Loading...
HomeMy WebLinkAboutContract 53004. -,., FORT WORTH ~ CITY SECRETARY CO .. fRACTNO . 5300Y SPECIFICATIONS AND CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF SANITARY SEWER REHABILITATION CONTRACT NO. 94 PART 1 City Project No. 100421 Sewer Project No . X-26029 Betsy Price Mayor David Cooke City Manager Chris Harder, P.E. Director, Water Department David V. Magana, P .E. City Engineer, Transportation and Public Works Department Prepared for The City of Fort Worth Water Department Prepared by: July 2019 ___ ..... ,,,,,,, ~i~OFT€ ,,, ;,,,_t-··••••·• :J,_ '• "' ,:_, •' * .;-.,v.n t tfll!' --J •• •• \I. • ~*/ \* ,. i!*: '·*"' , ....................... ······~ I GUIL LE RMO R. DAR CE ~ l•••• e •••I t• e •• •• •• t •••• t ••• ··1- , ~ '., 9647 6 :°/i $. 1ft c1<;.;·~!CENS'<£,~···# ,J' •, ~Q' ....... ~ .: \\\ -.S/ONAL 'CF -~ ~,,--- FICIAL RECORD Cl ~7Sf~5-ARY FT. WORTH, TX FORTWORTH SPECIFICATIONS AND CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF SANITARY SEWER REHABILITATION CONTRACT NO. 94 PART 1 City Project No. 100421 Sewer Project No. X-26029 Betsy Price David Cooke Mayor City Manager Chris Harder, P.E. Director, Water Department David V. Magana, P.E. City Engineer, Transportation and Public Works Department Prepared for The City of Fort North Water Department Prepared by:lot .....,. & AS,40cIAT as ine. COLIM E40 Llr.�l ,nnn1 . �,.-*1 6fi6ifU Q . ii.a.••u..a.. r....i ..gym _ Q GULL ERf3A0 R. VARUE NAL July 2019 07-16-2019 City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions 0005 10 Mayor and Council Communication 00 05 15 Addenda 00 11 13 Invitation to Bidders 0021 13 pv Instructions to Bidders i 5 00 32 15 Engineer- pf0je t Sehe&le Construction Project Schedule 00 32 15.1 Construction Project Schedule_ Baseline Example 00 32 15.2 Construction Project Schedule —Progress Example 00 32 15.3 Construction Project Schedule Progress Narrative 00 32 15.4 Construction Project Schedule_ Submittal Process 0035 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 0043 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 0045 11 Bidders Prequalifications 00 45 12 Prequalifzcation Statement 00 45 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 40 00 n 1 Minority Business Enterprise Goal cn 13usi o s E-R4 Fp - se Ge 1 am...., oo--T 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01- General Requirements 01 1100 Summary of Work 01 25 00 Substitution Procedures 01 31 19 Preconstruction Meeting 01 3120 Project Meetings 01 32 16 Construction Progress Schedule 01 32 33 Preconstruction Video 01 3300 Submittals 01 35 13 Special Project Procedures 01 45 23 Testing and Inspection Services 01 50 00 Temporary Facilities and Controls 01 55 26 Street Use Permit and Modifications to Traffic Control 01 57 13 Storm Water Pollution Prevention Plan 01 5813 Temporary Project Signage 01 60 00 Product Requirements 01 66 00 Product Storage and Handling Requirements CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 2, 2016 00 00 00 - 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 01 70 00 Mobilization and Remobilization 01 71 23 Construction Staking and Survey 01 7123.01 Attachment A_Survey Staking Standards 01 7423 Cleaning 01 7719 Closeout Requirements 01 7823 Operation and Maintenance Data 01 78 39 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing None Division 03 - Concrete None Division 26 - Electrical None Division 31— Earthwork None Division 32 - Exterior None Division 33 - Utilities 3301 31 Closed Circuit Television (CCTV) Inspection Division 34 - Transportation None Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's Buzzsaw ,site at: ht l/projecipoint.buzzsaw.com/client/fortworthgov;Resources/02%20- %20Constmction%2ODocuments/Specifications Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03 — Concrete 03 30 00 Cast -In -Place Concrete 03 34 13 Controlled Low Strength Material (CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 80 00 Modifications to Existing Concrete Structures CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 2, 2016 000000-3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Division 26 - Electrical 260510 Demolition for- Eleetfieal Systems 260533 Raeoways and Boxes or- Eleet.-;.,�crizal Systems 260543 Wadergfound Ducts and Raee...a. f 1~le f,.;e��i it 4 Systems Division 31- Earthwork 31 1000 Site Clearing 312323 B,.ff,.�r. 31 25 00 Erosion and Sediment Control 31 36 00 G.,bie- s vz�v 313700 Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 32�1 S 'To„,.,.,«. ry A ..ph 1+ D.,T ing >? e,-..,;. 32 01 29 Concrete Paving Repair 32 11 23 Flexible Base Courses 32 11 33 Cement Treated Base Courses 32 11 37 Liquid Treated Soil Stabilizer 32 12 16 Asphalt Paving l.,4s Paving 321273 73 3213 13 321322 C,.aek Se Asphalt alt Concrete Paving Gonery Sidewalks, Driveways Baffief Ffee Ramps 32 13 73 e and. Concrete Paving Joint Sealants Confete Gw-b affd Ge4effi 321613 321723 Pavement A/la„ 1. ngs rufb A d&ess minting Chain Fences and Gates 321723 3231 13 3291 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro -Mulching, Seeding, and Sodding 32-93-43 rr+aes and cl,..ubs Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 33 03 A -Bypass Pumping of ExisfiRg Sewer- Systems 33 04 10 Joint Bonding and Electrical Isolation 3304 11 CvfresiarGeat roff Test sta eaa m 3304 30 - '1 enVer-ar'y Wa4er cSen4ees 3304 4�0Cleaninband .,.._.,.. �, As.,, Test ing LxT AA Of AOF aiflS 33 04 50 Cleaning of`Sewer `'Mains 33 05 10 Utility Trench Excavation, Embedment, and Backfill CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 --- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 2, 2016 000000-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 33 05 Q 3305 13 W4ef Line Lowe, Frame, Cover and Grade Rings - Cast Iron 3305 16 3305 17 33 05 20 33 05 2i 330522 33 05 23 330524 Generete Water- Vauft� Concrete Collars Auger Bering Tlu�! Liner NeAe steel Gasifig Pip Hand Tlum ling Inst 1lati .,, n.,ffie Pipe i rryasi- Tunnel r : P Nate 33 05 26 of f g r- Utility Markers/Locators 33 05 30 Location of Existing Utilities 33 11 05 Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 11 33 i i i2 Ductile Iron Fittings Pol)-AnChloride(PVC) Presswe-Pip 33 11 1-4 33 42 , n 33 12 " 33 1220 33 1221 33 1225 33 1240 331250 331260 3331 12 93 34 W Bur-ied Steel Pipe artd Attings W ter Ser-vie s 1—ineh to 2 inoh Large we4ef Meters ResiliepA Se&tedg,te Valve A*AVA P�abbef Sea4ed Va4ves Gei+aaegan to Existing Water- Main-s Fim 17.,.ami# Water Sample 84a4ien Stanch Bl ffV l � �.� CTDTe i'f' G�rf9-CCrV'CZT.�7�C2IS0'ry Cured in Place Pipe (CIPP) Fiberglass P-ainfafeed Pipe for- ram..,,y4y Sanitafy Sewers 33 31 20 333121 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe Pe1)R,4nt4 Chloride Closed Ffefile Gfai* gaeftafy Sewer- Pipe 33 N 22 33 31 23 (PVC) Saffitafy Sewer Slip Lining Sanitary Sewer Pipe Enlargement 33 31 50 33 34;IQ Sanitary Sewer Service Connections and Service Line Gembinatien Air- Val-ve fef Aafy=Sewef Force Maine 33 39 10 Cast -in -Place Concrete Manholes 33 39 20 333930 Precast Concrete Manholes Fiber -glass Manholes 33 39 60 33 41 11 334602 -rreneh 334910 334920 `l:f 93--40 Epoxy Liners for Sanitary Sewer Structures High Del}sityRelye�e R)Pipe fer- StefffiClll Dr-ains bast in Place MapAieles and-Sut+etien Rexea r�,,.„�,., ,,,a n fep r.fls e SteiYit Di-aina'ge 14eadwAs a*d � itagwi[!6 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 2, 2016 00 00 00 - 5 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 Division 34 — Transportation 34 41 10 T„.,ff e Sign.,lg 34 41 10.01 Attdxehinen4 A C f,t fella,- Cabinet 34 41 11 Te..,ff, afy Tf ff G Qigfl 49 34 Al D-A—+,.:.,,-. Tx�,b.-:.7 s;..,,.,1 34T41fln Roadway ilYR111Ldio1AWsCFPxx't 34 4120.01 Ai4epial LED Read -way Luminaires- 344120.02 >a,.,.ew ay LED Roadway dway Luminaires 344120.VJ 34 4130 AliamiffHm Signs 3471 13 Traffic Control Appendix vv 4.01 GG 4.02 Subs .,.face and P4yo .,1 Conditions GG 4.04 Tr7Te . ,,,,d,...,.tm d >aae lifies GG 4,06 GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GG ti no DeFfflitS and Uihties GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 - PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 2, 2016 j� City of Fort Worths Texas Mayor and c®unr1if Communication DATE: 09/24119 M&C FILE NUMBER: M&C 19-0203 LOG NAME: 60SS94P1-RDBURNS SUBJECT Authorize Execution of a Contract with R&D Burns Brothers, Inc., in the Amount of $1,603,343.00 for Sanitary Sewer Rehabilitation Contract 94, Part 1 Located in the Rosemont, Worth Heights, South Wayside Brentmoor and Oakridge Terrace Neighborhood Associations and Adopt Appropriation Ordinance (COUNCIL. DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,898,949.00 from available funds; and 2. Authorize execution of a contract with R&D Burns Brothers, Inc., in the amount of $1,603,343.00 for Sanitary Sewer Rehabilitation Contract 94, Part 1 (City Project No. 100421). DISCUSSION: This Mayor and Council Communication is to authorize a construction contract for the replacement or rehabilitation of the deteriorated sanitary sewer mains on the following alleys and easements: STREET FROM TO Alley between Bolt Street and Travis Avenue 310 feet East Malta Avenue Alley between Malta Avenue and Travis Avenue 305 feet East Flint Street Alley between Anthony Street College Avenue 50 feet East of Travis Avenue and Seminary Drive Alley between Saint Louise Berry Street Devitt Street Street and Main Street Easement East of Hemphill 200 feet north of Fogg Street 125 feet south of Fogg Street Street Alley East of Hemphill Street Bolt street 160 feet south of Malta street Alley between Malta Street and Hemphill street Union Pacific Rail Road Flint Street Alley between Malta Street and Hemphill street Union Pacific Rail Road Bolt Street Alley West of Union Pacific Rail Malta Street Anthony Street Road Alley between Main Street and Bewick Street 357 feet south Bryan Street Alley between Saint Louise Bewick Street 357 feet south Street and Main Street Alley between Bryan street and Bewick Street 377 feet south Stuart Drive Easement south of Thornhill Pleasant Street 443 feet west Drive Easement east of Union Pacific Felix Street Access Road Felix Street Rail Road Alley between Fry Street and Prince Street Mason Street Belmeade Drive The project was advertised for bid on June 13, 2019 and June 20, 2019 in the Fort Worth Star -Telegram. On August 8, 2019, the following bids were received: Bidder ___1JAmount Time of Completion R&D Burns Brothers, Inc. 1,603,343.00 _ ; 210 Calendar Days , Venus Construction Co $1,995,221.00 _� Jackson Construction Ltd $2,178,674.50 This project is part of the Sanitary Sewer Overflow Initiative. In addition to the contract amount, $215,439.00 is required for project management, material testing and inspection and $80,167.00 is provided for project contingencies. This project will have no impact on the Water Department's operating budget when completed. Construction is expected to start in November 2019 and be completed by July 2020. M/WBE OFFICE - R&D Burns Brothers, Inc. is in compliance with the City's BDE Ordinance by committing to 11 percent MBE participation on this project. The City's MBE goal on this project is 11 percent. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Fiscal Year 2019 capital budget, as appropriated, of the Water and Sewer Capital Projects Fund. The Fiscal Year 2019 Water and Sewer Operating Budget includes appropriations of $35,856,873.00 within the Wastewater Operating Budget for the purpose of providing Pay -As -You -Go Funding for Sewer Capital Projects. After this transfer for Fiscal Year 2Q19, the balance will be $9,529,865.00. Appropriations for Sanitary Sewer Rehabilitation Contract 94, Part 1, are as depicted below: Fund Existing I Additional Project Total* Appropriations Appropriations W&S Capital Projects Fund 56002_ _ L�1,328,464.00$1,898,949.00 $3,227,413.00 Sewer Capital nid - Legacy 59607 $441,80Q 00 $0.00 �1 $441,800.00 Water Capital Find - ($72 200.00 $0.00 F72,200-00 Legacy 59601 Project Total $1,842,464.00 $1,898,949.Q0 $3,741,413.001 *Numbers rounded for presentation purposes. Submitted for City Manager's Office b . Dana Burghdoff 8018 Originating Business Unit head: Chris Harder 5020 Additional Information Contact: Suby Varughese 7803 000510-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page I of 1 1 SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION (M&C) 3 4 5 6 [Assembler: For Contract Document execution, remove this page and replace with the approved 7 M&C for the award of the project. M&C insert shall be on blue paper.] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 CITY OF FORT WORTH, TEXAS WATER DEPARTMENT ADDENDUM NO. I To the Spooificatiens and Contract Documents For SANITARY SENDER REHABILITATION CONTRACT 94, FART 1 City Project No. 100421 Addendum No. 1 Issued: June 27, 2019 Original Bid Cate: July 11, 2019 Revised Bid Opening Date: August 8, 2019 This addendum forms part of the Specifications and Contract Documents for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum In the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The specifications and contract documents for Sanitary Sewer Rehabilitation Contract 04, Part 1 are hereby revised by Addendum No. 1 as follows: 1. Bid Opening has date has been changed to August 8, 2019 This Addendum No. 1, forms part of the Specifications & Contract Documents for the above referenced project and modifies the original Project Manual & Contract Documents of the some. Acknowledge your receipt of Addendum No.1 by completing the requested information atthe following locations: (1) In the space provided in Section 00 4100, ©id Form, Page 3 of 3 (2) Indicate in upper case letters on the outside of your sealed bid envelope: „RECE.14/IirD & ACKNOWLEDGE ADDENDUM NO. I" Include a signed copy of Addendum No. 1 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 1 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. A-1 ADDENDUM 1 SANITARY SEWER REFIABiLITATIONfAMRACt NO.94 PART 1 City Project No. 100421 RECEIPT ACKNOWLEDGED Oomnanv; -:1 �) —6 Lt rA j i 5 A-1 Christopher Harder, P.E. DIRECTOR WAFER DEPARTMENT /Co Bv' Tony Shotola, P.E. Sr. Capital Projects Officer a�'L. LIM & ASSOCIATES, INC. F-3232 ''.Ols�:`���I ,�� ►•� '�•, i I�� ii••a•��a �••ii*l�Ul �y� GUILLERMO K'i DA-00 IN•••.1 •• F1X••w.w Ir,�;i-4• 9♦A4- 05-27-2019 ADDENDUM 1 SANITARY SEWER.REHABiirrATION.CONTRMT NO.94 PART 7 City Project No. 100421 CITY OF FORT WORTH, TEXAS WATER DEPARTMENT U At To the Specifications and Contract Documents 1-or SANITARY SEWER REHABILITATION CONTRACT 94, D'ART 1 City Project No. 100421 Bid Opening Date: August 9, 2019 Addendum No. 2 Issued; July 29, 2019 This addendum forms part of the Specifications and Contract Documents for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum In the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The specifications and contract documents for Sanitary Sewer Rehabilitation Contract 94, Part 1 are hereby revised by Addendum No. 2 as follows: Construction plans are revised as follows: 1. Construction flans Sheets 2, 5 through 20 revised and consist of one or more of the following: 1) Revised General Notes (Sheet 2 replaced with Sheets 2a & 2b) 2) Removed epoxy coating for some manholes. 3) Removed Mill and Overlay with 24nch Asphalt. 4) Contractor to verify location of existing utility prior to construction. 5) Fiber Optic Cable are drawn. 6) Some existing sanitary sewer manholes to remain. 7) 8" 0I1? Sewer Pipe Instead of PVC. 8) Added Water Stop. 9) Added Cement Stabilized Sand Backfill. See Revised set of plans for revisions mentioned. above. If. The Specifications are amended as follows: 1. Specifications and Contract Documents Manual —Revised In Its entirely. Including tho following updated sections: 00 4100 Bid Form 00 42 43 Proposal Form 00 43 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 00 4611 Bidders Prequaliffcatlons 00 4612 Prequalification Statement 00 4513 Bidders Prequalification Application 00 45 40 Minority Business Enterprise Goal A 2 ADDENDUM 2 SANITARYSEMR REHABILITATION CONTRACTNO. 04 PART i City Project No. 10042i This Addendum No. 2, forms part of the Specifications & Contract Documents for the above referenced project and modifies the original Project Manual & Contract Documents of the same. Acknowledge your receipt of Addendumn No. 2 by completing the requested Information atthe following locations: (1) In the space provided in Section .00 4100, Bid Form, Page 3 of 3 (2) Indicate in upper case letters on the outside of your sealed bid envelope: "RECEIVED & ACKNOWLEDGEADDENDUM NO. 2" Include a signed copy of Addendum No. 2 In the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 2 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. RECEIPT ACKNOWLEDGED WATER DEPARTMENT Tony Sholola, P.E. r Sr, Capital Projects Officer Compan ir 1-w-P.,. . 17 `+! �� It GUILLERMO R, DARC Yril:aasa� iliwaa.+ Hiaaap� 07-28-201 9 A 2 ADDENDUM 2 SAMIrARY'SEWER REIi MUTATION CONTRACT NO. $4 FART 1 City Project No. 100421 0011 U-1 INVITATION TO BIDDERS Page I of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Sanitary Sewer Rehabilitation, Contract No. 94 — Part 1, City 6 Project No. 100421 will he received by the City of Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 200 Texas Street 11 Fort Worth, Texas 76102 12 until 1:30 P.M. CST, Thursday, August 8, 2019, and bids will be opened publicly and read aloud 13 at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the (approximate) following: 17 18 71 LF of 6" Sanitary Sewer Pipe by CIPP 19 421 LF of 8" DIP Sewer Pipe 20 4,619 LF of 8" Sanitary Sewer Pipe by Open Cut 21 2,081 LF of 8"Sanitary Sewer Pipe by Pipe Enlargement 22 33 Std. 4' Dia. Manholes. 23 2 Drop 4' Dia. Manholes. 24 25 26 PREQUALIFICATION 27 The improvements included in this project must be performed by a contractor who is pre- 28 qualified by the City at the time of bid opening. The procedures for qualification and pre- 29 qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. 30 31 DOCUMENT EXAMINATION AND PROCUREMENTS 32 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 33 of Fort Worth's Purchasing Division website at bttp://www.fortworthtexas.My/purchasin and 34 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The 35 Contract Documents may be downloaded, viewed, and printed by interested contractors and/or 36 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 37 Parties Form 1295 and the form must be submitted to the Project Manager before the 38 contract will be presented to the City Council. The form can be obtained at 39 hos:Hwww.ethics.state.tx.us/tec/1295-Info.htm . 40 41 Copies of the Bidding and Contract Documents may be purchased from: Lim & Associates, Inc., 42 1112 N. Zang Boulevard., Suite 200, Dallas, Texas 75203, Phone: 214-942-1888. 43 44 45 The cost of Bidding and Contract Documents is: 46 Set of Bidding and Contract Documents with full size drawings: $80.00 47 Set of Bidding and Contract Documents with half size (if available) drawings: $50.00 48 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised Dece,nber 22, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 00 11 13-2 INVITATION TO BIDDERS Page 2 of 2 PREBID CONFERENCE A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following location, date, and time: DATE: June 26, 2019 TIME: 10: 00" PLACE: Fort Worth Water Department 311 W. I ( ` Street Fort Worth, Texas 76102 LOCATION: Conference Room CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject bids. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Suby Varughese, P.E., City of Fort Worth Email: suby.vamghese@fortworthtexas.gov Phone: (817) 392-7803 AND/OR Attn: Guillermo Darce, P.E., Lim & Associates, Inc. Email: gdarce@limtexas.com Phone: (214) 942-1888 ADVERTISEMENT DATES June 13, 2019 June 20, 2019 36 END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 22, 20 16 002113-1 INSTRUCTIONS TO BIDDERS Page I of 9 :4 MIN I COM111 P49kj 2 INSTRUCTIONS TO BIDDERS 3 1. Defined Terms 4 5 1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 6 00 - GENERAL CONDITIONS. 8 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 meanings indicated below which are applicable to both the singular and plural thereof. 10 11 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting 12 directly through a duly authorized representative, submitting a bid for performing 13 the work contemplated under the Contract Documents. 14 15 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or 16 corporation acting directly through a duly authorized representative, submitting a 17 bid for performing the work contemplated under the Contract Documents whose 18 principal place of business is not in the State of Texas. 19 20 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided) makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 26 resulting from the Bidders use of incomplete sets of Bidding Documents. 27 28 2.2, City and Engineer in making copies of Bidding Documents available do so only for the 29 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 30 for any other use. 31 32 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 33 34 3.1. All Bidders and their subcontractors are required to be prequalified for the work types 35 requiring prequalifcation at the time of bidding. Bids received from contractors who are 36 not prequalified (even if inadvertently opened) shall not be considered. Prequalification 37 requirement work types and documentation are as follows: 38 39 3.1.1. Paving — Requirements document located at; 40 hos://proiectnoint.buzzsaw.com/fortworthaov/Resources/02%20- 4.1 %20Construction%20Documents/Contractor%20Prequalification/TPW%20Paving 42%20Contractor%2OPregualification%2OProgram/PREOUALIFICATION%20REQ 43 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 44 45 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at; 46 https://i)rojeelpoint.buzzsaw.com/fortworthgov/Resources/02%20- 47 %o20Construction%2ODocuments/Contractor%2OPreaualification/TPW%2OPaving 48%20Contractor%2OPrequalification%2OProuamYREQUALIFICATION%20REo 49 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 0021 13 - 2 INSTRUCTIONS TO BIDDERS Page 2 of 9 2 3.1.3. Water and Sanitary Sewer — Requirements document located at; 3 hgps://vroiectvoint.buzzsaw.com/fortworthgov/Resourccs/02%20- 4 %o20Construction%2ODocuments/Contractor%2OPreaualification/Water%20and%2 5 OSanitarv%2OSewer%2OContractor%2OPrequalification%2OProgram/WSS%20pre 6 gual%20requirements.doc?public 9 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within 10 seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 11 45 11, BIDDERS PREQUALIFICATIONS. 12 13 3.2.1. Submission of and/or questions related to prequalification should be addressed to 14 the City contact as provided in Paragraph 6.1. 15 16 17 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low 18 bidder(s) for a project to submit such additional information as the City, in its sole 19 discretion may require, including but not limited to manpower and equipment records, 20 information about key personnel to be assigned to the project, and construction schedule, 21 to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to 22 deliver a quality product and successfully complete projects for the amount bid within 23 the stipulated time frame. Based upon the City's assessment of the submitted 24 information, a recommendation regarding the award of a contract will be made to the 25 City Council. Failure to submit the additional information, if requested, may be grounds 26 for rejecting the apparent low bidder as non -responsive. Affected contractors will be 27 notified in writing of a recommendation to the City Council. 28 29 3.4, In addition to prequalification, additional requirements for qualification may be required 30 within various sections of the Contract Documents. 31 32 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 33 34 4.1. Before submitting a Bid, each Bidder shall: 35 36 4,1, L Examine and carefully study the Contract Documents and other related data 37 identified in the Bidding Documents (including "technical data" referred to in 38 Paragraph 4.2. below). No information given by City or any representative of the 39 City other than that contained in the Contract Documents and officially 40 promulgated addenda thereto, shall be binding upon the City. 41 42 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 43 site conditions that may affect cost, progress, performance or furnishing of the 44 Work. 45 46 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 47 progress, performance or furnishing of the Work. 48 49 50 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 0021 13 - 3 INSTRUCTIONS TO 13JDDERS Page 3 of 9 1 4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site (except Underground Facilities) that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 9 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 10 the information which the City will furnish. All additional information and data 11 which the City will supply after promulgation of the formal Contract Documents 12 shall be issued in the form of written addenda and shall become part of the Contract 13 Documents just as though such addenda were actually written into the original 14 Contract Documents. No information given by the City other than that contained in 15 the Contract Documents and officially promulgated addenda thereto, shall be 16 binding upon the City. 17 18 4.1.6. Perform independent research, investigations, tests, borings, and such other means 19 as may be necessary to gain a complete knowledge of the conditions which will be 20 encountered during the construction of the project. On request, City may provide 21 each Bidder access to the site to conduct such examinations, investigations, 22 explorations, tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fill all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations, tests and studies. 25 26 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 27 cost of doing the Work, time required for its completion, and obtain all information 28 required to make a proposal. Bidders shall rely exclusively and solely upon their 29 own estimates, investigation, research, tests, explorations, and other data which are 30 necessary for full and complete information upon which the proposal is to be based. 31 It is understood that the submission of a proposal is prima -facie evidence that the 32 Bidder has made the investigation, examinations and tests herein required. Claims 33 for additional compensation due to variations between conditions actually 34 encountered in construction and as indicated in the Contract Documents will not be 35 allowed. C 37 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 38 between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted to make such corrections or interpretations as may 41 be deemed necessary for fulfillment of the intent of the Contract Documents. 42 43 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 44 45 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10042I Revised August 21, 2015 0021 13 - 4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.2. those drawings of physical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities) which are at or contiguous to 3 the site that have been utilized by City in preparation of the Contract Documents. 4 5 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 6 on request. Those reports and drawings may not be part of the Contract 7 Documents, but the "technical data" contained therein upon which Bidder is entitled 8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawn from any "technical data" or 11 any other data, interpretations, opinions or information. 12 13 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) 14 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 15 exception the Bid is premised upon performing and furnishing the Work required by the 16 Contract Documents and applying the specific means, methods, techniques, sequences or 17 procedures of construction (if any) that may be shown or indicated or expressly required 18 by the Contract Documents, (iii) that Bidder has given City written notice of all 19 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 20 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 21 etc., have not been resolved through the interpretations by City as described in 22 Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate 23 and convey understanding of all terms and conditions for performing and furnishing the 24 Work. 25 26 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 27 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 2.8 Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract 29 Documents. 30 31 5. Availability of Lands for Work, Etc. 32 33 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for 34 access thereto and other lands designated for use by Contractor in performing the Work 35 are identified in the Contract Documents. All additional lands and access thereto 36 required for temporary construction facilities, construction equipment or storage of 37 materials and equipment to be incorporated in the Work are to be obtained and paid for 38 by Contractor. Easements for permanent structures or permanent changes in existing 39 facilities are to be obtained and paid for by City unless otherwise provided in the 40 Contract Documents. 41 42 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 43 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 44 of -way, easements, and/or permits are not obtained, the City reserves the right to cancel 45 the award of contract at any time before the Bidder begins any construction work on the 46 project. 47 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10042t Revised August 21, 2015 0021 13 - 5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 2 way, easements, and/or permits, and shall submit a schedule to the City of how 3 construction will proceed in the other areas of the project that do not require permits 4 and/or easements- 5 6 6. Interpretations and Addenda 7 8 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 9 City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions 10 received after this day may not be responded to. Interpretations or clarifications 11 considered necessary by City in response to such questions will be issued by Addenda 12 delivered to all parties recorded by City as having received the Bidding Documents. 13 Only questions answered by formal written Addenda will be binding. Oral and other 14 interpretations or clarifications will be without legal effect. 