HomeMy WebLinkAboutContract 36360 G�fA�1- ��w , AMENDMENT NO.2 `� �STATE OF TEXAS § CITY SECRETARY CONTRACT NO C) \l� &C Needed) �� COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation (Engineer) made and entered into City Secretary Contract No. 28006 (the Contract) which was authorized by the City Council by M&C C-19172 on July 30t', 2002; and subsequently revised by one previous Amendment No. 1 for $111,800.50 on January 20,2004(M&C C- 19936); and WHEREAS,the Contract involves engineering services for the following project: Engineering Contract for Sanitary Sewer Main 257 and 325 (Middle and Upper Village Creek)Parallel Relief Alignment and Design WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 26, 2007, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total$329,406.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$1,163,106.28. 3. All other provisions of the contract,which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH,"rX EXECUTED on this the (�V day of 2007, in Fort Worth,Tarrant County,Texas. APPROVAL RECOMMENDED: APPROVED: A.Douglas Rademaker,P.E. Marc Ott Director,Department of Assistant City Manager Engineering Dannenbaum Eng_ineeriny,Corporation ENGINEER ATTEST: Marty Hen c, City Secretary By: Name: Wayne G Ahrens,P.E. Principal Conti,--t AUthor`.zatio7a Date APPRO AS TO FO LEGALITY: Assistant A orney f FFiCRAL RECORD ITY SECRETARY T. WORTH,TX DANNENBAUM ENGINEERING CORPORATION 6421 CAMP BOWIE BLVD.,SUITE 400 FORT WORTH,TEXAS 761165421 (817)763-8883 Yean July 26, 2007 Mr. Gopal Sahu, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth,Texas 76102-6311 RE: Revised Supplemental Agreement No. 2 Sanitary Sewer Mains 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design Main 325 Detailed Design Water Project No. P170-070170140030 D.O.E. No. 365.0 Dear Mr. Sahu: This letter is to provide information regarding the change in scope on the Water Department work on the above referenced project revised per David Cooper's comments. In the original contract, the City authorized and approved budget for the design of a portion of Main 257. That budget will be applied to the design of Main 325 along with the amount of this supplemental agreement. Since portions of the budget have already been approved, the following paperwork is different than usual. The City has requested that Dannenbaum Engineering add the detailed design of Main 325 to the original contract and deduct the design of a portion of Main 257, which was included in the original project budget. Also, changes in the alignment which deviated from the approved alignment study were made after portions of the field survey were completed. Those changes will require additional field survey. In order to prepare this supplemental budget, I prepared and attached three(3) items. They are: 1) The proposed Supplemental Agreement No.2 Attachment"B"; 2) The Exhibit B-3A from the original contract with the Part 2 (Outfall Design) items included; and 3) An Exhibit B-3A for the complete Main 325 design as if this were a new project. In order to arrive at the amounts for the proposed Supplemental Agreement No. 2, 1 simply took the difference between the complete Main 325 design amounts and the amounts authorized under the original agreement for the design of a portion of Main 257. Please review the attached information. If you have any questions about this information, please do not hesitate to call. Sincerely, Brian D. O'Neill, P.E. Project Manager cc: David Cooper, P.E. Carlon Small File 3642-32 0:\1210\3642-32\Admin\Agreement\Supplementa!92\Main 325\Utter Sahu 2007 07-26.dce ATTACHMENT "B" SUPPLEMENTAL AGREEMENT No.2 COMPENSATION AND SCHEDULE SANITARY SEWER MAIN 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-0701701400030 DOE#3650 I. Compensation A. The ENGINEER shall be compensated total lump sum.fees as summarized in Exhibit `B-3' and as follows_ Payment of the total lump sum fees