Loading...
HomeMy WebLinkAboutContract 53050 Received Date: Nov 11,2019 Received Time: 1:08 PM Developer and Project Information Cover Sheet: Developer Company Name: PMA FW Presidio LLC Address, State,Zip Code: 2929 Carlisle Ste. Ste 365,Dallas,TX 75204 Phone&Email: 214-361-5000,pmaA,,1eg_ac�cap.com Authorized Signatory,Title: Peter Aberg,Managing Member Project Name: Presidio at River East Brief Description: Water,Sewer,Paving, Street Lights Project Location: NE comer of Race St and Oakhurst Scenic Blvd Plat Case Number: Plat Name: Mapsco: Council District: 9 CFA Number: 2018-063 City Project Number: EO 464 City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 ��������`�����® Page 1 of 11 CITY SECRETARY ET WORTH,TX STANDARD COMMUNITY FACILITIES GREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 53050 WHEREAS, PMA FW Presidio LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Presidio at River East ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the cgllective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth,as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas OFRUA L RECOkU Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 CITY SECRETARY Page 2 of 11 FT.WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ❑, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Presidio at River East CFA No.: 2018-063 City Project No.: 101464 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 91,969.20 2.Sewer Construction $ 78,599.64 Water and Sewer Construction Total $ 170,568.84 B. TPW Construction 1.Street $ 111,629.00 2.Storm Drain $ - 3.Street Lights Installed by Developer $ 7,500.00 4. Signals $ - TPW Construction Cost Total $ 119,129.00 Total Construction Cost(excluding the fees): $ 289,697.84 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 3,411.37 D. Water/Sewer Material Testing Fee(2%) $ 3,411.37 Sub-Total for Water Construction Fees $ 6,822.74 E. TPW Inspection Fee(4%) $ 4,465.16 F. TPW Material Testing(2%) $ 2,232.58 G. Street Light Inspsection Cost $ 300.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 6,997.74 Total Construction Fees: $ 13,820.48 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 289,697.84 x Completion A reement= 100%/Holds Plat $ 289,697.84 Cash Escrow Water/Sanity Sewer-125% $ 213,211.05 Cash Escrow Paving/Storm Drain=125% $ 148,911.25 Letter of Credit=125%w/2 r expiration period $ 362,122.30 City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER PMA FW Presidio LLC Oang Br o Dana eurghdoff ov4,2019) Dana Burghdoff Interim Assistant City Manager f r r peteraberg(Nov4, 019) Recommended by: Name: Peter Aberg Title: Managing Member ifer L.Eze k(Nov 4,2019) velyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing,I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting R4:44rd A. plc Ackerz requirements. Richard A.McCracken(Nov 4,2019) Richard A. McCracken �7�1%g c�G 2tt Rrlw,�f Assistant City Attorney Janie Scarlett Morales(Nov 4,2019) M&C No. Name: Janie Morales Date: Nov 4,2019 Title: Development Manager Form 1295: n 7'4^( r o: .c ATTEST: �1 A .. 