15 16 Address questions to: 17 18 City of Fort Worth 19 200 Texas Street 20 Fort Worth, TX 76102 21 Attn: Suby Varughese, P.E., Water Department 22 Fax: (817) 392-2585 23 Email: ruby.varughes@fortworthtexas.gov 24 Phone: (817) 392-7803 25 26 27 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 28 City. 29 30 6.3. Addenda or clarifications may be posted via Buzzsaw at 31 hUs.,iproieetpoint.buzzsaw.com/client/fortworthgovllnfrastructuree%2OProjects/l00421 32 %20- 33 %20SS%20Rehab%20Contract%2094/General%20Contract%2UDocuments%20and%20 34 Specifications/10%20-%2OAddenda 35 36 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or 37 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 38 Project. Bidders are encouraged to attend and participate in the conference. City will 39 transmit to all prospective Bidders of record such Addenda as City considers necessary 40 in response to questions arising at the conference. Oral statements may not be relied 41 upon and will not be binding or legally effective. 42 43 7. Bid Security 44 45 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 46 (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 47 the requirements of Paragraphs 5.01 of the General Conditions. 48 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 0021 13 - 6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 2 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 3 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 4 default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 6 other Bidders whom City believes to have a reasonable chance of receiving the award 7 will be retained by City until final contract execution. 8 9 8. Contract Times 10 The number of days within which., or the dates by which, Milestones are to be achieved in 11 accordance with the General Requirements and the Work is to be completed and ready for 12 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 13 attached Bid Form. 14 15 9. Liquidated Damages 16 Provisions for liquidated damages are set forth in the Agreement. 17 18 10. Substitute and "Or -Equal" Items 19 The Contract, if awarded, will be on the basis of materials and equipment described in the 20 Bidding Documents without consideration of possible substitute or "or -equal" items. 21 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 23 City, application for such acceptance will not be considered by City until after the Effective 24 Date of the Agreement. The procedure for submission of any such application by Contractor 25 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 26 Conditions and is supplemented in Section 0125 00 of the General Requirements. 27 28 11. Subcontractors, Suppliers and Others 29 30 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 31 12-2011 (as amended), the City has goals for the participation of minority business 32 and/or small business enterprises in City contracts. A copy of the Ordinance can be 33 obtained from the Office of the City Secretary. The Bidder, shall submit the MBE and 34 SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor 35 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 36 Venture Form as appropriate. The Forms including documentation must be received 37 by the City no later than 2:00 P.M. CST, on the second business days after the bid 38 opening date. The Bidder shall obtain a receipt from the City as evidence the 39 documentation was received. Failure to comply shall render the bid as non- 40 responsive, 41 42 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 43 or organization against whom Contractor has reasonable objection. 44 45 12. Bid Form 46 47 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 48 obtained from the City. 49 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.2, All blanks on the Bid Form must be completed by printing in ink and the Bid Form 2 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 3 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 4 price item listed therein. In the case of optional alternatives, the words "No Bid," 5 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 6 written in ink in both words and numerals, for which the Bidder proposes to do the 7 work contemplated or furnish materials required. All prices shall be written legibly. 8 In case of discrepancy between price in written words and the price in written 9 numerals, the price in written words shall govern. 10 11 12.3, Bids by corporations shall be executed in the corporate name by the president or a 12 vice-president or other corporate officer accompanied by evidence of authority to 13 sign. The corporate seal shall be affixed. The corporate address and state of 14 incorporation shall be shown below the signature. 15 16 12A, Bids by partnerships shall be executed in the partnership name and signed by a 17 partner, whose title must appear under the signature accompanied by evidence of 18 authority to sign. The official address of the partnership shall be shown below the 19 signature. 20 21 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 22 member and accompanied by evidence of authority to sign. The state of formation of 23 the firm and the official address of the firm shall be shown. 24 25 12.6. Bids by individuals shall show the Bidder's name and official address. 26 27 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 28 indicated on the Bid Form. The official address of the joint venture shall be shown. 29 30 12.8. All names shall be typed or printed in ink below the signature. 31 32 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of 33 which shall be filled in on the Bid Form. 34 35 12.10. Postal and e-mail addresses and telephone number for communications regarding the 36 Bid shall be shown. 37 38 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 39 Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance 40 to State Law Non Resident Bidder, 41 42 13. Submission of Bids 43 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 44 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 45 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 46 envelope, marked with the City Project Number, Project title, the name and address of 47 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 48 through the mail or other delivery system, the sealed envelope shall be enclosed in a separate 49 envelope with the notation "BID ENCLOSED" on the face of it. 50 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14. Modification and Withdrawal of Bids 3 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 4 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 5 must be made in writing by an appropriate document duly executed in the manner 6 that a Bid must be executed and delivered to the place where Bids are to be submitted 7 at any time prior to the opening of Bids. After all Bids not requested for withdrawal 8 are opened and publicly read aloud, the Bids for which a withdrawal request has been 9 properly filed may, at the option of the City, be returned unopened. 10 11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 12 time set for the closing of Bid receipt. 13 14 15. Opening of Bids 15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 16 abstract of the amounts of the base Bids and major alternates (if any) will be made available 17 to Bidders after the opening of Bids. 18 19 16. Bids to Remain Subject to Acceptance 20 All Bids will remain subject to acceptance for the time period specified for Notice of Award 21 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 22 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 23 24 17. Evaluation of Bids and Award of Contract 25 26 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 27 to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids 28 and to reject the Bid of any Bidder if City believes that it would not be in the best 29 interest of the Project to make an award to that Bidder, whether because the Bid is 30 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 31 meet any other pertinent standard or criteria established by City. City also reserves 32 the right to waive informalities not involving price, contract time or changes in the 33 Work with the Successful Bidder. Discrepancies between the multiplication of units 34 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 35 between the indicated sum of any column of figures and the correct sum thereof will 36 be resolved in favor of the correct sum. Discrepancies between words and figures 37 will be resolved in favor of the words. 38 39 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 40 among the Bidders, Bidder is an interested party to any litigation against City, 41 City or Bidder may have a claim against the -other or be engaged in litigation, 42 Bidder is in arrears on any existing contract or has defaulted on a previous 43 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 44 Bidder has uncompleted work which in the judgment of the City will prevent or 45 hinder the prompt completion of additional work if awarded. 46 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 0021 I3 - 9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 2 other persons and organizations proposed for those portions of the Work as to which 3 the identity of Subcontractors, Suppliers, and other persons and organizations must 4 be submitted as provided in the Contract Documents or upon the request of the City. 5 City also may consider the operating costs, maintenance requirements, performance 6 data and guarantees of major items of materials and equipment proposed for 7 incorporation in the Work when such data is required to be submitted prior to the 8 Notice of Award. 9 10 17.3. City may conduct such investigations as City deems necessary to assist in the 11 evaluation of any Bid and to establish the responsibility, qualifications, and financial 12 ability of Bidders, proposed Subcontractors, Suppliers and other persons and 13 organizations to perform and furnish the Work in accordance with the Contract 14 Documents to City`s satisfaction within the prescribed time. 15 16 17.4. Contractor shall perform with his own organization, work of a value not less than 17 35% of the value embraced on the Contract, unless otherwise approved by the City. 18 19 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 20 responsive Bidder whose evaluation by City indicates that the award will be in the 21 best interests of the City. 22 23 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award 24 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 25 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 26 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 27 comparable contract in the state in which the nonresident's principal place of 28 business is located. 29 30 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 31 to be awarded, City will award the Contract within 90 days after the day of the Bid 32 opening unless extended in writing. No other act of City or others will constitute 33 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 34 the City. 35 36 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 37 38 18. Signing of Agreement 39 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 40 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 41 Contractor shall sign and deliver the required number of counterparts of the Agreement to 42 City with the required Bonds, Certificates of Insurance, and all other required documentation. 43 City shall thereafter deliver one fully signed counterpart to Contractor. 44 45 46 47 END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 21, 2015 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 00 3215 2 CONSTRUCTION PROJECT SCHEDULE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Project Schedule 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 D. Purpose 14 The City of Fort Worth (City) is committed to delivering quality, cost-effective 15 infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a 16 properly structured schedule with accurate updates. This supports effective monitoring 17 of progress and is input to critical decision making by the project manager throughout 18 the life of the project. Data from the updated project schedule is utilized in status 19 reporting to various levels of the City organization and the citizenry. 20 21 This Document complements the City's Standard Agreement to guide the construction 22 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 23 City in project delivery. The expectation is the performance of the work follows the 24 accepted schedule and adhere to the contractual timeline. 25 26 The Contractor will designate a qualified representative (Project Scheduler) responsible 27 for developing and updating the schedule and preparing status reporting as required by 28 the City. 29 30 1.2 PRICE AND PAYMENT PROCEDURES 31 A. Measurement and Payment 32 1. Work associated with this Item is considered subsidiary to the various items bid. 33 No separate payment will be allowed for this Item. 34 2. Non-compliance with this specification is grounds for City to withhold payment of 35 the Contractor's invoices until Contractor achieves said compliance. 36 1.3 REFERENCES 37 A. Project Schedules 38 Each project is represented by City's master project schedule that encompasses the 39 entire scope of activities envisioned by the City to properly deliver the work. When the 40 City contracts with a Contractor to perform construction of the Work, the Contractor CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 944 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 will develop and maintain a schedule for their scope of work in alignment with the 2 City's standard schedule requirements as deemed herein. The data and information of 3 each such schedule will be leveraged and become integral in the master project 4 schedule as deemed appropriate by the City's Project Control Specialist and approved 5 by the City's Project Manager. 6 7 1. Master Project Schedule 8 The master project schedule is a holistic representation of the scheduled activities 9 and milestones for the total project and be Critical Path Method (CPM) based. The 10 City's Project Manager is accountable for oversight of the development and I 1 maintaining a master project schedule for each project. When the City contracts for 12 the design and/or construction of the project, the master project schedule will 13 incorporate elements of the Design and Construction schedules as deemed 14 appropriate by the City's Project Control Specialist. The assigned City Project 15 Control Specialist creates and maintains the master project schedule in P6 (City's 16 scheduling software). 17 18 2. Construction Schedule 19 The Contractor is responsible for developing and maintaining a schedule for the 20 scope of the Contractor's contractual requirements. The Contractor will issue an 21 initial schedule for review and acceptance by the City's Project Control Specialist 22 and the City's Project Manager as a baseline schedule for Contractor's scope of 23 work. Contractor will issue current, accurate updates of their schedule (Progress 24 Schedule) to the City at the end of each month throughout the life of their work. 25 26 B. Schedule Tiers 27 The City has a portfolio of projects that vary widely in size, complexity and content 28 requiring different scheduling to effectively deliver each project. The City uses a 29 "tiered" approach to align the proper schedule with the criteria for each project. The 30 City's Project Manager determines the appropriate schedule tier for each project, and 31 includes that designation and the associated requirements in the Contractor's scope of 32 work. The following is a summary of the "tiers". 33 34 1. Tier 1: Small Size and Short Duration Project (design not required) 35 The City develops and maintains a Master Project Schedule for the project. No 36 schedule submittal is required from Contractor. City's Project Control Specialist 37 :acquires any necessary schedule status data or information through discussions with 38 the respective party on an as -needed basis. 39 40 2, Tier 2: Small Size and Short to Medium Duration Project 41 The City develops and maintains a Master Project Schedule for the project. The 42 Contractor identifies "start" and "finish" milestone dates on key elements of their 43 work as agreed with the City's Project Manager at the kickoff of their work effort. 44 The Contractor issues to the City, updates to the "start" and "finish" dates for such 45 milestones at the end of each month throughout the life of their work on the project. 46 47 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration 48 The City develops and maintains a Master Project Schedule for the project. The 49 Contractor develops a Baseline Schedule and maintains the schedule of their 50 respective scope of work on the project at a level of detail (generally Level 3) and in CITY OF PORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 201 S 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 alignment with the WBS structure in Section 1.4.11 as agreed by the Project Manager. 2 The Contractor issues to the City, updates of their respective schedule (Progress 3 Schedule) at the end of each month throughout the life of their work on the project. 4 C. Schedule Types 5 Project delivery for the City utilizes two types of schedules as noted below. The City 6 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 7 monthly updates to the City Project Manager (end of each month) as a "progress" 8 schedule. The Contractor prepares and submits each schedule type to fulfill their 9 contractual requirements. 10 11 1. Baseline Schedule 12 The Contractor develops and submits to the City, an initial schedule for their scope 13 of work in alignment with this specification. Once reviewed and accepted by the 14 City, it becomes the "Baseline" schedule and is the basis against which all progress 15 is measured. The baseline schedule will be updated when there is a change or 16 addition to the scope of work impacting the duration of the work, and only after 17 receipt of a duly authorized change order issued by the City. in the event progress is 18 significantly behind schedule, the City's Project Manager may authorize an update 19 to the baseline schedule to facilitate a more practical evaluation of progress. An 20 example of a Baseline Schedule is provided in Specification 00 32 15.1 21 Construction Project Schedule Baseline Example. 22 23 2. Progress Schedule 24 The Contractor updates their schedule at the end of each month to represent the 25 progress achieved in the work which includes any impact from authorized changes 26 in the work. The updated schedule must accurately reflect the current status of the 27 work at that point in time and is referred to as the "Progress Schedule". The City's 28 Project Manager and Project Control Specialist reviews and accepts each progress 29 schedule. In the event a progress schedule is deemed not acceptable, the 30 unacceptable issues are identified by the City within 5 working days and the 31 Contractor must provide an acceptable progress schedule within 5 working days 32 after receipt of non -acceptance notification. An example of a Progress Schedule is 33 provided in Specification 00 32 15.2 Construction Project Schedule Progress 34 Example. 35 36 1..4 CITY STANDARD SCHEDULE REQUIREMENTS 37 The following is an overview of the methodology for developing and maintaining a 38 schedule for delivery of a project. 39 40 A. Schedule Framework 41 The schedule will be based on the defined scope of work and follow the (Critical Path 42 Methodology) CPM method. The Contractor's schedule will align with the requirements 43 of this specification and will be cost loaded to reflect their plan for execution. Overall 44 schedule duration will align with the contractual requirements for the respective scope of 45 work and be reflected in City's Master Project Schedule. The Project Number and Name 46 of the Project is required on each schedule and must match the City's project data. 47 48 B. Schedule File Name CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised 3ULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shown below. ® Baseline Schedule File Name Format: City Project Number _Project Name_Baseline Example: 101376 North Montgomery Street I MAC Baseline Progress Schedule File Name Format: City Project Number _Project Name _YYYY-MM Example: 101376 North Montgomery Street MlAC_2018 01 • Project Schedule Progress Narrative File Name Format: City Project Number —Project Name_PN_YYYY-MM Example: 101376_North Montgomery Street BMAC_PN 2018 01 C. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water D. Schedule Calendar The City's standard calendar for schedule development purposes is based on a 5-day workweek and accounts for the City's eight standard holidays (New Years, Martin Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, Christmas). The Contractor will establish a schedule calendar as part of the schedule development process and provide to the Project Control Specialist as part of the basis for their schedule. Variations between the City's calendar and the Contractor's calendar must be resolved prior to the City's acceptance of their Baseline project schedule. E. WBS & Milestone Standards for Schedule Development The scope of work to be accomplished by the Contractor is represented in the schedule in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the development of the schedule activities and shall be imbedded and depicted in the schedule. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 1 The following is a summary of the standards to be followed in preparing and maintaining 2 a schedule for project delivery. 3 4 1. Contractor is required to utilize the City's WBS structure and respective project type 5 template for "Construction" as shown in Section 1.4.1-1 below. Additional activities 6 may be added to Levels 1 - 4 to accommodate the needs of the organization executing 7 the work, Specifically the Contractor will add activities under WBS XXXXXX.80.83 8 "Construction Execution" that delineates the activities associated with the various 9 components of the work. 10 11 2. Contractor is required to adhere to the City's Standard Milestones as shown in 12 Section 1.4.1 below. Contractor will include additional milestones representing 13 intermediate deliverables as required to accurately reflect their scope of work. 14 15 F. Schedule Activities 16 Activities are the discrete elements of work that make up the schedule. They will be 17 organized under the umbrella of the WBS. Activity descriptions should adequately 18 describe the activity, and in some cases the extent of the activity. All activities are 19 logically tied with a predecessor and a successor. The only exception to this rule is for 20 "project start" and "project finish" milestones. 21 22 The activity duration is based on the physical amount of work to be performed for the 23 stated activity, with a maximum duration of 20 working days. If the work for any one 24 activity exceeds 20 days, break that activity down incrementally to achieve this duration 25 constraint. Any exception to this requires review and acceptance by the City's Project 26 Control Specialist. 27 28 G. Change Orders 29 When a Change Order is issued by the City, the impact is incorporated into the previously 30 accepted baseline schedule as an update, to clearly show impact to the project timeline. 31 The Contractor submits this updated baseline schedule to the City for review and 32 acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the 33 following: 34 35 1. Time extensions associated with approved contract modifications are limited to the 36 actual amount of time the project activities are anticipated to be delayed, unless 37 otherwise approved by the Program Manager. 38 39 2. The re-baselined schedule is submitted by the Contractor within ten workdays after 40 the date of receipt of the approved Change Order. 41 42 3. The changes in logic or durations approved by the City are used to analyze the impact 43 of the change and is included in the Change Order. The coding for a new activity(s) 44 added to the schedule for the Change Order includes the Change Order number in the 45 Activity ID. Use as many activities as needed to accurately show the work of the 46 Change Order. Revisions to the baseline schedule are not effective until accepted by 47 the City. 48 49 50 H. City's Work Breakdown Structure CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised ]ULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Environmental XX3C XX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX. 80.85 Inspection XXXXXX.80.86 Landscaping XXXXXX90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure I. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. Activity ID Activity Name Design 3020 Award Design Agreement 3040 Issue Notice To Proceed - Design Engineer 3100 Design Kick-off Meeting 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3150 Peer Review Meeting/Design Review meeting (technical) 3160 Conduct Design Public Meeting #1 (required) 3170 Conceptual Design Complete 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3250 Conduct Design Public Meeting #2 (required) 3260 Preliminary Design Complete CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 1 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, 2 Water & Sewer 3 3330 Conduct Design Public Meeting #3 (if required) 4 3360 Final Design Complete 5 ROW & Easements 6 4000 Right of Way Start 7 4230 Right of Way Complete 8 Utility Relocation 9 7000 Utilities Start 10 7120 Utilities Cleared/Complete I 1 Construction 12 Bid and Award 13 8110 Start Advertisement 14 8150 Conduct Bid Opening 15 8240 Award Construction Contract I6 Construction Execution 17 8330 Conduct Construction Public Meeting #4 Pre -Construction 18 8350 Construction Start 19 8370 Substantial Completion 20 8540 Construction Completion 21 9130 Notice of Completion/Green Sheet 22 9150 Construction Contract Closed 23 9420 Design Contract Closed 24 1.5 SUBMITTALS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 A. Schedule Submittal & Review The City's Project Manager is responsible for reviews and acceptance of the Contractor's schedule. The City's Project Control Specialist is responsible for ensuring alignment of the Contractor's baseline and progress schedules with the Master Project Schedule as support to the City's Project Manager. The City reviews and accepts or rejects the schedule within ten workdays of Contractor's submittal. 1. Schedule Format The Contractor will submit each schedule in two electronic forms, one in native file format (.xer, .xml, .mpx) and the second in a pdf format, in the City's document management system in the location dedicated for this purpose and identified by the Project Manager. In the event the Contractor does not use Primavera P6 or MS Project for scheduling purposes, the schedule information must be submitted in .xls or .xlsx format in compliance with the sample layout (See Specification 00 32 115.1 Construction Project Schedule Baseline Example), including activity predecessors, successors and total float. 2. Initial & Baseline Schedule The Contractor will develop their schedule for their scope of work and submit their initial schedule in electronic form (in the file formats noted above), in the City's document management system in the location dedicated for this purpose within ten workdays of the Notice ofAward. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 - PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10042I Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 -00 32 15 - 0 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 The City's Project Manager and Project Control Specialist review this initial schedule to determine alignment with the City's Master Project Schedule, including format & WBS structure. Following the City's review, feedback is provided to the Contractor for their use in finalizing their initial schedule and issuing (within five workdays) their Baseline Schedule for final review and acceptance by the City. 3. Progress Schedule The Contractor will update and issue their project schedule (Progress Schedule) by the last day of each month throughout the life of their work on the project. The Progress Schedule is submitted in electronic form as noted above, in the City's document management system in the location dedicated for this purpose. The City's Project Control team reviews each Progress Schedule for data and information that support the assessment of the update to the schedule. In the event data or information is missing or incomplete, the Project Controls Specialist communicates directly with the Contractor's scheduler for providing same. The Contractor re -submits the corrected Progress Schedule within 5 workdays, following the submittal process noted above. The City's Project Manager and Project Control Specialist review the Contractor's progress schedule for acceptance and to monitor performance and progress. The following list of items are required to ensure proper status information is contained in the Progress Schedule. • Baseline Start date • Baseline Finish Date • % Complete • Float • Activity Logic (dependencies) • Critical Path • Activities added or deleted • Expected Baseline Finish date • Variance to the Baseline Finish Date B. Monthly Construction Status Report The Contractor submits a written status report (referred to as a progress narrative) at the end of each month to accompany the Progress Schedule submittal, using the standard format provided in Specification 00 32 15.3 Construction Project Schedule Progress Narrative. The content of the Construction Project Schedule Progress Narrative should be concise and complete to: • Reflect the current status of the work for the reporting period (including actual activities started and/or completed during the reporting period) • Explain variances from the baseline on critical path activities • Explain any potential schedule conflicts or delays • Describe recovery plans where appropriate • Provide a summary forecast of the work to be achieved in the next reporting period. C. Submittal Process CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 0032I5-0 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 0 Schedules and Monthly Construction Status Reports are submitted in Buzzsaw 2 following the steps outlined in Specification 00 32 15.4 Construction Project 3 Schedule Submittal Process. 4 a Once the project has been completed and Final Acceptance has been issued by the 5 City, no further progress schedules or construction status reports are required from 6 the Contractor. 7 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 8 1.7 CLOSEOUT SUBMITTALS [NOT USED] 9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE ll A. The person preparing and revising the Contractor's Project Schedule shall be 12 experienced in the preparation of schedules of similar complexity. 13 B. Schedule and supporting documents addressed in this Specification shall be prepared, 14 updated and revised to accurately reflect the performance of the Contractor's scope of 15 work. 16 C. The Contractor is responsible for the quality of all submittals in this section meeting the 17 standard of care for the construction industry for similar projects. 