HomeMy WebLinkAboutContract 53017 Received Date: 11/05/19
Received Time: 9:48 AM
Developer and Project Information Cover Sheet:
Developer Company Name: HRUS Alliance,LLC
Address, State,Zip Code: 609 Main St. Suite 2400,Houston,TX, 77002
Phone&Email: 713-237-5600,mark.coveraa,hines.com
Authorized Signatory,Title: i Mark A.Cover, Senior Managing Director/CEO
Project Name: Northlink Logistics Center Major Infrastructure Improvements
Brief Description: Water, Sewer,Paving
Project Location: Generally located Southwest of the intersection of Hwy 114 and FM
156
Plat Case Number: Plat Name:
Mapsco: Council District: 7
CFA Number: CFA19-0089 City Project Number: 102188
City of Fort Worth,Texas ----
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improv '601CiAL RECORD
CFA Official Release Date:02.20.2017
Page 1 of 11 CITY SECRETARY
FT. WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 53017
WHEREAS, HRUS Alliance, LLC , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto("Improvements")related to
a project generally described as Northlink Logistics Center Major Infrastructure Improvements
("Project")within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth,as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infi•astructure Improvement
CFA Official Release Date:02.20.2017 �0 ��� �� ,
Page 2 of 11
FT.WOM'
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ®, Sewer(A-1) N, Paving(B) Z, Storm Drain(B-1) _, Street Lights & Signs
(C) T
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253,Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CIA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total f 40/( of the developer's share of
the total construction cost as stated in the constru:tion contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent.(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements thin two (2) years, provided,
however, if construction of the Improvements 4as started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1)does not
boycott Israel; and(2) will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name:Northlink Logistics Center Major Infrastructure Improvements
CFA No.: CFA19-0089 City Project No.: 102188
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 297,558.00
2.Sewer Construction $ 232,633.00
Water and Sewer Construction Total $ 530,191.00
B. TPW Construction
1.Street $ 82,614.00
2.Storm Drain $ -
3.Street Lights Installed by Developer $
4. Signals $ -
TPW Construction Cost Total $ 82,614.00
Total Construction Cost(excluding the fees): $ 612,805.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 10,603.82
D. Water/Sewer Material Testing Fee(2%) $ 10,603.82
Sub-Total for Water Construction Fees $ 21,207.64
E. TPW Inspection Fee(4%) $ 3,304.56
F. TPW Material Testing(2%) $ 1,652.28
G. Street Light Inspsection Cost $ 1
H. Signals Inspection Cost $H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 4,956.84
Total Construction Fees: $ 26,164.
Choice
Financial Guarantee Options,choose one Amount 'fi',arfr one
Bond=100% $ 612,805.00 x
Completion Agreement=100%/Holds Plat $ 612,805.00
Cash Escrow Water/Sanitary Sewer—125% $ 662,738.75
Cash Escrow Paving/Storm Drain=125% $ 103,267.50
Letter of Credit=125%w/2 r expiration period $ 766,006.25
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories
effective as of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
HRUS Alliance,LLC
Dana ur 1 4 1Ho r
Dana Burghdoff ov 1,2019)
Dana Burghdoff
Interim Assistant City Manager
Date:
Nov 1,2019 Mark cover( ct 5,2019)
Name: Mark A. Cover
Recommended by: Title: Senior Managing Director/CEO
KI &- Date: Oct 25, 2019
Evelyn Rob ..
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing,I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
�d A4CC4-A4&y requirements.
Richard A.McCracken(Nov 1,2019)
Richard A. McCrackeny1._
Assistant City Attorney J,nn,1e,Ezernac4 1,, 11-1 2,119'
M&C No. NSA Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A FORTA.
