ORDINANCE NO. (p7Q�j
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF CHENAUIR AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND FERFOf�D; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS-
MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED
AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with AUSTTR ROAD COMPANY for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wit
UNIT is CHENAULT AVENUE From Paradise Street to Baurline Street, known and
designated as Unit 1, Project No. 104-24000-207.
UNIT 2: VAN HORN STREET From Riverside Drive to 200' east, known and design-
ated as Unit 2, Project No. 1o4-240oo-207.
UNIT 3: CHENAULT AVENUE From De Costa Street to Beach Street, known and
designated as Unit 3, Project No. 104-24000-207.
UNIT 4: BAURLINE STREET From Ennis Street to CRI&P Railroad, known and design-
ated as Unit 4, Project No. 104-240oo-207.
UNIT 5: LA SALT STREET From Baurline Street to Retta Avenue, known and
designated as Unit 5, Project No. 104-24000-207.
UNIT 6: FINLEY STREET From Sylvania Avenue to Baurline Avenue, known and
designated as Unit 6, Project No. 104-24000-207.
� .,.�.
r r
r
}
•; c r
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
city of Fort Worth, Texas, including Ordinance No, 6320 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the city council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6320 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
Io
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; .and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II,
The Mayor, be, and he is hereby, directed to issue and execute in the name
cf the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
IIY.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of 9 19
APPROVED AS TO FORM AND LEGALITY:
0 70
City Attorney
PROJECT NO. 104-24000-207, UNIT 1: CHENAULT AVENUE FROM PARADISE STREET TO BAURLINE STREET,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick cement stabilized subgrade with seven-inch high concrete curb and eighteen-
inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con-
structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where
specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF PARADISE STREET AND CHENAULT AVENUE
NORTH SIDE OF STREET RIVERSIDE ADDITION
Paradise Baptist 9 2 140' Adjusted to
Church Res. 100' Pavement $2.75 $275.00
120 Baurline 100' Curb & Gutter 2.65 265.00
76111 100' Sidewalk 2.71 271.00
$ 811.00
Paradise Baptist Church 10 2 140' Adjusted to
120 Baurline Res. 100' Pavement $2.75 $275.00
76111 100' Curb & Gutter 2.65 265.00
100' Sidewalk 2.71 271.00
$ 811.00
BAURLINE STREET INTERSECTS
SOUTH SIDE OF STREET
Fred Duncan 12 27 140' Adjusted to
200 Baurline Res. 100' Pavement $2.75 $275.00
76111 100' Gutter Only 1.33 133.00
96 Sq. Ft. Drive .77 73.92
$ 481.92
John D. Wesley 1 27 140' Adjusted to
5617 Maceo Lane Res. 100' Pavement $2.75 $275.00
76112 100' Curb & Gutter 2.65 265.00
96 Sq. Ft. Drive .77 73.92
$ 613.92
TOTAL COST TO PROPERTY OWNERS . . . . . . . . $2,717.84
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . 6,720.44
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . 9 438.28
1
P 4D.II Ci N0. 1ID4 '�t000-207 IIN1fN SARI I'T I"JIZOM ItIVE�;RSgDl. DRIVE f0 200' LAST, to be
JE 0 _00-.2 _ g..�,,.____r _ _.ri.... _ ._n__.. ,._.,. .rm _. v� __a_ . __._.— __..____ �.
