HomeMy WebLinkAboutContract 36657 AMENDMENT NO. 1
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and Teague, Nall and Perkins,
(Engineer) made and entered into City Secretary Contract No. 34092 (the
Contract) which was authorized by the City Council by M&C C-21722 on
the 26th day of September, 2006; and
WHEREAS, the Contract involves engineering services for the following
project:
South Pipeline Road at Post Oak Channel Bridge Replacement
Capital Project No. 00258; DOE NO. 5406
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised maximum
fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly-authorized representatives, enter into the following agreement
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services as specified in a proposal letter dated February 5th,
2008, a copy of which is attached hereto and incorporated herein. The cost
to City for the additional services to be performed by Engineer total $6,750.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $ 92,721 + $ 6,750
(Amendment No. 1) _ $ 99,471.
02-22-08 IN
Contract Amendment No. 2
Page 1 of 2 �'
`7(III17 '� ��U (IIII72r `\7
3.
All other provisions of the Contract, which are not expressly amended herein,
shall remain in full force and effect.
Executed on this the A�_ day of 2008, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
. Douglas Rademaker, P.E. Fernando Costa,,taT►Aq
Director, Department of Assistant City Manager
Engineering
Teague, Nall and Perkins.
ENGINEER
ATTEST:
0a A j \-'/�
tL�
Marty Hendri City Secretary
ay:
Ty Hilton, E.
Vice President
1100 Macon Street
Fort Worth, Texas 76102
APPROVED AS TO FORM AND LEGALITY:
Amy sey
Assistant City Attorney
Contract Amendment No. 2
Page 2 of 2
Responsive Service. Reliable Results.
X-mo TEAGUE NALL AND PERKINS
Civil Engineering I Surveying Landscape Architecture Planning
February 5, 2008
Mr. Joseph Bergeron, P.E.
Project Manager
Department of Engineering
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
RE: SOUTH PIPELINE ROAD AT POST OAK CHANNEL BRIDGE REPLACEMENT
CITY PROJECT NO. 00258
TNP No. FTW 06290
Dear Mr. Bergeron:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract
based on additional services requested. The following is a brief description and cost for the
additional services provided on this project:
Additional Services to prepare ROW Acquisition Documents
In order to provide a culvert crossing that will provide for increased capacity and channel
modifications, one (1) drainage easement is required on the discharge side of the culvert.
Paving modifications require three (3) right-of-way parcels along the south limits of the
project as well as one (1) embankment easement on the north side of the project. are
required in the vicinity of the culvert crossing. The following fees include applicable field
survey, preparation of metes and bounds,exhibits,and setting iron rods at property corners.
■ ROW and Easement Documents(5 total) $ 6,750
Total Contract Amendment No. 1: $ 6,750
Summary of Contract Fee:
Original Contract Amount: $ 92,721
Amendment No. 1: $ 6,750
Revised Contract Amount $ 99,471
Thank you for consideration of this contract amendment request. If you have any questions,please
do not hesitate to call me.
Sincerely,
TEAGUE N L AND PERKINS, INC.
Mich ell aum, P.E.
Copy: Mr. Ty Hilton, PE - TNP
NcorpdsllprojedsUdflflw0629MdocskorMrecfl contract amend 01.doc