HomeMy WebLinkAboutContract 53050-PM1f ORIGINAL CON'rRACT ]
FORT WORTH
~
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
CITY SECRETARY
CO NTRACT NO. 53050 -PM I
THE PRESIDIO AT RIVER EAST
City Project No. 101464
File No. K-2602
Water Project No. 56008-0600430-101464-001580
Sewer Project No. 56008-0700430-101464-001380
Betsy Price
Mayor
David Cooke
City Manager
Christopher P. Harder, P .E.
Director, Water Department
Steve Cooke
Interim Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
~DUNAWAY
DUNAWAY ASSOCIATES, L.P .
550 Bailey Avenue, Suite 400
Ft. Worth, TX 76107
Office: 817-335-1121 /Fax: 817-429-1370
TX REG . F-1114
w ... vw.dunawav-assoc .com
DA Project# B000977.005
May 2019
OFFICIAL RECORD
CITY SECRETARY
l=T. u,,,.,,, ... ,_. ..",
00 0010-1
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 1 of 4
1 SECTION 00 0010
2 TABLE -OF CONTENTS
3 DEVELOPER AWARDED PROJECTS
5
Division
00 - General Conditions
6
0-411-13
laviwiBft te Ri ddeFs
7
002113
1rstnietiefis to Biddeps
8
001100
Bid Form
9
00 42 43
Proposal Form Unit Price
10
0043 13
laid Bond
11
0045 !1
Bidde£s�re� tie
12
0045 12
Prequalification Statement
13
0945 13
Bidder-i1 equal if eu!ior_Applicatios
14
00 45 26
Contractor Compliance with Workers' Compensation Law
15
0045 40
=N4inBffty Business E;"ter-prkp C;AZi
16
00 52 43
Agreement
17
00 61 25
Certificate of Insurance
18
0062 13
Performance Bond
19
00 62 14
Payment Bond
20
0062 19
Maintenance Bond
21
00-:72 00
Geneml Conditions
22
0073_nn
Supplementary r;onditio s
23
0073 10
Standard City Conditions of the Construction Contract for Developer Awarded
24
Proj ects
25
26 Division 01- General Requirements
27
01 1100
Summary of Work
28
01 2500
Substitution-Weeedures
29
01 31 19
Preconstruction Meeting
30
01 -1 -1 2 0-
pr-qjeet meetiffgq
31
01 32-16
Construction Progress Sehedui
32
33
01 3300
Submittals
34
01 35 13
Special Project Procedures
35
01 45 23
Testing and Inspection Services
36
01 5000
Temporary Facilities and Controls
37
01 5526
Street Use Permit and Modifications to Traffic Control
38
01 57 13
Storm Water Pollution Prevention Plan
39
13
Kemper-ary_FiK, eet Signa„e
001-58
40
01 60 00
Product Requirements
41
01 66 00
Product Storage and Handling Requirements
42
01 70 00
Mobilization and Remobilization
43
04 7-1 2)3
99f4stFHW8f4-941kifig
44
01 74 23
Cleaning
45
0177 19
Closeout Requirements
46
01 78 23
Operation and Maintenance Data
47
01 78 39
Project Record Documents
48
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised September 1, 2015
0000 10- 2
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 2 of 4
1 Technical Specifications which have been modified by the Engineer specifically for this
2 Project; hard copies are included in the Project's Contract Documents
3
4 NONE
6 Technical Specifications listed below are included for this Project by reference and can be
7 viewed/downloaded from the City's Buzzsaw site at:
8
9 htps:/Iprojeetpoint.buzzsaw.com/client/fortworth2ov/Resources/02°/020-
10 %20Canstruction%2ODocuments/Specifications
11
12 Division 02 - Existing Conditions
13 0241 13 Selective Site Demolition
14 0241 14 Utility Removal/Abandonment
15 0241 15 Paving Removal
16
17 Division 03 - Concrete
18 03 30 00 Cast -In -Place Concrete
19
20
21
22
23 Division 26 - Electrical
24 260500 ovrraiirWedE Results f r greer' erl
25
26
27 26 05 4� sae f ffetmd il.,ets a" d RaEewV ys-for Eleetfieal system-,
28
29
Division 31 - Earthwork
30
31 1000
Site Clearing
31
31 23 16
�
1�n a l a:�f eeavati eel
32
3123-23
Beffew
33
31 2400
34
31 25 00
Erosion and Sediment Control
35
3! 36-00
Gabiens
36
37
38
Division 32
- Exterior Improvements
39
32 a_i V7
_ ae.... anent Asphalt Paving nepai
40
41
42
3i-H 233
Flexible Base Course
43
32 11 29
Lime Treated Base Courses
44
32 ! 1-33
Cement 44eated Base Eou
45
32 12 16
Asphalt Paving
46
47
32 13 13
Concrete Paving
48
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
49
32 13.73
Concrete Paving Joint Sealants
50
32 14 16
Bfiek Unit PwAng
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised September 1, 2015
00 00 10- 3
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 3 of
32 16 13 Concrete Curb and Gutters and Valley Gutters
32 1723 Pavement Markings
32 3 i i1 O'i-ci reH{csfmd gates
�'LL
32 3129 Wood Feneesand Gates
3232 13 Cast -in -Place Concrete Retaining Walls
3291 19 Topsoil Placement and Finishing of Parkways
ryvro- Mulching, oediHg, and Sodding
32 93 43 Trees and Shrubs
10
11
Division 33
- Utilities
12
33 01 30
Sewer and Manhole Testing
13
33 01 31
Closed Circuit Television (CCTV) Inspection
14
3303 10
Bypess_p. of Existing Sewer- Systems
15
3394 10
joiPA Bending and glrcvtr,ieal isolation
16
Z3 04 11
a��--r�
�Eer�e�e�--Ee�-teal Test Stations
17
18
9304 30
TreesTrefnpemr-y WateF Sefyiees
19
33 04 40
Cleaning and Acceptance Testing of Water Mains
20
3305 10
Utility Trench Excavation, Embedment, and Backfill
21
22
33 0-5-13
ffna -Grade R4Pgs
23
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade
24
3305 16
Concrete Water Vaults
25
33-05 17
GeneFete Gellam --- -. .
26
28
29
33 05 23
HandsunneliRg
30
33 05 24
1gstallaiiea-ef Cffiie:-Pipe-ift GaSiffg T Liner- P44e
eF e1
31
33 05 26
Utility er4wrs4=eeaters
32
33 05 30
Exploratory Excavation for Existing Utilities
33
331- -10-
DuII};'�;e
34
Z--r�'rsuccrrrrcrarrc'icri'f'ib'-�
33-1 1 11
n the 1, o" Fittings
35
33 11 12
Polyvinyl Chloride (PVC) Pressure Pipe
36
93 11 13
Eenefete Pressure F' a Steel (;y1i deF T
ccr; a«ci�sr�vcr��j=po
37
�7 14
33 11 14
Bur - ea. Steel Pip and Fitt:
38
33 11 15
Pre stressed GeFisr-ete Cylinder Pipe
39
33 12 1`0
Water- gefv-iees 1-ineh to ine
40
33 12! 1
Large Water Meteffi
41
-1-3 Q =
Resilient Seated gate Valve
42
43
33 1225
Connection to Existing Water Mains
44
33 1230
Gembine4iea Air- Valve Asseinblies f4ff Pa"le Water- Systems
45
46
93 1250
Wa4er Sample Statroini
47
33 1260
Blew effVelves
48
49
50
3 31 15
14PPfs Pipe Fe- eaita Sewem (Gr-a.vita and Force 11A w,)
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised September 1, 2015
00 00 10- 4
TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS
Page 4 of 4
1 33 31 20
Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
2
3
4
5 333190
"Sane Sewer - Se e C�eameetieasand Sepyiee Line
6
7 3339 10
Cast -in -Place Concrete Manholes
8 33 39 20
Precast Concrete Manholes
9
10
11 33 39 60
Epoxy Limas -for- Saai,., y Sewer- c}mstwe5
12 43 41-10
Reii3forreed Ge'neroe SteFri-1-Sewef PipeXulyei4s
13
14 33 46 90
Sub drainage
15 39 4601
gleRed gteFrn Drains
16 33 46 02
» -ro-
17 33 4 9 10
Cast in ee Mapiheles ad juletlel}-13ex$s
18 3349 29and
apWets
19 93-49 40
849FM DrainageHeadwalls and wifi.. aI6
20
21 Division 34 - Transportation
2234 4 1 1 n Traffic Signa46
23 34-41-13 Removing T-Faf ,e Signals
24 34 41 20 Roadway Illumination Assemblies
25 34 41 � O A1uPAiFmFHr&igfr5
26 3471 13 Traffic Control
27
28 Appendix
29 GC-4.01 Availability of Lands
30 GC-4.02 Subsurface and Physical Conditions
31 GC-4.04 Underground Facilities
32 CC-4.96 14,aZBrdE)t1s-EON'40» 6RW C-GfidiflOn at Sit'
33
34
35 GC 610-9- Pe;ri 4g And oiti1Wes
36 GG 6.24 I+ieedi sEi=tin
37 GR 0160 90 Pro w4s
38
39
40 END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised September 1, 2015
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - DID PROPOSAL
Page 1 or7
Bidder's Application
Project Item Information
Bidders Proposal
Bid]ist Item
No,
Description
Specification
Section No.
Unit of Bid
Measure Quantity
Unit Price
Bid Value
UNIT I- WATER
IMPROVEMENTS
1
0241.1510 Salvage Fire Hydrant _ T
0241 14
EA T
_-- 1
_�3,463.80
_ $3.453.80
_ 2
3305.0109 Trench Safety
3305 10 _
33 0,5 14
_T_ LF
EA
88
1
$7.00
$250.00
�$616.00
$250.D0
_ 3
_
3305.0111 Valve Box Adjustment
4
5
6
3311.0041 4" Water Pipe
3311.0141 6" Water Pipe
33 11 10,,
3311 12
LF —
31
41
1
$22.55
$699.05
3311 10,
3311 12
331240
LF
EA
$51.75
$2,121.75
3312.0001 Fire Hydrant _
$3 46� 3.86
$3,463.80
— 7
—'
_
3312.2801 3" Water Meter and Vault
331211
EA
1
.
$14,490.00
8
__—
3 312.2802 4" Water Mete r a nd Va ult —_
33 12 11
—EA
_
1
_—$14,490.00
$1570,00�
$15,870.00
9
_
3312.4003 8" x 4" TappincLSleeve & Valve
33 12 25
EA
2
— $5,092.20
_ _- $. 0,184,40
— 10
3312.4004 8" x 6" Tappir�g_Sleeve &Valve
331225
EA
4
$5,437.20
11
9999.0005 Kill Service (3/4" Domestic) _ _
00 00 00
EA
_ 2
$850.00
— $1,700.00
12 _
9999.0006.8"x2" Tapping Sleeve and Valve
00 00 00
EA
1
$1,000.00
$1,000.00
13
19999.0007 2" Irrigation Meter
00 00 00
EA
1
— $1,000.00
$1,000.00
14 _
9999.0008 1" Irri ation Pipe _-- _ W
00 00 00
LF
16
_ .— 960.10
— $15,361.60
15
16
--17--
18
19
f
20
-
—
22-
23
----
24
— --
--_
25-
26-
27
----
TOTAL UNIT 1: WATER
IMPROVEMENTS
$91,969.20
CITY OF FORT WORTH
STANDARD CONSTRUCrION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015
00 42 43—Bi d Proposat_DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BTD PROPOSAL
Page 2 or7
Bidder's Application
Project Item Information
Biddees Proposal
Bid! istItem
No.
Description
Specification
Section No.
Unitof
Measure
I Bid
Quantity
Unit Price
Bid Value
UNIT Ik: SANITARY SEWER IMPROVEMENTS
1
3301.0002 Post -CCTV Inspection ^--._
3301 31
LF ..
92
$13.58
_$1,249.36
_2
3301.0101 Manhole Vacuum Testing••.. _- -
3301 30
3305 10
kA
LF
3
_ 92
$416.88
..� �43.48
_ $1,250.64
$4,pp0. [ 6
3305.0109 Trench Safety _ _ _ _
w 4
3305.0113 Trench Water StnPs — _
33 05 15
3331 50
EA—
-- EA
2
1
$100.00
_- $1,084.68
$200.00
^ __— 1 084.66
-
5
3331_3102 4" 2-Way Cleanout _ _ -_ _ _-. _ -
3331.4101 4" Sewer Pipe
- _ - ._ _.................
3331.4115 8" Sewer Pipe -
6
3311 10,
3331 20
LF
24
$159.16
$3,819.84
$11,863.96
r
7
'33 11 10,
3331 12,
33 31 20—
33 39 10,
.333920 _
33 39 10,
33 39 20
LF
68
$174.47
8
3339.1001 4' Manhole
EA
EA
—2
1
$12,903.00
$7,935.00
$25,806.00
_
$7,935.00
9
3339.1002 4' Drop Manhole
10
3339.1003 4' Extra Depth Manhole
33 39 10,
33 39 20
EA
1
U1,390.00
$21,390.00
26-
27_-
- 28
29-
30
31-
--32
- -
- - - _
—
33
- -
_..
--
------- -
34
35
-
-.
3
--
-
--
-
37
38
39
40
rT�
-
41
42
- 43
-- - -- - ---
44
45
TOTAL UNIT II: SANITARY
SEWER
IMPF20VEMENT5
$78.599.64
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September I, 2015
00 42 43—Bid Propmal_DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP -BID PROPOSAL
Page 3 of 7
Bidder's Application
Project Item Information
Bidders Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT III: DRAINAGE
IMPROVEMENTS
1
--
-
2
3
6
- -
--
8__--
9
10--
_11
12
13-
14-
15
--- -
_-.--
16
17--
18
19
20
-
21
-
22
23
_ 24
w�-
25
-----
-----
- - ---
- - - -
2
-
-
--
27
28-
29
30
31__--
32-
33
— --
---
34
_
35_-
_
37
-
-
38
39
-_--
40_-
41
---
42-
43
44
--
--
45_-
TOTAL UNIT III:
DRAINAGE
IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015
00 42 43_Bid Proposal_DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 4 cF7
Bidder's Application
Project Item Information
Bidders Proposal
Bid]ist Item
No,
Description
Specification
Section No.
