Loading...
HomeMy WebLinkAboutContract 46465-A3 AMENDMENT No . 3 C!E Y 17CRET„RY TO CITY SECRETARY CONTRACT the City of Fort Worth (CITY) and Hazen and Sawyer, P.C . , (ENGINEER) made and entered into City Secretary Contract No. 46465, (the CONTRACT) which was authorized by M&C C-27183 on the 211 day of February, 2015 in the amount of $196, 485 . 00; and WHIIIII&EAS,the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $38, 914 . 00 which was administratively authorized September 28, 2015 and Amendment No. 2 in the amount of $22 , 384 . 00 which was administratively authorized April 12 , 2017; and NMERAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 90 ; and V MIEA M , it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal letter dated June 29, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $145, 400 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $403 , 183 . 00 R�C�1VD Page -1- DEC19201 CiC�D�EDRT�v�YTH 7 .7 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. E)ECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Ha en and Sawyer, P.C. JW, � Dana Burg off Chamindra Dassanaya PhD, P.E. Interim Assistant City Manager Vice President DATE: � ? 1!/j �� l DATE : APPROVAL RECOM�ENDED : aL Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I arrz the person responsible for the monitoring and administration of this contract, including ensuring all performance an eporting requirements . Walter Norwood, P.E . Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 19-0202 Date: September 24, 2019 fib la°9 s:a b I°1-5 3 6 1 0"7 Douglas W. Black Senior Assistant City Attorney b Ma y J. KayserWV 1 City Secretary i Page Hazen Hazen and Sawyer 500 West 71'Street,Suite 702 Fort Worth,TX 76102•817.870.2630 June 29,2019 Walter Norwood, PE Project Manager Fort Worth Water Department 200 Texas Street Fort Worth,TX 76102 Re: Sanitary Sewer Rehabilitation,Contract 90-Amendment No. 3 City Project No. 02382 Dear Walter: As a requested,we have prepared a are revised scope of services for Amendment No. 3 for Sanitary Sewer Rehabilitation Contract 90. This amendment is for revising the 100%design package and dividing the current project into three separate bid packages: 1. CIP Package—Design drawings to be incorporated into another project for street improvements 2. Package 1 —Standalone bid package requiring no easements for bidding in the near term 3. Package 2—Standalone bid package requiring 43 easements to be bid at later date once easements are obtained The amendment is for following services: CIP Package and Package 1 1. Divide 5 design sheets for inclusion into a CIP Package by another consultant.These plans are for L-3208 and L-7113. No other sheets (index,control points and key map, and erosion control plans)will be required for this package. No bidding services will be provided for this package. 2. Divide 21 design sheets and associated index, control points and key map and erosion control plans into Package 1. 3. Estimate an additional 12 months of project management. 4. No easement documents are required for this package 5. Eliminate segments within Weiler Boulevard that require significant pavement replacement and retain only segments that terminate and are perpendicular to Weiler Blvd,which require limited paving replacement. 6. Change from open cut to pipe bursting for mains under streets per city comment from 100% design submittal. hazenandsawyer.com Hagen Walter Norwood, PE June 29,2019 7. Redesign a portion Segment L2307 to relocate line into existing easement per city comment from 100% design submittal. 8. Redesign segments in Tierney Road from pipe bursting to open cut since the street will be fully replaced per city comment from 100%design submittal. 