Loading...
HomeMy WebLinkAboutContract 34369 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. LL uq (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall & Perkins, Inc. (Engineer) made and entered into City Secretary Contract No. 29059, (the Contract) which was authorized by the City Council by M&C C-19729 on the 26th day of August, 2003; and WHEREAS, the Contract involves engineering services for the following project: Walsh Ranch Sanitary Sewer Extension, Phases IVA and IVB WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include a additional engineering services specified in M&C C-21724, adopt by the City Council on September 26, 2006, and further amplified in a proposal letter dated July 11, 2006, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $42,292.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $304,392.00. t VORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of ! 2006, in Fort Worth, Tarrant County, Texas. ATTEST: ~�- Y� Cor.y,act Authorization Marty Hendrix Date City Secretary APPROVAL RECOMMENDED: APPRO A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering TEAGUE NALL 6 PERKINS, INC. Engineer Name:Mark R. Berry, P.E. , Treasurer 1100 Macon Street Fort Worth, TX 76102 APPR D AS T LEGALITY: Assis n City torne -2- a •'if�l� Responsive N-, TEAGUE NALL AND PERKINS Civil Engineering I Surveying Landscape Architecture Planning July 11, 2006 Mr. Liam Conlon Project Manager Department of Engineering City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: Walsh Ranch Sanitary Sewer Extension Project No. PS46-070460140320 D.O.E. Project No. 4162 Fee Proposal for Contract Amendment No. 1 Dear Mr. Conlon: Teague Nall and Perkins, Inc. is submitting this fee proposal for Amendment No. 1 to the contract for the above referenced project based on additional services requested. The following is a brief description and cost for the additional services provided on this project: 1. Realignment of Sanitary Sewer Main Across Cramer Property In order for the City of Fort Worth to acquire the easements to construct the Walsh Ranch Phase IVA sewer main across the Cramer property, approximately 1,600 feet of the sewer main has to be redesigned to follow a new route. A letter dated July 26, 2005 from TNP to the City summarizes the events leading to the alignment change. In addition to the engineering effort associated with the alignment change, it was also necessary to perform topographical surveys and revise the easement documentation. A summary of the additional engineering and surveying costs is presented below: Sewer Main Redesign: = $ 12,500 Topographical Survey: = $ 7,000 Easement Documentation: = $ 1,300 Subtotal for Item 1: = $ 20,800 2. Additional Right-of-Way Acquisition Services The original contract included three hours for appraiser testimony at a special commissioners hearing. Any time beyond the three hours was to be included as additional services. The original contract did also not include update appraisals in the scope. The Cramer easement acquisition went to condemnation and required an updated appraisal and additional hours for the appraiser and right-of-way agent to prepare for the hearings. The Lost Creek Golf Club was scheduled to go to condemnation, but it was avoided through extensive negotiations conducted by the right-of-way agents. An updated ra'sal was also conducted for the Lost Creek Golf Club property. A summary of the additior akservices associated with the easement acquisition is presented below: t r. 1100 Macon Street Fort Worth,Texas 76102 , 817.336.5773 phone 817.336.2813 fax www.tnp-online.com L Updated Appaisal for Lost Creek Golf Club: _ $ 3,500 Updated Appraisal for Cramer Property: _ $ 2,631 Additional Hours for Cramer Condemnation: _ $ 11,736 Additional Hours to Avoid Condemnation on Lost Creek: _ $ 3,625 Subtotal for Item 2: _ $ 21,492 Total Contract Amendment No. 1: _ $42,292 Summary of Contract Fee: Original Contract Amount: $262,100.00 Amendment No. 1: $ 42,292.00 Revised Contract Amount: $304,392.00 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE N L AND PERKINS, INC. Ty Hilton, P.E. Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9/26/2006 DATE: Tuesday, September 26, 2006 LOG NAME: 30WALSHIVAB TNP REFERENCE NO.: **C-21724 SUBJECT: Authorize Execution of Amendment No. 1 to Engineering Agreement with Teague Nall & Perkins, Inc., for Walsh Ranch Sanitary Sewer Extension, Phases IVA and IVB RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execut mendmen No. 1 to City Secretary Contract No. 29059 with Teague Nall & Perkins, Inc., in the amount of$42,292.00, provide for additional engineering services, thereby increasing the contract amount to $304,39 . DISCUSSION: On August 26, 2003, (M&C C-19729) the City Council authorized an engineering agreement with Teague Nall & Perkins, Inc., in the amount of $262,100 for Walsh Ranch Sewer Main Extension, Phases IVA and IVB. Amendment No. 1 will provide compensation for the following: • Additional design for the realignment of the project sewer main across private property. The owner of the property had initially agreed to the original alignment but later objected. In order to expedite construction of the project, staff agreed to redesign the route of the sewer main. • Additional effort involved with easement acquisition beyond the original project scope. The project will be located in COUNCIL DISTRICT 7 and pending the completed annexation for the project, Mapsco 71 S, T, W and X. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper—Sewer Fund. TO Fund/Account/Centers FROM Fund/Account/Centers PS46 531200 070460140320 $42,292.00 Submitted for City Manager's Office by: Marc a. Ott (8476) v � 111 � J Originating Department Head: A. Douglas Rademaker(6157) http://www.cfwnet.org/council_packet/Reports/mc_piint.asp 9/27/2006 Page Z of Z Additional Information Contact: Liam Conlon (6824) ✓ '�� J�c=?l �(Iu�iV��/�JJ�� http://www.cfwnet.org/council_packet/Reports/mc_print.asp 9/27/2006