HomeMy WebLinkAboutOrdinance 6569 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROV NTS ON A PORTION OF WEISENBERGER STREET
AND PORTIONS OF SUNDRY OTE M STR STS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FMT WORTH, TEXAS; ILCLARING THE CONTRACT WITH
TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID
IMPROV 1aNTS FULLY COMPLETED A-MD PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CMTIFICATES IN EVIDENCE OF SPECIAL ASSESS-
MENTS LEVIM AFTER GIVING EFFECT TO SUIRMY CREDITS HEREIN AUTHORIZED
AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS OB=?ANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THV CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AMP MFPCTIVE DATE.
WIMEAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with TEXAS BITULITHIC COMPANY for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public plades
in said City, to-wit:
UNIT 1: WEISENBERGER STREET From Carroll Street to Vacek Street,
known and designated as Unit 1, Pro-
ject No. 104-24000-211.
UNIT 2: FOCH STREET From Whitmore Street to White Settle-
ment Road, known and designated as
Unit 2, Project No. 104-24000-211.
UNIT 3: LITTLEPAGE STREET From Blackmore Avenue to Libbey Avenue,
known and designated as Unit 3, Project
No. 104-24000-211.
UNIT 4: SLOCUM AVENUE From Joyce Drive to Highway 183, known
and designated as Unit 4, Project No.
104-24000-211.
UNIT 5: BROADMOOR DRIVE From Highway 80 to West Elizabeth Lane,
known and designated as Unit 5, Project
No. 104-24000-211.
r
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 6402 a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6402 a and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the-true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS, day of _ s 19 '
APPROVED AS TO FORM AND LEGALITY:
' r e
City Attorney
PROJECT NO. 104-24000-211, UNIT 1: WEISENBERGER STREET FROM CARROLL STREET TO VACEK STREET,
to be improved with a five-inch thick reinforced concrete pavement on a six-inch thick lime
stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter,
so that the finished roadway will be thirty feet wide and by constructing six-inch thick
concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF CARROLL STREET AND WEISENBERGER STREET
NORTH SIDE OF THE STREET WEISENBERGER STREET
Joe Batey 11 8 50'
2634 Weisenberger Ind. 26' Pavement $11.20 $ 291.26
76107 26' Curb & Gutter 2.58 67.08
$, 358.34
Joe Batey 12 8 50' Owner Occupied
2634 Weisenberger Ind. 50' Pavement $ 7.01 $ 350.50
76107 50' Curb & Gutter 2.58 129.00
118 Sq. Ft. Driveway .90 106.20
$ 585.70
Ruby Thompson 13 8 50' Pavement $11.20 $ 560.00
3608 Cork Place Ind. 50' Curb & Gutter 2.58 129.00
76116 118 Sq. Ft. Driveway .90 106.20
$ 795.20
Carl Kisabeth 14, 15, & 8 150' Pavement $11.20 $1,680.00
4821 Terrace Trail 16 Ind. 150' Curb & Gutter 2.58 387.00
76114 237 Sq. Ft. Driveway .90 213.30
$2,280.30
Al & Ida M. Harris 17 8 50' Owner Occupied
2612 Weisenberger Ind. 50' Pavement $ 7.01 $ 350.50
76107 50' Curb & Gutter 2.58 129.00
118 Sq. Ft. Driveway .90 106.20
$ 585.70
1
PROJECT NO, 104-24000-211. UNIT 1: WEISENBERGER STREET FROM CARROLL STREET TO VACEK
STREET - CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF THE STREET WEISENBERGER ADDITION
Al & Ida M. Harris 18 8 50' Pavei:ient $11.20 $ 560.00
2612 Weisenberger Ind. 50' Curb & Gutter 2.58 129.00