Unit of Bid
Measure Quantity
Unit Price
Bid Value
UNIT IV: PAVING IMPROVEM
NTS
1
2
_ 3
0170.0100 Mobilization__ - „
U241.0401 Remove Concrete Drive _ -
0241.0500 Remove Fence
01 7000
LS
1
_ 10 000.00
_- $101000.00
0241 13
SF Y
405
2.00
$810.00
0241 13
LF
133
$5.00
$665.00
4
� � �
0241.1000 Remove Conc Pvrnt
0241.1100 Remove Asphalt Pvmt
02 41 15
Sy
16
- $10.00
-
$160.00
_ 5
8
0241 15
_
Sy
190
8.00
-_
- $1,520.00
$962.00
$2�450.00
0241.1300 _Remove Conc Curb&Gutter
3110.0101 Site Clearing �_ `
3110.0102 6"-12" Tree Removal -^ -
02 41 15
LF_
481
7
31 1000
LS
J 1
_$2.00
$8`000.00
- 8
31 10 00
Y EA -
u 7
350.00
9
3110.0103 12"-18" Tree Removal ------
31 1000
EA
2
_ 700.00
$1,400.00
10
3211..0400 Hydrated Lime _
3211 29
- TN
35
$176.00
$6 1,60.00
11
32_11.0501 6" Lime Treatment
32 11 29
Sy
500
$6.00
$3,000.00
12
-13
3212.0302 2" Asphalt Pvmt Type D
32 12 16_
__
SY
-
-205
~ $12.00
-
$2,460.00
µ
_
3212.0501 4" Asphalt Base Type B
32 12 1fi
Sy
_ 205
117
$62.46
$12,805.00
14
-� _-
3213.0101 6" Conc Pvmt _ _
32 13 13
SY Y
$123,08
$14,400.00
15
3213.0301 4" Conc Sidewalk
32 13 20
SF
841
$8�34
$7,015.00
16
_ _
3213,0311 4" Conc Sidewalk, Adjacent to Curb�
32 13 20
T_ SF
1342
23
$7,015.00
17�-
3213.0401 6" Concrete ❑riye"y -
32 13 20
SF
718
-$5
- $12.53
$9 000.00
_ 18
- �19 T
3213,0506 Barrier Free Ramp, Type P-1
_
32 13 20
EA
2
_
$850.00
. -_
$1,7_00.00
3216.0101 6" Conc Curb and Gutter _ _
32 16 13
_LF -
_ 132
_�7.27
$960.00
20
-
3217.0001 4" SLD Pvmt Markin HIAS (W) -T
32 17 23
_ LF
76
$0.75
_ _ _ $57.00
^
21
3232.0101_Conc Ret Wall with Sidewalk, Sidewalk
32 32 13
SF_
88
$10.00
$880.00
22
3291.0100 Topsoil T -
3291 19
Cy -
13
$30.00
-
$390.00
23
3293.0103 Plant 3" Tree _ -
32 93 43
- EA
4
_ $300.000
1 200.00
24
3471.0001 Traffic Control
34 71 13
MO_ _
- 2
$3,000.00
_ $6,000.00
25
9999.0001 Salvage Gas Meter w
100 00 00
EA
1
_ $1,300.00
$1.300-00
26
9999.0002 6" Conc Curb and Gutter (Inverted, per
100 00 00
100 00 00
LF
SF
308
48
W$20.00
$45.00
$6 160.00
$2,160 00
--27
9999.0003 Pedestrian -Rated Steel Plate (perplaq_
28
--
9999.0004 Erosion Control < 1 acre _
100 00 00
LS
1
_
_ $3,0-0.0.00
- _ 3 000.00
29
30
-3i-
-
- 33
34
-35
�36-
37
38
�39
_ _ --
- -
- ---
-
- -
40
41
42
----
-
---- _
43
-- - ---- - -
44
45
TOTAL UNIT
IV: PAVING; IMPROVEMENT§1
$111,629.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015
00 42 43-Bid Proposal -DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP-BIDPROPOSAL
Page 5 or?
Bidder's Application
Project Item Information
Bidders Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT V: STREET LIGHTING IMPROVEMENTS
1
3441.3054 Furnish/Install LED Lighting Fixture
3441 20
EA_
1
$7,500.00
$7,500.00
^�
--
_T
3
- --
4
5-
6
_ _ _ -- ---
--- —
- _
10
12
13-
14
15
16---
17
18
- 1
20_----
_
21
-
22___---
23-
24
-------- - -- - _ -
25�
_
--. -
-
-• ^
-
26
27
28
2
-- �.�-
-
-
-
30
--- -
-
--
- -
31
32--
33-
34
35
36
37
- --
38
-
40
41-
42
-_ _.....---• _-_
-- -
43
_ _
--
44
--- -
45
TOTAL UNIT V: STREET
LIGHTING IMPROVEMENTS
$7,500.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form'Version September I, 2015
00 42 43—Bid Proposal_DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP-BIDPROPOSAL
Page 6 o1`7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT VI-. TRAFFIC SIGNAL
IMPROVEMENTS
2
3
4
5
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT VI: TRAFFIC
SIGNAL
IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015
00 42 43—Bid Proposal —DAP
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 7 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
Description
Specification
I Unit of
I Bid
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
BldSummar
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
Total Construction Bid
Contractor agrees to Currrp]VIC WORK for FINAL ACCEPTANCE within
CONTRACT cat T
icnccto its as provided In the General Conditions.
00
G 61` END OF SECTION
$91.969.20
$78,599.64
$7,500.00
$289.697.84
CRlendar days after the date when the
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43 Bid Propoeet DAP
0045 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
DAP — PREQUALIHCATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Type'box provide the complete major work type and actual description as provided by the Water
De artment for water and sewer and TPW for paying.
Major Work Type
Contractor/Subcontractor Company Name
Prequalification
Expiration Date
Water Distribution,
Development, 8-inch diameter
5
and smaller
Sewer Collection System,
Development, 8-inches and
c{ 3 o Zo
I
smaller
Asphalt Paving Construction
Less than 15,000 squareyards)
Concrete Paving Construction
Less than 15,000 squareyards)
Roadway and Pedestrian
Lighting
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
BY
(Signature)
TITLE: �1
DATE: r 1'4C 4)
END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT — DEVELOPER AWARDED PROJECTS City Project No. 101464
Form Version September 1, 2015
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page I of I
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 101464. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
CRao1 Som 8,"�L* 6 GD r GiL iL
Company
9721 &Ahg Fwf . STiz lob
Address
By:
(PleasePrint)
Signature:
iN aSM WC*V Title:
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
Lro
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
�� lC ` S =t._er , known to me to he the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of D \0 ME '?— for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN DER My HAND AN SEAL OF OFFICE this day of
20_Gf
;lha p��r YURI SANCHEZ `
Notary ID #131583712 Not J
Public in and for the State e s
N� f My Commission Expires
May 25, 2022
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
The Presidio at River East
City Project No. 101464
005243-1
Developer Awarded Project Agreement
Page 1 of 4
1 SECTION 00 52 43
2 AGREEMENT
3
4 THIS AGREEMENT, authorized on 05/01/2019 is made by and between the Developer,
5 PMA FW Presidio LLC, authorized to do business in Texas ("Developer"), and Crimson Building
6 Company, LLC, authorized to do business in Texas, acting by and through its duly authorized
7 representative, ("Contractor").
8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
9 follows:
10 Article 1. WORK
11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
12 Project identified herein.
13 Article 2. PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
15 generally described as follows:
16 The Presidio at River East
17 City Proiect No. 101464
18 Article 3. CONTRACT TIME
19 3.1 Time is of the essence.
20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
21 Documents are of the essence to this Contract.
22 3.2 Final Acceptance.
23 The Work will be complete for Final Acceptance within { 365 calendar days after the
24 date when the Contract Time commences to run as provided in Paragraph 12.04 of the
25 Standard City Conditions of the Construction Contract for Developer Awarded Projects.
26 3.3 Liquidated damages
27 Contractor recognizes that time is of the essence of this Agreement and that Developer
28 will suffer financial loss if the Work is not completed within the times specified in
29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
30 the Standard City Conditions of the Construction Contract for Developer Awarded
31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
35 Developer Z-F-LD Dollars ($, C3 ) for each clay
36 that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City
37 issues the Final Letter of Acceptance.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised June 16, 2016
005243-2
Developer Awarded Project Agreement
Page 2 of 4
38 Article 4. CONTRACT PRICE
39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
40 Documents an amount in current funds of Two Hundred Eighty -Nine Thousand Six Hundred
41 Ninety -Seven Dollars and Eighty -Four Cents ($289,697.84).
42 Article 5. CONTRACT DOCUMENTS
43 5.1 CONTENTS:
44 A. The Contract Documents which comprise the entire agreement between Developer and
45 Contractor concerning the Work consist of the following:
46 1. This Agreement.
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
2. Attachments to this Agreement:
a. Bid Form (As provided by Developer)
1) Proposal Form (DAP Version)
2) Prequalification Statement
3) State and Federal documents (project specific)
b. Insurance ACORD Form(s)
c. Payment Bond (DAP Version)
d. Performance Bond (DAP Version)
e. Maintenance Bond (DAP Version)
f. Power of Attorney for the Bonds
g. Worker's Compensation Affidavit
h. MBE and/or SBE Commitment Form (If required)
3. Standard City General Conditions of the Construction Contract for Developer
Awarded Projects.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised June 16, 2016
005243-3
Developer Awarded Project Agreement
Page 3 of 4
76 Article 6. INDEMNIFICATION
77 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
78 expense, the city, its officers, servants and employees, from and against any and all
79 claims arising out of, or alleged to arise out of, the work and services to be
80 performed by the contractor, its officers, agents, employees, subcontractors, licenses
81 or invitees under this contract. This indemnification provision is specifically
82 intended to operate and be effective even if it is allezed_or iroven that all or some of
83 the damages being sought were caused, in whole or in part, by any act, omission or
84 penliaence of the city. This indemnity provision is intended to include, without
85 limitation, indemnity for costs, expenses and legal fees incurred by the city in
86 defending against such claims and causes of actions.
87
88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
89
the city, its officers, servants and employees, from and against any and all loss, damage
90
or destruction of property of the city, arising out of, or alleged to arise out of, the work
91
and services to be performed by the contractor, its officers, agents, employees,
92
subcontractors, licensees or invitees under this contract. This indemnification
93
provision is specifically intended to operate and be effective even if it is alleged or
94
proven that all or some of the damages being sought were caused, in whole or in part,
95
by any act, omission or negligence of the city.
96
97
Article
7. MISCELLANEOUS
98
7.1
Terms.
99
Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
100
the Construction Contract for Developer Awarded Projects.
101
7.2
Assignment of Contract.
102
This Agreement, including all of the Contract Documents may not be assigned by the
103
Contractor without the advanced express written consent of the Developer.
104
7.3
Successors and Assigns.
105
Developer and Contractor each binds itself, its partners, successors, assigns and legal
106
representatives to the other party hereto, in respect to all covenants, agreements and
107
obligations contained in the Contract Documents.
108
7.4
Severability.
109
Any provision or part of the Contract Documents held to be unconstitutional, void or
110
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
111
remaining provisions shall continue to be valid and binding upon DEVELOPER and
112
CONTRACTOR.
113
7.5
Governing Law and Venue.
114
This Agreement, including all of the Contract Documents is performable in the State of
115
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
116
Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised June 16, 2016
117
118 7.6 Authority to Sign.
119
120
121
122
123
124
125
126
127
005243-4
Developer Awarded Project Agreement
Page 4 of 4
Contractor shall attach evidence of authority to sign Agreement, if other than duly
authorized signatory of the Contractor.
IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
counterparts.
This Agreement is effective as of the last date signed by the Parties ("Effective Date")
Contractor:
'ri on Bui] n oZ)12aajs LLC
By.
(Signature)
Eric Little
Developer:
Peter
(Printed Name) (Printed Name)
Title: CEO _ Title: Managing Member_
Company Name: Crimson Building Company, LLC Company name: PMA FW Presidio LLC
Address: Address:
8721 Airport Freeway, Suite 100 2929 Carlisle Street, Suite 365
City/State/Zip: North Richland Hills, Tx 76180 City/State/Zip: Dallas, TX 75204
05/01/2019 05/01/2019
Date Date
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised June 16, 2016
006125-1
CERTIFICATE OF INSURANCE
Page 1 of 1
1 SECTION 00 6125
2 CERTIFICATE OF INSURANCE
3
4
5
6 [Assembler: For Contract Document execution, remove this page and replace with standard
7 ACORD Certificate of Insurance form.]
8
9
10
11
12
13
14
15
16
17
18
19
20
21 END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert ProjectManber]
Revised July 1, 2011
006213-1
PERFORMANCE BOND
Page l of 2
1 SECTION 00 6213
2 PERFORMANCE BOND
3 Bond Number: CE02671700164
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we,�+ernN rnasraaCrl°N , known as "Principal" herein and
8 PHILADELPHIA INDEMNITY INSURANCE COMPANY , a corporate surety(sureties, if more than
9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one
10 or more), are held and firmly bound unto the Developer, PMA Fw Presidio, LLC , authorized to
11 do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation
Onn
12 ("City"), in the penal sum of, ( }iUnired eleven Thousand Six ) y
Il�r J I Tvnney
(51Nine °oilQo ,lawful none of the United States, to
11, 627.❑QI
13 be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be
14 made jointly into the Developer and the City as dual obligees, we bind ourselves, our heirs,
15 executors, administrators, successors and assigns, jointly and severally, firm ly by these presents.
16
WHEREAS, Developer and City have entered into an Agreement for the construction of
17 community facilities in the City of Fort Worth by and through a Community Facilities
18 Agreement, CFA Number 2019- ; and
19
WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
20 the 1st day of May 201which Contract is hereby referred to and made a
21 part hereof for all purposes as if fullyset forth herein, to furnish all materials, equipment labor
22 and other accessories defined by law, in the prosecution of the Work, including any Change
23 Orders, as provided for in said Contract designated as The Presidio at River East.
24
NOW, THERE the condition of this obligation is such that if the said Principal
25 shall faithfully perform it obligations under the Contract and shall in all respects duly and
26 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
27 specifications, and contract documents therein referred to, and as well during any period of
28 extension of the Contract that may be granted on the part of the Developer and/or City, then this
29 obligation shall be and become null and void, otherwise to remain in full force and effect.
30
CITY OF FORT WORTH The Presidia at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of 2
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly authorized agents and officers on this the 1st day of May
2019
ATTEST:
(Principal) Secretary
i
im as rin ipal
W' ss s t Surety
PRINCIPAL:
CRETECON CONSTRUCTION LLC
BY:
Sigiia ur
Name and Title
Address:
440 Hwy 377 ##631
Argyle, TX 76226
SURETY:
PHILADELPHIA INDEMNITY INSURANCE COMPANY
BY: \/ UU(J(AA_t _ f"C�.N� il%%0111�
Signature
Valerie Ann Aber, Attorney -In -Fact
Name and Title
Address: ONE BALA PLAZA SUITE 100
BALA CYNWYD, PENNSYLVANIA 19004
Telephone Number: eee-518-e011
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
1
2
3
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
SECTION 00 62 13
PERFORMANCE BOND #4428918
0062 13 - I
PERFORMANCE BOND
Page l of 2
6 COUNTY OF TARRANT §
7 That we, Bean Electrical Inc. , known as
8 "Principal" herein and SureTec Insurance Company _ , a corporate
9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known
as
10 "Surety" herein (whether one or more), are held and firmly bound unto the
Developer, PMA FW Presidio LLC
11 , authorized to do business in Texas ("Developer") and the City of Fort
12 Worth, a Texas municipal corporation ("City"), in the penal sum of,
13 Seven Thousand Five Hundred and No/ 100s Dollars
($....7,500.00. },
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
15 payment of which sum well and truly to be made jointly unto the Developer and the City as
dual
16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number Project No. 101464; and
21 WHEREAS, the Principal has entered into a certain written contract with the Developer
awarded
22 the 8th day of August , 2019 , which Contract is hereby referred to and
made a part hereof for all purposes as if fully set forth herein, to furnish all
materials, equipment labor
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Pr(yed No. 101464
Revised January 31, 2012
1
2
3
4
5
24
25
0062 13 -2
PERFORMANCE BOND
Page 2 of 2
THE STATE OF TEXAS
KNOW ALL BY THESE PRESENTS:
and other accessories defined by law, in the prosecution of the Work, including any Change
Orders, as provided for in said Contract designated as The Presidio at River East.
