Loading...
HomeMy WebLinkAboutContract 44281-A3 AFC 4 CITY SECRETARY ON p�cC`6 I[ � AMENDMENT No-3 CONTRACT NO. 'a8(-�'3 Njys��gT�2�19 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Brown & Gay Engineers, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 44281, (the CONTRACT) which was authorized by M&C C-26438 on the 5th day of March, 2013 in the amount of $1,158 , 764 . 00; and WMIREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $175, 805 . 00 which was authorized by M&C C-26438 on September 17, 2013 and Amendment No. 2 in the amount of $301 ,462 . 00 which was authorized by M&C C-26934 on August 26, 2014; and V ERFAS, the CONTRACT involves engineering services for the following project: Northside II 48-inch Water Main, Phase 1, from Heritage Trace Parkway to Alta Vista Road. WHERFAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 23, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $19, 135 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 6551166. 00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. ,-- "AL RECORD CITY SECRETARY Page -1- T; UVOIRTH,TX i EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Brown & Gay Engineers, Inc. ;1 i i Dana Burghdof Carl J. Krogness , P.E. Interim Assistant City Manager Director Public Works DATE: %- I j DATE: APPROVAL RECOMMENDED: Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Jobh Kasavich,, P.E. Project Manager M&C : N/A Date: N/A Douglas W. Black Assistant City Attorney 0 � ATTEST: �f -3 '�.. OFFICIAL RECORD Mary J. Kay6fl FU ,, 3y;t a'' CITY SECRETARY City Secretary }:; � FT. WORTH, TX Page -2- September 23, 2019 Mr. John Kasavich,PE Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Re: Amendment No. 3— Design Services Design Services for Northside H 48-inch Water Main,Phase 1 from Heritage Trace Parkway to Alta Vista Road City Project No. 2082 City Secretary No. 44281 Dear Mr. Kasavich: As the contractor constructed the 8-inch sewer along Keller Hicks Road it was determined that the corridor has multiple fiber optic lines and other utilities drastically slowing the construction of the sewer line. Due to issues with existing utilities near the proposed alignment it is requested that an alternate alignment from Misty Run to end of sewer line be investigated. The additional services include: • Reroute design for Keller Hicks Road of approx. 875 linear feet sanitary sewer line Keller Hicks Road Sanitary Sewer Extension Reroute During construction of the 8-inch sewer the contractor rate of production was greatly reduced as they approached Misty Run due to existing fiber and other utilities. The sewer line cannot be moved any closer to the newly constructed 48-inch line without utilizing pressure sewer pipe/ encasing the 48-inch water main (TCEQ separation requirements) so the only real option is to move closer to the north ROW line or into a new easement north of the ROW. Because the electric poles are approx. 7 feet south of the north ROW there is not adequate room to construct the sewer line between poles-and fence. In order to get away from existing utilities in which slowed the contractor BGE recommends shifting the 8-inch sewer line into a 15 foot easement along the North ROW. This would require obtaining 2 easements,replacing approx. 300 feet of privacy fencing and adding additional manhole(s). Design services for the additional sewer line include: • SUE investigation of revised alignment • Topo.survey of revised alignment. • Survey documentation for proposed Easements 0 Re-alignment of approx. 875 linear feet`of 8-inch sanitary sewer. Mr.John Kasavich,PE September 16,2019 Page 2 Summary of Amendment#3 Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant BGE,Inc. Engineering and Surveying $ 19,135.00 100.00% City MBE/SBE Goal= 15% Original Contract Consultant Committed Goal= 21.0% Amendment#1 Consultant Commitment Goal= 31.9% Amendment#2 Consultant Commitment Goal= 29.3% Amendment#3 Consultant Commitment Goal= 0.0% Total revised Project Goal=23.43% This proposed amendment increases the total contract amount summarized below: Original contract amount $ 1,158,764.00 Amendment No. 1 $ 175,805.00 Amendment No.2 $ 301,462.00 Amendment No. 3 $ 19,135.00 Revised Contract Amount $ 1,655,166.00 Please contact me at your earliest convenience to discuss. Sincerely, Donald Lange,P.E. Project Manager Enclosures . §#G&# \\ .., /-;-} ® -^ }`}± \} § _ _ _ _ _ ®E wiloi co § ` . ± oI T' ITI « z ƒ c0 2,00� \ § \ ;tee Lu o \/ \RJ ~ ®) 27 \ WC)cn ®° °° - / Af / o ) , C , o o o L k � f \ / I \j \ -E ! r AS $ . @{frg2 - ;±� ; \ ` i °, ) _ : « }\ )\/) /) \D0 f/\{\ } 0 0\ §ji) \/ ƒ ®