Loading...
HomeMy WebLinkAboutContract 53047 Received Date: Nov 11,2019 Received Time: 12:47 PM Developer and Project Information Cover Sheet: Developer Company Name: Tpulte Homes of Texas,LP Address,State,Zip Code: 1 9111 Cypress Waters Blvd., Suite 100 1 Coppell,Texas 75019 Phone&Email: 972.304.2800 1 clint.vincent@pultegroup.com Authorized Signatory,Title: Clint Vincent,VP of Land Development Project Name: Elizabeth Creek Phase 1 Brief Description: Water,Sewer,Paving, Storm Drain and Street Lights Project Location: SH 114 West of John Day Road Plat Case Number: FP-18-143 Plat Name: Elizabeth Creek Phase 1 Mapsco: Council District: ETJ CFA Number: CFA19-0048 City Project Number: 102000 IPRC18-0122 City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 1 of 11 CITY SECRETARY FT WORTH,TX STANDARD COMMUNITY FACILITIES �GREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 536g7 WHEREAS, Pulte Homes of Texas, LP, ("Developer"),, desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Elizabeth Creek Phase 1 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and. obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance V th paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas UFFiCIAL RECORD Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date:02.20.2017 CITY SECRETARY Page 2 of 11 FT. WORTH, TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Elizabeth Creek Phase 1 CFA No.: CFA19-0048 City Project No.: 102000 1 1PRC18-0122 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 449,869.60 2.Sewer Construction $ 794,481.00 Water and Sewer Construction Total $ 1,244,350.60 B. TPW Construction 1.Street $ 1,106,198.20 2.Storm Drain $ 1,092,976.00 3.Street Lights Installed by Developer $ 138,486.40 4. Signals $ - TPW Construction Cost Total $ 2,337,660.60 Total Construction Cost(excluding the fees): $ 3,582,011.20 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 24,887.01 D. Water/Sewer Material Testing Fee(2%) $ 24,887.01 Sub-Total for Water Construction Fees $ 49,774.02 E. TPW Inspection Fee(4%) $ 87,966.97 F. TPW Material Testing(2%) $ 43,983.48 G. Street Light Inspsection Cost $ 5,539.46 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 137,489.91 Total Construction Fees: $ 187,263.93 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 3,582,011.20 X Completion Agreement=100%/Holds Plat $ 3,582,011.20 Cash Escrow Water/Sanitary Sewer-125% $ 1,555,438.25 Cash Escrow Paving/Storm Drain=125% $ 2,922,075.75 Letter of Credit=125%w/2 r expiration period I $ 4,477,514.00 City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Pulte Homes of Texas,LP Dn Sr Dana Burghdoff(Kov7,2019) Dana Burghdoff Interim Assistant City Manager Clirrf uincenfi Date: Nov 7,2019 Clint Vincent(Nov 5,2019) Name: Clint Vincent Recommended by: Title: VP of Land Development Date: Nov 5,2019 ifer L.Eze k(Nov 5,2019) ZZ Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting R,�d A McCrA4kesz requirements. Richard A.McCracken(Nov 7,2019) Richard A. McCracken c�(V7&�/t'4D A- GPar Assistant City Attorney Janie Scarlett Morales(Nov 7,2019) M&C No. Name: Janie Morales Date: Nov 7,2019 Title: Development Manager Form 1295: ATTEST: A.