Loading...
HomeMy WebLinkAboutIR 9494 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 9494 To the Mayor and Members of the City Council June 5, 2012 Page 1 of 1 r Subject: FULL- PURPOSE ANNEXATION OF TWO AREAS IN FAR NORTH rF FORT WORTH The June 12 City Council agenda will contain an M&C to initiate the zoning process for one enclave and to initiate the annexation and zoning process for another enclave. The 2012- 2016 annexation program, adopted with the 2012 Comprehensive Plan, recommends these areas be considered for full-purpose annexation in 2012. Both areas would be an addition to Council District 2. Attached is a PowerPoint for reference. The fiscal impact analyses are posted on the Planning and Development Department's website at httpe//fortworthtexas.qov/planninganddevelopment/design.aspx?id®8660 . The two annexations are described below: • Area 73-1, west of Old FM 156 and north of Intermodal Parkway, contains approximately 299.7 acres with right-of-way and vacant land. The land is currently owned by the City of Fort Worth for the expansion of the Alliance Airport runway and is requested to be annexed as an owner-initiated annexation. Annexation of Area 73-1 would create a very slight negative impact of $968.00 on the General Fund and would require no future capital roadway improvements. • Area 74, an enclave on and north of Litsey Road and east of Elizabethtown Cemetery Road, consists of 0.6 acre of vacant land and right-of-way. The enclave was found to have been inadvertently excluded from the surrounding annexations. Annexation of the area is expected to have a very slight negative impact of $968.00 on the General Fund and will require capital improvements to upgrade Litsey Road. Staff has determined the City will be able to provide full municipal services upon annexation. City Staff has submitted a request to begin the annexation process for Area 73-1. The property owner for Area 74 has been contacted by mail to explain the annexation process and to discuss appropriate zoning. Staff has also proposed zoning districts based on land use policies and future land use in the Comprehensive Plan, and on proposed land uses. The annexation and zoning of these areas would run concurrently, with final approvals anticipated to occur in August 2012. Should you have any questions, please contact Randle Harwood, Planning and Development Director, at 817-392-6101. Tom Higgins City Manager Attachment ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS 2012 Implementation of Annexation Program FORTWORTH Prepared for the City Council By the Planning and Development Department June 5, 2012 Purpose Review the following items- ,/Annexation criteria ✓Fiscal impact methodology; ✓Area proposed for full-purpose annexation in 2012. 2 1 Annexation Criteria A. Full-Purpose Annexation Areas must meet one or more of the following conditions: 1. Enclave a. Enclave within City's ETJ b. Ability to provide municipal services 2. Urban Development a. Development activity of an urban nature b. Ability to provide municipal services c. Positive fiscal impact analysis 3. Growth Center a. Designated growth center b. Ability to provide municipal services c. Positive fiscal impact analysis 4. Adverse Impact a. Adverse impact on City if not annexed b. Ability to provide municipal services 5. Option to Expand s a. Detriment to City's orderly growth if not annexed b. Ability to provide municipal services Preparation of Fiscal Impact Analysis A. Revenues G B. Expenditures C. Analysis Timeframe D. Per Capita Data Sources E. Population Estimate F. Methodology 1. Areas with Existing or Proposed Development 2. Other Areas G. Timing for Preparation of Fiscal Impact 4 Analysis 2 Revenues General Fund 1. Property taxes to be generated by existing land uses, based on Tarrant Appraisal District assessed values and the City's current property tax rate. 2. Property taxes to be generated by proposed land uses, based on anticipated assessed values and the City's current property tax rate. 3. Other General Fund revenues including: Other Local Taxes, Licenses and Permits, Fines and Forfeitures, Use of Money and Property, Service Charges, and Other Revenue, based on a per capita estimate. 5 Expenditures 1. One-time transitional costs, including street signs and markings, and emergency response set up 2. Required capital improvements for fire service, roadways and drainage, and water and wastewater infrastructure 6 3 AX-12-004 (Area 73-1 ) Where is the area proposed for full-purpose annexation at this time? l` 4 4 Analysis Basis • Existing right-of-way and vacant land' • 299.7 acres • Governmental tax exemptions ` • Industrial growth center future land use • No p lat or l final plat on file • Property tax revenues , (current) — $0 yearly Analysis Results • Initial Costs — TPW- $0 startup services — Police Department- $0 — Fire Department- $484 — Code Compliance- $0 • No future capital improvements • Slightly negative result to the General Fund j �o 10 5 What future land use is designated in the 2012 Comprehensive Plan? F` General Commercial rr Light Industrial 7'3-1 � . Industrial GrovAh Center 11 What is the surrounding zoning? ® K:Heavy Industrial 734 ® AG:Agricultural r d� 4 12 6 What zoning is a - proposed for s' _...::: , . AX-12-004? bl'� PD:Planned Development for"I"uses plus aviation-related uses,excluding some uses ..::M _. Rezoning area consists of a total of 8 parcels. 13 What is the proposed annexation and zoning schedule for area 73-1? Date Action May 1, 2012 Annexation application letter received from property owner. June 5 City Council receives Informal Report. June 12 City Council approves M&C to initiate zoning. July 11 Zoning Commission recommends zoning. Aug. 14 City Council considers and institutes adoption of annexation. Aug. 14 City Council considers zoning. 14 7 AX-12-005 (Area 74) 15 Where is the area proposed for full-purpose annexation at this time? w w U r � w w H>� LITSEY r 16 8 Analysis Basis • Existing right-of- way and vacant '� �" land , • 0.6 acre EALCiLEkfI�U yam, • No tax exemptions • Private open space ���u future land use • No preliminary plat ��` � or final plat on file • Property tax revenues (current) — $89 yearly 17 Analysis Results • Initial Costs — TPW- $0 startup services — Police Department- $0 — Fire Department- $484 — Code Compliance- $0 • Future capital improvements to Litsey Road • Slightly negative result to the General Fund f ,. refr 18 9 What future land use is designated in the 2012 Comprehensive Plan? s „ 1wo , J� r EAccu.Erzwuru 74 Y Industrial Private Open Single Family . GrovAh Center Space 19 What is the surrounding zoning? G z ^; I R i r. 0 A-7.5,A-5:One-Family ® K:Heavy Industrial ® AG:Agricultural 20 10 What zoning, is proposed for AX-12-005? Ui Z Ui EAGLERUM -LITSEY— — — — — — p A — - — — — — — — — — — — Rezoning area consists A-5:One-Family of a total of 1 parcel. 21 What is the proposed annexation and zoning schedule for area 74? Date Action May 11, 2012 Notification letter mailed to property owner. June 12 City Council adopts annexation timetable; approves M&C to initiate zoning. July 11 Zoning Commission recommends zoning. July 17 City Council conducts first public hearing. July 24 City Council conducts second public hearing. Aug. 14 City Council considers and institutes adoption of annexation. Aug. 14 City Council considers zoning. 22 11