Loading...
HomeMy WebLinkAboutContract 28920-A2 AMENDMENT No. 2 CITY SECRETARY TO CITY SECRETARY CONTRACT CONTRACT NO. C 212,�7i WHEREAS, the City of Fort Worth (CITY) and Hunter Associates Texas Ltd. d/b/a TRC Solutions, (ENGINEER) made and entered into City Secretary Contract No. 28920, (the CONTRACT) which was authorized by MSC C-19648 on the 8th day of July, 2003 in the amount of $62,638.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $36,335.00 which was administratively authorized on the 21et day of February, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2003, STM-F; and WHEREAS, it has became necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 12, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $4,041.00 (Water: $2,223.00; Sewer: $1,818.00) . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $103,034.00 OFFICIAL RECORD CITY SECRETARY RECEIVED APR 17 2013 Page -1- FT. WORTH,TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Hunter Ass dates Texas Ltd. d/b/a T C 1 ions Fernando Costa gi Massih Assistant City Manager Vice resident DATE: (o DATE: APPROV RECO t E,D: C�`� S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: v Date: Douglas W. Black Assistant City Attorney ATTEST: 4lip. , Jj o o��i 0 Copp $ o�a�t Mary J. a � � XA0 City Sec r i ary �r r OFFICIAL RECORD CITY SECRETARY Page -2- FT. WORTHY TX T.B.P.E. #F-8632 700 Highlander Blvd., Suite 177 Arlington_ TX 76015 817.522.1000 PHONE www.TRCsolutions.com March 12, 2013 Mr. Rakesh Chaubey, PE Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 RE: Amendment No. 2 Proposal Water and Sanitary Sewer Replacement Contract 2003 STM-F City Secretary Contract No. 28920 DOE No. 4061 Water Project No. PW53-060530177770 Sewer Project No. PS58-070580176100 Dear Mr. Chaubey, In accordance with your request, TRC Engineers, Inc. is providing this amendment proposal with respect to the above referenced contract. The amendment is needed in order to provide additional paving grades for one of the affected streets and to update the project contract documents and specifications in accordance with recently adopted new format criteria. Specific information concerning these two services is provided as follows: Littlejohn Avenue Pavement Grades It was recently determined that Littlejohn Avenue, between Vogt and Miller requires replacement of full paving and curbing following installation of new water and sanitary sewer lines, due to the deteriorated condition of the street section in this area that has now occurred. TRC will develop profile grades for the street section and will incorporate this information into the construction plans. Pavement grades will be provided over a distance of approximately 1,800 linear feet. Additional funds for data review, field verification, and design are required. Contract Document/Specification Update The City has recently revised the formatting of the contract documents and specifications for Water Department Projects. TRC had previously prepared these documents under the old format that has been discontinued. Additional funds to download, format, and assemble the documents for the specific project are required. Mr. Rakesh Chaubey, P.E. March 12, 2012 Page 2 of 2 Amendment No. 2 - Fee Summary Our fee summary for above two components is presented as follows: 1. Littlejohn Avenue—Provision of Pavement Grades over 1,800 LF between Vogt Street and Miller Avenue: $ 1,747.00 2. Contract Document/Specifications—New format update: $ 2,294.00 Total: $4,041.00 Amendment Breakout Summary Sub-Total; Water Design Fee= $ 2,223.00 Sub-Total; Sewer Design Fee= $ 1,818.00 Total: 4 041.00 Contract Adjustment Summary Original Contract Value: $ 62,638.00 Amendment No. 1 Value: $ 36,355.00 Amendment No. 2 Value: $ 4,041.00 Revised Total: $ 103,034.00 Thank you for your consideration. If you have any questions or should need additional information, please contact me at (817) 308-3287 or via E-mail at cschellbachktresolutions.com. We look forward to continuing to be of service to the City of Fort Worth toward the successful completion of this project. Sincerely, TRC 7ngineering Schellbach, PE Services Manager Attachment: Fee Calculation Sheet