26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to
the plans,
29 specifications, and contract documents therein referred to, and as well during any period
of
30 extension of the Contract that may be granted on the part of the Developer and/or City,
then this obligation shall be and become null and void, otherwise to remain in
full force and effect.
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19
20
PROVIDED FURTHER, that if any legal action be fled on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of
the
Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and
SEALED
this instrument by duly authorized agents and officers on this the 15th day of
August ) 2019
ATT ST: I
ItIA
(Principal) Sect•
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
Signature
Name and Title
The Presidio at River East
Projec! A'o. 101464
Bond #4427421
006213-1
PERFORMANCE BOND
Page 1 of 2
I SECTION 00 62 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, San Saba Construction, inc. known as
8 "Principal" herein and SureTec Insurance Company , a corporate
9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
1 I PMA FW Presidio LLC, authorized to do business in Texas ("Developer") and the City of Fort
12 Worth, a Texas municipal corporation ("City"), in the penal sum of, One Hundred Seventy
13 Thousand Five Hundred Sixty Eight and 84/100 Dollars ($.170,568.84 ?,
14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the
15 payment of which sum well and truly to be made jointly unto the Developer and the City as
dual 16 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly 17 and severally, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number ; and
21 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
22 the 'o day of_hy 201q , which Contract is hereby referred to and made a
23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution of the Work, including any Change
25 Orders, as provided for in said Contract designated as The Presidio at River East.
26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
29 specifications, and contract documents therein referred to, and as well during any period of
30 extension of the Contract that may be granted on the part of the Developer and/or City, then this
31 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
0062 13 -2
PERFORMANCE BOND
Page 2 of 2
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6
7
8
9
181
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
accordance with the provisions of said statue.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
this instrument by duly authorized agents and officers on this the `a`N day of M k4
20-LCL-.
ATTEST:
[Principal) Secretary
Witness as to Principal
dah", PJ,24�,
Witness as to Surety
PRINCIPAL:
San Saba Constructia c.
BY:
tgnature
4" 6 C"s*_i4A— B . im.
Name and Title
Address: 2475 Glenda Lane
Dallas. TX 75229
SURETY:
SureTec Insurance Company
gn ature
Sophinie Hunter, Attorney -In -Fact
Name and Title
Address: 9737 Great Hills Trail, Suite 320
Austin. TX 78759
Telephone Number: 214-989-0000
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
006214-1
PAYMENTBOND
Page 1 of 2
1 SECTION 00 6214
2 PAYMENT BOND Bond Number: CE02671700164
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That We, CCMMCON CONSTRUCTION 1, known as "Principal' herein, and
8 PHILADELPHIA INDEMNITY INSURANCE COMPANY a corporate surety ( or
9 sureties if more than one), duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
11 PMA Fw Presidio, LLc, authorized to do business in Texas "(Developer"), and the City of Fort
One Hundi cd Eleven Thousand ix
12 Worth, a Texas municipal corporation ("City"), in the penal sum of (Hundred v,nr, Nine a 00/200),
$111, C27. 0�1
13 lawful money of the United States, to be paid in Fort Worth, Tan -ant County, Texas, for the
14 payment of which sum well and truly be made jointly unto the Developer and the City as dual
15 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
16 and severally, firmly by these presents:
17
WHEREAS, Developer and City have entered into an Agreement for the construction of
18 community facilities in the City of Fort Worth, by and through a Community Facilities
19 Agreement, CFA Number 2019- ;and
20
WHEREAS, Principal has entered into a certain written Contract with Developer,
21 awarded the 1st day of May 2919 , which Contract is hereby
22 referred to and made a part hereof for all purposes as if fully set forth herein, to famish all
23 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
24 Work as provided for in said Contract and designated as The Presidio at River East.
25
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
26 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
27 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
28 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
29 force and effect.
30
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
006214-2
PAYMENT BOND
Page 2 of 2
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the 1st day of
6 May 20 19
7
PRINCIPAL:
CRETECON CONSTRUCTION LLC
ATTEST: BY:
Slgnatur
Name and Title
Address: 440 Hwy 377 #631
Arqyle, TX 76226
SURETY:
PHILADELPHIA INDEMNITY INSURANCE COMPANY
ATTEST: BY: � 1'Y1Rr-� 1'+C�—
Signature
N/A Valerie Ann Aber, Attorney -In -Fact
(Surety) Secretary Name and Title
Address: gtqeR&;.a, PLAZA SUITE lgo
BALA CYNWYD, PENNSYLVANIA 19004
t,✓
Wjufe'ss4s1to Surety
Telephone Number: 8ee-516-e011
8
9
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
10
bylaws showing that this person has authority to sign such obligation. If Surety's physical
11
address is different from its mailing address, both must be provided.
12
13
The date of the bond shall not be prior to the date the Contract is awarded.
14
END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
A NOTARY PUBLIC OR OTHER OFFICER COMPLETING THIS CERTIFICATE VERIFIES ONLY THE IDENTITY OF THE INDIVIDUAL WHO SIGNED THE
DOCUMENT TO WHICH THIS CERTIFICATE IS ATTACHED, AND NOT THE TRUTHFULNESS, ACCURACY, OR VALIDITY OF THAT DOCUMENT
STATE OF ARI ZONA
COUNTY OF MARICOPA
I SS.
ON 24kok BEFOREME, OLGA GONZALEZ
PERSONALLY APPEARED VALERIE ANN ABER, ATTORNEY- IN -FACT
WHO PROVED TO ME ON THE BASIS OF SATISFACTORY EVIDENCE TO
BE THE PERSON(S) WHOSE NAME(S) IS/ARE SUBSCRIBED TO THE
WITHIN INSTRUMENT AND ACKNOWLEDGED TO ME THAT
HE/SHE/THEY EXECUTED THE SAME IN HIS/HER/THEIR AUTHORIZED
CAPACITY(IES) AND THAT BY HIS/HER/THEIR SIGNATURE(S) ON THE
INSTRUMENT THE PERSON(S), OR THE ENTITY UPON BEHALF OF
WHICH THE PERSON(S) ACTED, EXECUTED THE INSTRUMENT.
I CERTIFY UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE
STATE OF ARIZONA THAT THE FOREGOING PARAGRAPH IS TRUE
AND CORRECT.
OLGA GONZALEZ
Notary Public, State of Arizona
Maricopa County
My Commission Expires
April 23, 2021
THIS AREA FOR OFFICIAL NOTORIAL SEAL
3185
PHILADELPHIA INDEMNITY INSURANCE COMPANY
One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and
existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint Valerie Ann Aber its true and lawful Attorney -in -fact with full
authority to execute on its behalf bonds, undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course
of its business and to bind the Company thereby, in an amount not to exceed $25,00%000.00.
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 14" of November, 2016.
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company: (1) Appoint Attorney(s) in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings, contracts of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the
authority given. And, be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attorney or certificate relating thereto by facsimile, and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with respect to any bond or
undertaking to which it is attached.
IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS
CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 27ru DAY OF OCTOBER, 2017.
(Seal)
Robert D. O'Leary Jr., President & CEO
Philadelphia Indemnity Insurance Company
On this 27"' day of October, 2017, before me came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said
that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is
the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed.
rawawKtAvi
Hv�uw,s ae n:
p4k Notary Public;
Lonai Meion f.p.umf�,y�pfyf 'J
Fry Smw.n�on eapr.r i.p 75, 7071
residing at:
(Notary Seal)
My commission expires:
Bala Cynwyd. PA
September 25.2021
I, Edward Sayago, Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of
Directors and the Power of Attorney issued pursuant thereto on the 271h day of October, 2017 are true and correct and are still in full force and effect. I do further certify
that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President
of PHILADELPHIA INDEMNITY INSURANCE COMPANY.
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this L day of 20
. 192Edward Sayago, Corporate Secretary
PHILADELPHIA INDEMNITY INSURANCE COMPANY
Bond #4427421
0062 14- 1
PAYMENT BOND
Page 1 of 2
1 SECTION 00 62 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, San Saba Construction, Inc. known as
8 "Principal" herein, and SureTec Insurance Company , a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, PMA FW Presidio LLC, authorized to do business in Texas
12 "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal
13 sum of One Hundred Seventy Thousand Five Hundred Sixty Eight and 84/100Dollars
14 ($ 170,568.84 ), lawful money of the United States, to be paid in Fort Worth,
15 Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the
16 Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators,
17 successors and assigns, jointly and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number ;and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the clay of MA.t , 20 lq , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as The Presidio at River East.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project No. 101464
Revised January 31, 2012
006214-2
PAYMENT BOND
Page 2 of 2
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the $m day of
6 Mhy , 20 1 t .
8
9
10
11
12
13
14
ATTEST:
R
4
(Pri Ipai Secretary
Witness as to Principal
ATTEST:
(Surety) Secretary
a,� i4pat4,4—
Witness as to Surety
PRINCIPAL:
San Saba Constructio c.
BY:
attire
9'1k J (� 9-M.
Name and Title
Address: 2475 Glenda Lane
Dallas. TX 75229
SURETY:
SureTec Insurance Company
BY:
Signature —
Sophinie Hunter, Attorney -In -Fact
Name and Title
Address: 9737 Great Hills Trail, Suite 320
Austin. TX 78759
Telephone Number: 214-989-0000
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
2
3
21 Address: 821 E Enon
22 Fort Worth, TX 76140
23 _
24
25 Witness to Princi a1
26 SURETY:
27 ureT ran man
28
29
30 BY:
31 'nature
32
33 Johnny Moss
34 Name and Title
35
36 Address: 2255 Ridge Rd.
v
37 Ste- 333
38 Rockwall, TX 75087
39
40 Witness as o Surety Muni Rabah, Bond Account Manager Telephone Number: 972-772-7220
41
42
43 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from
the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is
different from its mailing address, both must be provided.
46
47 The date of the bond shall not be prior to the date the Contract is awarded.
0062 14- 1
PAYMENT BOND
Page 1 of 2
SECTION 00 62 14
PAYMENT BOND #4428918
6 COUNTY OF TARRANT §
7 That we, Bean Electrical, Inc, , known as
8 "Principal" herein, and
SureTec Insurance Comi2any , a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the
State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto
the Developer, PMA FW Presidio LLC, authorized to do business in
Texas
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Nrc jecl No. 101464
Revised January 31, 2012
1
2
3
4 THE STATE OF TEXAS
5 KNOW ALL BY THESE PRESENTS:
12 "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal
13 sum of Seven Thousand Five Hundred and No/ 100s Dollars
14 ($ 7,500.00 ), lawful money of the United States, to be paid in Fort Worth,
15 Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the
16 Developer and the City as dual obligees, we bind ourselves, our heirs, executors,
17 administrators, successors and assigns, jointly and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number Project No. 101464;and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the 8th day of August , 20 19 , which Contract is
hereby referred to and made a part hereof for all purposes as if fully set forth herein, to
furnish all
materials, equipment, labor and other accessories as defined by law, in the prosecution of the
Work as provided for in said Contract and designated as The Presidio at River East.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as
defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the
Work under the Contract, then this obligation shall be and become null and void;
otherwise to remain in full force and effect.
006214-2
PAYMENT BOND
Page 2 of 2
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the 15th day of
August , 20 19
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Pr<jcct No. 101464
Revised January 31, 2012
A TEST:
(Principal) Sear ary
WiI s as to Principal
ATTEST:
(Surety) Secretary
r
Witness A to Surety
Muni Rabah, Bond Account Manager
Nan eland Title
Address: 821 E Enon
Fort Worth, TX 76140
SURETY:
SureTe Sur ce Company
BY: ✓L_
Si ture
Johnny Moss, Attorney- in- Fact
Name and Title
Address: _ 2255 Ridge Rd., Ste 333
Rockwall. TX 75087
Telephone Number: 972-772-7220
Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws
showing that this person has authority to sign such obligation. If Surety's physical address is different
from its mailing address, both must be provided.
12
13
The date of the bond shall not be prior to the date the
Contract is awarded.
14 END OF SECTION
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
The Presidio at River East
Prcjecl No. 101464
1
2
3
4
5
6
7
SECTION 00 6219
MAINTENANCE BOND
006219-1
MAINTENANCE BOND
Page 1 of 3
Bond Number: CE02671700164
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
8 That we -rBOON coHSTRuarioN , known as "Principal" herein and
9 PHILADELPHIA INDEMNITY INSURANCE COMPANY a corporate surety (sureties, if more than
10 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one
11 or more), are held and firmly bound unto the Developer,. PMA FM Pres idio, LLc , authorized to
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation
One Hundred eleven Thousand six
("City") In the sum of / Hundred 7nenty Nine & 00/100) lawful money of the United States, to be paid in
e Sll e,2r.uo> >
Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto
the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Developer and City have entered into an Agreement for the construction of
community facilities in the City of Fort Worth by and through a Community Facilities
Agreement, CFA Number 2019- ; and
WHEREAS, the Principal has entered into a certain written contract with the Developer
awarded the let day of May 20 19 , which Contract is
hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
materials, equipment labor and other accessories as defined by law, in the prosecution of the
Work, including any Work resulting from a duly authorized Change Order (collectively herein,
the "Work") as provided for in said Contract and designated as The Presidio at River East; and
WHEREAS, Principal binds itself to use such materials and to so construct the Work in
accordance with the plans, specifications and Contract Documents that the Work is and will
remain free from defects in materials or workmanship for and during the period of two (2) years
after the date bf Final Acceptance of the Work by the City ("Maintenance Period"); and
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
00 62 19 - 2
MAINTENANCE BOND
Page 2 of 3
1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
2 upon receiving notice from the Developer and/or City of the need thereof at any time within the
3 Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or City, to a
7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all such
12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
W
23
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
006219-3
MAINTENANCE BOND
Page 3 of 3
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the 1st day of
e 20 19
ATTEST:
(Principal) Secretary
t
i TOSas to Prin pal
ATTEST:
N/A
(Surety) Secretary
Wi s . to urety
May
PRINCIPAL:
CRETECON CONSTRUCTION LLC
BY:
Signat re
Name and Title
Address: 440 Hwy 377 #631
Argyle, TX 76226
SURETY:
PHILADELPHIA INDEMNITY INSURANCE COMPANY
BY: UIA2 t?�
Signature
Valerie Ann Aber, Attorney -In -Fact
Name and Title
Address: ONE BALA PLAZA SUITE 100
BALA CYNWYD. PENNSYLVANIA 19004
Telephone Number: e8e-51e-6011
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
The Presidio at River East
City Project No. 101464
A NOTARY PUBLIC OR OTHER OFFICER COMPLETING THIS CERTIFICATE VERIFIES ONLY THE IDENTITY OF THE INDIVIDUAL WHO SIGNED THE
DOCUMENT TO WHICH THIS CERTIFICATE IS ATTACHED, AND NOT THE TRUTHFULNESS, ACCURACY, OR VALIDITY OF THAT DOCUMENT
STATE OF ARI ZONA
COUNTY OF MARICOPA
ON MkCsx,` BEFORE ME, OLGA GONZALEZ _
PERSONALLY APPEARED VALERIE ANN ABER, ATTORNEY -IN -FACT
WHO PROVED TO ME ON THE, BASIS OF SATISFACTORY EVIDENCE TO
BE THE PERSON(S) WHOSE NAME(S) IS/ARE SUBSCRIBED TO THE
WITHIN INSTRUMENT AND ACKNOWLEDGED TO ME THAT
HE/SHE/THEY EXECUTED THE SAME IN HIS/HER/THEIR AUTHORIZED
CAPACITY(IES) AND THAT BY HIS/HER/THEIR SIGNATURE(S) ON THE
INSTRUMENT THE PERSON(S). OR THE ENTITY UPON BEHALF OF
WHICH THE PERSON(S) ACTED, EXECUTED THE INSTRUMENT.