18 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 1.12 WARRANTY [NOT USED] 0' NKJKV W KTIJ 11011 DIQ0 &K 22 Spec 00 32 15.1 Construction Project Schedule Baseline Example 23 Spec 00 32 15.2 Construction Project Schedule Progress Example 24 Spec 00 32 15.3 Construction Project Schedule Progress Narrative 25 Spec 00 32 15.4 Construction Project Schedule Submittal Process 26 27 28 PART 2 - PRODUCTS [NOT USED] 29 PART 3 - EXECUTION [NOT USED] 30 31 32 33 34 END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 100421 Revised IULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 003215.1 -0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page I of 5 1 SECTION 00 32 15.1 2 CONSTRUCTION PROJECT SCHEDULE — BASELINE EXAMPLE 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 00 32 15 Construction Project Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 2 of 5 co lies --- (. F -- - `-- -`__ I --�_- - `-- --'-- --5-- --�- -i-- ---�-- J --�-- •-t-- --i-•- --�-•- _ ..................... ...... ....�.... ...�---------- ------- -----•- .......... I r .............._._._._.___._._._�� � EE I _.......... r...._.. �... �... ....... . ..._ ... __t__v----------- iR I lb c.Irs W 7y r@ O '9 O mrl@ W @I@ ■ 1.ifC .±• � fF fd iili3 io-' ' i ii Ti In' n nl MI X f� ., ,.r r'M t_ yr ti- � n ti n r �r yF �►r��. .r � n,���in. tires ri�f� � r rr i4 IY 1F s : ry :I CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 - PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project.No. 100421 Revised JULY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE— BASELINE EXAMPLE Page 3 of 5 s s s I Ll '3 ................................ •- �_._.._._.I_......_.s_ s I i .� Is t- L� ` -.t. ....-_ ..........5. ' - �_ ' . ------�- :::_.�._ -----------4-----. ...... - ------ -- -� -- - 11 - I %- _ I __ __�_!_ I 1 i i 1 s s ! r I — -- —�— — -- 0 a a M .. - p p_ i:A r. ZN �I�P P @ ® ® A O D-0 q O C! 99� eelF r=' - Wi INNER A F"ii n I W q�' �iV IaY �. _YI q�W MI If p�p4M M Yr 41 m 2! at @E [[ 0 W it pe p Ri� - ! if - .40— IR 13 A 8 0 0 is .r a km I a o ' - '� �k a3 *Ire oNIl�19 �KL 0 40 KP IY 1?" iV �1 `4 '�_- t I', I � Q Al 7 I pmp� tv 40 0 }a� CITY OF PORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 4 of 5 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 5 of 5 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 00 32 15.2 - 0 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 1 of 4 1 SECTION 00 3215.2 2 CONSTRUCTION PROJECT SCHEDULE — PROGRESS EXAMPLE 3 PART 1- GENERAL 4 The following is an example of a Contractor's project schedule that illustrates the data and 5 expectation for schedule content depicting the progress for the project. This version of the 6 schedule is referred to as a "progress" schedule. This example is intended to provide 7 guidance for the Contractor when developing and submitting a progress schedule. See 8 CFW Specification 00 32 15 Construction Project Schedule for details and requirements 9 regarding the Contractor's project schedule. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 00 32 15.2 - 0 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 2 of 4 7 »._i._... _.i-._.._ f--..... . ..... ........................ ».. ----. --- - •- •..».. .. i_.-.._ •....�•t �------ _-1------- - • [••_.-_�� .._.... ._.. ......-'I--�..».- ..... ....—* ..., .........I...... _M_...- - - ... -..... -... -......7---...-..1.--------- - ._.i._- T...... —T..............`.....-------- - ---._.._. - -! -- - --,-- -•----i-----��-::::::j. T....... ..4... ...... .................... {.. ---t----�-- �------- - -4--------- --- ----- - JIM ----_ v ri n W4 iM aloe sr M M Yd .r !4' M A! 140 lay N eq et f1 Y. n anl'IY r I4'a 41 O Mi 16 yY 1� M�1101 12`� { #; x t e �� W 1rtd3l s i r i aL ' f 1 #t L i * radbe UCir a gitw , AMg 11= YYMAw — rYark a yaF 9 p A srA yyy� Ii M a � � � CF M Y4 YF YF 14 11 -9 CF y � YI Ck CITY OF FORT WORTF SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART 1 STANDARD CONSTRUCTION SPhCIFICA'1'ION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 1 2 003215.2-0 CONSTRUCTION PROGRESS SCHEDULE - PROGRESS EXAMPLE Page 3 of . . ...... . . ........ .......... ....... . . ........ ........ . .. .. --------- ------ ---------- ........ ---------- t --------- ......... J .......... . .. - --------- --- — ----- ----- — --- — . . ....... 4 - — ------ ......... tv I----------- ------ 29 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20,2018 0032 1 s.2 - 0 CONSTRUCTION PROGRESS SCHEDULE— PROGRESS EXAMPLE Page 4 of 4 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF (FORT WOR H SANITARY SEWER REHABIL4TXrION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 00 32 15.3 - 0 — PROGRESS NARRATIVE Page 1 of 1 SECTION 00 3215.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: bate Issued: Project Name: Company Name: City Project No: Engineer's Project No: City Project Manager: Engineer's Project Manager: A. List oT activities accompusnea in the reporting perioa. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) tS. List of activities to be accomplisnea in the next reporting period 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) C. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) D. List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) Construction Project Schedule Narrative Report for CFW Projects CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 TPW Official Release Date: 7.20,2018 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page I of 7 I SECTION 00 32 15.4 2 CONSTRUCTION PROJECT SCHEDULE — SUBMITTAL PROCESS 3 PARTI- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 I8 19 20 21 22 23 24 25 The following information provides the process steps for the Contractor to follow for submitting a project baseline or progress schedule for a capital project to the City of Fort Worth. See CFW Specification 00 32 15 Construction Project Schedule for details and requirements regarding the Contractor's project schedule. If you are not a registered CFW Buzzsaw user, please email or contact: Fred Griffin, Buzzsaw Administrator City of Fort Worth Fred.Griffin@fortworthgov.org 817-392-8868 Using your registered username and password log into the City's Buzzsaw Site Navigate to your Project molder. Verify that your Project ID and Project Name are consistent with Project Folder Name. Navigate to the Schedule Directory under your Project Folder. The 00701 Flaxseed Drainage Improvements project is used for illustration. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 t 3 4 5 G 7 8 9 10 li 12 b 14 15 16 17 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 2 of 7 Kr= rok Y— :)3- tlV P+awd rai.m+h�+ L .o7ax-Fwas 0U nW_ r^;•r:J ri � tddFr^ s L:) "Rewnnes C]awrruCkn '4 L] CMit 3 b. L_J K•rra: irra i t�GI�rCIX CA[�lFrf Ere i, r L�j Red trVM tY F L,jti*bt r 0017054%bN` Wwi wrif&,[ 27 • ODVS-abmn mwseentrd CAT& bon 003(6-. hMMVAS 5ECkst rler t 4i:SS-Hsp�e Rd mw�[�Yer [�i I� W7B7 �gAnd-$'}n'It'Jv� tmr r WRe 4ebm*gm d ? OWN Aria 6µ4 R sy� a"I ♦ C6i97-1dM*Jy0QW-.►hYlrra 10A It radwa A .,.. t rl. xv Atr Tm� iSd 1-dex.ids FredCr,1hi 16,334 NUOMMt Eger W.. Two files will be uploaded For c-ach s.ib—ndtii-Al. A liaLivi� schcdule file format eil h-or Primavera ,xer or MS PrgJect .mpp and a PDF version of the sAhedule will be uploadeed Wrify that the file Fame coniaia; the 5-digit Project LD, Project Name, and Submittal Dale and follows the sUmdard naming convention. Initial schedule subntimil will b labeled as `Baseline` Fur exa_rlll*le: 007 01 -FlaxseedDrainageLmprc)veiiients-Baseline Schedule submittal updates :t+ill be.. labeled t;r:tJt Schedule Submittal Date 'Y Y.—MM' for example.: 007 {) I -Flax seedl rrainageimprovements-2009-01 Expand or select [lie Schedules folder w.d add both the native file and PDF file to the directory, Fro)n the Toolbar Selecl Ddd DDowmeni CITY OF FORT '>71OR-17H SAN`FARY SE'VVERREHABILITATION, CONTRAf i NO.94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMEN IS City Project No. 100421 Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 003215.4-0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 3 of 7 V LOA W I -i 19? 0�vt Rmmdra At cc.er J1. mdft, Cmsac W C--P-d— fl. [22 CrdW11C0*8CtDW­Jft PW spa! 111-6 ro 0 pt-zaketbas ReeNqmrtV )7W-tMbm'4WsSEa6BLqTy-Rh _-M -mm- he Rd Z-24 C -AP Year I >6 .7 rD7784AIL ChamrW nn(b &rCre&&Sr_—WeS&_J1 Lh Aube, J-5m I-Tiv— Rejc---t 16,384 fsuowft Select Browse and go to the location of the files on your desktop, Select Open : Faim ; t,1W*KUmja* tQ *M kn tF4 prqjmt twb mts &-j ixt ab�D add tn m Lmmnk Rm"Imi [Optcr4. r _5�F.. - 'F..iI P-A--jim. m wtmu� 76�Ltk* wl d (3. [P C-Loft b*r. poo-Wt. 1 7 - Emwa, D-LW OiX4 K-It wm jMa na -IMP ew S-1 7.1 Q-i6WRfiV" Alar.00pwth t0l NL� Qt;*Re%rWftQ'*.W E A Del'aa, -VV Ptp".r4r fteeSi -ARecM$u St Z Mon 0_�'Sr EIE , JPG ,0 Agam N l,rj V.—_Ian =2.7,%:k 04 ~k 2)-kVm-7 66.J UPI CO tmp I4,. F06 1- -1 The file will appear in the f3uzzsaw Add to Project — Select Documents window Select Next. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20,2018 1 2 4 S 6 7 S 9 10 !1 13 N 15 16 Do not select Finish at this time. . • 5'Le�i Ponrmm#. Ahbdl Camoent Send or,dl ri2aneeea, 0 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE - SUBMITTAL PROCESS Page 4 of 7 { I J saeu d&Lmmou eo mW Loft Dialed rmfi site, Twe n rW mW In . DwAthr,e PAOLLV raqwwu- 51M_ fdo�r4:*la„�dprr�+vo;n�a�+r.rdl�� Ci7peQn�4�� �iil!- .�I,zSn to- L} I Fy_J• L CELyM_� _ ti=a You wi 11 be placed ir:!, the Attach Comment window to enter a record into the Project Scht-dnle Nuhn;ttal i og. Enter the Project LD-Prejet 1yme-S„ b littal in ffic Subject Line. Type Stibmittal and Company Name into the Comment window along with Contact Name and Conma Phonc Number. elew-.L Next. ,.l C1rah aaL*rLtLe++LhNhemmu ft VerOM deiolpnar WW tiLtda4,sa1%IMMI ra Kn teams added rr�e.l� w �voW� t,e w� 1' 6 rKw 4{ClF44n p, 'A1L■dFCommeM I .� I9 7-1� u IIF' FILL Cal—it-1 serlPA%-M It?77C: Is}eerimd++eoL aMoe�a-0u lw lbVL9AtWr 99W" $daicrk Stf.-eea'CurrMrAl" NOW' Lp%kit$dvdLf! SLd3"tEa2 *c n'CDmpwVP PLx e' fdf YW k perKN raed aQ tl 25h'-wY - tr MUD' cm CPrii�[tFie�a c@e eigat 5 Fro h I C+r.;■I wary cyry GE? FORT WOPT1i SANITARY SEWER REHABILITATION, CONTRACTNQ 94- ]PART I STANDARD CONSTRUCTION SPECIFICATION DOCUWIEWTS City Project No. 100421 Revised DULY 20, 2018 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 5 of 7 1 2 You will be placed into the Send Email Notification window. 3 4 Select To and the Select Recipients window will appear with a list of Project Contacts. 5 6 Select the Project Manager as the To Recipient and the Project Controls Group as the Copy 7 Recipient. 8 9 10 11 12 13 14 15 �-•` I D...I--0%WOW .4,.1...V" 0—xF V. •.-w .J.Ld'A. �J .X �.Atn.' �' Cu :4., �''p:' c _ilP►'� 1'roYlY... T... 1T... '-9-... 12f•.. Yft.. V... v... n... d... 4f3... —rtm ... V.., K— C+— 7Jf... Y42.... W... P... NO... 11t ... P.p. W.odr••• W.- C... CF... 4/2... 9.... W:x.:-. W... c... R ... 12/ PS! it/... MM- Wul 0A.. ra�P.41... ld... M.., hb.•. A... N... pf--- 1/l... ��4s 6bt� WKS Pf.•.. F... a... CV... �usYr BEM. fA4eA Tr �'E'51 L'4e Go.'fGrt_ h •�#0 8 � ...4i .t -_ J I�nPnF.tl0..E14RF+, I C*." WA* I Select the Paste Comment button to copy the Comment into the body of the email Select Finish. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 1 2 1 4 5 12 13 14 0032 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 6 of 7 �5"emdwulhuprojedrtnterinobfy*VtymOF5wnmorgxkWfia.ThnNrpaEW VY^ ie mglLfnl �YtbifimhiwnY JI -J � i 4 •. .I 54ndfnieil �,.,, 1 �Frco1(1�n MoUtK&N lurl ,,, flrfectCnntoET€'� — �v S[bloGiT I�Oltiif�reced3l�r�roe�rora�ements�etw3ue 5bw&e* G4- MA *a v ft rift", CXnWt Nwm Lam' � kms tiOrr4111 g�nop ++.ms frf +h'N!< oeriw�x? WID-AFWY ] I. I Corascl Ihw�r _ K.1px 1I J l The sAadulle idle- is upload -A to tho diirectory. An email is eM La the City's 'Project Managerand Projow Corawl Specialim, ZV !�W titlN�Ff C i rpLd� I .- aoAa l�.da�s•aK�x+,a; . ��.. � u�xo � ... � �r, las�i L-JRdFr Sireiis6Wa-i� FhlowGb P. y�cal 1r qb rrrrr pn1.� m?r�.r 4.� � � AWIE:"rrr7'F AIM ip�flf 5y �dy/Lt+w �4�7aRIMpahk#Mg4wh'7m� �i.FiAn41#!�� LIftw mm3 Lion Mw Cr*W Ckntp xs L Ill OOPH-WJ ffingri Ompkpi ML fit XI !p'i41-i'Lyr, LM'!Cn I�k CjwM Mi 1 {in XI 00�41 • lrkir Way � Gkair �#r La! Ni Wd'A •irb:Yiererad+rt[�+�-:{I 7k g97ii-Y�i«DT.�+CP •IY LEA � OG?w-t.1.aMo'r'ilnrir•+�taG.b IMF WaJ�-L�riOIS�[� . i Upload thE PDF file using the ;came gwdeline- END OFSECTION CITY OF FORT wc)wr13 SANITARY SEWER REHABILITATION, COMI RACT NO. Q4 PART 1 STANDARn CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised JULY 20, 2018 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE —SUBMITTAL PROCESS Page 7 of 7 Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jaffell Initial Issue CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 10042I Revised JULY 20, 2018 003513 BID FORM Page 1 of 1 SECTION 00 36 13 CONFLICT OF INTEREST STATEMENT Each Kidder, offeror or respondent (hereinafter referred to as "You") to a City of Fort Worth procurement may be required to complete a Conflict of Interest Questionnaire (the attached CIQ Form) and/or a Local Government Officer Conflicts Disclosure Statement (the attached CIS harm) pursuant to state law. You are urged to consult with counsel regarding the applicability of these forms to your company. The referenced forms may be downloaded from the links provided below. http://www.athics-state.tx.us/forms/CIQ.pdf hftp:llwww.ethics.state.tx.us/forms/CIS.pdf ❑ CIQ Form does not apply CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply ❑ CIS Form is, on File with City Secretary ❑ CIS Form is being provided to the City Secretary I-I117A i; R & D Bums Brothers, Inc. By: Ocn\G -3Lt'Vrkj PO BOX 786 Signature: Burleson, Texas 76097 0 Title: President END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20171109 CONTRACT-94-PART1 as 4100 BID FORM Page 1 of 3 SECTION 00 4100 BID FORM TO; The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: SANITARY SEWER REHABILITATION, CONTRACT N.O. 94 — PART 1 City Project No.: 100421 Units/Sections: 1. Inter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed Individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a Miss or sham Bid. 2.5. Bidder has not sclicited or induced eny individual or entity to refrain from bidding. 2.6. Bidder has not engaged In corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH SANiTARY'SEwER.REHABILITATION, CONTRACT NO, 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project.No. 100421 Form Revised 20150821 0041 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to Influence their participation in the bidding process or affect the execution of the Contract. 3. Prrequallfication The Bidder acknowledges that the following work types must be performed only by prequalifled contractors and subcontractors: a. Sanitary Sewer Improvements [ol G. 5111 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 21Q days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of Failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. S. Attached to this Bid The following documents are attached to and made a part of this Bid: a, This Bid Form, Section 00 4100 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d Ve-dor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 0.0 4512 g. Conflict of Interest.Affidavit, Section 00 35 1.3 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.0..4 — PART 1 `1 NDARrj coNSTRtlCTf464 SPECIFICATION DOCUMENTS City Project No. 100421 f arm Revised 2u150821 00 41 00 BID FORM Page 3 of 3 I subject to verification and/or modification by multiplying the unit. bid prices for'each pay Item by the respective ;estimated quantities- shown in this proposal .and then totaling all of the .extended amounts. 6.3. Evaluation of Bid Items Total Bid 7. Bid Submittal This Old Is -submitted on Respectfull s u (. i0d, By: (Signature) Donald -Burns Title: President Company: R #, D Bums Brothers, linc'. Address: PO BOX 786 Burlesdn, Texas 76097 St* of Incorporation: Texas, Em.all'. rdbuffisbrosp_aboolobal. net Phone, 61744.7-0285 MD OFSECTION 6-3op —1,43 - 0 V by the entity named below. Receipt Is acknowledged of the follibwIngAddenda: Initial Addendum 'Nix. 1: DB Addendum No. 2-. DB Addendum No. . 3, Addendum No. 41 Corporate Seal'. 'CITY OF FORT WORTH SANITARY SEWER (REHABILITATION, CONTRACT 'JNO'. '94 PART 1 STA�NbAR&CONSTRUCTION SPECIFICATION DOCUMENTS City OiojacA No. 900421 Foff" ReAed 20150821 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item la£orom6on BiddeA Proposal WOW ltem Na. Description Specification Section No. antler Measure Bid Quantity Unit Price Bid Valve 1 33314115 8" Sewer Pipe PVC SDR-26.Acoe tableBaekfill 333120 LF 4619 $87.00 $401.853,00 2 3331.4119 $" DIP Sewer Pipe with Proieeto 401 Coating, CLSM Backfill 33 11 10 LF 421 $113,00 $48 416.00 3 3331.1102 6" to 8' PiN Enl ant 333123 LF 24181 $85.00 $176,885.OD 4 3$31.2101 6" CIPP 3331 12 LP 71 Y200.00 $14 200.00 5 3339.1001 4' Manhole 333920 EA 33 $5 20D.00 $171,600.00 8 3339.1002 DrupV Manholo 33 39 20 EA 2 $7 000.00 $14,000:00 7 3339.1003 4' Extra Dt h Manhole 131920 VF 59 S250.00 8 3305.0112 Concrete Collar 3305 17 EA 35 $500.00 $17,500:00 9 3331.3101 4" Sewer Service with_Cteanow 33 3150 EA lee $E 200.00 $199 200,00 10 3339.OD01 Epoxy Manhole Liner ffa -an Environmental or Chesterton 33 39 60 VF 67 S375.D0 �.�E' ,E52,59 11 3301.0101 Manhole Vacuum Testing 33 01 30 EA 37 $250.00 $9 250.00 12 0171.0101 ConshuclionStaking 017123 LS 1 $16500.00 $16,500.00 13 0171.0102 Red line As -Built Survey 017123 LS 1 $9,500,00 $9.500.00 14 320L0112 5`Wide As hait Pvnd Repa it Residential 3201 17 LF 167 $130.00 $21,710.OD 15 3201-0614 Cone NintRepair, Residential 320129 SY 456 3.185.00 $84;360.00 16 0241.220.1 Remove aP 3ewerManhole 02 41 14,, EA 31 $500,00 $151600.00 17 330.1.0001 Pre -CCTV Inspection 33 01 31 LF 2J52 N.00 $12 872.D0 18 3301.OW2 P se-.CCTYins action 330131 LF 7,192 $4.00ff$28,768.00 19 _ _ 3305,0109 Trench Sa£e 330510 LF 5 040 $1.005:04D:t1020 3305.0103 loratory Exeavafion o£Existiog Utilities 330530 EA 15 $2,000.000,000.00 21 1305.0113 Trench Water Sto 33 05 15 EA 12 $1,000:00 12 OD0.00 22 3331.0103 8" Sewer Pi Point 333123 LF 200 $90.00 $16 000,00 23 3331.1201 Service Reinstatement Pipe Enlargement with Cleanout 33 31 23 FA 6.4 $1,200.00 $76.000,00 24 3125.0101 SWPPP>= I sore 3125 OD LS 1 S4 000:00 $4 OQO.DO 25 3110.0102 6'-12" Tree Removal 31 10 00 EA 12 $700.00 S8 400.00 26 3231.01214'C6 wbrikFenc Aluminium 323111 LF 148 $45.D0 $61660,00 27 3292,0400 Speft H dromldeh 329213 SY 6.109 $5,00 28 1292.0100 Block Sod Placement 329213 SY 773 $15.00 29 _ 0241.2103 Abandon $" Sewer Line with Plowable Fill 02 4114 CY 6 =W.00 411'200.00 30 3,171.0003 TrafCioControl 3471 13 MO 8 S3 000.00 $18.000;00 31 3305.02D2 Im oded EmbeidmartIlBackfill. CSS 330510 CY 141 $75 310,575.00 32 33i 1;0001 Ductile Iron WaterFltO s 33 11 11 TON 1 $8 500 $ .00 33 9999.0001 Sewer Construction Allowance 00 00 00 LS 1 BO 000.00 000.00 00 42 43 DID PROPOSAL Pr.2ef oft AWI.5415-m 61' 4111'r95-M316 TOW DIE[ IP03,34-3.oco END OF SWHON /3 Id CrryOF PORT WtlRiH SAWARY SEWER RF,HAD=ATM. CONTRACT 49- PART 1 STANDARDCO2E8tRUCTM WSCOiCATION DOCUNWIS My Pi4W 11% 100421 Fong Rt%iwd 2012012D SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 2 That we, , known as "Bidder" herein and a corporate surety duly authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of five percent (b%) of Bidder's maximum bid p0ce, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project designated as SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 NOW, THEREFORE, the condition of this obligation is such that if the City shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's total bid amount and the next selected bidder's total bid amount. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the day of 2019. F1111-M115 Witness as to Principal PRINCIPAL: BY: Signature Name and Title CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20171109 SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 City Project No. 100421 00 43 13 BID BOND Page 2 of 2 Address: SURETY: BY: Signature Name and Title Address: Witness as to Surety Telephone Number: Attach Power of Attorney (Surety) for Attorney -in -Fact *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Form Revised 20171109 ` Q- 10 U.S. Specialty Insuranco Company 601 S. Tipncrna Street, Suite 1600. Cos Angeles, California 9=7 reain310649090 facsimile 310W0416 BOND NO. bid PREMIUM BID DATE: 07/11/19 DID BOND KNOW ALL MEN BYTHESE PRESENTS, That we, R & D Burns Brothers, Inc, (hereinafter called Principal), as Principal, and U.S. Specialty Insurance Company , a corporation, organized and existing under the laws of the State of Texas and authorized to transact a general surety business in the State of Texas (hereinafter called Surety), as Surety, are held and firmly bound unto City of Fort Worth, TX (hereinafter called Obligee) in the penal sum of _ FIVE percent ( 5 —%) of amount bid not to exceed FIVE PERCENT GREATEST AMOUNT BID BY ABOVE MENTIONED PRINCIPAL--------------- ------------------------------------------------------------------------------------ Dollars ($ ) for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That, whereas the Principal has submitted or is about to submit a proposal to the Obligee on a contract for Sanitary Sewer Rehabilitation Contract No. 94 Pant 1 City project No 100421 Sewer Project No. X-26029. NOW, TIIEREFORE, if the said contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the contract in writing, then this obligation shall be void. If the Principal shall fail to do so, then the undersigned shall pay the obligee the damages which the obligee may suffer by reason of such failure up to and not exceeding the penal sum of the bond. SIGNED, SEALED AND DATED THIS 11 th DAY OF July 2019 R & U Bu17�rothers, Inc. PRINCIPAL By. i — — ecialty In urarlce Company By.?� Tracy lifer Attorney-i'i2-1'act --- — - - RCCSZZ2241BO4110 004337 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT SIUDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. F-11 S11110I =R: R & D Burns Brothers, Inc. PO BOX 766 Burleson, Texas 76097 0 END OF SECTION By: 0 7>-O-k 6k lj t S (Signature) Title: President Date: g- 15 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 City Project No. 100421 004511-1 BIDDERS PREQUALIFICATIONS Pagel of 3 SECTION 00 4511 BIDDERS PREQUALIFICATIONS 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 10 The prequalification process will establish a bid limit based on a technical evaluation and l 1 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7tb of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by, Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "NIA" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 4 7 0045 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. if a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 004512 BID FORM Page 1 of 1 SECTION 00 4812 PREQUALIFICAT ION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequaliiied contractors and/or subcontractors whore they intend to utilize for the major work type(s) listed. r Major Work Typo Contractor/Subcontractor Company Name Preq Expir alificatiori Expiration Date Sanitary Sewer Improvements R & D Burns Brothers, Inc. 4/3.0/2020 0 EXCEL 4 Constuction, LLC 10/31/2019 0 0 Corl1pc +,-y- 1 r: I i;., 1: ,1_ nI ;=. _ Daty: or spaui:� The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: R & D Burns Brothers, Inc. PO BOX 786 Burleson, Texas 76097 0 FEND OF SECTION By: 0� m 5 (Signature) Title: President Date. K� _ ? ✓ j 9 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form. Revised 20120120 CONTRACT-94-PART1 FoRT WT F SECTION 00 4513 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box City Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State Zip Code Street Address (required) City State Zip Code Telephone Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 0045 13 -2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your fret: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or FiHas less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006,001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 0045 13 - 3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Asphalt Paving Construction/Reconstruction (10,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Concrete Paving Construction/Reconstruction (10,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 004513-4 BIDDER PREQUALWICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting I DESCRIPTION OF EQUIPMENT I NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. Haw many years of experience in had: construction work has your organization (a) As a General Contractor: (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CONTRACT AMOUNT CLASS OF WORK DATE COMPLETED LOCATION CITY -COUNTY- STATE NAME AND DETAILED ADDRESS OF OFFICIAL TO WHOM YOU REFER *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you?_ If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract?. If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 00 45 13 - 5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 In what other lines of business are you financially interested?, 9. Have you ever performed any work for the City?. If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whore you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY I DETAILED ADDRESS I 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? NAME PRESENT POSITION OR OFFICE YEARS OF EXPERIENCE MAGNITUDE AND TYPE OF WORK IN WHAT CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 0045 13 - 6 BIDDER PREQUALIFICATION APPLICATION Page 6 of & CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Secretary Treasurer Limited Partners (if applicable) LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December- 20, 2012 14. Equipment 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 TOTAL ITEM QUANTITY ITEM DESCRIPTION BALANCESHEET VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 0045 13 - 8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page I of I 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 01488. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it Will provide to City its subcontractor's certificates of compliance with 8 Worker's compensation coverage, 9 10 CONTRACTOR- ] 13 Company 14 15 i -- r C 16 Address By: 3 LL (l' em- print) T.. 1,Ifi� Signature' 17 1 { _5 r 3t I# . it.. Title. 19 „ .,.,..,(-� , . . ,..., .,,.._. City/5tatelzip (Please Print) 20 21 22 THE STATE OF TEXAS § 23 24 COUNTY OF TARRANT § 25 26 BEFORE ME, the undersigned authority, on this day personally appeared ' 27 :�v-4zt� �.) , known to ine to be the person whose name is 28 subscribed to the foregoing Instrument, d acknowledged to Ine that he/she executed the game as 29 the act and deed of �D 8U A-s for the purposes and 30 consideration therein expressed and in the capacity therein stated. 31 32 GIVEN UNDER MY HAND AND SEAL OF OFFICE this -7 � day. of 33 34 35 '36 37 Notary Public in and for the State of Texas 38 39 END OF SECTION ,., PAr / � IfAi�EN A i3URN5 LANE[ NOtary 10 # 125125303 40 ray commission Expires �, calm NOVe per 22. 2020 CITY OF FORT W01ZTH SANITARY SEWER REHABILITATION. CONTRACT NO.94 — PAIZr 1 STANDARD CONSTRUCTION Sr I:61FICATION DOCUMFNTs City Project No. 100421 Revised July I, 2011 0454D. i Min()rity BipinCSN F1ue1r%1-6e 5p&IGcaiion S r'ege 1 of2 SECTION 00 45 40 2 Minority Busiur�s Enterr hse Spccifik:ationg 4 APPLICATION OF POLICY 5 If 11w: total dollar valtic of the contract is Leiter than ,$w50,000, theta a MBE subcontm' ding g9al is applicable, 7 S P J1Cy.STAT1Wi4i.1H NT 9 It is the policy of the City of Fort Werth to ousurc the full and equitable participation by Minority 10 BwMnc-, t Entetprises (MBE) in the prol?iireinent Of all goods and xerviccs. Ali rcgtlirunic:nts and I I regulatiQns : tated in fife City; current Buslne .,Diverxity Enterprise Ordinance apply to this Laid. 12 13 .fi_BE EflO.TEr CT GOAIaS 14 Tlw City°s MBE goal on this }project is I I% of the tolal bid val tie or the wntract (Base -bid applies to 15 P rkv and Co ruin ty {Senpices). IG 17 Note: if both MBE and SHE subcontracting goals are established for this project, then Fin Offeror IS must submit both a UBE UfilJznfilon Form and a S1BE Uti3iaation Form to be deemed ra'5p0nsive. 19 20 COMPLIANCE TO DID SPECIFICATIONS 21 On City conlracls -$50,000 or mom where a MBE subcontracting goal is applied, Offerers are required to 22 cxmiply. with the intent of thv C"ity's Business Diversity Ditetpii,%v 0rdinancu by one of Itie roilowing- 23 1. M M or exceed the ithuve stateed INB)Ea; goal through KBE wbeontracting plarticipation, or 24 2. M cet or exceed tlha above stated MSE goal through ME Joint Venture participation, or 25 3. Coot] Faille Effort doe umentantion, or; 26 4. Prince Waiver docurnentation. 27 28 29 30 31 32 33 34 LLf I MTAL OF REOLTM.FD DOCUMENTATION The applic0le documents Lnust be received by thie Purdiasing Division, within Itiv following times aIIt1t~.ituci, in order for the entlru bid to b v considered responsive to the Te,0 fie i i i c u 1 _ '11ie 0ff+. mr uhaII Ochvr=r j1u > fft, dCJI`.1ii11 T1tmjer1'tin pcira�c�tl lei ll�1: r ipri�lll{ cnils]exYee 1J(life Iaurcli1i,iii tiivisiol'a t111(l ob111iII a EinIri1 iItie receipt. Sne}t ree.[91 OnII he cvidmwc i1wt tIic 0ty mccivcrl the 1" iviinuntai i xi -in Iba. i ,-a I loc:ticd. A faxed Andior ema11rd spy will not be acceple& 1- Subconfirartar Utilization Farm, if received no later than. 2:00 p.m., on the seac>nd City businelig goAI is met ur exceeded: day after the bid oMing date, nxc:lusivc of the bid opening data. 2. Good Fititih Ef art and received no later them 2:00 p.m., on the second City business Subcontractor Utilization Form, if day alter the bid opening date, exclusive of the bid olicahig participation is less than statedgoal: date. 3. Good faith Effort and reced ved no later Ihan 2.-00 p.m., on the second City business Subtontrarctor Utillza#iup Form, if no day after the bid opening date, cxclusiva of the bid opening MBE panici tion: elate. A. Prime-Contractar Witiver Farm, received no later than 2.00 p.m., on Iho.s=ond City lousiness ifyou will pedorm all day after the bid opaiiing date, exclusive of the bid op.:ning contractin lsu Iier work: drlto. CMY OF MRT WORTH SANITARY SEWER K RAii UTATION, G{lNTAACT W). "- 1`ART I STANDARD CONSTRLI(_ ON U1`171F l{;ATioN pacMENTs City PrUJtbl N11- 11)[421 Rewf.Ged.love %201S on45M1-1 M mdty 2uK nm alaprja Spcmrvmt1nnr Nye 2 of I 5. Joint Venture Form, if goal is mal i-eceived no later than 2:00 pm., m the second City business or exceeded. cry after the bill opim ng date. exclu�ivc of tho bid +ipening datuw IFAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE I L1.1, RESULT M TH E B11D BEING CONSIDERED NON-RPsSONSIVE TO SPECIFICATIONS. j FAILURE TO SUBMIT THE REQLFIRED MBE DOCUMENTATION WILL RESULT IN TTiE BID BEING CONSMERE D NON-REI.SPONS IVE. A SIECOND F,AMURF WELL RESULT Ili TI1E OFFEROR BEING DISQUALIFTED FOR A PERIOD OF ONE YEAR. THREE, FAILURES IN A FIVE YEAR PERIOD WYLL RESULT IN A DISQUALYH- CAITON PERIOD OF THREE YEARS. 7 Any Q ti"Ilomi, Please Co The M/WBE Office at (817) 212-2674. 