HomeMy WebLinkAboutContract 44649-A4 CITY SECRETARY, CONTRACT NO.. RECEIVED AMENDMENT No.No. 4 DEC 2 7 2019 CITY OF FORT WORT[, TO CITY SECRETARY CONTRACT No. 44649 CITY SECRETARY WHEREAS, the City of Fort Worth (CITY) and Wade Trim, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 44649, (the CONTRACT) which was authorized by M&C C-26320 on the 9th day of July, 2013 in the amount of $ 524 , 244 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $47, 710 . 00 which was administratively authorized on May 12, 2016, Amendment Number 2 in the amount of $574 , 992 . 00 which was authorized by M&C C-28254 on June 6th, 2017; Amendment Number 3 in the amount of $836, 860 . 00 which was authorized by M&C C-29087; and WHEREAS, the CONTRACT involves engineering services for the following project: Westcliff Drainage Improvements Project; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 21st, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $77, 415. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $2, 061, 221 . 00. 3 . All other provisions of the Contract, which are not expressly City of Fort Worth Westcliff Ph Professional Services Agreement Amendment Template 0FF110 Via, 4$MnfW. R CFW Official Release 9/19/2017 Page 1 of 4 @. �aBitl+Pa d lf'ug 'u 6i1 amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Wade Trim, Inc. Dana Burgh#f Shawn Keough Interim Assistant City Manager Vice President DATE: Z l Z 7 1 DATE: 1� Z6 G o APPROVAL RECOMMENDED: L�7L VJ� William Johnso Director, Tran portation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . i nnett Pr je t Manager OFFICIAL RECORD CITY SECRETARY City of Fort Worth FT. WORT cff h Professional Services Agreement Amendment Template C N' 9 CFW Official Release 9/19/2017 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: M&C: N lA- Date : Douglas W. Black Assistant City Attorney ATTE � i� � m o ar J. Kayser City Secretary City Fort Worth ®FFICIA( Professional Services Agreement Amendment Template CFW Official Release 9/19/2017 & ;'^� *• dd Page 3 of 4 FUNDING BREAKDOWN SHEET City Secretary No. 44649 Amendment No. 4 Department Fund-Account-Center Amount TPW 52002-0200431-5330500-001669-0O2830 77, 415 . 00 Total : 77, 415 . 00 City of Fort Worth Westcliff Ph1 Professional Services Agreement Amendment Template CPN 01669 CFW Official Release 9/19/2017 Page 4 of 4 WADE TBPE Firm No. 4 TBPLS Firm No.10194374374 TRIM Wade Trim,Inc. IN3575 Lone Star Circle,Suite 410• Fort Worth,TX 76177 682.237.7718•www.wadetrim.com November 21, 2019 City of Fort Worth Capital Delivery Division/TPW 200 Texas St. Fort Worth, TX 76102 Attention: Mike Bennett, PE, Project Manager Re: Westcliff Drainage Improvements, Phase 1 - Revised Proposal for Additional Services (0) Dear Mike, As we discussed during our conference call on October 21, 2019 regarding the urgent need for selection of a final alignment to meet the City's target bid advertisement date for the Westcliff Phase 1 project, and proposed completion of the design for the City's preferred alignment, Wade Trim is providing this revised Proposal to define the additional engineering and other services needed to complete the project. This proposal incorporates the further comments the City provided on the revised proposal previously submitted. Exclusions: as previously verified by our President & CEO Andy McCune, this proposal excludes Wade Trim's effort related to development of the