I CERTIFY UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE
STATE OF ARIZONA THAT THE FOREGOING PARAGRAPH IS TRUE
AND CORRECT.
WITNESS
SIGNATURE
-w'-OLGA GONZALEZ
Notary Public. State of Arkzona
Marlcopa County
My Commissio20�1ires
Aord 23,
THIS AREA FOR OFFICIAL NOTORIAL SEAL
3383
PHILADELPHIA INDEMNITY INSURANCE COMPANY
One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing under the
laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint Valerie Ann and Daniel Ruggeri, its true and lawful Attorney -in -fact with full
authority to execute on its behalf bonds, undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the
course of its business and to bind the Company thereby, in an amount not to exceed $50,000,000.
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 14"' of November, 2016.
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company: (1) Appoint Attorney(s) in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings, contracts of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the
authority given. And, be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attorney or certificate relating thereto by facsimile, and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with respect to any bond or
undertaking to which it is attached.
IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS
CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 27... DAY OF OCTOBER, 2017,
1Q�r
(Seal) "
Robert D_ O'Leary Jr., President & CEO
Philadelphia Indemnity Insurance Company
On this 27"' day of October, 2017, before me came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said
that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is
the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed.
I "°�^'^^++•^a Notary Public:
I �r[wm.lw+Ear,.r. $�N 78� M i51�
residing at:
(Notary Seal)
My commission expires:
Ba�vnwyd. PA
September 25, 2021
1, Edward Sayago, Corporate Secretary of P1111.ADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of
Directors and the Power of Attorney issued pursuant thereto on the 27"' day of October, 2017 are true and correct and are still in full force and effect. I do further certify
that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President
of PHILADELPHIA INDEMNITY INSURANCE COMPANY.
In "Testimony Whereof I have subscribed my name and aflxed the facsimile soal ofcach Company this day of . 20
Edward Sayago, Corporate Secretary
PHILADELPHIA INDEMNITY INSURANCE COMPANY
Bond #4427421
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
SECTION 00 62 19
MAINTENANCE BOND
THE STATE OF TEXAS §
§
COUNTY OF TARRANT §
0062 19- 1
MAINTENANCE BOND
Page 1 of 3
KNOW ALL BY THESE PRESENTS:
That we San Saba Construction, Inc. , known as
"Principal" herein and SureTec Insurance Company , a corporate surety
(sureties, if more than one) duly authorized to do business in the State of Texas, known as
"Surety" herein (whether one or more), are held and firmly bound unto the Developer,
PMA FW Presidio LLC, authorized to do business in Texas ("Developer") and the City of Fort
Worth, a Texas municipal corporation ("City"), in the sum One Hundred Seventy Thousand
of Five Hundred Sixty Eight and 84/100 Dollars ($170,568.84 },
lawful honey of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment
of which sum well and truly be made jointly unto the Developer and the City as dual obligees and
their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents.
20 WHEREAS, Developer and City have entered into an Agreement for the construction of
21 community facilities in the City of Fort Worth by and through a Community Facilities
22 Agreement, CFA Number ;and
23 WHEREAS, the Principal has entered into a certain written contract with the Developer
24 awarded the &3 day of M te4 , 20 ►g , which Contract is
25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
26 materials, equipment labor and other accessories as defined by law, in the prosecution of the
27 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
28 the "Work") as provided for in said Contract and designated as The Presidio at River East; and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and will
32 remain free from defects in materials or workmanship for and during the period of two (2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
006219-2
MAINTENANCE BOND
Page 2 of 3
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
upon receiving notice from the Developer and/or City of the need thereof at any time within the
Maintenance Period.
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice was provided by Developer or City, to a
completion satisfactory to the City, then this obligation shall become null and void; otherwise to
remain in full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agreed that the Developer or City may cause any and all such
defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
by the Principal and the Surety under this Maintenance Bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
The Presidio at River East
City Project No, 101464
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the. 2± day of MN
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
ATTEST:
(Principal) Secretary
S�==- §!�� —_'/
Witness as to Principal`
ATTEST:
F �
(Surety) Secretary
ecretary
Witness as to Surety
, 2Q—IL.
PRINCIPAL:
San Saba Construction,
BY:
tatuie
N" _N LS1L0, .n- Q.OA.
Name and Title
Address: 2475 Glenda Lane
Dallas, TX 75229
SURETY:
SureTec Insurance Company
BY:
*nature
Sophinie Hunter, Attorney -In -Fact
Name and Title
Address: 9737 Great Hills Trail, Suite 320
Austin. TX 78759
Telephone Number: 214-989-0000
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
38 from the by-laws showing that this person has authority to sign such obligation. If
39 Surety's physical address is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
42
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
The Presidio at River East
City Project No 101464
POA a: 4221097
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Don E. Cornell, Ricardo J. Reyna, Sophinie Hunter, Robbi Morales,
Kelly A. Westbrook, Tina McEwan, Joshua Saunders, Tonie Petranek
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on Vfi of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 29th day of March , A.D. 2019 .
SURWJr.,
PAIYY
5�]RAt�fp�'
`ttir'' ' '• C
tllGr �' '9 t.''layt By:
State of Texas ss:
County of Harris ..
On this 29th day of March , A.D. 2019 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
E
;.f.idlP. f. fIA;dFZ
:�i°Ia IH Ut Tt??(aS
us U9 't1-2020
''l.talY iD 129117659
Xe avez, Notary Public
1� commission expires September 1 , 2020
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this day of A.D.
Br t eaty, Assi Cant Secrete
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and 5:00 pm CST.
SureTec Insurance Company
HIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a
complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of insurance to obtain information on companies, coverage, rights or complaints at 1-800-252-
3439. You may write the Texas Department of Insurance at
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web:11ttu://%vww.tdi.stateAx—us
Email: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the
Surety first, If the dispute is not resolved, you may contact the Texas Department of Insurance.
1
Texas Rider 06042014
0062 19- 1
MAINTENANCE BOND
Page I of 3
1
2
3
4 THE STATE OF TEXAS
5 KNOW ALL BY THESE PRESENTS:
SECTION 00 62 19
MAINTENANCE BOND #4428918
6 COUNTY OF TARRANT §
7
8 That we Bean Electrical, Inc. , known as
9 "Principal' herein and _ SureTec Insurance Company , a corporate
surety
10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as
11 "Surety" herein (whether one or more), are held and firmly bound unto the
Developer, PMA FW Presidio LLC
12 , authorized to do business in Texas ("Developer") and the City of Fort
13 Worth, a Texas municipal corporation ("City"), in the sum
14 of Seven Thousand Five Hundred and No/100s Dollars
($ 7,500.00 ),
15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for
payment
16 of which sum well and truly be made jointly unto the Developer and the City as dual
obligees and
17 their successors, we bind ourselves, our heirs, executors, administrators, successors and
assigns, jointly and severally, firmly by these presents.
19
20 WHEREAS, Developer and City have entered into an Agreement for the construction of
21 community facilities in the City of Fort Worth by and through a Community Facilities
22 Agreement, CFA Number Project No. 101464;and
23 WHEREAS, the Principal has entered into a certain written contract with the
24 Developer awarded the 8thday of August , 20 19, which Contract is
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Azyeel No, 101464
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1
2
3
25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to
furnish all
26 materials, equipment labor and other accessories as defined by law, in the prosecution of
the
27 Work, including any Work resulting from a duly authorized Change Order (collectively
herein,
28 the "Work") as provided for in said Contract and designated as The Presidio at River East;
and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and
will
32 remain free from defects in materials or workmanship for and during the period of two
(2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
upon receiving notice from the Developer and/or City of the need thereof at any time within the
Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or
City, to a completion satisfactory to the City, then this obligation shall become null and
void; otherwise to remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all
such
12 defective Work to be repaired and/or reconstructed with all associated costs there of
being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Projea liro. 101464
Revised January 31, 2012
006219-3
MAINTENANCE BOND
Page 3 of 3
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of
Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
21
22
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
instrument by duly authorized agents and officers on this the 15th day of August , 2019.
ATE
(Principa e
ATTEST:
(Surety) Secretary
Name and Title
Address: 821 E Enon
Fort Worth, TX 76140
SURETY:
SureTe ns ance Co an
BY:
igr�ature
Johnny Mom Attorney -in -Fact
Name and Title
Address: 2255 Ridge Rd., Ste 333
Rockwall,
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised January 31, 2012
The Presidio at River East
Prcjecl No. 101464
r
3
35 Witness as to 'urety
36 Muni Rabah, Bond Account Manager
006219-4
MAINTENANCE BOND
Page 4 of 3
Telephone Number: 972-772-7220
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from
the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address
is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
42
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project No. 101464
Revised January 31, 2012
p0A #.. 4221049
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Tony Fierro, Jay Jordan, Johnny Moss, Steven W. Searcey, Robert J. Shuya, Mistie Beck,
Jeremy Barnett, Robert G. Kanuth, Jade Porter, Jennifer Cisneros, Jarrett Willson, Jack Nottingham
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars ($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the CEO, sealed with the corporate seal
of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be fr Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or Facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 201' of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its CEO, and its corporate seal to
be hereto affixed this 27th day of August , A.D. 2018 .
��yRAAi�+� SURETEC7
CE PANY
...... C%
'e;w; -1 '�� By:
w' us ; n John Kr Jr., C
State of Texas ss: s y4 rO .r
County of Harris ••••
On this 27th day of August , A.D. 2018 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say,
that he resides in Houston, Texas, that he is CEO of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the
Board of Directors of said Company; and that he signed his name thereto by like order.
" �''• �`� fintary Public., 51,}te Of" L'Xa'-
oU-io-2020
129117659 XeqA avez, Notary Public
commission exTpires September 1 , 2020
1, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this _ day of A ao A.D,
9V
Brcintibenty, Assi tent secrets
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call (713) 812-0800 any business day between 8:30 am and 6:00 pm CST.
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make
a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints
at 1-800-252- 3439. You may write the Texas Department of Insurance at:
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-490-1007
Web: http://www.tdi state.tx.us
Email: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should
contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Texas Rider 06042015
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Page
Article 1 —
Definitions and Terminology.......................................................................................................... I
1.01
Defined Terms...............................................................................................................................1
1.02
Terminology..................................................................................................................................5
Article 2 —
Preliminary Matters.........................................................................................................................
6
2.01
Before Starting Construction........................................................................................................
6
2.02
Preconstruction Conference..........................................................................................................
6
2.03
Public Meeting..............................................................................................................................
6
Article 3 —
Contract Documents and Amending..............................................................................................
6
3.01
Reference Standards.....................................................................................................................
6
3.02
Amending and Supplementing Contract Documents...................................................................
6
Article 4 —
Bonds and Insurance.......................................................................................................................
7
4.01
Licensed Sureties and Insurers.....................................................................................................
7
4.02
Performance, Payment, and Maintenance Bonds........................................................................
7
4.03
Certificates of Insurance...............................................................................................................
7
4.04
Contractor's Insurance..................................................................................................................9
4.05
Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 —
Contractor's Responsibilities.............................................................................. .....................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or -Equals" ........................................ .............
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16
5.07
Concerning Subcontractors, Suppliers, and Others...................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas......................................................................................................19
5.12
Record Documents......................................................................................................................20
5.13
Safety and Protection..................................................................................................................21
5.14
Safety Representative.................................................................................................................21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee..........................................................................23
CITY OF FORT
WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
5.18 Indemnification........................................................................................................................... 24
5.19 Delegation of Professional Design Services.............................................................................. 24
5.20 Right to Audit: ............................................................................................................................ 25
5.21 Nondiscrimination.......................................................................................................................25
Article 6 - Other Work at the Site................................................................................................................... 26
6.01 Related Work at Site................................................................................................................... 26
Article 7 -
City's Responsibilities...................................................................................................................
26
7.01
Inspections, Tests, and Approvals.............................................................................................. 26
7.02
Limitations on City's Responsibilities.......................................................................................
26
7.03
Compliance with Safety Program...............................................................................................
27
Article 8 -
City's Observation Status During Construction...........................................................................27
8.01
City's Project Representative.....................................................................................................27
8.02
Authorized Variations in Work..................................................................................................
27
8.03
Rejecting Defective Work..........................................................................................................
27
8.04
Determinations for Work Performed.........................................................................:................
28
Article9 - Changes in the Work..................................................................................................................... 28
9.01 Authorized Changes in the Work............................................................................................... 28
9.02 Notification to Surety..................................................................................................................28
Article 10 - Change of Contract Price; Charge of Contract Time................................................................28
10.01 Change of Contract Price............................................................................................................28
10.02 Change of Contract Time............................................................................................................28
10.03 Delays.......................................................................................................................................... 28
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work......................29
11.01 Notice of Defects........................................................................................................................ 29
11.02 Access to Work........................................................................................................................... 29
11.03 Tests and Inspections..................................................................................................................29
11.04 Uncovering Work....................................................................................................................... 30
11.05 City May Stop the Work............................................................................................................. 30
11.06 Correction or Removal of Defective Work................................................................................ 30
11.07 Correction Period........................................................................................................................30
11.08 City May Correct Defective Work............................................................................................. 31
Article12 - Completion.................................................................................................................................. 32
12.01 Contractor's Warranty of Title................................................................................................... 32
12.02 Partial Utilization........................................................................................................................ 32
12.03 Final Inspection...........................................................................................................................32
12.04 Final Acceptance......................................................................................................................... 33
Article 13 - Suspension of Work ........
13.01 City May Suspend Work
Article 14 - Miscellaneous .........................................
14.01 Giving Notice .........................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
..................................................................................... 33
..................................................................................... 33
..................................................................................... 34
..................................................................................... 34
The Presidio at River East
[Insert Project Number]
14.02 Computation of Times................................................................................................................ 34
14.03 Cumulative Remedies................................................................................................................. 34
14.04 Survival of Obligations............................................................................................................... 35
14.05 Headings......................................................................................................................................35
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of35
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is .
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
in. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
p. Documentation submitted by contractor prior to Notice of Award.
a. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and -Regulations —Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be' assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor An individual or entity having a direct contract with Contractor or with ahy
other Subcontractor for the performance of a part of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a. m. and ending at 5: 00 p. m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective. -
The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: Januaty 10, 2013
0073 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates oflnsurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH The Presidia at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either party or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10-10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of.
