 189,499.00 B. TPW Construction 1.Street $ 49,060.00 2.Storm Drain $ - 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 49,060.00 Total Construction Cost(excluding the fees): $ 238,559.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,789.98 D. Water/Sewer Material Testing Fee(2%) $ 3,789.98 Sub-Total for Water Construction Fees $ 7,579.96 E. TPW Inspection Fee(4%) $ 1,962.40 F. TPW Material Testing(2%) $ 981.20 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 2,943.60 Total Construction Fees: $ 10,523.56 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 238,559.00 x Completion Agreement=100%/Holds Plat $ 238,559.00 Cash Escrow Water/Sanity Sewer-125% $ 236,873.75 Cash Escrow Paving/Storm Drain=125% $ 61,325.00 Letter of Credit=125%w/2 r expiration period $ 298,198.75 City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Castle Development Group,Inc. Dana&rq!2d?ff Dana Burghdoff ov 3,2019) Dana Burghdoff Interim Assistant City Manager µndrowrfiller Date: Nov 3,2019 Andrew Miller(Oct 31,2019) Name: Andrew Miller Recommended by: Title: Manager Partner l� •� r�e2�; Date: Oct 31,2019 J}�fiifer L.Eze� <(Oct 31,2019) /TTTT`!!llEvelyn Roberts/Jennifer Ezemack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract,including ensuring all performance and reporting Kicrui�a,a., rncG�acKesz requirements. Richard A.McCracken(Oct 31,2019) Richard A. McCracken _iu��2 cs�rrt rail`Aivrur f Assistant City Attorney Janie Scarlett Morales(Oct 31,2019) M&C No. Name: Janie Morales Date: Oct 31,2019 Title: Development Manager Form 1295: , FBf�T ATTEST: ,•� 0: A_ Maer(Nov 4 Mary J. Kayser/Ronald Gonzales City Secretary/Assistant City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development aUFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 9 of 11 CITY SECRETARY FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ❑ Paving Cost Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 10 of 11 ATTACIEMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 36T36T101900 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Harris Parkway Medical Development CFA Official Release Date: 02.20.2017 Page 11 of 11 00 42 43 PAP-➢ID PROPOSAL. Page I or4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BidlistIlem Description Specification Unit of Sid No, p Section No- Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 0171.0101 Construction Staking 01 71 23 LS 1 $3,000.00 $3,000.00 2 3110.0102 W-12"Tree Removal 31 1000 EA 1 $500.0_0 $500,00 3 3292.0500 Seeding,Soil Retention Blanket 32 92 13 SY 1230 $1.00 $1.230.00 4 3305.0109 Trench Safety 33 05 10 LF 1110 $1.00 $1,110.00 5 _3305.1103 20"Casing 8y Other Than Open Cut 33 05 22 LF _ 55 $520.00 $28,600.00 6 3311.0001 Ductile Iron Water Fittings WI Restraint 33 1111 TON 0.5 $26,000.00 $13,000.00 7 3311.0161 6"PVC Water Pipe 3311 12 LF 10 $30.00 $300.00 8 3311,0261 8"PVC Water Pipe _ 33 11 12 LF 45 $34.00 $1,530,00 9 3311.0461 12"PVC Water Pipe 3311 12 LF 1110 $54.00 $59,940.00 10 3312.0001 Fire Hydrant 33 12 40 EA 2 $4,450.00 $8,900.00 11 _3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 1 $13,000.00 $13,000.00 12 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 $7,200.00 $7,200.00 13 3312,2003 1"Water Service 331210 EA 2 $2,400.00 $4,800.00 14 3312.2203 2"Water Service 33 12 10 EA 2 _ $3,500.00 _ $7,000.00 15 3312.3002 6"Gate Valve 33 12 20 EA 2 $1,250.00 $2,500.00 16 3312.3003 8"Gate Valve 33 12 20 EA 3 $1,650.00 $4,950.00 17 3312.3005 12"Gate Valve _ 33 12 20 EA 3 $3,000.00 $9,000.00 18 - - 19 20 21 22 23 24 25 26 27 28 29 30 - - 31 32 _ 33 34 35 36 40 41 42 43 44 - 45 - - TOTAL UNIT l:WATER IMPROVEMENTS $166,560.