ATTEST:
Cj X
Mary J.Myse,
WGL�
Mary J.Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort Worth,Texas `
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvern ]OFFICIAL RECORD
CFA Official Release Date:02,20.2017 C' SECRETARY
Page 9 of 11
FT WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attac ent
�9 Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
® Exhibit A:Water Improvements
® Exhibit A-1: Sewer Improvements
Water and Sewer Cost Estimates
Exhibit B: Paving Improvements
® Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
CJ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 102188
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Northlink Logistics Center Major Infrastructure Improvements
CFA Official Release Date:02.20.2017
Page 11 of 11
W 4242
run RONo9AL
Nylofl
NORTHLINK LOGISTICS CENTER MAJOR INFRASTRUCTURE
BID PROPOSAL
UNIT PRICE BID
Project hem Information CONTRACTOR NAME
Bidlist Dnit aF
item No. Description Ur.Serbort No. M4Rsure Bid Quantity Unit Price Bid Value
Water Facilities
1 3311.01616"PVC Water Pie 33 11 10.33 11 12 LF 201 $35.DO $7035.00
2 3311.0261 8'PVC Water Pie 33 11 10,33 11 12 LF 30 $ao.Do $1,2oD.00
3 3311.0361 10"PVC Water Pi 33 11 11.33 11 12 LF 115 $42.00 $4,830.00
4 3311.0441 12"PVC Water Pi 3311 10,33'1
0,3311 12 LF 4,333 $45.00 $194,985.00
5 3311.1346712N PVC Water Pioe.CLSM Backfill 34 11 10,33 11 12 LF 120 $60.00 $7 2D0.00
6 3304.0101 Water Test 330430 LF 4.979 $1.00 $4679.00
7 3305.0109 Trench Safety 330510 LF 4,644 $1.00 $4644.00
8 3305.0116 Concrete Encasement for U61' s 330510 CV 8 $150.00 $1,200.00
9 3305.1104 24"Casin B Other Than en Cut 330522 LF 35 $350.00 $12,250.00
10 IT311.0001 DUctile Iron Water Fittings wl Restraint 331111 TON 2.3 $2.500=1 $5,750.00
11 3312.0001 Std.Fire H rant Assembl wl 6"Gate Valve&Valve Box 331240 EA 7 $2,500.00 $17 500.00
12 3312.2003 2'Domestic Water Services 331210 EA 3 $750.o0 $2250.00
13 3312.23 2' ation Waler Services 331210 EA 2 $750.00 $1 500.00
14 3312.300003 8'Gate V L&Valve Box 331220 EA 1 $1 D00.00 $t 0D0.00
15 3312.30041 10"Gate Valve&Valve Box 331220 EA 2 $1 200.00 $2 4D0.00
16 3312.3005 12'Gate Valve&Valve Box 331220 EA 11 $1 400.00 $15400.00
17 9999.0005 6"Thick Concrete Rio-Rao 4.000 psi 00 00 o0 SV 84 $55.00 $4 620.00
18 211061 O an Cut Exlstln Concrete Flume 8 Re lace 00 00 00 Sy 70 $70.00 $4 900.00
19 9999.0007 Cut-in 12 x 12 Anchor Tee 00 00 00 EA 1 $1,500.00 $1 500.00
20 9999.0008 Sawcut Remove&Re lace Concrete Pavement DO 00 00 Sy 11 $65.D0 $715.00
21 3312.0117 Connect to Existin Water Main 331225 EA 1 I $2.0D0.001 $2,000.00
Water Subtotal $297,558.00
Sanitary Sewer Facllkles
