HomeMy WebLinkAboutContract 53193 Received Date: Dec 10,2019
Received Time: 4:53 PM
Developer and Project Information Cover Sheet:
Developer Company Name: Cabela's Wholesale,LLC
Address, State,Zip Code: 2500 E.Kearney, Springfield,MO,65803
Phone&Email: 417-873-5000,Steven.Krajewksldacabelas.com
Authorized Signatory,Title: Kevin A.Maliszewsld,Chief Financial Officer
Project Name: Cabela's Sanitary Sewer Extension
Brief Description: Water,Sewer
i
I
Project Location: 12901 Cabela Dr.
Plat Case Number: FS 17-270 Plat Name: Cabela Addition
Mapsco: Council District: 7
CFA Number: CFA18-0133 City Project Number: 101704
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 1 of 18 OFFICIAL RECORD
CITY SECRETARY
FT WORTH, TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 53193
WHEREAS, Cabela's Wholesale, LLC, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto("Improvements")related to
a project generally described as Cabela's Sanitary Sewer Extension ("Project")within the City or
the extraterritorial jurisdiction of Fort Worth,Texas("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended,is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
City of Fort Worth,Texas _
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension R
CFA Official Release Date:02.20.2017 OFFICIAL.RECORD
Page 2 of 18
CITY SECRETARY
FT WORTH,TX
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ®, Sewer(A-1) ®,Paving(B) ❑, Storm Drain(B-1) ❑, Street Lights & Signs
(C) ❑.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured,licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 3 of 18
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 4 of 18
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer, if any, and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City,its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein Further,Developer will require its contractors to indemnify, and hold harmless
the City for any losses, damages, costs or expenses suffered by the City or caused as a
result of said contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with the Policy,
and in accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 5 of 18
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%) and material testing fees equal to two percent(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 6 of 18
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company with 10 or more
full-time employees that has a value of$100,000 or more that is to be paid wholly or partly
from public funds of the City for goods or services unless the contract contains a written
verification from the company that it: (1) does not boycott Israel; and (2) will not boycott
Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to
it by Section 808.001 of the Texas Government Code. The term"company"has the meaning
ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter
2270 of the Government Code is applicable to this Agreement, by signing this Agreement,
Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of this
Agreement.
R. IMMIGRATION AND NATIONALITY ACT. Developer shall verify the identity and
employment eligibility of its employees who perform work under this Agreement, including
completing the Employment Eligibility Verification Form (I-9). Upon request by City,
Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall
adhere to all Federal and State laws as well as establish appropriate procedures and controls
so that no services will be performed by any Developer employee who is not legally eligible
to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY
HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 7 of 18
VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S
EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for
violations of this provision by Developer.
S. SALE OF PROPERTY AND CONSENT TO ASSIGNMENT.
i. The Improvements in this CFA are being constructed as a requirement for the
development of[insert lot, block, and addition] ("Property") in connect with plat
FS 17-270 ("Plat"). Developer intends to sell the Property after execution of this
CFA and approval and recording of the Plat.
ii. If the Property is sold by Developer, Developer intends to assign this CFA to the
purchaser of the Property("Purchaser"). A Consent to Assignment of this CFA,in
substantially the form set forth in Attachment 2 of this CFA, must be executed by
City,Developer, and Purchaser at the time of the sale.
iii. If a Consent to Assignment of this CFA is executed, the City will reconcile all
material testing, laboratory testing, and inspection fees with the Purchaser and
Developer would not be entitled to any refunds. The Purchaser would be required
to provide the City with an acceptable financial guarantee for the Improvements
before the City could release or refund to Developer the financial guarantee
provided by Developer for this Agreement. Additionally, if this Agreement is
assigned, the City would have to approve the construction contracts between the
Purchaser and their contractors, and the Purchaser would be required to amend this
Agreement to revise the unit bid prices or other provisions that have changed as a
result of the sale and pay the City's $2,300.00 amendment fee.