additional alignment options study, and design of additional alignment options following the study's review meeting. It also excludes Wade Trim's effort to design the new preferred alignment up to October 21, 2019, when the City explained that additional services already performed without the City's prior approval were not being considered eligible for compensation, and affirmed the City's intention to put the project on hold until the City could evaluate alignment options alongside future additional services. The message Wade Trim received from the City on the morning of November 20, 2019 excluded future additional work for two out of the three new junction structures; in the spirit of moving the project forward, we have revised this proposal to exclude two of the new junction structures. Regarding this revised proposal, remember that some of the proposed future effort is directly related to continued design of the new preferred storm drain alignment, while other additional effort is independent of either the original alignment or the new alignment. In the revised table that follows, are the explanations of tasks and their proposed budgets. A revised detailed level-of-effort is attached for reference. Per the City's questions on Wade Trim's proposal dated November 15, 2019, discussed by phone on November 19, 2019, along with the City's follow-up comments received by Wade Trim on November 20, 2019, this revised proposal changed and considered: • Reduced junction structure design to one new structure; • The scope and effort of roadway design has not changed; • The scope and effort of our subconsultant's participation in the Phase 2B tunnel review and observation has not changed. City of Fort Worth,Capital Delivery Division/TPW November 21,2019 Page 2 Per the City's comments on Wade Trim's proposal dated October 31, 2019, the following adjustments were incorporated previously: • Provided more information and explanations to clarify effort and answer questions; • Verified level of effort for inlet lateral design, roadway engineering and design to be performed by Wade Trim engineers, and subconsultant's additional Time & Materials effort for the Phase 2B tunnel; • Reduced proposed contacts with the City to every other week; • Reduced CADD technician effort for roadway design; • Reduced Project Manager coordination with the water& sanitary sewer design firm, and reduced Senior Engineer coordination with the Wade Trim team to incorporate the water& sanitary sewer improvements to resolve utility conflicts; • Deleted Utility Conflict Matrix effort; and • The proposed levels of effort have been vetted by other Wade Trim managers and engineering staff regarding their respective areas of expertise. IAI estcliff Phase 1, Additional Services Proposed Budget Additional services related to the preferred storm drain alignment Design of additional junction boxes, including structural engineering $ 6,965 (1 additional new junction structure) Revise inlet lateral designs (11 of 13 inlet laterals affected by revised $ 6,590 storm drain location —verified) Additional roadway and pavement engineering, assisted by CADD $ 22,870 technician (affected curbs and 2,000 LF road reconstruction on Trail Lake, Manderly, and a portion of Suffolk) Additional water and sanitary sewer conflicts (Additional conflict $ 18,000 analysis, additional Project Manager coordination with the engineering firm performing