Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 51375-CO2
i i Ts F4 V,-) -F Wo P,-F�g CO;2 5)3 City of Fort Worth CITY SECRETARY 7 ! Change Order Request CON'rRACTNO. Project Name:1 Lake Worth Dam Improvements Project City Sec No.: 1 - 847-7 51 3 7 ' IOrojecl No.(s):l FTW16591 DOE No. N/A CI1yProj.No.:1 100543 Conduct slope restoration as required by TCEQ,clear the spillway underdrain piping system,provide a new manhole drain Project Description: improvements and weir box for measurement purposes,rehabilitate concrete spall,and crack repairs to the spillway Contractor: Welch Excavation and Utility Company Change Order# 0 Date: 9/16/2019 t City Project Mgr.1 John Lopez City Inspector: I Ron Rackley Phone Number: 817-392-6818 Phone Number: 817-392-6950 Dept, Facility Totals Contract Time j (Calender days) Original Contract Amount $363,960.00 $363,960.00 180 Extras to Date(CO#1) Time Only 157 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $363,960.00 $363,960.00 337 CO#2 $13,934.00 $13,934.00 Revised Contract Amount $377,894.00 $377,894.00 337 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding(if necessary) $13,934.00 $13,934.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.83% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1$454,950.00 j JUSTIFICATION(REASONS)FOR CHANGE ORDER Change Order No.2 will provide for the following:• f Installation of a drainpipe to collect and discharge seepage from a trough at the middle of the dam. i • Installation of a gravel maintenance pathway to a wier box for collecting data. I R? p Attested by: ` Maty J.K4ffi, it secratMry i It is understood and agreed that the acceptance of this Change Order by the contractor co ilutes n acco d and sells ctio and represents payment In full(both time and money)for all costs arising out of,or incidental to,the above Chang Order. Contractor's Company Name Contractor Name Co cto re Date Welch Excavation and Utility Company Jeffery Pool lnspeftqy 4 42 4 Date Project Manager Date 9 ,-L q// Director Water Dept) Date onsiruction Supervisor(Water Dept) Date t 7 s. A40/ /f Assistant CI or ey Date Assistant C ty qanager D to 7 9 / — - Council Action If Required) ('(ORD M&C Number N/A M&C Date Approved NIA t SECR /iRY RRR D P,T ` vc�P, F1-1 City of Fort Worth Change Order Additions Project Name Lake Worth Dam Improvements Project City Sec No.: 48477 Project No.(s): FTW16591 DOE No. N/A City Proj.No.: 100543 r r Project Conduct slope restoration as required by TCEQ,clear the spillway underdrain piping system,provide a new manhole drain improvements and weir Description box for measurement purposes,rehabilitate concrete spall,and crack repairs to the spillway structure. Contractor Welch Excavation and Utility Company Change Order:E2 Date: 9116/2019 r City Project Mgr. John Lopez City Inspector FRon Rackley ADDITIONS TE�I �SCRIPTFO-N DEPT G1ty Unit Unit Cost Total 18 Install 4-Inch Drain pipe,double cleanoul encased in concrete,headr+all and re-seed disturbed area FaClllty 1.00 LS $12,434.00 $12,434.00 19 Install gravel tralnlenance pathway tomanholeAvierbox Facility 1.00 LS $1,500.00 $1,500,00 I I' ( i! f i i I it II I it i i Facility $13,934.00 I� Page 2 of 4 l Additions Sub Total $13,934.00 I 'i E City of Fort Worth Change ©rder Deletions Project Name Lake Worth Dam Improvements Project City Sec No.: 1 46477 Project No.(s): FTW16591 DOE No, N/A City Proj.No.: 100543 Project Description Conduct slope restoration as required by TCEQ,clear the spillway underdrain piping system,provide a new manhole drain improvements and weir box for measurement purposes,rehabilitate concrete spall,and crack Contractor Welch Excavation and Utility Company Change Order: F2—] Date 9/16/2019 City Project Mgr. John Lopez City Inspector: FRon Rackley DELETIONS ITEM IDESCRIPTION DEPI Qty Unit Unit Cost Total I I� I . I i i t� Facility i Page 3 of 4 Deletions Sub Total i i MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 i i Previous Change Orders cots DATE AMOUNT I �I i I, i r. I Total $0.00 I, I 1 I 9 III CI t I' I I Ir. f Page 4 of 4 f M ■ EESE AICHOLS � .