21 3331.4208 12'SDR-26PVCSewerPiDe 3311 10.33 31 12,33 3120 LF 2.101 $35.00 $73 535.00
23 3331.4115 12"D.I.P.Sewer PI 33 11 10.33 31 12,33 3120 LF 250 $4 00 2.00 $I o.5 .00
22 9999.0001 Connect to Extsd 30'SS. . Do 00 00 EA 1 $2.500.D0 $2.500.00
23 3331.41 is 8"SDR-26 PVC Sewer Pie 33 11 10,33 31 12,33 31 20 LF 11199 $32.00 $38 368.00
24 3339.100t 4'Std.Die.S.S.Manhole 33 39 10,33 39 20 EA 13 $2,0D0.00 $28 0D0.00
25 3339.1002 4'Std.Die.Drop S.S.Manhole 33 3910,33 3920 EA 2 $2,500.00 $5,000.00
26 3339.1003 Extra Depth for 4'SW.Die.Manhole 33 39 10,33 3920 VF 68 $150.00 $10 200.00
27 3339.1101 S Manhole 33 39 10,33 39 20 EA 1 S3 500.00 $3 500.00
28 3339.1103 5'Extra De nth Manhole 33 3910,33 39 20 VF 15 $200.00 $3 000.00
29 3331.4209 12'SDR-26 PVC Sewer CSS Backtill 33 11 10,33 31 12,33 3121 LF 101 $45.00 $4 545.00
30 3331 A116 8'SDR-26 PVC Sewer Pipe,CSS Back811 33 11 10,33 31 12,33 31 20 LF 30 $42.00 112611,00
31 9999.0002 Interior Corrosion Protection Dow EA 7 1000.00 7000.00
32 3305.0113 Trench Waters 330515 EA 7 200.00 1400.00
34 3305.11 D4 24'Cesin B Other Then 0 n Cut 33 05 22 LF 183 225.00 $41 175.00
35 0330.0001 Concrete Encase Sewer Pi 03 30 00 Cy 4 $150.00 $600.00
36 9999.0003 8'End&Plug 00 00 Do FA 1 $500.00 $500.00
37 3301.0002 Post-CCTV Inspection 330131 LF 3,550 $1.00 $3,550.00
Sanitary Sewer Subtotal $232,633.00
WaterlSanitary Sewer Facllidea Subtotal $530,191.00
Pavin9 Facilities
39 3213.0509 Bonier Free Ramp,Type C-2 321320 FA a $433.00 $2,598.00
40 3213.0302 10'Concrete Sidewalk 32 13 20 SF 18,763 $4.26 $80,016.00
Paving Subtotal L $82,614.00
Bid Suiranary
WabMdanlfary Sower Fat:Ohfas SubtalloftSt,00
Pavan Faciillea fulstotal 814.00
Total Ski M2.803AOI
This bid is submitted by the entity listed below:
Company.North Taxes Contracting,Inc, By: Rtsiter- '�'
Street Address:4999 Keller Haslet Road j z City,State,TLp Code:Keller,Toms 76248 C�
Phone:817-4304WO flgnaaun
Ttle:Vice President
Date:9/12119
Comnector agrees 10 complN WORK far PtNAL ACCEPTANCE within _j&�jworWog days after the date when the
CONTRACT eoreaseeeo to Re as provided le the Ceaenl Coodideoa
END OF SECTION
Q ofroaraVeara
aru In txxVfTa1)(7nelr SFECvlcAr lwcvr4rNrs
F®se0as.la12b inEe MAIa0.pSa TIAUCRJREBm ROh)8N._
.N'
HIGHWAY 114 TEXAS MOTOR
SPEED WA Y
PROJECT
Lll.yCA 7Y®N
F �
EAGLE.PKWY AlDo
Po
Lu LuZ Z Z
Q �
AVONDALE WESTP RT PKW
HASLE
0
Vl�
a NTS
0
N(GRUMENK LOGEuSnCS
a
` CE=R
m
m
N
a d.+O .aL1►YM IN
0
OF FORT WORnL IMXM
Af PSCO# .109 T
COUNCIL DISTRICT 7
CPN 102188
ffines
Pffi4YM BY
N
N QM ETMEER4•-KAMM—BUfiN6YONco
0 2200 RQSSDAI AVENUE.SUrTE
tA.%TX 75MI 42OOW AUGUST 2019 2406 M-wYMDry(a �a "wl �
Or-71"152 719.82Y-0152
w
i
N
E NORTHLIN
W K.