76107 118 Sq. Ft. Driveway .90 106.20
$ 795.20
Allen Duncan 19 & 20 8 100' Pavement $11.20 $1,120.00
P.O. Box 10351 Ind. 100' Curb & Gutter 2.58 258.00
76114 323 Sq. Ft. Driveway .90 290.70
$1,668.70
VACEK STREET INTERSECTS
SOUTH SIDE OF THE STREET WEISENBERGER ADDITION
Wess A. Culwell 10 13 50' Pavement $11.20 $ 560.00
105 Boland Ind. 50' Curb & Gutter 2.58 129.00
76107 194 Sq. Ft. Driveway .90 174.60
$ 863.60
Boyles Galvanizing Co. 9 13 50' Pavement $11.20 $ 560.00
P.O. Box 187 Ind. 50' Curb & Gutter 2.58 129.00
Hurst, Texas 76053 $ 689.00
Wilma Johnson 8 13 50' Pavement $11.20 $ 560.00
1015 Buford Ind. 50' Curb & Gutter 2.58 129.00
76107 118 Sq. Ft. Driveway .90 106.20
$ 795.20
A. B. Melton 7 13 50' Pavement $11.20 $ 560.00
Rt. 1 Ind. 50' Curb & Gutter 2.58 129.00
Brookesmith, Texas 118 Sq. Ft. Driveway .90 106.20
76827 $ 795.20
PROJECT 10, 104-24000-211, UNIT 1: WEISENBERGER STREET FROM CARROLL STREET TO VACEK STREET,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF THE STREET WSISENBERGER ADDITION
C. L. Clark 6 13 50' Owner Occupied
2617 Weisenberger Ind. 50' Pavement $ 7.01 $ 350.50
76107 50' Curb & Gutter 2.58 129.00
118 Sq. Ft. Driveway .90 106.20
$ 585.70
Virgie Mae Boardman 4 13 50' Owner Occupied
4507 Erin Lane Ind. 50' Pavement $ 7.01 $ 350.50
Austin, Texas 50' Curb & Gutter 2.58 129.00
78756 118 Sq. Ft. Driveway *90 106.20
$ 585.70
Virgie Mae Boardman 5 13 50' Pavement $11.20 $ 560.00
4507 Erin Lane Ind. 50' Curb & Gutter 2.58 129.00
Austin, Texas $ 689.00
78756
James A. Boyd 3 13 50' Owner Occupied
2629 Weisenberger Ind. 50' Pavement $ 7.01 $ 350.50
76107 50' Curb & Gutter 2.58 129.00
118 Sq. Ft. Driveway .90 106.20
$ 585.70
Earl E. Mitchell 1 & 2 13 100' Frontage
251 Carroll Street Ind. 76' Pavement $11.20 $ 851.20
76107 $ 851.20
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . $13,509.44
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 6,518.94
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 1 . . . . . . . $20,028.38
3
PROJECT NO. 104-24000-211, UNIT 2: FOCH STREET FROM WHITMORE STREET TO WHITE SETTLEMENT
ROAD, to be improved with six-inch thick reinforced concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide
concrete gutter, so that the finished roadway will be thirty-six feet wide and by con-
structing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF WHITMORE STREET AND FOCH STREET
WEST SIDE OF THE STREET WEISENBERGER ADDITION
Armature Exchange Inc. 19 & 20 1 142' Pavement $14.23 $2,020.66
2712 White Settlement Ind. 131' Curb & Gutter 2.67 349.77
Road $2,370.43
76107
Harrol D. Walker 10 1 142' Frontage
536 W. Division Ind. 142' Pavement $14.23 $2,020.66
Arlington, Texas 42' Curb & Gutter 2.67 112.14
76041 $2,132.80
WHITE SETTLEMENT ROAD INTERSECTS
EAST SIDE OF THE STREET WEISENBERGER ADDITION
Henry Rosenberg 1 & 2 2 142' Pavement $14.23 $2,020.66
3631 Norfold Road Ind. 72' Curb & Gutter 2.67 192.24
76109 219 Sq. Ft. Driveway .90 197.10
$2,410.00
Armature Exchange Ind. 11 & 12 2 142' Pavement $14.23 $2,020.66
2730-36 Whitmore St. Ind. 149 Sq. Ft. Driveway .90 134.10
76107 $2,154.76
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . $ 9,067.99
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . . 7,135.12
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 2 . . . . . . . $16,203.11
4
