Loading...
HomeMy WebLinkAboutContract 50015-AR5 CITY SECRETAR Y l VORTH� City of Fort Worth �CONTRACTNO. <P 500I��5 ��'� GF^ Construction Allowance Request J �hstrn'FDA# Date 12/5/2019 City Sec# 50015 project#(s)1 02693 FAC#(s)J 59601/39411/39412/34014-0600430/0200431-c02693 Project Name 2014 CIP Year 3 Contract 2 combined Paving,and Water Replacement in Como Neighborhood. Description Contractorl JLB Contracting City Inspector Gary Deyon Funding Water Unit 1 Paving Unit 2 Select Day Type Allocation Account Totals Original Contract Amount $1,748,001.05 $1,629,261.10 $3,377,262.15 300 Extras to Date $11,231.25 $11,231.25 84 Credits to Date Current Contract Amount $1,748,001.05 $1,640,492.35 $3,388,493.40 384 Amount of Proposed Allocation $0.00 $84,371.20 $84,371.20 Original Allowance Available for Allocation $100,000.00 $100,000.00 $200,000.00 Allowance Funds Previously Allocated $1,250.00 $10,750.00 $12,000.00 Remaining Funds Available for this Allocation $98,750.00 $89,250.00 $188,000.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:This construction allowance for intersection improvements at Goodman and Prevost requested by Stormwater Division to alleviate some flooding problem occurring at 5301 Goodman Ave:The request was received after the Final Inspection for this project,so the unit prices as part of this allowance include remobilization and traffic control items. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Date Date 1216/2019 P t Date Asst -A . FORT WORTHS. City of Fort Worth Construction Allowance Request Construction FOA# -5—� Date 12/5/2019 City Sec# 50015 Client Project#(s)J 02693 FAC#(s)I 59601/39411/39412/34014-0600430/0200431-c02693 Project Name 2014 CIP Year 3 Contract 2 combined Paving,and Water Replacement in Como Neighborhood. Description Contractorl JLB Contracting City Inspector Gary Deyon ADDITIONS ITEM DESCRIP I ION ep y unitUnits o a one valley gutter amongtUm II Unclassified Excavation a ex se Paving Unit I Asphalt wn F Water Unit 1 0.00 Paving Unit 2 $84,371.20 Sub Total Additions 7 . Change Order Additions Page 3 of 5 FORT WORTH. City of Fort Worth Construction Allowance Request Construction FDA# 5—� Date 12/5/2019 City Sec# 50015 Client Project#(s)l 02693 FAC#(s)1 59601/39411/39412/34014-0600430/0200431-c02693 Project Name 2014 CIP Year 3 Contract 2 combined Paving,and Water Replacement in Como Neighborhood. Description Contractor JLB Contracting City Inspector Gary Deyon CONSTRUCTION ALLOWANCE ITEMS TO 6E REDUCED ITEM DIEKKIP I ION DepVFAG Oty Unit Uni os I o a avmg ns ruc ion owance aving Unit Water Unit 1 0.00 Paving Unit 2 $84,371.20 Sub Total DeletUn—s 7 . Change Order Deletions Page 1 of 1 MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests co# DATE AMOUNT Total $0.00 � > z4 P ' G t G O, e o nr� � b E �,c y �Z c p • � � •.. L 9 N .o. 0 rye■ � � �, a P � �T � � €�ga � � �€os p� � � � $ � C � C C L L � a .2 •Y� 9 �90 Q .^ + .� � .y � � a o � � a yS 8 E 4 r C S C S ^� , • L J - • • i - —• -• • O f0 m CL J O - O R + + @ 1 • 6 s w 0 IWL U. fSj ISj Y� s s U _ .vw z { J J � 0 E � Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Gt✓ Name f Employee/Signature Title U ❑ This form is N/A as No City Funds are associated with this Contract- Printed Name Signature UFFiCUAL RECORD CITY SECRETARY