water& sanitary sewer utility design, and incorporation of additional conflict resolution designs into storm drain sheets—coordination estimates are based on Wade Trim staff's previous experience with similar coordination between engineering firms for various other City of Fort Worth projects) Total additional services related to preferred storm drain alignment $ 54,425 Additional services unrelated to storm drain alignment Bi-Weekly conference calls with the City's PM to mitigate project $ 1,800 delays (4 months remaining) Floodplain easement acquisition documents (qty 5, including survey $ 15,540 and exhibits by subconsultant PK) City of Fort Worth,Capital Delivery Division/TPW November 21,2019 Page 3 Extra subconsultant effort for Phase 2B tunnel change order $ 4,000 (Schnabel; upcoming submittal reviews and construction site visits— (T&M) Amendment 3, Task 6 Construction Phase Services is a Time & Materials contract item, where the existing budget has been utilized for Schnabel to attend multiple extra meetings precipitated by the Phase 2B tunnel change order, as well as working with the Contractor to correct many submittal deficiencies and omissions) Subconsultant mark-up (Schnabel and PK) $ 1,650 Total additional services unrelated to storm drain alignment $ 22,990 Total proposed Additional Services budget (v2) $ 77,415 We look forward to your selection, and to moving forward with the Westcliff project. Respectfully, %A/Aa. e Trim, inc. Karen Stafford-Brown, PE, Senior Project Manager 682-237-7713 office 817-507-7685 cell kstaffordbrown@wadetrim.com Ftw2004.04X cc: Linda Young, PE, Engineering Manager and Dillon Johns, Deputy Project Manager(TPW) Shawn Keough, PEmI, Steve Kalinowski, PE, and Andy McCune, PE (Wade Trim) Westcliff Amendments No. 3 and No. 4 Page 1 of Amendment No. 4 Additional Services Proposal - Manhour Breakdown 11/21/19 WESTCLIFF AMENDMENT No.4(highlighted Items) Struct Hyd Civil Tech Tech Sr Tech Proj Sr WT WT Phase 1 Imprpvrmpnfy Gtllgn t10g9F) PE PE PE EIT CADD-GIS Admin Specs Mgr Eng Labor Labor Activity Name 21 00 1 0 1U44` $1QQ � 2 0 200 $3Q Hours C t 1.1 Managing the Team Internal Project Mana ement 0 0 96 0 0 0 0 160 80 336 $69,280 Pre-Submittal OA/OC of Plans(60/90/100Bid) 0 0 24 0 0 0 0 12 12 48 $9,720 Pre Submittal CNOC of Specs(60/90/100Bid) 0 0 24 0 0 0 0 12 12 48 $9,720 1.2 Communications and Reporting Project Kick-Off Meeting0 0 4 0 0 0 0 4 0 8 $1,520 Month) Project U date Meetin s/Calls(Deli n-9) 0 0 18 0 0 0 0 14 14 45 $9,315 WMWFMN0 4 0 Ei 0 @ 4 Monthly Project Update Meetings/Calls(Construction-27 0 0 54 0 0 0 0 41 41 135 $27,945 Monthly Invoices(Design-9) 0 0 45 0 0 0 0 0 0 45 $8,100 Monthly Invoices(Construction-27) 0 1 0 135 0 1 0 0 0 0 0 135 $24,300 Monthly MWBE Reports(Design-9) 0 1 0 0 0 0 9 0 5 0 14 $1,675 Month) MWBE Reports(Construction-27) 0 1 0 0 0 0 27 0 13 0 40 $4,625 Monthly P6 Schedule Updates(9) 0 0 9 0 0 0 0 6 0 15 $2,820 Conduct Plan Review Meetings(60/90/100) 0 0 12 0 0 0 0 12 0 24 $4,560 Coordination Meetings/Calls w/Water Department 0 0 8 0 0 0 0 8 0 16 $3,040 Coordination Meetings/Calls w/Streets Division 0 0 8 0 0 0 0 8 0 16 $3,040 Coordination Meetings/Calls w/Parks Department 0 0 8 0 0 0 0 8 0 16 $3,040 0 0 lip 40 0 0 35 0 306 M 949 $48400 2.2-Drainage Computations(If Authorized Step Pool Channel Improvements Layout 0 2 8 0 16 0 0 0 6 32 $4,940 Step Pool Hydraulics 0 1 8 16 6 0 0 0 2 0 32 $5,750 2.3-Subsurface