` '-�' 2 Mary J.kayser(Nov 11, 19) `Mary J.Kayser/Ronald Gonzales City Secretary/Assistant City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 9 of 11 eiTv SECRETARY FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 10 of 11 ATTACIEMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 102000 1 IPRC 18-0122 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Elizabeth Creek Phase 1 CFA Official Release Date: 02.20.2017 Page 11 of 11 W 42 4] DAP•RID PROPOSAL Page t oi-5 SECTION 00 42 43 Developer Awarded Profec(z-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Inrormation Bidders Proposal Bidlisl Item Specification Unit of Bid No. Description Emit Price Bid Value Section No. Measure Quantity UNIT I WATER IMPRaVEMENTS 1 3311,0241 8'Water Pfpe 3311 12 LF 749D $22-50 $168,525.00 2 3312.20031"Water Service 331210 EA 191 $830.00 $168430-00 3 3312-3003 8'Gate Valve 33 12 20 EA 23 $1,370XO $31.510.00 4 3312.0001 Fire Hydrant 331240 EA 16 $3,930.00 $62,880,00 5 3311.DD01 Ductile Iron Water Fittings w!Restraint 3311 11 TON 7-49 $2,440-00 $16.275,60 6 3305.0109 Trench Safety 330610 LF 7490 $0.1❑ $749,00 7 0241-1118 4%12"Pressure Plug 0241 14 EA 1 $200=1 $200.00 _8 3312.4112 16'x 8"Tapping Sleeve&Valve 33 12 25 EA 2 $4,00.00 $9,200,00 9 10 11 12 13 14 15 16. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 33 34 35 38 37 39 40 _ 41 42 TOTAL UNIT I:WATER IMPROVEMENTS 5449,669.60 Contrac tor agrees to complete WORK for FINAL ACCEPTANCE within 180 ea leodar days a(ter the date when the CONTRACT commences to run as provided io the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECI FICA7fON DOM MENTS•DEVELOPER AWARDE D PROI ECT$ Form Version Sepiemher 1.20t5 W 42438id Proposal_OAP 004243 DAA-81D PROPOSAL P�gr 2 at 5 SECTION 00 42 43 Degeloper Awarded Projects-PRO PC)SAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Ite ❑escri Ian Specification Unit of Bid No. Section No- t fea5lirC Quantity Unit Pne¢ Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3331.4115 8"Sewer Pipe 3311 10 LF_ 6474 $30,00 $194,220.00 2 3331.4308 21"Sewer Pipe _33 11 10 _ LF 231 $95.50 $220,987.00 �3 3339.1001 4'Manhole 33 39 10 EA__ 22 _ $2_,560-0 $56,320-00 4 3305.0116 Concrete Encasement for Utility Plpas 33 05 1R LF 605_ $30.00 $18,150.00 5 3339.1403 4'Extra Depth Manhole 33 3920 �VF _ _ 81 _$-140.00 $11,340.DC 6 3339.1101 5'Manhole _T 333910 EA -_ 12 _$4.900AD $68.800.00 7 3339.1102 5'Drop Manhole_ 33 39 10 _ EA` 4 $8,600.00 $26,400.00 8_ 3339-1003 5'Extra Depth Manhole _33 39 20 VF_ 132 _$220.00 _ $29,040.00 9 3339.0001 Epoxy Manhole Liner 33 39 do VF 68 $270.00 $17,820,00 10 3305-0113 Trench Water Stops 33 05 15 EA_ 11 __$300.00 _ $3,300.00 11 3331.31014'Sewer Service 333150 EA i91 $660.00 $126,060-00 12 0 nnect to ExisF}ng 5'Manhole _00 00 00 EA -- —1 $1,500.00 $1.500.00 t___ - 13 3301.6101 Manhole Vacuum Testing 33 01 30 �FA - - -- --- 38 _ $110.00 -$4,180.00 14 3305.0109 Trench Safety 33 05 i0 LF 8788 $1.00 $8,788.00 15 83s71.0062 Post-CCTV Inspection 33 01 31 LF 8788 52--- $17,576.00 1S - --- - 18 - -- - 20 - — 22 - - — - - 23 - - 24 -- - 25 27 28 — -- - - - _29 - - 31 33 -- --- - - - - 34 - — - 37 - — -- 38 - — - - -- 41 - 42 - - - - - - 43 — — 44 - 45 TOTAL UNIT II:SANITARY EWER IMPRQVEMENT $794,481.00 Centractor agrees to complete WORK for FINAL ACCEFT E within 100 calendar dsys after the date when the CONTRACT commences to run as provided in the(Re neraI Conditions. MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-OEV ELOPIER AWARDED PROJEM Furor Ve ..Septemhn 1,2015 1104243-Bid Proposal-DAP 004243 DAP-HID PROPOSAL Page 4 00 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Ste Specification Unit of Sid Na DcscriptivD Unit price Bid Value Section No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 3213.0101 6"Canc Pvmt ,T 321313 SY 25721 $3350 $861.653,50 -2-3213.0301 4"Cone alk Sidew - 32 13 20 SF 2089 _ $6.50�$13.578.50 3 3211.0501 fi"Lime Treatment 32 11 29 SY 27521 $3,00 $82,563.00 4 3211.0400 Hydrated Llme - 321129 TN 496 $165.00 $81,840.00 5 3213.0501 Barrier Free Ramp,Type R-1 _ 321320 EA 8 _ $1,6(10.00_ $12,800A0 6 3-0505 Barrier Free Ramp,Type P-1 321320 EA 16 $1,300.00 $20,800.00 7 3291.0100Topsoil 3291 19 -CY 1773 $10.00 T $17,730.00 8 3292.0400 Seeding,Hydromulch 32 92 13 SY 15952 $0.35 $5,583.20 9 3471.0001 Traffic Control 34 71 13 MD 1 $2 000 $2,000.00 10 0.0 -- TxDOT Turn Lanes Altercate 81d item - 12 9999.0007 Excavation - T--- 00 00 00 CY -1200 $8.001 $9 600.00 13 9999.0008 Remove Existing Striping 00 00 00 LF 556 $1.00 $555,00 14 3441.4108 Remove Sign Panel and Post 3341 30 EA 7 $125.00 $875.00 15 5241.0550 Remove Guardrail 4 02 41 13 LF 277 $10.00 $2,770.00 16 9999.0009 Ccnneet to Existtng Pavement __ _ 00 00 00 LF 1280 $10,00 $ 22 800.00 17 9999.0010 12"CRCP �� 00 00 00 SY 1879 $87.85 VK070.15 18 9999.0011 1-112"Type D ACP --` 00 00 00 SY 2146 $15.30 $32 833.80 19 9999.0012 6"Cement Stabilized Subgrade �-00 00 00 SY 2146 .30 $11,373.80 20 9999.0013 I"Lfine Stabilized Sutigrade -- -00 00 00 -SY 2146 $5.30 $11.373.80 21 9999.0014 Emulsifier 00 00 00 SY 2146 $3.00 $6 438,00 22 9999A015 Cement Material @ 301b/SY 00 00 00 Tel 33 $165.00 $5.445.00 23 3211.0400 Hydrated Lime Q 331bfSY 321129 TN 36 $165.00 $5.940,00 24 9999.0016 Guardrail 00 00 00_ LF 206 W,00 $g 270.p0 25 9999.0017 4" ermoplastic Stripe - -^ -- --00 00 00 LF u 2289 $1.50 $3.433,50 26 99%.0018 24"Thermoplastic Stop Bar 00 00 00 LF 4 $15,95 $63&()0 27 9999.0019 Thermoplastic"ONLY" 00 00 00 FAA 4 $375.00 $1,500.00 28 9999.0020 Si le The rmoplastic.An-ow - O0 00 00 EA 4 $375,00 $1 500,00 29 3471.0001 Traffic Control 34 71 13 MD 1 $7,500.00 $7.500.00 30 31_Street Sins 32 3441.4006 Install Alum Sign Ground Mount 34 41 30 EA- 17 $450.00 $7 650.00 33 34 - -- 35 36 37 38 39 - - -- - 40 - 41 _.. 42 --- _ 43 - 44 -- 45 - TOTAL UNIT IV:PAVING IMPROVEMENTS $1,106,198.20 Contractor agrees to Complete WORK far FL-NAIL ACCEPTA.'VCE within calendar days after the date when the CON TRAC-1'commences to run as provided in the General Conditions. Crry OF FORT WORTH STANDARD CON57RUCT10N SPECIFICATION DOCUMENT$•DEVELOPER AWARDED PROJECTS Form Vmmn Seplcmbe I.2015 W 42 43 Bid Pmp-L PAP 004243 DAP-BIDPROPOSAL Pnye 3 of 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item lnfoanslian Bidders Proposal BidN fte Specification knit OF Bid No. Description Ural Price uantity Bid Value Section Na- Measure Q UNIT III:DRAINAGE IM ROVEMENTS 1 3341.1303 2-6'X4'Box Culvert 3341 10 LF 440 $734-00 $322,960.00 2 3341,05#64"RCP,Class III 33 47 10 LF 135 $232,00 $31,320.00 4 3341.0402 42"RCP,Class III 33 41 10 LF 632 $14&00 $93,536.00 — 5 3341.0309 36"RCP,Class f!I 3341 10 _LF_ 620 $112.50 $69,750.00 6 3341.0302 30"RCP,Class III 33 41 10 LF - 1086 $84-00 $91.224.00 7 3341.02fl8 27"RCP,Class III _33 4_1 10 LF_ _38 $71.00 $2,598.0a 8 3id 341.0_2U6 24"RCP,Class III_ _ 33 41 16 _ LF 1184 $66.50 _$78.736.00 9 3341.0201 11"RCP,Class 111 — 33 41 10 LF - 463 $57.0D $26.391.00 - - . —. 1 Concrete Collar 33 05 17 EA 3 $4D0,00 $1.200.00 11 3349.5001 1D'Curti Inlet 33 4920 EA 25 $3,700.00 $92,500.00 - - - - - 12 3349.50.02 15'Curti Inlet 33 49 20 EA 4 $5,200.00 $20.800.00 13 3349.0001 4'Storm Junction Box 3349 1D EA _ 10 $4,600A0 J$4fi,00D.00 14 14 3349-DOD2 5'Storm Junction Box 33 49 10 EA 5 $4,800-00 $24,000.00 - -- u ct x— - -. ..._. --- - -- 15 3349.D0o4 7'Storm Junction Box 33 4910 EA 1 $fi,600.00 $6,600.00 --__ - -. -. .. --- ..... ----- - — 16 9999.0002 TXDOT 6'x4'CH-PW,5 Headwall 60 00 60 EA _ 1 $16,000.00 $16.000,00 17 9999.o003 In&Precast Safte End Treatment— _ --•— - y _m......-•- Type II 060000 - EA 4 — $3,300.00 $13.200-00 18_ 3349.0166 Manhole Steps 3349 10 _ E.A. 13 $24-00 $312.DO 19 3137. 