Loading...
HomeMy WebLinkAboutContract 36854 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 5 (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Stream Water Group Inc. , (Engineer) made and entered into City Secretary Contract No. 30209, (the Contract) which was authorized by the City Council by M&C C-20121 on the 22nd day of June 2004, and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2004 ; STM-D WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 20, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $5,605.00 (Water Cost: $1,580.00; TPW Cost: $4 ,025.00) . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $101,039.00. Iry �Q 04-01 -08 PO4:54 IN ° �f U�GL10 3. All other provisions of the contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 0�n4 day of , 2008, in Fort Worth, Tarrant County, Texas. ATTEST: Marty HendrixPl NO M&C REQUIRED] � City Secretary APPROVAL REC NDED• APPROVED: A. Douglas Rademaker, P.E. Fernando Costa Director, Department of Engineering Acting Assistant City Manager Stream Water Group, Inc. ENGINEER By: Name:Shamsul Arefin, P.E . President 6707 Brentwood Stair, Suite 630 Fort Worth, TX 76112 APPROVED AS FORM "ALITY: Assistant 5131ty Attorney r.��'�,��•al '�VV'lIJ March 20,2008 Mr.Rakesh Chaubey,P.E. Project Manager Department of Engineering,City of Fort Worth 1000 Throckmorton St,Fort Worth,TX 76102 Phone:817 392 6051 KL: Contract Amendment No.2 Water and Sewer Replacement Contract 2004 STM-D,DOE No.4431 Water Project No. P153-6U8170101483,Sewer Project No.P258-7081701UI483 Stream Water Group Project No. 17011 Dear Mr.Chaubey: The tollowing is a summary of additional work requested for Amendment No.2 to the Water and Sewer Replacement Contract 2004 STM-D,per recent design meetings with City of Fort Worth officials. The proposed amendment includes additional reproduction cost,survey and design,and modification of Plan Sheets. Additional Survey for Atlanta St Curb and Gutter Design(100 If @ 3.50/1.f.) _ $1,400 Curb and Gutter Design Atlanta St(25 hrs@$105s) = $2,625 Additional Reproduction: 13 Sheets/set total 15sets with Mylar= $590 Modification of Existing Plan and Contract Documents (Location Map, Cover Sheet, Bid Proposal Section)(4hrs@S105) = S 120 Modification ofSWPPP Documents(6hrs(a S95) = $570 The total cost to perform the additional services included in Contract Amendment No.2 is= $5,605 The current status of the contract between Stream Water Group,Inc and City of Fort Worth for the Water and Sewer Replacement Contract 2004 STM-D is as follows: Original Contract Amount= $85,534.00 Amendment No. I Amount= $9,900.00 Amendment No.2 Amount= S5.605.00 Total Contract Amount including Amendment No.2= $101,039.00 Please process Amendment No.2,to the Water and Sewer Replacement Contract 2004 STM-D in the amount of $5,605.00. If you require any additional information or have any questions regarding this matter,please do not hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity to provide Engineering Design Services for the City of Fort Worth. Sincerely, Stream Wat Group,Inc. Shamsul Arefin,P.E. President ^I Copy.Fil$u J,c '1ilt0 J tii.u, Nd tiulic _';(I 1 „ir \\grill. I `; �nl l= 1'11nnL I I Io .I I I I d'. ..1 - -111. i ; ,Ilil lnU11.i 0ltl