10 END OF SEC<TFON C fTY OF FORT WORTH SAN FTARY S EWER REHAE1ILFTATIGN, CONTRACT NO, "— PARS' STANDARD Ct72VMI'FCTION SPECFHCATION DOCUMENTS City Prgj t twit 1 NM21 1{evi5rdd lane 4,{}I 5 00 52 43 - 1 Agreement Page I of 5 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on 4 1q&Zl'1 is made by and between the City of Forth 4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 5 ("City"), and R & D Burns Brothers, Inc. , 6 authorized to do business in Texas, acting by and through its duly authorized representative, 7 ("Contractor"). 8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK ll Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 SANITARY SEWER REHABILITATION, CONTRACT 94 -PARTI 17 CITY PROJECT NO. 100421 18 Article 3. CONTRACT PRICE 19 City agrees to pay Contractor for performance of the Work in accordance with the Contract 20 Documents an amount, in current funds, of Dollars 21 22 Article 4. CONTRACT TIME 23 4.1 Final Acceptance. 24 The Work will be complete for Final Acceptance within 210 days after the date when the 25 Contract Time commences to run, as provided in Paragraph 2.03 of the General Conditions, 26 plus any extension thereof allowed in accordance with Article 12 of the General 27 Conditions. 28 4.2 Liquidated Damages 29 Contractor recognizes that time is of the essence for completion of Milestones, if any, and 30 to achieve Final Acceptance of the Work and City will suffer financial loss if the Work is 31 not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also 32 recognizes the delays, expense and difficulties involved in proving in a legal proceeding, 33 the actual loss suffered by the City if the Work is not completed on time. Accordingly, 34 instead of requiring any such proof, Contractor agrees that as liquidated damages for 35 delay (but not as a penalty), Contractor shall pay City six hundred fifty Dollars ($650.00) 36 for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance 37 until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised 11.15.17 00 52 43 - 2 Agreement Page 2 of 5 38 Article 5. CONTRACT DOCUMENTS 39 5.1 CONTENTS: 40 A. The Contract Documents which comprise the entire agreement between City and 41 Contractor concerning the Work consist of the following: 42 1. This Agreement. 43 2. Attachments to this Agreement: 44 a. Bid Form 45 1) Proposal Form 46 2) Vendor Compliance to State Law Non -Resident Bidder 47 3) Prequalification Statement 48 4) State and Federal documents (project specific) 49 b. Current Prevailing Wage Rate Table 50 c. Insurance ACORD Form(s) 51 d. Payment Bond 52 e. Performance Bond 53 f. Maintenance Bond 54 g. Power of Attorney for the Bonds 55 h. Worker's Compensation Affidavit 56 i. MBE and/or SBE Utilization Form 57 3. General Conditions. 58 4. Supplementary Conditions. 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6, Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued, become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 71 72 Article 6. INDEMNIFICATION 73 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 74 expense, the city, its officers, servants and employees, from and against any and all 75 claims arising out of, or alleged to arise out of, the work and services to be performed 76 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 77 under this contract. This indemnification provision is specifically intended to operate 78 and be effective even if it is alleged or proven that all or some of the damages being 79 sought were caused, in whole or in part, by any _act, _omission or negligence of the city. 80 This indemnity provision is intended to include, without limitation, indemnity for 81 costs, expenses and legal fees incurred by the city in defending against such claims and 82 causes of actions. 83 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised 11.15.17 005243-3 Agreement Page 3 of 5 84 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 85 the city, its officers, servants and employees, from and against any and all loss, damage 86 or destruction of property of the city, arising out of, or alleged to arise out of, the work 87 and services to be performed by the contractor, its officers, agents, employees, 88 subcontractors, licensees or invitees under this contract. This indemnification 89 provision is specifically intended to operate and be effective even if it is alleged or 90 proven that all or some of the damages being sought were caused, in whole or in part, 91 by any act, omission or negligence of the city. 92 93 Article 7. MISCELLANEOUS 94 7.1 Terms. 95 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 96 have the meanings indicated in the General Conditions. 97 7.2 Assignment of Contract. 98 This Agreement, including all of the Contract Documents may not be assigned by the 99 Contractor without the advanced express written consent of the City. 100 7.3 Successors and Assigns. 101 City and Contractor each binds itself, its partners, successors, assigns and legal 102 representatives to the other party hereto, in respect to all covenants, agreements and 103 obligations contained in the Contract Documents. 104 7.4 Severability. 105 Any provision or part of the Contract Documents held to be unconstitutional, void or 106 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 107 remaining provisions shall continue to be valid and binding upon CITY and 108 CONTRACTOR. 109 7.5 Governing Law and Venue. 110 This Agreement, including all of the Contract Documents is performable in the State of 111 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 112 Northern District of Texas, Fort Worth Division, 113 7.6 Authority to Sign. 114 Contractor shall attach evidence of authority to sign Agreement if signed by someone other 115 than the duly authorized signatory of the Contractor. 116 117 7.7 Prohibition On Contracts With Companies Boycotting Israel. 118 Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government 119 Code, the City is prohibited from entering into a contract with a company for goods or 120 services unless the contract contains a written verification from the company that it: (1) 121 does not boycott Israel; and (2) will not boycott Israel during the term of the contract. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. t00421 Revised 11.15.17 005243-4 Agreement Page 4 of 5 122 The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms 123 in Section 808.001 of the Texas Government Code. By signing this contract, Contractor 124 certifies that Contractor's signature provides written verification to the City that 125 Contractor. (I) does not boycott Israel, and (2) will not boycott Israel during the term of 126 the contract. 127 128 7.8 Immigration Nationality Act. 129 Contractor shall verify the identity and employment eligibility of its employees who 130 perform work under this Agreement, including completing the Employment Eligibility 131 Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of 132 all I-9 forms and supporting eligibility documentation for each employee who performs 133 work under this Agreement. Contractor shall adhere to all Federal and State laws as well as 134 establish appropriate procedures and controls so that no services will be performed by any 135 Contractor employee who is not legally eligible to perform such services. 136 CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS 137 FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF 138 THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, 139 SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to 140 Contractor, shall have the right to immediately terminate this Agreement for violations of 141 this provision by Contractor. 142 143 7.9 No Third -Party Beneficiaries. 144 This Agreement gives no rights or benefits to anyone other than the City and the Contractor 145 and there are no third -party beneficiaries. 146 147 7.10 No Cause of Action Against Engineer, 148 Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their 149 sureties, shall maintain no direct action against the Engineer, its officers, employees, and 150 subcontractors, for any claim arising out of, in connection with, or resulting from the 151 engineering services performed. Only the City will be the beneficiary of any undertaking by 152 the Engineer. The presence or duties of the Engineer's personnel at a construction site, 153 whether as on -site representatives or otherwise, do not make the Engineer or its personnel 154 in any way responsible for those duties that belong to the City and/or the City's construction 155 contractors or other entities, and do not relieve the construction contractors or any other 156 entity of their obligations, duties, and responsibilities, including, but not limited to, all 157 construction methods, means, techniques, sequences, and procedures necessary for 158 coordinating and completing all portions of the construction work in accordance with the 159 Contract Documents and any health or safety precautions required by such construction 160 work. The Engineer and its personnel have no authority to exercise any control over any 161 construction contractor or other entity or their employees in connection with their work or 162 any health or safety precautions. 163 164 SIGNATURE PAGE TO FOLLOW 165 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised 11.15.17 166 167 168 169 170 171 172 173 174 175 176 177 178 005243-5 Agreement Page 5 of 5 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: R&D Bw-ns $r 4kus, fru--. By: (Signature) (Printed Name) Title: ► Address:�3L-v City of Fort Worth By: K�_ W "A Dana ghd fj Assistant Vty Manager Date I V v Attest: City Se re ary {Seal} R M&C 1q Date: 9/s—A/1 q Form 1295 No<:QV qc5c-Q l'6 City/State/Zip: Contract Compliance Manager: ' By signing, I acknowledge that I am the person responsible for the monitoring and Date administration of this contract, including ensuring all performance and reporting requiremen 6 L—IA_,; �- Suby Varughese, P.E. Project Manager A owed t qgn and Legality: 6XglalAYIBIack Assistant City Attorney APPROVAL RE ENDED: L� Chris Harder, P.E. DIRECTOR,�� Water Department fC FIC14L RECORD s` CCR ` ARY WORT FT. WORTH, Q CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. W0421 Revised 11.15.17 006113-1 PERFORMANCE BOND Page 1 of 1 SECTION 00 6113 Bond #1001119507 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, R & D Burns Brothers, Inc. , known as 9 "Principal" herein and U.S. Specialty Insurance Company , a corporate 10 surety(sureties, if more than one) duty authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and fumly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal 13 sum of, One Million Six Hundred Three Thousand Five Hundred Fourteen------- Dollars 14 ($ 1,603,514.00------------------ ), lawful money of the United States, to be paid in Fart Worth, 15 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind 16 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 17 firmly by these presents. 18 WHEREAS, the Principal has entered into a certain written contract with the City 19 awarded the -4,= day of , 20 19 , which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 21 labor and other accessories defined by law, in the prosecution of the Work, including any Change 22 Orders, as provided for in said Contract designated as Sanitary Sewer Rehabilitation, Contract 23 No. 94 — Part 1, City Project No. 100421. 24 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 27 specifications, and contract documents therein referred to, and as well during any period of 28 extension of the Contract that may be granted on the part of the City, then this obligation shall be 29 and become null and void, otherwise to remain in full force and effect. 30 PROVIDED .FURTHER, that if any legal action be filed on this Bond, venue shall lie in 31 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 32 Worth Division. CITY OF FORT WORTH SAN ITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 IM 61 l3 -2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the � day of 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ATTEST: (Principal) Secretary Witness as to Principal Witness as to Suf&Y c II Jennings PRINCIPAL: R & D Burns Brothers, Inc. BY: signature J� '9 Name and Title Address: P.O. Box 786 Burleson, TX 76097 SURETY: U.S. Specialty Insurance Comuan BY:N _ V Signature Lindsay Senior Gingras, Attorney -in -Fact Name and Title Address: 500 West 13th Street Fort Worth, TX 76102 Telephone Number: 800-728-2374 41 `Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised duly 1, 2011 POWER OF ATTORNEY _ - AMERICAN CONT1R,4C-1ORS-4NDISIMNITY COMPANY TEXA'S BONDING -COMPANY - UNITED $TAT-E #IR W MPANY U. S. SPECIAETY;11NSURA CE COMPANY KNOW ALL MEND BY THESE PRESENTS: Thai American Contractors Indemnity Company, a j�IlfornIs wrporation. Texas Bonding Company, an assumed name of Amerlean Genlractors Indernnily Company. Unite if Stales Surely Company, a Mmyrland cotporaliorf and U-5. Specially Insurance Company. a Texas corporation (coil actively, the'" Companies" ), do by these piesenls make, constituta and appoint: Tracy L. Miller, William Mifchefl Jennings, W1111am- lamhard, 4 t;-_Rogefs = or Lindsay Sevier- Ingras of F&I Wbrt, Texas — i lru I uI Itlnfrley�s}-fn-fact. each In Me* separate capacity if more44ri' r,61 named above, with full power and authority hereby wnferred in Its fame, place and stead, to execute, acknowledge and deliver. arty and all bonds, recognixances, uncles takings or other Instruments or cantracts of suretyship to Include riders, amendments, and consents of surety, providing the bond penalty aloes not exceed ""'Ten M1PirxkA.. Dollars "'S70.0130-0013-00..' This Power ofAliojney shall�scplre—wiitLouk furiheraaliorion Aprii 23m, 2422..This Po>n+er of Atlornay is granted— under==and by .aulfiolAy of the falla+rrihq re-solulre:"s gdorge�,--� #y tl-w Oasrds of Directors of the Comaanien: A7 N r`iesory C�, #Let 1h� resldenl, any esl ni rLy$s5e sal Vlce•PrasWenl, any Secretary or anylliAs5�5 aril secrefafy slab -sad Rfham�y vested with full power and suthafiiy to appalnl ffnyYli-i� or mote s0w le persons as Anamey(s)-lrl-Fact [a represent and act far ter` on D Ir of ti,e GamfrLiny subject Io the folloMrkg provl�;Iorw, A [[orriay in aoi may be g Ivan full powe r and eulhorq for and i n the nan-0 of and on behalf of the Company. to exanule, acAnowledge and duMve r, a ny and all bands, recopnimances, 665tracts, agremanis or fnderrin+ty rind fllhet contkltioriel or otftatory undertakings, Inefuding any and -all mnsenis for -the _release=of-remined percentages andlbr flnei esllmwea on anglneeling end consiruatl#rr antra is nd any and all n tices and &oumems.__ _-c+tt eltng terrnln tingflie Company's flnblllty thereunder, atw any, such lflndou upto tl-ot• ��mga�y a�f s�gne� by i he I'r�slden! and eclaled and efteckod by oho Gr�rparale�re�rr- &-rd Resnlved, Itiat ihla signature of any sulhcrixed ufkar arLd anal of the Company gIacmF ar6—Ur hEfemkir'atflwed to any powarlH afkorrrryy or 4ny 00r11iImte meting 1116reto by facsimile, and any Paver of attorney of certiflcate bring €M04M a 51g nwkjre or facsimile saW shall be valid and binding upon the CDmpany with reaper.! to any bond or utldertaklag Ie which It Is atkethmd. IN WITNESS WHERE0F, The Companies have caused,lhis Inslrumiofit to be signal and their corporate seals to be hereto affixed, this 1 "1-da-bfJurie, 2b1 B; AMEMCAN CON"T4AMOIRS INDEMNITY C40MPAIYY TEXAS 13014DINlG COMPANY IJMITEf] ST I FiE w.r`i PAY I Y G41A �I UI' 4t�GE COMPANY - - - -- State of California _� _ �J!}{./IIW-=ail R_�Tq l VllLl�+_r Yt��'ZIU I�- 1 County of Los Angeles By. �;N Daniel P. Aguilar, ce prasidt�rlt — uhliYir + —_ F�A offker camplaUng,, this -certirwafe�rer0'%F o0Y„rh (A-r,frof t;F,E=�rrrcfrvrc gat who signedlbe !���tr 11MI r....ark,.0—A .,.J..i:/Op— On this 1 "I day of June, 2018, before -me, Sonia Q. Carrejo, s notary public, personally appeared Daniel P- Aguilar, dice President of American Contractors Indemmnily Company, Texas Sonding Company, United States Surety Ccfnp8ny and U.S. Speclaity Insurance Company who proved to me vn the basis of s.atmfacloty evidence to be the person whose nama is subscribed to the wili-iln Irtstrurneni and acl�nowledged !o me that he oxecuted the sarnedri. his authorized capacity, and lhat by Iris signature on the Instrumenl _ the person, or tl'r+e ertlty upon executed the In*'ifrt:muril- = _ 1=r-zerlify+ urldiar PENALTY OF PERJURY? b sder-the 1-9-ws of lhu State of California that the foregoing paragraph Is true end- rrect. WIT-NESS my hared grid official see]. 3hW4Ca?into 111b4Nhth-rAll.ru L1r„�6Yr;�7 � _ Sign- lure `_ - � {seal} �Mr M-E�y4��dpll,l77i _ — — t _-Xi A'rrie'rlcan C4nlracicrs :hideir rilty Comp_ai xa Ean Carnparvy, Unikod [ales ureky Gempariy- and U.S. Speclalty Insurance Con �ar,y, do hereby certify that the Mauve end' regoing is a true and onrred-copy-of a Pawor of Alorney, executed by said ComInanles, whIch is still In full force and affect. Nrtherrnore, the resolul ions of the Boards of Directors, set out in the f'awsf of Altorrhey are In full force arid effect. In Wiliness Whereof I bEtVia hereunto set rrry_ = day (ifSond No. ��nazMn = i IPR� IL RI Agenoy+ No. 18757 and affixed I e seals of satoat Los Angales Cailfatnla this rrtpanLes = visit°trnhoc.corri surely Kilo Lo, Assl S6cr8Cel+y !cCYMAraaona_,r? is 006114-1 PAYMENT BOND Pege 1 of 2 1 SECTION 00 6114 Bond #1001119507 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § it 8 That we, R & D Burns Brothers, Inc. known as 9 "Principal" herein, and U.S. Specialty Insurance Company , a 10 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 13 In the penal sum of One Million Six Hundred Three Thousand Five Hundred Fourteen ------------ Dollars 14 ($ 1,603,514.00 - ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 16 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 17 presents: 18 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 19 lday of �lCe(­ , 20 19 , which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 21 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 22 said Contract and designated as Sanitary Sewer Rehabilitation, Contract No. 94 — Part 1, City 23 Project No. 100421. 24 25 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 26 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 27 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 28 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 29 force and effect. 30 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 31 Texas Government Code, as amended, and all liabilities on this bond shall be detennined in 32 accordance with the provisions of said statute. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 0061 14 - 2 PAYMENT BOND Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 84 day of 3 , 20 19 4 5 6 7 8 9 10 11 12 ATTEST: (Principal) Secretary Witness as to Principal PRINCIPAL: R & D Burns Brothers, Inc. BY: Sign tore 2�=ed Title Address: P.O. Box 786 Burleson, TX 76097 SURETY: U.S. Specialty Insurance Company ATTEST: BY: /LIAA�� - "--/I Signature NIA (Surety) Secretary Witness as to S 11 Jennings Lindsay Senior Gingras, Attorney -in -Fact Name and Title Address: 500 West 13th Street Telephone Number: 800-728-2374 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CrrY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 —PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July I, 2011 VAQ ;�rOKIOMARINE H C C POWER OF ATTORNEY AMERICAN CONT-RAGET-ORSANDEMNITY COMPANY TEXAS HONDING-COMPANY UNIT E D STAE JttET�' MPANY J.S. SPECIALTY INStfRAN E COMPANY K14OW ALL MEN BY THESE PRE BE S; �ial American Contractors Indernnily Company, a Califamia cvrpuration_ Texas € ondlIn Gamparay, z)n assumed name of .Arnerlcan Coniractors Indemnily Company, United States Surely Company, a Maryland corperatlon and U.S. Specialty Insurance Company, a Texas. r rporalIon (colle-utiveiy, if i8 "CfympaAQs"), do by These presenis snake, constitute and appoint= 'racy L. Miller. W1111am Mitchell Jennings. Wiiiia"larlaard, F��tie.R�rgors - at Lindsay Senior uingras -of Fa III V061h, 17ex1as - - - :t irwle aim f wful`Atfom y(s)-in-last, each In their se0arate capacity if moreAti-an' ill nafnod�Above, vl full power and aulharity harr;by conforr in Its- name, place and stood, to execute, acknowledge Molt deliver any and all .bonds, recogntaances, undertakings or other fnatruments or contracts of suretyalilp to Include riders, amendments, and corisants of surety. providing the bond pamilty does not exceed "'Tan MiNicri*"" Dol.lars t:ll= r_ Cl.tRD0,000.00'), This Power olAtiorneyshalle�.plfe-withoutfurther-action onApril28'd, ZM2. This Powt-fofAttorney Isgraiited— under -and by% aL�khari#y of the iaalawrn 7 ins 66Weoly the Boards of Directors of the Companies: - — - - �v it f2aspr: sd, 3Fiak Cher Presidonl, any Vice Mra_s dent�rL}'�ks� staff Vice-Pil ani. any Secretary or any Assi5t8rit Secrelary sr�dllbe�nd Jal3ted with Ful l power and aulhority to 2IIP�Olnt any�Xfe of rniop a "liable persona m Attvmey(s)-IfJ-FaG1 to rIII and aak for anf orriI of The Company Bubjed lu the following provfsi4ri9: Aftomey-rn,Factmay be given Lull power and authority fur and In the +lama of and on bahiglF of the Company, to execute, acknowledge Lind dol per, arty and all bonds, recogniz-ances, contracts, agreements Dr and mrlity and father candltiunef Cif obligatory undliarlakinge, Inoluding any and all onm&I-it8 for the relegs�ofsetlained petcentages eriftr final estirnwes on onglneeiing and construction aontracts,And any I all noffues and da=l lts_ ._ ei EeJr aM 1e0 1s3a _the Corn anys Itahlally ll,BreLrn er, arsd any such Irlstr+rrri nia soex s !_by_ n c_ orneyrn-Fast shall -be hlrrdllrii� upav_ Ihii 4tr#i�+ el�iF 3ig�r��-by 11:9 Presider: and Sealed aarcf`efFecrrid by rho Corporal�ret�rry Veit F3e5er1vc�d. �h t % atgn$kUf$ of arty gulhorized nircerand weal oFthe Compank-Ke__ratoi:dr3-er K&e &fl affixed to any powl:57 i ettorn6 or any cartiFcata {elating thereto by Facsimire, and any power of attorney or oertltas#e bearing facsImIle signslu rs or facslmlie wiW she II be vatld and binding upon the Comoriy wJth reopen to arty bond or Lintlertaking lc which II Is attached. IN WITNE SS WHEREOF, The Cornpanlea have caused 1hls Inslrument to be Signed anti ifieir corporate seats to be hereto of ed, thils 1"I day of June, 2V'I8 - rtc�uiouj,rI cRn�n�rvu rcUNITED s ia(,a Jill 1 - Slate of California _ o+ant A Los es�� �,� ---Daniel P. Aguiiar, plc$ President A No-faVublid%r;�thero��cer comp)eiing fl ce ificale ver{ffes only fho-idanIr`fy oL�fr�frrr�n+��?�raI wf�u s+�rrrad fhe doiaurirerrf to arlurzm f i _cM 08mm is al#achecl, and not fH try fidnessI 'accr.rracy, or YalrC7Aftr��ZIQCa��R4�?>` On this 1 `I day of June. 2018. before mu, Sonia Q- Garrejo, 4 notary public, personally appeared Daniel P. Aguilar, Vloe Pre sweni of Amarfcan Contractors indemnity Company, Texas Bondirrg Company. UraJted States Surety Company and U.S. Specialty Insurance campany wfro panned to me on the hasis of satlsfactory evidence to be the person whose norm is sutuAbed ID l#1e within OII lrurneni and acknowledged to me that he execukod the nnme-L in Itfs aultlofized capacity, and that by his signalure on the in3trumenl _ the person, or the entity upon behalLar whicHhe *sian acled. executed Me InStniment, I�certify underFENALTY OF PERJ LJ W66ndsrMe laws Gt the State of California lhet #h5 forvgoJng paragraph Is.trae and-p-csrrec t WITNESS my hand and official seal, v YNAa CARXI ' Ilidiry PyWL -6111nn1i + L•hlarin[wep - {a[uIIIkU+rF77T114 nature{min i;IPr.. %- __ l_ - ecreiarY -8rl cara ConCfaoos; Indemnity Company, T�xs� �ondinomparly, Unitad�#etasurefy srpa.nd U �pe ylnsuran eari.pany, do" Eby cartify that the above ncL{prey irr a true ant! correrl sapy of a Power f A#lorn'ey, executed by Bald Companies, which is Mil in full farce and effect; furihermore, the rewlutions of the Soaras of Directors, set out In the Power of Attorney are In full fofc+e and a+Yecl, to Witness 4ryrhareof I have hereunic set my hi day, or bj s_ ,3lir LLdE= 1 �CI1�}ilre'1tE`-ti�'J$at — Bond ND- oo t I RY�1� Agency No. 1B767i affixed the seals of said Companies all. Los Angetes, CallfoWa Ihls Illip-rYJJV� S 6lI,R�h _�' N I ( t i �: � - *. �ijt Kla L4, Al Sectmar� AC05IM+ PICIAD zs+s vlsit,''Imhcc-c0nLr;1 sly for more-n rrr tic 4106E 19-1 MAINTENANCE BOND Page I of 3 1 SECTION 00 6119 Bond #1001119507 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we R & D Burns Brothers, Inc. , known as 9 "Principal" herein and U.S. Specialty Insurance Company , a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as l I "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 13 In the Slim of one Million Six Hundred Three Thousand Five Hundred Fourteen Dollars 14 ($ 1,603,514.00------------------- ), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 16 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 19 WHEREAS, the Principal has entered into a certain written contract with the City awarded 20 the, _ day of feoiaal r , 20 19 , which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 22 materials, equipment labor and other accessories as defined by law, in the prosecution of the 23 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 24 the "Work") as provided for in said contract and designated as Sanitary Sewer Rehabilitation, 25 Contract No. 94 — PART 1, City Project No. 100421; and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT No. 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 201 t 006119-2 MAINTENANCE BOND Page 2 or 3 2 NOW THEREFORE, the condition of this obligation is such that if Principal shall 3 remedy any defective Work, for which timely notice was provided by City, to a completion 4 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 5 full force and effect. 6 7 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired anchor reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond, and 11 12 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 14 Worth Division; and 15 16 PROVIDED FURTHER, that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 20 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 006119-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the o*+ day of 3 t - *`r , 20 19 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 ITES (Principal) Secretary Witness as to Principal ATTEST: NIA (Surety�� Witness as to S i el ennings PRINCIPAL: R & D Burm Brothers, Inc. BY: Signature ._' — -" Name and Title Address: P.O. Box 786 Burleson TX 76097 SURETY: U.S. Specialty Insurance Company BY-_2 /1 Signature Lindsay Senior Gineras. AttomgJn-Fact Nance and Title Address: 500 West 13th Street Fort Worth, TX 76102 Telephone Number: 800-728-2374 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. if 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 —PART t STANDARD CONSTRUCTION SPECIFICATION 130CCUMENTS City Project No. 100421 Revised July 1, 2011 TOKlONiARINli _ I-f C POWER OF ATTORNEY AMERICAN C0NTRA=RS7INDE LAITY COMPANY TEXAS BONDING COMPANY UNITED STATESW-REVY']hAPANY U.S. SPECIALTY IN�JRANCE COMPANY KNOW ALL MEN BY THESE PRIES f NTS; TNA American Contractors indemnity Caanipany, a California corporatfffi Texas Bonding Company, are alssumed name of American Conlractors Indernnity Company, United Stales Surely Company, a Mt lrylond Corporalion and U.S. Speclalfy InsLrrance Company, a Texas corpora1Jon (UectlVely, the "Comonles"), do by these presents make. conrliiuto and appoint; Tracy L. Miller. VV1111am Mitchell Jenningsr William :Blanchard, Kafie Roq@rs or Lindsay Senior ingras of F&t Vftrxh ex s �4s tr ib and lawluJ A ornay(s�-[n-racr each in their se�a'rate t~apacity if mor��an-€reds narrte�SJ�o�+a, wfli7 illR p�rv�rPr and authority heraby conferred In its name, place and stead, to execute, acknowledge and defiver arty and all bonds, IrecognIzances, undartakings or other Instruments or contrauta of suretyship to inCtulde driers, amendments, and consents of surety, providing the bond penalty clues not exceed "*"*Ten M1111orf ""' Dollars ( "'$10,00D.Don.m. • } This Power of Attorney Ethatl expire wilhoul fuftheraetlon on April2Y", 2022-This Power of Attorney is granted under slid bj+ authorlty of the following easoluHops-a-io�t cl=by ti,$ k cards of iro�4#rs .of the Ccrrtparrlee: _se -it ftsolve, J -thal [he�Ptavkienl, any V0a-F o It— n} kSE�slla cff l3resEdent, any SBuretary-or any Asslslat Secretary shall*?=arid i - hereby_ u sted Whit full poyr ei and authorlty to apR ar5y-atne or Moe sultaible persona as Alromey(a)-in-r-act to iopreeent and ac;t Lar a�orti ehaI of -the - Company subjw to the followlrtg pmvisions- Arraragy-in-Fraw may bo gkon full power and aultlority for and in the name of and on telxalf of the Company. to execute, ackngwledge and deliver, any and all bonds. Teccgnizames, corltrsots, agreements or Indemnify and other condltlonal or r,blfgr}tory undartak". Including any and all conserris roe the releAse OC_re[a.ned 9eroe11te908 iaoftr flnel &Stimalas era anginserlog and construdlbon cmtrac:13, andany and all notlees and dmurnenls r rl lkra � lennir mti the Comparryrs llablllly thsmoAndar; j *qd any sucl) irtstfuments so uxeuGed n _u6!t_AUomey-In-Factshall be bMing upon� _[tam ConlPany tf r[gnodt ilia Presldant chid s®clad ant!-affecte0 by the Comorftw-S e*eff = _ i3 r R&-�oKed; tha9-11—0 sianatura of any authorized officer aad°seal or the CffmpanytwMI; r her?rt#ter Cafflxed tb any power of atiomeyor any certificate raiating thereto by Facsimile, and arty power of attorney cr certlfinale boa ring Wlsimile Og nature or #acsimife seat shall bEr valid and binding upork the Company Mth rasped to arty bond or undaetakirrg Ja which it Is-a(tacheci. I WITNESS WHEREOF. The Compsn+es have caused Min Inslrument to be signed and their corporate seals to be fleretu affixed, this 1 "' day of Juno, 2018. A MERICAA CO A;; TORS INDEMNITY COMPANY TEXAS AS SONDENG COWANY UNITED i t-SUREI)�- _ -NY Ur ECIAl�fN.-IN ORANGE COMPANY tfiC 4irr r�nI U. RJR 15414i Yn� _ State of California �"�� County of Los Angeles _wo j1(ar)LPq! lft-mr jMur nlYirer compWir yu'ffa►s cerfiJrcate veriJrea wily tit 'ha fNiff cae iifwOs atlarhad. and,, twf the fruthfuiness. accuralcv, or WAJ Daniel P. Aguilar, Vlee President duet who q(gr?vd= lhe=do;vmenif to On this 111 day of .tuner 2018, before rue. Sonia Q- Carrejo, a notary public, pefsonalfy appeared Daniel F. Aguilar, Vice President of American ContmcAws Indemnlly Company, Temps Gooding Company, United States Surely Company and U.S. Spedally Insurance Company who proved to me on the basis of satlsfactary evidence 10 be the person whose name Is subscribed to the within inslrwmaril and ockmwWedgE f to rile that he executed the south; in his aulhoriaed capadty, and 1hai by his signalure on the Instrument_ Ohs. person, car the entity upon behalf Df whI&Nhe pamw acted. executed the Instrt: ment. 1-certify under f E NALFY OF PERJUl�' ndtf•e-lawa the Slata of Callforr is thaiiiithe foregurig paragraph ism and-WFr$ct. WI TNESS my hand and official PL- i I do aalx UV" • ll 16 �r alu.ly Wok � CA11A.11d Ia�M+F143CWly Irt'rh garralyaa, Signalufe - (Seal) — _ = — .r:r.r.