2 Large Stone li prap,dry _31 37 00 _ SY_ 208 $70.00 $14,56D.90 20 3305.0109 Trench Safety 33 0510 LF _4598 $0-50 $2,299.00 9999.oDo4 TXDOT6'x4'FW Headwall __ 00 0000_ _ EA_ _ _ _ 1 _ $17,900.00 $17,900,00 21 3137.01--Large Stone Riprap,dry 31 37 00 SY 296 $70-00 $20.720.00 22 9999.0005 5"3000 PSI Concrete for Weir 00 CO[k7 SY 175 _ $88.00 $15,400.00 23 9999,6666 4"3000 PSI Concrete for OutfalI Flume 00 00 00 SY 1150 $73.8t] $84,870.00 24 - — - — 7 26 — - - -- 26 - - — --- - - - -- 27 - - — — — 28 29 30 31 32 33 34_ 35 - 36 - 37 __ - 38 - - 39 - 40 — - — — 41 _ - - 41 — 43 4- 45 — 46 — — 47 48 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $1,092,97fi.D0 Contractor agrees to cvmptete WORK for FINAL ACCEPTANCE within t80 calendar days after the date when the CONTRACT commences to rua as provided in the GeneraE Conditions. Cf3V OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-OE V ELOP ER AWA R DED PROIEC r$ Form Version stpinnber 1.2015 1 4?41 Berl?MPM]_DAP 00 4213 DAP-BI❑PROPOSA L Paso 5 of 5 SECTION DO 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification I [Inis of Bid Ii❑ 1]escr1Pllon Section No. Measure Quantity UniI Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3016 2"CONDT PVC S C H 80(T) 26 05 33 LF 2610 $11.39 $29.727.90 2 3441.3050 FumishllnstalI LED Lighting Fixture(70 watt ATBO) 3441 20 EA 34 $270.00 $9.180.00 3 3441.3301 Rdwy Illum Foundation TY 1,2,4 3441 20 EA 34 $1.064.00 $36,176.00 4 3441.3351 Fumishllnsta€1 Rdway Illum TY 11 Pole 34 41 20 EA 34 $1,436.00 $48,B24,00 5 3341.1646 Fumishllnstall Type 33B arm 3441 20 EA 34 $210.00 $7.140.00 6 3441.1410 NO 101nsulated Elec Cond 3441 10 LF 7830 $0.95 $7,438.50 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT V;STREET LIGHTING IMPROVEMENTS $138,486.40 Contractor aZrees to complete WORK for FINAL ACCEPTANCE within JU calendar days after the date when the CONTRACT commences to run as provided in the General Condifiatm. END OF SECTION &1a ffed b d Wolfe President Independent Utility Construction, Inc. CITY OF FORT W03TH STAB DARD CONST RUCTION SPECIFIC ATION DOCLI MENTS-DEVELOPER A W ARDE D PROlEC75 F.—Vernon Scw.bc,1,2015 410 42 438111 Pmposal_DAP z w g Ow cc,�)°° H c~n$r� N O UWHw J m�Da LU LLmL)ui I I 11 / o LO / CSLL= I & �bo 7 o o dy `7 S w �tib 9�� o J co f �� J i M S�Sj f 0wLOo �bLuW X cn y Luwaz V Q J}Va o j o o m ' o 0 avow AVa NHor / Q 3NVl3lVJNI1HJIN � 4V021 3NI�Ai Nnoo S 3Nb 1?J3182iVMLU f W� Op rn� N o � JL 3NV13ONVNIIVHU > 'I-' z / W p LA v _ N z � o,`L3 J o oPoa W w J U O z F- O z Z � w g 00 W cm)co N 3 O ° O H o� w J o cUn�pa Aav4Nnoa w ; LL 0 U Ljj ua3doad — ►� o U)z \ ( oo LL O w N� I � � 1 x - w a O � o z m� � _� w O CD I �$w I �doa oA N0 a d w L.