Loading...
HomeMy WebLinkAboutContract 36654-A1 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. ti � COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and TranSystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 36654 (the Contract) which was authorized by the City Council by M&C C-22627 on the 22nd day of January, 2008; and WHEREAS,the Contract involves engineering services for the following project: Engineering Services Related to the Bridge Maintenance Program. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 28, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $84,230.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$234,230.00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD 0 4 2 l-0 g €'01 :0 5 IN CITYSECRETARY FT.WORTH,TX -23-0 9 A 1 0 :55 IN ORIGINAL l EXECUTED on this the q-i-4 k day of 2009, in Fort Worth, Tarrant County, Texas. ATTEST: CITY OF FORT WORTH: v. Marty Hendrix Fernando Costa, City Secretary 2 Assistant City Manager U a'q Contract Authorization APPROVAL RECOMMENDED: 0 c, Date William A. Verkest A Director—Transportation and Public Works APPROVED AS TO FORM ENGINEER: AND LEGALITY: TranSystems Corporation Consultants By.Wresident C Assistant C' ttorney Josrson, P.E. Vic 500 West Seventh Street Fort Worth, TX 76102 OFFICIAL RECORD CITYSECRETARY FT.WORTH,TX —� TranSystems Bank of America Building 500 West 7th Street Suite 1100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com August 28,2008 Mr.Najib Fares,P.E. Infrastructure Manager City of Fort Worth Department of Transportation Public Works 1000 Throckmorton Fort Worth,TX 76102 RE: Request for Additional Fees-Fort Worth Bridge Maintenance Contract Mr.Fares: Per our previous discussions TranSystems Corporation Consultants is requesting a contract amendment for the consulting fees associated with the additional scope of work for the Fort Worth Bridge Maintenance Contract. These fees are in addition to our previous bridge maintenance contract amount of$150,000.00. The original contract amount was based on our scope of work for the inspection, recommendations and the preparation of a single bid document for work related to the rehabilitation of two(2) bridges;at W. Lancaster Avenue and W. Seventh Street(at Forest Park).This request is for services associated with changes to the original scope of work and the preparation of two(2) additional bid packages for the rehabilitation of nine(9) additional bridges.All work shall be in accordance with the existing contract and provisions. The following summarizes the scope and fees for each Bid Package: Bridge Maintenance Services Contract Addendum: A. Bid Package 1 (2008-17): W.Lancaster Avenue Bridge Rehabilitation: Changes to the scope of work included providing separate bid documents for the W. Lancaster Avenue Bridge project and the W. 7h Street Bridge project. Additional design includes revisions to bridge estimates; additional coordination meetings and design time and preparation of details (plans &specifications)for the rehabilitation of 42 truss members. While the fees for the design of the revised rehabilitation work increased,the estimated construction cost was significantly reduced by changing the scope of the project from full replacement of 42 existing rocker bearings (with pot bearings), to the rehabilitation of 42 existing bearings (cleaning, greasing and painting) and strengthening of the existing vertical truss bearing members at the same locations (2 separate designs).These fees are in addition to the proposed$75,000 previously submitted for this project. Additional Labor: $10,500.00 Additional Reimbursables: $300.00 Total Additional Fees Bid Package 1 (2008-17): $10,800.00 B. Bid Package 2(2008-16): Bridge Repair and Repainting at Various Locations: W.7th St, (original scope) E. Fourth St Riverside Drive S. University Dr(North Bound) N.University Dr(North Bound) S. University Dr(South Bound) Engineering services for the W. Seventh Street Bridge rehabilitation project was expanded to include rehabilitation of five (5) additional bridges. Notice to proceed was provided by email. Additional design included detailed site investigations (including bridge component measurements and photos), coordination meetings, preparation of plans, specifications and estimates and construction administration services for each bridge. These fees are in addition to the proposed $75,000 previously submitted for the W. Seventh Street Bridge Rehabilitation project. Additional Labor: $50,000.00 Additional reimbursables: $500.00 Total Additional Fees Bid Package 2(2008-16): $50,500.00 C. Bid Package 3(2008-18): Bridge Repair at Various Locations: Long Avenue(East Bound) Berry Street at Sycamore Creek Long Avenue(West Bound) Seminary Drive(East Bound) Additional work for the bid documents associated with the rehabilitation of four (4) additional bridges. Notice to proceed was provided via email. Fees include detailed site investigations (including measurements and photos), coordination meetings, and preparation of plans, specifications and estimates for the bid package and construction administration services. Labor: $22,430.00 Reimbursables: 500.00 Total Fees Bid Package 3(2008-18): $22,930.00 TOTAL ADDENDUM BRIDGE MAINTENANCE CONSULTANT FEES: $84,230.00 If you have any questions, please feel free to give me a call at(817)334-4477. 