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43—Bid Pmp"s"I_DAP 00 42 43 DAP-BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Inrormation Bidders Proposal Bidlist Item Specification Unit or Bid No. Description Seclian No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 0171.0101 Construction Staking 0171 23 LS 1 $550.00 $550.00 2 _ 0241.0600 Remove Wall<4' 02 41 13 L.F 235 $5,00 $1,175.00 3 0241.0800 Remove Rip Rap 0241 13 SF 1230 $1-00 $1,230.00 4 0241.0900 Remove Misc Conc Structure 0241 13 LS 1 $500.00 $500.00 5 3292,0500 Seeding,Soil Retention Blanket 32 92 13 SY 180 $2.00 $360.00 6 3301.0002 Post-CCTV Inspection 33 01 31 _ LF 160 $3.00 $480.00 7 3301,0101 Manhole Vacuum Testing 33 01 30 EA 1 $400-00 $400.00 8 3305.0109 Trench Safety 330510 LF 160 $5.00 $800.00 3331.4108 6"Sewer Pipe 3311 10,33 9 31 12,3331 LF 5 _20 $46.00 $230.00 3331.4115 8"5ewer Pipe 3311 10,33 10 31 12,3331 LF 140 20-- __ $67,00 $9,380.00 3331.4116 8"Sewer Pipe,CSS Backfill 3311 10,33 11 31 12,3331 LF 20 20 $95.00 $1,900_.00 3339.1001 4'Manhole 33 39 10,33 EA 12 3920 1 $4,650.00 $4,650.00 3339.1003 4'Extra Depth Manhole 33 39 10,33 13 _ 3920 VF 4 $321.00 $1,284.00 14 15 16 17 18 19 20 21 22 23 24 — - 26 27 28 29 30 31..— . 32 33 34 36 37 TOTAL UNIT II:SANITARY SEWER IMPROVEKENTS1 $22,939.00 CITY OF FORT wORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vemion September t,2015 00 42 43_bid Pmposal_DAP 00 42 43 DAP-BID PROPOSAL 11a2c 3 of d SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM U1 Hl F PRICE BID Bidder's Application Project Item Infonnation Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT III: PAVING IMPROVEMENTS 1 0171.0101 Construction Staking 01 71 23 LS 1 _$1,500.00 $1,500-00 2 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 80 $20.00 $1,600.00 3 3213.0301 4"Conc Sidewalk 321320 SF 1675 $8.00 $13,400.00 4 3213.0401 6"Concrete Driveway 32 13 20 SF 860 $12..00 $10.320.00 5 3213.0506 Barrier Free Rampr Type P-1 321320 EA 2 $4,000,00 $8,000.00 6 3291.0100 Topsoil 329119 CY 132 $15.00 $1,980-00 7 3292.0100 Block Sod Placement 32 92 13 SY 1190 $4.00 $4,760.00 8 3471.0001 Traffic Control 3471 13 MO 2.5 $3,000.00 $7,500.00 1012 -- — 11 13 - ---- 14 15 16 - 17 18 19 20 21 - - — 22 23 24 25 26 27 28 29 — - 30 31 32 - 33 -- —— - -— - 34 _35 36 - - - 37 38 39 44 -- - - 45 - - - TOTAL UNIT III: PAVING IMPROVEMENTS $49,060.00 CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fom Venion September 1,2015 ou 4243 Bid Pmpoml_DAP 00 42 43 DAP-BID PROPOSAL Page 4 oF4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT L WATER IMPROVEMENTS $166,560.00 UNIT II:SANITARY SEWER IMPROVEMENTS $22,939.00 UNIT III:PAVING IMPROVEMENTS $49,060.00 Total Construction Bid $2313,559.00 This Bid is submitted by the entity named below: BIDDER: BY:Jason Ili iei Tri Dal Utilities 540 Commerce T[TLE:V.P.of pe,Minns SouthInIce,Texas 76092 DATE:8128l20 9 Contractor agrees to complete WORK For FINAL ACCEPTANCE within 90 