HomeMy WebLinkAboutContract 53011 Received Date: Nov 4,2019
Received Time: 8:43 AM
Developer and Project Information Cover Sheet:
Developer Company Name: Castle Development Group,Inc.
Address, State,Zip Code: 251 E. Southlake,TX,76092
Phone&Email: 817-337-3433 ,amiller(i�cast1edevgr0up.com
Authorized Signatory,Title: Andrew Miller,Manager Partner
Project Name: Harris Parkway Medical Development
Brief Description: Water, Sewer,Paving
Project Location: 6840 Hams Parkway,Fort Worth,TX 76132
Plat Case Number: FP-18-132 Plat Name: Chisholm Trail Hospital Add
Mapsco: Council District: 6
CFA Number: CFA19-011 City Project Number: 36T36T36T101900
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Hams Parkway Medical Development CITY SECRETARI(
CFA Official Release Date:02.20.2017
Page 1 of 11 FT WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 53011
WHEREAS, Castle Development Group, Inc. , ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Harris Parkway Medical Development ("Project")
within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas I
—`
Standard Community Facilities Agreement-Hams Parkway Medical Developme-11 OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 CITY SECRETARY
FT. WORTH, TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ❑, Street Lights & Signs
(C) ❑.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Harris Parkway Medical Development
CFA No.: CFA19-011 City Project No.: 36T36T36T101900
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 166,560.00
2.Sewer Construction $ 22,939.00
Water and Sewer Construction Total $ 189,499.00
B. TPW Construction
1.Street $ 49,060.00
2.Storm Drain $ -
3.Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ 49,060.00
Total Construction Cost(excluding the fees): $ 238,559.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 3,789.98
D. Water/Sewer Material Testing Fee(2%) $ 3,789.98
Sub-Total for Water Construction Fees $ 7,579.96
E. TPW Inspection Fee(4%) $ 1,962.40
F. TPW Material Testing(2%) $ 981.20
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 2,943.60
Total Construction Fees: $ 10,523.56
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond= 100% $ 238,559.00 x
Completion Agreement=100%/Holds Plat $ 238,559.00
Cash Escrow Water/Sanity Sewer-125% $ 236,873.75
Cash Escrow Paving/Storm Drain=125% $ 61,325.00
Letter of Credit=125%w/2 r expiration period $ 298,198.75
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories
effective as of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Castle Development Group,Inc.
Dana&rq!2d?ff
Dana Burghdoff ov 3,2019)
Dana Burghdoff
Interim Assistant City Manager µndrowrfiller
Date: Nov 3,2019 Andrew Miller(Oct 31,2019)
Name: Andrew Miller
Recommended by: Title: Manager Partner
l� •� r�e2�; Date: Oct 31,2019
J}�fiifer L.Eze� <(Oct 31,2019)
/TTTT`!!llEvelyn Roberts/Jennifer Ezemack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract,including
ensuring all performance and reporting
Kicrui�a,a., rncG�acKesz
requirements.
Richard A.McCracken(Oct 31,2019)
Richard A. McCracken _iu��2 cs�rrt rail`Aivrur f
Assistant City Attorney Janie Scarlett Morales(Oct 31,2019)
M&C No. Name: Janie Morales
Date: Oct 31,2019 Title: Development Manager
Form 1295: ,
FBf�T
ATTEST: ,•�
0:
A_
Maer(Nov 4
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development aUFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 9 of 11 CITY SECRETARY
FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
❑ Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 10 of 11
ATTACIEMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 36T36T101900
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Harris Parkway Medical Development
CFA Official Release Date: 02.20.2017
Page 11 of 11
00 42 43
PAP-➢ID PROPOSAL.