+
S LoGlsncs CENTER
GRAPHIC.SCALE 1 WAMR WAMKEYM"
EXMIT"All
a 300 600 900
CPN: 102188
WPN-56008-0600430—,102188--001580
KFILE:2693
XRM:26095
LEGEND
PROPOSED-WATER LINE
PREPAMBY- EXISTWG WATER LINE
PROPOSED PRE HYDRANT ASSEMBLY
EXISTING FIRE HYDRANT ASSEMBLY
0MLENG1NMM—PL&XNEFIS—SMVEYM
24M MudwV D*A.MaprArla.Tom?W61 N PROPOSED GATE VALVE
EmnkG GATE VALVE SI
MA TCHL INE — SEE PAGE 2
R. DOM. 7�ZYF
ME
12' WATERLINE
12 'WATER LINE
12 WATER LINE
12 WATER LINE
6. WL
oa
cc 2" DOM. SERVICE- 61 WL
-7
::u,CL
BUILDING A
BUILDING C Er�
L.0 T I, BLOCK A _j
NOR THL INK L OGIS TICS LOT 3, BLOCK A
NOR THL INK L OGIS TICS
CENTER 4-r.0
CENTER UJ
Q U I Iq to C�
12,�' WATER LINE
TIT,
/0' WATER LINE
'6' WL
'
2 IRR.. SERVICE 2' DOM. SERVICE
PAGE I OF 2
Ei\108*22.—Hines FM 156\P1ans\nor1h1!nk logistics c6nter.pro 24 Sep 2019
L NN
gOR i WK V
E
LOGESnCS4ENM 9
WAM
GRAPHIC'SCALE I
laR7TC7fIfi rF"A'
R-CP : 1021
,88 0 300 600 900
WM:56W& 430--102188--W1580
KFEE.
:26W5
LOT I; BLOCK I
NORTHWEST I.S.D. ADDITION
VoL. u, Pc...186 12' WA TER LINE 8
CALLED 37.07 ACRES P.R.0.C..T. ` 2-4'__CAS1N_ PEE_._. ti
ORTHWEST.INDEPE'NDEN.
SCHOOL DISTRICT �_._ .�`1= `_— ._ 4#ww
INST. NO. 2001-8004
D.R.D..C.T. f .i
12 WATER LINE
WATER LINE 1
12' WATER LINE
8' WATER LINE
REMAINDER OF CALLED
73.700 ACRES, TRACT 1.
BUILDING B '""' WILLIAM SCOTT WILSON
LOT 2,. BLOCK,4 INST. NO, 2018-3714
NORTHLINK LOGISTICS D.R.D.C.T.
CENTER
i
i
2' D
IRR. SERVICE ,
T MA TCHLINE - SEE PAGE l
t
12' WA TER LINE
f I2' WA"TER LINE
i
l
WAS IKEY MAlP
LEGEND
--(A( PROPOSED WATER LINE
PP"ARIABY, �� -- EWTING WATERLINE
y,�Ag Y fl .-41F PROPOSED ME HYDRANT ASSEMBLY
p
Ji EXISTING FIRE HYDRANT ASSEMBLY
CMLFNOMERS-PL4NNOM-:sunyeYo�
2405 MudwV DIM% .Tom 7e061 i PROPOSED GATE VALVE
Metro(017)3 VS
(�
PAGE 2 OF 2 D4 EXISTING GATE VALVE
Ew\1.0822— Hines FAA 156\Plans\northlink logistics center.pro 24 Sep 2019
NORTHLH4K N
LOGHSTIC S CENTER W*E
SEWER S
EXMIT"A-111 GRAPHIC SCALE 1'-300'
cam: 102188
RPM 56008-(➢7W430-402Il$8--W138® 0 300 600 900
KFaB:2693
laME:26095
MA TCHLOE SEE PAGE 2
— — --- -- — — — — _. — ..... _._.. _... — — —. _.._ — —
artY3
- BUILDING C _
BUILDING A LOT 3, BLOCK A o►-z.
I,. .BLOCK A Woo
V. :NO2RTHLINK LOGISTICS •NO Tf/LINK LOGISTICS; a�,�
CENTER CENTER m ti
�j'j
M 8 S.S. ��� 4
..� 8" S.S. LLIQ"z�
4' CASING I
REMAINDER.OF CALLED
73.567 ACRES, TRACT 2 ;
ALLIANCE-156 PARTNERS, L.P. w V o t1-
INST. NO. 2010-110449 J M
D.R.D.C.T.
12' S..S. owp°U
�U�OO
EX.. 30' QSQ�Q
SEWERKEYMAP S.S. LINE .3z
S
CITY OF FORT WORTH
MIST. NO. O3-18I167
0.R.D.C.T.