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. = Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of35
1) $1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by: None
Write the name of the railroad compam. (If none, then %� rite none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate:
b. Each Occurrence: :
None
Enter limits provided by Railroad Compam (If none. write none)
None
Enter limits provided b% Railroad Compam- (If none. %\rite none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed .in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14of35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals "
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" -item or no substitution is permitted; -other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any. resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or Other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.13. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance. -
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- l7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract.
(Check this box if there is any City Participation)
® Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditioAs of these Contract
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
❑ Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penaltyfor Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted from successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the I Ith day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10-19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnijy and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to fmish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation,, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of 'a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.B. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10,2013
0073 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the . City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution Or results of any part of Contractor's Work depends lino work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (excel* as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10,2013
0073 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor. City will forward all invoices for retests to
Developer/Contractor.
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10,2013
0073 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given if:
delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10, 2013
0073 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH The Presidio at River East
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised: January 10,2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 01 11 00
SUMMARY OF WORK
011100-1
DAP SUMMARY OF WORK
Pagel of3
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
11 2. Division 1 - General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18 A. Work Covered by Contract Documents
19 1. Work is to include furnishing all labor, materials, and equipment, and performing
20 all Work necessary for this construction project as detailed in the Drawings and
21 Specifications.
22 B. Subsidiary Work
23 1. Any and all Work specifically governed by documentary requirements for the
24 project, such as conditions imposed by the Drawings or Contract Documents in
25 which no specific item for bid has been provided for in the Proposal and the item is
26 not a typical unit bid item included on the standard bid item list, then the item shall
27 be considered as a subsidiary item of Work, the cost of which shall be included in
28 the price bid in the Proposal for various bid items.
29 C. Use of Premises
30 1. Coordinate uses of premises under direction of the City.
31 2. Assume full responsibility for protection and safekeeping of materials and
32 equipment stored on the Site.
33 3. Use and occupy only portions of the public streets and alleys, or other public places
34 or other rights -of -way as provided for in the ordinances of the City, as shown in the
35 Contract Documents, or as may be specifically authorized in writing by the City.
36 a. A reasonable amount of tools, materials, and equipment for construction
37 purposes may be stored in such space, but no more than is necessary to avoid
38 delay in the construction operations.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 101464
Revised December 20, 2012
2
3
4
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
01 11 00-2
DAP SUMMARY OF WORK
Page 2 of 3
b. Excavated and waste materials shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
c. If the street is occupied by railroad tracks, the Work shall be carried on in such
manner as not to interfere with the operation of the railroad.
1) All Work shall be in accordance with railroad requirements set forth in
Division 0 as well as the railroad permit.
D. Work within Easements
1. Do not enter upon private property for any purpose without having previously
obtained permission from the owner of such property.
2. Do not store equipment or material on private property unless and until the
specified approval of the property owner has been secured in writing by the
Contractor and a copy furnished to the City.
3. Unless specifically provided otherwise, clear all rights -of -way or easements of
obstructions which must be removed to make possible proper prosecution of the
Work as a part of the project construction operations.
4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
lawns, fences, culverts, curbing, and all other types of structures or improvements,
to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
appurtenances thereof, including the construction of temporary fences and to all
other public or private property adjacent to the Work.
5. Notify the proper representatives of the owners or occupants of the public or private
lands of interest in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours in advance of the beginning of the
Work.
b. Notices shall be applicable to both public and private utility companies and any
corporation, company, individual, or other, either as owners or occupants,
whose land or interest in land might be affected by the Work.
c. Be responsible for all damage or injury to property of any character resulting
from any act, omission, neglect, or misconduct in the manner or method or
execution of the Work, or at any time due to defective work, material, or
equipment.
6. Fence
a. Restore all fences encountered and removed during construction of the Project
to the original or a better than original condition.
b. Erect temporary fencing in place of the fencing removed whenever the Work is
not in progress and when the site is vacated overnight, and/or at all times to
provide site security.
c. The cost for all fence work within easements, including removal, temporary
closures and replacement, shall be subsidiary to the various items bid in the
project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 101464
Revised December 20, 2012
1
2
3
4
5
6
7
8
.01
01 11 00 - 3
DAP SUMMARY OF WORK
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11
12
13
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 101464
Revised December 20, 2012
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 013119
PRECONSTRUCTION MEETING
01 31 19-1
DAP PRECONSTRUCTION MEETING
Pagel of3
5 A. Section Includes:
6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to
7 clarify construction contract administration procedures
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. No construction schedule required unless requested by the City.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19
A. Coordination
20
1.
Attend preconstruction meeting.
21
2.
Representatives of Contractor, subcontractors and suppliers attending meetings
22
shall be qualified and authorized to act on behalf of the entity each represents.
23
3.
Meeting administered by City may be tape recorded.
24
a. If recorded, tapes will be used to prepare minutes and retained by City for
25
future reference.
26
B. Preconstruction Meeting
27
1.
A preconstruction meeting will be held within 14 days after the delivery of the
28
distribution package to the City.
29
a. The meeting will be scheduled and administered by the City.
30
2.
The Project Representative will preside at the meeting, prepare the notes of the
31
meeting and distribute copies of same to all participants who so request by fully
32
completing the attendance form to be circulated at the beginning of the meeting.
33
3.
Attendance shall include:
34
a. Developer and Consultant
35
b. Contractor's project manager
36
c. Contractor's superintendent
37
d. Any subcontractor or supplier representatives whom the Contractor may desire
38
to invite or the City may request
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
0131 19-2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
in. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
jj. Questions or Comments
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
0131 19 -3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11
12
13
END OF SECTION
Revision Log
DATE NAME I SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 0133 00
DAP SUBMITTALS
013300-1
DAP SUBMITTALS
Pagel of 8
5 A. Section Includes:
6 1. General methods and requirements of submissions applicable to the following
7 Work -related submittals:
8 a. Shop Drawings
9 b. Product Data (including Standard Product List submittals)
10 c. Samples
11 d. Mock Ups
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division 1 — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various items bid. ,
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Coordination
24 1. Notify the City in writing, at the time of submittal, of any deviations in the
25 submittals from the requirements of the Contract Documents.
26 2. Coordination of Submittal Times
27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of
28 performing the related Work or other applicable activities, or within the time
29 specified in the individual Work Sections, of the Specifications.
30 b. Contractor is responsible such that the installation will not be delayed by
31 processing times including, but not limited to:
32 a) Disapproval and resubmittal (if required)
33 b) Coordination with other submittals
34 c) Testing
35 d) Purchasing
36 e) Fabrication
37 f) Delivery
38 g) Similar sequenced activities
39 c. No extension of time will be authorized because of the Contractor's failure to
40 transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
01 33 00 - 2
DAP SUBMITTALS
Page 2 of 8
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other
contractor.
B. Submittal Numbering
When submitting shop drawings or samples, utilize a 9-character submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
03 30 00-08-B
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
C. Contractor Certification
1. Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Conformance with the Contract Documents
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Certification Statement
1) `By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criteria, materials, dimensions,
catalog numbers and similar data and I have checked and coordinated each
item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 8 1/2 inches x 11 inches to 8 '/2 inches x 11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Submittal Content
1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
01 33 00 - 3
DAP SUBMITTALS
Page 3 of 8
1
2.
The Project title and number
2
3.
Contractor identification
3
4.
The names of-
4
a. Contractor
5
b. Supplier
6
c. Manufacturer
7
5.
Identification of the product, with the Specification Section number, page and
8
paragraph(s)
9
6.
Field dimensions, clearly identified as such
10
7.
Relation to adjacent or critical features of the Work or materials
11
8.
Applicable standards, such as ASTM or Federal Specification numbers
12
9.
Identification by highlighting of deviations from Contract Documents
13
10.
Identification by highlighting of revisions on resubmittals
14
11.
An 8-inch x 3-inch blank space for Contractor and City stamps
15 F. Shop Drawings
16 1. As specified in individual Work Sections includes, but is not necessarily limited to:
17 a. Custom -prepared data such as fabrication and erection/installation (working)
18 drawings
19 b. Scheduled information
20 c. Setting diagrams
21 d. Actual shopwork manufacturing instructions
22 e. Custom templates
23 f. Special wiring diagrams
24 g. Coordination drawings
25 h. Individual system or equipment inspection and test reports including:
26 1) Performance curves and certifications
27 i. As applicable to the Work
28 2. Details
29 a. Relation of the various parts to the main members and lines of the structure
30 b. Where correct fabrication of the Work depends upon field measurements
31 1) Provide such measurements and note on the drawings prior to submitting
32 for approval.
33 G. Product Data
34 1. For submittals of product data for products included on the City's Standard Product
35 List, clearly identify each item selected for use on the Project.
36 2. For submittals of product data for products not included on the City's Standard
37 Product List, submittal data may include, but is not necessarily limited to:
38 a. Standard prepared data for manufactured products (sometimes referred to as
39 catalog data)
40 1) Such as the manufacturer's product specification and installation
41 instructions
42 2) Availability of colors and patterns
43 3) Manufacturer's printed statements of compliances and applicability
44 4) Roughing -in diagrams and templates
45 5) Catalog cuts
46 6) Product photographs
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
01 33 00 - 4
DAP SUBMITTALS
Page 4 of 8
1 7) Standard wiring diagrams
2 8) Printed performance curves and operational -range diagrams
3 9) Production or quality control inspection and test reports and certifications
4 10) Mill reports
5 11) Product operating and maintenance instructions and recommended
6 spare -parts listing and printed product warranties
7 12) As applicable to the Work
8 H. Samples
9 1. As specified in individual Sections, include, but are not necessarily limited to:
10 a. Physical examples of the Work such as:
11 1) Sections of manufactured or fabricated Work
12 2) Small cuts or containers of materials
13 3) Complete units of repetitively used products color/texture/pattern swatches
14 and range sets
15 4) Specimens for coordination of visual effect
16 5) Graphic symbols and units of Work to be used by the City for independent
17 inspection and testing, as applicable to the Work
18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to
19 be fabricated or installed prior to the approval or qualified approval of such item.
20 1. Fabrication performed, materials purchased or on -site construction accomplished
21 which does not conform to approved shop drawings and data is at the Contractor's
22 risk.
23 2. The City will not be liable for any expense or delay due to corrections or remedies
24 required to accomplish conformity.
25 3. Complete project Work, materials, fabrication, and installations in conformance
26 with approved shop drawings, applicable samples, and product data.
27 J. Submittal Distribution
28 1. Electronic Distribution
29 a. Confirm development of Project directory for electronic submittals to be
30 uploaded to City's Buzzsaw site, or another external FTP site approved by the
31 City.
32 b. Shop Drawings
33 1) Upload submittal to designated project directory and notify appropriate
34 City representatives via email of submittal posting.
35 2) Hard Copies
36 a) 3 copies for all submittals
37 b) If Contractor requires more than 1 hard copy of Shop Drawings
38 returned, Contractor shall submit more than the number of copies listed
39 above.
40 c. Product Data
41 1) Upload submittal to designated project directory and notify appropriate
42 City representatives via email of submittal posting.
43 2) Hard Copies
44 a) 3 copies for all submittals
45 d. Samples
46 1) Distributed to the Project Representative
47 2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
01 33 00 - 5
DAP SUBMITTALS
Page 5 of 8
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
1. The review of shop drawings, data and samples will be for general conformance
with the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the,City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the
Work with all other associated work and trades, for selecting fabrication processes,
for techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an
exception.
5. Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or
comments on the submittal.
a) When returned under this code the Contractor may release the
equipment and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
01 33 00 - 6
DAP SUBMITTALS
Page 6 of 8
1
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
2
the notations and comments IS NOT required by the Contractor.
3
a) The Contractor may release the equipment or material for manufacture;
4
however, all notations and comments must be incorporated into the
5
final product.
6
c. Code 3
7
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
8
assigned when notations and comments are extensive enough to require a
9
resubmittal of the package.
10
a) The Contractor may release the equipment or material for manufacture;
11
however, all notations and comments must be incorporated into the
12
final product.
13
b) This resubmittal is to address all comments, omissions and
14
non -conforming items that were noted.
15
c) Resubmittal is to be received by the City within 15 Calendar Days of
16
the date of the City's transmittal requiring the resubmittal.
17
d. Code 4
18
1) "NOT APPROVED" is assigned when the submittal does not meet the
19
intent of the Contract Documents.
20
a) The Contractor must resubmit the entire package revised to bring the
21
submittal into conformance.
22
b) It may be necessary to resubmit using a different manufacturer/vendor
23
to meet the Contract Documents.
24 6. Resubmittals
25 a. Handled in the same manner as first submittals
26 1) Corrections other than requested by the City
27 2) Marked with revision triangle or other similar method
28 a) At Contractor's risk if not marked
29 b. Submittals for each item will be reviewed no more than twice at the City's
30 expense.
31 1) All subsequent reviews will be performed at times convenient to the City
32 and at the Contractor's expense, based on the City's or City
33 Representative's then prevailing rates.
34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for
35 all such fees invoiced by the City.
36 c. The need for more than 1 resubmission or any other delay in obtaining City's
37 review of submittals, will not entitle the Contractor to an'extension of Contract
38 Time.
39 7. Partial Submittals
40 a. City reserves the right to not review submittals deemed partial, at the City's
41 discretion.
42 b. Submittals deemed by the City to be not complete will be returned to the
43 Contractor, and will be considered 'Not Approved" until resubmitted.
44 c. The City may at its option provide a list or mark the submittal directing the
45 Contractor to the areas that are incomplete.
46 8. If the Contractor considers any correction indicated on the shop drawings to
47 constitute a change to the Contract Documents, then written notice must be
48 provided thereof to the Developer at least 7 Calendar Days prior to release for
49 manufacture.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
013300-7
DAP SUBMITTALS
Page 7 of 8
1 9. When the shop drawings have been completed to the satisfaction of the City, the
2 Contractor may carry out the construction in accordance therewith and no further
3 changes therein except upon written instructions from the City.
4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
5 following receipt of submittal by the City.
6 L. Mock ups
7 1. Mock Up units as specified in individual Sections, include, but are not necessarily
8 limited to, complete units of the standard of acceptance for that type of Work to be
9 used on the Project. Remove at the completion of the Work or when directed.
10 M. Qualifications
11 1. If specifically required in other Sections of these Specifications, submit a P.E.
12 Certification for each item required.
13 N. Request for Information (RFI)
14 1. Contractor Request for additional information
15 a. Clarification or interpretation of the contract documents
16 b. When the Contractor believes there is a conflict between Contract Documents
17 c. When the Contractor believes there is a conflict between the Drawings and
18 Specifications
19 1) Identify the conflict and request clarification
20 2. Sufficient information shall be attached to permit a written response without further
21 information.
22
23
24
25
26 1.5 SUBMITTALS [NOT USED]
27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
28 1.7 CLOSEOUT SUBMITTALS [NOT USED]
29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
30 1.9 QUALITY ASSURANCE [NOT USED]
31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
32 1.11 FIELD [SITE] CONDITIONS [NOT USED]
33 1.12 WARRANTY [NOT USED]
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
1 PART 2 - PRODUCTS [NOT USED]
2 PART 3 - EXECUTION [NOT USED]
3 END OF SECTION
4
01 33 00 - 8
DAP SUBMITTALS
Page 8 of 8
Revision Log
DATE
NAME
SUMMARY OF CHANGE
12/20/2012
D. Johnson
1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
01 35 13 -1
DAP SPECIAL PROJECT PROCEDURES
Pagel of 7
1 SECTION 013513
2 SPECIAL PROJECT PROCEDURES
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedures for special project circumstances that includes, but is not limited to:
7 a. Coordination with the Texas Department of Transportation
8 b. Work near High Voltage Lines
9 c. Confined Space Entry Program
10 d. Air Pollution Watch Days
11 e. Use of Explosives, Drop Weight, Etc.
