HomeMy WebLinkAboutContract 45531-A1 ` 010, f553 I- A t
AMENDMENT NO. I TO
Basswood Boulevard Bridge
DESIGN PROCUREMENT AGREEMENT
WHEREAS, D.R. Horton—Texas, Ltd. ("Developer") and the City of Fort Worth("City") entered into
a Design Procurement Agreement (City Secretary Contract No. 45531, M&C C-26554) ("DPA") regarding,
among other things, certain improvements to Basswood Boulevard Bridge (the"Project"); and
WHEREAS, as design of the Project progressed, additional engineering design revisions due to gas
line and revised bridge section("Additional Facilities")were necessary; and
WHEREAS, Developer executed an amendment with the Engineer in an amount of $254,931.00 to
provide for the design of the Additional Facilities("Developer Amendment"); and
WHEREAS, Staff has reviewed the scope, fee and schedule for the work for the Additional Facilities'
design and find them to be fair and reasonable; and
WHEREAS, on or about June 2, 2015, the City Council authorized execution of this Amendment No. 1
to the Design Procurement Agreement to increase the City's contribution for the design of the Additional
Facilities in the amount of$254,931.00 (M&C C-27318); and
WHEREAS, on or about October 23, 2015 (M&C C-27425), the City and Developer entered into an
Infrastructure Construction Agreement ("ICA") for the construction of improvements to Basswood Boulevard
from Cloudcroft Lane to Horseman Road and Robert Downing Road from Basswood Boulevard to Lou Menk
Drive including related water, sewer, bridge and drainage improvements; and
WHEREAS, City and Developer intend to amend the ICA to provide for the reimbursement to
Developer from the City for the Additional Facilities construction costs related to the Developer Amendment;
and
NOW THEREFORE, for and in consideration of the recitals, covenants and conditions contained
herein, the City and Developer, acting herein by and through their duly authorized representatives, do hereby
agree as follows:
General Requirements
A. The Developer Amendment will generally consist of the design of the additional revised design
under the bridge to avoid gas line and revised bridge structural design due to the revised section
later in the design process on Attachment A hereto.
B. Developer has amended its Engineering Contract with Engineer to reflect the Developer
Amendment attached hereto as Attachment B.
C. City agrees to reimburse Developer for all additional engineering drawings, studies, renderings,
contract specifications, estimates, and other documents related to the Developer Amendment in
an amount not to exceed $254,931.00. Section C of the Design Procurement Agreement is
hereby amended to increase the City's reimbursement of Developer for the City's share of
design costs by $254,931.00, for a total of $713.570.00. Upon pay lient to Developer, 11
AMENDMENT NO.1 OFMIAL PFCORD
Project-Basswood Design Procurement(CS 45531) s
Page 1 of ;k
FT. WORTH,TX
designs, drawings, specifications, documents related to the Developer Amendment, whether in
hard copy or electronic form, shall become the property of the City.
D. All other terms of the original Design Procurement Agreement not specifically amended or
altered herein remain in full force and effect.
ACCORDINGLY, the City through its duly designated Assistant City Manager and Developer, through
its President, have each caused this instrument to be executed to be effective as of the date subscribed by the
City's Assistant City Manager.
DEVELOPER CITY OF FORT `vV ORTH
D.R. Horton—Texas,Ltd., _ � n 'j
A Texas limited partnership Dana Burgh
By: D.R. Horton,Inc., Imterim Ass's ant ity anager
A Delaware corporation, Date: ID 7 �
Its Authorized Agent
Recommended By:
Transportation&Public Works Department
Benjamin M. Clark William Johnson
Assistant Vice President Director
Date: 10131 zo'9 Date: /
A roved as to Form &Legality: ATTEST: `� .••••••••..