PROJECT NO, 104-24000-211, UNIT 3: LITTLEPAGE STREET FROM BLACKMORE AVENUE TO LIBBEY AVENUE,
to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch
thick concrete driveways and four-foot wide concrete sidewalks where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF BLACKMORE AVENUE AND LITTLEPAGE STREET
WEST SIDE CF THE STREET CHAMBERLIN ARLINGTON HEIGHTS ADDITION, SECOND FILING
City of Fort Worth 39 & 40 370 125' Pavement $6.54 $817.50
Water Department Comm. 125' Curb & Gutter 2.58 322.50
c/o W. R. Hardy 125' Sidewalk 3.05 381.25
76102 $1,521.25
City of Fort Worth 1 & 2 370 125' Side Lot Credit
Water Department Res. 100' Pavement $3.92 $392.00
c/o V. R. Hardy 100' Curb & Gutter 2.58 258.00
76102 100' Sidewalk 3.05 305.00
$ 955.00
LIBBEY AVENUE INTERSECTS
EAST SIDE OF THE STREET
Sarah Teamer 19 & 20 369 125' Side Lot Cre&i.t
5839 Libbey Avenue Res. 100' Pavement $3.92 $392.00
76107 100' Curb & Gutter 2.58 258.00
89' Sidewalk 3.05 271.45
118 Sq. Ft. Driveway .90 106.20
$1,027.65
Theresa J. Arrant 21 & 22 369 125' Pavement $6.54 $817.50
1860 64th Street Comm. 125' Curb & Gutter 2.58 322.50
Los Angeles, Calif. 114' Sidewalk 3.05 347.70
90047 118 Sq. Pt. Driveway .90 106.20
$1,593.90
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . . $ 5,097.80
COST TO THE CITY OF FORT WORTH . . . . . . . . . . . . . 3,934.09
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 . . . . . . . $ 9,031.89
5
PROJECT NO. 104-24000-211, UNIT 4: SLOCUM AVENUE FROM JOYCE DRIVE TO HIGHWAY 183, to be
improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide courete
gutter, so that the finished roadway will be forty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF JOYCE DRIVE AND SLOCUM AVENUE
NORTH SIDE OF THE STREET ALTA MERE ADDITION
Trentmaa Co. 11 & 12 14 175' Side Lot Credit
1008 Mallick Tower Res. 100' Pavement $2.82 $282.00
76102 100' Curb & Gutter 2.58 258.00
$ 540.00
Trentmaa Co. West 135' 14 135' Side Lot Credtt
1008 Mallick Tower of 13 & 14 Res. 100' Pavement $2.82 $282.00
76102 100' Curb & Gutter 2.58 258.00
$ 540.00
STATE HIGHWAY 183 INTERSECTS
SOUTH SIDE OF THE STREET ALTA MERE ADDICTION
L. L. Hutton West 135' 16 135' Side Lot Credit
3109 Ramona of 24 Res. 100' Pavement $2.82 $282.00
100' Curb & Gutter 2.58 258.00
140 Sq. Ft. Driveway .90 126.00
Request for driveway,-on 5-5-71 (See Unit file) $ 666.00
W. G. Champion 1 16 175' Side Lot Credit
3101 Joyce Drive Res. 100' Pavement $2.82 $282.00
76116 100' Curb & Gutter 2.58 258.00
85 Sq. Ft. Driveway .90 76.50
Request for driveway on 5-12-71 (See Unit file) $ 616.50
COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . . $ 2,362.50
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . . 11,380.83
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 . . . . . . . . $13,743.33
6
PROJECT NO. 104-24000-211, UNIT 5: BROADMOOR DRIVE FROM HIGHWAY 80 TO WEST ELIZABETH
LANE, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch
wide concrete gutter, so that the finished roadway will be forty feet wide and by con-
structing six-inch thick concrete driveways and four-foot wide concrete sidewalks where
specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF STATE HIGHWAY 80 AND BROADMOOR DRIVE
WEST SIDE OF THE STREET BROADMOOR ADDITION
Noel A. Cohen 1-R & J-R 2 187' Pavement $10.07 $1,883.09
8100 Weatherford Highway Comm. 187' Curb & Gutter 2.58 482.46