improved by co¢�struc� if�Y; a six-inch thick hot-mix asp
haltic concrete pavement on a six- anti
thick cement stabilized subgrade, ,semen-inch high concrete curb and eighteen-inch wide conerct_,
gitter, so that the uintshed roadway wilt be thirty feet wade and by constructing six-inch
thick concrete driveways where specified.:
BLOCK
OWNER LOT 20NINC F90NTACE RATE AMOUNT ASSESSMENT
BEGINNING AT TFE ryORMW CORNER or RivAP`.w DRIVE Ab D 'BAN IIOIt.N STREET
Ri)',TII S IDF OF W W I C,^sMi:` 5 PLA ;: 0P21TI0N
Bearing Bldg_ Corp, 29 96" adjusted to
015 Riverside :Drive Ind} 80' Pavement $5. 77 $46130
76111 80` Curb & Cutter 245 212,00
271 Sq, Ft. Driveway J7 20847
$ 882,27
JoEferson Brown 30 & 31 _ 100' Pavement $4.26 $42V00
3205 Van Horn S,t, Ind. 100' Curb & Cutter 2065 26500
76111 85 Sq: Ft, Driveway .77 65.45
$ 756M
Harvey Rockwell 32 50' Pavement $537 $280 50
3224 Todd Street Ind. 50' Curb & Gutter 2,65 13&50
76110 $ 421:00
`'`.SUCH SIDE OF STREET
E. G. Van Dyke 33 620 Pavement $5a77 $357.74
6112 Cliftside Ind 62' Curb & Cutter 2.65 164.30
76134 85 Sq, Ft. Driveway o77 65A5
$ 587 M
011ie Lee 34 _ 62' Pavement $4026 $264, 12
3208 Ian horn Ind_ 621 Curb & Gutter V 65 16400
76111 85 Sq. Ft. Driveway o77 65A5
$ 493,87
[ Qnn M, Al l_e ! 3`a _ 62 ' pa�,=enent 04:26 $26442
204 Van Horn F;7'd : 62' Curb rb & Cutter 2.65 164.30
i611.1 85 Sq: Ft, Drivowny . 77 65 ,45
S 49347
2
PROJECT NO. 104-24000-207, UNIT 2: VAN HORN STREET - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET CARVER'S PLACE ADDITION
Edgar W. Hopkins 36 80' Pavement $4.26 $340.80
3200 Van Horn Ind. 80' Curb & Gutter 2.65 212.00
76111 85 Sq. Ft. Drive .77 65.45
$ 618.25
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . $4,253.20
TOTAL COST TO CITY OF FORT WORTH 1,337.96
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . $5,591.16
3
PROJECT NO. 104-24000-207. UNIT 3: CHENAULT AVENUE FROM DE COSTA STREET TO BEACH STREET,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick six-inch thick cement stabilized subgrade, seven-inch high concrete curb
and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet
wide and by constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF DE COSTA STREET AND CHENAULT STREET
NORTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, FIRST FILING
J. R. Epps W. 50' of 1 50' Pavement $2.48 $124.00
3924 Ryan Place Dr. 13 Res. 50' Curb & Gutter 2.65 132.50
30 Sq. Ft. Driveway .77 23.10
$ 279.60
C. J. Headrick E. 50' of W.1 50' Pavement $2.48 $124.00
3905 Chenault 100' - 13 Res. 50' Curb & Gutter 2.65 132.50
30 Sq. Ft. Driveway .77 23.10
$ 279.60
Mrs. Estelle Huddleston W. 50' 1 50' Pavement $2.48 $124.00
c/o C. W. Hutchison of E. 300' Res. 50' Curb & Gutter 2.65 132.50
801 N.P. Anderson Bldg. - 13 $ 256.50
C. R. Mitchell W. 50' of Z. 1 50' Pavement $2.48 $124.00
3913 Chenault 250' - 13 Rea. 50' Curb & Gutter 2.65 132.50
30 Sq. Ft. Driveway .77 23.10
$ 279.60
Audie C. Cottrell W. 100' of 1 100' Pavement $2.48 $248.00
3917 Chenault E. 200' - Res. 100' Curb & Gutter 2.65 265.00
13 30 Sq. Ft. Driveway .77 23.10
$ 536.10
H. W. Bounds W. 50' of 1 50' Pavement $2.75 $137.50
3921 Chenault E. 100' - Res. 50' Curb & Gutter 2.65 132.50
13 30 Sq. Ft. Driveway .77 23.10
$ 293.10
4
PROJECT NO. 104-24000-207, UNIT 3: CHENAULT AVENUE - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, FIRST FILING
Mrs. Ray S. Whitefield E. 50' 1 50' Pavement $2.75 $137.50
San Angelo Route of 13 Res. 50' Curb & Gutter 2.65 132.50
Eola, Texas 76937 30 Sq. Ft. Driveway .77 23.10
$ 293.10
HARPER STREET INTERSECTS PAGE COMPANY EAST SIDE ADDITION, SECOND FILING
Willis H. Owens 4 1 60' Pavement $2.75 $165.00
3933 Chenault Res. 60' Curb & Gutter 2.65 159.00
$ 324.00
Carl Erwin 5 1 60' Pavement $2.75 $165.00
3935 Chenault Res. 60' Curb & Gutter 2.65 159.00
50 Sq. Ft. Driveway .77 38.50
$ 362.50
