HomeMy WebLinkAboutContract 50567-AR3 CITY SECRETARY CONTRACT NO._ 505 0.1- ORTWORTHm city of Fort worth J q�� _ Construction Allowance Request CliSnstruction FOA# 3 Date 61812019 City Sec# 50567 99Y yClient Project#(s) 101265 FAC#(s) Project Name HMAC 2017-5 Street Rehabilitation at Various Locations Description Contractor TexasBit-JLB City Inspector Martina Salinas Funding TPW Select Day Allocation Account Totals Type Original Contract Amount $1,945,950.00 $1,945,950.00 210 Extras to Date $55,787.00 $55,787,00 15 Credits to Date 97 Current Contract Amount $2,001,737.00 $2,001,737.00 322 Amount of Proposed Allocation $5,395.80 $5,395.80 10 Original Allowance Available for Allocation $95,785.00 $95,785.00 Allowance Funds Previously Allocated $55,787.00 $65,787.00 Remaining Funds Available for this Allocation $39,998.00 $39,998,00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:In an effort to eliminate premature street failure at 3544 Sth.Avenue from excessive groundwater and stormwater runoff a decision was reached to install a sub-drain, after consultation with the City's Stormwater Group.Therefore,appropriated Construction Allowance funds are being requested to be used for this added item.Also,to complete this added construction activity,an additional 10 calendar days is being requested. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. 10/10/2019 j Y _ OFFICIAL RECOF FORT WORTH® City of Fort Worth _0�_ Construction Allowance Request Construction FOA# Date 618/2019 City Sec# 1 50567 Client Project#(s)J 101265 FAC#(s) Project Name HMAC 2017-5 Street Rehabilitation at Various Locations Description Contractor TexasBit-JLB City Inspector Martina Salinas IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: In an effort to eliminate premature street failure at 3544 8th,Avenue from excessive groundwater and stormwater runoff a decision was reached to install a sub-drain,after consultation with the City's Stormwater Group.Therefore,appropriated Construction Allowance funds are being requested to be used for this added item.Also,to complete this added construction activity,an additional 10 calendar days is being requested. i i i I FORT WORTH® City of Fort Worth Construction Allowance Request Construction FOA# Dale 6/8/2019 City Sec# 50567 Client Project#(s)l 101265 FAC#(s) Project Name HMAC 2017-5 Street Rehabilitation at Various Locations Description Contradorl TexasBit-JLB City inspector Martina Salinas ADDITIONS ITEM DESCRIPTION DepYFACty Unit Unit Cost I ota Subdrain pipe 2 install Subdrain Pipe TPW 1.00 LS $2,000.00 3 Haul Olf TPW CY 20.0 4 Rip Rap TPW 36.00 CY 15.00 5 Filter Fabric TPW 120.00 LF 1 .50 _6 Asphalt Patch TPW 11.00 SY $65.00 Change Order Additions Page 4 of 8 TPW $5,395.80 Sub Total Additions $5,395.80 Change Order Additions Page 5 of 8 FORT WORTH. City of Fort Worth Construction Allowance Request Construction FOA# 0 Date 618/2019 City Sec# 50567 Client Project#(s) 101265 FAG#(s) Project Name HMAC 2017-5 Street Rehabilitation at Various Locations Description Contractor TexasBit-JLB City Inspector Martina Salinas CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ITEM E R PT ep ty Unit Unit Cost Total Change Order Deletions Page 6 of 8 I TPW $0.00 Sub Tot JDelefionS $0.00 Change Order Deletions Page 7 of 8 MIWBE Breakdown for this Construction Allowance Request Total Previous Construction Allowance Requests Total BIM 360 Document Management Page 1 of 2 AUTODESK'BIM 360- fortworthgov>101265-HMAC 2017-5 Street Rehabilitation- A KS Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews > Review detail CLOSED ##15 Construction Allowance Workflow Approval Export Report - 1 This review is closed. Name^ Description Version Markup Comments PROGRESS 13 CA3_101265-Subdrain.xlsm V1 0 No comments yet. Initiator Initial Review n CA#_101265_Subdrain.pdf V1 1 No comments yet. KS Kristian Sugrim Oct 10,11:59 AM IMG_0037.MOV VI 0 No comments yet. <kristian.sug rim @fortworthtexas.gov> . -- Submitted to Reviewer 1 Reviewer 1 Initial Review 1 LZ Lane Zarate Oct 17,2:02 PM <la ne.zarate@fortworthtexas.gov> Submitted to Reviewer 2 approved Reviewer 2 Initial Review 2 LP Lauren Prieur Oct 18,2:58 PM <lauren.prieu r@fortworthtexas.gov> Submitted to Reviewer 3 It is not apparent from the surface that there is any drainage or groundwater issue on the street. O ;0 Though it looked like the street had Aµ� }� U: been patched there previously before tte by: i :_ our construction,there weren't any previous storm water complaints recorded that could have lea... Show more Mari J. K r Ci ecretary 'AS ^�^^ Reviewer 3 Initial Review 3 n WJ William Johnson Oct 31,4:36 PM <willia m.joh nson @fortworthtexas.gov> Submitted to Reviewer 4 No further comments Reviewer 4 Initial Review 4 n DB Douglas Black Nov 1,9:40 AM <d oug.black@fortworthtexas.gov> Submitted to Approver No legal issues.Approved. Show more Approver Final Review n OFFICIAL.RECORD DB Dana Burghdoff Nov 5,2:44 PM CI I T SECRETARY <dana.burghdoff@fortworthtexas.gov> FT. WORTH,T , Review ended " — Review closed < y - https://docs.b360.autodesk.com/projects/a874fca9-d47a-4766-962d-57c936269c55/reviews/ddfb7759-ddcd-... 11/5/2019 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Surim / Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Kristian Sugrim �^- Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT WORTH,TX