CONTRACT NO._ 505 0.1-
ORTWORTHm city of Fort worth
J
q�� _ Construction Allowance Request
CliSnstruction FOA# 3 Date 61812019 City Sec# 50567
99Y yClient Project#(s) 101265
FAC#(s)
Project Name HMAC 2017-5 Street Rehabilitation at Various Locations
Description
Contractor TexasBit-JLB City Inspector Martina Salinas
Funding TPW Select Day
Allocation Account Totals Type
Original Contract Amount $1,945,950.00 $1,945,950.00 210
Extras to Date $55,787.00 $55,787,00 15
Credits to Date 97
Current Contract Amount $2,001,737.00 $2,001,737.00 322
Amount of Proposed Allocation $5,395.80 $5,395.80 10
Original Allowance Available for Allocation $95,785.00 $95,785.00
Allowance Funds Previously Allocated $55,787.00 $65,787.00
Remaining Funds Available for this Allocation $39,998.00 $39,998,00
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:In an effort to eliminate
premature street failure at 3544 Sth.Avenue from excessive groundwater and stormwater runoff a decision was reached to install a sub-drain,
after consultation with the City's Stormwater Group.Therefore,appropriated Construction Allowance funds are being requested to be used for
this added item.Also,to complete this added construction activity,an additional 10 calendar days is being requested.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the
basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
10/10/2019
j Y
_
OFFICIAL RECOF
FORT WORTH® City of Fort Worth
_0�_ Construction Allowance Request
Construction FOA# Date 618/2019 City Sec# 1 50567
Client Project#(s)J 101265
FAC#(s)
Project Name HMAC 2017-5 Street Rehabilitation at Various Locations
Description
Contractor TexasBit-JLB City Inspector Martina Salinas
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as
per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: In
an effort to eliminate premature street failure at 3544 8th,Avenue from excessive groundwater and stormwater runoff a decision was reached to
install a sub-drain,after consultation with the City's Stormwater Group.Therefore,appropriated Construction Allowance funds are being
requested to be used for this added item.Also,to complete this added construction activity,an additional 10 calendar days is being requested.
i
i
i
I
FORT WORTH® City of Fort Worth
Construction Allowance Request
Construction FOA# Dale 6/8/2019 City Sec# 50567
Client Project#(s)l 101265
FAC#(s)
Project Name HMAC 2017-5 Street Rehabilitation at Various Locations
Description
Contradorl TexasBit-JLB City inspector Martina Salinas
ADDITIONS
ITEM DESCRIPTION DepYFACty Unit Unit Cost I ota
Subdrain pipe
2 install Subdrain Pipe TPW 1.00 LS $2,000.00
3 Haul Olf TPW CY 20.0
4 Rip Rap TPW 36.00 CY 15.00
5 Filter Fabric TPW 120.00 LF 1 .50
_6 Asphalt Patch TPW 11.00 SY $65.00
Change Order Additions Page 4 of 8
TPW $5,395.80
Sub Total Additions $5,395.80
Change Order Additions Page 5 of 8
FORT WORTH. City of Fort Worth
Construction Allowance Request
Construction FOA# 0 Date 618/2019 City Sec# 50567
Client Project#(s) 101265
FAG#(s)
Project Name HMAC 2017-5 Street Rehabilitation at Various Locations
Description
Contractor TexasBit-JLB City Inspector Martina Salinas
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
ITEM E R PT ep ty Unit Unit Cost Total
Change Order Deletions Page 6 of 8
I
TPW $0.00
Sub Tot JDelefionS $0.00
Change Order Deletions Page 7 of 8
MIWBE Breakdown for this Construction Allowance Request
Total
Previous Construction Allowance Requests
Total
BIM 360 Document Management Page 1 of 2
AUTODESK'BIM 360- fortworthgov>101265-HMAC 2017-5 Street Rehabilitation- A KS
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED ##15 Construction Allowance Workflow Approval
Export Report - 1 This review is closed.
Name^ Description Version Markup Comments PROGRESS
13 CA3_101265-Subdrain.xlsm V1 0 No comments yet.
Initiator Initial Review n
CA#_101265_Subdrain.pdf V1 1 No comments yet. KS Kristian Sugrim Oct 10,11:59 AM
IMG_0037.MOV VI 0 No comments yet.
<kristian.sug rim @fortworthtexas.gov>
. --
Submitted to Reviewer 1
Reviewer 1 Initial Review 1
LZ Lane Zarate Oct 17,2:02 PM
<la ne.zarate@fortworthtexas.gov>
Submitted to Reviewer 2
approved
Reviewer 2 Initial Review 2
LP Lauren Prieur Oct 18,2:58 PM
<lauren.prieu r@fortworthtexas.gov>
Submitted to Reviewer 3
It is not apparent from the surface
that there is any drainage or
groundwater issue on the street.
O
;0 Though it looked like the street had
Aµ� }� U: been patched there previously before
tte by: i :_ our construction,there weren't any
previous storm water complaints
recorded that could have lea...
Show more
Mari J. K r Ci ecretary 'AS
^�^^ Reviewer 3 Initial Review 3 n
WJ William Johnson Oct 31,4:36 PM
<willia m.joh nson @fortworthtexas.gov>
Submitted to Reviewer 4
No further comments
Reviewer 4 Initial Review 4 n
DB Douglas Black Nov 1,9:40 AM
<d oug.black@fortworthtexas.gov>
Submitted to Approver
No legal issues.Approved.
Show more
Approver Final Review n
OFFICIAL.RECORD DB Dana Burghdoff Nov 5,2:44 PM
CI I T SECRETARY <dana.burghdoff@fortworthtexas.gov>
FT. WORTH,T , Review ended
" — Review closed
< y -
https://docs.b360.autodesk.com/projects/a874fca9-d47a-4766-962d-57c936269c55/reviews/ddfb7759-ddcd-... 11/5/2019
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Kristian Surim /
Name of Employee/Signature
Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Kristian Sugrim �^-
Printed Name Signature