shall be considered full compensation for the services described in Attachment`A' and Exhibit`GA-2"for labor materials,supplies and equipment necessary to complete the project. B. Partial payments shall be made monthly,as stipulated on Exhibit B-1,upon receipt of an invoice from the ENGINEER Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER Payment according to statements will be subject to certification by the designated representative of the Water Departrnent that such work has been performed. H. Schedule Part 1 (for the first bid set)shall be completed 60 days after notice to proceed This schedule is dependent of CITY turnaround time on plan reviews. Part 2(for the first bid set)design shall be completed 13 5 days after notice to proceed. This schedule is dependent of CITY turnaround time on plan reviews. Part 3(for the first bid set)design shall be completed 205 days after notice to proceed. This schedule is dependent of CITY turnaround time on plan reviews. Part 4(for the first bid set)design shall be completed 270 days after notice to proceed. This schedule is dependent of CITY turnaround time on plan reviews. EXI IT"B-1" (SUPPLEMENTAL TO ATTACHMENT B) METHOD OF PAYMENT—SUPPLEMENTAL AGREEMENT No.2 SANITARY SEWER MANS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 I. Method of Payment Partial payment shall be made to the Engineer monthly upon City's approval of an invoice from the Engineer outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Exhibit A-2, Part B, Section 1,hereunder, a sum not to exceed 30 percent of the respective total lump sum fee for each scope of services. Until satisfactory completion of Exhibit A-2, Part B, Section 2j, hereunder, a sum not to exceed 70 percent of the respective total lump sum fee for each scope of services, less previous payments. Until satisfactory completion of Exhibit A-2, Part B, Section 3, hereunder, a sum not to exceed 95 percent of the respective total lump sum fee for each scope of services, less previous payments. Balance of earnings to be due and payable after the pre-construction meeting for each project. 11 Progress Reports A. The Engineer shall submit to the designated representative of Director of Department of Engineering monthly progress reports covering all phases of design by the 15'h of every month in the format required by the City. B. If the Engineer determines in the course of making design drawings and specifications that the construction cost estimate of$9,197,000.00(as estimated on Exhibit B-4)will be exceeded,whether by change in the scope of the project, increased costs or other conditions,the Engineer shall immediately report such fact to the City's Director of the Department of Engineering and,if so instructed by Director of the Engineering Department,shall suspend all work hereunder. E-3CMIT B-2 (SUPPLEMENT TO ATTACHMENT B) ]SOURLY RATE SCHEDULE-SUPPLEMENTAL AGREEMENT No.2 SANITARY SEWER MAIMS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 Emnlo�ee Classification Rate/Hour Principal $258.00 Project Manager/Planner $160.00 Senior Engineer/QA-QC $160.00 RPLS $125.00 Project Engineer $117.00 Design Tech. $81.00 CADD Tech. $58.00 Clerical $ 60.00 2-Man Survey Crew $91.00 3-Man Survey Crew $124.00 4-Man Survey Crew $167.00 Reimbursables Cost f 10% Mileage $0.485 Per Mile Reproduction work will beat current commercial rates. Subcontractors will be paid for at actual invoice cost plus ten percent(10%). 