12 f. Water Department Notification
13 g. Public Notification Prior to Beginning Construction
14 h. Coordination with United States Army Corps of Engineers
15 i. Coordination within Railroad permits areas
16 j. Dust Control
17 k. Employee Parking
18
19 B. Deviations from this City of Fort Worth Standard Specification
20 1. None.
21 C. Related Specification Sections include, but are not necessarily limited to:
22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1 — General Requirements
24 3. Section 33 12 25 — Connection to Existing Water Mains
25
26 1.2 REFERENCES
27 A. Reference Standards
28 1. Reference standards cited in this Specification refer to the current reference
29 standard published at the time of the latest revision date logged at the end of this
30 Specification, unless a date is specifically cited.
31 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
32 High Voltage Overhead Lines.
33 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
34 Specification
35 1.3 ADMINISTRATIVE REQUIREMENTS
36 A. Coordination with the Texas Department of Transportation
37 1. When work in the right-of-way which is under the jurisdiction of the Texas
38 Department of Transportation (TxDOT):
39 a. Notify the Texas Department of Transportation prior to commencing any work
40 therein in accordance with the provisions of the permit
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
01 35 13-2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
1 b. All work performed in the TxDOT right-of-way shall be performed in
2 compliance with and subject to approval from the Texas Department of
3 Transportation
4 B. Work near High Voltage Lines
5 1. Regulatory Requirements
6 a. All Work near High Voltage Lines (more than 600 volts measured between
7 conductors or between a conductor and the ground) shall be in accordance with
8 Health and Safety Code, Title 9, Subtitle A, Chapter 752.
9 2. Warning sign
10 a. Provide sign of sufficient size meeting all OSHA requirements.
11 3. Equipment operating within 10 feet of high voltage lines will require the following
12 safety features
13 a. Insulating cage -type of guard about the boom or arm
14 b. Insulator links on the lift hook connections for back hoes or dippers
15 c. Equipment must meet the safety requirements as set forth by OSHA and the
16 safety requirements of the owner of the high voltage lines
17 4. Work within 6 feet of high voltage electric lines
18 a. Notification shall be given to:
19 1) The power company (example: ONCOR)
20 a) Maintain an accurate log of all such calls to power company and record
21 action taken in each case.
22 b. Coordination with power company
23 1) After notification coordinate with the power company to:
24 a) Erect temporary mechanical barriers, de -energize the lines, or raise or
25 lower the lines
26 c. No personnel may work within 6 feet of a high voltage line before the above
27 requirements have been met.
28 C. Confined Space Entry Program
29 1. Provide and follow approved Confined Space Entry Program in accordance with
30 OSHA requirements.
31 2. Confined Spaces include:
32 a. Manholes
33 b. All other confined spaces in accordance with OSHA's Permit Required for
34 Confined Spaces
35 D. Use of Explosives, Drop Weight, Etc.
36 1. When Contract Documents permit on the project the following will apply:
37 a. Public Notification
38 1) Submit notice to City and proof of adequate insurance coverage, 24 hours
39 prior to commencing.
40 2) Minimum 24 hour public notification in accordance with Section 01 31 13
41 E. Water Department Coordination
42 1. During the construction of this project, it will be necessary to deactivate, for a
43 period of time, existing lines. The Contractor shall be required to coordinate with
44 the Water Department to determine the best times for deactivating and activating
45 those lines.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
013513-3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
1 2. Coordinate any event that will require connecting to or the operation of an existing
2 City water line system with the City's representative.
3 a. Coordination shall be in accordance with Section 33 12 25.
4 b. If needed, obtain a hydrant water meter from the Water Department for use
5 during the life of named project.
6 c. In the event that a water valve on an existing live system be turned off and on
7 to accommodate the construction of the project is required, coordinate this
8 activity through the appropriate City representative.
9 1) Do not operate water line valves of existing water system.
10 a) Failure to comply will render the Contractor in violation of Texas Penal
11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor
12 will be prosecuted to the full extent of the law.
13 b) In addition, the Contractor will assume all liabilities and
14 responsibilities as a result of these actions.
15 F. Public Notification Prior to Beginning Construction
16 1. Prior to beginning construction on any block in the project, on a block by block
17 basis, prepare and deliver a notice or flyer of the pending construction to the front
18 door of each residence or business that will be impacted by construction. The notice
19 shall be prepared as follows:
20 a. Post notice or flyer 7 days prior to beginning any construction activity on each
21 block in the project area.
22 1) Prepare flyer on the Contractor's letterhead and include the following
23 information:
24 a) Name of Project
25 b) City Project No (CPN)
26 c) Scope of Project (i.e. type of construction activity)
27 d) Actual construction duration within the block
28 e) Name of the contractor's foreman and phone number
29 f) Name of the City's inspector and phone number
30 g) City's after-hours phone number
31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit
32 A.
33 3) Submit schedule showing the construction start and finish time for each
34 block of the project to the inspector.
35 4) Deliver flyer to the City Inspector for review prior to distribution.
36 b. No construction will be allowed to begin on any block until the flyer is
37 delivered to all residents of the block.
38 G. Public Notification of Temporary Water Service Interruption during Construction
39 1. In the event it becomes necessary to temporarily shut down water service to
40 residents or businesses during construction, prepare and deliver a notice or flyer of
41 the pending interruption to the front door of each affected resident.
42 2. Prepared notice as follows:
43 a. The notification or flyer shall be posted 24 hours prior to the temporary
44 interruption.
45 b. Prepare flyer on the contractor's letterhead and include the following
46 information:
47 1) Name of the project
48 2) City Project Number
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
013513-4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
3) Date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
1. At locations in the Project where construction activities occur in areas where
USACE permits are required, meet all requirements set forth in each designated
permit.
I. Coordination within Railroad Permit Areas
At locations in the project where construction activities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
0135 13 -5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1 1.4
SUBMITTALS [NOT USED]
2 1.5
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
3 1.6
CLOSEOUT SUBMITTALS [NOT USED]
4 1.7
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.8
QUALITY ASSURANCE [NOT USED]
6 1.9
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.10
FIELD [SITE] CONDITIONS [NOT USED]
8 1.11
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11
12
13
END OF SECTION
Revision Log
DATE NAME
SUMMARY OF CHANGE
8/31/2012 D. Johnson
1.3.B — Added requirement of compliance with Health and Safety Code, Title 9.
Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
013513-6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
0135 13 -7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
1 EXHIBIT B
2
3
4
FORT WORTH
DOB NO. ILIUM
fto,ea name:
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT)
OR
MR.
(CITY INSPECTOR)
(TELEPHONE NUMBER)
AT
(TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
CONTRACTOR
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August, 30, 2013
014523-1
DAP TESTING AND INSPECTION SERVICES
Pagel of2
1 SECTION 0145 23
2 TESTING AND INSPECTION SERVICES
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Testing and inspection services procedures and coordination
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 a. Contractor is responsible for performing, coordinating, and payment of all
17 Quality Control testing.
18 b. City is responsible for performing and payment for first set of Quality
19 Assurance testing.
20 1) If the first Quality Assurance test performed by the City fails, the
21 Contractor is responsible for payment of subsequent Quality Assurance
22 testing until a passing test occurs.
23 a) Final acceptance will not be issued by City until all required payments
24 for testing by Contractor have been paid in full.
25 1.3 REFERENCES [NOT USED]
26 1.4 ADMINISTRATIVE REQUIREMENTS
27 A. Testing
28 1. Complete testing in accordance with the Contract Documents.
29 2. Coordination
30 a. When testing is required to be performed by the City, notify City, sufficiently
31 in advance, when testing is needed.
32 b. When testing is required to be completed by the Contractor, notify City,
33 sufficiently in advance, that testing will be performed.
34 3. Distribution of Testing Reports
35 a. Electronic Distribution
36 1) Confirm development of Project directory for electronic submittals to be
37 uploaded to City's Buzzsaw site, or another form of distribution approved
38 by the City.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
01 45 23 - 2
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
1 2) Upload test reports to designated project directory and notify appropriate
2 City representatives via email of submittal posting.
3 3) Hard Copies
4 a) 1 copy for all submittals submitted to the Project Representative
5 b. Hard Copy Distribution (if required in lieu of electronic distribution)
6 1) Tests performed by City
7 a) Distribute 1 hard copy to the Contractor
8 2) Tests performed by the Contractor
9 a) Distribute 3 hard copies to City's Project Representative
10 4. Provide City's Project Representative with trip tickets for each delivered load of
11 Concrete or Lime material including the following information:
12 a. Name of pit
13 b. Date of delivery
14 c. Material delivered
15 B. Inspection
16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to
17 perform work in accordance with the Contract Documents.
18 1.5 SUBMITTALS [NOT USED]
19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
20 1.7 CLOSEOUT SUBMITTALS [NOT USED]
21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
22 1.9 QUALITY ASSURANCE [NOT USED]
23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
24
25
26
27
28
29
30
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised August 30, 2013
015000-1
DAP TEMPORARY FACILITIES AND CONTROLS
Pagel of4
1 SECTION 0150 00
2 TEMPORARY FACILITIES AND CONTROLS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provide temporary facilities and controls needed for the Work including, but not
7 necessarily limited to:
8 a. Temporary utilities
9 b. Sanitary facilities
10 c. Storage Sheds and Buildings
11 d. Dust control
12 e. Temporary fencing of the construction site
13 B. Deviations from this City of Fort Worth Standard Specification
14 1. None.
15 C. Related Specification Sections include, but are not necessarily limited to:
16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
17 2. Division 1 — General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 REFERENCES [NOT USED]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24 A. Temporary Utilities
25 1. Obtaining Temporary Service
26 a. Make arrangements with utility service companies for temporary services.
27 b. Abide by rules and regulations of utility service companies or authorities
28 having jurisdiction.
29 c. Be responsible for utility service costs until Work is approved for Final
30 Acceptance.
31 1) Included are fuel, power, light, heat and other utility services necessary for
32 execution, completion, testing and initial operation of Work.
33 2. Water
34 a. Contractor to provide water required for and in connection with Work to be
35 performed and for specified tests of piping, equipment, devices or other use as
36 required for the completion of the Work.
37 b. Provide and maintain adequate supply of potable water for domestic
38 consumption by Contractor personnel and City's Project Representatives.
39 c. Coordination
40 1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised JULY I, 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
01 50 00 - 2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
1. Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised JULY 1, 2011
01 50 00 - 3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1 1. Contractor is responsible for maintaining dust control through the duration of the
2 project.
3 a. Contractor remains on -call at all times
4 b. Must respond in a timely manner
5 F. Temporary Protection of Construction
6 1. Contractor or subcontractors are responsible for protecting Work from damage due
7 to weather.
8 1.5 SUBMITTALS [NOT USED]
9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
10 1.7 CLOSEOUT SUBMITTALS [NOT USED]
11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12 1.9 QUALITY ASSURANCE [NOT USED]
13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
14 1.11 FIELD [SITE] CONDITIONS [NOT USED]
15 1.12 WARRANTY [NOT USED]
16 PART 2 - PRODUCTS [NOT USED]
17 PART 3 - EXECUTION [NOT USED]
18 3.1 INSTALLERS [NOT USED]
19 3.2 EXAMINATION [NOT USED]
20 3.3 PREPARATION [NOT USED]
21 3.4 INSTALLATION
22 A. Temporary Facilities
23 1. Maintain all temporary facilities for duration of construction activities as needed.
24 3.5 [REPAIR] / [RESTORATION]
25 3.6 RE -INSTALLATION
26
3.7
FIELD [OR] SITE QUALITY CONTROL [NOT USED]
27
3.8
SYSTEM STARTUP [NOT USED]
28
3.9
ADJUSTING [NOT USED]
29
3.10
CLEANING [NOT USED]
30
3.11
CLOSEOUT ACTIVITIES
31 A. Temporary Facilities
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised JULY 1, 2011
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1 1. Remove all temporary facilities and restore area after completion of the Work, to a
2 condition equal to or better than prior to start of Work.
3 3.12 PROTECTION [NOT USED]
4 3.13 MAINTENANCE [NOT USED]
5 3.14 ATTACHMENTS [NOT USED]
6
7
8
END OF SECTION
Revision Log
DATE NAME I SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised JULY 1, 2011
01 55 26 - 1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Pagel of 3
1 SECTION 0155 26
2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Administrative procedures for:
7 a. Street Use Permit
8 b. Modification of approved traffic control
9 c. Removal of Street Signs
10 B. Deviations from this City of Fort Worth Standard Specification
11 1. None.
12 C. Related Specification Sections include, but are not necessarily limited to:
13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
14 2. Division 1 — General Requirements
15 3. Section 34 71 13 — Traffic Control
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 1. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES
21 A. Reference Standards
22 1. Reference standards cited in this specification refer to the current reference standard
23 published at the time of the latest revision date logged at the end of this
24 specification, unless a date is specifically cited.
25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
26 1.4 ADMINISTRATIVE REQUIREMENTS
27 A. Traffic Control
28 1. General
29 a. When traffic control plans are included in the Drawings, provide Traffic
30 Control in accordance with Drawings and Section 34 71 13.
31 b. When traffic control plans are not included in the Drawings, prepare traffic
32 control plans in accordance with Section 34 71 13 and submit to City for
33 review.
34 1) Allow minimum 10 working days for review of proposed Traffic Control.
35 B. Street Use Permit
36 1. Prior to installation of Traffic Control, a City Street Use Permit is required.
37 a. To obtain Street Use Permit, submit Traffic Control Plans to City
38 Transportation and Public Works Department.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
01 55 26 -2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of
1 1) Allow a minimum of 5 working days for permit review.
2 2) Contractor's responsibility to coordinate review of Traffic Control plans for
3 Street Use Permit, such that construction is not delayed.
4 C. Modification to Approved Traffic Control
5 1. Prior to installation traffic control:
6 a. Submit revised traffic control plans to City Department Transportation and
7 Public Works Department.
8 1) Revise Traffic Control plans in accordance with Section 34 71 13.
9 2) Allow minimum 5 working days for review of revised Traffic Control.
10 3) It is the Contractor's responsibility to coordinate review of Traffic Control
11 plans for Street Use Permit, such that construction is not delayed.
12 D. Removal of Street Sign
13 1. If it is determined that a street sign must be removed for construction, then contact
14 City Transportation and Public Works Department, Signs and Markings Division to
15 remove the sign.
16 E. Temporary Signage
17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control
19 Devices (MUTCD).
20 2. Install temporary sign before the removal of permanent sign.
21 3. When construction is complete, to the extent that the permanent sign can be
22 reinstalled, contact the City Transportation and Public Works Department, Signs
23 and Markings Division, to reinstall the permanent sign.
24 F. Traffic Control Standards
25 1. Traffic Control Standards can be found on the City's Buzzsaw website.