iv. If the sale of the property does not occur after the execution of this CFA and the
recording of the Plat, Developer does not intend to construct the Improvements in
this CFA and Developer agrees to file an application with the City to vacate the
Plat. Upon vacation of the Plat,City and Developer agree that this Agreement shall
terminate. Developer will not receive a refund or return of the financial guarantee
for the Improvements or any refund of estimated material testing,laboratory testing,
or inspection fees until the Plat is vacated and this Agreement is terminated.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 8 of 18
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 9 of 18
Cost Summary Sheet
Project Name: Cabela's Sanitary Sewer Extension
CFA No.: CFA18-0133 City Project No.: 101704
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 11,742.50
2.Sewer Construction $ 45,108.50
Water and Seiner Construction Total $ 56,851.00
B. TPW Construction
1.Street $ -
2.Storm Drain $ -
3.Street Lights Installed by Developer $ -
4. Signals $
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 56,851.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,137.02
D. Water/Sewer Material Testing Fee(2%) $ 1,137.02
Sub-Total for Water Construction Fees $ 2,274.04
E. TPW Inspection Fee(4%) $ -
F. TPW Material Testing(2%) $G. Street Light Inspsection Cost $H. Signals Inspection Cost $H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 2,274.04
Choice
Financial Guarantee Qptlon4 choose one Amount Mark one
Bond=100% $ 56,851.00
Completion Agreement=100%/Holds Plat $ 56,851.00
Cash Escrow Water/Sanitary Sewer=125% $ 71,063.75
Cash Escrow Paving/Storm Drain=125% $ -
Letter of Credit=125%w/2 r e iration period $ 71,063.75 x
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 10 of 18
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories
effective as of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
C6ela's Wholesale,LLC
Dana SurghdoH(Mc 10,20
Dana Burghdoff
Interim Assist ze
Assistant City Manager Kevin Naliswski
Date: Dec 10,2019 Kevin Maliszewski(Dec 10,2019)
Name: Kevin A.Maliszewski
Recommended by: Title: Chief Financial Officer
_ Date: Dec 10,2019
Je ifer zernack(Dec 10,2019)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract,including
ensuring all performance and reporting
requirements.
Richard A.McCracken(Dec 10,2019)
ol Richard A.McCracken � utL ��z eo-�¢� �!
Assistant City Attorney Evelyn Ro on behalf of(Dec 10,2019) 61
j Name: Janie Morales
Date: Dec 10,2019 Title: Development Manager
�• ''�i1
Form 1295:
ATTEST:
Mary J.Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 11 of18 OFFICIAL REU (t
CITY SECRETARY
FT: WORTH '
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Attachment 2—Form of Consent to Assignment
® Location Map
® Exhibit A:Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
❑ Paving Cost Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 12 of 18
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101704
Negotiated changes are included in the body of the Agreement.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 13 of 18
ATTACHMENT"1"
FORM OF CONSENT TO ASSIGNMENT
CITY SECRETARY CONTRACT NO.
CONSENT TO ASSIGNMENT OF
COMMUNITY FACILITIES AGREEMENT
(CITY SECRETARY CONTRACT NO.
This CONSENT TO ASSIGNMENT OF COMMUNITY FACILITIES
AGREEMENT(CITY SECRETARY CONTRACT NO. ("Consent") is made and
entered into by and between the CITY OF FORT WORTH, a home rule municipal
corporation organized under the laws of the State of Texas ("City"), CABELA'S
WHOLESALE,LLC,a Nebraska limited liability company("Assignor"), and
("Assignee").
The following recitals are true and correct and form the basis of this Consent:
WHEREAS,on , the City and Cabela's Wholesale, LLC entered into that
certain Community Facilities Agreement on file in the City Secretary's Office as City Secretary
Contract No. ("CFA"). Under the CFA, Cabela's Wholesale, LLC (defined as
"Developer" for purpose of the CFA) agreed to construct certain specific public infrastructure
("Improvements")in connection with the development of[lot,block addition] ("Property"); and
WHEREAS, Developer has sold the Property to Assignee and desires to assign all of
Assignor's duties, obligations,rights,title and interest in the CFA to Assignee; and
NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of
which are hereby acknowledged,the City,Assignor and Assignee agree as follows:
1. The City hereby consents to an assignment by Assignor to Assignee of all right, title and
interest granted to Developer by the CFA effective upon the sale of the Property from
Assignor to Assignee ("Effective Date").
2. The City consents to such assignment expressly upon the promise and covenant by
Assignee, and Assignee promises and covenants to the City, that Assignee will comply
with and assume all duties and obligations of Developer set forth in the CFA.
3. Notwithstanding anything to the contrary herein, Assignee understands and agrees that no
act or omission of Assignor, whether before or after the Effective Date, will serve to
mitigate any event of default set forth in the CFA, or limit or modify City's ability to
terminate the CFA.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 14 of 18
4. Notwithstanding anything to the contrary herein, Assignee represents and warrants to the
City that Assignee has made a thorough inspection of the Property and that Assignee
understands and agrees that on and after the Effective Date, Assignee shall be responsible
for ensuring that the condition of the Property is in compliance with all applicable laws,
including environmental regulations.
5. By executing this Consent, the City does not ratify or endorse any agreement or
representation between Assignor and Assignee; grant Assignee any rights greater than
those granted to Developer under the CFA; or consent to any amendment to the CFA.