7 V' Mary J. yser(Nov 11, 19) •' Mary J.Kayser/Ronald Gonzales City Secretary/Assistant City Secretary I � City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 9 of 11 CITY SECRETARY FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101464 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Presidio at River East CFA Official Release Date:02.20.2017 Page 11 of 11 00 42 43 DAP-BID PROPOSAL Pagel or7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid No. p Section No. I Measure Quantity Unit Price Bid Value UNIT is WATER IMPROVEMENTS 1 0241.1510 Salvage Fire Hydrant 0241 14 EA 1 $3,463.80 $3,463.80 � 2 3305 0109 Trench Safety _ 33 05 10 w w LF 88 $7 00 $616.00 3 3305 0111 Valve Box Adjustment 33 05 14 EA 1 $250.00 $250.00 4 3311.0041 4"Water Pipe 3311 10, LF 31 $22.55 $699.05 3311 12 5 3311.0141 6"Water Pipe 33311 3 11 92, LF _.41 _..$51.75 $2 121.75 w .... 6 3312 0001 Flre Hydrant _ .._._._ _. 331240 EA 1 $3,463.80 $3,463.80 7 a_3312 2801 3"Water Meter and Vault 33 12 11 EA 1 $14 490 00 m$14 490_00 8 3312.2802 4'Water Meter and Vault 331211 EA 1 $15,870--- $15,87_0.00 _._ - _ _ 9 3312 4003 8 x 4 Ta it _Sleeve&Valve 331225 EA 2 $5,092.20 $10,184.40 10 3312.4004 8"x 6 Tapping Sleeve&Valve 33 12 25 EA 4 $5 437 20 w $21 748.80 __ 11 µ 9999.0005 Kill Service(3/4'Domestic) 00 00 00 EA 2 $850 40 $1 700 00 12 9999 0006 8'x2 Tapping Sleeve and Valve 00 00 00 EA 1 $1,000.00 $1,000.00 j 13 9999 0007 2 Irngatlon(Meterw 00 00 00 EA 1 $1_000 00 $1.000.00_ 14 9999 0008 1 Irriciation Pl e 00 00 00 LF 16 $960 10 $15 361 60 _.., 16 17 � I_. 18 ------------- 19 _ 20 .. s 21 22 23 _. _ 25_. 2 26 27 28 _ n TOTAL UNIT I;WATER IMPROVEMENTS _ $91,969.20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 004243_Bid Proposal DAP t 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BIDBidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS . _ _..._, _ _ LF 92 $13 58 ..�$1 24936 1 3301 0002 Post CCTV Inspection 33 01 31 2 3301_0101 Manhole Vacuum Testlnq 3301 30y EA 3 $416.88 $1 250.64 3 3305 0109 Trench Safety_.___-_ _ _,,.,_ 33 05 10 LF 92 $43 48 $4,000.16 4 3305 0113 Trench Water Stops 33 05 15 EA 2 $100 00 $200.00 5a._. 3331 3102 4 2-Wad Cleanout y _ W 3331 50 p .F EA 1 $1 084 68 $1 r084.68 6 3331.4101 4"Sewer Pipe 3311 10, LF 24 $159.F6 $3,849.84 33 31 2.0_.__ ._. ,_ __ _ _ 3331.4115 8"Sewer Pipe 33 11 10, LF _.,,._._.. rt68 $174 47 $11,863.96 7 3331 12, 3331 20 . _ 33 39 10, EA ry V T 2 Tv $12 903 00 $25,806.00 8 3339.1001 4'Manhole —--- --------- __,__H.. 9 3339.1002 4'Drop Manhole _ ..._._... 33 39 10, EA 1 $7,935.00 $7,935.00 _,_____ _.... ___..w... _. _. .- _._. _.__u.... 33 39 20 10 3339,1003 4'Extra Depth Manhole 333910, EA 1 $21,390.00 $21,390.00 33 39 204w 26 27 ......._-----___ 28 29 30 31 M._._ . ...__ 32 33 34 ....... ..... ... 35 36_w _ 37 38 39 40 i 41 42 43 44 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS1 $78;599.64 i CITY OFFORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER.AWARDED PROJECTS Form Version September 1,.2015 00 42 43—Bid Proposal—DAP 00 42 43 DAP-13IOPROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM IT PRICE BIDBidder's Application Project Item Information Bidder's Proposal Bidlist item Specification Unit of Bid No Description Section No. I Measure Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 2 _----------. __ _ �. _ _-._.-_..._ w,__._..u_. _ ,..._... . ...-. .___..W,. __ __.-.a. ._.. _.-_. 3 4 5 6 - ._._._ ____. _w . ._.a____._.. .. .._ __ __. - .__.._.__ _._ _ . . 