3642 Exhibit B-2 EXHIBIT B-3 (SUPPLEMENT TO ATTACHMENT B) DESIGN FEE COST SUiNUM ARY—SUPPLEMENTAL AGREEMENT No.2 SANITARY SEWER MAINS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 Phase Scope of Services Fee WWBE % I-Design Services Part 1 —Alignment Study $ 39,900.00 $ 39,900.00 100% Environmental Documents(Blanton) Part 2—Main 325 Design $ 275,606.00 $ 90,828.00 33.0% (Exhibit A-2,Parts A&B) Il-Construction Phase Part 2—Main 325 $ 9,400.00 Construction Assistance (Exhibit A-2,Part C) Part 2—Main 325 $ 4,500.00 As-Built Drawings TOTAL $ 329,406.00 Proposed M/WBE Subconsultants Services Fees % ANA Consultants Field Survey $ 74,470.00 22.6% ANA Consultants Easement Preparation $ 1,800.00 0.5% Geotel Engineering,Inc. Geotechnical Investigation $ 14,558.00 4.4% Blanton&Associated Environmental Documents $ 39,900.00 12.1% TOTALS $130,728.00 39.7% G:\1210\3642-32\AdminVZreement\Supplemental#2\Main 325\Main 325 Supplemental#2.doe EXHIBIT B-3A (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF DESIGN FEE—SUPPLEMENTAL AGREEMENT No. 2 SANITARY SEWER MAINS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 The project was previously divided into four(4)distinct parts. This Supplemental Agreement proposes to replace Main 257 detailed design with the detailed design of Main 325 as Part 2 of the contract. Part 1—Alignment Study(Special Services) Environmental Assessment(Blanton) $ 39,900.00 Part 2—Main 325 Design Basic Design Fee $ 132,575.00 Special Services(Part 2—Main 325 Design) Geotechnical Investigation(Geotel) $ 14,558.00 Design Surveys(ANA) $ 74,470.00 Easement Preparation(ANA) $ 600.00 Temporary Construction Easement(ANA) $ 1,200.00 Temporary Right of Entry $ 0.00 Traffic Control Plans(DEC) $ 3,560.00 Storm Water Pollution Prevention Plan $ 3,530.00 Engineering Feasibility Report $ 5,000.00 Final Engineering Design Report $ 6,000.00 Coordination: Railroad Coordination(Permit) $ 500.00 TxDOT Coordination(Permit) $ 500.00 ONCOR Coordination 1 Permit $ 2,500.00 Reproduction $ 17,540.00 10%for M/WBE Subcontractor(0.1 *$ 130,728.00) $ 13,073.00 Construction Services (Part 2—Main 325) $ 9,400.00 As-Built Drawings (Part 2—Main 325) $ 4,500.00 TOTAL NOT-TO-EXCEED S 329,406-00 G\1210\3642-32\Admm\Ag=ment\SupplemenW#2Wam 325\Mam 325 Supplemeatd#2.doc SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE(LESS SURVEY FEE) A. SUMMARY OF TOTAL FEE Service Description Water Sewer Paving/Drainage Total Engineering Services $0.00 $253,136.00 $ 0.00 $ 253,136.00 Surveying Services $ 0.00 $ 76,270.00 $ 0.00 $ 76,270.00 Total $ 0.00 $ 329,406.00 $ 0.00 $ 329,406.00 B. BREAKDOWN OF WATER,SEWER AND PAVING FEES (LESS SURVEY FEES) Total Paving/Drainage Fee(less survey fee)Breakdown by Concept,Preliminary and Final Design: 1. Concept(30%)=(Total Drainage Fee—Paving Survey Fee)x(0.3) =$ 75,941.00 2. Preliminary(60%)=(Total Drainage Fee—Paving Survey Fee)x(0.6) =$ 151,882.00 3. Final(10%)=(Total Drainage Fee—Paving Survey Fee)x(0.1) =$ 25,313.00 In order to ensure sufficient M/WBE participation in this project, we will be using Blanton & Associates for environmental investigation,ANA Consultants for surveying,and Geotel Engineering, Inc. for geotechnical investigation. This will result in a 39.7% portion of the supplemental agreement that will be performed by approved M/WBE firms which will exceed the target goal of 24%. G:\1210\3642-32\Admin\Agreement\Supplemental 92\Main 32SlMam 325 Supplemental#2.dac ORIGINAL CONTRACT EXHIBIT B-3A (SUPPLEMENT TO ATTACHMENT B) SUNDIARY OF DESIGN FEE SANITARY SEWER MAIN 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 The project has been divided into four(4)distinct parts.We propose to complete the design portion proposed work in accordance with the following fee schedules: Special Services(Part 1 —Alignment Study) Environmental Assessment(Blanton) $ 28,900.00 Part 2—Main 257 Design: Construction Cost $ 6,020,718 85%of TSPE Curve B(5.2% * 0.85) 4.42% Basic Design Fee $266,115.74 Special Services(Part 2—Main 257 Design) Geotechnical Investigation(Geotel) $ 41,247.50 Design Surveys(ANA) $ 53,750.00 Easement Preparation(42 at$500.00/Ea) (ANA) $ 21,000.00 Temporary Construction Easement(42 at$200/EA) (ANA) $ 8,400.00 Temporary Right of Entry $ 2,500.00 Traffic Control Plans(DEC) $ 3,000.00 Storm Water Pollution Prevention Plan(DEC) $ 13,100.00 Railroad Coordination(Permit) $ 500.00 Construction Assistance $ 6,000.00 