9. Add note to drawings indicating owner information is based on survey received on February 28,2017 and provide an excel spreadsheet with updated property owner information for use by COFW. 10. Revise opinion of probable construction cost(OPCC)for design changes and separate into specific OPCC for CIP and Package 1. 11, No additional bid services for CIP package. Any construction support required for the CIP package will be handled out of the original contract scope budget. 12. Bid and construction services for Package 1 are included in the original contract scope. 13. Provide list of affected property owners in excel to be used by COFW for public meeting notification. 14. Provide excel table with property owners to be used by COFW for temporary right of entry notification letters. Package 2 1. Divide 14 design sheets and associated index, control points map and erosion control plans into Package 2. 2. Estimated an additional 24 months of project management. 3. Prepare 43 easements documents for all segments not currently within easements 4. Add note to drawings indicating owner information is based on survey received on February 28,2017 and provide an excel spreadsheet with updated property owner information for use by COFW. 5. Revise opinion of probable construction cost(OPCC) for design changes and separate into specific OPCC for Package 2. 6. Add additional bid and construction services to support for Package 2. 7. Provide list of affected property owners in excel to be used by COFW for public meeting notification. 8. Provide excel table with property owners to be used by COFW for temporary right of entry notification letters. A detailed listing of segments and their proposed package is included in Exhibit B-1. Page 2 of 3 hazenandsawyer.com Hazen Walter Not-wood, PE June 29,2019 The scope of services and corresponding fees are as follows: Description Fee Additional Services Requested Package 1 and CIP Package $42,778.00 Package 2 $102,622.00 Fee For Additional Services $145,400.00 A detailed breakdown of fees is included in Exhibit B-2 for each package. The following work is not included in this amendment: • Permit application filing fees • Online submittal of permit applications • Services to acquire real property including but not limited to acquisition of easements, approval of easements,preparation or mailing of additional temporary right-of-entry documents, and other related services • Bid phase services for CIP Package • Bid documents for segments within Weiler Blvd The original contract between Hazen and Sawyer and the City of Fort Worth(Contract 46465)was authorized by M&C C-27183 on February 26,2015 in the amount of$196,485.00. The cost to the City for additional design services to be performed by Hazen and Sawyer totals$38, 914.00 for Amendment No. 1 and$22,384.00 for Amendment No, 2(M&C C-28153)and$145,400.00 for Amendment No. 3 resulting in a revised total of$403,183.00 as shown in the table below. Item Amount Original Contract(M&C C-27183) $ 196,485.00 Amendment No. 1 $38,914.00 Amendment No.2(M&C C-28153) $22,384.00 Amendment No.3 $145.400.00 Total Contract Amount with Amendments $403,183.00 Please feel free to contact me at 817-870-2630 or shardy@hazenandsawyer.com hazenandsawyer.com should you have any questions. Sincerely, Scott Hardy,PE,PMP Senior Associate and Fort Worth Operations Manager Enclosure:Level of Effort Spreadsheet cc:Tracey Long, PE-Hazen Page 3 of 3 hazenandsawyer.com ATTACHMENT Design Package and Easement List for Amendment No. 3 -Design Services for Sanitary Sewer Rehabilitation Contract 90 City Project No. 02382 No Easement Design Design