HomeMy WebLinkAboutContract 52868-FP1 City Secretary 52868 -FP1
Contract No.
FORTWORTH. Date Received Dec 27,2019
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Chisholm Trail Ranch Section 2 Phase 3 Offsite- Sewer
City Project No.: 102075
Improvement Type(s): Water ❑ Sewer
Original Contract Price: $125,787.16
Amount of Approved Change Crder(s): $7,521.00
Revised Contract Amount:
Total Cost of Work Complete: $133,308.16
47alffej111(el beef Dec 17, 2019
In mpg Mr ehhea(Dec17 M19) -
Contractor Date
Project Manager
Title
L.H. Lacy
Company Name
Pedro G. ndez(Dec 17,2019) Dec 17 2019
Project Inspector Date
o atel De 2019) Dec 17, 2019
Project Manager Date
Je ifer zernackonbehalfofJanieMorales(C Dec 18, 2019
CFA Manager Date
& d
Dana Burghdoff(D c26,201 Dec 26,2019
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 'I of 2
FT.WORTH,TX
Notice of Project Completion
Project Name: Chisholm Trail Ranch Section 2 Phase 3 Offsite - Sewer
City Project No.: 102075
City's Attachments
Final Pay Estimate x❑
Change arder(s): ® Yes ❑ NIA
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 15 WD Days Charged: 15
Work Start Date: 9/16/2019 Work Complete Date: 10/7/2019
Page 2of2
FO RT WO RT H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CHISHOLM TRAIL RANCH SECTON 2 PHASE 3 OFFSITE-SEWER
Contract Limits
Project Type SANITARY SEWER
City Project Numbers 102075
DOE Number 2075
Estimate Number I Payment Number 1 For Period Ending 12/15/2019
W
City Secretary Contract Number Contract Time 1 W
Contract Date 6/17/2019 Days Charged to Date 15
Project Manager NA
Contract is 100.00 Complete
Contractor L.H.LACY COMPANY
P.O.BOX 541297
DALLAS, TX 75354
Inspectors MILLER,W 1 HERNANDEZ,P
Tuesday,D=mber 17,2019 Page 1 of
City Project Numbers 102075 DOE Number 2075
Contract Name CHISHOLM TRAIL RANCH SECTON 2 PHASE 3 OFFSITE-SEWER Estimate Number 1
Contract Limits Payment Number I
Project Type SANITARY SEWER For Period Ending 12/15/2019
Project Funding
UNIT I;SANITARY SEWER IMPROVMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
----- - - --- -------------------- ---------
1 8"SDR-26 PVC SEWER PIPE 1675 LF $35.31 $59,144.25 1675 $59,144.25
2 SDR-26 4"SEWER SERVICES 30 EA $765.71 $22,971.30 30 $22,971.30
3 4'STD DIA.MANHOLE 6 EA $3,557,54 $21,345.24 6 $21,34524
4 EXTRA DEPTH FOR 4'DIA MANHOLE 20 LF $204,14 $4,082.80 20 $4,082,80
5 8"PVC SANITARY SEWER PIPE WICSS 147 LF $73.07 $10,741.29 147 $10,741.29
BACKFILL
6 TRENCH SAFETY 1822 LF $1.01 $1,840.22 1822 $1,840.22
7 POST-CCTV INSPECTION 1822 LF $1.41 $2,569.02 1822 $2,569.02
8 CONNECT TO EXISTING 8"SEWER 1 EA $761.20 $761.20 1 $761.20
9 CORE INTO EXISTING MANHOLE 1 EA $1,204.84 $1,204.84 I $1,204.84
10 VACUUM TEST MANHOLES 6 EA $102.00 $612.00 6 $612.00
11 SEEDING,BROADCAST 1.03 AC $500.00 $515.00 1.03 $515.00
12 CONCRETE PADS FOR MANHOLES(CO#1) 6 EA $1,253.50 $7,521.00 6 $7,521.00
---- -- - - - - -----------------------------
Sub-Total of Previous Unit $133,308.16 $133,308.16
--- -------------------------------
Tuesday,December 17,2019 Page 2 of 4
City Project numbers 102075 DOE Number 2075
Contract Name CHISHOLM TRAIL RANCH SECCON 2 PHASE 3 OFFSITE-SEWER Estimate Number 1
Contract Limits Payment number 1
Project Type SANITARY SEWER For Period Ending 12/15/2019
Project Funding
Contract Information Summary