1 look forward to hearing from you soon. Sincerely, TranSystems Corporation Consultants Teresa M. Dellies, P.E. Project Manager cc:Vile G:1FW07104911ProjectMgmt\Amendments1202070491-Fee Amendment-2008-08-28.dou - TranSystems Bank of America Building 500 West 7h Street Suite 1100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.transystems.com October 9, 2008 Mr.Najib Fares,P.E. Infrastructure Manager City of Fort Worth Department of Transportation Public Works 1000 Throckmorton Fort Worth,TX 76102 RE: Request for Additional Fees-Fort Worth Bridge Maintenance Contract Mr.Fares: Per our previous discussions TranSystems Corporation Consultants is requesting a contract amendment for the consulting fees associated with the additional scope of work for the Fort Worth Bridge Maintenance Contract. These fees are in addition to our previous bridge maintenance contract amount of$150,000.00. The original contract amount was based on our scope of work for the inspection, recommendations and the preparation of a single bid document for work related to the rehabilitation of two(2) bridges;at W.Lancaster Avenue and W. Seventh Street(at Forest Park),This request is for services associated with changes to the original scope of work and the preparation of two(2)additional bid packages for the rehabilitation of nine(9) additional bridges.All work shall be in accordance with the existing contract and provisions, The following summarizes the scope and fees for each Bid Package: Bridge Maintenance Services Contract Addendum: A. Bid Package 1 (2008-17): W. Lancaster Avenue Bridge Rehabilitation: Changes to the scope of work included providing separate bid documents for the W. Lancaster Avenue Bridge project and the W. 7t^ Street Bridge project.Additional design includes revisions to bridge estimates; additional coordination meetings and design time and preparation of details (plans &specifications)for the rehabilitation of 42 truss members. While the fees for the design of the revised rehabilitation work increased,the estimated construction cost was significantly reduced by changing the scope of the project from full replacement of 42 existing rocker bearings (with pot bearings), to the rehabilitation of 42 existing bearings (cleaning, greasing and painting) and strengthening of the existing vertical truss bearing members at the same locations (2 separate designs).These fees are in addition to the proposed$75,000 previously submitted for this project. Additional Labor: $10,500.00 Additional Reimbursables: $300.00 Total Additional Fees Bid Package 1 (2008-17): $10,800.00 B. Bid Package 2(2008-16): Bridge Repair and Repainting at Various Locations: W.701 St,(original scope) E.Fourth St Riverside Drive S. University Dr(North Bound) N.University Dr(North Bound) S. University Dr(South Bound) Engineering services for the W. Seventh Street Bridge rehabilitation project was expanded to include rehabilitation of five (5) additional bridges. Notice to proceed was provided by email. Additional design included detailed site investigations (including bridge component measurements and photos), coordination meetings, preparation of plans, specifications and estimates and construction administration services for each bridge. These fees are in addition to the proposed $75,000 previously submitted for the W,Seventh Street Bridge Rehabilitation project. Additional Labor: $50,000.00 Additional reimbursables: $500.00 Total Additional Fees Bid Package 2(2008-16): $50,500.00 C. Bid Package 3(2008-18): Bridge Repair at Various Locations: Long Avenue(East Bound) Berry Street at Sycamore Creek Long Avenue(West Bound) Seminary Drive(East Bound) Additional work for the bid documents associated with the rehabilitation of four (4) additional bridges. Notice to proceed was provided via email. Fees include detailed site investigations (including measurements and photos), coordination meetings, and preparation of plans, specifications and estimates for the bid package and construction administration services. Labor: $22,430.00 Reimbursables: $500.00 Total Fees Bid Package 3(2008-18): $22,930.00 TOTAL ADDENDUM BRIDGE MAINTENANCE CONSULTANT FEES: $84,230.00 If you have any questions, please feel free to give me a call at(817)334-4477. 