+'r•����+�-mot = - - iYrpart+ n {5 peiaitylnsUran a Company, C6'nhuctr�rs Indemnity CDmp�n16 �sxa r 113- ding ompany, klrrited�ta[es unity rY do hereby cel-14 that the abc��rr�l�reg-ping--s a true and correct copy -of a Power - aF Attorney, execu led by sold Companies, which is sti11 In full force and effst t furihermorif , the resolulions of the Boards of Directors, set out in the Power of Attorney are In full force and effect Its 1+�►f,Ine5s Whereof, I hilve ho sunlo set my hand arid affixed the seals. of said Companies of LD5; Angeles, Callfornia this d _ day- olf - -- Corp rate Seats n�c� ��., 10 tuff Bond No. � rY ��. f � A;, � y � # f 5 rd Klo Lei, 1�8$a SBCfela Agency 90, 1a757 rY L r,W2*14 �ICGS4bAH1'UAO = = -visit trnhcc,co.rblspjrety frjr rnL?re gWmalJ0ff J.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE IMPORTANT NOTICE l . To obtain information or make a complaint: 2. You may contact your agent. 3. You may call the company's toll free telephone number for information or to make a complaint at: 1-800-486-6695 4. You may also write to the company at: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 6. You may write to the Texas Department of Insurance at: Consumer Protection (I 1 I -IA) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsuinerProtection@tdi.texas.gov 7. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. 8. ATTACH THIS NOTICE TO YOUR POLICY This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener information o para someter una que j a: Puede comunicarse con su agente. Usted puede Ilamar al numeeo de telefono gratis de la compani's para informacion o para someter una queja al: 1-800-486-6695 Usted tambien puede escribir a la compania 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companies, coberturas, derechos, o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas al: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtectionatdi.texas.gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA Esta aviso es solo para proposito de informacion y no se convierte en parte o condition del documento adjunto. 11CCSTWO008110 I_POW ER OF ATTORNEY AMF:RTC.AN 0.)NTRACTOR-S !NDRM1 _M N COMPANY T ExAS BONDING COMPANY UNIT•F11CTerrrc&METY COMPANY Il.$, SPEC AI,'f'y In;cttgANCR r'-mpArVv Qt.l. MEN i?V SE Wl;. an r' an fnrni vi T...,,?'7._ 1'1hAl.lrll_�1.... t antractcus lndi.ri�nity CornP,�.y, a C'ali__---- _car�uraEs,'lxa tar nr{ coin n atC..c ♦,1rQ1_V C n17Y }a1t1 Iv - .Naolriirig. C:usi7riiuy, ut? as„sr�n,ec� IZ1t1�t''-,L•1•nffii�Cdri. �{�n#roc-_-5 II..,.c.....ity Cff:t�}aa.',}, Urtttet! SL-- �'..- ror,►mation and US Specialty iilsurtirrce a ::xuC corporation {collectively, the"Car„panies"), d4 by thesd- prestrits make, constitute and appoint: Tracy L. Miller. Williom R41tcheli Jennino�r %Villiarrt Blanchard or Alledss C;rrrrDhlex of Fart ft: tiff, `leas Allornx�y(s)-in-fArl, each in lheir separAle capaciry if rn* -A"0919-i'l above. with 11,11 pc wtr and tltnitnrity. �hes by0r* 13'iis l ame, place alld 6tCttci, to cxcx:litc, airkr cl�:litfgc attd �r3�+1� - xjf kq_o Jllfburtds. reeognizmnem unii'ergriking.4 - 11• {4{i1%r imefrv�mant3 i?r CflLtrrttls of 541 t,]rai;l�} toi^:I:::i:' f1de.9T ilii:4�il{ t1#Pltlti; Riif� 4"pncantc fit St::'Ci'jv jy?'4Vltf:ni; iilC bond resr=sraty.y*#i'k'rri:si ��a�►st�kl�uvsi nr�s� a�r�u#* olla *r >us penalty digs not exceed Terl Millilf,, � r'v This Power of Anortley shall c:q;�irc iWiti out further action orl I}eanml•Yr 20, 2017- This Po-ke* Ol Atiarnoy !8 gr-arlted tit;;,te* 4n,t by authority of-tk fli lowing resoitltic;ns adapted by the boa -rds of DirPrrt ;ta of the Companies; --tic salvi r1, t[l�l f!ao Prr�.yent, ony Vxc-Presidetit, iirW.A=is;xnl:4�ie uny Secretary r Duty lkssU n nl e4�eIttrw shah bt+ a^d 1 Jeer y u►utad.*vet�l. a�tr ataThnr iiy ifz gpoinl any one o., rnere-guil.alitr pefsbii3..> A111�nry[at-w-Flat to repi"Plit and oat tur and 4n llcfaaif ar ti c Campany;fu4 tea t[+�fipttii � _� t� ri€titisinfu _'_ - AIIewney-in-Face may t given full powe End �a[hurtt}� fw and in Lice �ureo pi` and un Lnhef rf the Company. t 2xccule, xcklSrnv]�edgo and deriveC, any and al t fonds, pecogniz.! L-es, contracts, agrarmeiars or indemnity arm a>�har CQ00.'t1fjgPl i+r tth[igatx7. l"ludirlg MW Pact ail cuflwlts ro. 4116- release Of Rmmed pererratvl{a<s a ,afar f1mil egti•rtma im onxtnwring and a:MIMFar:;llon eo .ww.ls, slid w4 and all IT4ta:•44 n:,d ddcurnrnls rat ItrmrnntPng 0ry CotWaaP.y's hob3b!y ncCrcirn'!pr, a,ad antf such 1119L-wivrga so cxecwcd by any xtieh Adorn*-to-l+a0 shall be iamding upon the compiuiy its irsigrod by The Flestilcni and SeQicd atal a&cted bydircirlQjx+tav 3pz.wm Ae 1� k fclta 3ki�h naaum of any c ilio{iaed oi%rkr nnd,s #�ih Conipa:.y hcrctal of Sl41t:: L {flxor[ T,5_ao over of attomey sN,at� Qetfificitl$, f.401a - hnrClo tgj.iq li ^y powor of allnd'ay w hf bq�r[n hWmAt dt�rsaiura ut ri ffin�taw iffwl be warhi acid bending apssn tha GY,m¢arly w:#h r spo,t i�,. — .. - �� _ _ t tu.q why bonanr utfd&fdXfeg lO A'l:ikh it n auloc}1k. 41it'fr ' ' ....- --- --- - IN WITNESS SS WHEREOF. The Compl anies have canscd this instrument to Le signed and their corporate seals to he hereto affixed. this lst clay of December, 2014L _ - — A.b1ERWAN Ct„4NlFAr43r TiCXAS BONDING COMPANY �=-: C-Ilmorate ticola, ll.liYl SATE& MTY C'aYi ANY U.S. SPECJAL'TY INSLlRANCi C PMPAKY — EF i Itz ,►,t % a Donki P, Agiailar�, Yice Pre itlent note itlali: > other Qfric,r:ampicling lhi ccrt�ticlto vp lfifl only t11e idsntity ft ig�livt yaG*hq=pl the $DrUrncnW Whicfl_fti terti MIC is aifoc[Led, aL.iA dot thQ killitfv16asa, accuracy, cn�� oiartbal }tl li1 -stme ofCelift?M-ia Ctjv'lly oF1,csAR3rres SS; On thi9 ; at day of December, 2014, be (rare IRE, i.4nria G. Radrig=-Wang, a navy public, personally oppoeaa: d Dna P, Aguilar. Viva P. eaWow al- AtmcrlrA4 GnrFph�j- tly.aFB 1gd�amal4' Camparly. 7 xes ondiag_i:umpau r totiSlatra Suroly Cor::pany and i J.S. 5pr ciri l ty traaltanca C ompr+ny wkr r[El?pd to rp og 'Ile:etfulisfact9yevdence[nbhie eda� oci;lnnd 1} a#layiaivs�cdls.OF PFRJUJZy ti�tder then a od li.e 51aty o[ Ca;iiPua :ea dial lUe 1'c:asg;sirlg;+ntaigrnjtll is ire rin"! ca •cei, WLTNESS my hand ald ofRriat seal, 1AAttltd G. Rt1llRt�tlt� us�}1� A t _. 21Jj Mottle: a l ,ti# lemnP.Punric coi.runle { i t411414�Aid1 CuUEI:y ' Va` ��,r� as r i - — - Gomet,.#ar Ins Ore $ 2017 r _Q ;�#•" L. rw - - I,Michael Chaleksoa , Asslslrinl Secrrfnry oi' At orican ti untrac tars 11-1 dwinityCorn,a„v, Texas F;r luiug Gorrta ony, Unilccl 9tatas Surety Cam;�any and U.S. Specialty Insurance Company, dd heMby certify [hat the above and foregoing is a tl ire iind correel copy of a PW veer of 11lwrney, exectood by said Companies, which is still in Full fnr=o bail vM6 , hirlhertrnore, the rastalutions of tltc brads of t)irr•crmrs. set e;:i in the Powa: orAt;, =y acre in full force and-effout;-w I -_ n Wi[tt 1Vhe�enf, ! ha:fe h eutito-si t my hand ,rid �ftixi,d Lbe seals of ggid 1? }pail{ R rt1 l.ps ringe9es, C'0ifnr<ria this . all ;� I �' corpointe Seale s °7 tr y'ip "!P,'j,o wa y � y $' � __ �� �! x.� ,� _ �1+iici.:lal r:hllleksorl, it9sis#ant SecFctstry ti. :isia]�Si� �: 17h't" --ir- - a f : ^p.Pa1u w, raw — —_ _ TEXAS; COl1+lI PAINT NOTICE IMPORTANT NOTICE To obtain infon+itation or rnakc a complaint: You may contact your apnt. 3. You may coil the company's toll free Mc hone munber for information or to make a comp iaira at 1-800-486-6695 4. YOU U1,ay also Wrile to the oDrnpany at; go S. Figueroa Sr�et, Suite 7U0 Los Anples. CA 90017 You inay contact the Texas Dgpariment of Insurance to obtain information on euitipariies, Coverages, rights, or compiaials at: 1-800-25 3439 You may write to the Texas D admra:t of Insurance irt: Consumer Protection (l 1 I -I A) P.O. Box 149091 Auistiil, TX 78714-9091 Fax 1+10. (512) 49.0-1007 Web: http:ffww2,tdi.1pxas,goy E-mail; Corasulr+.e� Pral�ctic�nCc�tdi.tt:xas_goy 7- PREMIUM OR CLAIM DISPUTES. Should -U have x dispute concur ing yow premium or abaul a claim you should cont,ao tbQ a r t or the company first. If the dispute is not resolved, you nmy contact the Texas Deparlmosit of insurance. 8. ATTACH 1WIS NOTICE TO YOUR POLICY This noliCe is for iniormation only and doe; not bec:a= a gait cr conditi-on a the at(mbed A VISO EVWORTANTE Para obtener informacion o para someter una queja: Puede comunicarse con su agente. Usted pede ilamar al numero de telefono gratis de I compania's para informacion o para someter ana queja al: 1 800.48&-6695 Uned tarnhien puede escribir n la cornpahla; 801 S. Figueroa Street, Suite 100 Los Angeles, CAL 90017 Puede romunicarse con el €]eparramento de Sepf-o,s de Texas Para o 1--cr infannacioti acerca de c.rimpania�, c: burturas, derechos, o quejas al: 1400-Z82-3 9 Puede m4bir-aI DepaMrnento de Segures de Texas at - Con 5urner Protection (1 I 1-1-A) RO. Box 149091 A►xstin, TX 79714-RD91 Fax No. (512) 490-1007 Web: Iitt :! vrww.tdi.state.ix.iis E-mail: 91 kltriarPl Ule iorl d:di.texas av DISPUTA5 SOBRE PREVUS O CI AMOS: Si tiemt una displtta concerniente a .Su prim o a un reclarno, debo cornunicwtie con el agente a is cntlTania pcinlerrt, Si no se resuelve la disputa, pu de entonces comunicarse con el depaname ato (TDI). UNA ESTE AVISO A SU POLIZA l*stat aviso es solo para prioposito de inform. acion y no se c^nvierte en parte o c^ndicion del d+JC:;. mento ad,;unlo. 1'CC.STyMM+[ 'i fl STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 — Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................6 Article2 — Preliminary Matters......................................................................................................................... 7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time; Notice to Proceed................................................................ 7 2.03 Starting the Work.......................................................................................................................... 8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference.......................................................................................................... 8 2.06 Public Meeting.............................................................................................................................. 8 2.07 Initial Acceptance of Schedules.................................................................................................... 8 Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent.............................................................:................................................................................ 8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies....................................................................................... 9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................ I I Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 6.02 Labor; Working Hours................................................................................................................ 20 6.03 Services, Materials, and Equipment........................................................................................... 20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals"....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations................................................................................................................. 27 6.11 Taxes........................................................................................................................................... 28 6.12 Use of Site and Other Areas....................................................................................................... 28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection.................................................................................................................. 29 6.15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communication Programs............................................................................................. 30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indenmification......................................................................................................................... 33 6.22 Delegation of Professional Design Services.............................................................................. 34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site................................................................................................................... 35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities................................................................................................................... 36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due............................................................................................................................ 36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals.............................................................................................. 36 8.07 Limitations on City's Responsibilities....................................................................................... 37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program........................................:...................................................... 37 Article 9 - City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager............................................................................................................ 37 9.02 Visits to Site................................................................................................................................ 37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work............................................................ ..38 ............................................ 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 - PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 Article 10 - Changes in the Work; Claims; Extra Work................................................................................ 38 10.01 Authorized Changes in the Work ................................................... .............. 38 .............................. 10.02 Unauthorized Changes in the Work...........................................................................................39 10.03 Execution of Change Orders....................................................................................................... 39 10.04 Extra Work.................................................................................................................................. 39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process............................................................................................................. 40 Article 11- Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ...................... 41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances.................................................................................................................................. 43 11.03 Unit Price Work.......................................................................................................................... 44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time................................................................. 46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays.......................................................................................................................................... 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects........................................................................................................................48 13.02 Access to Work........................................................................................................................... 48 13.03 Tests and Inspections.................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................ 50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work.............................................................................. ............... 51 Article 14 --- Payments to Contractor and Completion.................................................................................... 52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization........................................................................................................................ 55 14.05 Final Inspection............................................................................................................................55 14.06 Final Acceptance.................................................................. 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................ 56 14.09 Waiver of Claims........................................................................................................................ 57 Article 15 - Suspension of Work and Termination........................................................................................ 57 15.01 City May Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience....................................................................................... 60 Article 16 - Dispute Resolution...................................................................................................................... 61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 - PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 Article17 — Miscellaneous.................................................................................................................. 17.01 Giving Notice.............................................................................................................................. 62 17.02 Computation of Times................................................................................................................ 62 17.03 Cumulative Remedies................................................................................................................. 62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic document management and collaboration system. 12. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 2 of 63 13. Change Order A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief' with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 20. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor —The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February2, 2016 007200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements —Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs —Polychlorinated biphenyls. 49. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 50. Plans --- See definition of Drawings. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 5 of 63 51. Project Schedule A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project —The Work to be performed under the Contract Documents. 53. Project Manager —The authorized representative of the City who will be assigned to the Site. 54. Public Meeting An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 6 of 63 63. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent -- The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities --All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 7 of 63 The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to ran. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over, those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.1 S.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for casements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or I differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if. 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated.- 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before farther disturbing conditions affected thereby or performing any CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2, other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06 G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates oflnsurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto', defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named i£ a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the, completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; e) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page25 of63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. hW2://www.window.state.tx.us/taxinfo`/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work. During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-L GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or' anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 . 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking ,the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and. agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INL)EAiMFICATION PROVISION IS SPECIFICALLY Iii1UMED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IIiT PART. BY ARTY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS !NDElVMVIFICATIOIV PROVISIOliT IS CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATEAND BE EFFECTIVE EVERT IF IT IS ALLEGED -OR -PROVEN THAT AI,L OR SQIVIE OF THE DAMAGES BEEG SOUGHT WERE CAUSED, IN WHOLE OR Ili_ PART, BY ANY ACT. OMISSIOIS OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-I GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VT, Civil Rights Act of 1964 as amended. Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements, Reports and Tests City's duties with respect to providing lands and casements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is Suby Varughese, P.E., or his/her successor pursuant to written notification from the Director of Water Department. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORD 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTIH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required. All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City s Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not . submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANTS QUANTITY MEASUREMENT 11.01 Cast of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the, Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall he apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. c. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 44 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0I.A. I or specifically covered by Paragraph 11.0 LAA, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit. price. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 46 of63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 -- CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.01.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.Q. C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.01.A.1, 11.01.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.0l.A.4 and 11.01.A.5, the Contractor's fee shall be five percent (5 %); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 49 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 oa7200-1 GENERAL CONDITIONS Page 54 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final deternination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY n FORT wnRTN SANITARY_ SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Reaainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. rlrr nF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL. CONDITIONS Page 56 of63 14.07 Final Payment A. Application far Payment. 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY 01' FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.023, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no fiu-ther orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to -agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 —MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a Iegal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revision: February 2, 2016 2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions 007300-1 SUPPLEMENTARY CONDITIONS Page I of 6 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in fall force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4,01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of June 7, 2019 Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER IsLei 8I0aILI TARGET DATE OF POSSESSION The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised January 22, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 l8 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4T 42 43 44 45 46 47 48 49 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 6 SC-4.01A.2, "Availability of Lands" Dtilltie$ ar j3bsiructfnng M he removed, adjusteg, iwdfur relocated The- following ie list ofutilifiem andMir obs0ri c-fianR 1-hat havo not heci-L renw-md, ad;uFWd, an(Vor ref^.:, -led "of June 7, 2019, EXPECTED UTILITY AND LOCATION OWNER None TAR(iiET DATE 0 ADJUSTMENT The ConLmetcr understands and agrecs that dhe [late.- Listed above are estimates ot_1y, art not gumantwtid, and do nut bind the C;ity- SC-4.02A., "Su bsor:awe and Ph—ysicaI 117ond Hions" The following are reports of explorations and tests of subsurface conditions at tfie sit-- of the Murk: A NONE Report No. , dated , prepared by NONE a gub-consultant of NONE. a consuRent of the City, providing additiomi fnfor tion on NONE The following are dmwings of physical conditions in or relating to existing surface and subsurface structures (except Undergro�umd Facilities) Zcc we at or contiguous to tho site of the Word-: NONE SC-4-06A*., "Hazardous Unvironmen*al Conditions at Site", 'The fallowing are repnrte and drawings of oxisting bazar;lons environment{,I conditinns kno'"M to the Cif-?: NONE SC-5.03A.,"Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respertivo officers, directors, agents and employees- (1) City (2) Canis-ltant= Lim & Associates, Irc_ C'C:Y OF Fnu T 'PVti.`R I SANI' ARY CF:.FR RLHARR IT+, llr' ''I*i3OfOr Tt?ACTNO. 94—PAPT I T.JLNDARD CONISTRt,MON SPECIFIC.:Tt.ON 4�JCL019I NM City Pmjwt No. 10(A21 Revi.%A 1mmmry 22, 2016 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 6 1 (3) Other: NONE 2 3 SC-5.04A., "Contractor's Insurance" 4 5 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following 6 coverages for not less than the following amounts or greater where required by laws and regulations: 7 8 5.04A. Workers' Compensation, under Paragraph GC-5.04A. 9 10 Statutory limits 11 Employer's liability 12 $100,000 each accidentloccurrence 13 $100,000 Disease - each employee 14 $500,000 Disease -policy limit 15 16 SC-5.04B., "Contractor's Insurance" 17 18 5.0413. Commercial General Liability, under Paragraph GC-5.0413. Contractor's Liability Insurance 19 under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with 20 minimum limits of: 21 22 $1,000,000 each occurrence 23 $2,000,000 aggregate limit 24 25 The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the 26 General Aggregate Limits apply separately to each job site. 27 28 The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. 29 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 30 31 SC 5.04C., "Contractor's Insurance" 32 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under 33 Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: 34 35 (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", 36 defined as autos owned, hired and non -owned. 37 38 $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at 39 least: 40 41 $250, 000 Bodily Injuryper person f 42 $500, 000 Bodily Injury per accident ! 43 $100,000 Property Damage 44 45 SC-5.04D., "Contractor's Insurance" 46 47 The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and 48 material deliveries to cross railroad properties and tracks NONE 49 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised January 22, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 14 25 26 27 28 29 30 31 32 3a 34 35 36 37 38 34 40 41 42 43 44 45 46 47 48 49 St 52 53 54 55 00 73 00 - 4 SUPPLEMENTARY CONDITIONS Page 4 of 6 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occ it en : I equived for ehis Corer de? $Confirm Limits with Railroad SConf mi Limits Web Railroad X Not ruVideedJbr this Cunsizct With respect to the above outlined insurance Fequirements, the following shall govorn: 1. Whcue a sinpla railroad company is invoivcd, the Contractor t half pro.tido one insurance policy in the name of tl;e railroad company. However, if wz m th n one ,grade separation or at -grade cressing is a11e;1ed by Ilse Protect r1t entirely separate lmatiops on the line or lines of tl:a name railroad company. seY arate, coverage maybe required, cacti in tine arnouni staled above. 2. Where more than tine railroad company is operating on th-o Caine right-of-way or wbera several railroad companies are involved rand operated on 1buir owq sYparate rights -of -way, tl:e Contractor may be required to pmov;de sepa;»te it unince policies in llle name orcacb railroad company, 3. If. in addition to a gradc separation or an at -grade crossing, other -work or activity is prclrasC-d 013 a railroad cottmpany's right-ur- gay at a location entirely separate from the grade s..eparafinn or at - grade crossing, insureme coverage for this o rrk must lie included hi the policy covering ncc grade separation. 4. 