Page I or4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
BidlistIlem Description Specification Unit of Sid
No, p Section No- Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 0171.0101 Construction Staking 01 71 23 LS 1 $3,000.00 $3,000.00
2 3110.0102 W-12"Tree Removal 31 1000 EA 1 $500.0_0 $500,00
3 3292.0500 Seeding,Soil Retention Blanket 32 92 13 SY 1230 $1.00 $1.230.00
4 3305.0109 Trench Safety 33 05 10 LF 1110 $1.00 $1,110.00
5 _3305.1103 20"Casing 8y Other Than Open Cut 33 05 22 LF _ 55 $520.00 $28,600.00
6 3311.0001 Ductile Iron Water Fittings WI Restraint 33 1111 TON 0.5 $26,000.00 $13,000.00
7 3311.0161 6"PVC Water Pipe 3311 12 LF 10 $30.00 $300.00
8 3311,0261 8"PVC Water Pipe _ 33 11 12 LF 45 $34.00 $1,530,00
9 3311.0461 12"PVC Water Pipe 3311 12 LF 1110 $54.00 $59,940.00
10 3312.0001 Fire Hydrant 33 12 40 EA 2 $4,450.00 $8,900.00
11 _3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 1 $13,000.00 $13,000.00
12 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 $7,200.00 $7,200.00
13 3312,2003 1"Water Service 331210 EA 2 $2,400.00 $4,800.00
14 3312.2203 2"Water Service 33 12 10 EA 2 _ $3,500.00 _ $7,000.00
15 3312.3002 6"Gate Valve 33 12 20 EA 2 $1,250.00 $2,500.00
16 3312.3003 8"Gate Valve 33 12 20 EA 3 $1,650.00 $4,950.00
17 3312.3005 12"Gate Valve _ 33 12 20 EA 3 $3,000.00 $9,000.00
18 - -
19
20
21
22
23
24
25
26
27
28
29
30 - -
31
32 _
33
34
35
36
40
41
42
43
44 -
45 - -
TOTAL UNIT l:WATER IMPROVEMENTS $166,560.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Pmp"s"I_DAP
00 42 43
DAP-BID PROPOSAL
Page 2 of 4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Inrormation Bidders Proposal
Bidlist Item Specification Unit or Bid
No. Description Seclian No. Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 0171.0101 Construction Staking 0171 23 LS 1 $550.00 $550.00
2 _ 0241.0600 Remove Wall<4' 02 41 13 L.F 235 $5,00 $1,175.00
3 0241.0800 Remove Rip Rap 0241 13 SF 1230 $1-00 $1,230.00
4 0241.0900 Remove Misc Conc Structure 0241 13 LS 1 $500.00 $500.00
5 3292,0500 Seeding,Soil Retention Blanket 32 92 13 SY 180 $2.00 $360.00
6 3301.0002 Post-CCTV Inspection 33 01 31 _ LF 160 $3.00 $480.00
7 3301,0101 Manhole Vacuum Testing 33 01 30 EA 1 $400-00 $400.00
8 3305.0109 Trench Safety 330510 LF 160 $5.00 $800.00
3331.4108 6"Sewer Pipe 3311 10,33
9 31 12,3331 LF 5
_20 $46.00 $230.00
3331.4115 8"5ewer Pipe 3311 10,33
10 31 12,3331 LF 140
20-- __ $67,00 $9,380.00
3331.4116 8"Sewer Pipe,CSS Backfill 3311 10,33
11 31 12,3331 LF 20
20 $95.00 $1,900_.00
3339.1001 4'Manhole 33 39 10,33 EA 12 3920 1 $4,650.00 $4,650.00
3339.1003 4'Extra Depth Manhole 33 39 10,33
13 _ 3920 VF 4 $321.00 $1,284.00
14
15
16
17
18
19
20
21
22
23
24 — -
26
27
28
29
30
31..— .