26 1.5 SUBMITTALS [NOT USED]
27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
28 1.7 CLOSEOUT SUBMITTALS [NOT USED]
29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
30 1.9 QUALITY ASSURANCE [NOT USED]
31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
32 1.11 FIELD [SITE] CONDITIONS [NOT USED]
33 1.12 WARRANTY [NOT USED]
34 PART 2 - PRODUCTS [NOT USED]
35 PART 3 - EXECUTION [NOT USED]
36 END OF SECTION
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
015526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page of
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
015713-1
DAP STORM WATER POLLUTION PREVENTION
Pagel of3
1 SECTION 01 5713
2 STORM WATER POLLUTION PREVENTION
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Procedures for Storm Water Pollution Prevention Plans
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
11 Contract
12 2. Division 1 — General Requirements
13 3. Section 3125 00 — Erosion and Sediment Control
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Construction Activities resulting in less than 1 acre of disturbance
17 a. Work associated with this Item is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 2. Construction Activities resulting in greater than 1 acre of disturbance
20 a. Measurement and Payment shall be in accordance with Section 3125 00.
21 1.3 REFERENCES
22 A. Abbreviations and Acronyms
23 1. Notice of Intent: NOI
24 2. Notice of Termination: NOT
25 3. Storm Water Pollution Prevention Plan: SWPPP
26 4. Texas Commission on Environmental Quality: TCEQ
27 5. Notice of Change: NOC
28 A. Reference Standards
29 1. Reference standards cited in this Specification refer to the current reference
30 standard published at the time of the latest revision date logged at the end of this
31 Specification, unless a date is specifically cited.
32 2. Integrated Storm Management (iSWM) Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. General
36 1. Contractor is responsible for resolution and payment of any fines issued associated
37 with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
0157 13 -2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
1 B. Construction Activities resulting in:
2 1. Less than 1 acre of disturbance
3 a. Provide erosion and sediment control in accordance with Section 3125 00 and
4 Drawings.
5 2. 1 to less than 5 acres of disturbance
6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
7 Permit is required
8 b. Complete SWPPP in accordance with TCEQ requirements
9 1) TCEQ Small Construction Site Notice Required under general permit
10 TXR150000
11 a) Sign and post at job site
12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of
13 Transportation and Public Works, Environmental Division, (817) 392-
14 6088.
15 2) Provide erosion and sediment control in accordance with:
16 a) Section 3125 00
17 b) The Drawings
18 c) TXR150000 General Permit
19 d) SWPPP
20 e) TCEQ requirements
21 3. 5 acres or more of Disturbance
22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
23 Permit is required
24 b. Complete SWPPP in accordance with TCEQ requirements
25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
26 a) Sign and post at job site
27 b) Send copy to City Department of Transportation and Public Works,
28 Environmental Division, (817) 392-6088.
29 2) TCEQ Notice of Change required if making changes or updates to NOI
30 3) Provide erosion and sediment control in accordance with:
31 a) Section 3125 00
32 b) The Drawings
33 c) TXR150000 General Permit
34 d) SWPPP
35 e) TCEQ requirements
36 4) Once the project has been completed and all the closeout requirements of
37 TCEQ have been met a TCEQ Notice of Termination can be submitted.
38 a) Send copy to City Department of Transportation and Public Works,
39 Environmental Division, (817) 392-6088.
40 1.5 SUBMITTALS
41 A. SWPPP
42 1. Submit in accordance with Section 0133 00, except as stated herein.
43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
44 as follows:
45 1) 1 copy to the City Project Manager
46 a) City Project Manager will forward to the City Department of
47 Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
01 57 13 - 3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
1 B. Modified SWPPP
2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
3 in accordance with Section 01 33 00.
4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
5
1.7
CLOSEOUT SUBMITTALS [NOT USED]
6
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7
1.9
QUALITY ASSURANCE [NOT USED]
8
1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
9
1.11
FIELD [SITE] CONDITIONS [NOT USED]
10
1.12
WARRANTY [NOT USED]
11 PART 2 - PRODUCTS [NOT USED]
12 PART 3 - EXECUTION [NOT USED]
13
14
15
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised July 1, 2011
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 0160 00
PRODUCT REQUIREMENTS
01 60 00 -1
DAP PRODUCT REQUIREMENTS
Pagel of 2
5 A. Section Includes:
6 1. References for Product Requirements and City Standard Products List
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
13 1.3 REFERENCES [NOT USED]
14 1.4 ADMINISTRATIVE REQUIREMENTS
15
A.
A list of City approved products for use is located on Buzzsaw as follows:
16
1. Resources\02 - Construction Documents\Standard Products List
17
B.
Only products specifically included on City's Standard Product List in these Contract
18
Documents shall be allowed for use on the Project.
19
1. Any subsequently approved products will only be allowed for use upon specific
20
approval by the City.
21
C.
Any specific product requirements in the Contract Documents supersede similar
22
products included on the City's Standard Product List.
23
1. The City reserves the right to not allow products to be used for certain projects even
24
though the product is listed on the City's Standard Product List.
25
D.
Although a specific product is included on City's Standard Product List, not all
26
products from that manufacturer are approved for use, including but not limited to, that
27
manufacturer's standard product.
28
E.
See Section 0133 00 for submittal requirements of Product Data included on City's
29
Standard Product List.
30 1.5 SUBMITTALS [NOT USED]
31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
32 1.7 CLOSEOUT SUBMITTALS [NOT USED]
33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
34 1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 60 00 - 2
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2 - PRODUCTS [NOT USED]
5 PART 3 - EXECUTION [NOT USED]
6 END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
10/12/12
D. Johnson
Modified Location of City's Standard Product List
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Pagel of4
1 SECTION 0166 00
2 PRODUCT STORAGE AND HANDLING REQUIREMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Scheduling of product delivery
7 2. Packaging of products for delivery
8 3. Protection of products against damage from:
9 a. Handling
10 b. Exposure to elements or harsh environments
11 B. Deviations from this City of Fort Worth Standard Specification
12 1. None.
13 C. Related Specification Sections include, but are not necessarily limited to:
14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
15 2. Division 1 — General Requirements
16 1.2 PRICE AND PAYMENT PROCEDURES
17
A. Measurement and Payment
18
1. Work associated with this Item is considered subsidiary to the various Items bid.
19
No separate payment will be allowed for this Item.
20
1.3
REFERENCES [NOT USED]
21
1.4
ADMINISTRATIVE REQUIREMENTS [NOT USED]
22
1.5
SUBMITTALS [NOT USED]
23
1.6
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
24
1.7
CLOSEOUT SUBMITTALS [NOT USED]
25
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
26
1.9
QUALITY ASSURANCE [NOT USED]
27
1.10
DELIVERY AND HANDLING
28
A. Delivery Requirements
29
1. Schedule delivery of products or equipment as required to allow timely installation
30
and to avoid prolonged storage.
31
2. Provide appropriate personnel and equipment to receive deliveries.
32
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
33
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 6600-2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Paget of
1
4.
Deliver products or equipment in manufacturer's original unbroken cartons or other
2
containers designed and constructed to protect the contents from physical or
3
environmental damage.
4
5.
Clearly and fully mark and identify as to manufacturer, item and installation
5
location.
6
6.
Provide manufacturer's instructions for storage and handling.
7
B. Handling Requirements
8
1.
Handle products or equipment in accordance with these Contract Documents and
9
manufacturer's recommendations and instructions.
10
C. Storage Requirements
11
1.
Store materials in accordance with manufacturer's recommendations and
12
requirements of these Specifications.
13
2.
Make necessary provisions for safe storage of materials and equipment.
14
a. Place loose soil materials and materials to be incorporated into Work to prevent
15
damage to any part of Work or existing facilities and to maintain free access at
16
all times to all parts of Work and to utility service company installations in
17
vicinity of Work.
18
3.
Keep materials and equipment neatly and compactly stored in locations that will
19
cause minimum inconvenience to other contractors, public travel, adjoining owners,
20
tenants and occupants.
21
a. Arrange storage to provide easy access for inspection.
22
4.
Restrict storage to areas available on construction site for storage of material and
23
equipment as shown on Drawings, or approved by City's Project Representative.
24
5.
Provide off -site storage and protection when on -site storage is not adequate.
25
a. Provide addresses of and access to off -site storage locations for inspection by
26
City's Project Representative.
27
6.
Do not use lawns, grass plots or other private property for storage purposes without
28
written permission of owner or other person in possession or control of premises.
29
7.
Store in manufacturers' unopened containers.
30
8.
Neatly, safely and compactly stack materials delivered and stored along line of
31
Work to avoid inconvenience and damage to property owners and general public
32
and maintain at least 3 feet from fire hydrant.
33
9.
Keep public and private driveways and street crossings open.
34
10.
Repair or replace damaged lawns, sidewalks, streets or other improvements to
35
satisfaction of City's Project Representative.
36
a. Total length which materials may be distributed along route of construction at
37
one time is 1,000 linear feet, unless otherwise approved in writing by City's
38
Project Representative.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 66 00 - 3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2 - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5
3.1
INSTALLERS [NOT USED]
6
3.2
EXAMINATION [NOT USED]
7
3.3
PREPARATION [NOT USED]
8
3.4
ERECTION [NOT USED]
9
3.5
REPAIR / RESTORATION [NOT USED]
10
3.6
RE -INSTALLATION [NOT USED]
11
3.7
FIELD [OR] SITE QUALITY CONTROL
12
A. Tests and Inspections
13
1. Inspect all products or equipment delivered to the site prior to unloading.
14
B. Non -Conforming Work
15
1. Reject all products or equipment that are damaged, used or in any other way
16
unsatisfactory for use on the project.
17
3.8
SYSTEM STARTUP [NOT USED]
18
3.9
ADJUSTING [NOT USED]
19
3.10
CLEANING [NOT USED]
20
3.11
CLOSEOUT ACTIVITIES [NOT USED]
21
3.12
PROTECTION
22 A. Protect all products or equipment in accordance with manufacturer's written directions.
23 B. Store products or equipment in location to avoid physical damage to items while in
24 storage.
25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by
26 the manufacturer.
27 3.13 MAINTENANCE [NOT USED]
28 3.14 ATTACHMENTS [NOT USED]
29 END OF SECTION
30
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
017000-1
DAP MOBILIZATION AND REMOBILIZATION
Pagel of 4
1 SECTION 0170 00
2 MOBILIZATION AND REMOBILIZATION
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Mobilization and Demobilization
7 a. Mobilization
8 1) Transportation of Contractor's personnel, equipment, and operating supplies
9 to the Site
10 2) Establishment of necessary general facilities for the Contractor's operation
11 at the Site
12 3) Premiums paid for performance and payment bonds
13 4) Transportation of Contractor's personnel, equipment, and operating supplies
14 to another location within the designated Site
15 5) Relocation of necessary general facilities for the Contractor's operation
16 from 1 location to another location on the Site.
17 b. Demobilization
18 1) Transportation of Contractor's personnel, equipment, and operating supplies
19 away from the Site including disassembly
20 2) Site Clean-up
21 3) Removal of all buildings and/or other facilities assembled at the Site for this
22 Contract
23 c. Mobilization and Demobilization do not include activities for specific items of
24 work that are for which payment is provided elsewhere in the contract.
25 2. Remobilization
26 a. Remobilization for Suspension of Work specifically required in the Contract
27 Documents or as required by City includes:
28 1) Demobilization
29 a) Transportation of Contractor's personnel, equipment, and operating
30 supplies from the Site including disassembly or temporarily securing
31 equipment, supplies, and other facilities as designated by the Contract
32 Documents necessary to suspend the Work.
33 b) Site Clean-up as designated in the Contract Documents
34 2) Remobilization
35 a) Transportation of Contractor's personnel, equipment, and operating
36 supplies to the Site necessary to resume the Work.
37 b) Establishment of necessary general facilities for the Contractor's
38 operation at the Site necessary to resume the Work.
39 3) No Payments will be made for:
40 a) Mobilization and Demobilization from one location to another on the
41 Site in the normal progress of performing the Work.
42 b) Stand-by or idle time
43 c) Lost profits
44 3. Mobilizations and Demobilization for Miscellaneous Projects
45 a. Mobilization and Demobilization
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 70 00 - 2
DAP MOBILIZATION AND REMOBILIZATION
Page 2 of 4
1 1) Mobilization shall consist of the activities and cost on a Work Order basis
2 necessary for:
3 a) Transportation of Contractor's personnel, equipment, and operating
4 supplies to the Site for the issued Work Order.
5 b) Establishment of necessary general facilities for the Contractor's
6 operation at the Site for the issued Work Order
7 2) Demobilization shall consist of the activities and cost necessary for:
8 a) Transportation of Contractor's personnel, equipment, and operating
9 supplies from the Site including disassembly for each issued Work
10 Order
11 b) Site Clean-up for each issued Work Order
12 c) Removal of all buildings or other facilities assembled at the Site for
13 each Work Oder
14 b. Mobilization and Demobilization do not include activities for specific items of
15 work for which payment is provided elsewhere in the contract.
16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects
17 a. A Mobilization for Miscellaneous Projects when directed by the City and the
18 mobilization occurs within 24 hours of the issuance of the Work Order.
19 B. Deviations from this City of Fort Worth Standard Specification
20 1. None.
21 C. Related Specification Sections include, but are not necessarily limited to:
22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1 — General Requirements
24 1.2 PRICE AND PAYMENT PROCEDURES
25 A. Measurement and Payment
26 1. Mobilization and Demobilization
27 a. Measure
28 1) This Item is considered subsidiary to the various Items bid.
29 b. Payment
30 1) The work performed and materials furnished in accordance with this Item
31 are subsidiary to the various Items bid and no other compensation will be
32 allowed.
33 2. Remobilization for suspension of Work as specifically required in the Contract
34 Documents
35 a. Measurement
36 1) Measurement for this Item shall be per each remobilization performed.
37 b. Payment
38 1) The work performed and materials furnished in accordance with this Item
39 and measured as provided under "Measurement" will be paid for at the unit
40 price per each "Specified Remobilization" in accordance with Contract
41 Documents.
42 c. The price shall include:
43 1) Demobilization as described in Section 1.1.A.2.a.1)
44 2) Remobilization as described in Section 1.1.A.2.a.2)
45 d. No payments will be made for standby, idle time, or lost profits associated this
46 Item.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 70 00 - 3
DAP MOBILIZATION AND REMOBILIZATION
Page of4
1
3. Remobilization for suspension of Work as required by City
2
a.
Measurement and Payment
3
1) This shall be submitted as a Contract Claim in accordance with Article 10
4
of Section 00 72 00.
5
2) No payments will be made for standby, idle time, or lost profits associated
6
with this Item.
7
4. Mobilizations and Demobilizations for Miscellaneous Projects
8
a.
Measurement
9
1) Measurement for this Item shall be for each Mobilization and
10
Demobilization required by the Contract Documents
1 ]
b.
Payment
12
1) The Work performed and materials furnished in accordance with this Item
13
and measured as provided under "Measurement" will be paid for at the unit
14
price per each "Work Order Mobilization" in accordance with Contract
15
Documents. Demobilization shall be considered subsidiary to mobilization
16
and shall not be paid for separately.
17
c.