6. Contemporaneous with the execution of this Consent by Assignee and the City, Assignee
shall deliver to the City an acceptable financial guarantee in the amount of
guaranteeing Assignee will construct the Improvements in the CFA and pay all
cost of labor,materials and equipment furnished in construction of the Improvements under
the CFA.
7. Assignor, Assignee and City agree, that upon delivery of the financial guarantee by
Assignee to the City and execution of this Consent by the City, the City shall, within 30
days, refund, return, or release Assignor's financial guarantee that was provided by
Assignor to the City in connection with the CFA
8. Assignor, Assignee and City agree that the estimated material testing and inspection fees
in the amount of that Assignor paid to the City in connection with the CFA
shall become the property of Assignee and shall remain on deposit with the City as
Assignee's payment of estimated material testing and inspection fees required by the City.
After construction of the Improvements in the CFA has been completed and the
Improvements have been accepted by the City, any refund owned by the City for material
testing fees and inspection fees shall be paid to Assignee and any shortage of material
testing and inspection fees shall be paid by Assignee to the City.
9. All terms in this Consent that are capitalized but not defined shall have the meanings
assigned to them in the CFA.
10. The CFA is in full force and effect and has not been modified, supplemented, or amended
in any way unless specifically set forth herein.
11. On and after the Effective Date, all notice which is required or desired to be sent to
Developer under the CFA shall be delivered to the following:
IN WITNESS WHEREOF,the undersigned have caused this Consent to be executed in
multiples as of the last date indicated below:
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 15 of 18
The City:
CITY OF FORT WORTH
Dana Burghdoff
Interim Assistant City Manager
Date:
Recommended by:
Evelyn Roberts
Project Assistant
Approved as to Form &Legality:
Richard A. McCracken
Assistant City Attorney
No M&C Required
Form 1295: N/A
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the monitoring and administration
of this contract, including all performance and reporting requirements.
Janie S. Morales
Development Manager
ATTEST:
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 16 of 18
Mary J. Kayser
City Secretary
Assignor:
CABELA'S WHOLESALE,LLC
Name:
Title:
Date:
Assignee:
Name:
Title:
Date:
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 17 of 18
City of Fort Worth,Texas
Standard Community Facilities Agreement-Cabela's Sanitary Sewer Extension
CFA Official Release Date:02.20.2017
Page 18 of 18
00 42 43
DAP-BID PROPOSAL
Page 1 of7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 3312.2203 2"Water Service 331210 EA 1 $1,587.00 $1,587.00
2 3312.3003 8"Gate Valve 33 12 20 EA 1 $1,450.00 $1,450.00
3 3312.3005 12"Gate Valve 33 12 20 EA 1 $2 358.00 $2 358.00
4 3312.4107 12"x 8"Tapping Sleeve&Valve 33 12 25 EA 1 $2,689.00 $2,689.00
5 3311.0261 8"PVC Water Pipe 3311 12 LF 74.3 $35.00 $2,600.50
6 3312.2003 1"Water Service 331210 EA 1 $1,058.00 $1,058.00
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT I:WATER IMPROVEMENTS $11,742.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 0170.0100 Mobilization 01 7000 LS 1 $1,200.00 $1,200.00
2 0171.0101 Construction Staking 01 71 23 LS 1 $850.00 $850.00
3 0171.0102 As-Built Survey 01 7123 LS 1
4 3110.0106 Remove and Transplant 2"Tree 31 1000 EA 1
5 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 2218
6 3301.0002 Post-CCTV Inspection 3301 31 LF 475 $1.00 $475.00
7 3305.0109 Trench Safety 33 05 10 LF 475 $0.50 $237.50
8 3305.0202 Imported Embed ment/Backfill,CSS 33 05 10 CY 15.5 $35.00 $542.50
9 3305.1001 12"Casing By Open Cut 33 05 22 LF 125 $35.00 $4,375.00
10 3331.3201 6"Sewer Service 3331 50 EA 1 $32.00 $32.00
11 3331.4115 8"Sewer Pipe 33 31 20 LF 475 $42.00 $19 950.00
12 3339.1003 4'Extra Depth Manhole 33 39 10,33 VF 22.1 $225.00 $4,972.50
13 3301.0101 Manhole Vacuum Testing 3301 30 EA 3 $150.00 $450.00
14 3339.1001 4'Manhole 33 39 10,33 EA 3 $3,858.00 $11,574.00
15 3305.0113 Trench Water Stops 33 05 15 EA 2 $225.00 $450.00
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $45,108.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT III:DRAINAGE IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT IV:PAVING IMPROVEMENTS
1 3213.0101 6"Conc Pvmt 32 13 13 SY 386
2 3213.0102 7"Conc Pvmt 32 13 13 SY 29
3 3213.0311 4"Conc Sidewalk,Adjacent to Curb 32 13 20 SF 1578
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT IV:PAVING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT V:STREET LIGHTING IMPROVEMENTS
1 _
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 6 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
1 _
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43 Bid Proposal_DAP
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS $11,742.50
UNIT II:SANITARY SEWER IMPROVEMENTS $45,108.50
UNIT III:DRAINAGE IMPROVEMENTS
UNIT IV:PAVING IMPROVEMENTS
UNIT V:STREET LIGHTING IMPROVEMENTS
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid $56,851.00
Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
Submitted By:
Isaac Rey,Sr.Project Manager
Parkway C&A,LP
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43_Bid Pmposal_DAP
N
r w ■
a
o
WESTPORT PKWY
KELLER HASLET RD
s
'jo
E
P.I.Q. PLP�o a
vp >
OPF�
s
3
M
_ F9
r
z
0
s
a
x
6B vo D
BLUE MOUND RE)
VICINITY MAP
N.T.S.