32
33
34
36
37
TOTAL UNIT II:SANITARY SEWER IMPROVEKENTS1 $22,939.00
CITY OF FORT wORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Vemion September t,2015 00 42 43_bid Pmposal_DAP
00 42 43
DAP-BID PROPOSAL
11a2c 3 of d
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
U1 Hl F PRICE BID Bidder's Application
Project Item Infonnation Bidders Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT III: PAVING IMPROVEMENTS
1 0171.0101 Construction Staking 01 71 23 LS 1 _$1,500.00 $1,500-00
2 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 80 $20.00 $1,600.00
3 3213.0301 4"Conc Sidewalk 321320 SF 1675 $8.00 $13,400.00
4 3213.0401 6"Concrete Driveway 32 13 20 SF 860 $12..00 $10.320.00
5 3213.0506 Barrier Free Rampr Type P-1 321320 EA 2 $4,000,00 $8,000.00
6 3291.0100 Topsoil 329119 CY 132 $15.00 $1,980-00
7 3292.0100 Block Sod Placement 32 92 13 SY 1190 $4.00 $4,760.00
8 3471.0001 Traffic Control 3471 13 MO 2.5 $3,000.00 $7,500.00
1012
-- —
11
13 - ----
14
15
16 -
17
18
19
20
21 - - —
22
23
24
25
26
27
28
29 — -
30
31
32 -
33 -- —— - -— -
34
_35
36 - - -
37
38
39
44 -- - -
45 - - -
TOTAL UNIT III: PAVING IMPROVEMENTS $49,060.00
CITY OF PORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fom Venion September 1,2015 ou 4243 Bid Pmpoml_DAP
00 42 43
DAP-BID PROPOSAL
Page 4 oF4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT L WATER IMPROVEMENTS $166,560.00
UNIT II:SANITARY SEWER IMPROVEMENTS $22,939.00
UNIT III:PAVING IMPROVEMENTS $49,060.00
Total Construction Bid $2313,559.00
This Bid is submitted by the entity named below:
BIDDER: BY:Jason Ili iei
Tri Dal Utilities
540 Commerce
T[TLE:V.P.of pe,Minns
SouthInIce,Texas 76092 DATE:8128l20 9
Contractor agrees to complete WORK For FINAL ACCEPTANCE within 90 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Cnmi Version September 1,2015 00 42 43_Bid PmpaW_DAP
O
R y�N
0
PROJECT
LOCATION
K—S CITY
rMrr
N
a
v
W E
1000 500 0 1000
a
GRAPHIC SCALE: 1"= 1000 Feet S
PROJECT: VICINITY MAP
HARRIS PARKWAY MEDICAL DEVELOPMENT
s1uRo HAMPTOi—fim- —yingBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":1000' SHEET
"ate Ave,,Ste 50`Grail DATE: JANUARY 2019
3so1 William D.Tate Ave,Ste soo Grapevine:Tx 7sos1 6840 HARRIS PARKWAY,FORT WORTH TX 76132 1
mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS
TBPE Firm#44•TBPLs FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF
— [�-so❑ � V LOT 2,BLOCK 1
M
EXISTING CHISHOLM TRAIL HOSPITAL ADD. /
12"x12"TEE, I ® I BUILDING CHISHOLM TRAIL ASC PARTNERS LLC pN /
12"GATE VALVE, BUILDING ® 6928 HARRIS PKWY �
12"x8"REDUCER,
0
8"GATE VALVE, m_ PROP.SEWER CROSSING
20 L.F.OF 8"STUBOUT, ° 12"WATER TOP=741.60 END 12"PUBLIC WATER'A'
&8"PLUG. `� 8"SS FL-737.35 CONNECT TO EX.16"DIP
.00' WATER LINE,X-20203.
S88°07'46"E 100Fla
FUTURE / INSTALL 16"x12"CUT-IN TEE.
BUILDING s S88o0T46"E 515.82' — — —_—
2"DOM.WATER
SERVICE TAP,
+8 LF OF 2"WATER PROP.15'WATER CD o
SERVICE LINE, EASEMENT 25'x10'BORE PIT Q'
&2"WATER ±562 L.F.OF PROPOSED INSTALL 55 L.F.OF 20"STEEL r
METER BOX. 12"PVC PUBLIC WATER CASING PIPE BY BORE o E
FIRE HYDRANT ASSEMBLY, 5'x5'RECEIVING PIT �o
1"IRR.WATER on v
rn 12"x6"TEE,
SERVICE TAP, M 6"GATE VALVE&BOX,
±8 LF OF 1"WATER LOT 4,BLOCK 1
o w &5 LF OF 6"LEAD LINE. a s
SERVICE LINE, CHISHOLM TRAIL HOSPITAL ADD.
&1"WATER a M HARRIS PARKWAY DEVELOPMENT PARTNERS 2,LLC U co�'
METER BOX. J 6840 HARRIS PKWY a
o a N
s z !.� a
±550 L.F.OF PROPOSED Q,
12"PVC PUBLIC WATER
0 x
1"IRR.WATER FIRE HYDRANT ASSEMBLY,
SERVICE TAP, 12"x6"TEE,
±8 LF OF 1"WATER 6"GATE VALVE&BOX, EXIST.16"DIP PUBLIC WATER LINE
SERVICE LINE, &5 LF OF 6"LEAD LINE. X-20203,DOE 5674
&1"WATER BEGIN 12"PUBLIC WATER W
METER BOX.