Design Does Length Length Length Pkg Sheet Segment REQD Surface Permanent Easement Needed CIP Pkg 2 Pkg 1 1 14 L 2319 0 Asphalt need additional 10 It width,exist only 5ft for OC? 400 r 1 15 L-2319 0 Asphalt Existing Easement 118 1 23 L-3852 0 Yard Additional 5 ft to meet COFW requirements 422 1 29 L-3888 0 Yard Additional 5 ft width to meet COFW requirements; 400 Cone (Sm Amt) 1 30 L-3888 0 Yard MH Patch in Weiler RD 74 1 31 L-3888A 0 Yard 68 1 33 L-4165 0 Yard 261 1 34 L-4166 0 Yard 341 Asphalt 1 36 L-4738 0 Cone 20'Alley-3 MH,5 Svc 271 Yard 1 37 L-6306 0 Drive way Beatey St ROW-behind curb 70 Asphalt Rosedale-1 MH Cane Parking Lot& 1 40 LH-8263 0 Asphalt Hart Street-1 MH,4 Svc 245 1 41 M-187R 0 Asphalt Rosser St-2 MH,i Svc 300 1 41 M-187R 0 Field Easement already acquired(Parcel 1 PE,Parcel 2A PE-2F PE) 300 1 42 M-187R 0 Field Easement already acquired(Parcel 1 PE,Parcel 2A PE-2F PE) 400 1 43 M-187R 0 Field Easement already acquired(Parcel 1 PE,Parcel 2A PE -2F PE) 302 M-265& 1 52 M-265R 0 Field East Rosedale St(303)-TXDOT and Fort Worth Ave 272 Cone Private Property 1 44 M-187 1 0 Asphalt I E Lancaster Ave(US 180) 220 1 8 L2307 0 Asphalt Tierney RD ROW-2MH,2Svc 400 1 9 L2307 0 Asphalt Tierney RD ROW-1 MH,3 Svc 400 Asphalt& Tierney RD ROW-1 MH 1 10 L-2307 0 Yard Line out of easement 400 400 1 11 L-2307 0 Yard Line out of easement 125 125 Line in aerial electrical easement,Esmt for line location and other properties for access/maint;8 for existing line;Additional 8 for 2 12 L-2317 16 Yard across property line for 15'Esmt 400 2 13 L-2317 3 Yard Line in aerial electrical easement 90 Asphalt Meadowbrock Drive-I MH-Single patch ism amt) Additional 5 ft width to meet COFW requirements -Difficult, 2 20 L-3824 0 Yards existing sheds along alignment 400 2 21 L-3824 7 Yard Line on easement line,MHs out of Esmt 400 Line on easement line,MH outs of Esmt;Additional Access 2 22 L-3824 i Yard easement Optional 59 2 27 L-3858 1 Yard MH out of easement 70 2 28 L-3859 2 Yard 12 MHs out of easements 267 Cone Cravens Road 1 MH Yard Private Property 2 45 M-187 4 Asphalt Pollard Rd-1 MH 361 Asphalt Greenlee Street-iMH Gravel Private Property 2 46 M-202 2 Yard Private Property 147 Cone Private Drive Asphalt Van Nattal Lane-MH Large Patch for OC section 2 47 M-202 0 Yard Yards 400 Cone Private Drive Asphalt Parking Lot 2 48 M-202 2 Asphalt 20'Alley 400 Asphalt 20'Alley Cone water Blvd-Large Patch 2 49 M-202 1 Asphalt Private Property Drainage easement in asphalt parking lot 400 Asphalt 20'alley Asphalt Yeager St-I MH and OC 2 50 M-202 2 Asphalt Private Property drainage easement in asphalt parking lot 400 Asphalt Private Property 10'Stormwater Esmt in asphalt parking lot 2 51 M-202 2 Asphalt Stark Street 84 60000-001 6128/20196:30 PM ATTACHMENT Design Package and Easement List for Amendment No.3-Design Services for Sanitary Sewer Rehabilitation Contract 90 City Project No. 02382 No Easement Design Design Design Does Length Length Length Pkg Sheet Segment REQD Surface Permanent Easement Needed CIP Pkg 2 Pkg 1 3 24 L-3853 0 Cone Weiler ROW-Deleted from Project 3 25 L-3854 0 Cone Weiler ROW-Deleted from Project 3 26 L-3854 0 Cone Weiler ROW-Deleted from Project 3 32 L-3888B 0 Cone Weiler ROW-Deleted from Project 3 35 L-4166 0 Cone Weiler ROW-Deleted from Project CIP 16 L3208 0 Asphalt Cravens Rd ROW-1 MH.10 Svc 400 CIP 17 L3208 0 Asphalt Cravens Rd ROW-IMH,12 Svc 400 CIP 18 L3208 0 Asphalt Cravens Rd ROW-1 MH,6 Svc 100 CIP 38 L-7113 0 Asphalt Cravens Rd ROW-2 MH,9 Svc 400 CIP 39 L-7113 0 Asphalt Cravens Rd ROW-1 MH,10 Svc 217 19 T7ot used1 TXU Realignment Eliminated this Sheet Total No of Easements 43 Total Design Lengths 2262 3878 5569 Design