8 9 10 12 13 11 15 . ._ 19 20 21 24 26 28 32 41 42 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION.DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2015 00 42 43_Bid Proposal DAP 00 42 43 DAP-BID PROPOSAL Page.4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM IT PRICE BIDBidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid No, p Section No. I Measure Quantity U.iIPice7 Bid Value UNIT IV: PAVING IMPROVEMENTS 1 0170.0100 Mobilization 01 7000 LS 1p $10 000 00 T $10 000%00 _ __ 2 0241 0401 Remove Concrete Drive 02 41 13 SF 405 $2 00 $810.00 3 0241 0500 Remove Fence 0241 13 LF 133 $665:00 4 0241 1000 Remove Conc Pvmt 0241 15 SY 16 5 0241 1100 Remove Asphalt Pvmt 02 41 15 SY 190_ $8.00 $1,520 00 6 0241 1300 Remove Conc Curb&Gutter 0241 15 LF 481a $2 00 �$96200 7 3110 0101 Site Clearing 31 1000 LS 1 $8 000 00 $8 000.00 _ 9 8 3110 0102 6 12 Tree Removal 31 1000 EA 7 _. $350 00 $2 450.00 9 31100103 12 18 Tree Removal 31 10 00 EA 2 $700 00 $1,400.00 _ _. _w 10 3211 0400 Hydrated Lime 3211 29 TN 35 $176.00 $6,160.00 11 3211 0501 6 Lime Treatment _ 3211 w29 SY 500 $6 00 $3 000.00 12 3212.0302 2 Asphalt Pvmt Type D___..__n, „32 1216 SY _.$12 00 $2 460.00 13 3212.0501 4 Asphalt Base Type B 32 12 16 SY 205 ....____.„-$62 46 $12 805.00 14 3213 0101 6 Conc Pvmt 32 13 13 SY 117 $123 08 $14 400.00 15 3213 0301 4 Conc Sidewalk 32 13 20 SF 841 $8 34 $7 015.00 16 3213 0311 4 Conc Sidewalk Adjacent to Curb 32 13 20 SF 1342 $5 23 $7 015 00 17 3213 0401 6 Concrete Driveway 32 13 20 SF 718 $12 12.5 53 $9,000 OOV .n. 18 3213 0506 Barrier Free Ramp Type P 1 32 13 20 0. EA 2 $850 00 $1.700.00 19 3216 0101 6 Conc Curb and Gutter 32 16 13 LF 132 $7 27 $960.00 20 32170001 4 SLD Pvmt Marking HAS(W) 32 17 23 LF 76 75 $57,00 � 21 3232 0101 Conc Ret Wall with Sidewalk Sidewalk 32 32 13 SF 88 $10 00 $880 00 22 3291 0100 Topsoil 3291 1.9 CY 13 $30 00 ._ $390.00 _ w 23 3293 0103 Plant 3 Tree 32 93 43 EA 4 24 3471 0001 Traffic Control 34 71 13 MO 2 000 00$300 00 $1 000.00 $3 __ $6 n00.00 25 9999 0001 Salvage Gas Meter 00 00 00 EA 1 $1 300 00 $1 300.00 26 9999 0002 6"Conc Curb and Gutter(Inverted per 00 00 00 LF 308 $20 00 $6 160.00 1 27 9999 0003 Pedestrian Rated Steel Plate(per plan) 00 00 00 SF 48 $45 00 $2 160µ00 28 9999.0004 Erosion Control< 1 acre 00 00 00 LS 1 $3 000 00 $3,000.00 29. . 30 31 _____ 32 34 35 37 -..... _ __..38 39 40 41 m42 __.___.M_ - 44 45 _- TOTAL UNIT IV:PAVING IMPROVEMENTS $111,629.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Verson September 1,2015 004243_Bid Proposal_DAP 00 42 43 DAP-BID PROPOSAL Page :of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid No. p Section No: I Measure Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS ll LED L 1 3441.3054 Furnish/install Lighting Fixture 34 41 20 EA 1 �0 $7 500 00 r _. __. _w 9 g ure $7 500 0 _.__ .00� 2 4 7 .._a.___ ...__.._,__ _. 12 10 11 13 14 15 16 17 18 _. 19 _. 20 21 22 23 24 25 26 - 28 29 30 31 32 ----.,,u . ._ 33 .. _._ 36 37 38 39 _.40 41 ___._. 43 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $7,500.00 CITY OF FORT WORTH :STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September I,2015 0042'43_Bid ProposaLDAP 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS 1 _ -- _. _ ___ ..__ _. �. _ __.._. e__.. .. _.._. _ __... . A 7 8 _ 10 w.___ _....a_.. __ _ __ . _,..__.._ _- �__._._._.. .. _.__.-_.� ___._,._..__. ,..__.. 13 �5_ 16 _- 17 18 19 — -_---___ .w_-- 20 21 j 23 24 25 26 29 30 31 32 33 34 35 37 __._. ..._. 3 _._ 9 41 42 .._ _--- ...;a 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Verson September 1,2015 00 42 43_Bid Proposal—DAP 004243 DAP-BID PROPOSAL Pagr 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity Did Summary UNIT I:WATER IMPROVEMENTS $91,969,20 UNIT II:SANITARY SEWER IMPROVEMENTS _ _$78,599.64 UNIT III: DRAINAGE IMPROVEMENTS UNIT IV:PAVING IMPROVEMENTS T $111,629.00 UNIT V:STREET LIGHTING IMPROVEMENTS $7,500.