CONNECT TO EX.8"PVC WATER LINE,X-9565. v
2"DOM.WATER REPLACE EX.8"BEND WITH 8"x8"TEE.
SERVICE TAP, INSTALL 8"GATE VALVE,12"x8"REDUCER, I
±8 LF OF 2"WATER &12"90'HOR.BEND.
SERVICE LINE,
&2"WATER EXIST.8"PVC PUBLIC
METER BOX. WATER LINE 6
N88°06'45"W 487.79' X-9565,DOE 1570 P
12"x12"TEE, 1,94 12"GATE VALVE, DEER HOLLOW DRIVE
12"x8"REDUCER,
8"GATE VALVE, a
--� EXIST.8"PVC PUBLIC ;
20 L.F.OF 8"STUBOUT, ~Q WATER LINE ui L
&8"PLUG. V X-9565,DOE 1570
Cl:A=2°54'14",R=884.00',L=44.80',CB=S13"34'41"W,CD=44.80'
C2:A=12"00'50",R=952.00',L=199.62',CB=S9°01'22"W,CD=199.25'
LEGEND
— — PROPERTY LINE N
THIS DOCUMENT IS
EASEMENT RELEASED FOR THE
PURPOSE OF INTERIM
PROP.WATER REVIEW UNDER THE o
AUTHORITY OF W = E
DANIELA. FRANKLIN, PE
TX 122044.
IT IS NOT INTENDED FOR
CONSTRUCTION, BIDDING, S
OR PERMIT PURPOSES.
100 50 0 100
4-30-2019
GRAPHIC SCALE: 1"= 100 Feet
PROJECT: WATER IMPROVEMENTS EXHIBIT
HARRIS PARKWAY MEDICAL DEVELOPMENT
s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1": 100' SHEET
"ate A'a, to 00 Grapevine.
"a DATE: JANUARY 2019
3801 William D.Tate Ave,Ste Soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 A
mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS
TBPE Firm#44•TBPLS FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF
i
LOT 2,BLOCK EXIST. PUBLIC 8" PVC SS
QUAIL RIDGE ESTATES X-22976
FORT WORTH ACADEMY SSMH
7301 DUTCH BRANCH RD RIM-747.63 Rv/
T%/T//77TTj/
FL W=733.68 x
FL N=
S88°0 733.78 LT LOT 2,BLOCK 1
T16"E 563.23' - Ft NE 7-4-4. EXIST.6"SS SERVICE CHISHOLM
S IL
HOSPITAL ADD
_ SS-—4°" \\ CHISHOLM TRAIL ASC
— x-:-
PARTNERS LLC
LF—EXIST, PUBLIC 8"PVC SS BEGIN 8" PUBLIC SSW 6928 HARRIS PKWY
X-22976 ° 'CONNECT TO EXIST.4'DIA.SSMH.
- — ❑�L� EX. RIM=747.63
EX.&PROP.8"SS FL1N=733.78
o EX.8"SS FLOUT=733.68 EXISTING
/ BUILDING
FUTURE o EX.6"SERVICE FLiN=744.53
LOT 3,BLOCK 1 BUILDING I Ex. 1 0" RooF D L1//L1//
CHISHOLM TRAIL
HOSPITAL ADD.
CNS-F.W.,LLC
\ ±157 L.F.OF 8"PVC SANITARY SEWER
\ � 0
FUTURE PRIVATE 24"STORM DRAIN i
q BY OTHERS I�S88°67-46"E
100.00' I Lj
d — — — S88°07'46"E 415.82' —
d LT
\ END 8"PUBLIC SSW —
CONSTRUCT STD.4'DIA.SSMH
o\ PROP.WATER CROSSING &±5 LF OF 6"SS STUBOUT @ 2%
L; 8"SS FL=737.35 RIM=746.78
m 12"WATER TOP=741.60 6"SS FLIN=737.78
co
8"SS FLOUT=737.61 PROP. PUBLIC
\ w LOT 4, BLOCK 1 12"WATER LINE
\ CHISHOLM TRAIL HOSPITAL ADD.
