HomeMy WebLinkAboutContract 34355 AMENDMENT NO. 2
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and DMJM Aviation, Inc (Engineer)
made and entered into City Secretary Contract No. 31732 (the Contract) which was
authorized by the City Council by M&C C-20624 on the 29th day of March, 2005; and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Service For:
D.O.E. NO. 4710 : Upgrade Wind Cones and Signs
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated August 18, 2006, a copy of which is attached hereto
and incorporated herein. The cost to City for the additional services to be performed by
Engineer total $ 4,196.00
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of$50,985.43
3.
All other provisions of the contract,which are not expressly amended herein, shall
remain in full force and effect.
ORIGINAL
R4, !-N�Hh, MY.
EXECUTED on this the 1 5� day of 2006, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPRO D:
A.Douglas Rademaker, P.E. arc Ott
Director, Department of Assistant City Manager
Engineering
DMJM Aviation, Inc.
ENGINEER
ATTEST:
Mart Hendrix, City Secretary
t
By: o
z a
Nam 4V.P.
Beratan, P.E. NO MSC REQUIRED
& Chief Administrative Officer
APPROVE A O FORMGALITY:
Amy amsey
Assistant Cit At�07
ney
1
MAs TEK Engineering
August 18, 2006 &Associates, Inc.
DMJM AVIATION/AECOM
1200 Summit Avenue, Suite 320
Fort Worth, Texas 76102-4409
Attention: Larry Gaines
Re: CMT Testing Proposal
Ft. Worth Alliance Airport
Signage and Wind Cone Improvements
Fort Worth, Texas
Mas-tek Proposal No.8-02-C
Mas-Tek Engineering & Associates is delighted to submit this
proposal and fee schedule for the following Construction Material
Testing -Services on the above referenced project:
• Earthwork/Soils Testing
• Underground Cable/Electrical Duct Backfill Testing
• Concrete Testing
Total Estimated Amount-----------$4,196. 00
At your earliest convenience, please sign in the space provided
below as your agreement for us to perform testing as described
above. Mail or FAX (972-709-7385) a copy of this signed document
for our files. We look forward to performing testing service on
the project upon receiving this or other signed correspondence.
We appreciate the opportunity to serve you. If you have any
questions please- contact our office.
Sincerely yours,
�-Tek & Assoc. , INC.
r
Aaron CoN� e
tton, Jr.
Supervisor of Technical Services
ACJ/acj
Attachment: Schedule of Fees
Confirmed/Agreed to this day of , 2006
Company: By:
Title: -
Geotechnical Consulting & aerials Testing
3228 Halifax,Suite B Dallas,Texas 52f7 972 709-7384,7
pp .';f..�r 1•�n �
DMSM AVIATION/AECOM
SCHEDULE OF FEES
CONSTRUCTION MALT MAi S ENGINEERING&TESTING
SIGNAGE AND WIND CONE H"ROVEMENTS AT ALLIANCE AIRPORT MAS-TEK PROPOSAL NO.9-02•C
DESCRIPTION OF SERVICES QUANTITY UNIT FEE UNIT FEE
j EARTHWORK/SOILS TESTING
• Standard Proctor(ASTM D-698) 2 @ $155.00 each $310.00
Atterberg Limit Test 2 @ $45.00 each $90.00
In-Place Density Test(ASTM D2922) 9 @ $20.00 each $180.00
Senior Engineering Technician 8 @ $39.50 each $316.00
j Project Manager(Qa/Qc) 2 @ $75.00 each $150.00
Trip Charge 2 @ $30.00 each $60.00
Sub-Total $1,106.00
UNDERGROUND CA13LE/ELECTRICAL DUCT BACKFILL TESTING
Standard Proctor(ASTM D-698) I @ $155.00 each $155.00
Atterberg Limit Test 1 @ $45.00 each $45.00
In-Place Density Test(ASTM D2922) 10 @ $20.00 each $200.00
Senior Engineering Technician 8 @ $39.50 each $316.00
Project Manager(Qa/Qc) 2 @ $75.00 each $150.00
Trip Charge 3 @ $30.00 each $90.00
Sub-Total $956.00
CONCRETE TESTING
• Concrete Testing by Senior Engineering Technician 32 @ $39.50 each $1,2600
• Concrete Cylinders(4 Cyls.Per trip) 32 @ $15.00 each $480.00
Project Manager(Qa/Qc) 2 @ $75.00 each $150.00
Trip Charge 8 @ $30.00 each $240.00
Services listed above do not Include aggregate testing
Sub-Total S2,134.00
ESTIMATED TOTAL S4,1%.00
NOTES:
1. Overtime rates of 1.5 tunes the regular hourly rate will be charged for hours worked over eight(8)hours.
per day Monday thru Friday or any time before 7:00 a.m.or after 5:00 p.m. Service performed on Saturdays
and Sundays will be billed at 1.5 times the regular hourly rate.Services performed on recognized holidays
will be billed at 2.0 times the regular hourly rate.
2. All laboratory test fees are F.O.B.our laboratory;additional charge for sample pickup rnay apply.
3. Any additional tests will be billed on a hourly rate and charged at the applicable rate.portal-to-postal.
4. Additional test not specified in this proposal will be quoted upon request,
5. This proposal does not include any technician stand-by,non-readiness charges,and/or trips or re-tests. Q
previous failing tests. � ,1 ,
Schedule of Fees Page 1 of 1 FIR