Design Design Length Length Length CIP Pkg 2 Pkg 1 Cost Per Cost Per Design Other Total Set Set Sheets Sheets Notes Sheets Bond Mylar No cover,index shl,notes,traffic control or details; Incl 2 Control Point Shts,2 key maps,2 erosion key maps 2 No Sheets in CIP Pkg 5 8 erosion plans, 13 $ 52.00 $ 260.00 No Sheets in Package 1 21 22 43 $ 172.00 $ 860.00 No Sheets in Package 2 14 22 36 $ 144.00 $ 720.00 No Sheets in Package 3 5 Deleted from Project since in Weiler Blvd(Cone Street) 5 No Easements in CIP Pkg 4 No Easements in Pkg 1 0 No Easements in Pkg 2 43 No Easements in Pkg 3 0 Deleted from Project since in Weiler Blvd(Cone Street) 60000-001 6/28/20196:30 PM a c c loll, �n o 0 o o�° �n ev v m r m m m N m.N N N� - p �°N t9 M N to F M v3 N Y F eq o fH of...M to O O O O OM f9 to to b3 to to W C o a o H x U W _ ° a 0 0 w v � c � u a W W� c a m N W� 'O QI m 3 m N... of m»u v mm» �roi uoio om m mmo n Q N r OmO Y N N N d h M O N M A N J O � n U 0 F O � W N m _ QI � t. d Z Y C a L m V N Q a. C M O v N N m Y C N O O Q I_-cn a' U 2 ;pZ Mo N a m d a) � d w w W W p z L O = y N o o fL w C t N m v V J Fa v N C 2' m m a w` a a Y1 N m V N m m N VETN V N N m N D1 N C O C y a`2 12 1 M a 0.2 - N � S aTi .E m U d a a m m H r o a m Ham m 16 1� ° U )❑ o O�d tyJ Z y ry E 2EEv m E vi > c mL rn a `^dc -' m� '3N of a E oc w a -`° 3 '^ a o 3 m Uv> c `° x LL c v V a w E Via' o t v o = m w a o a o a m_ .3¢ o =N.m c 3 v a y a L o g s zN �a �u� o. ucmm coa m^amc� -" Y 'uSE � 2 � oav ~ E m = > um m `=° t°`0 m a�13, u� NN - �� °'QNv rn F E rn o a >.>. .�w Zo ai N ^ Q >Ua r v N L in a o U c 0 3 o c U o m aai U `m v'EawUa a mcU�w my �_a � a o� 0,-`0o rna Ez U= .°w w`mU v m m`a E=°u v w w c°i U v rnE m °'° H rn a 9 .N 'v v v W 0 m 3 ^�`w m iL. N C .°c d o5aa`da` sg a� U Uo m ❑a`Aa 1)Et ti of uv m frcmofir oawI-u)nU in Da'I)f �N M Vm (V N N N H zcd N` N M M Cm J N m C'l [O r m N N IS ( CD � � ] f to 2 ; ca 'C'i 2 \± 3m e Es eE2f ; LU Gao - 03W 0 \§ ) « o ! 4 « § m -all / (\ o § 22B« { E2 (� \ƒ ( **�® 2 { § ) \{ \]) \ - Eƒta f: _,0 ! a)/o ()§ / \ §\\f . \E!E 3$ °- - ( )(§$ / ()! & lwe52 } (f%a & 2 = uu-iu &/ { { # : (/k T fk\Z\6�7E ' _ - - =, z : 4777; .) ! ! cl 7% [ [;2§ s ! �sr ] \{, !! ƒf\ 3224373loa +c k /0 ) : Q�z:e: ( o ! .17E J J\} }\�\000 \/§\ R k § \ / [± & ) \ j Ema2222 � LU )t(/ a t L) \ k U) C ( / « ; _ , }0o. k \)\ [3f \\ [{G of } [i2{ E� f( a N 0 0 0 0 O of O �O O�O vI m m O p E9 f9 M F N Y N F w N C y p O O W 0 a K d m N H C W W� C 3 Z� C O a W ttl �+ 3 o � o�n �nrom p a r vj cs vt N e - r - O m U 0 f m o � U p c N ' y Z 61 C a C >? 61 O N Q t N U � m N V o�N N ttI N Y a N O Q Q M aw _Z Z Q„ ro ° C F ro o �zcii .c CD Xp � rn�a � W w l o > u) � � wL) ` J Fa- E Q m a w m � N � N O � O Ol J W > r _ N O O r >N O V 2 a` u) m 0 a a u! E o N E w m M ^ o E c > O N E d C LLO y v a cl Z ai 3 �Nx w u O U O ll] O N d N m N N a d L a 3 g L E c LL rn rn N N .y rn a m cl 0 0 p N td om >m o m o ... .a Y c � m o n— � ° NR o c c rn o_ rn Z=a m H N v a N m m C s y m 2 �n Y N. 6. vi y(9 �Yt a°1 o Ya E. mw Via" mcn _ad `oE~a c -ate'E vN c�U oaf m> N w m�� t°aj o x - o v E m o E „ o o p a o y a U o N U J c 5; 3 0 mcU cw o, '-€ a �U Y '"ti n- E Ow`w` �p 3 o m m E O E m u w m m o a rn E .-r d y rn 4m m m —E h n va o �O o aa`a`a` o'" am arn-om a-a-o > 3 a` o U o m is a` a z U`, co >>> a' c • N N N N N �O1�l0Olq.l= --[lM �p al cs «zQ c cq , \260, /c@ o § ® ) , m � = o % \ )§ )� . ƒ/ LU 'D L � - ie-0 \ kk no « � G \_\ \ ?/ ({ §{ )} /{ » [� - { § CO ) ES, , \ )o \ I \}\\ 2i Zi \(} }{\\i( ) }) \\({{ }(2 [{{!/ q -{ \ 7 [ ;5 \������3 {j\ £ )k() S/ ] �£ !2; -k (§��f k \ ({ § /) ! B/\/ !\}!)!fƒ8+ k\�� = EJlz± E \\\\\/ }7$ [\§\! {... 