FUTURE � HARRIS PARKWAY DEVELOPMENT PARTNERS 2, LLC
BUILDING \ Z 6840 HARRIS PKWY
LEGEND
— — PROPERTY LINE N
THIS DOCUMENT IS
EASEMENT RELEASED FOR THE
PURPOSE OF INTERIM
PROP.SEWER REVIEW UNDER THE o
AUTHORITY OF W = E
DANIELA. FRANKLIN, PE
TX 122044.
IT IS NOT INTENDED FOR
CONSTRUCTION, BIDDING, S
OR PERMIT PURPOSES.
50 25 0 50
4-30-2019
GRAPHIC SCALE: 1"= 50 Feet
PROJECT: SANITARY SEWER IMPROVEMENTS EXHIBIT
HARRIS PARKWAY MEDICAL DEVELOPMENT
s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":50' SHEET
"ate Ave,Ste 50`Grail DATE: JANUARY 2019
3so1 William O.Tate Ave,Ste soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 A
mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS
TBPE Firm#44•TBPLs FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF
z
U�
m w
a
_ w
a w
O U
K U
as
Z
00
9
0
C
cn
1 LOT 4, BLOCK 1
0 1 CHISHOLM TRAIL HOSPITAL ADD. c,
HARRIS PARKWAY DEVELOPMENT PARTNERS 2, LLC loco
±860 SF OF 6"CONC. 6840 HARRIS PKWY v
DRIVEWAY APPROACH 4�
TC=757.20 TC-756.48
TP=756.70 TP=755.98 INSTALL TYPE P-1 CURB RAMP fll
10.5' 20' PROP.10'UTILITY ±1,675 SF OF 4"
o °30'°° 18.53' EASEMENT
.� CONC.SIDEWALK �
P C P ° ,° -0� TS=755.81
. ° N R20' MATCH EXIST. - ..
R20' TC=755.40ROp..5'. \
TP=756.40 TP=755.66 TP=754.90 /pE�A k.
TC=757.05 TP=756.14 TP=755.41
TP=756.55 SAWCUT,DEMOLISH,& `\ ` 5 C1 ` z
CD
REMOVE±70 LF OF S 1°51'01"W u,-1 09,17'
EXISTING CURB AND cc — —
GUTTER ±5'
TS=748.60
P
ET- ..5:07..,
DIP W H ��E
-0203,DOI 1674 A ��
�'1 P INSTALL TYPE P-1 CURB RAMP
_w V \ (Posted SPeed(iAR,wqy SAWCUT,DEMOLIS ,&
REMOVE±101- OF
EXISTING CURB ND
GU ER
W
VV
C2:A=12"00'50",R=952.00',L=199.62',CB=S9°01'22"W,CD=199.25'
LEGEND
— — PROPERTY LINE
THIS DOCUMENT IS
EASEMENT RELEASED FOR THE P
PURPOSE OF INTERIM
REVIEW UNDER THE
CURB&GUTTER AUTHORITY OF 1:n z
DANIELA. FRANKLIN, PE
e
a PROP.6"CONCRETE DRIVEWAY TX 122044.
IT IS NOT INTENDED FOR
CONSTRUCTION, BIDDING,PROP.4"CONCRETE SIDEWALK OR PERMIT PURPOSES. m
50 25 0 50
5-23-2019
GRAPHIC SCALE: 1"= 50 Feet
PROJECT: PAVING IMPROVEMENTS EXHIBIT
HARRIS PARKWAY MEDICAL DEVELOPMENT
s1uRo HAINPTOHiBROWN CHISHOLM TRAIL HOSPITAL ADD.,LOTS 3&4,BLOCK 1 SCALE: 1":20' SHEET
"ate Ave,Ste 50`Grail DATE: JANUARY 2019
3so1 William D.Tate Ave,Ste soo Grapevine:Tx 76051 6840 HARRIS PARKWAY,FORT WORTH,TX 76132 B
mail@bhbinc.com•817.251.8550•bhbinc.com DRAWN BY: EMS
TBPE Firm#44•TBPLS FIRM#10011302 BHB PROJECT No.2018.711.001 CHECKED BY: DF