Original Contract Amount $125,787,16
Change Orders
Change Order Number 1 $7,521.00
Total Contract Price $133,308.16
Total Cost of Work Completed $133,308.16
Less %Retained $0.00
Net Earned SI33,308.16
Earned This Period $133,308.16
Retainage This Period $0.00
Less Liquidated Damages
Days Q 1 Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less I5% $0.00
Balance Due This Payment S133,308.16
Tuesday,December 17,2019 Page 3 of 4
f
City Project Numbers 102075 DOE Number 2075
Contract Name CHISHOLM TRAIL RANCH SECTON 2 PHASE 3 OFFSITE-SEWER Estimate Number 1
Contract Limits Payment Number I
Project Type SANITARY SEWER For Period Ending 1211512019
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors MILLER,W / HERNANDEZ,P Contract Date 6/17/2019
Contractor L.H.LACY COMPANY Contract Time 15 W
P.D.BOX 541297 Days Charged to Date 15 W
DALLAS, TX 75354 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Cornpleted $133,308.16
Less %Retained $0.00
Net Earned $133,308.16
Earned This Period $133,308.16
Retninage This Period $0.00
Less Liquidated Damages
0 Days a@ $0.00 1 Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $133,308.16
Tuesday,December 17,2019 Page 4 of 4
�
� qq
@k §§Lq
S
°
C
; £ &
\IX - m /
o ! 2 & \ ± r
§ / , §
U.
(/
cq ee
at co
k CD a)
� \ u
� e ° � a ; u
I . §
o aI §2 k
} ( B ■� §
� )_ � .. .. � a ■ s � §2 ,. \ � �
E \{ no § r
S \ §} § \ 4 2 k § E t &
2 - • | q « r
\ 2
ƒ § �� |� § ; ■ } `� � §§
LU § |ƒ % e k §§ \
>
LU ID3 eE § ` \ $ o §§
\ � ®
_ � ■
k to §
S < n zx £ o B 2■ ■ « I
co
kc
� • t LU ) k
$ 2
_ § \ § Al
k§ § k
ix
0 o n e «
# 0- § a § ° ° / ( 0 La
7 £
§ § k § q $ § B ( 8 LU
7 7 ) B
o 0 0 mLL
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Chisholm Trail Stanch Section 2 Phase 3 Offsite Sewer
PROJECT NUMBER: 102075
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8" SCR-26 PVC 1822
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 4" (30) SDR-26 PVC
TRANSPORTA`I ION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me, the undersigned authority, a notary public in the state and county
aforesaid,on this day personally appeared Bobby W. Gordon, President of L.H. Lacy
Company, Ltd., known to me to be a credible person, who being by me duly sworn, upon
his oath deposed and said,
That all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
Off-site Sewer Improvements to serve Chisholm Trail Ranch 2.3 -City Project 102075
BY
Bobb . G rdon
Subscribed and sworn before me on this date 1-7—of �iC,0Cd.L , 2019.
AA9 (LA�Le
ary, State of Texas, C ty of Dallas
yam' DARLENE CONEY "
Notary io -* 10317301
X N7y Commission Expires
sr. ;f roarcil 9.-020
CONSENT OF SURETY OWNHR a
TO FINAL PAYMENT ARMITECT
AM Document 6707 CC3MACTOR �
SURETY
Bond No. 3017969 OTHER p
TO OWNER ARCHI'T crs PROJECT NO.:
r�varRa.tms•adrlrrxs]
City of Fort Worth &.labez CTR 2.3 LLC
1038 Texan Trail CON'lRACrFOR. Construction
Grapevine, TX 76051
PROJECT: CONTRACT DARTED:
(Mnw and ad&id f
Offsite Sewer Improvements to Serve Chisholm Trail Ranch, Section 2, Phase 3
In acomAzncewith the provisions of the Contract bemeen die Ownerand[lie Conti aw as Wicated above,The
(Iasarr narrrp gird addr�rofS7+rrK3y
Great American Insurance Company
301 E. Fourth Street
Cincinnati, OH 45202
SURMY,
on Toni of
Ont*"name and add)vw rfCanfrdawy
L.H. Lacy Company, Ltd.
