HomeMy WebLinkAboutContract 36657 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Teague, Nall and Perkins, (Engineer) made and entered into City Secretary Contract No. 34092 (the Contract) which was authorized by the City Council by M&C C-21722 on the 26th day of September, 2006; and WHEREAS, the Contract involves engineering services for the following project: South Pipeline Road at Post Oak Channel Bridge Replacement Capital Project No. 00258; DOE NO. 5406 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly-authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services as specified in a proposal letter dated February 5th, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $6,750. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 92,721 + $ 6,750 (Amendment No. 1) _ $ 99,471. 02-22-08 IN Contract Amendment No. 2 Page 1 of 2 �' `7(III17 '� ��U (IIII72r `\7 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the A�_ day of 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: . Douglas Rademaker, P.E. Fernando Costa,,taT►Aq Director, Department of Assistant City Manager Engineering Teague, Nall and Perkins. ENGINEER ATTEST: 0a A j \-'/� tL� Marty Hendri City Secretary ay: Ty Hilton, E. Vice President 1100 Macon Street Fort Worth, Texas 76102 APPROVED AS TO FORM AND LEGALITY: Amy sey Assistant City Attorney Contract Amendment No. 2 Page 2 of 2 Responsive Service. Reliable Results. X-mo TEAGUE NALL AND PERKINS Civil Engineering I Surveying Landscape Architecture Planning February 5, 2008 Mr. Joseph Bergeron, P.E. Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: SOUTH PIPELINE ROAD AT POST OAK CHANNEL BRIDGE REPLACEMENT CITY PROJECT NO. 00258 TNP No. FTW 06290 Dear Mr. Bergeron: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to prepare ROW Acquisition Documents In order to provide a culvert crossing that will provide for increased capacity and channel modifications, one (1) drainage easement is required on the discharge side of the culvert. Paving modifications require three (3) right-of-way parcels along the south limits of the project as well as one (1) embankment easement on the north side of the project. are required in the vicinity of the culvert crossing. The following fees include applicable field survey, preparation of metes and bounds,exhibits,and setting iron rods at property corners. ■ ROW and Easement Documents(5 total) $ 6,750 Total Contract Amendment No. 1: $ 6,750 Summary of Contract Fee: Original Contract Amount: $ 92,721 Amendment No. 1: $ 6,750 Revised Contract Amount $ 99,471 Thank you for consideration of this contract amendment request. If you have any questions,please do not hesitate to call me. Sincerely, TEAGUE N L AND PERKINS, INC. Mich ell aum, P.E. Copy: Mr. Ty Hilton, PE - TNP NcorpdsllprojedsUdflflw0629MdocskorMrecfl contract amend 01.doc 1100 Macon Street I Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax www mp-online.com Fort Worth - Dallas Denton