The price shall include:
18
1) Mobilization as described in Section 1.1.A.3.a.1)
19
2) Demobilization as described in Section 1.1.A.3.a.2)
20
d.
No payments will be made for standby, idle time, or lost profits associated this
21
Item.
22
5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects
23
a.
Measurement
24
1) Measurement for this Item shall be for each Mobilization and
25
Demobilization required by the Contract Documents
26
b.
Payment
27
1) The Work performed and materials furnished in accordance with this Item
28
and measured as provided under "Measurement" will be paid for at the unit
29
price per each "Work Order Emergency Mobilization" in accordance with
30
Contract Documents. Demobilization shall be considered subsidiary to
31
mobilization and shall not be paid for separately.
32
c.
The price shall include
33
1) Mobilization as described in Section 1.1.A.4.a)
34
2) Demobilization as described in Section 1.1.A.3.a.2)
35
d.
No payments will be made for standby, idle time, or lost profits associated this
36
Item.
37 1.3 REFERENCES [NOT USED]
38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
39 1.5 SUBMITTALS [NOT USED]
40 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
41 1.7 CLOSEOUT SUBMITTALS [NOT USED]
42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
43 1.9 QUALITY ASSURANCE [NOT USED]
44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 70 00 - 4
DAP MOBILIZATION AND REMOBILIZATION
Page 4 of
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2 - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION [NOT USED]
5 END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
017423-1
DAP CLEANING
Pagel of 4
1 SECTION 0174 23
2 CLEANING
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Intermediate and final cleaning for Work not including special cleaning of closed
7 systems specified elsewhere
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Work associated with this Item is,considered subsidiary to the various Items bid.
17 No separate payment will be allowed for this Item.
18 1.3 REFERENCES [NOT USED]
19 1.4 ADMINISTRATIVE REQUIREMENTS
20
A. Scheduling
21
1. Schedule cleaning operations so that dust and other contaminants disturbed by
22
cleaning process will not fall on newly painted surfaces.
23
2. Schedule final cleaning upon completion of Work and immediately prior to final
24
inspection.
25
1.5
SUBMITTALS [NOT USED]
26
1.6
ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
27
1.7
CLOSEOUT SUBMITTALS [NOT USED]
28
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29
1.9
QUALITY ASSURANCE [NOT USED]
30
1.10
STORAGE, AND HANDLING
31
A. Storage and Handling Requirements
32
1. Store cleaning products and cleaning wastes in containers specifically designed for
33
those materials.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 74 23 - 2
DAP CLEANING
Page 2 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART2- PRODUCTS
4 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
5 2.2 MATERIALS
6 A. Cleaning Agents
7 1. Compatible with surface being cleaned
8 2. New and uncontaminated
9 3. For manufactured surfaces
10 a. Material recommended by manufacturer
11 2.3 ACCESSORIES [NOT USED]
12 2.4 SOURCE QUALITY CONTROL [NOT USED]
13 PART 3 - EXECUTION
14
3.1
INSTALLERS [NOT USED]
15
3.2
EXAMINATION [NOT USED]
16
3.3
PREPARATION [NOT USED]
17
3.4
APPLICATION [NOT USED]
18
3.5
REPAIR / RESTORATION [NOT USED]
19
3.6
RE -INSTALLATION [NOT USED]
20
3.7
FIELD [OR] SITE QUALITY CONTROL [NOT USED]
21
3.8
SYSTEM STARTUP [NOT USED]
22
3.9
ADJUSTING [NOT USED]
23
3.10
CLEANING
24 A. General
25 1. Prevent accumulation of wastes that create hazardous conditions.
26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of
27 governing authorities.
28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
29 storm or sanitary drains or sewers.
30 4. Dispose of degradable debris at an approved solid waste disposal site.
31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
32 alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 74 23 - 3
DAP CLEANING
Page 3 of 4
1 6. Handle materials in a controlled manner with as few handlings as possible.
2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
3 this project.
4 8. Remove all signs of temporary construction and activities incidental to construction
5 of required permanent Work.
6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
7 have the cleaning completed at the expense of the Contractor.
8 10. Do not burn on -site.
9
B. Intermediate Cleaning during Construction
10
1.
Keep Work areas clean so as not to hinder health, safety or convenience of
I 1
personnel in existing facility operations.
12
2.
At maximum weekly intervals, dispose of waste materials, debris and rubbish.
13
3.
Confine construction debris daily in strategically located container(s):
14
a. Cover to prevent blowing by wind
15
b. Store debris away from construction or operational activities
16
c. Haul from site at a minimum of once per week
17
4.
Vacuum clean interior areas when ready to receive finish painting.
18
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
19
5.
Prior to storm events, thoroughly clean site of all loose or unsecured items, which
20
may become airborne or transported by flowing water during the storm.
21 C. Exterior (Site or Right of Way) Final Cleaning
22 1. Remove trash and debris containers from site.
23 a. Re -seed areas disturbed by location of trash and debris containers in accordance
24 with Section 32 92 13.
25 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
26 that may hinder or disrupt the flow of traffic along the roadway.
27 3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
28 junction boxes and inlets.
29 4. If no longer required for maintenance of erosion facilities, and upon approval by
30 City, remove erosion control from site.
31 5. Clean signs, lights, signals, etc.
32 3.11 CLOSEOUT ACTIVITIES [NOT USED]
33 3.12 PROTECTION [NOT USED]
34 3.13 MAINTENANCE [NOT USED]
35 3.14 ATTACHMENTS [NOT USED]
36
37
38
39
40
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 74 23 - 4
DAP CLEANING
Page 4 of
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 01 7719
CLOSEOUT REQUIREMENTS
017719-1
DAP CLOSEOUT REQUIREMENTS
Pagel of 3
5 A. Section Includes:
6 1. The procedure for closing out a contract
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18 A. Guarantees, Bonds and Affidavits
19 1. No application for final payment will be accepted until all guarantees, bonds,
20 certificates, licenses and affidavits required for Work or equipment as specified are
21 satisfactorily filed with the City.
22 B. Release of Liens or Claims
23 1. No application for final payment will be accepted until satisfactory evidence of
24 release of liens has been submitted to the City.
25 1.5 SUBMITTALS
26 A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 77 19 - 2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1 1.6 INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3 PART 2 - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.2 EXAMINATION [NOT USED]
7 3.3 PREPARATION [NOT USED]
8 3.4 CLOSEOUT PROCEDURE
9 A. Prior to requesting Final Inspection, submit:
10 1. Project Record Documents in accordance with Section 01 78 39
11 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
13 01 74 23.
14 C. Final Inspection
15 1. After final cleaning, provide notice to the City Project Representative that the Work
16 is completed.
17 a. The City will make an initial Final Inspection with the Contractor present.
18 b. Upon completion of this inspection, the City will notify the Contractor, in
19 writing within 10 business days, of any particulars in which this inspection
20 reveals that the Work is defective or incomplete.
21 2. Upon receiving written notice from the City, immediately undertake the Work
22 required to remedy deficiencies and complete the Work to the satisfaction of the
23 City.
24 3. Upon completion of Work associated with the items listed in the City's written
25 notice, inform the City, that the required Work has been completed. Upon receipt
26 of this notice, the City, in the presence of the Contractor, will make a subsequent
27 Final Inspection of the project.
28 4. Provide all special accessories required to place each item of equipment in full
29 operation. These special accessory items include, but are not limited to:
30 a. Specified spare parts
31 b. Adequate oil and grease as required for the first lubrication of the equipment
32 c. Initial fill up of all chemical tanks and fuel tanks
33 d. Light bulbs
34 e. Fuses
35 f. Vault keys
36 g. Handwheels
37 h. Other expendable items as required for initial start-up and operation of all
38 equipment
39 D. Notice of Project Completion
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
01 77 19 - 3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
017823-1
DAP OPERATION AND MAINTENANCE DATA
Pagel of 5
1 SECTION 0178 23
2 OPERATION AND MAINTENANCE DATA
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Product data and related information appropriate for City's maintenance and
7 operation of products furnished under Contract
8 2. Such products may include, but are not limited to:
9 a. Traffic Controllers
10 b. Irrigation Controllers (to be operated by the City)
11 c. Butterfly Valves
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division 1 — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Schedule
24 1. Submit manuals in final form to the City within 30 calendar days of product
25 shipment to the project site.
26 1.5 SUBMITTALS
27 A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
28 approved by the City prior to delivery.
29 1.6 INFORMATIONAL SUBMITTALS
30 A. Submittal Form
31 1. Prepare data in form of an instructional manual for use by City personnel.
32 2. Format
33 a. Size: 8 '/z inches x 11 inches
34 b. Paper
35 1) 40 pound minimum, white, for typed pages
36 2) Holes reinforced with plastic, cloth or metal
37 c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
I d. Drawings
2 1) Provide reinforced punched binder tab, bind in with text
3 2) Reduce larger drawings and fold to size of text pages.
4 e. Provide fly -leaf for each separate product, or each piece of operating
5 equipment.
6 1) Provide typed description of product, and major component parts of
7 equipment.
8 2) Provide indexed tabs.
9 f. Cover
10 1) Identify each volume with typed or printed title "OPERATING AND
11 MAINTENANCE INSTRUCTIONS".
12 2) List:
13 a) Title of Project
14 b) Identity of separate structure as applicable
15 c) Identity of general subject matter covered in the manual
16 3. Binders
17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers
18 b. When multiple binders are used, correlate the data into related consistent
19 groupings.
20 4. If available, provide an electronic form of the O&M Manual.
21 B. Manual Content
22 1. Neatly typewritten table of contents for each volume, arranged In systematic order
23 a. Contractor, name of responsible principal, address and telephone number
24 b. A list of each product required to be included, indexed to content of the volume
25 c. List, with each product:
26 1) The name, address and telephone number of the subcontractor or installer
27 2) A list of each product required to be included, indexed to content of the
28 volume
29 3) Identify area of responsibility of each
30 4) Local source of supply for parts and replacement
31 d. Identify each product by product name and other identifying symbols as set
32 forth in Contract Documents.
33 2. Product Data
34 a. Include only those sheets which are pertinent to the specific product.
35 b. Annotate each sheet to:
36 1) Clearly identify specific product or part installed
37 2) Clearly identify data applicable to installation
38 3) Delete references to inapplicable information
39 3. Drawings
40 a. Supplement product data with drawings as necessary to clearly illustrate:
41 1) Relations of component parts of equipment and systems
42 2) Control and flow diagrams
43 b. Coordinate drawings with information in Project Record Documents to assure
44 correct illustration of completed installation.
45 c. Do not use Project Record Drawings as maintenance drawings.
46 4. Written text, as required to supplement product data for the particular installation:
47 a. Organize in consistent format under separate headings for different procedures.
48 b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
017823-3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
1
i.
Charts of valve tag numbers, with location and function of each valve
2
j.
List of original manufacturer's spare parts, manufacturer's current prices, and
3
recommended quantities to be maintained in storage
4
k.
Other data as required under pertinent Sections of Specifications
5
3. Content, for each electric and electronic system, as appropriate:
6
a.
Description of system and component parts
7
1) Function, normal operating characteristics, and limiting conditions
8
2) Performance curves, engineering data and tests
9
3) Complete nomenclature and commercial number of replaceable parts
10
b.
Circuit directories of panelboards
11
1) Electrical service
12
2) Controls
13
3) Communications
14
c.
As installed color coded wiring diagrams
15
d.
Operating procedures
16
1) Routine and normal operating instructions
17
2) Sequences required
18
3) Special operating instructions
19
e.
Maintenance procedures
20
1) Routine operations
21
2) Guide to "trouble shooting"
22
3) Disassembly, repair and reassembly
23
4) Adjustment and checking
24
f.
Manufacturer's printed operating and maintenance instructions
25
g.
List of original manufacturer's spare parts, manufacturer's current prices, and
26
recommended quantities to be maintained in storage
27
h.
Other data as required under pertinent Sections of Specifications
28
4. Prepare and include additional data when the need for such data becomes apparent
29
during instruction of City's personnel.
30 1.7 CLOSEOUT SUBMITTALS [NOT USED]
31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
32 1.9 QUALITY ASSURANCE
33 A. Provide operation and maintenance data by personnel with the following criteria:
34 1. Trained and experienced in maintenance and operation of described products
35 2. Skilled as technical writer to the extent required to communicate essential data
36 3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2 - PRODUCTS [NOT USED]
5 PART 3 - EXECUTION [NOT USED]
6 END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
8/31/2012
D. Johnson
1.5.A.1 —title of section removed
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
017839-1
DAP PROJECT RECORD DOCUMENTS
Pagel of 4
1 SECTION 0178 39
2 PROJECT RECORD DOCUMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Work associated with the documenting the project and recording changes to project
7 documents, including:
8 a. Record Drawings
9 b. Water Meter Service Reports
10 c. Sanitary Sewer Service Reports
11 d. Large Water Meter Reports
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division 1 — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 ' 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
23 1.5 SUBMITTALS
24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
25 City's Project Representative.
26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE
30 A. Accuracy of Records
31 1. Thoroughly coordinate changes within the Record Documents, making adequate
32 and proper entries on each page of Specifications and each sheet of Drawings and
33 other Documents where such entry is required to show the change properly.
34 2. Accuracy of records shall be such that future search for items shown in the Contract
35 Documents may rely reasonably on information obtained from the approved Project
36 Record Documents.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
01 78 39 - 2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of
2 information that the change has occurred.
3 4. Provide factual information regarding all aspects of the Work, both concealed and
4 visible, to enable future modification of the Work to proceed without lengthy and
5 expensive site measurement, investigation and examination.
6 1.10 STORAGE AND HANDLING
7 A. Storage and Handling Requirements
8 1. Maintain the job set of Record Documents completely protected from deterioration
9 and from loss and damage until completion of the Work and transfer of all recorded
10 data to the final Project Record Documents.
11 2. In the event of loss of recorded data, use means necessary to again secure the data
12 to the City's approval.
13 a. In such case, provide replacements to the standards originally required by the
14 Contract Documents.
15 1.11 FIELD [SITE] CONDITIONS [NOT USED]
16 1.12 WARRANTY [NOT USED]
17 PART 2 - PRODUCTS
18 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
19 2.2 RECORD DOCUMENTS
20 A. Job set
21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
22 charge to the Contractor, 1 complete set of all Documents comprising the Contract.
23 B. Final Record Documents
24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide
25 the City 1 complete set of all Final Record Drawings in the Contract.
26 2.3 ACCESSORIES [NOT USED]
27 2.4 SOURCE QUALITY CONTROL [NOT USED]
28 PART 3 - EXECUTION
29 3.1 INSTALLERS [NOT USED]
30 3.2 EXAMINATION [NOT USED]
31 3.3 PREPARATION [NOT USED]
32 3.4 MAINTENANCE DOCUMENTS
33 A. Maintenance of Job Set
34 1. Immediately upon receipt of the job set, identify each of the Documents with the
35 title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
2
3
4
6
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
01 78 39 - 3
DAP PROJECT RECORD DOCUMENTS
Page of
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
5. Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
1. Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
0-41
24
01 78 39 - 4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE
NAME
SUMMARY OF CHANGE
4/7/2014
M.Domenech
Revised for DAP Application
CITY OF FORT WORTH The Presidio at River East
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 101464
Revised April 7, 2014