76116 97' Sidewalk 3.05 295.85
388 Sq. Ft Driveway 90 349.20
Change Order 8-25-71 $3,010.60
Eli R. Merrill 11 & E. k of 12 2 150' Owner Occupied
8101 West Elizabeth Lane Apt. 150' Pavement $ 6.44 $ 966.00
76116 150' Curb & Gutter 2.58 387.00
132' Sidewalk 3.05 402.60
85 Sq. Ft. Driveway 90 76.50
$1,832.10
WEST ELIZABETHIANE INTERSECTS
EAST SIDE OF THE STREET
Noel A. Cohen 22 & 23 3 150' Pavement $10.07 $1,510.50
8100 Weatherford Highway Apt. 150' Curb & Gutter 2.58 387.00
76116 150' Sidewalk 3.05 457.50
$2,355.00
John P. Williams A-R & B-R 3 187' Pavement $10.07 $1,883.09
5538 Byers Comm. 187' Curb & Gutter 2.58 482.46
76107 147' Sidewalk 3.05 448.35
310 Sq. Ft. Driveway .90 279.00
$3,092.90
COST TO PROPERTY OWNERS • ASSESSMENT . . . . . . . . . . $10,290.60
COST TO THE CITY OF FORT WORTH . . . . . . . . . . . . 2,602.47
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . $12,893.07
7
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE SUBJECT: Final Payment - Assessment Pavi g PAGE
NUMBER at Five Locations on the West
10/18/71 FP-831 Side � O} 2
Final Council action on the project described below is requested.
Project Description
Name: Assessment Paving at Five Locations on the
West Side Project No. 104-24000-211
Contractor: Texas Bitulithic Company
Contract Awarded: November 9, 1970, (M&C C-1861)
Work Order Issued: January 26, 1971
Work Order Effective: February 5, 1971
Work Began: February 2, 1971
Date of Final Inspection
and Approval: July 9, 1971
Working Time Bid: 75 Working Days
Working Time Used: 65 Working Days
Project Cost and Financing
Original Bid Price: $71,169.00
Change Order No 1: + 351.00 (A.R. 1-15, 2.3, 2/17/71)
Change Order No. 2: - 557.40 (A.R. 1-15, 2.4, 8/17/71)
Change Order No. 3: - 115.20 (A.R. 1-15, 2.3, 8/25/71)
Revised Bid Price: $70,847.40
Final Contract Cost: $65,363.44
Less Penalty for Deficient Paving -412.96
$64,950.48
Partial Payments Previously Made: 5, Amount: $58,734.00
Final Payment Due: $6,216.48
Sufficient funds are available for the final payment to be made from Project
Number 104-24000-211.
Deviation from Bid Price: The final contract cost of this project is
$5,483.96 under the revised bid price. A major portion of the savings,
$3,750.00 resulted because 6" metal pipe sub drain was found to be unne-
cessary, and a savings of $851.69 was realized because it was not necessary
to adjust as riany utilities as anticipated. The remaining cost difference
$882.27, is attributed to minor variations between quantities estimated
in the contract documents and a a:t=t: vs Tactually r.e«�ured and used at the
job site.
DATE REFERENCE SUBJECT: Final Payment - Assessment Pavi g PAGE
NUMBER
at Five Locations on the West 2 or 2
10 18 71 FP-831 Side
Compliance with Specifications
Tests made during construction show that materials used and required
thickness was in compliance with contract specifications except on one
unit, and on this unit the contractor was penalized as provided in the
contract specifications.
Recommendations
It is recommended that the project described be accepted by the adoption
of an ordinance and that final payment of $6,216.48 be authorized to the
Texas Bitulithic Company.
RNL/mj
SUBMITTED BY: DISPOSITIO BY COUNCIL: PROCESSED BY
EF APPROVED /J O OTHER (DESCRIBE) 4 4—
1Al�/�GL�/IystLl't c�� (U C" ITY SECRETARY
DATE
CITY MANAGER OXYA/