1 look forward to hearing from you soon. Sincerely, TranSystems Corporation Consultants Teresa M. Dellies, P.E. Project Manager cc:\file GAM07104911Proiec ftmMmendments1202070491-Fee AmendmeWeAdom City of Fort Worth BRIDGE REPAIR AT VARIOUS LOCATIONS-(Bid Package 3) FEE PROPOSAL 9/20/2008 LABOR COSTS: TASK DESCRIPTION Principal in Charge Project Manager Design Engineer Project Engineer Sr.Engineering CADD CADD CLERICAL TOTAL HOURS TOTAL FEE Charge Manager Engineer Engineer Technician Technician Technician Bid Documents,Plans&Design 0 10 60 0 55 6 0 8 0 $ 18,350.00 Proposal Quantity Summary Sheets Project Layout Sheets Detads General Notes,Specificatans and Estimate QA/QC Site Visits(Identity&Quantty Required Repairs) Design and Review Meetings Administrative&Accounting Construction Support 0 20 4 0 0 0 0 0 24 S 4,080.00 Attend pre—nstruction meeting 4 4 $ 680.00 Respond to RFI's 4 4 $ 680.00 Review shop drawings 4 t 8 $ 1.360.00 Ste Visits dunrg Construction 8 8 $ 1.360.00 TOTAL HOURS: 0 30 64 0 55 6 0 8 24 S 22,430.00 AVERAGE HOURLY SALARY RATE: $ 210.00 $ 170.00 $ 170.00 S 150.00 $ 100.00 $ 85.00 8 65.00 $ 55.00 BASE SALARY COST: S - $ 5,100.00 $ 10,880.00 $ - $ 5,500.00 $ 510.00 $ - $ 440.00 SUB-TOTAL LABOR COSTS: $ 22,430.00 TOTAL LABOR COST: $ 22,430.00 1.0000% DIRECT COSTS: hem Expense ESTIMATED UNITS UNIT RATE ESTIMATED COST Binding 30 EA S 3.00 S 90.00 812"X I V copies Sheet 1 J $ 280.00 1 VX17'copies Z00 Sheet $ - S 100.00 11-X17"Mylar Sheet $ 20.00 Waage - M4e !',45 $ 11.13 TOTAL: $ 501.13 TOTAL COSTS: TOTAL LABOR: $22430.01 $ 22,430.00 TOTAL NON-LABOR: $501.1 $501.13 TOTAL LABOR&NON-LABOR COST: $22 931.1 $22.111.11 C"of Fon�+ionn t aermoe Page 4 of 4 e.eye w—.—comma Letter of Transmittal 500 West 7h Street,Suite 1100 Fort Worth,Texas 76102 T 817-339-8950 F 817-336-2247 www.transystems.com To: Mr.Tariqul Islam From: Teresa Dellies,P.E. T/PW Infrastructure TranSystems Corporation Consultants --.._............................_..................................._...................................................................._................._....................._......................... ............._......................................................................................_._......_..............................................................----....-......................................................................._._... City of Fort Worth,TX Subject: Contract Amendment No. 1 Documents City Contract 36654 Date: 04-15-2009 Project Name: Bridge Maintenance Contract No.of Pages: 13 Project No: P202070491 Handling Instructions: ® URGENT!! ❑ Please Confirm Receipt ❑ Approved as Submitted ❑ Approved as Noted ❑ For Your Information and Use ❑ For Review and Comment ❑ Returned for Corrections ❑ Rejected ❑ As Requested ® For Approval ❑ See Comments ❑ Sent under separate cover via the following items: ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Copies Date Description 6 2009 Contract Amendment No. 1 -Contract Documents Comments: Tariq, Please process immediately. Thank you, Teresa Deliver Via: ❑Overnight Service(FedEx,UPS,DHL) ❑Courier/Messenger ® Hand Deliver ❑ Mail , file P202070491 CC: Signature: Print: Teresa Dellies,P.E. c a City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/31/2009 DATE: Tuesday, March 31, 2009 REFERENCE NO.: **C-23410 LOG NAME: 20TRANSYS 2ADM SUBJECT: Authorize Amendment No. 1 in the Amount of$84,230.00 to City Secretary Contract No. 36654 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants of Fort Worth, Texas, for Engineering Services Related to the Bridge Maintenance Program RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 in the amount of$84,230.00 to City Secretary Contract No. 36654 with TranSystems Corporation, d/b/a TranSystems Corporation Consultants of Fort Worth, Texas for additional engineering services related to the Bridge Maintenance Program. This amendment will bring the total contract cost to $234,230.00. DISCUSSION: On January 22, 2008, (M&C C-22627), the City Council authorized an engineering agreement with TranSystems Corporation Consultants for engineering services related to bridge maintenance program. The proposed amendment will cover engineering services for rehabilitation of additional bridges as listed below: ,Stree Council i District i Riverside Drive Over Trinity River 8 North University Drive Over West Fork of Trinity River 9 East Fourth Street 'Over Trinity River 8 South University Drive North µBound Over Clear Fork of 9 Trinity_River ,South University Drive South Bound Over Clear Fork 9 i _ of Trinity River Long Avenue East Bound Over BNSF Rail _i 2 Road Long Avenue `West Bound Over BNSF Rail 2 Road Berry Street Over Sycamore Creek 8 'Seminary Drive East Bound Over Carter Park ' 8 Drive City staff has reviewed the proposal and considers this fee to be fair and reasonable for the scope of Logname: 20TRANSYS 2ADM Page 1 of 2 services proposAd. TranSystems Corporation Consultants is in compliance with the City's M/WBE Ordinance by committing to an additional 10 percent M/WBE participation on this Amendment No.1. The City's goal on this amendment is 10 percent. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budgets, as appropriated, of the Contract Street Maintenance Fund and the Specially Funded Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fu nd/Accou nt/C enters C291 531200 209260111330 $10,800.00 C293 531200 202260115430 $22,930.00 C293 531200 209260111430 $50,500.00 CERTIFICATIONS: Submitted for City Manager's Office bv_ Fernando Costa (8476) Originating Department Head: William Verkest (8255) Additional Information Contact: George Behmanesh (7914) ATTACHMENTS No attachments found. Logname: 20TRANSYS 2ADM Page 2 of 2