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Total Construction Sid $289,697,84 Cantractor agrees to com cte WORK for FINAL ACCEPTANCE within 96 calendar days after the date when the CONTRACT co tenr •to ru as provided in the General Cond'etians i u � �u "� ,fir„ c�►�4fi-'"� G�c END OF SECTION CITY OF FORT woRTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farm Vernon Sepiem ber 1,2015 00 42 43 Sid Proposal DAP O O W I rn m 0 0 -4 -1 LD -4 o - 66 oM 00 o � 0 0 0 0 0 � � o Ln � 0p zz ZN U U U r� � w O w Y � � O IZ a = O K = a Z F W LU U l Ln U � N H Q LA w a � > � g W U 0 z � oF- U 0 of Lu Fa U =U cac dd, G b� y�9 �II1�1 I�I����IIII �3 t: O Ci c`i LL Z C3 n G 1 c�c Q 6mp•6ulned VdD OTb0-ST\s4lglgx3 VAD\s4lglgx3\sbulmuJa\SOO\u6isaO\LL60000\006000\00Suollonpojd\:J:H1tld]lId Wd TS:b:ltl 6TOZ'T01!jdy'AepuoW:NO AleW magl}eW:X0 Cl 11Old �. z ¢W > z w U N a�l ¢ 2 ¢ j in o " w ' UZ m LL 0 0 0 0 0 pL'J Z 0 0 O O O LU 0 0 00 0 0 0 �l WIF a a a a c c J I AL 4� �' Z j j cn c Q W J O p � '' O XQL: N p I ti O I O Z Z --i O Z Q u X u- ',w lv Z W j WW w w ~ I X t= Z wo X Qo w wz cr- � u X t — w Ow /0❑ X Q w a u W - } N CO U H_ a CO EL � � \ � � � � zoW �_ � � I S O ~ O W C/) III W �- O � I o p ���Illui O a ?Ln LO j , _ � a }. ? rx o W Lr, Z Q o Lo ` u; �u I F— a N t;r7 w c ' v~ Nil o CD nn c� u'a x V)w cn u'a w 6mp•ja4eM VdO\s lglgx3 yj:)\s4lglqx3\s6uimeJd\S00\u6isaa\Z/60000\006000\OOSuoiannpoJd\:S:H1tld]lId Hd 9£:S:ltl 6TOZ`T0lljdy'AepuoW:NO/VeW mag44PW:A9 COLLOld UBGC WATER, ceurraiiv'crwco ►un " EXISTING 6" PUBLIC SSMH ON EXISTING 6" SSWR LINE /\ SSWR LINE _ RIM = 553.13 FL 4" IN = 549.62 2 CP XS FL 6" OUT = 549.45 Mw - - - - - - - - - - - - - - - - - 1N- ^ 4" 2357 LF @ 3.457 (PUBLIC) SMILE ORE VENUE~ INSTALL CLEANOUT @ Rl -OF-WAY ARIES) PROPERTY LINE FL 4"= 550.43 + a ,..Lr- fZt r_Z- I_ PRI VA TE 4" SSWR LINE' L_Lj— r� ❑ EXISTING 18" PUBLIC SSWR LINE © 0. 129 w SS WR MH _ r 578.46 NW 578.46 SE c�?�`r� , PROPOSED SSMH RIM = 534.36 ' FL 8" OUT = 524.14. m J L 0 r D.O.E. NO. 0976rt PR1 VA TE 8" SSWR LINE ` SEWER PROJECT NO. — PS46-070460410170 CITY PROJECT NO. a X-16697 RACE STREET 6M#1 CP SIR 1� t (60'R1GIiT-OI-WAY) 1/20C YPA 8" 67.73 LF SDR-26 0 74Z (PUBLIC) . . 526,45 SSMH ON EXISTING 18" SSWR LINE EX SSWR MH RIM = 527.98 FL 8" IN = 519.07 FL 18" 1N: 518. 18 NW FL 18" DUT = 518,25 a FL 18" OUT. 518, 18S O [:RAI,H I r.SCALE I N FM HORIZONTAL 15 R. D U N AWAY EXHIBIT 'A-1' 550 Bailey Avenue •Suite 400•Fort Worth,Texas 76107 SEWER EXHIBIT Tel:817.335.1121 mo (TXREG.F-1114) McLEMORE AVENUE w CITY PROJECT NO.101464 3 a I b 4 W W z-� � ❑ � o o° o o� w (1 Cp1 (1 y O 15 X � VO J a L M • o e W f Z I > I ,� Q ° I I.I_I a � a 0 u w a J 5U Q W � ~ Z � ® m m wo > r' X Q O Z U ® = Z 00 X > Wa LU Q } d U L: C U ❑ G O o B I o � I � SCENIC ' HILL DRIVE �I 3 LL N V O Z Lei LL}^W Cp c N ~�JZ, O c of co LO p 4Wip a W ,a J wz � LO 6mp•6ulned tlj3 01b0-91\s!!glgx3 yjo\s1!glgx3\s6u!mejp\S00\u6!saa\LL60009\006000\00SuolpnpoJd\:J:H1tld3lIj Wd 91:9:ltl 61OZ'10 I!jdy'AepuoW:NO AIeW magpeW:A9 0311Old I b 4 u z¢ N I �o n M � _ w ! ® Z LU > Q � I LU m s O I w I u GU i C C I I � I 1 ~ W m Z � ® U x wo w > ~ 2 w z m = ~ ® _ 0 p xLU LU � � W !,_! � u x kill,I ® ��IIIUIII�`n J I I— x SCENIC HILL DRIVE • ,r:;'' } V C1 LL Z Q7 CO c Wow o l i / m U� M Lu 6mp•6u!ned VAD OTb0-9T\s4!q!yx3 Vdoo\sa!q!yx3\s6ulmEJ(I\S00\u6!saa\LL60009\006000\005uo!;onpoadG!):HIVd]lId Hd ST:S:ltl 61OZ'101!ady'AepuoH:NO NpH m@g442H:A9 031101d