1880 Crown Dr.,Suite 1200
Dallas, TX 75234
CONTMCT01,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of
any of its abligatiom to
amwrt name and ardixwt afCwwcr}
City of Fort Worth &Jabez CTR 2.3 LLC
1038 Texan Trail
Grapevine, TX 76051
, oavNv�,
as set firth to said SurecYs b nncL
IN WfTNE55 WHRRE0F,the Surety has bereumo set its hwd on this date: December 10, 2019
(14W11 in 940W the monrbraAxctarbv the munerk drura:?d p'-Vr,!
Great American Insurance Company
By:
r�+alllYr vJrrtpba rlx+xr rrprYsxn►a1rt+Q1
Attest:
Rita G. Gulizo Attorney-in-Fact
Susan D. Zapalo i (hDardtrarfteand&W
0707---1994
GREAT AMERICAN INSURANCE COMPANY0
Administrative Office: 301 E 4TH STREET * CINCINNATI,OHIO 45202 0 513-369-B000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE
No,0 19964
POWER OF ATTORNEY
KNOW ALL INIEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY,a corporation organized and existing under
and by virtue or the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually if more than
one is named,its true and lawful attomey-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety,any and all bonds,
undertakings and contracts of suretyship,or other written obligations in the nature thereof;provided that the liability of the said Company on any such bond,
undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.
Name Address Limit of Power
RITA G.GULIZO ALL OF ALL
SUSAN D.7APALOWSKI NEW ORLEANS,LOUISIANA S100,000,000
DAVI❑T.MICLETTE
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above,
IN WITNESS WHEREOF the GREATAMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate sea]hereunto affixed this 6TH day of FEBRUARY 2019
Attest4Z,. GREAT AMFRICAN IN5 ANCE CAMP
�N�`�'b
A,xstsranr Secretary Dirisfonat Senior face Presrdenr
STATE OF OIIIO,COUNTY OF HAMILTON-ss: MARK VICARK](877-377-2408)
On this 6TH day of FEBRUARY 2019 ,be£oreme personally appeared MARK VICARiO,tome known.
being duly sworn,deposes and says that he resides in Cincinnati,Ohio,that he is a Divisional Senior Vice President of the Bond Division of Great American
Insurance Company,the Company described in and which executed the above instrument;that he knows the seal of the said Company,that the seal affixed to the
said instrument is such corporate seal;that it was so affixed by authority of his office under the By-Laws of said Company,and that he signed his name thereto
by like authority.
&Mjk Oft
NoMryWaftatow a '44�
Wan imbllBossism
This Power ofAttomey is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company
by unanimous written consent dated June 9,2008.
RESOLVED: That the Divisional President,the several Divisional Senior rice Presidents.Divisional lice Presidents and Divisonaf Assistant t tce
Presidents,or any one of them, be and hereby is authorized,from time to time,to appoint one or more Attorneys-in-Fact to execute on behalf of the Company,
as surety,any and all bonds,undertakings and contracts ofsuretyship,or other written obligations in the nature thereof-to prescribe their respective duties and
the respective limits of their authority;and to revoke any such appointment at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of rise aforesaid officers and any Secretary or Assistant Secretary of the
Company may be a(fued by facsimile to any power of attorney or certificate of either given for the execution of any bona undertaking,contract of suretyship,
or other written obligation in the nature thereof,.such signature and seal when so used being hereby adopted by the Company as the original signature of such
officer and the original seal of the Company,to he valid and binding upon the Company with the same force and effect as though manually affixed.
CERTIFICATION
I,STEPHEN C.BERAI IA,Assistant Secretary of Great American Insurance Company,do hereby certify that the foregoing Power of Attorney and
the Resolutions of the Board of Directors of June 9,2008 have not been revoked and are now in full force and effect.
Signed and sealed this loth day of December 2UTS
Asswas:Secretary
51029AG(07118)