L/
_ 0
Douglas W. Blac Mary J.K r Y '
Assistant City Attorney City Secretary
M&C No.: C-27318
Date: 6/2/2015
Contract Compliance Manager:
By signin I acknowledge that I am the person
respon '�ble for the monito 'ng and administration
o:P th' co act, includin nsuring all performance
an 7reo g r q et,
Patrick 4esZonal
y, P.E. OFFICIAL RECORD
Engineer
CITY SECRETARY
AMENDMENT NO.1 FT WORTH,TX
Project-Basswood Design Procurement(CS 45531)
Page 2 of 4
Attachment A
AMENDMENT NO.1
Project-Basswood Design Procurement(CS 45531)
Page 3 of 4
OBE BBBGCB
OGCBGIBM
�DO�tEG0�6 !
a6Be�co6B@o- � -
�CBQBB4BBBEl,
oB�c��ocll '�
��� �� IJlil{hIINIIIIJ'IIIIIE�JNIkll�lfl�l8l!'l!
JI I�II��iIIlJ@JIIffl,Vllh!I�II@ 18C!Ifll
JI lifltilllN lk1N�IIkIIIJI�11111[lil
,1 �!�GI� JI�IiII�Jl��ll�E!��CIf,Ik�IINIINGlIIPiI�
rv,j�ri�ir�lr� �!��flkik�tJikIIIVJIN;I�9,'m:cmu�H9N:�r
1 _: �; ��� � 1yI`I�'�iflilfll!�!�l�Ifrylg�I'JyLLNgflMfill�til�kmpJi�ll��gl`pq���flpN�;yyl�
BIf��NI�E�117��Y1'8 N'IBi W/NMMY92�'.ti 7'
I � I! 111NtJliIIIINIJiI�l�lill!l�fltfl!�IIII�Il,!�
�f�'�,- .-•-- Illill{fl!Cfl'IVNI'fl�rlh�lVi'C>r9lC@!'fl�i
p`�`. i��i�!������'�l41�fl�16k�J11'ICINCIIIl�I
II ClJlikl!INCIJ',!i'iN NI IIiflINIAiI liflN!!!l
"' II'NiJllkl!INNII�dI�,N!klllfltl�Nill!�ili!!f
IIiIIJlkll,'A 1!i4'jp,.1111 l kfllllfl!kllllllil,I
I��IliC�Y�,�il'wtICIItflIGfl�JI.11lNflf
Iifl1119111111
Ilflllikl'Ifl�I NI'�IJatl�rw�l�l I!N@III!'l
f'� IVfli�ikll Ifl il'ET RI IHIS[11111
IIIN,�IIIINIII,NII�i�ll !!@!IIIIlVIII
-==� cx�;� Ilfll!!fl�lll�!@'Nll�il@I(IlkfliNfl'illllll8!191
'�• tlfli!!fA�►11111!clfl�e�fl,Nfl�I,II�flI:LV
IIIkIIfflN@@!I!e"@I!!h fl(Illfl'Nfli@l!IINII flF
kklkllf INiI@flII,NIINrh C!N�fl+li�u:il�fll lil
IllklN'INI!@INIIIININII flhfl�@y",IIC!IVINIkflJ
IllklICIININI!II!NIIN!'flh'lfflil'�!I1!NfNlhfll
�v!lIICfiNlillNos!rV;l!INili�'Ifiis!`ilflk�V
llll!!kIIVi'�Il lll�WkVI'kCJikfl'!`''iNflClb
flVIIJ!i Illlkl�l@J@kIIIJJI�iJkl�N6,A�slklNll
Ilk@ICI@Illlhl IN'fllf Ill fliilN'flJNCi N1�!'i�lll!<<
��;I IIkIIVINIINIGl I@�@Ikllhfl�Il�kdl�N��Ni�!IJII I`k
IiJIIBNkIIIINfl III fl!!IflNiNIIE'I�NEc�INJ'r'll!�l
' !''JII�V�@lil'.IlNi�kl��B11�BII�I'I'�i�lNIIJI
Ilia tI�II I II IIII!II11G U II 17 .1 l'IINJIV
:;� NIIIIL'N�I�B�d�Bi�IIBiJko I►II r�r�f ol,biiNl!
Nllk�lllil�NlliflIEIII'Jkfli�C61 kl�I!Clill(a
N:iillflklli!':@NklilhlC��'!`�!I@'°I'!tC�'�uul@Ill's
,a 'I'J� _--- IllllflfflllflN�li�ll�el'h�iil NII!II�!INfl�ll
'7� - hl�illl!'!I'I!!'p�l�d;9ifiiCfl oii�,l'I!IiN!