Paul Daffern 6 1 60' Pavement $2.75 $165.00
3947 Chenault Res. 60' Curb & Gutter 2.65 159.00
$ 324.00
GROSS STREET INTERSECTS
Joe G. Cox 4 2 60' Pavement $2.75 $165.00
4001 Chenault Res. 60' Curb & Gutter 2.65 159.00
$ 324.00
Roy Enoch White 5 2 60' Pavement $2.75 $165.00
4005 Chenault Res. 60' Gutter Only 1.33 79.80
$ 244.80
L. H. Tyler 6 2 60' Pavement $2.75 $165.00
4009 Chenault Res. 50' Curb & Gutter 2.65 132.50
74 Sq. Ft. Driveway .77 56.98
$ 354.48
5
PROJECT NO. 104-24000-207, UNIT 3° CHENAULT AVENUE ¢ CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE DATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, SECOND FILING
BEACH STREET INTERSECTS
J. S. Masters 1 thru 6 187.4° Pavement $2075 $515.35
4000 Chenault 4 187.4° Gutter Only 1, 33 249.24
$ 764. 59
GROSS STREET INTERSECTS
Edger C. Brown 11 5 50' Pavement $2o75 $137�50
730 Hughes Res , 50' Gutter Only 1.33 66.50
$ 204.00
A, B. Batchelor 10 5 50' Pavement $2.75 $137050
3936 Chenault Res. 50' Curb & Gutter 2065 132.50
30 Sq. Ft. Driveway .77 23. 10
$ 293�10
Ida Jane Vaughn 9 5 50' Pavement $2.75 $137.50
3934 Chenault Res, 50' Curb & Gutter 2e65 132.50
30 Sq< Ft. Driveway .77 23. 10
$ 293.10
Eugene C. Doyle, Jr. 8 5 _ 50' Pavement $2.75 $137.50
3928 Chenault Res, 50' Curb & Gutter 2065 132,50
30 Sep, Ft. Driveway .77 23. 10
$ 293, 10
John T. McCraw 6 & 7 5 100" Pavement $2, 75 $275.00
2219 Skylark Ress 100' Curb & Gutter L 65 26 MO
60 Sq. Ft, Driveway .77 46.20
$ 586.20
Jim Lee Gunther 5 5 50° Pavement $2048 $124.00
3916 Chenault Res, 50' Curb & Gutter 2065 O L 50
30 Sq, Ft. Driveway .77 23. 10
$ 279.60
6
PROJECT NO. 104-24000-207, UNIT 3: CHENAULT AVENUE - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, SECOND FILING
T. 0. Fulcher 3 & 4 5 100' Pavement $2.48 $248.00
3908 Chenault Res. 100' Curb & Gutter 2.65 265.00
30 Sq. Ft. Driveway .77 23.10
$ 536.10
S. A. Dwight 2 5 50' Pavement $2.48 $124.00
6520 Allena Lane Res. 50' Curb & Gutter 2.65 132.50
30 Sq. Ft. Driveway .77 23.10
$ 279.60
Elmer L. Shoaf 1 5 50' Pavement $2.48 $124.00
3900 Chenault Res. 50' Curb & Gutter 2.65 132.50
30 Sq. Ft. Driveway .77 23.10
$ 279.60
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . . $ 7,960.37
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 11,688.61
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . $191648.98
7
PROJECT NO. 104-24000-207, UNIT 4: BAURLINE STREET FROM ENNIS STREET TO CRI&P RAILROAD,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-
inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by
constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF ENNIS AVENUE AND BAURLINE STREET
WEST SIDE OF STREET RIVERSIDE ADDITION, 1ST FILING
Curtis Session, Jr. 7 83 140' Adjusted to
2317 12th Avenue Res. 100' Pavement $2.75 $275.00
Los Angeles, Calif. $ 540.00
Curtis Session, Sr. 6 83 110' Adjusted to
2723 Finley Ind. 90' Pavement $5.73 $515.70
76111 90' Curb & Gutter 2.65 238.50
118' Sq. Ft. Driveway .77 90.86
$ 845.06
EAST SIDE OF STREET
Thomas M. Evans 131 2 & 3 82 129' Pavement $5.73 $739.17
Rt. 1, Box 393 Ind. 129' Curb & Gutter 2.65 341.85
Euless, Texas 76064 354 Sq. Ft. Driveway .77 272.58
$ 1,353.60
Julius Harris 12 82 140' Adjusted to
2801 Ennis Res. 100' Pavement $2.75 $275.00
76111 100' Curb & Gutter 2.65 265.00
118 Sq. Ft. Driveway .77 90.86
$ 630.86
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . $ 33,369.52
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 3,884.29
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . $ 7,253.81
8
PROJECT N0. 104-24000-207. UNIT 52 LA SALLE STREET FROM BAMILINE STREET TO RETTA AVENUEE, to
be improved by constructing a six-inch hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide
concrete gutter, so that the finished roadway will be thirty feet wide and by constructing
six-inch thick concrete driveways and four-feet wide sidew-alk where specified.