Utility Engineering Coordination 0 0 12 0 0 0 0 4 0 16 $2,960 (Subconsultant Budget at Bottom) Task 2-ConceliA,00811P 6 is 36r12 is 0 a 6 60 3.1-Development of Preliminary Design Drawings Include Plat/Easement Information in Plans 0 0 6 0 0 0 0 0 18 $2,820 Include Environmental Assessment Information in Plans 0 0 18 0 0 0 0 0 32 $5,200 60%CivilDesign-Ad dress City Comments 0 8 60 0 0 0 1 8 16 172 1 $29,600 60%Civil Design-Add Dimensions from ROW,etc. 0 0 [ff1224 0 0 0 0 0 16 $2,460 60%Civil Design-Finalize Inlet Calculations 0 24 0 0 0 2 4 70 $12,560 i of iS 4 0 2 4 60%Civil Design-Finalize Calculations Plans Presentation 0 24 0 0 0 0 4 48 $9,120 60%Civil Des! n-Add HGL's to Profiles 0 4 0 0 0 0 2 22 $4,040 60%Civil Design-Outfall Improvements 0 8 0 0 0 8 8 60 $10,840 60%Civil Design-Update Downstream Assessment 0 30 0 0 0 6 4 64 $12,240 60%Civil Design-Construct on Details 0 0 0 0 0 0 4 24 $4,040 60%Civil Design-Traffic Control Plan 0 0 0WOO 8 0 18 $3,120 60%Civil Design-Detour Plan 0 0 2 8 to 8 0 18 $3,120 60%Civil Design-Traffic Control Details 0 0 2 8 4 0 14 $2,320 60%Structural Desi n 30 0 2 20 2 2 76 $12,460 AttditbnOwilli Structural i adddonsi ou t res 4c 0 1 7 7 1 1 27 1 $04 60%Specs/Project Manual 16 1 0 18 22 0 0 5 13 4 78 $14,390 Update OPCC 3 1 0 6 0 0 0 0 1 1 11 $2,160 Update Project Decision Log 0 1 0 2 0 0 0 0 0 0 2 $360 3.2-Geotechnical Investigation/Pavement Desi n Coordinate Pavement Cores Needed 0 0 2 2 0 0 0 2 1 7 $1,300 Incorporate Data from Cores into Pavement Repair Design 0 0 4 6 0 0 0 2 0 12 $1,990 1 00 0 q 0 0 2 2 I Coordinate w/Streets Division for POL/MOL Recommendations 0 0 4 0 0 0 0 4 0 8 $1,520 0 0 2 Q 0 2 0 # 3.3-Constructability Review Schedule&Attend Constructabili Review Meetin 0 0 4 0 0 0 0 4 0 8 $1,520 Prepare&Submit Meeting Notes/Minutes/Comments 0 0 4 0 0 0 0 1 1 6 $1,170 3.4-Public Meeting Prepare Exhibits 0 2 2 6 0 0 0 0 1 11 $1.880 Attend Public Meetin 0 0 5 0 1 0 0 0 5 0 10 $1,900 3.5-UtilityClearance Communicate w/Ci Staff Regarding Potent al Issues 0 0 4 2 0 0 0 2 1 9 $1,660 0 0 6 a 0 0 a a 4 4rF Create&Upload DWF Files to Buzzsaw 0 0 2 6 0 0 0 0 0 8 $1,230 Task 3-Pirellimitmy Des SWR 50 104 325 329 79 0 5 96 61 Idm Si7$XM 4.1-Pre-Final Design Drawings(90%) 90%Civil Design-Address City Comments 0 0 60 80 0 0 0 6 8 154 $25,600 90%Structural Desi n 18 0 0 0 0 0 0 0 0 1 18 $3,780 AIRS 90% 6 0 0 0 0 6 0 e 0 a _ 90%Soecs/ProiectManual 6 0 46 6 1 0 10 31 31 4 124 1 $23,810 Westcliff Amendments No. 3 and No. 4 Page 2at3 Amendment No. 4 Additional Services Proposal - Manhour Breakdown 11/21/19 Check Water Department Plans for Coordination 0 r 0 16 6 0 0 0 4 4 30 $5,550 Coordinate w/Streets Division for Final Limits 0 0 2 2 0 0 0 2 0 6 $1,050 4 # E $ A 4 Update OPCC 0 0 4 0 0 0 0 1 1 6 $1,170 Update Project Decision L 0 0 2 0 0 0 0 0 1 3 $610 4.2-Final Design Drawin s(100%) 100%Civil Design-Address City Comments 0 0 30 40 0 0 0 4 8 82 $14,000 100%Structural Design 18 0 0 0 0 0 0 0 0 18 $3,780 10094 4 0 0 0 4 C Check Water Department Plans 0 0 16 6 0 0 0 4 4 30 $5,550 Incorporate Water Department Plans 0 0 24 36 0 0 0 16 16 92 $16,740 WMer Coordinate w/Streets Division for Final Limits 0 0 2 2 0 0 0 2 0 6 $1,050 # @ Incur orate Streets Division Specs 0 0 8 16 0 0 0 4 2 30 $5,060 Inco orate Water Department Specs 0 0 24 24 0 0 0 16 4 1 68 $12,000 100%Specs/Project Manual 6 0 24 24 0 0 16 16 4 90 $16,460 Update OPCC 0 0 8 4 0 0 0 2 2 16 $2,920 Update Project Decision Log 0 0 4 0 0 0 0 0 2 6 $1,220 Create&Upload DWF's of All Plans 0 0 2 8 0 0 0 0 0 10 $1,520 Task 4-Fktat Des rk 813-100% as 0 307 302 0 0 1 47 124 79 90 "1112-3ee 5.1-Bid Support Sell Contract Documents and Maintain Plan Hollers List 0 0 4 0 0 16 0 8 0 28 $3,520 Log 8 Answer Bidder's Questions(Issue Addenda) 4 0 40 0 0 0 0 12 8 64 $12,440 Attend Pre-bid Conference 0 0 4 0 0 0 0 4 0 8 $1,520 Attend Bid Opening 0 0 4 0 0 0 0 4 0 8 $1,520 Tabulate Bids and Recommend Award 0 0 8 4 0 0 0 4 0 16 $2,826 Issue Conformed Contract Documents 0 0 4 4 0 0 0 4 4 16 $3,100 5.2-Final Design Drawings PDF Drawings 0 0 12 0 0 0 0 8 0 20 $3,760 DWFDrawings 0 0 8 0 0 0 0 2 0 10 $1,840 DWG Sheet File Drawings(Bound) 0 0 8 0 0 0 0 2 0 10 $1,840 Task 5-Sid Phase Services 4 s a2 a s 1s 6 48 12 in $3"" 6.1-Construction Support V� Attend Preconstruction Conference 0 0 4 F 0 0 0 0 4 6 $1,720 Attend Public Meetin 0 0 4 0 0 0 0 4 8 $1,720 Project Site Visits 0 0 42 0 0 0 48 0 90 $17,160 Submittal Review16 16 28 0 0 0 40 8 108 $21,600 Request for Information/Change Order Review0 0 40 0 0 0 40 24 104 $21,200 Final Walk Through and Punch List 0 0 16 0 0 0 0 16 8 40 $8,080 rPh.2B CPh.2B C onst.Supp.Used for Cox McLain+Management 0 0 20 20 0 20 20 18 16 114 $19,600 6.2-Record Drawings Create Record Drawings from Construction Information 0 0 12 24 0 0 0 0 2 38 $6,140 Create&Upload New PDF&DWFs 0 0 4 8 0 0 0 0 1 13 $2,130 Task 8-C.W WftttkM Phase SVVICM &M t6 1a 17a 52 0 20 20 1 162 67 =3 7.2-ROW/Easement Preparation&Submittal Finalize Easement Documents 0 0 2 0 0 0 0 2 2 6 $1,260 ModOOTANn" 0 i 5 0 0 0 0 a 0 Coordination w/Survey Subconsultant 0 0 2 0 0 0 0 2 0 4 $760 coordination w/Survey Subconsultant for floodplaim_ _ 0 0 3 0 0 0 0 3 0 6 $1,140 7.3-Temporary Right of Entry Prepare,Mail,&Obtain Temporary ROE from Landowners 0 0 2 0 0 0 0 2 0 4 $760 7.4-Parks Conversion Finalize Limits of Conversion Area,Access,etc. 0 0 4 2 0 0 1 0 2 2 10 $1,910 Coordination w/Survey Subconsultant 0 1 0 2 0 0 0 0 2 0 4 $760 Prepare Exhibits 0 0 4 8 0 0 0 2 0 14 $2,280 Attend Meetings 0 0 10 0 0 0 0 0 0 10 $1,800 Task 7-ROW Eettement 0 a 34 10 0 0 rO 20 4 68 €12,ST0 8.1-Design Survey Coordination w/Survey Subconsultant 0 0 16 0 0 0 12 4 32 $6,280 Task 8- a 0 15 0 0 0 12 4 32 $6,280 9.1-SWPPP iSWM Construction Plan 0 0 8 12 0 0 0 2 2 24 $4,080 Prefiminary iSWM Checklist 0 0 2 0 0 0 0 0 1 3 $610 Final iSWM Checklist 0 0 2 0 0 0 0 0 1 3 $610 9.2-Environmental Services Coordinate w/Environmental Subconsultant 0 0 24 0 0 0 0 12 4 40 $7,720 Examine Altematives 0 8 10 10 0 0 1 0 2 2 32 $5,750 Prepare Exhibits,Calculations 0 1 12 20 20 0 0 0 2 2 56 $9,800 Westcliff Amendments No. 3 and No. 4 Page 3of3 Amendment No. 4 Additional Services Proposal - Manhour Breakdown 11/21/19 Attend Meetings 0 0 8 0 0 0 t 0 8 0 16 $3,040 Task 9-PermitUng 0 20 74 42 0 0 0 26 12 174 $31,610 TOTAL W r Labor Budget 139 150 1499 749 95 72 72 794 406 3976 $121,635 Subconaultant Bud is _ RIOS-SUE Survey(2.2.1) _ _ $3,700 _ RIOS-SUE B,C,D 2.2.1 $12,500 RI nt-SUE A 2.2.1 _ _ 2 SUE Sub-Consulta Total(R I OS) $18,700 PK-Topo Survey(8.1) _ $10,500 PK-Property Survey(7.2) $14,400 PK-Meets&Bounds for Parks Conversion(7.4) $4,000 PK-Tree Survey(7.4) $2,500 PK-Floodplain easement acquisition exhibits(q 5) $12,500 PK-Bidding Assistance(5.1.5 and 5.1.6) $10,000 PK-Construction Assistance(6.1.3 and 6.1.4) $10,000 Surve Sub-Consultant