As-Built Drawings $ 3,200.00 Reproduction* 16 Sets of preliminary plans(util.clear) (Trevino) $ 1,600.00 40 Sets of Construction Plans(Trevino) $ 4,000.00 40 Sets of Specifications($30.00/ea) (Trevino) $ 1,200.00 Miscellaneous Printing(6 sets and Misc.) (Trevino) $ 780.00 10%for M/WBE Subcontractor(0.1 * $ 131,977.50) $ 13,197.75 SPECIAL SERVIES SUB-TOTAL $ 173,475.25 TOTAL NOT-TO-EXCEED $468,490.99 COMPLETE 11I4IN 325 PROJECT EXHIBIT B-3A (SUPPLEMENT TO ATTACffiVIENT B) SUMMARY OF DESIGN FEE—SUPPLEMENTAL AGREEMENT No.2 SANITARY SEWER NIA'INS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 The project was previously divided into four(4)distinct parts. This Supplemental Agreement proposes to replace Main 257 detailed design with the detailed design of Main 325 as Part 2 of the contract. Part 1—Alignment Study(Special Services) Environmental Assessment(Blanton) $ 68,800.00 Part 2—Main 325 Design Construction Cost $ 9,197,000.00 85%of TSPE Curve B(5.1% *0.85) 4.335% Basic Design Fee $ 398,690.00 Special Services(Part 2—Main 325 Design) Geotechnical Investigation(Geotel) $ 55,805.00 Design Surveys(ANA) $ 92,000.00 Design Surveys(ANA)Revised Alignment 9055 $ 36,220.00 Easement Preparation(18 at$1,200.00/Ea)(ANA) $ 21,600.00 Temporary Construction Easement(24 at$400/EA)(ANA) $ 9,600.00 Temporary Right of Entry $ 2,500.00 Traffic Control Plans(DEC) $ 6,560.00 Storm Water Pollution Prevention Plan $ 16,630.00 Engineering Feasibility Report $ 5,000.00 Final Engineering Design Report $ 6,000.00 Coordination: Railroad Coordination(Permit) $ 1,000.00 TxDOT Coordination(Permit) $ 500.00 ONCOR Coordination/Permit $ 2,500.00 Reproduction(See Exhibit B-3B) Part I Reproduction $ 8,600.00 Part II Reproduction $ 7,920.00 Part III Reproduction $ 8,600.00 10%for M/WBE Subcontractor(0.1 *$284,025.00) $ 28,403.00 Construction Services (Part 2—Main 325) $ 15,400.00 As-Built Drawings (Part 2—Main 325) $ 7,700.00 TOTAL NOT-TO-EXCEED $800,028.00 G:\1210\3642-32k 4dmin\Ageement\Supplemental#2\Main 325\Entire Main 325 Fee\Misn 325 SA#2 Entire Fee.doc EXHIBIT B-3B (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF REPRODUCTION FEE—SUPPLEMENTAL AGREEMENT No.2 SANITARY SEWER MAINS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.P170-070170140030 DOE No.3650 PART I: 6 Sets of Preliminary Plans(City Review) $ 480.00 3 Sets of Preliminary Plans(TWDB Review) $ 240.00 6 Sets of Final Plans(City Review) $ 480.00 3 Sets of Final Plans(TWDB Review) $ 240.00 16 Sets of Preliminary Plans(Utility Clearance) $ 1,280.00 45 Sets of Construction Plans $ 3,600.00 45 Sets of Specifications($40.00/ea) $ 1,800.00 Miscellaneous Printing(6 sets and Misc.) $ 480.00 PART I:TOTAL $ 8,600.00 *Estimated using 40 sheets per plan PART II: 6 Sets of Preliminary Plans(City Review) $ 432.00 3 Sets of Preliminary Plans(TWDB Review) $ 216.00 6 Sets of Final Plans(City Review) $ 432.00 3 Sets of Final Plans(TWDB Review) $ 216.00 16 Sets of Preliminary Plans(Utility Clearance) $ 1,152.00 45 Sets of Construction Plans $ 3,240.00 45 Sets of Specifications($40.00/ea) $ 1,800.00 Miscellaneous Printing(6 sets and Misc.) $ 432.00 PART II:TOTAL $ 7,920.00 *Estimated using 36 sheets per plan PART III: 6 Sets of Preliminary Plans(City Review) $ 480.00 3 Sets of Preliminary Plans(TWDB Review) $ 240.00 6 Sets of Final Plans(City Review) $ 480.00 3 Sets of Final Plans(TWDB Review) $ 240.00 16 Sets of Preliminary Plans(Utility Clearance) $ 1,280.00 45 Sets of Construction Plans $ 3,600.00 45 Sets of Specifications($40.00/ea) $ 1,800.00 Miscellaneous Printing(6 sets and Misc.) $ 480.00 PART M-TOTAL S 9,600.00 *Estimated using 40 sheets per plan G:\1210%3642-32\L d in\Agreementl5upplemental#2\Main 325\Entire Main 325 Fee\Mian 325 SA#2 Entire Fee.doc ) # m m o0af 7${» /so ° ' e§�2 &\#§ - ci ) / coLU co § 7LU » § § ; § ) § yin §)_ )0 k)§ k ] 0 « .K§E //)§� �m0 ,mod §2k§ k � �§ �) } G w qa[§§mm§§§§m rm2� a © -o° ` ®- - «;om � a§[ 2 § o Nq ©-- 'x';7 k - zz■ , ° 2 � � LuLL w IL§t{ ( 0 ■ - �§[/§)j6d/§ bga » E ® 22§ < 9 ; U3 $ & #aee##aa@## 00: 2 2 \ \ 70§�§0�00 ) _� , § u[ w� co w ƒ 0-0& @ @ � £ § co � 2 §§ar * e Lu Coco §[[Luogmmww/ %§ww o /q� w »z � ] z § } k n. \ § 11 'o / § 00r§( ! 