BLOCK
OWNER 'DOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF BAU URINE STREIT AND 1A SALLE STREET
NORTH SIDE OF STREET ADAMS HEM SUBDIVISION
Ola Mae Davis 2 C b 1125 Side 1A)t Adjusted to
709 Baurline Res. 100" Pavement $2.75 $275.00
76111 100" Curb & Gutter 2.65 265.00
100° Sidewalk 2.71 2'11.00
$ 811.00
Frazier Guyden I C _ 55" Pavement $2.75 4151.25
2813 La Salle Ree. 55" Curb & Gutter 2.65 145.75
76111 441 Sidewalk 2.71 119.24
30 Sq. Fit. Driveway 7r' 23.10
439.34
Mrs. E. M. Posey H C 100' Pavement $2.75 $275.00
404 N. Hickory Res. 100" Curb & Gutter 2.65 265.00
Sapulpa, Okla. 891 Sidewalk 2.71 241.19
74066 30 Sag. Ft. Driveway .77 2.3.10
$ 804.29
Lucille C. Smith G C 50" Pavem#ntt $2.75 $137.50
2907 La Salle Res. 50' Curb & Gutter 2.65 132.50
76111 391 Sidewalk 2.71 105.69
30 Sag. Ft. Driveway .77 23.10
$ 398.79
Robert W. Nelson F C 50" Pavement $2.75 $137.50
2909 La Salle Res. 50' Curb & Gutter 2.65 132.50
39' Sidewalk 2.71 105.69
30 Sag. Ft. Driveway .77 23.10
$ 398.79
9
PROJECT NO. 104-24000-207, UNIT 5: LA SALLE STREET - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ADAMS HEIRS SUBDIVISION
Paul Edward Ray E C 64' Pavement $2.75 $176.00
2911 La Salle Res. 64' Curb & Gutter 2.65 169.60
76111 53' Sidewalk 2.71 143.63
30 Sq. Ft. Drive .77 23.10
$ 512.33
Charles Albert D C_ 51.4' Pavement $2.75 $141.35
2915 La Salle Res. 51.4' Curb & Gutter 2.65 136.21
40.4' Sidewalk 2.71 109.48
$ 387.04
Fannie B. Lee C C 64' Pavement $2.75 $176.00
Estate Res. 64' Curb & Gutter 2.65 169.60
3625 Hatcher 64' Sidewalk 2.71 173.44
76119 $ 519.04
Devora Breedlove & B C 50' Pavement $2.75 $137.50
Earl Lou Breedlove Res. 50' Curb & Gutter 2.65 132.50
414 S. Sylvania 39' Sidewalk 2.71 105.69
76111 30 Sq. Ft. Drive .77 23.10
$ 398.79
Mammie Wright, Est. (A) C 150' Side Lot Adjusted to
c/o Mammie Crowder 100' Pavement $2.75 $275.00
1225 Mansfield 100' Curb & Gutter 2.65 265.00
100' Sidewalk 2.71 271.00
30 Sq. Ft. Drive .77 23.10
$ 834.10
RETTA AVENUE INTERSECTS BUBAR SUBDIVISION
Church of God in Christ 6 E 100' Pavement $2.75 $275.00
c/o C. D. Clark 100' Gutter Only 1.33 133.00
1604 Stalcup Road $ 408.00
76112
10
PROJECT NO. 104-24000-207, UNIT 5: LA SALLE STREET - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ADAMS HEIRS SUBDIVISION
City of Fort Worth E. E 50' No Assessment
50' $ -0-
of 5
Fort Worth Ind. 1, 2, E 255.9' Pavement $2.75 $703.73
School District 3, 4 Res. 255.9' Gutter Only 1.33 340.35
3210 W. Lancaster & W. $1,044.08
76107 50' of 5
ADAMS HEIRS SUBDIVISION
Fort Worth Ind. E 364' Pavement $2.75 $1,001.00
School District Res. 364' Gutter Only 1.33 484.12
3210 W. Lancaster $1,485.12
76107
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . $ 8,440.71
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . 19,265.34
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . $27,706.05
11
PROJECT NO. 104-24000-207, UNIT 6: FINLEY STREET FROM SYLVANIA AVENUE TO BAURLINE STREET,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on
a six-inch thick cement stabilized s ubgrade, seven-inch high concrete curb and eighteen
inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and
by constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE: OF STREET SYLVANIA ADDITION, SECOND FILING
Brown Heating & W. 187' of 187' Pavement $4.87 $911.18
Air Conditioning E. 347' of Ind. 187' Curb & Gutter 2.65 495.82
c/o Arthur E. Brown 58 83 Sq. Ft. Driveway .77 63.91
909 S. Sylvania $131470.91
76111
Joe A. Weisberg E. 150' of 150' Pavement $4.87 $730.50
2621 Finley 58 Ind. 150' Curb & Gutter 2.65 397.50
76111 66 Sq. Ft. Driveway .77 50.82
$1,178.82
MARTINDALE ADDITION
T. C. Thomas 21 & 22 115' Pavement $2.75 $316.25
2715 Finley Res. 65' Curb & Gutter 2.65 172.25
76111 50' Gutter Only 1.33 66.50
30 Sq. Ft. Driveway .77 23.10
$ 578.10
Effie Webb 20 3 50' Pavement $2.75 $137.50
2717 Finley Res. 50' Gutter Only 1.33 66.50
76111 $ 204.00
Joe Carbin 19 3 50' Pavement $2.75 $137.50
2529 Lawnwood Res. 50' Curb & Gutter 2.65 132.50
76111 30 Sq. Ft. Driveway .77 23.10
$ 293.10
Curtis Sessions, Sr. 18 3 50' Pavement $2.75 $137.50
2723 Finley Res. 50' Gutter Only 1.33 66.50
76111 $ 204.00
12
PROJECT NO. 104-24000-207, UNIT 6: FINLEY STREET FROM SYLVANIA AVENUE TO BAURLINE STREET -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET SYLVANIA ADDITION, SECOND FILING
Carl 0. Jackson 17 3 50' Pavement $2.75 $137.50
2725 Finley Res. 50' Curb & Gutter 2.65 132.50
76111 30 Sq. Ft. Driveway .77 23.10
$ 293.10
MARTINDALE ADDITION
A. Guery 16 3 55' Pavement $2.75 $151.25
912 Baurline Res. 55' Curb & Gutter 2.65 145.75
76111 $ 297.00
BAURLINE STREET INTERSECTS
SOUTH SIDE OF STREET
Richard Hill et ux 3 thru 7 4 255' Pavement $2.75 $701.25
Amanda Res. 255' Curb & Gutter 2.65 675.75
1000 Baurline 90 Sq. Ft. Driveway .77 69.30
76111 $1,446.30
Arniece McKinney 2 4 50' Pavement $2.75 $137.50
2716 Finley Res. 50' Curb & Gutter 2.65 132.50
76111 30 Sq. Ft. Driveway .77 23.10
$ 293.10
Richard Hill 1 4 65' Pavement $2.75 $178.75
1000 Baurline Res. 65' Curb & Gutter 2.65 172.25
76111 30 Sq. Ft. Driveway .77 23.10
$ 374.10
SYLVANIA ADDITION, SECOND FILING
Mable Thorpe Wright E. 50' of 50' Pavement $4.87 $243.50
1912 Belcrest Drive E. 100' of Ind. 50' Curb & Gutter 2.65 132.50
Greensboro, N.C. 57 $ 376.00
J. E. Winters W. 50' of 50' Pavement $4.87 $243.50
Tarrant Co. CriminalE. 100' Ind. 50' Curb & Gutter 2.65 132.50
Court Building of 57 $ 376.00
76102
13
PROJECT NO. 104-24000-207, UNIT 6: FINLEY STREET FROM SYLVANIA AVENUE TO BAURLINE STREET -
CONTINUED
BLOCK
OWNER IOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET SYLVANIA AVENUE, SECOND FILING
Jimmie Mae Bluitt W. 50' of 50' Pavement $3.81 $190.50
2608 Finley E. 150' Ind. 50' Curb & Gutter 2.65 132.50
76111 of 57 30 Sq. Ft. Driveway .77 23.10
$ 346.10
Susie Byers W. 65' of 65' Pavement $4.87 $316.55
Address Unknown E. 215' of Ind. 65' Curb & Gutter 2.65 172.25
57 $ 488.80
J. E. Winters W. 165' less 132' Pavement $4.87 $642.84
Tarrant Co. CriminalR.O.W. of Ind. 132' Curb & Gutter 2.65 349.80
Court Bldg. 57 $ 992.64
76102
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . $ 9,212.07