1f no grade separation is invotved but other work is proposed out a railroad 0ornpany's right-of- way, all such other ►-ork /nay be covmd in a Ong It policy for that railroad, oven though the work may be at two or more separate locations, We work or activities on a roilmaa company's pronerty to be performed by ibe Contactor shall be commenced until the Contramr has fi!rmshcd the City �srith an original policy or poli .ies of the insurance for each raitread company vamed, as requLmd abava. All such 4iurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. Thu insurance specified above must be varried until all Work to be pe-rformed on the railroad right-of-way has been completed and the made crossing, if any, is no longer /used by the Contractor. In addition, insureDc.e must be earn-ed during all maintenance and/or repair ~workperformed in the railroad right-of-way. S. in Tiro n: muSt name the raih)ad company as the insured, tone -+her with any tenant or lessee of the railroad company operating over tracks involved in the Project, SC-6.04_, "Proied tichedtlte" Project r.ched,ule shall be tier- 3 for the rrv,e 1. CITY OF FORT WORTI I e qurrAR V SEWER REHABtLTTAT£ ;N, CONTRACT No. 904 -- RA IR i 1 ST NDARD CONISTRUCTI�}n; pp: 1i7 °Tlwra DOCUMENTS CiCy 1'w*t Nur 1 W42) Revised January �i, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 6 SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: 2013 Prevailing Wage Rates (Heavy & Highway Construction Projects) SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: 2. <List all known permits or licenses that are being provided by the City to TxDOT> 3. <List all known permits or licenses that are being provided by the City to USACE> 4. <List all known permits or licenses that are being provided by the City to TCEQ> 5. <List all known permits or licenses that are being provided by the City to Railroad> SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of June 19, 2013: NONE Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION NONE SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: NONE Vendor Sco a of Work Coordination Authority <Listfill Vendor Name> in <List services berovided>4s� "CITY—, SC-8.01, "Communications to Contractor" NOht SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Suby Varughese, P.E., or his/her successor pursuant to written notification from the Director of Water Department. SC-13.03C., "Tests and Inspections" NONI CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised January 22, 2016 1 SC-16.01C.1, "Methods and Procedures" 3 NONE END OF SECTION 007300-6 SUPPLEMENTARY CONDITIONS Page 6 of 6 Revision Log DATE NAME SUMMARY OF CHANGE 112212016 F. Griffin SC-9.01., "Cify's Prnier.t Representative" worrtin9 C--hangar! b Citu'g Prnloti± ,-- -� --- - - Manager. CTTY OF FORT WORTH SANITARY SEWER PX! dKn ITA7ION. CONTRACT NO. 94 - PART I STANDARD CONS i-KtK- l N SPEC FWATIVN Rw'k. iMENTS 0(y Proluc1 No. 101?421 ReeisEd ]anum7 22, 2016 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 011100 SUMMARY OF WORK 011100-1 SUMMARY OF WORK Page I of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES INOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 011100-2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or casements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 011100-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILTI ATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 1 01 25 00 - 1 SUBSTITUTION PROCEDURES Page 1 of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1— General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or 31 catalog numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b, Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if- 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. hi the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 19 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USEDI 26 1.12 WARRANTY [NOT USED] 27 PART 2 - PRODUCTS [NOT USED] 28 PART 3 - EXECUTION [NOT USED] 29 30 31 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT. DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm _ Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended Received late By Date _ Remarks Date Rejected CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 013119 PRECONSTRUCTION MEETING 013119-1 PRECONSTRUCTION MEETING Pagel of 3 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division I — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 17, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 01 31 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives £ Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 0132 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule c. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j . Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ce. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 17, 2012 0131 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised August 17, 2012 OI3120-1 PROJECT MEETINGS Page 1 of 3 1 SECTION 013120 2 PROJECT MEETINGS 3 4 PART1- GENERAL 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Provisions for project meetings throughout the construction period to enable orderly 8 review of the progress of the Work and to provide for systematic discussion of 9 potential problems 10 B. Deviations this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES [NOT USED] 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination 22 1. Schedule, attend and administer as specified, periodic progress meetings, and 23 specially called meetings throughout progress of the Work. 24 2. Representatives of Contractor, subcontractors and suppliers attending meetings 25 shall be qualified and authorized to act on behalf of the entity each represents. 26 3. Meetings administered by City may be tape recorded. 27 a. If recorded, tapes will be used to prepare minutes and retained by City for 28 future reference. 29 4. Meetings, in addition to those specified in this Section, may be held when requested 30 by the City, Engineer or Contractor. 31 B. Pre -Construction Neighborhood Meeting 32 1. After the execution of the Agreement, but before construction is allowed to begin, 33 attend 1 Public Meeting with affected residents to: 34 a. Present projected schedule, including construction start date 35 b. Answer any construction related questions 36 2. Meeting Location 37 a. Location of meeting to be determined by the City. 38 3. Attendees CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 013120-2 PROJECT MEETINGS Page 2 of 3 1 a. Contractor 2 b. Proj ect Representative 3 c. Other City representatives 4 4. Meeting Schedule 5 a. In general, the neighborhood meeting will occur within the 2 weeks following 6 the pre -construction conference. 7 b. In no case will construction be allowed to begin until this meeting is held. 8 C. Progress Meetings 9 1. Formal project coordination meetings will be held periodically. Meetings will be 10 scheduled and administered by Project Representative. 11 2. Additional progress meetings to discuss specific topics will be conducted on an as- 12 needed basis. Such additional meetings shall include, but not be limited to: 13 a. Coordinating shutdowns 14 b. Installation of piping and equipment 15 c. Coordination between other construction projects 16 d. Resolution of construction issues 17 e. Equipment approval 18 3. The Project Representative will preside at progress meetings, prepare the notes of 19 the meeting and distribute copies of the same to all participants who so request by 20 fully completing the attendance form to be circulated at the beginning of each 21 meeting. 22 4. Attendance shall include: 23 a. Contractor's project manager 24 b. Contractor's superintendent 25 c. Any subcontractor or supplier representatives whom the Contractor may desire 26 to invite or the City may request 27 d. Engineer's representatives 28 e. City's representatives 29 f. Others, as requested by the Project Representative 30 5. Preliminary Agenda may include: 31 a. Review of Work progress since previous meeting 32 b. Field observations, problems, conflicts 33 c. Items which impede construction schedule 34 d. Review of off -site fabrication, delivery schedules 35 c. Review of construction interfacing and sequencing requirements with other 36 construction contracts 37 f. Corrective measures and procedures to regain projected schedule 38 g. Revisions to construction schedule 39 h. Progress, schedule, during succeeding Work period 40 i. Coordination of schedules 41 j. Review submittal schedules 42 k. Maintenance of quality standards 43 1. Pending changes and substitutions 44 m. Review proposed changes for: 45 1) Effect on construction schedule and on completion date 46 2) Effect on other contracts of the Project 47 n. Review Record Documents 48 o. Review monthly pay request CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 013120-3 PROJECT MEETINGS Page 3 of 3 I p. Review status of Requests for Information 2 6. Meeting Schedule 3 a. Progress meetings will be held periodically as determined by the Project 4 Representative. 5 1) Additional meetings may be held at the request of the: 6 a) City 7 b) Engineer 8 c) Contractor 9 7. Meeting Location 10 a. The City will establish a meeting location. 11 1) To the extent practicable, meetings will be held at the Site. 12 1.5 SUBMITTALS [NOT USED] 13 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 14 1.7 CLOSEOUT SUBMITTALS [NOT USEDI 15 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 16 1.9 QUALITY ASSURANCE [NOT USED] 17 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 18 1.11 FIELD [SITE] CONDITIONS [NOT USED] 19 1.12 WARRANTY [NOT USED] 20 PART 2 - PRODUCTS [NOT USED] 21 PART 3 - EXECUTION [NOT USED] 22 23 24 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 013216 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1 - No schedule submittal required by contract. Small, brief duration 23 projects 24 b. Tier 2 - No schedule submittal required by contract, but will require some 25 milestone dates. Small, brief duration projects 26 c. Tier 3 - Schedule submittal required by contract as described in the 27 Specification and herein. Majority of City projects, including all bond program 28 projects 29 d. Tier 4 - Schedule submittal required by contract as described in the 30 Specification and herein. Large and/or complex projects with long durations 31 1) Examples: large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5 - Schedule submittal required by contract as described in the 34 Specification and herein. Large and/or very complex projects with long 35 durations, high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule - Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule - Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 32 16 - 2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 4, Schedule Narrative - Concise narrative of the schedule including schedule 2 changes, expected delays, key schedule issues, critical path items, etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost -loaded baseline Schedule using approved software and the 9 Critical Path Method (CPM) as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost -loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative (Project Scheduler) responsible for 15 developing and updating the schedule and preparing reports. 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 B. Progress Schedule 1. Update the progress Schedule monthly as required in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 3. Change Orders a. Incorporate approved change orders, resulting in a change of contract time, in the baseline Schedule in accordance with City of Fort Worth Schedule Guidance Document. C. Responsibility for Schedule Compliance 1. Whenever it becomes apparent from the current progress Schedule and CPM Status Report that delays to the critical path have resulted and the Contract completion date will not be met, or when so directed by the City, make some or all of the following actions at no additional cost to the City a. Submit a Recovery Plan to the City for approval revised baseline Schedule outlining: 1) A written statement of,the steps intended to take to remove or arrest the delay to the critical path in the approved schedule 2) Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of work and return current Schedule to meet projected baseline completion dates 3) Increase the number of working hours per shift, shifts per day, working days per week, the amount of construction equipment, or any combination of the foregoing, sufficiently to substantially eliminate the backlog of work 4) Reschedule activities to achieve maximum practical concurrency of accomplishment of activities, and comply with the revised schedule 2. If no written statement of the steps intended to take is submitted when so requested by the City, the City may direct the Contractor to increase the level of effort in manpower (trades), equipment and work schedule (overtime, weekend and holiday work, etc.) to be employed by the Contractor in order to remove or arrest the delay to the critical path in the approved schedule. a. No additional cost for such work will be considered. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 l D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence, make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled, the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time, it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions, weather, 27 technical difficulties, strikes, unavoidable delays on the part of the City or its 28 representatives, and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions, the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates, and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 0132 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays, affecting paths of activities 2 containing float time, will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts, the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors, the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases, the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera (P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City, no further progress schedules are required. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] 14 PART 2 - PRODUCTS [NOT USED] 15 PART 3 - EXECUTION [NOT USED] 16 17 18 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 1 2 3 PARTI- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 01 32 33 - 1 PRECONSTRUCTION VIDEO Pagel of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Farms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 19 QUALITY ASSURANCE jNOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 o PRODUCTS [NOT USED] CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July I, 2011 01 32 33 - 2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0133 00 SUBMITTALS 013300-1 SUBMITTALS Page] of 8 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 013300-2 SUBMITTALS Page 2 of S d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use'a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C 4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 %2 inches x 11 inches to 8 1/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CityProject No. 100421 Revised December 20, 2012 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 01 33 00 - 4 SUBMrTTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated ,project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 013300-6 SUBMITTALS Page 6 of S 1 1) "EXCEPTIONS NOTED". This code is assigned when a. confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; I 1 however, all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments, omissions and 14 non -conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense, based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals, will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial, at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor, and will be considered "Not Approved" until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents, then written notice must be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 01 33 00 - 7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications I 1 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information (RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CityProject No. t0042 t Revised December 20, 2012 01 33 00 - 8 SUBMITTALS Page 8 of 8 I PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1,4,K,8. Working Days modified to Calendar Days CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 013513-1 SPECIAL PROJECT PROCEDURES Page I of 8 1 SECTION 013513 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination. with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. t00421 Revised December 20, 2012 0135 13 -2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments (NCTCOG) -- Clean Construction 22 Specification 23 1.4 ADMINISTRATNE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation (TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. insulating cage -type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 013513-3 SPECIAL PROJECT PROCEDURES Pagel of 8 1 a. Notification shall be given to: 2 1) The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as "AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. if. 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives, Drop Weight, Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 01 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on ll to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 I. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. EIectronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers (USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 £ Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. 45 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 0135 13 - 6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson I A.B — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEMEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mrs. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 I 2 3 4 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 EXHIBIT B OTWOT ]NOTICE OF TEMPORARY WATER SERVICE IN E "10M DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF MRT'NORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 014523-1 TESTING AND INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1- GENERAL 4 11 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1, Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 o EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015000-1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 c. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES. [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance, 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 111 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 5000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 313 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 7 S END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015526-1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1m GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transportation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHHABILITATION, CONTRACT NO.94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 1 SECTION 015713 2 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fart Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1— General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in Iess than i acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH SANITARY SEWER REHABILPI'ATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than i acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 3125 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. - 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 19 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 0133 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CIT`i! OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 —PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 0133 00. 4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS ]NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 --- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 015913-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 I SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item.. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMTTTALSANFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS 27 2.1 OWNER -FURNISHED [oR1 OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 421 Revised July 1, 2011 01 58 13 - 2 TEMPORARY PROJECT SIONAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of %-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 c EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR I RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 421 Revised July 1, 2011 01 58 13 - 3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revisions Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 42I Revised July 1, 2011 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 0160 00 PRODUCT REQUIREMENTS 016000-1 PRODUCT REQUIREMENTS Page] of2 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Rcsources102 - Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 016600-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division I — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED) 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. i"ITY OF IFOR1 wOR` M SANPI ARY SEWER REHABILITATION, CONTRACT" NO. 94 — PART i STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION W CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART ] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 017000-1 MOBILIZATION AND REMOBILIZATION Page I of 4 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 4 GENERAL 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Mobilization and Demobilization 8 a. Mobilization 9 1) Transportation of Contractor's personnel, equipment, and operating supplies 10 to the Site 11 2) Establishment of necessary general facilities for the Contractor's operation 12 at the Site 13 3) Premiums paid for performance and payment bonds 14 4) Transportation of Contractor's personnel, equipment, and operating supplies 15 to another location within the designated Site 16 5) Relocation of necessary general facilities for the Contractor's operation 17 from 1 location to another location on the Site. 18 b. Demobilization 19 1) Transportation of Contractor's personnel, equipment, and operating supplies 20 away from the Site including disassembly 21 2) Site Clean-up 22 3) Removal of all buildings and/or other facilities assembled at the Site for this 23 Contract 24 c. Mobilization and Demobilization do not include activities for specific items of 25 work that are for which payment is provided elsewhere in the contract. 26 2. Remobilization 27 a. Remobilization for Suspension of Work specifically required in the Contract 28 Documents or as required by City includes: 29 1) Demobilization 30 a) Transportation of Contractor's personnel, equipment, and operating 31 supplies from the Site including disassembly or temporarily securing 32 equipment, supplies, and other facilities as designated by the Contract 33 Documents necessary to suspend the Work. 34 b) Site Clean-up as designated in the Contract Documents 35 2) Remobilization 36 a) Transportation of Contractor's personnel, equipment, and operating 37 supplies to the Site necessary to resume the Work. 38 b) Establishment of necessary general facilities for the Contractor's 39 operation at the Site necessary to resume the Work. 40 3) No Payments will be made for: 41 a) Mobilization and Demobilization from one location to another on the 42 Site in the normal progress of performing the Work. 43 b) Stand-by or idle time 44 c) Lost profits 45 3. Mobilizations and Demobilization for Miscellaneous Projects 46 a. Mobilization and Demobilization CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised November 22, 2016 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 ! l) Mobilization shall vans- Nt of the activities and Coo! on :1 Work { rider basiy 2 neces. sao, for- 3 a) Transportation of Contractor's personnel, equipment, and Uperating 4 supplies to the Site for the issued Work Order. 5. b) Establishment of necessary general facilities for the Contractor's .b operation at the Site for the issued Work Order 7 21, Demobilization shall consist of the activities and cost necessary For; .8 A) Transportation of C ontracior's .personnel, equipment, and operating 9' supplies from rhe.. Site including disassembly Lhr each i s„ed Work k 10(jrelr~r 1 b) Site Clean -,gyp for each Work Order 12 e,- LRemuva! of all buildings or other facilities assembled i#t the She for 13 each Wonk Oder 14 b, M-obili7nt;or and Demobili7nl on do not incJude acti,Af;eS for snecIfc itema of 13 work for hich payment is: rovided elsewhere in the contract, 16 C Emergency Mobilizations and Ninobilization for M.=d1=eou8 Projects 17 a. A Mobilization for Miseclianeous Pr Ala wv ca directed by the City and the 18 mobilization oc =s within 24 Lours of Lbe is-u---ce of the Work Order. 19 & Deviations from this City of For( Worf, Standard Speeificalion 20 11]. None. 21 C. Rtlated SnEcifivation �e3i:ctions include`, hul fre wx neecssarlly IfinitrA to: 27 1. DavWon 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 1 IDivision M — Gcne.ral Requirements 25 A� Measurement and Payment [Consult City 1DepattmenUDivision Car direction on if 26 1vlobilizat4on pair item to be included or the it�n should N, subsidiarv. Include the 27 upprop:;ate Section 1.2 A. 1.] 28' 1. Mobilization and Demobilization 29 a. Measum 30 1) 'This Item is considered subsi&iry to the various ltwmg bid. 31 b. Payment 32 1) The work performed and materials fUrnished in accordancx wiih this ltern 33 are suhaidlary to the va-,i-us Items bid wid no other com,---ation will be 34 allowed. 35 36 2, Remobilizatiom For suspension of Work as :specifically required in the Contrml 37 lD=Liments 38 a, measllr r: ent 39 1) Measurement For this item shall be put each remobilization performed. 40 b_ Payincv. 41 t) The ;work prrLormPd and materials furnished in accordance with this item 42 and rneasurvd as iurovided under °iMea-sureyrem will he paid for ai the unit 43 priLv per each "SpeciliPrl Remobilization" in a-gnrrlance with Contrant 44 Documents.. 45 c_ The price shall include, 46 i) JDemobiIization --. descri► t!d in See( ion 1.1.A.2.a, I) CITY OV FORT WORTH SANITARY SEWER REHABILITA:'rio ;', f:oxi'F-Acr no- w - PAM, I STANDARD CONSTRUCTION SPEC IF)CA77Ot;' [][]0NEN7a City P_mpect No. I00471 Revised November 22, 2Q 16 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 2) Remobilization as described in Section 1.1.A.2.a.2) 2 d. No payments will be made for standby, idle time, or lost profits associated this 3 Item. 4 3. Remobilization for suspension of Work as required by City 5 a. Measurement and Payment 6 1) This shall be submitted as a Contract Claim in accordance with Article 10 7 of Section 00 72 00. 8 2) No payments will be made for standby, idle time, or lost profits associated 9 with this Item. 10 4. Mobilizations and Demobilizations for Miscellaneous Projects 11 a. Measurement 12 1) Measurement for this Item shall be for each Mobilization and 13 Demobilization required by the Contract Documents 14 b. Payment 15 1) The Work performed and materials furnished in accordance with this Item 16 and measured as provided under "Measurement" will be paid for at the unit 17 price per each "Work Order Mobilization" in accordance with Contract 18 Documents. Demobilization shall be considered subsidiary to mobilization 19 and shall not be paid for separately. 20 c. The price shall include: 21 1) Mobilization as described in Section 1.1.A.3.a.1) 22 2) Demobilization as described in Section 1.1.A.3.a.2) 23 d. No payments will be made for standby, idle time, or lost profits associated this 24 Item. 25 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 26 a. Measurement 27 1) Measurement for this Item shall be for each Mobilization and 28 Demobilization required by the Contract Documents 29 b. Payment 30 1) The Work performed and materials furnished in accordance with this Item 31 and measured as provided under "Measurement" will be paid for at the unit 32 price per each "Work Order Emergency Mobilization" in accordance with 33 Contract Documents. Demobilization shall be considered subsidiary to 34 mobilization and shall not be paid for separately. 35 c. The price shall include 36 1) Mobilization as described in Section I.1.A.4.a) 37 2) Demobilization as described in Section I.1.A.3.a.2) 38 d. No payments will be made for standby, idle time, or lost profits associated this 39 Item. 40 1.3 REFERENCES [NOT USED] 41 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 42 1.5 SUBMITTALS [NOT USED] 43 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 44 1.7 CLOSEOUT SUBMITTALS [NOT USED] 45 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 100421 Revised November 22, 2016 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2 - PRODUCTS [NOT USED] 6 PART 3 - EXECUTION [NOT USED] 7 8 9 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRU(MON SPECIFICATION DOCUMENTS City Project No. 100421 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Page I of 8 SECTION 017123 CONSTRUCTION STAKING AND SURVEY PART I - GENERAL 1.1 ,SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division I — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials famished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1, Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Staking — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survey "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice forLand Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A.The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be received and reviewed by the City prior to delivery ofwork. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMFNTS City Project No. 100421 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and scaled by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — AttachmentA — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS INOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH SANITARY SEWER REH"ILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 14, 2018 017123-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable iCrr►V OF FORT WORTH SANITARY SEWER REHABILITATION. CONTRACT NO- 94 -.PART 1 STANDARD CONSTRUCTIOM SPECIFICATION DOCUMENTS City Project No, 100421 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART 2 - PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner forreference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (S 17-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CrI'Y OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. I00421 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.esv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 EXECUTION 3.1 INSTALLERS A.Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances, f!, Earthwork: 04-andes For earthwork or rough cut should not c'xeecd 0.1 fir. vertical tolerance. Horizontal alignment for earthwork and rough cut Should not exceed I.0 fl_ tolerance_ b. Horizontal alignment on a structure shall be within ,0.1ft tolerance. c:. Paving or concrete For streeis, curbs, gutters, parking areas, drives, nileyand -walkways shall be located within the confiu: s of the site boundaries and, occasionally. along a boundary or any other restrictive line. Away from any restrictive line, these thcilities should be staked with an accuracy prod'ucingno mom. than 0.0511. tolerance From their sx ccifled locution,,, d. Underground and overhead utilities, s;1ch as sewem, gas, water, telophone and iL-Iwric lines, shall by Ioc-ated horizontally within their pmscr ib:d areas or eases cuts. Within assigned areas, these u)W ties Aonld bF staked with all accuracy producing no more than 0.1 ft tolerance fiord a Specified c-cation, e. The accursey ireciuired For the vertical Imatiotl of iiiihtI 't,Yr:cs widely, tutarly underground utilities require only a anmmuna c01rer and a tolerance of 0.1 ft. should be riiahntaincd. Underground and o crht�ml tilditles on planned profrtle, but not depending on gravity flow for performance, should not exceed 0.1 ff. tolerance. 13.Surveying lmdrumenushall he kept in close adjustment according tornanuLac-turor's specifications or in compliance to standards. The City reserves the rig111 to request a calihrntinn report at arty tittle and reroam ends regular rr,ainten .n,:e sch duly he performed by a certified technician every 6 monthu. I _ Field measurements of angles and distances shall be clone Ln such -fashion as to satisfy thu Closures and tolerancesq expressed in part 3. I .A. 2. Vertical locatiors shall be establbshcd fi-ore a Fare-establi shed lbenchalark and checked by closing to S dMin-ent inch mark on the Earle dai m. 3. ConCtractinil survev field Work shall correspond to the 6 ient's plans. hTegtilari#1es car conflicts round shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be, logged for future reference. CITY OF MRT W ORT11 '-"ArJ1TARV SEWER ftEMAB11,11 ,yTHM, CONTRACTNO. 