HomeMy WebLinkAboutContract 36862 AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO �042, (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Slater Engineering, Inc., (Engineer) made and entered into City Secretary Contract No. 34076 (the Contract) which was authorized by the City Council by M&C C-21723 on the 26th day of September, 2006; and WHEREAS, the Contract involves engineering services for the following project: 2004 Capital Improvement Project Contract 45 Pavement Reconstruction and Water and Sanitary Sewer Main Replacement on Spindletree Lane (Buttonwood Drive to Pepperbush Drive Capital Project No. 00446; DOE No. 5399 Water Project No. P253-6041700446 Sewer Project No. P253-7041700446 TPW Project No. C200-2044000446 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly- authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services as specified in a proposal letter dated August 30, 2007, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $ 9,160.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 134,288.00. FFICJAL kRICIM�M'111 9�411C 04-04-08 P03: 42 IN 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the /Z day of , 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: 44"emakv" A. ouglas ademaker, P.E. Fernando Costa Director, Department of Assistant City Manager (Acting) Engineering Slater Engineering, Inc. ENGINEER By: Z 2 ATTEST: J. �n Slater, P.E. �^ ' President ( r \ 5280 Trail Lake Drive, Suite 2 M y Hendrix, City Secretary Fort Worth, Texas 76162 NO M&C REQUIRED APPRO AS TO FORM AND LEGALITY: Amy R e ��� Assistant City Attorney 'v��`, coil U?LI� 4U e SLATER ENGINEERING, INC. 5280 TRAIL LAKE DRIVE, SUITE 2 Municipal Engineering • Hydraulics P.O. BOX 16593 FORT WORTH, TEXAS 76162 Transportation • Land Surveying e-mail: sslater0l@msn.com Site Engineering • Land Development PH: 817.346.6520 FAX: 817.346.6523 0e^:W.v,•a,:,a.s; ..;gia�r,:^,. . :xd:av,;c+i rnxx:min.:Va;:n-:s;s:.cirss�:eias�.w.-�:•:•msnit..v^:r:.::w+;�.z;:ni�:a�a;:xs:n,a:c�;:ei. ..xsm;a::i:;;:�rooso August 30,2007 Ms.Dena Johnson,P.E. Manager, Consultant Services Division Department of Engineering City of Fort Worth,Texas 1000 Throckmorton Ave. Fort Worth,Texas 76102 SUBJECT: Spindletree Lane Paving,Water And Sewer Buttonwood Drive To Pepperbush Drive D.O.E. 5399 RE: Additional Services Storm Drain Construction Plans Dear Ms.Johnson: Submitted herewith is Slater Engineering,Inc.'s(SEI)proposal for performing the additional engineering services requested for Spindletree Lane. SEI proposes to amend City Secretary Contract No. 34076, approved by Mayor and Council Communications No 21723, and add certain engineering services to the scope of work. The additional Scope of Services will provide for; 1 Engineering,Design and preparation of construction documents for the relief storm drain through the limits of the paving on Spindletree Lane: and, The additional services will result in additional costs for engineering, design, reproduction and computer services. In additional the following increase in fees and services will be as follows: Item No. 1. Add Parallel Relief Line Throughout paving limits. A Revise Hydraulic Computations and Drainage Area Map And Calculate HGL; EIII 30 Hours @$150/Hr._ $ 4,500.00 B Engineer Relief Storm Drain Line,Inlet Lead Line; Ell 16 Hours @ 135/Hr. $ 2,160.00 C Prepare Construction Plans; Ell 20 Hours @$125/Hr._ $ 2,500.00 Subtotal $ 9,160.00 5280 TRAIL LAKE DRIVE, SUITE 2 P.O. BOX 1653 SLATER ENGINEERING, INC, FORT WORTH, TEXAS 76162 Municipal Engineering • Hydraulics e-mail: ssiater0l@msn.com PH: 817.346.6520 Transportation • Land Surveying FAX: 817.346.6523 Site Engineering • Land Development RECAP: Proposed Contract Amendment Number 2 $ 9,160.00 Existing Contract Amendment Number 1 $ 7,332.00 Original Contract Amount $ 117,796.00 New Total Contract Amount $ 134,288.00 In addition to the increased engineering fees,an increase in schedule of 40 working days will be necessary to complete the additional work referenced above. Sincerely Slater Engineering,Inc. G- .James Steven Slater,P.E.,R.P.L.S.,