2 - C., m ° §))mot I k )3\x lu z §W fk f§ \ 2z z 2( B «�=oz c)§KK§d K§(§ 0 01 � �()z - ww ];! uj , § §§� kkk( . Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication —�&r. ...P�''.1:...vu^T�w.:iv.�:.'�'u?iK�3.iL^'�.v__.�.�.y-w _ ,. .r ��..`.'9'.::.�--vmn�rra.—...,m-s._+r�vmr+.e.-•..m--"�^'..—a. ....:�...�':�u...'....iw� COUNCIL ACTION: Approved on 11/27/2007 -Ordinance No. # 17880-11-2007 DATE: Tuesday, November 27, 2007 LOG NAME: 30SSMAIN257-325 REFERENCE NO.: **C-22535 SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 28006, an Engineering Agreement with Dannenbaum Engineering Corporation, for Sanitary Sewer Main 257 and 325 (Middle and Upper Village Creek) Parallel Relief Alignment and Design, and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to execute Amendment No. 2 to City Secretary Contract No. 28006 with Dannenbaum Engineering Corporation for Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment and Design; 2. Authorize the transfer of $329,406, for the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the Amount of$329,406 from available funds. DISCUSSION: On July 30, 2002, (M&C C-19172) the City Council authorized the City Manager to execute an engineering agreement with Dannenbaum Engineering Corporation in the amount of$721,899.76, to prepare plans and specifications for Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design. The City Council approved amendment No. 1 for $111,800.50, (M&C C-19936) on January 20, 2004, for additional engineering services for approximately 3,000 linear foot extension of Sanitary Sewer Main 257 alignment study and design of Sanitary sewer laterals 2389, 2484, 3694, Main 238 and Lateral 9920. This proposed amendment will allow Dannenbaum Engineering Corporation to provide additional engineering services for approximately 23,076 linear feet of 42-inch Sanitary Sewer Main 325, 47 manholes, five junction boxes, concrete pavement repairs and other pertinent items. This amendment also includes special services for geotechnical studies, easement documents preparations, plans for Storm Water Pollution Prevention, Traffic Control Plans, Engineering Feasibility Report and coordination with railroad companies, TX DOT and local utilities companies. Dannenbaum will also provide limited assistance during construction services and prepare As-Built drawings. Dannenbaum Engineering Corporation proposes to provide these additional services for a lump sum fee of $329,406. This fee includes credits for the design of Sanitary Sewer Main 257 included in the original contract. The Water Department decided to remove this portion of design work from the contract. City staff considers this fee to be fair and reasonable for the scope of services proposed. http://www.cfwnet.org/council_packet/Reports/mc_print.asp 11/28/2007 Page 2 of 2 Dannenbaum Engineering Corporation is in compliance with the City's M/WBE Ordinance by committing an additional 40 percent M/WBE participation on this Amendment No. 2. The City's Goal on this amendment is 40 percent. This project is located in COUNCIL DISTRICT 8, Mapsco 106V, and Z, 107F, K, J, N, S. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation No. 1 and the adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated of the Sewer Capital Projects Fund, TO Fund/Account/Centers FROM Fund/Account/Centers 11&2) $329,406.00 1)PE45 538070 0709020 $329,406.00 P172 472045 070172141030 P172 531200 070172141030 31 $329,406.00 $329,406.00 P172 531200 070172141030 Submitted for City Manager's Office by: Marc A. Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: Gopal Sahu (7949) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 11/28/2007