Total(Pacheco Koch) $63,900 Westra-Hydraulic Computations 3.1 j $11,500 Westra-OA/OC&Calculations(3.1&4.1) S39,700 Hydrology Sub-Consultant Total(Westra) $51,200 Phase 2B Tunnel Inspection&Construction Phase Services _ _ $14,000 ..Additional Phase 2B Tunnel inspection&Construction Phase Services 00 Tunnel Inspection&Construction Phase Services Sub-Consultant $18,000 Total Schnabell AGG-Pavement Cores $3,850 AGG-Soil Type Samples $1295 Geotsch Sub-Consultant Total AGG $5,145 Total Sub-Consultant Budget- $156 945 10%Sub Markup-original $14,045 10%Markup on Additional subconsultant services _ $1,650 10%Sub Marku _ _ $15,695 WT Exvense Bud t 1 $20 000 Total $914,275 Amendment 3 $836.860 Amendment 4 $77,415 Westcliff Amendment No. 4 Prime and Subconsultants Breakdown 11/21/19 Fee %of Total SBE Amendment 4 Total $ 77,415 100% Prime Consultant Wade Trim $ 60,915 79% Subconsultants Pacheco Koch $ 12,500 16% X* Schnabel $ 4,000 5% *Participation exceeds 6% SBE goal for project DOE PROJECT-(_BID NUMBER FORT WORTH 01669(Please check one) Minority/Women Business Enterprise Office LETTER OF INTENT TO PERFORM AS A SBE SUBCONTRACTOR/SUBCONSULTANT [NOTE: Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, SBE firms participating under the Ordinance must be certified prior to recommendation of award in order to be counted towards subcontracting participation. A Small Business Enterprise(SBE)is defined as a business concern located in the marketplace that meets the Unites States Small Business Administration definition of a small business as outlined in the code of Federal Regulation 13 CFR 121. Firms certified as a Disadvantaged Business Enterprise (DBE) also meet small business enterprise requirements.] 1. Name of Project Westcliff Drainage Improvements,Amendment No.4 2. Name of Offeror/Prime contractor Wade Trim, Inc. 3. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project(where applicable specify"supply"or"install"or both): Surveying & Floodplain Easement Acquisition Document Preparation (special services) at the price of$12,500 Pacheco Koch Consulting Engineers, Inc. 12/10/2019 (Name of SBE Firm) (Date) Mark A. Pacheco P.E. R.P.L.S. .... Circle one iOjR 7/Authorized Agent of SBE firm)Type or Print Name (Signature of 0 ner or Authorized Agent of SBE firm) mpacheco -Pkce.com (972)235-3031 /(972)235-9544 (Email Address to appear on Listings provided by the MWBE Office) (Office and Fax Numbers) AFFIDAVIT OF Offeror/Prime CONTRACTOR I HEREBY DECLARE AND AFFIRM that I,Shawn Keough am the duly authorized representative of Circle one(Owne thorized A e Wade Trim, Inc. and that I have personally reviewed the material and Name of Prime Contractor facts set forth in this Letter of Intent to Perform. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth Business Diversity Enterprise Ordinance, any person [entity]who makes a false or fraudulent statement in connection with participation of a SBE in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth Business Diversity Enterprise Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the Prime Contractor are true and correct,and that I am authorized on behalf of the Prime Contractor to make the affidavit. Shawn Keough Wade Trim, Inc. Circle One(Owner/Authorized Agent)Type or Print Name (Name of Prime Contractor-Print or Type) -� ��_�' 12/10/2019 (Signature of Owner or Authorized Agent) (Date) (734)947-2622 n/a (Office Number) (Fax Number) 6/1/2012