�,, sJlr,I tJl , 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 917-735-7300 fax 817-735-7491 www.freese.com September 16,2019 I Mr.John Lopez City of Fort Worth Water Department 200 Texas Street Fort Worth,TX 76102 i Re: Lake Worth Dam Change Order 2 i Dear Mr. Lopez: Enclosed for.your signature is a copy of.the revised Change Order 2-for the Lake Worth Dam Improvements project which has been received from Welch Excavation and Utility Company. The Change Order is for extension of the spillway drain outlet on the north side of the spillway in accordance with Proposed . Contract Modification 02,and the constructlon of.a gravel path to the weir box on the south side of the spillway in accordance with Proposed Contract Modification 03. The change order amount is$13,934.00. No additional time is included in the change. i' As we discussed In the field,the change will be good for the long-term maintenance of the project. We recommend approval of the change order. Please let me know if you have questions. I fj I Sincerely, I� �QM►S i' Janis Murphy,P.E. i Enclosure I it i [FFW16591)T:\4.0 CONSTRUCTION\4.10 Correspondence and Memos\4.11 Letters\Change Order 2R Recommendation.docx I I it III N CHANGE ORDER(4.43) PROJECT: Lake Worth Dam Improvements OWNER: City of Fort Worth OWNER PRO.I 4 100543 CONTRACTOR: Welch Excavation and Utility Company CONTRACTOR tJ ENGINEER: Freese Rc Nichols,Inc. ENG, PROJ.N FTW16591 j I CHANGE ORDER NO. 2 CHANGE ORDER DATE: 30-Aug-19 f Make following additions/deletions or modifications to work described in the Contract Documents: _ Description of Change Cost Add gravel pathway to new manholw and weir in accordance with 1 PCM 02. $1,500.00 2 Extend North Spillway Drain Outlet In accordance with PCM 03. $12,434.00 l f TOTAL COST or THIS CHANGE ORDER: $13,934.00 Tile coml)ensutlon agreed to upon In tlds change order Is full,complete and finalpaymant for all costs the Contractor may Incur as a result of orrelated to this change whotharsold costs are known,unknown,foreseen or unforeseen at thts time,Including wltlwuut llnitatlon,any costfur delay,extended overhead,ripple or impact cost,or any other affect on changed or unchanged work as a result of this Change Order. Contract Cost and/or Time Impacts: Original Contract Amount $363,960.00 Previously Approved Change Order Amount $0.00 Adjusted Contract Amount $363,960.00 Proposed Change order Amount(this change order) $13,934.00 Revised Contract Amount $377,894,00 Previous Contract Time 337 Previous Substantial Completion Date 30-Sep-19 Previous Final Completion Date 29-Nov-19 Net Change In Contract Time 0 Revised Contract Time 337 Revised Substantial Completion Date 90-Sep-19 Revised Final Completion Date 30-Sep-19 Recommended by: FREESE AND NICHOLS, ate Approved by: WELCH CAV KNAND 1 COMPANY By 0 / I ware Approved by: CITY OF FORT WORTH i ! �FREESE NICHOL.S PI.OPOSC7D OOIVTI.ACT MODir-(CATION ,d.49/ PROJECT: Lake Worth Dam Improvements PROJECT NUMBER: OWNER: City of Fort Worth 100543 CONTRACTOR: Welch Excavation and Utility Company ENGINEER: Freese &Nichols Inc. FTW16591 DESCRIPTION: Gravel Pathway PCNI No: 02 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the Contract Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days: ❑ Notify us that you concur that this change does not require a change in Contract time or amount.A Field Order will be issued. Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials, i equipment and all other costs related to this change. Impacts on Contract Time shall be I shown in a revised schedule, included with the submitted proposal. ❑ Proceed with the change. Payment will be made at the unit price bid. ❑ Proceed with the change under the time and materials provisions of the Contract. I. Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. By: Janis Murphy P.E. Date: March 27. 2019 CONTRACTOR 'S RESPONSE: We respond to your request as follows: ❑ We propose that this is a no cost or time change. Issue Field Order. ❑ We submit the attached Price/Credit Proposal with detailed cost breakdown and revised l schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. ❑ We are proceeding with the change under the time and materials provisions of the Contract. i By: Date:. j i ACTION TAKEN: ❑ Proposed Contract Modification rejected. See comments. ❑ Field Order will be issued. ❑ Change Order will be issued. By: Date: h I PROPOSED CONTRACT MODIFICATION ATTACHILAIENT A The Owner proposes to make the following additions, modifications or deletions to the work described In the Contract Documents. Authotization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents,prior to commencing the work involved. Create a pedestrian path to the new manhole and weir box for maintenance access b City p P Y Y personnel. i On the existing rock riprap in the area immediately adjacent to the downstream side of the chain link fence, fill the rock riprap with gravel (No. 57 stone) to create a walking path approximately 3 feet wide. The path should extend'From the top of the rock riprap to the weir box near the downstream end of the training wall. Estimated distance is 50 feet.The rock used to build the access ramp to the spillway may be reused for this purpose. i I, By:_ Janis Murphy, P.E. Date: March 27, 2019 (V�r GIA EXCL, V&j�- And Utility Gumpany laic. estimating@welciiexcavation.net Texas •Oklahoma-1_ouislaria •Arkansas•Alabama •Mississippi•Florida 171901-20E Office(903)877-3528 Winona,TX 75792 Fax(903)877-3092 Cell(903)235-2612 Request For Change Proposal For: Lake Worth Dam Improvements Date: 9/16/2019 Fort Worth,Texas Install gravel maintenance pathway to manhole/wier box, $ 1,500.00 Quantity Unit Price Stonel 20 CY $ 1,200.00 Labor/Equipemt 1 LS Is 300,00 TOTAL $ 1,500.00 ;1 �I Thank You, i r 4l i Jeffrey Pool it I' i MFREESE AICHO" PROPOSED CONTRACT MODIFICATION 4.4I/ PROJECT: Lalce Worth Dam Improvements PROJECT NUMBER: OWNER: City of Fort Worth 100543 � CONTRACTOR: Welch Excavation and Utility Company ENGINEER: Freese &Nichols, Inc. FTW16591 I' DESCRIPTION: North Spillway Drain Outlet PGM No: 03 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the i Contract Documents as shown In Attachment"A". We request that you take the following action within 10 calendar days: ❑ Notify us that you concur that this change does not require a change in Contract time or amount.A Field Order will be issued. ❑X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials, equipment and all other costs related to this change. Impacts on Contract Time shall be shown in a revised schedule, included with the submitted proposal. ❑ Proceed with the change. Payment will be made at the unit price bid. ❑ Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the Contract Documents. By: Janis Murphy, P.E. Date: September 13, 2019 CONTRACTOR'S RESPONSE: We respond to your request as follows: ❑ We propose that this is a no cost or time change. Issue Field Order. 0 We submit the attached Price/Credit Proposal with detailed cost breakdown and revised schedule for performing the described change. I i ❑ We are proceeding with the change at the unit price bid. ❑. We are proceeding with the change under the time and materials provisions of the Contract. By: Brandon Arden Date:September 16,2019 I ACTION TAKEN: ❑ Proposed Contract Modification rejected. See comments. i ❑ Field Order will be issued. ❑ Change Order will be issued. By: Date: i f! PROPOSED CONTRACT MODIFICATION ATTACHMENT A The Owner proposes to make the following additions, modifications or deletions to the work described In the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents,prior to commencing the work involved. Put the north spillway drain outlet into a ductile Iron pipe to discharge across the access road. The existing pipe Is 4-inch diameter and has a bell end on the exposed section. Install a double cleanout as shown in the attached drawing, with a concrete surface protection as shown. Extend the pipe under the access road (about a foot deep to protect it from traffic)and discharge it through a concrete headwall, Backfill the ditch created in accordance with the attached section and reseed the disturbed area. i Estimated total distance is about 140 feet. i' r I i I. f i i I i I i NIS t;NURPHYfrc� it l; By: Janis Murphy, P.E. Date:September 13,2019 I, I i� �I a i And Utility � �Orn any inc. estimating@welchexcavation.net Texas •Oklahoma•Louisiana •Arkansas•Alabama Mississlppl-Florida 171901-20E Office(903)877-3528 Winona,TX 75792 Fax(903)877-3092 Cell(903)235-2612 Request For Change Proposal For: Lake Worth Dam Date: 9/16/2019 Fort Worth,Texas i • I I 'I Install4"DI drain pipe,double cleanout encased In concrete, headwall,and re-seed disturbed area. $ 12,434.00 Quanity Unit Price 4"DI Pipe 140 If $5,526.00 { Double Cleanout 1 ea $1,665.00 I Headwall 1 ea $1,110.00 Bedding 50 tons $1,720.00 Re-Seed 1 ea $1,110.00 Survey Data/TVTape 1 lea $ 500.00 Mesh Strainer 1 ea Is 500.00 Bond 1 lea 1$ 303.00 TOTAL $ 12,434.00 i i Thank You, Jeffrey Pool BACKFILL AND SURFACE REPAIR TO MATCH SEVIER MAIN 1!I 2"MIN. �< i •-- TRENCH GEOTEXTILE / FABRIC J CV/ P0v v I TI• CRUSHED ROCK PER 33 ObE10 2"MIN. CITY OF FORT WORTH,TEXAS REVISED:08-31-2012 N IMP EMBEDMENT FOR SANITARY SEVVER ---.. SERVICES 33 05 10-0202 5 K m O O ZUWJO uomww m O I. U z J ou Ja cW P U❑m:s L)0 c v (n NJ �ei� o zzQi¢ a��00 No�OOUW © w W In tz"b�y oo rn > RUM..- W Z-j6 n -9 z fn F Wown o 'I m Z u aw1�1 m4Ziy J bi o?� oW��da❑U 4 ¢ o o oam� �'kµ1weoo� - a c w LLIi Z W}w.W Nz4Ll��Z 00-. ¢ IX w UUw.O �'�`' O J W G 11 a 4 Q5�0WW] R'�]J w W O O Jw W UUO9UW z�,,��,,a.—' L�w W?p �ZM Z�WWO (n �ySpl ao?a��v'ic�iin°d? uv�i S a ��zo ,1r�' ❑ F U U q O ; Lei L•L71 z.= C4 1�a ui 0 0 a mBw z�n a � H Z U�UI 6�U05 U� "� ❑ 7 J On FJ uffigrh LU rr•, CL LL a 00 gg 1y�'• 1`t`t`.'t�• r` a���' x oa. O\11�1•• .O.ra• M�t,V�07�U1f \\ ❑ — U Z w OQ r{f KO.�f�Z f'U OUr, j CL aiw 0 't+•~�Ory1c�3�'`+' W�N`• \ `+s+'.•'+'+',' �`\ ' z «s`+`•`1,`•`r`•`:a �I1.li:.; \/ -- ,W.t U Z L 1- Op¢, UK :i+s 1 , •+••+1 • , .},t n T. Zen C� �_ l\ •fJ♦`r+4;4,' F\ f' V., i''r• 1+� \� V)J V`ter`+`i r`t •'r`.�'.�.:4+F.f. }• 1"\; o , - ,17 •4 i J W . r • r~. \\� Op t Z-ZF��,-1Q IL �m�a IL .r1 09 � 1 J �J 41Wa N `7 oOo U W ww D r rr•Clm 3 L 4 6 N LL a 7 aw�aal 6 U z l Ol ro 1311vuvd a i I I I Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitozing and administration of this contract including i ensuring all performance and reporting requirements. Signature j: I, L46 G'L Name of Employee Title f OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX Soto, Vania Elizabeth From: Black, Doug Sent: Monday, December 16, 2019 1:26 PM To: Soto, Vania Elizabeth; Kayser, Mary Cc: Sholola, Tony Subject: FW: City Secretary Contract No. 51375 Attachments: 20191216124109961.pdf, 20191216124039874.pdf Importance: High Vania—please see the attached corrected documents for corrections of the record. Please let me know if there are any questions. Thanks, Doug From:Sholola,Tony Sent: Monday, December 16, 2019 12:21 To: Black, Doug<Douglas.Black@fortworthtexas.gov> Cc: Lopez,John (Water) <John.Lopezl@fortworthtexas.gov>; Howe, Cheryl <Cheryl.Howe @fortwo rthtexas.gov>; Oakes, Heather<Heather.Oakes@fortworthtexas.gov>; Rackley, Ronald <Ronald.Rackley@fortworthtexas.gov> Subject: City Secretary Contract No. 51375 Doug: The City Secretary Contract No. was inadvertently listed as 48477 instead of 51375 on the attached change orders for the Lake Worth Dam Improvement Project. Please okay the City Secretary's office swapping out the two existing change orders for the project with the attached change orders and advise them of such. Thanks 1