94 STANDARD COOS M1 fC`.-rTION S-PEC-1111CATION ►7Q["UM-ENTS {�ltY Proiac:t Nil. 100421 Revised February 14, 201S 01 71 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION AM the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL A.It is the Contractor's responsibility to maintain all stakes and control data placed bythe City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B.Do not change or relocate stakes or control data without approval from the City. 3.5 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at anytime deemed necessary. 2. Checks by City personnel or 3'd party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy: 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 14, 201$ City Project No. 100421 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER RERABILiTArION, CONTRACT NO. 94 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised February 14, 2018 FORT WORTH Section 017123.01 - Attachment A Survey Staking Standards Fc,bruary 201 Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 1 of 22 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right -of way or through Joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://online.manuals.txdo_t goy/txdotmanualsless/ess.pdf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents I_ City of Fort Worth Contact Information II, Construction Colors III. S*andard Staking Supplies IV. Survey Equipment, control. and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VIL Starrn Staking Vlll. Curb and Gutter Staking Ix. Cut Sheets X. As -bull t Survey Survey m,taking Standards - February 2017 O TY OF FORT VIE)ORTH SANITARY SEWER F;u4BILiTATION, CONTRACT No. 94 --PART 1 STANDAPO CONS7RUCTION SPECIFICATION DOCUMENTS City Prolert No, 100421 Page 72 of 22 1. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 11. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS ; yf. 7- POTABLE WATER GAS OR OIL YELLOW TELEPHONE/FIBER OPTIC ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS PINK SANITARY SEWER IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hubs) 3/4" long Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 3 of 22 IV. Survey Equipment, Control, and Datum Standards X City Renchmarks All city benchmarks can be found here: htta Lf-ortwcxthtexas.goy/itsolutions/GIS/ Look for'Zoning Maps'. Under'Layers' , expand'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. ,A minimum of a 10 arc -second instrument is required. Il_ A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at leas: 1 occurrence evert, h months. C. Net►_+mork/V.R-S. arid static GP.S Equipment 1. It is rritiraI that the surveyorverify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additionat flel6 checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. ll. Network GPS sur;h as the Western Data Systems or SmartNet systems may be used for staking of property/ R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitant sewer, storm. drain, final grade, or ;anything that needs vertical gradine with a_tolerance of 0.25' or less, is allovied. D. Control Points Set All control points set shalt be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable} of the }point set_ Control points can be set rehar,'X' in concrete, or any Other appropriate item with a stable base and of a semi-permaner}t nature. A rebar cap is optional, but preferred If the cap is marked 'cOfltrnl point or Similar wording, Datasheets are required for all control points set_ Datasheet should include: A. Horizontal and Vertical Datum used, Exampfe: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations S. Grid or ground distance_ — If gmund, provide scale factor used and base point coordinate, Example: C.S.F.--0.999125, Ease point=North: C, East=O C. Geoid model used, Example: GE01D12A E. Preferred Grid Datum Survey Staking Siandards - Felbrua^{ 2017 CITY OF FORT WORTH SAIJITARY SEWEP REHABILITATION. CONTRACT NO. 94 -- PART 1 STANDARD COK15TRUCTION SPECIFICATION DOCUMENTS City Protect No. 100421 Page 4 of 22 Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Proiected Coordinate System: WAD-1983—StatePlane_Texas—North—Central—FIPS-4202—Feet Projection: Lambert —Conformal —Conic Fa lse_Easting: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.50000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —of —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS—North—American-1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Naming Convention below F. Preferred Deliverable Format txt csv .dwg job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) W. Preferred File Naming Convention This is the preferred format: City Project Number Description_Datum.csv Example for a project that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 5 of 22 Example Control Stakes w m d c 0 z 1-- _ O w -1 m F- `S > w w ir1016 EL.= 100.01 C p Ld Ld C.] 08 -3 d Ld LLr + J 0 LL oc z D z w L) 0 fix 5u eey Staking 5±andwds- Fpbruvi 2017 CITY OF FORT WORTH SANI ARY SEWER REHABILITATION, CONTRACT NO- 94 PART 5TAR3l3AIRQ {:()nrcTallFlO'hi SPECIFICATION DOCUMENTS City Project No. 1w�41 Page 6 of 22 V. 'luster Staking Standards A. Centerline Staking — Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required Ill. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VII. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional. Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking o Curves I. if arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Dater Meter Boxes 1. 7,0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans O. Fire Hydrants I. Center of Hydrant should be 3.0' behind proposed face of curb U. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water !Valves&!Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 7 of 22 e Example !Aster Stakes ZD I--( ft Si^oy Staking Standar is • Tebrt.,ary ;703 1 CITY OF FORT `NORTH SAN[TAIRY SEWER REMAREI-ITATION, CONITRA(7 NO- gq -PART i STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pro,Fr-t No- 100421 Page 8 of 22 V1. Sanitary Sewers Stakin A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required Ili. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VII. Stakes at every grade break Vill. Cut sheets are required on all staking Optional: Actual stakes shall consist of a SOD nail or hub set with a whisker B. Centerline Staking— Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94— PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 9 of 22 w— Ld M V) Example Sanitary Sewer Stakes ,J 7' /S SS II STA=3+710 � �, c-ate ll F u< fY �. orp. ` J213 � a �F Eg ¢ �n 4f, 'I II. Storm Serer & inlet Staking Su n,P,y Stakinp Standards - February 2017 CITY OF FORT WORTH SAN ITARY SEVVER RE!- ABIL;TA F)ON, CONTRACT NO- 1.94 — PART'] 7 STANDARD CONSTRUCTION' SPECIFICATION DOCUMENTS/� s y Cite Project No. 100421 P ajoe 10 of 22 A. Centerline Staking— Straight Line Tangents I. 1 offset stake every 200' on even stations IL Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking— Cut ves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing II. Standard 10' Inlet= 16.00'total length III. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes 1. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100421 Page 11 of 22 Example Storm Inlet Stakes FRONT (SIDE FACING (L-) BACK 01M FAdXmo FULM) Now 4 HLU M&AUM am "T" TA" -A EDGE � OF EVT NO FLAGGING REQUIRED - IN LIEU OFF PINK PAINTED LATH fi mm VAr" rr wM0 c" Pe- m,31 KCRIN -GRAIX 'M tw cr "Me mnFO OK ro FL A BACK {DOE FAMC R.O.W.) FMI 0 wit bxwLum FRONT (SIDE FACING -0- WrANDAMU DMOU Ur - MaV —QUAUIT - WA7'- ti al '41 bi EDGE OF FIKE OF MLEF FACE GF IMLET EME 0041MIM WUGH VHO W' TWE WNG tONr; NTAXED RACK dF -j(4 M MWME —ER-i-ci-F—AW—ME—NT— — Survey Staking Standlar&-. - February 2017 CITY 0-F -FORT WORTH SANI'fARY SEWER REHABIL11 ATION, CONTRACT NO- 94 - PART 1 STANDARD CONSTRUCTION SPECIFICUr tON DOCUMENTS City Pro)e,-t No- 100421 Pape 12 of 22 VIII. Curb and Gutter Staking A. Centerline Staking-- Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VII. Stakes at every grade break Vlll. Cut sheets are required on all staking Optional. Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted Exam ple Curb & Gutter Stakes FRONT (SIDE FACING $) FRONT ar FRONT T T (SIDE FACING MUTIMs SURE PC a FONT CIF CLWAIUFM {SIDE FACING TQ 0 o- q ff g PT + r '� BACK MNTF es OFFMT Is m (SIDE FAGGING R.O.W.) / RACK FOr r MM a`AURB T a y .j � N III I POINT 0 31 F I a III I I1! I KZNTNMR MAW Is � II TP TW OF MW sR" M a III I HUB EIfVAT10N o + fthm" rovers IN LIEU OF PINK PAINTED LATH � !J I � •�v r r f 1 TOP OF CURB 13ACK OF CURB FACE OF CURB � I �- ' r I7- FLOK-INE EDGE OF PAVEMEN Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100421 Page 13 of 22 Example Curb & Gutter Stapes at Intersection lei.. 10' O/S 1$1 WA-3+69 4 V., Ft00A W ti.✓ Si,rsQy Staking Stendard5 - FATUOry 2017 ciTYOF FORT WORTH 5AN"TARY SEWER REHANLITATION, CONTRACT 111:0, 9A —PART 1 STANDARD CONSTRUCTION SPEOFICA"ICIN DOCUMENTS City PrajPcl No. 100421 Wage 14a4'22 W. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name q. E- ' -in ha n-k- Standard City Cut Sheet City Project Date: Number: _ Project Name: _ ® TOTAL Staking Method: 0 GPS STATION IZI OTHER LOCATION: CONSULTANT/CONTRACTOR SURVEY CREW INITIALS ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET DESCRIPTION PROP. STAKED -CUT + FILL -LTI+RT GRADE ELEV. Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100421 Page 15 of 22 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Tots of pine eievations every 250 feet !-Horizontal and verticai point!; of inflection, curvature, etc. (Ail Fittings) Cathodic protection test stations Samplings stations Meter boxesf vau is (Alf sizes) Fire lures rite hydrants Got& valves (rim and top -of nut) Plugs, stub -outs, dead-end lines Air Release valves (Aft n V le rhm and vent pipe) glow off valves (Manhole rim t.,nd volve lid) Pressure plane valves C_lenr►Hng wyes Clean outs lcsing pipe (eoth end) over-M of pipes Turbo Meters Survey itakina rttandard-� - February 2017 CITY 01• FORT WOR r 1 f S�; rlTAgY $;1WER fiEH? BILR7e;rinn� �rnniTRAGT IuO. �# - PART I STANDIIARO CGNSTI UCT!GN SPECIFICATION DOCUMENTS City Proiect No. 100421 Page 16 tol 22 S. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. if the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. f r—, x saG'i'X �y'rvAP.romY a RdY _ OF'fi.'0 rob .1�3lW' d .VKI '.�•/I,f41 fMR 1.A21?AC+.�_ W3ri3J/td3b N3M35 .QA'y¢YS Rk a e pp , gg ks1; e� I E t I! g 1p smimt 1 2 f gg 4 y / T. 'fOjy� I I _Lirp'A '7 t Er Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 17 of 22 7w-r'+' ip*4 WCl,%70V AM SrA 0--r00 - I,-WL IFIA/D AV OA&W - "L IFIM ZM i awe A 3ALV.VE EMT WV/ATER RATE VILVE a NEDOCFR r IM IxtJ#W TO EXIST.Ir WATER 16ArX IeTEE MSTAW Nr2SCHD Sa&C STAotw r2WL •! )404 ilOV9�14EI.D '-IPF IPFIEDRCFR IiI XI, � T F t2` PJ? 1• oWE VN--VE F 12,4 VEfIl. AEA.4 STA 011MM W L x�n r; i9•►ras hm T a' Irnelsi4s AuTwil 22y j291F3£ E-Moxi S E 2gA6�lr no HlrX 6'f4WhW '►FE' 16 4rI E VAtYL -. f FI17E IA'CrW aw fs { RLF exrnva�r r�nD f'm ti P .(� 14WOArf VANE rc rA� '��d' Or ��. ``�` �.� � . 6v � .$ C•P. ,Q � Tudcx:,FtH.rortztrrn �, �� � � � Id r�{Ylr F=�;,f',F R F�•'r GJP i ` ~*)WW lul•DiP• :':d ` Etdr*OSSM Qf f( (j ST FJ.FK Tito yW r JP��F1.lirt'nwel 0 y7 JrWArfR iC_ FM fitw4/e66.193D .- .—._ r......_ E?�rS�EA ram of sop x, dw L I�E11�•P >l r }. £7ht. WZ VAUK aMTAfi trA f iK �� sryno � .tia orr..w.rr.�.,w bTA &MM _ MrK F=D M fsr a Odom = WW O-WMAs[y.r[751mz I•ECo-rVnzr•d v i 047VQFr.lLE�i W If EF JMFER PAW kdPl�W i4lW M�6Wp7r1rs6v *Mwmr TD pwff w wMep L-:rSG]o3�'.1 t4�16.7�Syl1 i p i i ism Is Pfe - _ Survey Staking Stamndard5 • February 2017 CITY OF FART WORTH SANITAlty SEWER REHABILITATION, C NTRACT N10- 94— P""T 1 STANDARD CONSTRUCTION SPECIFICNBON DOCUME":T5 City Project NoWWI Page 18 of 22 Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Page 19 of 22 - - i--��' �aw�w��j�=3 ���--_-�_--_= ate_ � Obviously the .csv or Axt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING FASTING ELEV, DESCRIPTION 1 6946257.189 2296079.165 726.09 SSMH RIM f� t O f, r C . 2 3 6946260.893 6946307.399 2296062.141 2296038.306 725.668 GV RIM 726.85 GV RIM C( - b!&-, 6i ,f- t 4 6946220.582 2296011,025 723.358 SSMH RIM 5 694619S,23 2296015.116 722.123 GV RIM 6 6946190.528 2296022.721 722.325 FH c� 8 7 6946136.012 2295992.115 719,448 WM RIM 4 8 6946002.267 2295919,133 713.331 WM RIM -rX ci-o- .4 9 6946003.056 2295933.418 711652 CO RIM ?,orjJF L1 2-o7- 10 6945984.677 2295880.52 711.662 SSMH RIM 11 6945986.473 2295869.892 710.046 WM RIM 12 6945895.077 2295860,962 707.72 WM RIM 13 6945896.591 2295862.188 708.205 WM RIM Vq:r' (A (- 14 6945934.286 2295841.925 709.467 WM RIM 15 6945936,727 2295830.441 710.084CORIM CC:•6$�}n £J 16 6945835.678 2295799.707 707.774 SSMH RIM f� 17 6945817.488 2295827.011 708.392 SSMH RIM 18 6945759.776 2295758.643 711.218 SSMH RIM 19 6945768.563 2295778.424 710,086 GV RIM 20 6945743.318 2295799.392 710,631 GV RIM 21 6945723.219 2295754.394 712.849 GV RIM 22 6945682.21 2295744.22 716.686 WM RIM 23 6946621.902 2295669.471 723.76 WM RIM 24 6945643.407 2295736:03 719.737 CO RIM 25 6945571.059 2295655.195 727.514 SSMH RIM 26 6945539.498 2295667.803 729,123 WM RIM 7D 27 6945519,834 2295619.49 732.689 WM RIM O�1CQ�d L� ©� 28 6945417.879 2295580.27 740,521 WM RIM 29 6945456,557 2295643.145 736.451 CO RIM r 30 6945387.356 2295597,101 740.756 GV RIM Ti4-6 . i> c AO S 31 6945370.689 2295606,793 740.976 GV RIM 32 6945383,53 2295610.559 740.408 FH 33 6945321.228 2295551.105 746.34 WM RIM 34 6945319,365 2295539.728 746.777 CO RIM 35 6945242.289 2295570.715 748.454 WM RIM 36 6945233.624 2295544,626 749.59 SSMH RIM 37 6945206.483 2295529.305 751.059 WM RIM �: ' 38 6945142.015 2295557,666 750.853 WM RIM �-T-AAAe . 39 40 6945113.445 6945049.02 2295520.335 2295527,345 751.971 WM RIM 752,257 SSMH RIM 41 6945041.024 2295552.675 751.79 WM RIMi 42 6945038.879 2295552,147 751.88 WM RIM 43 6945006.397 2295518.135 752.615 WM RIM �# 44 6944944,782 2295520.635 752.801 WM RIM 45 6944943.432 2295556.479 752.156 WM RIM 46 6944860,416 2295534.397 752.996 SSMH RIM Survey Staking Standards - February 2017 CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 -- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100421 Page 21 of 22 C. Other preferred as -built dliverabe Some vendor haveindicated thtit measier to liverthm|«or information format. Below isanexample spreadsheet that is also acceptable and can b obtained by request from the survey superintendent. - r2' ■ � � $ ƒ g � � . g ■ & , | a ■ - � - — ���- _ 9 ( £ ¥ § © � % � % ■ � k �ki � , ! � § $ d $ | � $ $ ■ � � � $ \ � - k § � � ! �I F J 0 ■ it | F. Rey -staking StaaMs February 2017 CITY OF FORT WORTH SANITARY SEAR HAEuT pomCONTRA(-'[wb94-M 1 STANDARD CON CT[ON SPECIFICATION WCUME 5 y Project No.1021 Page 22 of 22 017423-1 CLEANING Pagel of 4 1 SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning. for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. Section 32 92 13 --- Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fail on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 74 23 - 2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 7 8 9 10 II 2.3 12 2.4 A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer ACCESSORIES SNOT USED] SOURCE QUALITY CONTROL SNOT USED] 13 PART 3 - _F.xk;CUTION 14 3.1 1NSTALLE'PS INOT USED[ 15 3.2 EXAMINATION [NOT USED) 16 3.3 PREPARATION I NUf USED] f i 3.4 APPLICATION [NOS' USED1 1; 3a5 REPAFR I RESTORATION JINOT USED) IiJ 3.6 RE-FN+TA1,I,.AT1ON [ISOT USSEDI 20 3.7 LPTFLD joRl SITF. QIJALFrY CONTROL INOT USEb[ 21 3.9 SYST�.� STARTUP [NOT USED] 22 3.9 ADJUSITNG INOT US- F.1PI 23 3.10 +CLEANTNC 24 A. Gcncral 25 1, prevent ,acciumillation u f wastes thnt erPat� hwznrrinm.z rennrlltl{1135, 26 2. Conduct cleaning and disposal opeg-moos to comply w31ft laws and safety orders of 27 governing authorUies. 28 3. Do not dispose of volatile wastes y» ch as mit;eral spirits} nil or paint thinner in 29 storm or sanftwy dmins or sewers, 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an apprnved solid wasic disposal site or in an 32 Llte-mate m anz er approved by City and regulatory f rage;;-m-8, Cif y OF F^:i'T WORTIi SANITMY 13MVER REHAPT ITAf^Y"t, COMM eC7 NU. 4=1 - P,APT i STANDARD (.QNCTRUCTION SPEC!FWATION Duci)MENTS City P*oirct Nu- 100421 Revised h,iy 1, 21! 11 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of l l personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other 23 foreign materials from sight -exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts, blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior (Site or Right of Way) Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re -seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 74 23 - 4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities, and upon approval by 2 City, remove erosion control from site. 3 5. Clean signs, lights, signals, etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 9 10 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT wOr-TH SANITARY SEWER REHABILITATION, CONTRACT NO- 04 - PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Proje<;C No. 100421 Revised July 1, 2011 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 01 7719 CLOSEOUT REQUIREMENTS 017719-1 CLOSEOUT REQUIREMENTS Page I of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bands and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF PORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94—PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 01 77 19 - 2 CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b, Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 017719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report (if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR / RESTORATION [NOT USED] 18 3.6 RE -INSTALLATION [NOT USED] 19 3.7 FIELD IOR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 29 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 017923-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 1 SECTION 0175 23 2 OPERATION AND MAINTENANCE DATA 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products fixrnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 %2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. I00421 Revised December 20, 2012 01 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly -leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 £ Cover 10 1) Identify each volume with typed or printed title "OPERATING AND i 1 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings, 20 4. If available, provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List, with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. Crry nR FORT wnwrR SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 51 ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1, Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in fmal form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 4.8 1) As installed color coded piping diagrams CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 £ Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings (.1Ty OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 --- PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING INOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised December 20, 2012 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0178 39 PROJECT RECORD DOCUMENTS 017s39-1 PROJECT RECORD DOCUMENTS Page 1 of 4 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 1.8 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION ]NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CrrY OF FORT "NO R-Oi SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes, use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 23 ducts, and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch, the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor, subject to the 33 City's approval. 34 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where, in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents, coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction, and the actual location of items. CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as fmal Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 314 ATTACHMENTS [NOT USED] END OF SECTION IRevision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 33 01 31 - I CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 1 of 7 SECTION 33 0131 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements and procedures for Closed Circuit Television (CCTV) Inspection of sanitary sewer or storm sewer mains 2. For sanitary sewer projects all (existing: Pre -CCTV, proposed: Post -CCTV) main shall be inspected. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 —Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 33 03 10 — Bypass Pumping of Existing Sewer Systems 4. Section 33 04 50 —Cleaning of Sewer Mains 5. Section 01 32 16 — Construction Progress Schedule 1.2 PRICE AND PAYMENT PROCEDURES A. Pre -CCTV Inspection 1. Measurement a. Measurement for this Item will be by the linear foot of line televised for CCTV Inspection performed prior to any line modification or replacement determined from the distance recorded on the video log. 2. Payment a. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per linear foot for "Pre -CCTV Inspection". 1) Contractor will not be paid for unaccepted video. 3. The price bid shall include: a. Mobilization b. Cleaning c. Digital file B. Post -CCTV Inspection 1. Measurement a. Measurement for this Item will be by the linear foot of line televised for CCTV Inspection performed following repair or installation determined from the distance recorded on the video log. 2. Payment CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 3301 31 -2 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 2 of 7 a. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per linear foot for "Post -CCTV Inspection". 1) Contractor will not be paid for unaccepted video. 3. The price bid shall include: a. Mobilization b. Cleaning c. Digital file 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. City of Fort Worth Water Department a. City of Fort Worth Water Department CCTV Inspection and Defect Coding Program (CCTV Manual). The CCTV Manual is available for download on Buzzsaw. Location: Resources170 — Inspection ToolslStandard Construction b. City of Fort Worth Water Department CCTV Spread Sheet Log is available for download on Buzzsaw. Location: Resources170 — Inspection Tools\Standard Construction. 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Sanitary Sewer Lines a. Meet with City of Fort Worth Water Department staff to confirm that the appropriate equipment, software, standard templates, defect codes and defect rankings are being used, if required. 2. Storm Sewer Lines a. Meet with City of Fort Worth Transportation/Public Works Department staff to confirm that the appropriate equipment, software, standard templates, defect codes and defect rankings are being used, if required. B. Schedule 1. Include Pre and Post CCTV schedule as part of the Construction Progress Schedule per Section 0132 16. 2. Include time for City review (2 weeks minimum —Notification needs to be send out to Project Manager & Field Operation). 3. If CCTV is accepted by City, proceed with work. If rejected, coordinate with City per Part 1.4 A. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. B. All submittals shall be approved by the Engineer or the City prior to delivery. C. If inspected with Infrastructure Technologies I.T. Software per CCTV Manual provide video data per the CCTV Manual. Provide additional copy of video in Windows Media Audio/Video (.wmv) format for City Inspection review. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 330131-3 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 3 of 7 D. If inspected with other software provide video data in Windows Media Audio/Video (.wmv) format. Provide CCTV log in EXCEL spread sheet format -- The CCTV spread sheet log can be found on Buzzsaw. Location: Resources170 — Inspection ToolslStandard Construction. E. Inspection Report shall include: 1. Asset a. Date b. City c. Address and/or Project Name d. Main Number — GIS ID (If Available) e. Upstream Manhole GIS ID (If Available) f. Downstream Manhole GIS ID (If Available) g. Pipe Diameter h. Material i. Pipe Length j. Mapsco Location Number k. Date Constructed 1. Pipe Wall Thickness 2. Inspection a. Inspection Number (i.e. 1g',2"d,etc...) b. Crew Number c. Operator Name d. Operator Comments e. Reason for Inspection f. Equipment Number g. Camera Travel Direction (Upstream/Downstream) h. Inspected Length (feet) i. Work Order Number (if required) j. City Project Number (if required) k. City Contract Name 1. DOE/TPW Number (if required) m. Consultant Company Name n. Consultant Contact Name o. Consultant Contact Phone Number p. Contractor Company Name q. Contractor Contact Name r. Contractor Contact Phone Number 1.6 INFORMATIONAL SUBMITTALS A. Pre -CCTV submittals 1. 2 copies of CCTV video results on USB drive 2. 2 hard copies of Inspection Report and one pdf copy on USB drive B. Additional information that may be requested by the City 1. Listing of cleaning equipment and procedures 2. Listing of flow diversion procedures if required 3. Listing of CCTV equipment 4. Listing of backup and standby equipment CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 33 01 31 -4 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 4 of 7 5. Listing of safety precautions and traffic control measures 1.7 CLOSEOUT SUBMITTALS A. Post -CCTV submittals 1. 2 copies of CCTV video results on USB drive 2. 2 Hard copies of Inspection Report. A pdf copy on USB drive shall be submitted to the City Inspector for review prior to scheduling a project final walk through. 3. CCTV speadsheet log in EXCEL format — A blank copy of the CCTV spread sheet log can be found on Buzzsaw. Location: Resources170 — Inspection ToolslStandard Construction 4. Construction Plans identifying the line segments that were videoed. Include cover sheet, overall line layout sheet(s), and plan and profile sheet(s). 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS A. Equipment — Closed Circuit Television Camera a. The television camera used shall be one specifically designed and constructed for sewer inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100 percent humidity/submerged conditions. The equipment will provide a view of the pipe ahead of the equipment and of features to the side of the equipment through turning and rotation of the lens. The camera shall be capable of tilting at right angles along the axis of the pipe while panning the camera lens through a full circle about the circumference of the pipe. The lights on the camera shall also be capable of panning 90-degrees to the axis of the pipe. b. The radial view camera must be solid state color and have remote control of the rotational lens. The camera shall be capable of viewing the complete circumference of the pipe and manhole structure, including the cone -section or corbel. The camera lens shall be an auto -iris type with remote controlled manual override. Video Capture System a. The video and audio recordings of the sewer inspections shall be made using digital video equipment. A video enhancer may be used in conjunction with, but not in lieu of, the required equipment. The digital recording equipment shall capture sewer inspection on USB drive, with each sewer segment (from upstream manhole to downstream manhole) inspection recorded as an individual file in Windows Media Audio/Video (.wmv) format. City has a right to change the format from. WMV media to .MP4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 33 01 31 - 5 CLOSED CIRCUrr TELEVISION (CCTV) INSPECTION Page 5 of 7 b. The system shall be capable of printing pipeline inspection reports with captured images of defects or other related significant visual information on a standard color printer. c. The system shall store digitized color picture images and be saved in digital format on a USB drive. d. The system shall be able to produce data reports to include, at a minimum, ail observation points and pertinent data. All data reports shall match the defect severity codes outlined in the City's CCTV manual. e. Camera footage, date & manhole numbers shall be maintained in real time and shall be displayed on the video monitor as well as the video character generators illuminated footage display at the control console. PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. General 1. Prior to inspection obtain pipe and manhole asset identification numbers from the plans or City to be used during inspections. Inspections performed using identification numbers other than the plans or from assigned numbers from the City will be rejected. 2. Inspection shall not commence until the sewer section to be televised has been completely cleaned in conformance with Section 33 04 50. (Sewer system should be connected to existing sewer system and should be active) 3. Inspection of newly installed sewers (not yet in service) shall not begin prior to completion of the following: a. Pipe testing b. All manhole work is complete c. Installation of all lateral services d. Vacuum test of manholes 4. Temporary Bypass Pumping (if required) shall conform to Section 33 03 10. B. Storm Sewer Lines 1. Coordinate with City of Fort Worth Transportation/PubIic Works Department for CCTV equipment and cleaning requirements. 3.4 INSPECTION (CCTV) A. General 1. Begin inspection immediately after cleaning of the main. 2. Move camera through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of the main's condition. 3. Do not move camera at a speed greater than 30 feet per minute. 4. Use manual winches, power winches, TV cable, and power rewinds that do not obstruct the camera view, allowing for proper evaluation. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 3301 31 -6 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 6 of 7 S. During investigation stop camera at each defect along the main. a. Record the nature, location and orientation of the defect or infiltration location as specified in the CCTV Manual. 6. Pan and tilt the camera to provide additional detail at: a. Manholes, Include condition of manhole in its entirety and interior corrosion protection (if applicable) (Camera should pan the entire manhole from top as well as while lowering into manhole, also show complete view of invert) b. Service connections, Pan the Camera to get a complete overview of service connection including zooming into service connection Include location (i.e. 3 o'clock, 9 o'clock, etc...) c. Joints, Include comment on condition, signs of damage, etc... d. Visible pipe defects such as cracks, broken or deformed pipe, holes, offset joints, obstructions or debris (show as % of pipe diameter). If debris has been found in the pipe during the post -CCTV inspection, additional cleaning is required and pipe shall be re -televised. e. Infiltration/Inflow locations f. Pipe material transitions g. Other locations that do not appear to be typical for normal pipe conditions h. Note locations where camera is underwater and level as a % of pipe diameter. 