LEGEND
SI-- PROPOSED;SANITARY.SEWER LINE
Sr— EXISTING SANITARY SEWER LINE
PROPOSED SANITARY SEWER MANHOLE FREIPARMBY:� •. ',f = -=
x EXISTING SANITARY SEWER MANHOLE G OODI
�ti °� _ ��
PROPOSED'iW0-WAY CLEANOUT -
ya CIVIL ENGINEERS—PLANNERS-UMVEYORS
2106 MURN p Dt",QmpwI n,Togo 79051
wy mwa(a17)3M-=
PAGE I OF 2
E 10822 -Hines FM l56\Plops\n6rlhlink logistics center.pro 24 Sep 2019
A V®R.Ji 1L.41.LL I V K N
LOGHSTHCS CIENMR WE
SEW S
7p�p�
1[]Lfll7lt I nA lu GRAPHIC SCALE 1'-300'
cm- 102188
S EST.56MA770WO-102188-W1380 0 300 600 900
K:E:2693
I,1M:26095
BUILDING B
LOT 2, BLOCK A
NOR THLINK LOGISTICS
CENTER
0
0 0 r9
N_
B` S..5.
aNi :- ptiz
( I 8 S:S.
U� OtOF'NU
OqjIt cO
41
BUILDING A
Q.ory
oa ; LOT 1, BLOCK A 8' S.S.
-� NOR THLINK LOGISTICS ^
CENTER
BUILDING C
.LOT 3, BLOCK A
NORTHLINK LOGISTICS
CENTER
12' S.S. _ - - - -
— — — MA'TCHLINE - SEE PAGE l
SEWBRKEYMAP
I� 1
LEGEND]
9 PROPOSED SANITARY SEWER LINE
�= EXISTING SANITARY SEWER LINE
O PROPOSED SANITARY SEWER'MANHOLE ]PktBPAREDHY.
Q EXiSTWG SANITARY SEWER MANHOLE G-00pWM3
PROPOSED TWO-WAY GLEANOUT hiAM"--' L ` —
CML ENGINEERS-PLANNERS.-SURVEYORS
2105 Mm"D*^G VPff&^Tm=a76051
Metro P17)S 4373
PAGE 2 OF 2
Et\10822 — Hines FM 156\Plans\norihiink fogisfics cenfer.pro 24 Sep 2019
ORTHL \\TK N
ILOGNSUCC S CENTER W*E
�p IPAVw1t�(a s
1�t6�P u�Ay KBIJ GRAPHIC SCALE 3-306'
2693 0 300 500 e0C
E:26095
N 7
H 1
�oa� i
a 0 �- f
MWN= Ci.
JpJ(L O {
j ; A t
C) Ul DI G- �t
OR ( 1 1 PUBLIC ACCESS
NL 1 � E4SEMENT m
PR
P SE.P )V oN
. T.B, .-BLOCK.A :$
S
I E A Tx O P ! LO BWLDING.CNOR ;
Qi; L OGICS CENTER �.
WZ
ADA ADA -4
- -- RAlNP RAMP f ' Ap• U y
I { I
-� 10'SIDEWALK �.
, lYf ADA h
EX. 6' C i
_ -�ji - RAMP
SIDEWALK RAMP IO`SIDEWALK`-
ADA
_
REMAINDER OF CALLED SED PRIVA]E
73.362 ACRES DRIV R `�
JEANNE SHELTON TxDOT.PERM/fi' 10'SIDEWALK
NST. NO. 19.9 9--1158 4 8 �`'`^-.
D.R.D.C.T. REMAINDER OF CALLED
73:567 ACRES. TRACT 2
ALLIANCE-156 PARTNERS, L.P.
INST. NO. 20/0-(I0449
D.R.D.C.T.
PREPARED BY'
( OODWIINI
LEGEND CNLOX E.M—PLANNERS—SUMIEYM
PROPOSED IO'SIDEWALK2406 MLOWO DO^GMpevk-A Tame 70051
Metro(917)3Z"M
EXISTING 6"SIDEWALK
Ei\10822-Hines R1 156VIansVorthlink logistics center.pro 24 Sep 2019