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Cnmi Version September 1,2015 00 42 43_Bid PmpaW_DAP O R y�N 0 PROJECT LOCATION K—S CITY rMrr N a v W E 1000 500 0 1000 a GRAPHIC SCALE: 1"= 1000 Feet S PROJECT: VICINITY MAP HARRIS PARKWAY MEDICAL DEVELOPMENT s1uRo HAMPTOi—fim- —yingBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":1000' SHEET "ate Ave,,Ste 50`Grail DATE: JANUARY 2019 3so1 William D.Tate Ave,Ste soo Grapevine:Tx 7sos1 6840 HARRIS PARKWAY,FORT WORTH TX 76132 1 mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS TBPE Firm#44•TBPLs FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF — [�-so❑ � V LOT 2,BLOCK 1 M EXISTING CHISHOLM TRAIL HOSPITAL ADD. / 12"x12"TEE, I ® I BUILDING CHISHOLM TRAIL ASC PARTNERS LLC pN / 12"GATE VALVE, BUILDING ® 6928 HARRIS PKWY � 12"x8"REDUCER, 0 8"GATE VALVE, m_ PROP.SEWER CROSSING 20 L.F.OF 8"STUBOUT, ° 12"WATER TOP=741.60 END 12"PUBLIC WATER'A' &8"PLUG. `� 8"SS FL-737.35 CONNECT TO EX.16"DIP .00' WATER LINE,X-20203. S88°07'46"E 100Fla FUTURE / INSTALL 16"x12"CUT-IN TEE. BUILDING s S88o0T46"E 515.82' — — —_— 2"DOM.WATER SERVICE TAP, +8 LF OF 2"WATER PROP.15'WATER CD o SERVICE LINE, EASEMENT 25'x10'BORE PIT Q' &2"WATER ±562 L.F.OF PROPOSED INSTALL 55 L.F.OF 20"STEEL r METER BOX. 12"PVC PUBLIC WATER CASING PIPE BY BORE o E FIRE HYDRANT ASSEMBLY, 5'x5'RECEIVING PIT �o 1"IRR.WATER on v rn 12"x6"TEE, SERVICE TAP, M 6"GATE VALVE&BOX, ±8 LF OF 1"WATER LOT 4,BLOCK 1 o w &5 LF OF 6"LEAD LINE. a s SERVICE LINE, CHISHOLM TRAIL HOSPITAL ADD. &1"WATER a M HARRIS PARKWAY DEVELOPMENT PARTNERS 2,LLC U co�' METER BOX. J 6840 HARRIS PKWY a o a N s z !.� a ±550 L.F.OF PROPOSED Q, 12"PVC PUBLIC WATER 0 x 1"IRR.WATER FIRE HYDRANT ASSEMBLY, SERVICE TAP, 12"x6"TEE, ±8 LF OF 1"WATER 6"GATE VALVE&BOX, EXIST.16"DIP PUBLIC WATER LINE SERVICE LINE, &5 LF OF 6"LEAD LINE. X-20203,DOE 5674 &1"WATER BEGIN 12"PUBLIC WATER W METER BOX. CONNECT TO EX.8"PVC WATER LINE,X-9565. v 2"DOM.WATER REPLACE EX.8"BEND WITH 8"x8"TEE. SERVICE TAP, INSTALL 8"GATE VALVE,12"x8"REDUCER, I ±8 LF OF 2"WATER &12"90'HOR.BEND. SERVICE LINE, &2"WATER EXIST.8"PVC PUBLIC METER BOX. WATER LINE 6 N88°06'45"W 487.79' X-9565,DOE 1570 P 12"x12"TEE, 1,94 12"GATE VALVE, DEER HOLLOW DRIVE 12"x8"REDUCER, 8"GATE VALVE, a --� EXIST.8"PVC PUBLIC ; 20 L.F.OF 8"STUBOUT, ~Q WATER LINE ui L &8"PLUG. V X-9565,DOE 1570 Cl:A=2°54'14",R=884.00',L=44.80',CB=S13"34'41"W,CD=44.80' C2:A=12"00'50",R=952.00',L=199.62',CB=S9°01'22"W,CD=199.25' LEGEND — — PROPERTY LINE N THIS DOCUMENT IS EASEMENT RELEASED FOR THE PURPOSE OF INTERIM PROP.WATER REVIEW UNDER THE o AUTHORITY OF W = E DANIELA. FRANKLIN, PE TX 122044. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING, S OR PERMIT PURPOSES. 100 50 0 100 4-30-2019 GRAPHIC SCALE: 1"= 100 Feet PROJECT: WATER IMPROVEMENTS EXHIBIT HARRIS PARKWAY MEDICAL DEVELOPMENT s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1": 100' SHEET "ate A'a, to 00 Grapevine. "a DATE: JANUARY 2019 3801 William D.Tate Ave,Ste Soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 A mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS TBPE Firm#44•TBPLS FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF i LOT 2,BLOCK EXIST. PUBLIC 8" PVC SS QUAIL RIDGE ESTATES X-22976 FORT WORTH ACADEMY SSMH 7301 DUTCH BRANCH RD RIM-747.63 Rv/ T%/T//77TTj/ FL W=733.68 x FL N= S88°0 733.78 LT LOT 2,BLOCK 1 T16"E 563.23' - Ft NE 7-4-4. EXIST.6"SS SERVICE CHISHOLM S IL HOSPITAL ADD _ SS-—4°" \\ CHISHOLM TRAIL ASC — x-:- PARTNERS LLC LF—EXIST, PUBLIC 8"PVC SS BEGIN 8" PUBLIC SSW 6928 HARRIS PKWY X-22976 ° 'CONNECT TO EXIST.4'DIA.SSMH. - — ❑�L� EX. RIM=747.63 EX.