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 9,417.53
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . , 18,629.60
14
City of Fort Worth, 'rfexas
Mayor and Council Communication
DATE REFERENCE SUBJECT: Final Payment - Assessment Pavin PAGE
NUMBER at Six Locations on the Northeas
6 71 FP-805 "ide i of
Final Council action on the project described below is requested.
Project Description
Name: Assessment Paving at Six Locations on
the Northeast Side, Project No. 104-
24000-207
Contractor: Austin Road Company
Contract Awarded: May 25, 1970 (M&C C-1742)
Work Order Issued: August 14, 1970
Work Order Effective: August 24, 1970
Date of Final Inspection and Approval: March 4, 1971
Working Time Bid: 90 Working Days
Working Time Used: 64 Working Days
Project Cost and Financing
Original Bid Price: $94,328.35
Change Order No. 1 + 200.00
Revised Bid Price $94,528.35
Final Contract Cost: $80,243.52
Less Penalty for Deficient Paving on Chenault: -$58.50
Revised Contract Cost: $80,185.02
Partial Payments Previously Made: 5, Amount: $72,084.13
Final Payment Due: $ 8,100.89
Payment is to be made from Project Account Number 104-24000-207. A bond
fund transfer of $77.47 is needed to provide additional funds for the pro-
perty owners' share to cover the cost of additional driveways requested by
property owners,
Deviation from Bid Price: The final cost of this project is $14,343.33
less than the original bid price. This under-run was caused primarily by
the following:
1) Necessity for no metal pipe subdrain which resulted in a savings
of $3,600 and:
2) The necessity for fewer cubic yards -of structural concrete resulting
in a savings of $7,440.
The remaider of the cost difference, $3,303.33 is attributable to minor
variations between quantities estimated in the contract documents and
quantities actually measured and used on the job site.
'i
DATE REFERENCE SUBJECT: Final Payment - Assessment Paving PAGE
NUMBER
6J7/71 FP-805 at Six Locations on the Northeast2 of 2
qiHP
Compliance -with Specifications
During testing on this project 21 corings were made with the following results:
Exceeds Even with Under Specs but Below
Specs Pecs Within .Tolerance Tolerance
Paving 13 4 3 1
Sub-grade 9 12 0 0
On the entire project the average thickness of the MAC paving is 6.38
inches as compared to the 6.00 inches specified, and the average thickness
of the cement stabilized sub-grade is 6.09 inches as compared to the 6.00
inches specified. On Unit 1, Chenault Street, the contractor is paying
a deficient paving penalty of $58.50 for the one core listed as "below.tole-
rance". Tests made during construction show that materials used were in
compliance with contract specifications.
Recommendations
It is recommended that:
1) A bond transfer of $77.47 be approved from Account No. 042-09424-901,
Revolving Fund, Unspecified, to Account No. 104-24000-207, Assess-
ment Paving at Six Locations on the Northeast Side and,
2) The project described above be accepted by the adoption of an ordi-
nance and that final payment of $8,100.89 be authorized to Austin
Road Company.