�-FXN Q~P J .. J W'�wW I� AVM AE J38N3d z O J of Oo° " �O LLJ Q J �v a 3m ]AV SM3�10 m Nm - - _ 1 r w� = Mw I �� � > 3f1N Q 3nb' N132�c ��w LU Q �= "p c`nn. / W o � I cW WN IN 3nNa GNV-liOJ V * m I � m 2 > w H � ° W o w w m o w " M w w j W w ® _ a Q 1 z fi — d W w = wp w J I w w w ui W s ww O� Na 11 a w a w ow Q w W II _,o g w cn co oZ M U) Z Z) u z V N �u Z � w g Oo -W� OD r '. U)OP!2 09 UwrM to navaNnoa °d W ly 0 UCD w \ ( o fr O I n N 1 44/ 1 I " o Q o z CD oN a a d w �wX a Z VF~n Q <J�1 _ . WCD JW." N O N AVMi1�1b38W3d ITT w Q o ?of 00 }va a I Q 3nN3n`d SM32:JO cl I " Z I Q �wINILU a z I � z �w _ Q — 3nN3AV NIM ] —H-111 �w 0 —WI moo= poll a c`nn� z W o � � W o ^ l o 3AUHG GNV-liOJ a l W (� *t I < I I J Z O Cl) Cl) W H w o Z Z � Lu N ~ W � w of co M w Z Q Z W w N w o Q F J cnwoQ W .W Q W llo CC) w `L ��� o \J " w W W az( Q w a a a-�LL pTpT U)Ww al "Na I� X Of X Ww} Q W I a w a w ooa o w I a != m ocnz ww _ Q _jz9 co W Q 6 Q w e z 2a li p Z- NI Z w o 0 . W MM M o a. � M U)O o M N O o (nH CO V Adv(]Nno8 w Al2i3d02id L1 LL CDU U Z _ o lyO \ o LL 44/z O � o / Z� W O v K/ CD >� a= c =criuoiN �WX CCZ a Z f^< V�J�1 — — p W C') lkvm 131b38W3d z O JofOo " w Q a Q 3M1 IAd SM3210 1� m r r Q I �j - UJ Z Q 3nN3AV NIM I �� ©`LU—crMo - - - - - IrQN U) N 0� a -c`nn� / W� o 0 LL� a W I Q / LIB o N Q 3/�Ria QNb'11lOJ / U W a m 2 � ; N � o w H z M a o w W O w — 0 OJ Q o F- � g W N 0 p 0 0 >. Z W m m U) > " o oCD LO Y Y d Q A Q m m O" I ?w i W job W W d uma I' g_ 0_ U coal P w II W co (N cn U) _ " II J co Q U x e_ � x m Z w o cm)co 0 z 0 . ly Lo— 0 H wopm O N U ` U w-M j J m�pa x navaNno8 W a LL�U LLj 0 in ua3doad ►� o U)z m x a — — / o EEO z'� O "ccoo \ U \` Z\d U U X FM V N X 10 xx x C0 m 0 — — z l m 0 z v U o z 0 Q a z U J '� m ��� ���� D z �.Z z OCo _ V J W W U I �j Waa " N xzXz at o z in Ln in X N $ O v o� I iCMI) n o N a m °ate°� w �FF� _ l �j mW I AVM 2 38W3d I z J WOO Ca" c� LU U W Q Z in X �vva �� II � � � � 4 I ¢ J m a� z �X v 3f1N3nd SM32��M =o 0 Z °' N� N — LIB N U U a U d X_ I U � � Q DWI c m I o = O � � � U LU X I �I� z M N Z-= > M W W 0 v N N O > c~i-W I 3f1N3AV NIMI I ❑ N Q �= X ❑�I M__ __ j4T) �� / W ocn I CD �I I `�—�I �LLJ o o ❑ LL O N Q J�/Aflllk aNb'�lOJ "' W Q V w I J Q � aI — ° 2 C) > �� aa a zn0 W Z Q Z W z° �" z _ w I z - � LD � I " cn I � r'1 N NCOZ J Z_ Z_ a m z N N N X Z J O //II O O J CD CD CD 0 of 'z0 O N /I w�W z CD OH cn in Zp O U I �rQ // W p CD O O WZ °I z Na �� W d fn O O ¢c WLU m a II J 0 o I v X w d W d d W� co m J V Z= ¢ -j p = um) ¢ X o U W w �z a II z: q� Z � w g 00 W cm)co N O ow -M J m�0T navaNno8 LU ; ly LL U LLj ua3doad — ►c CDU)z \ ( oo fr O 11 _ I >I ^ 1 � — J 0 z o� I � � o � CD \ w a a a W �wx CCZ AbM 2138W3d \ �j J*k W w — — — craw TFFN ~af00 0 U- z }Ua- c i � w Q N acl aJ a I I I II ` IF II N } I I I I I I Lu _ _ _ _ _ _ _ ©N > W — —3 bnkla N13� — — of I Y ��I ICI ICI (n W o a CD `o I ICI 1El a W IQI z C7 NW o N II — I..V I r I IOI w 3ARIa ON,b�lOJ— O w 2 W o H 2 � z o Q W ° w I — — z cnZ qm o (D W 'V Z in W J W ¢ W o \ � (n cn W _� o % o o W U II C� O U \\ W d H — O J O U) m Q a W X cn r L � W eo a I I 'l F= lip