2 § / 3{ e, � §§f / § f LU / $ kf�� \ kk « [ to , e JE j\ §/ ! ] K { () WE )} )/ ' ! §« E' f�f{G/mot Qawee) 2wd: (if / \ � � � � \ E j ® \\ \ \ !! • )\ . [§ ) ! \ 2 [ \ City of Fort Worth, T e)cas Mayor and CouncH Communication DATE: 09/24/19 M&C FILE NUMBER: M&C 19-0202 LOG NAME: 60SS9OA3-HAZENSAW SUBJECT Authorize Execution of Amendment No.3 in the Amount of$145,400.00 to an Engineering Agreement with Hazen and Sawyer, P.C.(CS No. 46465),for a Revised Contract Amount of$403,183.00 for Sanitary Sewer Rehabilitation,Contract 90 for Various Sanitary Sewer Mains Located Within the Central Meadowbrook and Handley Neighborhoods and Adopt Appropriation Ordinance(COUNCIL DISTRICTS 5 and 8) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$405,400.00 from available funds;and 2. Authorize execution of Amendment No.3 to City Secretary Contract No.46465,an Engineering Agreement with Hazen and Sawyer, P.C.,in the amount of$145,400.00 for a revised contract in the amount of$403,183.00 for the Sanitary Sewer Rehabilitation,Contract 90(City Project No.CO2382). DISCUSSION: On February 10,2015 Mayor and Council Communication(M&C C-27183),the City Council authorized the execution of an Engineering Agreement with Hazen and Sawyer,P.C., in the amount of$196,485.00 for the preparation of plans and specifications for the Sanitary Sewer Rehabilitation, Contract 90 project.The agreement was subsequently revised by Amendment No.1 in the amount of$38,914.00 administratively authorized September 28,2015 and Amendment No.2 in the amount of$22,384.00 administratively authorized on April 12,2017. Amendment No.3 will provide for additional design services on the project and preparation of the easement documents that are now necessary for the sanitary sewer mains located on private property.In addition to the amendment amount$260,000.00 is required for real property acquisition, additional project management and utility coordination. M/ BE Office—Hazen and Sawyer, P.C.agrees to maintain its initail SBE commitment of 33 percent that it made on the original agreement and extend and maintain that same SBE commitment of 33 percent to all prior amendments up to and inclusive of this Amendment No.3. Therefore Hazen and Sawyer remains in compliance with the City's BDE Ordinance and attest to its commiment by is signature on the Acceptance of Previous SBE Commitment from executed by an authorized representative of its company. The project is located in COUNCIL DISTRICTS 5 and 8. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the Fiscal Year 2019 capital budget,as appropriated,of the Water and Sewer Capital Projects Fund.The Fiscal Year 2019 Water and Sewer Operating Budget includes appropriations of$35,856,873.00 within the Wastewater Operating Budget for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects.After this transfer for Fiscal Year 2019,the balance will be$13,765,527.00. Appropriations for Sanitary Sewer Rehabilitation,Contract 90 project are as depicted below: Fund Existing Additional Project -Il *Appropriations Appropriations Total W&S Capital Projects-Fund $0.00 $405,400.00 $405,400.00 56002 Sewer Legacy- $320,483.00 $0.00 $320,483.00 Fund 59607 _ Project Total 11 $320,483.00 $405,400.00 J$725,883.00J *Numbers rounded for presentation purposes. Submitted for City Manager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Walter Norwood 5026 • + ��: • Q • • • • • • • • • Q tD11 � D • O - • 0 • • • • • • • • • 0 = v • h • • • • • • • =3 r-. CD CD •• (D :3 •• n •• •• •• •• •• •• •• •• •• (D CD G Z. N co^^^ 0 Q Q Y, 0- 0 • (Q 0 • - (o r (Q -1 • O • • v m v CD v '1 N -n'N 111111' -n :3 111'11'1' IV -n CD n� FD. O 0 O " O (Q Q (Q (Q v 0 3 31 tD D Di 3 3 c 01 • (D (D (D (D i - D 0 N� CD