CPN: 101704
MAPSCO NO. 007Y
OWNER:
CABELA'S WHOLESALE LLC
12901 CABELA DR.
FORT WORTH, TX 76177
DENGINEERING TITLE: VICINITY M A P
(dba)MIDWEST DYNAMIC ENGINEERING CONSULTANTS,PC
1301 Central Expressway South-Suite 210-Allen, TX 75013 PROJECT: SANITARY SEWER IMPROVEMENTS SCALE:(H) N.T.S.
T:dyner42100
ww CABELA'S ADDITION (V)
w.dynamicec.com
Texas Registered Engineering Firm No.F-13660 LOTS 1 R, 2R, BLOCK 1
r
RAWN BY: CHECKED BY: DATE: CITY OF FORT WORTH JOB 8
JMA JTE 06/13/19 TARRANT COUNTY, TEXAS 257 -99-001
N
w E
OP. 8" WATER
SERVICE
PROP. 2" WATER
Z/PR
SERVICE
' \ PROP. 1 WATER
SERVICE
\ LOT 2R
t 120,061 SF \ \
t 2.7562 ACRES \
CABELA'S WHOLESALE LLC \
LOT 1 R
t 2,053,101 SF \
t 47.1328 ACRES
LEGEND
—— PROPERTY LINE
PROPOSED WATER SERVICE
W EXISTING WATER MAIN
OWNER:
CABELA'S WHOLESALE LLC
12901 CABELA DR.
FORT WORTH, TX 76177
DENGINEERING TITLE: EXHIBIT A WATER
(dba)MIDWEST DYNAMIC ENGINEERING CONSULTANTS,PC
1301 Central Expressway South-Suite 210-Allen, TX 75013 PROJECT: SANITARY SEWER IMPROVEMENTS SCALE:(H) 1"=300'
T:.*aflvcgc. CABELA'S ADDITION (V)
www.dynamicec.com
Texas Registered Engineering Firm No.F-13660 LOTS 1 R & 2R, BLOCK 1
DRAWN BY: CHECKED BY: DATE: CITY OF FORT WORTH JOB 8
JMA JTE 06/13/19 TARRANT COUNTY, TEXAS 2578-99-001
N
LOT 2R
± 225,422 SF W E
± 5.1750 ACRES
I ti g
±LOT
1 0,061 SF \�
ti
± 2.7562 ACRES
I �
\ LOT 4R
as ± 2�57059ACRES
SF
CABELA'S RETAIL
LOT 1R
± 1,715,710 SF \
± 34.3873 ACRES
LEGEND
—— PROPERTY LINE
——————— PROPOSED EASEMENT LINE
PROPOSED SANITARY SEWER NOTE:
55 EXISTING SANITARY SEWER ALL PROPOSED SANITARY SEWER LINES
ARE 8" UNLESS OTHERWISE NOTED.
OWNER:
CABELA'S WHOLESALE LLC
12901 CABELA DR.
FORT WORTH, TX 76177
DENGNERING TITLE: EXHIBIT Al -WASTEWATER
(dba)MIDWEST DYNAMIC ENGINEERING CONSULTANTS,PC I I
1301 Central Expressway South-Suite 210-Allen, TX 75013 PROJECT: SANITARY SEWER IMPROVEMENTS SCALE:(H) 1"=300'
T:.dynai 42100 CABELA'S ADDITION (V)
www.dynamicec.com
Texas Registered Engineering Firm No.F-13660 LOTS 1 R, 3 R & 4R, BLOCK 1
DRAWN BY: CHECKED BY: DATE: CITY OF FORT WORTH JOB 8
JMA JTE 08/21/18 TARRANT COUNTY, TEXAS 257 -99-001