&PROP.8"SS FL1N=733.78 o EX.8"SS FLOUT=733.68 EXISTING / BUILDING FUTURE o EX.6"SERVICE FLiN=744.53 LOT 3,BLOCK 1 BUILDING I Ex. 1 0" RooF D L1//L1// CHISHOLM TRAIL HOSPITAL ADD. CNS-F.W.,LLC \ ±157 L.F.OF 8"PVC SANITARY SEWER \ � 0 FUTURE PRIVATE 24"STORM DRAIN i q BY OTHERS I�S88°67-46"E 100.00' I Lj d — — — S88°07'46"E 415.82' — d LT \ END 8"PUBLIC SSW — CONSTRUCT STD.4'DIA.SSMH o\ PROP.WATER CROSSING &±5 LF OF 6"SS STUBOUT @ 2% L; 8"SS FL=737.35 RIM=746.78 m 12"WATER TOP=741.60 6"SS FLIN=737.78 co 8"SS FLOUT=737.61 PROP. PUBLIC \ w LOT 4, BLOCK 1 12"WATER LINE \ CHISHOLM TRAIL HOSPITAL ADD. FUTURE � HARRIS PARKWAY DEVELOPMENT PARTNERS 2, LLC BUILDING \ Z 6840 HARRIS PKWY LEGEND — — PROPERTY LINE N THIS DOCUMENT IS EASEMENT RELEASED FOR THE PURPOSE OF INTERIM PROP.SEWER REVIEW UNDER THE o AUTHORITY OF W = E DANIELA. FRANKLIN, PE TX 122044. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING, S OR PERMIT PURPOSES. 50 25 0 50 4-30-2019 GRAPHIC SCALE: 1"= 50 Feet PROJECT: SANITARY SEWER IMPROVEMENTS EXHIBIT HARRIS PARKWAY MEDICAL DEVELOPMENT s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":50' SHEET "ate Ave,Ste 50`Grail DATE: JANUARY 2019 3so1 William O.Tate Ave,Ste soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 A mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS TBPE Firm#44•TBPLs FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF z U� m w a _ w a w O U K U as Z 00 9 0 C cn 1 LOT 4, BLOCK 1 0 1 CHISHOLM TRAIL HOSPITAL ADD. c, HARRIS PARKWAY DEVELOPMENT PARTNERS 2, LLC loco ±860 SF OF 6"CONC. 6840 HARRIS PKWY v DRIVEWAY APPROACH 4� TC=757.20 TC-756.48 TP=756.70 TP=755.98 INSTALL TYPE P-1 CURB RAMP fll 10.5' 20' PROP.10'UTILITY ±1,675 SF OF 4" o °30'°° 18.53' EASEMENT .� CONC.SIDEWALK � P C P ° ,° -0� TS=755.81 . ° N R20' MATCH EXIST. - .. R20' TC=755.40ROp..5'. \ TP=756.40 TP=755.66 TP=754.90 /pE�A k. TC=757.05 TP=756.14 TP=755.41 TP=756.55 SAWCUT,DEMOLISH,& `\ ` 5 C1 ` z CD REMOVE±70 LF OF S 1°51'01"W u,-1 09,17' EXISTING CURB AND cc — — GUTTER ±5' TS=748.60 P ET- ..5:07.., DIP W H ��E -0203,DOI 1674 A �� �'1 P INSTALL TYPE P-1 CURB RAMP _w V \ (Posted SPeed(iAR,wqy SAWCUT,DEMOLIS ,& REMOVE±101- OF EXISTING CURB ND GU ER W VV C2:A=12"00'50",R=952.00',L=199.62',CB=S9°01'22"W,CD=199.25' LEGEND — — PROPERTY LINE THIS DOCUMENT IS EASEMENT RELEASED FOR THE P PURPOSE OF INTERIM REVIEW UNDER THE CURB&GUTTER AUTHORITY OF 1:n z DANIELA. FRANKLIN, PE e a PROP.6"CONCRETE DRIVEWAY TX 122044. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING,PROP.4"CONCRETE SIDEWALK OR PERMIT PURPOSES. m 50 25 0 50 5-23-2019 GRAPHIC SCALE: 1"= 50 Feet PROJECT: PAVING IMPROVEMENTS EXHIBIT HARRIS PARKWAY MEDICAL DEVELOPMENT s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":20' SHEET "ate Ave,Ste 50`Grail DATE: JANUARY 2019 3so1 William D.Tate Ave,Ste soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 B mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS TBPE Firm#44•TBPLS FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF