Loading...
HomeMy WebLinkAboutContract 36879 STATE OF TEXAS § ��� COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO. 9 WHEREAS, the City of Fort Worth ("City") and Jones & Boyd, Inc. ("Consultant") made and entered into City of Fort Worth City Secretary Contract No. 35388, ("Contract"); and WHEREAS, the Contract involves professional services for the following project: Park Improvements at Oakmont Park and Clear Fork Park; and WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and/or revised maximum fee. NOW, THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: 1. Article I, Section A of the Contract is amended to include the additional engineering services specified in a letter dated February 18, 2008, a copy of which is attached hereto and incorporated herein. 2. Article II of the Contract is amended to provide for an increase in the maximum fee in the amount of $ 21,000.00, which is to be paid to Consultant for all work and services under the Contract, as amended, so that the total fee to be paid by City for all work and services shall not exceed the sum of $ 111,400.00. 3. All other provisions of the Contract that are not expressly amended herein shall remain in full force and effect. Executed on this the 1-—day of , 20�. 0 4-14-0 8 A 1 0:3 3 IN CONTACT AMENDMENT #2 ATTEST: CITY OF FORT WORTH ` By: Marty Hendrix Carl S art City Secretary Actin Assistant City Manager E:O::M7&CREQUIRED Ri and Zavala, erector P fs and Community Services Department APPROVED AS TO FORM CON ULTANT: Jon s By Assistant C' A orney N e: lick c nney, ASLA Ti . Executive Vice President 17090 Dallas Parkway Suite 200 Dallas, TX 75248 Engineering I Surveying I Planning Landscape Architecture Construction Management Jones& Boyd,Inc. February 18, 2008 Via USPS& email joel.mcelhany@fortworthgov.org Mr.Joel L.McElhany,ASLA City of Fort Worth Parks and Community Services Department 4200 South Freeway Suite 2200 Fort Worth,Texas 76115-1499 RE: Additional Services Proposal for Floodplain Engineering Services Oakmont Park Fort Worth,Texas Dear Mr. McElhany: Thank you for permitting us the opportunity to submit this proposal for floodplain engineering services on the referenced property. This proposal is based on providing a CLOMR and follow-up LOMR for three future trail crossings located within Oakmont Park west of Bellaire South Road.Two of the trail crossings are located on Stream CF-6,which is designated as a Zone AE floodplain with a floodway. The third trail crossing is located on an un-named tributary designated as a Zone A floodplain.Based on our conversations and the information provided to us, we propose the following scope of services: 1. Conditional Letter of Map Revision(CLOMR)—We will prepare a narrative drainage report requesting a CLOMR based on the proposed hydraulic analysis above. The report will document the procedures and findings of our analysis. Typical FEMA approval time for a CLOMR ranges from six(6)to twelve(12)months after City acceptance and signature. Please note, all FEMA review fees are required upon submittal and will be paid by the City. 2. Meetings/Coordination—We will attend meetings with you and public agencies to coordinate, present and answer questions regarding the drainage study and other engineering issues as well as coordinate the submittals with City staff and FEMA. 3. As-Built Survey—We will provide a one-time survey of the bridges to establish the constructed condition. The elevation data will be used to reflect as-built condition in the hydraulic model. 4. As-Built Letter of Map Revision(LOMR)—We will update the hydraulic models based on the as-built information. We will prepare and submit a narrative report requesting an As-Built LOMR from FEMA. We will also coordinate with FEMA regarding comments, public notices and the map revision process. Typical FEMA approval time for an As-Built LOMR ranges from six(6)to twelve(12)months after City acceptance and signature. 5 17090 Dallas Parkway Suite 200 Dallas,Texas 75248 972.248.7676 tel HAProposWs\2008 Proposals\pro-20080218-cbm-Oakmont Park-FrW001-addmi svcs.doc www.ones-foX www.jones-boyd.com Mr.Joel McElhany February 18, 2008 Page 2 SUMMARY OF FEES For the scope of work described herein,we propose to be compensated as shown on attached Exhibit "A".Next to each work item,we have noted whether the fee is either a lump sum or hourly. If the fee is noted to be hourly,the amount shown is an estimate because the time necessary to complete the task is unknown. Hourly based fees will be billed in accordance with the attached Hourly Fee Schedule,Exhibit"B".For your budgeting purposes,an estimated fee has been shown for hourly- based fees. Non-labor expenses will be charged at cost plus ten(10%)percent.These expenses include all necessary and related non-labor expenses incurred by Jones&Boyd, Inc.,which are directly chargeable to the work.These generally include expenses for reproduction, deliveries and filing fees. The terms and conditions of our current contract shall apply to the work described in this proposal. Services which are not expressly written in this agreement will be considered additional services. Jones&Boyd, Inc.will not proceed with any additional services without your prior authorization. This proposal is valid for sixty(60)days from the date of its submittal; if not accepted by the end of the 60-day period, it is subject to change, renegotiation or withdrawal at the option of Jones&Boyd, Inc. If this proposal is acceptable, please signify your acceptance below by initialing each page of the attached exhibits. Please return one fully executed original to us. Should you have any questions, please do not hesitate to contact me. Thank you for allowing us to submit this proposal. Sincerely, JONES & BO Y D", WC. D. Rya l se, P.E., C F M ice President at Resource Engineering If it C r es B. inney,ASLA ecutive Vice President 2 andscape Architecturev HAProposa6\2008 Proposals\pro-20080218-ebm-Oakmont Park-FPW001-addtn1 sves.doc Mr.Joel McElhany February 18, 2008 Page 3 DRP:CBM:Igg Enclosures(3) Jz � ACCEPTED this da of 2008. By: N Title: Printed Name: g.9 HAProposals\2008 Proposals\pro-20080218-cbm-Oakmont Park-FTW001-addtnl wcs.doc EXHIBIT A Item 1. Conditional Letter of Map Revision(CLOMR) $ 12,000 Lump sum fee Item 2. Meetings/Coordination $ 2,000 Hourly estimate Item 3. As-Built Survey $ 2,000 Lump sum fee Item 4. As-Built Letter of Map Revision(LOMR) $ 5,000 Lump sum fee TOTAL $ 21,000 �L 1 ULG\Sa Client HAProposds\2008 Proposals\pro-20080218-cbm-Oakmont Perk-FMOOI-addtnl svcs.doc Initial