III!Nllllll'all'@ti111iI1I'��Ilif I'..IflIkJIIIIIIIN!€
c���-:�.•— Il�lflfl€Il'll�l,"yll'lj�i'�IaIr�G�I�!NIII'J@I
J -�'— P!k�i;IJICI'll�""111$+Ii�illllkfl�i�@I�IIN�I�'flk
I�kll!'flrN'JI'Ifl�iliP�-lr'lllik(l�CII I'lll�iliflk
r ilkfllflkl�klfl 111 l dkfl llrL�ii�l�!NVII�I!!fl"
Iklil!flkIkJBJ�IIIN d!l�dlll�IN I�I IIIVIIFI!II fli
r- II INfIII�tIIJi'i�'Ilt'�'V'J,flll�IlN�ilil!!!I!LIII!fll
! � nil INkIIIkJfJflfllfliJl'ilCIIl611kiiIIIIIINkVIIflN
' t) (Ikllflfll�!fll►t'Blh!ffll!'tIIhVIIIIIIkIIII�N
t:�� � i��, � I flkl�!!hNflJll�lf'dIIIIN�III�I,lI@�lkNlf�N
IlkllllNlNlilllll.Ntlll!I:N!IVIlNI'JfII11HIlIE,
'fir t'� o !IfJl�l!IlIIIINIIII'I��.�IGIN,INIINI',ilNlllllff!I�INC
� � �= �o IfN9mN!4!!I'II.I'�alh4@llVllli!f�flfllhllHJJ@N!C
' I - oo IfflIINIIIIIJIIC;�Ilfli!iNliillllflll'lIIIIIli��l{1C
. ' �� !I'III�NI�iIINJUIIPIII!!INIIIflIIIFIIk�JIIIIfiIC
) � �� Illllll!IINI!II'INI@!'�JIIIIIIiIIIINfINIfIIIIIi�l1N
`� � Illlllllllll!4'IIINIiIIIIIIIINNI fl:l�Nlilllll!@lil
���� o IVTIIIC!IIl9'�lll''IILI'al�lllll�lll!III!IIINI'NNIN
-� -' � ___1 IIIIIII�Ilil'III'III@hIIIJNiIINlllllllllll!III'IC
-- 11�!l�l�lkiil��;lklll�(11�INVtlIJIC@!CI!NN.I@��
� �� N;, !'N'6!@lih'tii�flflIIIIIpINllll!!!I'!!I!flll�
� ` __ __ hllllaf@lJolldl�ti�i�tallllll�lllllu@lLM111111C
III!IIII II C IIIBi�,ili��il!i�uu el�illlfl�lIINIIRIN@
HIS MINIMUM
Attachment B
AMENDMENT NO.1
Project-Basswood Design Procurement(CS 45531)
Page 4 of 4
_ P E LOTO N
ILAND SOLUTIONS 12/1/2014
Amendment No. 1
Basswood Boulevard
The purpose of this work order is to amend the scope and fee in the original work order for the design of
Basswood roadway and bridge dated December 11,2013.
Scope
1. Revise roadway and bridge design to accommodate a longer bridge over Big Fossil Creek
from 330 ft.to approximately 420 ft. It will also reduce roadway and bridge cross section
between Robert Downing Rd. and Horseman Rd. Value engineering.Design revisions are as
follows:
a) Roadway geometry
b) Paving cross sections
c) Grading
d) Storm drain locations and calculations
e) Structural design
f) Creek hydraulics and scour design
g) Engineers opinion of probable construction cost
h) Quality review
2. Revisions to Robert Downing Roundabout Plans
Fee
1. Roadway and Bridge Revisions $ 99,720.00
2. Roundabout Revisions $ 19,850.00
Total Amendment No 1 $119,570.00
Original Contract $594,000.00
Amendment No 1 $ 119 570 00
Total Fees $ 7139570.00
Peloton Land Solutions, Inc. Basswood Boulevard 1 of 1