Loading...
HomeMy WebLinkAboutContract 51257-CO2 CITY SECRETARY a' 5►a5�-cc� FORT WORTM City of Fort Worth �NTRACT IdO. Change Order Request Project Namel Concrete Restoration(2019-3) City Sec# 1 51257 Client Project#(s)l 101602 pmw DescriptionI Concrete Restoration at Various Locations Contractorl Select Striping,LLC Change Order# 0 Date 10122/2019 City Project Mgr. Tariqul Islam City Inspector Lame Pitts Dept. TPW-Storm Contract Time Water Totals D Original Contract Amount $940,678.00 $940,678.00 150 Extras to Date $169,500.00 $169,500.00 60 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,110,178.00 $1,110,178.00 210 Amount of Proposed Change order $288,00 $288.00 82 Revised Contract Amount $1,110,466.00 $1,110,466.00 292 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) 1 $288.00 $288.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 18.05% MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%J $1,175,847.50 jWMATM OMM)FOR CFIAtW ONM This change order is to add 192 linear feet of joint sealant to the contracl.The major item for this contract is to remove and replace 7 inch concrete pavement sections.The original quantity for this item was 4,500 square yards.However,the actual pavement failures requiring replacement increased by 2,186 square yards to 6,686 square yards.To complete this additional work,a total of 82 calendar days are required to be added to the contract for the pavement repairs and ancMary work, It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, The ProjectlProgram Manager signing below acknowledges that helshe is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. iwontracbdes C.UMWW Name Contractor NarrmA Cn+dract�JOIWSelect Stn in ,LLIr L -t I Id .3c sor DWe Project M DaW;, Date . Director,Con6drig DWMent Date Qi A Date Assfstent Ike . Couriir�Atli d iced - - �I M&C Number M8C Date Approved C PAR ' i FT. WORTH,TX FORT WOKrH City of Fort Worth -1 Change Order Additions Project Name Concrete Restoration(2019-3) City Sec# 51257 Client Project# 101602 Project Description Concrete Restoration at Various Locations Contractor Select Striping,LLC Change Order# 0 Date 10/22/2019 City Project Mgr. Tariqul Islam City Inspector Lorrie Pitts ADDITIONS ty Unit Unit Cost I ota Joint Sealant - torm ater TPW-Storm Water $288.00 ub Total Additions 288.00 Change Order Additions Page 1 of 3 FORT WORTH City of Fort Worth Change Order Deletions Project Name Concrete Restoration(2019-3) City Sec# 51257 Client Project# 101602 Project Description Concrete Restoration at Various Locations Contractor Select Striping,LLC Change Order# Date 1 0/2 212 01 9 City Project Mgr. Tariqul Islam City Inspector Lonne Pitts ITEM DELETIONS unit Unit Cost Total TPW-Storm Water $0.00 Sub Total Deletions 00 Change Order Additions Page 2 of 3 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO# DATE AMOUNT None Total $0.00 Change Order Additions Page 3 of 3 >o 3 a � a� o a =m > o Y n z m N O o o ; o o °1 o i x c o v N o S @l ; @J E C a q N @l o O w @J z ; o a d 6 E o Im 'E .o -i N .o U Y' Y «O G o L d 3 P A O d A ; .0 6 -i a W L W d N d a y L P a a S z a o E t z m a a 5 E" A d z z E � T E — E E,« 3 o E Q n m d 'Q 3 ' d Vd a ° a o a v° n q ° o v c Fo 0 7E F- m S 3 m n .C. C C ¢ 6 n E $ c co CD 0 n o o $& a �7 E iO o X Lo O cVo E M W vo s zo o m v C Y m z v z \ O co � Mil � o 0 v 5 Q� 142 m oa N � o ❑ O o N o a Eco N M 8 C c Lo cn o Cco .o C o � . m a fO o a r ul 7 � �sr � a C o m � co a � a OFFICIAL RECORD o o 0 ° CITY SECRETARY O ¢ w n z L0 FT WORTH TX t Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tariqul Islam Graduate En ig neer Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT. WORTH,T