7. Provide accurate distance measurement. a. The meter device is to be accurate to the nearest 1/10 foot. 8. CCTV inspections are to be continuous. a. Do not provide a single segment of main on more than 1 USB drive. b. A single segment is defined from manhole to manhole. B. Pre -Installation Inspection for Sewer Mains to be rehabilitated 1. Perform Pre -CCTV inspection immediately after cleaning of the main and before rehabilitation work. 2. If, during inspection, the CCTV will not pass through the entire section of main due to blockage or pipe defect, set up so the inspection can be performed from the opposite manhole. 3. Provisions for repairing or replacing the impassable location are addressed in Section 33 3120, Section 33 3121 and Section 33 3122. C. Post -installation Inspection 1. Complete manhole installation before inspection begins. 2. Prior to inserting the camera, flush and clean the main in accordance to Section 33 0450. D. Documentation of CCTV Inspection 1. Sanitary Sewer Lines a. Follow the CCTV Manual (CCTV standard manual supplied by City upon request) for the inspection video, data logging and reporting or Part 1.5 E of this section. 2. Storm Sewer Lines a. Provided documentation for video, data logging, and reporting in accordance with City of Fort Worth Transportation/Public Works Department requirements. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3.2016 33 01 31 -7 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION Page 7 of 7 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. See Section 33 04 50. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS INOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson Various— Added requirements for coordination with T/PW for Storm Sewer CCTV 03/03/2016 J Kasavich Various— Alternative to CCTV Manual, modified submittal detail requirements CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised March 3, 2016 APPENDIX GC-4.01 Availability of Lands NONE GC-4.02 Subsurface and Physical Conditions NONE GC-4.04 Underground Facilities NONE GC-4.06 Hazardous Environmental Condition at Site NONE GC-6.06.D Minority Owned Business Enterprise Compliance • MBE Special Instructions for Offerors • MBE Subcontractors/Suppliers Utilization Form • MBE Prime Contractor Waiver Form • MBE Good Faith Effort Form • MBE Joint Venture Eligibility Form GC-6.07 Wage Rates • 2013 PREVAILING WAGE RATES (HEAVY AND HIGHWAY CONSTRUCTION PROJECTS) GC-6.09 Permits and Utilities NONE GC-6.24 Nondiscrimination NONE GR-01 60 00 Product Requirements • CITY OF FORT WORTH WATER DEPARTMENT'S STANDARD PRODUCT LIST CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO. 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised Juty 1, 2011 G-G-6a06.D Minority and Women Owned ]business Enterprise Compliance e MBE Special Instructions for Offerors o MBE Subcontractors/Suppliers Utilization Form o MBE Prime Contractor Waiver Form ® MBE Good Faith Effort Form * MBE Joint Venture Eligibility Form CITY OF FORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO, 94 — PART I STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 Fowl, WO T14 City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR FFERO APPLi CATION OF POLICY If the total dollar value of the coniract is $50,000 or more, titer a MBE suhconiraotIng goat is eppIfcabie. POLICY STATEMENT it is the poiiq of the City of Fort Worth to ensure tho full and equitaDle participation by Minority Business Enterprises (MBE) rn the procufem"t of all goods and servlces. All requirements and regulalions stater) in the City'& current BUSines Diversily Enterprise Ordinance applies to this bid_ Thai 0 ly`s MSE owl cii 1IMi. projecl v, 11 MBE PROJECT GOALS % of IIto Liasn bj0 vajuo of the Cori Ct. Noll 0; If halh MBE and S$E isu In en ntracti n p goal aro Putnbtlah#d for thIs proiar#, then an Offaror inusI submit bo;ft a MOM Vidoxallon Fe nn and a 5BE Utilization Form to hD deamed respar s ive_ COMPLIAN E 19.8ID_. iPECIFIDATION On Cfly contracts $550.0010 or more where a MBE subcoritracllnrg goal Is EippIIed, Offerors are- repuirod to comply wNh the Intent of the C`,iity's Business Diversity Enterprise Ordinance by one oI 111e following, 1. Meet or exceed the Above stated MBE goal through MBE subcantractIng parti!c1patlon, or 2. Meet or exceed the above stated M 0 k goat through MBE Joint Venture participation, or, 3. Good Faith Effort documentation, or; 4. Prime Waiver documerltalIon, SUBMITTAL OF REQUIRED DOCUMENTATION Tne app4cable documents rriu qe F6FCUlVed by the Purchasing Divistorl, within the rollowing #Imes allocated, in &dtr for the antire bid to be considered responsive to the speclfleations. Tht+ Off r f1w MBE dncumerptallorll ki . ,cal to ti -jppmpiJWP orrlplayne nI 1h0 purrha%Inq divi Mari in id t)kamhl o dwv)lII-no femillm Syu;h lotolpt Shall i)l' t_ViLif;fxwn thal 010 Katy rerelft.d the dDcumenialimi In the Ilrnit! allu ;atf:d. A faxed andlor omallod copy will not fit: 4tccepled. 1. Subcontractor Utilization Farm, K goal Is rerelved no tafef Ihan 2,00 p.m., on the second City ho-c less day met or exoesded. after Jhe bld opening dMiti, exclusive of the bid o entng date. 2. Good Faith Effort and uhcontractor received no later than 2:00 p.m., on the second Clly business day Utiltzetion Form. it particlpatfon is less thafr after the bid opening date, axcluslvo of the bird opening date - state d gaBl: 3. Good Faith Effort and Subcontractor reL:elved no Dater than :00 p.m., on the second City business day Utill lzation Form, If no MBE par Iff i patton: after lire bid openingopenIng date. exclusive of Iha bid op enin g date_ 4. Prime Cont ractar Waiver Form, of you wall received rio laler than 2,'00 p.m=, on the second CIty business day erfofm all su bco n I ra4' A ng/sup pher work: efter the bid opening tfate, excluslve or the bid opening date_ 5. ,point Venture Forin, If goal IS mel or received no I€atef than 2.00 p.m., on the second City hus0e%s clay exceeded; after the bad o enln date, exclusive of lha bid opening date_ FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVER iTY ENTERPRISE ORDINANCE, WILL RESULT IN THE 191D 5EfNG CONSIDERED NON -RESPONSIVE TO SPECIFICATION . FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID 13E!ING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES ICE A FIVE YEAR PER10D WILL RESULT IN A DISOUALIF1CAT(ON PERIOD OF THREE YEARS. Any questions, pl*aep contact the MfWBE Offica at (817) 212.2674. Rev. V10115 ATTACHMENT 1A Page T of 4 FORT WORTH City of Fort Worth Minority Business Enterprise BE SubcontractorsiSuppliers Utilization Farm OFFEROR COMPANY NAME: Cheek appftable block to deaaribe Orfertr PROJECT NAME: M11+ +OBE I-10r.I Xf`W oral SANITARY SEWER REHAB)LITATION. CONTRACT NO. 94 — PART 1 810 DATE August 8, 2019 City's ME Project Goal: Offeror's MSE PrOjer I COIRMilm+xrt: PROJECT MUM HER 11 % 100421 Identify all subcontractorstsuppliers you will use on this project Failure to complete (his farm, in its entirety with requested documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, a clusi+re of bid opening date, will result in the bid being considered nary -responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the N1BE ffrm(s) listed In this utiilration schedule, conditloned upon execution of a contract with the City of Fort Worth The intenlional andlor Knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specificatliens. MBEs listed toward meeting the project goal must be located In the six (6) counter Marketplace at the time of bid or the business has a Significant Business Presence In the Marketplace. Marketplace Is the geographic area of Tarrant. Dallas, Denton, Johnson. Parker, and Wise counties. 'rime contractors must 1,derktify by tler level of all subcontractorslsUppliers. Tier: means the level of subcontracting below the prime contracloriwnsultant i.e. a direct payment from the prime contraclor to a subcontractor is considered 1" tier, a payment by a subcontractor to its supplier ks considered 2 "d tier, The prime contractor is responsible to provide Proof of payrnent of all gered subcontractors Identified as a MBE and counting those dollars towards meeting the contract cormmitted goal. ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located wtthIn the Marketplace, that have been delerwined 10 be a bond-tfide (Timorily business entmrprise by the North Ceniral Texas Reg lonal CartlfIcation Agency (NCTRCA) or outer cartifyin g agencies that the City may deem appropriate and accepted by the C i I y of Fart WWh. It hauling services are utilized, the Offeror will be given credit as long as (he MBE listedi awns and operates at Jeasl one fully licensed and operational truck to tie used on the contract. The IMSE may lease trucks from another MBE firm, lincludiing MBE owner -operated, and receive full kMBE credit. The M13E may lease (rucks from non-fl BIEs, including owner -operated, but wJIJ only receive credit for the fees and commissions earned by the MBE as oyl.hnod in the lease agreement, Rev. ;v I0115 ATTACHMENT 1A Page 2 cf 4 Offerors are required to identity 4�LL_ subnan#ractof s�ppllurs. migardlerw of stains; I.e.. MIncrAy and non-M91*s_ MBE PrM3 aru 10 be 11sled first, use additoana[ sheets if necessary. Please note that only certified MUEs wlII be counted to meet aft MBE goal_ SUBCONTRACTORISUPPLIER Company Name Address Talepfnonetrax emai€ Contact Person T I r NCTRCA N 8 " E Detail Subcontracting Work Detail supplies Purchned Dallar Amount $ z B E I �f Rev_ ,2110115 I.-bETWORTH A77ACN[u4EtJT 1A �R Page 3 of 4 Offerors are requb3d to Identify ALL subcontrantoWsuppiiers, cegartflu5s of stales: i,a_, Minorily and nDn-MeEa MBE firrrks ana la ba IIsted first, use addilIon al. sheets if necessary. Please note that arniy certlfied MBEs wlli be uountad to meet an MBE goal_ NCTRCA NJ "SUBCONTRACTOWSUPPLIER Q Company hiame T fl detail Detail Address i Subcontracting Supplies M UV Subcontracting Amount TeiephonelFax e B M Work Purcho5ad Email f E E S Contacf Person E El D EJ El Rev, W(Y15 F R-1-WOO.1-11 ATTACHMENT to Pape'l cif 4 Total Dollar Amount of IM UE Subcontractexsl uppljors 1 Total Dollar Amount of Non-IMfIBE SUbcoritractorsl uppliers 1 TOTAL DOLLAR AIMA UNT 0 F ALL SUB ONTRA TORSI U P PL I E IRS 1 The Offeror will flat make additions, deletions. or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal cf a Request for Approval o harrgelAdcfrfrfon form. Any unjustified change or deletion shall to a material breach of contract and may result irl debarment in accord with the procedures outlifled in the ordinance, The Offeror shah submit a detailed explanation of how the reg1jested changeladdition or deletion will affect the committed MBE goal_ If the detail ext lanotion is not submitted, it +mill affect the final compliance determination, By affixing a algnature to this form, the Offeror fUnher agrees to provide, directly to the City upon request, complete and accurate information regarding actual wort[ performed by all subcontractors, Including MBE(s) and any special arrangements with IVIBf s, The Offerer also agrees to allow an aud-It and/or exarninaftori of any books, records and fNes field by lheir company_ The Offeror agrees to allow the transmission of interviews with owners, principals. officers, employees and applicable subcontractorslsuppilers participating on the conlract that will substantiate the actual work performed by the MBE(s) on this contract. by an authorized officer or employee of the City. Any intelntionaI and/or knowing m isre pre sen tatic n of facts will he grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for InIflating action under Federal. State or Local laws con erning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of tirne not less than one (1) year. Authorixid Signature Tltio Company Mama Address POnlod Slgnalura Contact Nam4aMle of difforent) Telephone andiar Fax E-mall Address crtwstator£ip i]ato Row. PJIWIS FORT WORT" City of Fort Worth Minority Business Enterprise Specifications Prime Contractor Waiver Form PROJECT ATTAC:HMErxlr 'I8 Page 1 of 1 Check nppiicabro hIock to dmmrib* A FARY SEWER REHABI LITATION, CONTRACT NO- 94 — PART 1 August 8, 2019 City'a WE Pro)act Goal. Offerer's M$Ir Prvlact Commi#monk; PROJECT NUM3ER 1 1100421 If both answers in this form are YES. do not complele ATTACHMENT 1 G (Goad Faith Effort Form), All questloas on this form rnual be completed arid a detailed explanation provided, if applicable. If the answer to ellher question is NO, then you !Ilujs complete ATTACHMENT 1C. This form is only applicable If tuWh answers are yes. Fa#furo to complete this form in its entirety and be received by the Purchasing Division no later than 2:00 p.M., on the second City business day after bid oegning, exclusive o€the bid openIng date, w1II result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanatlori that proves based on the size a3fid scope of Ihis N0 project, Ihlr* is your normal 11U91ness practice end provide an opereticnat profile of your business, Will you perform this entire contract wlthoUt suppilers? YE If yes, please provide a detailed explarki icin that proves based on the size and scope of Ihis project, this is your normal business practice and provide an lnventory profile of your business_ NO The OHerar further agrees to provide, directly to the City upon request, completu and accurate Inf6rmatf'on regarding actual work performed! by all subrontraclors. Including h4BE(s) on this contract, the payrnent Chereof grid any proposed changes to the original I IBB(s) arrangements submilted with lhis bid, The Offeror also agrees to allow an audit and?or examination of any books, records and filar held by their company thaI w1iI substantiate the actual work p-erformed by the MBEs an Ihis contracl, by an aulhorized officer or employer of the C11y. Any Intentlonal and/or knowlhq mistapr$serttatlfln of facts will be grounds for terminating the contract or debarment from City work for a period of not lass than three (3) years and for initiating ectlun undar Federal, State or I-oual lakes concern Ing false slatemants. Any fallure la comply with this ordinance creates a material breach of i:onlraot and may result In a determinallon of an irresponsible Offeror and barred from participaling In City work for a period of time not less than one (I) year_ Aulhanzed SIgnaloxre Gompany Name Address Printed Signalure Cantad Name �It drfforeni) Phone dumber Fax Number Address Qy1srate0p Dale Rev. 21IN15 Fi(-)f T- Wo wm OFFEROR COMPANY t4►ME; PROJECT NAME: City of Fort North Minority Business Enterprise MBE Good Faith Effort Form ATTACHMENT 1C Page 1 of 4 Check appli=We black to dmcr�be ANITAR`( SEWER RE HABILITATION, C ONTRACT N0. 94 -- PART -I August 8. 2D19 City'. MBE Project Goal. Offeror'. MBE Prolac( ComniRmen1: 11 % 1 % �100421 If the Offeror did not ineet or exr.eed the MBE subcontracting goal for ihIs proj0ut. the OFferor M us complete this fQP.M. It the Offreror"s method of compliance with the MBE goal is based upon* demonstration Df a "goad faith effort". the Offeror will have the burden of correctly aped accurately preparilig and submitting the documentetiont required by the City. Compliance with each item, I thl-U 'I I below, shall satisfy the Goad Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or Intentional discrimination by the Offeror. Failure to complete this form, In Its entirety with supporting documentation, and r"eived by the PurGhasing Division no later titan MO p.m. an the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non -MBE. (DO NOT LIST NAVIES OF Fl� RMS1 On ali projects, the Offeror mast list each subcontracting and or supplier opportunity regardless of tier. Ray. 2110115 ATTACHMENT 1 Page 2 of 4 2.) 0Mai n a current {not more than two () inonths old from the bid open date) list of M 8 F SUhCont ractors and/or-,;upp1lem from the City"s M/WI3E Off ire. Yes Date of Listing No 3.) Did you soIIcIt bids from MBE fIrrns, within the 5Ubcontractinq and/or Supplier areas previously listed, at least ten calendar days prior to bid opening by rnail. exclusive of the day the bids are opened 7 Yes (if yes, attach MElE mail listing to include nama of firm and addrxrss and a datod copy of latter mailed.) No 4,) i]id you solicit bids from M8I° firms, within the subcontracting and/or Suppher areas previously listed, at least ton calendar days prior to ibId opening by telepho€Ie, exclusive of the day the bids are opened? YOS {If yes, attach list to incIudo nr+mff of MBE firm. parson contactod. phono number and Craw and tEma of contact.) No 5.) Did you solicit bids froin MBE firms, within the subcontracting and%or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? Yes (If yas, attach liat to includo rin of MBE firm, fax number and date and t{ma of contact. In addlllon, if tho fax is muirned as undelivarablc, then iha! "'und*Waruble tonflrmation" rocaivnd must be ptlnted directly from the facsimile for proper documentation, Failure to submit confirmation and/or "undeiivorabia oonilrrnatlon" dururnanlallor; may Vendor ihn G F E non -responsive-) No S.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previotsly listed, at least ten calendar days prior to b€d npenI ng by email, exclusive of the day the bids are opened? Yes (If yes, a#taOk small canfirmation to Include raatkre of MBE firm. AaLe and ice, In 9011.10n, Ef i�n emimil Gr. returned ar. tindedverable, than chat "undelIverable mersage" recelpt mir9t be prGnked directly from the email syslem for prober do"lnefitiAtlon. Fallurt- #n submilt canflematEpn and/or "uride llyi2rable message" tloourrreniatiark may rartifor Zhu GFE non- rip uponslv&) No NOTE. The four methods identified above are acceptable for soliciting kids, and each selected method must be applied to the applicable contract. The Offeror inust document that either at least two attempts were made Ll5€ng two of tale four inothads or that at least one successful contact wag made ixsing one of the four methods in order to be deemed responsive to the Goad Faith Effort requirement. NOTE. The Offeror must contact the en ire MBE list specific to each subcontracting and supplier opportunity to be In compiIarice with questions 3 through 6- 7.) Did you provide plans and specifications to potential MBEs? Yes No 8.) Did you provide the information regarding the focation or plans and specificaations in order to assist The M9fi$7 Yes No flu v- 211 W 15 ATTACHMENT 4 Page 3 of 4 9j Did you prepare a quotation for the MBEs to bid on goodslservices specific to their skill Sint? `des �1f yas, 4;11aoh ill coryfes; of qu(Hal ions. No 10.) Was titre contact Information are any iaf the listings not valid? Yes (If yes, aURGh 114e JrlfQFITlaftn i131.11 was nol valid In order for Ilre UMBE office to addrin%s the comet:tlons No 11.)Submit doctlrnentation if MBE quotes were rejected. The documentation submitted should be in the farrns of an-aff!davit, include a dotal led explanation of why the MBE was rejected and any supporting documentation the OfForor wishes to be considered by the City. In the event of a Dona fide dispute concerning quotes, tho Offeror will provide for confidential In-canyebra access to an inspection of any relevant docurnentatiorl by City personnel. fora w irco ar#r0111nnal.chawrc !fYlnroeeam Atpei,atrar.h I Company Narne Telephonel Contact Person Scope of Work Roason for Ike ection ADDITIONAL AL INFORMATION: Please provide �idditional Information you feel will further explain your good and honest efforts to obtain MBE participation on 1his project, The Offeror further agrees to provide, directly to the City upon regUest, Campiete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allover an audit and/or examination of any books, records and files Reid by their company that will sixbstantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing m1srepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three () years and for initiating action under Federal, State or Local laves concerning false statements. Any failure to comply with this ordinance stall create a material breach of contract and may result in a determination of are Irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Rev. V10)15 ATTACHMENT 1 Page +4 of 4 The undersigned certifies that the information provided and the MBEs} listed ►eras/were contacted in good faith. It is understood that any MBEs} listed in Attachment 9C will be contacted and the reasons for not using there will be verified by the ity's MNVBE Office. Autharix" SignEdure Title Company Name Add res s Citylstetealp Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Fax Number Ray. 2JIOfl 5 JoInt Venture Paige 1 of 3 CITY OF FORT WORTH MBE Joint Venture Efitribility Form r1 f1 que-SVIPYI ' u#&W ke mmwered. me " ir1 " if oral applicalAp NNMe 0f City project: swNITARY,9EWERRF;HAFil.ITATION,CONT ..rt4O. spa -PART i, csiyProjocl Na. ium2l A jLAM Y�gllure rimik must be. Co1Tllildled {in rjwJi pmject RFPIBid[PurchaRing N'ti ber: 1. ,Joint Venture idfornkli ien: Joint Venture Name: Joint V=ture Addmsla; Tolephone; Fmiirahw E-Tooii address; Cellular: Identify the firms that compriw the join# venturc: PWSe 4fjaGh oxfia sh Rato if 0"Jjorra+ sV=ft-is Yegtjfred fo provide def€a&d exp#ansliaus of work fo be pvrfomiisd by oach Am comer fzr nV UT& Pfrrf vonture Moe firm Fla me* Np -MIIE IIrm 1111 me: B uNirws$ Ad¢Tm'.. Bu%iims4 Ackb -m! City. slate, Lip: City, slolc, Zip. 'I'VIC01111kC FEGSIInilc F-Mail Trlephnor FP�S]!A]IG ['ellviOr Cellular Certirrestiva Status: ftddress Nakne of Cerdrying Agenicy: L. ZWOP COT WOI L{ IWA01'Mell DY IIle JOIIiI Vcut tffe: Aeowribe the scape of ►vork of the 14'fBE: I Describe Iho xcoue of work of the uon-NiBE- Ra v. 211 Gf7 6 Jcartl Vanlure Page 2 o! 3 3. Wlint h the perceninge of NfBT pnTfic!pation on this joint venture that you wish to be counted toward ineeting the project goal': d. Attaeb a copy or the joint venture agreement. 5. Lisi compuueata, of Givnership ofj4fnt venture: lair 0201 vufflplere if fi+Fs igformafion is dercribril In juiml ivnifom tfgmLyrttew) Prnfit and 1oH9 y�aring: Capital oontribution>s, including equipment. 01her appiicubIQ owneship interests: G. Identify by nanie, race, "s n nd firm those individuate (with Gu ) wbo are r ponsible for the day-to-day mztaagement and dechion malking of the joini venture: Finnncial deniaicta-i (in insludw Xorvuur Pop{tbla ewsd Reudva4Ja): M:magemeni dccisinm: El. EaiurmtYng b, Markeling and Sates — c, Hiring and Vilring ofmanugernenl personnel d. Puvchmingofmajor equipment anchor suppliw Supatvision of fibld opemdcebs The C fty's MInotity and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied Ioward the goal for the project listed on this fora. NOTE: From and after the date of project award, If any of the par#Icip2nts, tha Irid lvldi,ally deflnid sc Pas of work or the dollar amountslpercentages grange from the ortglnally approved Information, then the participanls rust Inform the kty's MIWBE Office Immediately for approval. Any unjusfifleci ch' ange or deletion shall be a material hreaolt of cantracl and may result In debarment in a nd with the procedures outIaned in the ity's BDE Ordinance. Rev. 211 Oil 5 Joint Venture Paw 3 of 3 FFIAVTT Thy, undersigned affirms that the foregaing stafeme€tts are true and correct and include -all material informotiou ii=x, nary to identify and explain tlne tarns and cTc ation of the Joint venture. Furthprmore, the undmiwicd shall agree to }provide to the j *in t vertture the staffed gcol of work. decision -making mspomiibil#ties and payments heroin. The City also reserves flue right to iAtieat any additi*nRI information deemed necessary to delurmine i f Ihcioirit venturb is e]igible— Failure to cooperate and/orprovide rNuested infornnation within the i.imie specified is gn'c>unda fa€ te€mi.ngtion of the eligibility process, The undersigned agree to permit audits, interviuws with owners and examination or the books, retards and files of the joint venture by any autir(rir n'q)resentatives of [lie city of Turn Wnrlln. Failure to comply with Ibis provision shall result in the terminatimn of any contract, which luny be awarded under kite provisions of this joint vemuiv's eligibility and may initiate action kinder Federal, State andfor Local Imyslordirnances conceming fala Alatements or wilI!i misEep #atio of facts. � .. . Name orMBE film e ofnon•MSE firm Printed Nawit oMwhcr Primed Nww or owner SIgnollic01'OhV u Signntmeof0wRcr r'rintrJ NaTimul'Owncr Plinlf.i htnmc Or()M)Cr 5igeelarc �rfOwrur 8f matu�cuf Owner 71tle Tin4 Met ]ale State of Notarizadou cc=ty of n this day of , 20 , before me appeared and to me persona ly known and who, being duly swom. did execute the foregoi.ig affidavit and diet state that they were propely aiclharized to execute this afldavit and did so as their free act and deed. INoiary Public ]dowry Publfu sigrrntum Commission Expires (Seflo R ay. 714 0115 %IffC-6o07 Wage Rates 0 2013 PREVAILING WAGE RATES (HEAVY AND HIGHWAY CONSTRUCTION PROJECTS) CITY OF PORT WORTH SANITARY SEWER REHABILITATION, CONTRACT NO.94 — PART 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 100421 Revised July 1, 2011 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 5ervicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Baton Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 ORTWORTHO CITY OF FORT WORTH WATER DEPARTMENT T STANDARD PRODUCT LIST Updated: April 12, 201 1-9 The Fort Worth Water Department's Standard Products List has been developed to nainLr-nize Lhe submittal review of products which meet the Fort Worth Water Deparnent's Standard Specifications during utility construction projects. 'When Technical Specifications for specific products, are included as part oft the Construction Contract Documents, the requireT ic.nts of the Technical Spec3#icatior; will override the Fart `Worth Water Department's Standard Specifications and the Fort Worlh Water Department's Standard Products List and approval of the specific products will he based on the requirements of the 'Fechnical Su1ecification Whether or not the specific product meets the Fort Werth Water D►eparLment's Standard Specifications or is on die Fort Worth Water Department's Standard Products List. Table ®f Content (Click on items to go directly to the page) Items Page A. Water & Sewer 1. Manholes & Bases/Components........................................................... 1 2. Manholes & Bases/Fiberglass............................................................... 2 3. Manholes & Bases/Frames & Covers/Rectangular ............................... 3 4. Manholes & Bases/Frames & Covers/Round....................................... 4 5. Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight .. 5 6. Manholes & Bases/Precast Concrete .................................................... 6 7. Mant-kcleg & Bascs/Rehab Systems/Cementitious,,,,,,,,,;,,,,;,,,,;,,,;;,,,;,,; 7 8. Manholes & Base-SiR h:,lb Syste ins/N' u ii Cement i 6 ous ..:...................... 8 9. Manhole Insert (Field Operations Use Oiliv) ........................................ 9 10, Pipe C:`ashng Spacer ........... ....... :....... ............................... ...... ............... 10 11. PipesMuctiie iron.........:..:.�....................... ;.,............................ , 11 12. Utility Line Marker ..................... .................. .......................................1Z B. sewer 13, C'oatings.fFpoxy..................................................................................... 13 14. Coatings/Polyurethane.......................................................................... 14 I S. C t)nyhinatinn Air Valves ....................................................................... 15 16.Plpes/Coincre-te......................... .......,.,............. ....................................... 16 17. Pip-- Enlargerne tt Syctfem Neihiod'} .. ,— ...... 17 18. PipwRiberglas3 R.einLorced Pipe .................. 19. I iYPsI±TDPr............+.................... yF.......... ....... ,+ ............................ F.,..... 19 20. Pipes./PVC (Pressure Sewer)........................,.......................20. 21 _ Pipes/ C"' ................... k....... ._,,. ,..........................................: 21 22. Pipes/Rchab/CIPP......................................... .............. ....,.,.................... .... 3. Pipes/Rehab/Fold & Fumi.................................................................... 23; 24. Pipes/Open Profile Lwg-c Diarneter..................................................... 24 C. Waler 25, Appurtenance& ....................................-.................................................. 25 26. Bolts, Nuts, and Gasketq ...................+.........;+.........+...........................:F.. 26 7. C'ombination Air Release Wye ..+:...,,.,+. . .................................. 27 2.8. Lary Barrel Fire Hydrants ............. .............................. ........................... 28 29. Meters................................................................................................... 29 30. PipesW (Pressure Water)................................................................. 30 31. PipesNahres &. FittingifDuctile Imn Fittings ......................................... 31 32. PipesM lves & FittiBgslResilient Seated Cate Valve ..:......t.,,%,....... ,... 3 33. Pipe"alyes & Pittingsl libber Seated Butterfly Valve ...:::#:,..+P,4+.::....31 34. Polyethylene. Encasemew,....................................................................34 35, Sampling Stations................................................................................. 35 E ir 0 i� a2 �5 'a A A A C3I v ee}} v o o a a o Y 0 0 � 0 0 1 0 'u 00 00 � E 00 00 &k al 4 � Xl u � CE u. � o h Y E s � � J - 4 AS �? le T z a � G L L .G � K I'l M �'1 � T'F •TI O G�V� 0 0 rJ O G O o _ � � � � k C � 0 m § -w -Lo % § | & f \ } | | o u o u U u c (q f 2 « ? ? # � � — k } $ 7) { 2 § ± t � ® 4 k � a - $ \ ƒ § } ) } � 2 ` b § k � k $ \ | �\ -j� � /see/e/,a m k m m■ k k ; n % q Q » ; § . � r. SC m 9iff T rl op Mni I d d o I.� 0 n d. F� e' c y 1y _ Li w e YYy4y O a rn r. n g k � � n \ � } } 2 2 � ±34 | | LP � ))� m m 7 AM A / 2 § � � � � cu u k n § . \k\ \\\ � / § f \ 2 § i ■ � t Lo m 46. 40 a g O, U m Al. woo 4 v m v v s F-� w 14 H N 9z 0 CI? N N �_ O s F OFG N N -71 g a u v ce IR a 4P4 Fri CI] f.� I= F a ■F i Csi I� a 04 PW I I ` PC O i d 9 0 qr g 'r G4 i W 14 W IL w iS Iu µi Lci I1� li1 .n 6 N W A _ Q\ 0 M w ter/ iu y C L H ri N .f'y r N 1 G LO 1 W � �ti °^Vim d A � w 4� a .y A r-a .� _ L y+ n rn rn r� in 0 44 �. u M I I �I M V � � h O � U Vi C.) �e�i U �n V In U U U f C I � x 9 F, p6S �Tj iJ y L�s ll � w � i L�+ 9 4 y Mh �y ■ p y� 11 J � ri y U l7 43 C7 7 +� a C7 4i s } IZ } } } 4 }T}�+ ti 4 �t Fl 'x' �t 'S2 't % !J tI +L!���! R ] a ia �j �•'CF O L4 O 6 +p� 6 f 6� i'Yi iY. Ty L* F 21 Rd P4 W LU :i7 h M _ M m �4 FA